New Units for SALE/TO

Total Page:16

File Type:pdf, Size:1020Kb

New Units for SALE/TO New units FOR SALE/TO LET 6,243 to 39,558 sq ft (580 to 3,675 sq m) A new development of industrial warehouse units situated in a prime location on the Brimsdown Industrial Area in Enfield, North London. www.enfieldthegrid.com UNITS AVAILABLE Q3 2017 LOCKFIELD AVENUE | ENFIELD | EN3 7PX A range of flexible units ideally suited for serving the North and Central London markets and the wider South East Enfield’s strategic location with easy access to the M25 and A406, plus central London, London airports and public transport network has attracted a diverse industrial and distribution base. It is home to over 10,000 logistics and industrial businesses employing nearly 90,000 people. Images of other speculative developments carried out by Chancerygate Accommodation Planning use Unit Ground Floor First Floor TOTAL* B1 (c), B2 and B8 (industrial and warehouse) uses. (sq ft) (sq ft) (sq ft) Unit 1 21,743 2,799 24,542 (2,280 sq m) Unit 2 12,540 2,476 15,016 (1,395 sq m) Unit 3 5,070 1,173 6,243 (580 sq m) Green credentials Unit 4 5,404 1,259 6,663 (619 sq m) Chancerygate employ the latest environmentally friendly technologies Unit 5 UNDER OFFER Sliding Gate to reduce the costs of occupation. The scheme will ensure a minimum *Areas are approximate on a GEA basis 35% decrease in CO2 emissions over 2010 Buildings Regulations and achieve a BREEAM rating of “Very Good”. As a result occupation costs 36m General specification to the end user will be reduced. The green initiatives will include: • Photovoltaic Panels (Units 1, 2 and 5) • 8.4m clear internal heights • Low air permeability design • Full height electric loading doors • Electric vehicle charging points • 37.5kN per sq m floor loading • 15% warehouse roof lights increasing natural lighting • Unit 1 benefits from a self-contained • High performance insulated cladding and roof materials secure yard BRANCROFT WAY • Secure cycle parking • First floor for additional storage 1 or fitting out as offices • 15% warehouse roof lights • Gated secure estate 36m 2 Sliding Gate 5 UNDER OFFER 4 3 Images of other speculative developments carried out by Chancerygate LOCKFIELD AVENUE Location Terms M25 25 M25 Capel Manor The Freehold of the units are available WHI TEWEBB College SMOOR LN S Gardens ULL M25 Lockfield Avenue is located just off Mollison Avenue (A1055) in the heart L B for sale. Leasehold options will be N of the Brimsdown Industrial Estate within the second largest industrial/ MOLLISONN AVE Bullsmoor considered subject to covenant strength. 0 S 1 warehouse area in London. Its position provides an ideal location for S A O D R R companies looking to deliver services and provide “just in time” logistical C D More information available S R ’ E O L support into the capital. V F through the joint selling agents: L T A U R N B E O H S TURKEY I The local road network offers excellent access. The A1055 links the site STREET L Forty Hall L Country O ENFIELD to the A406 North Circular (4 miles south) and the A10 providing directPark L 0 M L LOCK I 1 H 0 1 access into Central London (12 miles). The M25 (J25) is located 4 milesY T D A R A O north and the M11 Motorway is 8 miles to the east. F O R Hoe Green E Albany Park Park G D I E The location is served by Brimsdown Rail station which is within R V B A M N walking distance and provides regular services into London Liverpool A O C IS A C L RT D L E T R O RIVER LEE NAVIGATION Street and the West End via Tottenham Hale (Victoria Line) and north A R M ROFT W D C A H E N A Y A R R R T B Jack Booth Richard Sullivan O to Stansted Airport. C G H F T L [email protected] [email protected] R N D CA E E RTERHATCH LN AV L H E I 07807 999 558 07799 413 721 A10 F A1184 K C O L M L A L I R M S H A1(M) E L A414 AN A414 E 0 G V RE 1 E A N HARLOW 0 S T N 1 HATFIELD RIVER LEA A O BRIMSDOWN M11 S ST ALBANS A10 I 0 L 1 Durrants A414 L A Park A414 O SAT NAV M A414 A1(M) M1 EN3 7PX M25 M25 Travel distances M25 M25 M11 A1 BY ROAD: WATFORD BARNET ENFIELD Ivan Scott Peter Ley A10 M1 A406 4 miles/8 mins M1 J1 12 miles/26 mins [email protected] [email protected] A1055 M25 J25 4 miles/10 mins Central London 12 miles/38 mins 07342 880685 07717 730 876 M1 A406 A10 M11 J4 8 miles/15 mins A1 A development by: A12 ROMFORD BY RAIL: A503 A406 A41 A406 A12 A1 WEMBLEY STRATFORD Brimsdown Stn 1.3 miles/5 mins walk (to London Liverpool Street: 22 mins) DAGENHAM Alastair King A40 A10 Enfield Town 3 miles/8 mins (to London Liverpool Street: 33 mins) A501 [email protected] A40 A13 Tottenham Hale 4.7 miles/11 mins (Victoria Line to Central London: 17 mins) A5 A13 07748 324 966 CENTRAL A406 LONDON M4 AIRPORTS: Misrepresentation Act 1967. Every care has been A102 taken in the preparation of these details, however any intending occupier should satisfy themselves of City 15 miles/28 mins the correctness of each statement contained herein. Stansted 28 miles/39 mins They are expressly excluded from any contract. All measurements and distances are approximate. VAT www.enfieldthegrid.com Heathrow 43 miles/53 mins may be applicable to rent/price quoted. November 2016..
Recommended publications
  • New Units To
    NEW UNITS TO LET 5,869 to 45,788 sq ft (545 to 4,254 sq m) A new development of industrial/warehouse units situated in a prime location on the Brimsdown Industrial Area in Enfield, North London. www.enfieldthegrid.com ONLY FOUR UNITS REMAINING LOCKFIELD AVENUE | ENFIELD | EN3 7PX A range of flexible units ideally suited for serving the North and Central London markets and the wider South East Enfield’s strategic location with easy access to the M25 and A406, plus Central London, London airports and public transport network has attracted a diverse industrial and distribution base. It is home to over 10,000 logistics and industrial businesses employing nearly 90,000 people. Accommodation Terms General specification Unit Ground First TOTAL* The units are available on new leases with full terms • 8.4m clear internal height No. Floor (sq ft) Floor (sq ft) (sq ft) upon application. • Full height electric loading doors 1 LET 24,696 • 37.5kN per sq m floor loading 104 LET 15,070 • Fully fitted first floor offices 90 5,278 1,243 6,521 • Gated secure estate 92 5,510 1,298 6,808 Sliding Gate • 3 phase power supply 94 4,750 1,119 5,869 • Potential for mezzanine floors 96 4,790 1,129 5,919 98 UNDER OFFER 6,337 36m 100 LET 6,743 102 LET 7,591 Green credentials TOTAL 85,554 The scheme employs the latest environmentally friendly technologies *Areas are approximate on a GEA basis. to reduce the costs of occupation and will ensure a minimum 35% Units can be combined.
    [Show full text]
  • Welcome to This A14 Cambridge to Huntingdon Improvement Scheme Public Exhibition. This Exhibition Is About the Work We Are Doing
    A14 Cambridge to Huntingdon improvement scheme A1 Welcome Alconbury D3 Woolley A141 S2 Huntingdon St Ives A14 Town centre improvements including removal of A14 viaduct Ellington D3 The Hemingfords Brampton D2 Existing A14 Godmanchester Fenstanton Fen Drayton Proposed A14 Swavesey Buckden D3 D3 D2 The Offords A1 Northstowe Hilton Conington New development S2 A1198 D3 Boxworth Lolworth Histon Bar Hill D4 Milton Girton A14 D3 M11 Routes for construction traffic East Coast Mainline railway Cambridge River Great Ouse A428 Huntingdon Southern Bypass S2 Single 2 lane carriageway A1 widening D2 Dual 2 lane carriageway A14 on-line improvements D3 Dual 3 lane carriageway Cambridge Northern Bypass D4 Dual 4 lane carriageway Local access roads © Crown copyright and database rights 2016 Ordnance Survey 100030649 Highways England, creative S160069 Welcome to this A14 Cambridge to Huntingdon improvement scheme public exhibition. This exhibition is about the work we are doing in Huntingdon as part of the A14 Cambridge to Huntingdon improvement scheme. Members of the project team are here to answer any questions you might have. Thank you Highways England – Creative BED19_0157 A14 Cambridge to Huntingdon improvement scheme Why is the scheme necessary? The A14 provides an east- west route linking the Midlands with East Anglia. It begins at Catthorpe near Rugby, where it connects with the M1 and M6 motorway, and continues east for approximately 130 miles to the port town of Felixstowe. It forms one of the UK’s strategic routes and is part of the Trans-European Transport Network. The A14 between Cambridge and Huntingdon serves an additional purpose, connecting the A1(M) motorway to the North The scheme will: of England with the M11 motorway � combat congestion, making the to London and the South East.
    [Show full text]
  • Employment & Regeneration in LB Enfield
    Employment & Regeneration in LB Enfield September 2015 DRAFT 1 Introduction • LB Enfield and Enfield Transport Users Group (ETUG) have produced a report suggesting some large scale alterations to the bus network. One of the objectives of the report is to meet the demands of the borough’s housing and regeneration aspirations. • TfL have already completed a study of access to health services owing to a re-configuration of services between Chase Farm, North Middlesex and Barnet General Hospital and shared this with LB Enfield. • TfL and LB Enfield have now agreed to a further study to explore the impact of committed development and new employment on bus services in the borough as a second phase of work. 2 DRAFT Aims This study will aim to: •Asses the impact of new housing, employment and background growth on the current network and travel patterns. •Highlight existing shortfalls of the current network. •Propose ideas for improving the network, including serving new Developments. 3 DRAFT Approach to Study • Where do Enfield residents travel to and from to get to work? • To what extent does the coverage of the bus network match those travel patterns? • How much do people use the bus to access Enfield’s key employment areas and to what extent is the local job market expected to grow? • What are the weaknesses in bus service provision to key employment areas and how might this be improved? • What is the expected growth in demand over the next 10 years and where are the key areas of growth? • What short and long term resourcing and enhancements are required to support and facilitate growth in Enfield? 4 DRAFT Methodology •Plot census, passenger survey and committed development data by electoral ward •Overlay key bus routes •Analyse existing and future capacity requirements •Analyse passenger travel patterns and trip generation from key developments and forecast demand •Identify key issues •Develop service planning ideas 5 DRAFT Population Growth According to Census data LB Enfield experienced a 14.2% increase in population between 2001 and 2011 from 273,600 to 312,500.
    [Show full text]
  • Queens' College Back
    PUBLIC TRANSPORT M11 NORTH- Cambridge A1307 London HUNTINGDON, A1, A14 DIRECTIONS By Rail, Cambridge Station. Newmarket M11 Situated on the south side of the city, has N Felixstowe A14 Leave the M11 motorway at Junction 12 and follow the signs for Cambridge A603; regular services to London (Kings Cross GET IN LANE Harwich * Follow this road, including a forced left-turn at traffic lights (at Grantchester Street) Ely (A10) and Liverpool Street) with a non stop N'market C'bridge until you reach a roundabout; journey time of approximately 55 minutes. M1 A14 A1307 * From 06:00 to 10:00 only, go straight across (first exit) into Newnham Road; For information on train times and * At traffic lights, turn right into Silver Street and pass through bollards: Queens' 1 31 operators call National Rail Enquiries on College entrances are on the left. 0845 7484950. * At other times, turn right (second exit) onto Fen Causeway, part of the Ring Road Cambridge Newmarket A1134; By Bus, Felixstowe A1307 Coach services run regularly from Stansted, A14 Harwich * At a mini-roundabout by the Royal Cambridge Hotel, turn left and keep in the left Heathrow and Gatwick Airports. A A14 lane; 13 Ely 0 * Go straight across an immediate second mini-roundabout (at Lensfield Road), to 7 (A10) By Air, Stansted Airport. 428 head north up Trumpington Street; A Is approximately a 40 minute journey by * Go straight past the Mill Lane/Pembroke Street junction; M11 car. Train services run from Stansted Airport * At Silver Street, take a forced left turn (King's Parade is closed to motor traffic); Junction 14 Ring road Ring road and run hourly (journey time 30 minutes).
    [Show full text]
  • Services Between Enfield Lock and Tottenham Hale
    Crossrail 2 factsheet: Services between Enfield Lock and Tottenham Hale New Crossrail 2 services are proposed to serve Tottenham Hale, Northumberland Park, Angel Road, Ponders End, Brimsdown and Enfield Lock, with between 10 and 12 trains per hour in each direction operating directly to, and across, central London. What is Crossrail 2? Why do we need Crossrail 2? Crossrail 2 is a proposed new railway serving London and On the West Anglia Main Line, local stopping services and the wider South East that could be open by 2030. It would faster services from Cambridge and Stansted Airport all connect the existing National Rail networks in Surrey and compete for space on the line. This limits the number of Hertfordshire with trains running through a new tunnel trains that can call at local stations, and extends journey from Wimbledon to Tottenham Hale and New Southgate. times to and from the area. Crossrail 2 will connect directly with National Rail, Liverpool Street and Stratford stations also currently face London Underground, London Overground, Crossrail 1, severe capacity constraints. It is forecast that by 2043 High Speed 1 international and domestic and High Speed 2 demand for rail travel on this line will have increased by 39%. services, meaning passengers will be one change away There is currently no spare capacity for additional services. from over 800 destinations nationwide. Crossrail 2 provides a solution. It would free up space on the railway helping to reduce journey times for longer distance Crossrail 2 in this area services, and would enable us to run more local services to central London.
    [Show full text]
  • Winchmore Hill
    Enfield Society News No. 194, Summer 2014 Enfield’s ‘mini-Holland’ project: for and against In our last issue we discussed some of the proposals in Enfield Council’s bid under the London Mayor’s “mini-Holland” scheme to make the borough more cycle-friendly. On 10th March the Mayor announced that Enfield was one of three boroughs whose bids had been selected and that we would receive up to £30 million to implement the project. This provides a great opportunity to make extensive changes and improvements which will affect everyone who uses our streets and town centres, but there is not unanimous agreement that the present proposals are the best way of spending this money. The Council has promised extensive consultations before the proposals are developed to a detailed design stage, but it is not clear whether there are conditions attached to the funds which would prevent significant departures from the proposals in the bid. The Enfield Society thinks that it would be premature to express a definitive view until the options have been fully explored, but we are keen to participate in the consultation process, in accordance with the aim in our constitution to “ensure that new developments are environmentally sound, well designed and take account of the relevant interests of all sections of the community”. We have therefore asked two of our members to write columns for and against the current proposals, in order to stimulate discussion. A third column, from the Enfield Town Conservation Area Study Group, suggests a more visionary transformation of Enfield Town. Yes to mini-Holland! Doubts about mini- Let’s start with the people of Enfield.
    [Show full text]
  • 2019 Annual Report Annual 2019
    a force for good. 2019 ANNUAL REPORT ANNUAL 2019 1, cours Ferdinand de Lesseps 92851 Rueil Malmaison Cedex – France Tel.: +33 1 47 16 35 00 Fax: +33 1 47 51 91 02 www.vinci.com VINCI.Group 2019 ANNUAL REPORT VINCI @VINCI CONTENTS 1 P r o l e 2 Album 10 Interview with the Chairman and CEO 12 Corporate governance 14 Direction and strategy 18 Stock market and shareholder base 22 Sustainable development 32 CONCESSIONS 34 VINCI Autoroutes 48 VINCI Airports 62 Other concessions 64 – VINCI Highways 68 – VINCI Railways 70 – VINCI Stadium 72 CONTRACTING 74 VINCI Energies 88 Eurovia 102 VINCI Construction 118 VINCI Immobilier 121 GENERAL & FINANCIAL ELEMENTS 122 Report of the Board of Directors 270 Report of the Lead Director and the Vice-Chairman of the Board of Directors 272 Consolidated nancial statements This universal registration document was filed on 2 March 2020 with the Autorité des Marchés Financiers (AMF, the French securities regulator), as competent authority 349 Parent company nancial statements under Regulation (EU) 2017/1129, without prior approval pursuant to Article 9 of the 367 Special report of the Statutory Auditors on said regulation. The universal registration document may be used for the purposes of an offer to the regulated agreements public of securities or the admission of securities to trading on a regulated market if accompanied by a prospectus or securities note as well as a summary of all 368 Persons responsible for the universal registration document amendments, if any, made to the universal registration document. The set of documents thus formed is approved by the AMF in accordance with Regulation (EU) 2017/1129.
    [Show full text]
  • A428 Black Cat to Caxton Gibbet Improvements
    A428 Black Cat to Caxton Gibbet improvements TR010044 Volume 6 6.8 First Iteration Environmental Management Plan Planning Act 2008 Regulation 5(2)(a) Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 26 February 2021 A428 Black Cat to Caxton Gibbet improvements First Iteration Environmental Management Plan Infrastructure Planning Planning Act 2008 The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 A428 Black Cat to Caxton Gibbet improvements Development Consent Order 202[ ] First Iteration Environmental Management Plan Regulation Reference: Regulation 5(2)(a) Planning Inspectorate Scheme TR010044 Reference Application Document Reference TR010044/APP/) 6.8 Author A428 Black Cat to Caxton Gibbet improvements Project Team, Highways England Version Date Status of Version Rev 1 26 February 2021 DCO Application Planning Inspectorate Scheme Ref: TR010044 Application Document Ref: TR010044/APP/6.8 A428 Black Cat to Caxton Gibbet improvements Environmental Statement – First Iteration Environmental Management Plan Table of contents Chapter Pages 1 Introduction and background to the Scheme 1 1.1 Purpose of the Environmental Management Plan 1 1.2 The Scheme 4 1.3 Scheme Objectives 7 2 Project team roles and responsibilities 9 2.1 Site roles and responsibilities 9 3 Environmental actions and commitments 15 3.1 Introduction 15 3.2 Guide to the REAC tables 15 4 Consents and permissions 35 4.1 Consents and Agreements Position Statement 35 5 Environmental asset data and as
    [Show full text]
  • Impact of Improvements in the Road Network on the Accessibility & Economic Potential of Counties, Urban Areas, Gateways &
    Transport Research & Information Note Impact of Improvements in the Road Network on the Accessibility & Economic Potential of Counties, Urban Areas, Gateways & Hubs March 2012 Transportation Research & Information Notes Impact of Improvements in the Road Network on the Accessibility & Economic Potential of Counties, Urban Areas, Gateways & Hubs March 2012 This document is available to download at www.nra.ie/publications/trin For further queries please contact: Strategic Planning Unit National Roads Authority St Martin’s House Waterloo Road Dublin 4 Tel: (01) 660-2511 Email: [email protected] Web: www.nra.ie Prepared on behalf of the National Roads Authority by The AECOM Consortium Impact of Improvements in the Road Network on the Accessibility & Economic Potential of Counties, Urban Areas, Gateways & Hubs Contents 1. Introduction ........................................................................................................ 1 2. Accessibility, Effective Density & Productivity ................................................... 1 3. Methodology ...................................................................................................... 6 4. Accessibility to Employment & Population 2006 ................................................ 9 5. The Impact on Accessibility to Employment & Economic Productivity............. 15 6. Implications for Roads Policy, Planning and Research ................................... 23 Impact of Improvements in the Road Network on the Accessibility & Economic Potential of Counties, Urban Areas, Gateways
    [Show full text]
  • 58B Alexandra Road, Brimsdown, ENFIELD, EN3 7EH
    Freehold Vehicle Repair Garage / Workshop For Sale - Enfield EN3 58b Alexandra Road, Brimsdown, ENFIELD, EN3 7EH Area Gross Internal Area: 305 sq.m. (3,282 sq.ft.) Price Guide Price £475,000 subject to contract Property Description The property comprises predominantly single storey motor-trade workshop and yard. The property is currently configured to accommodate a small customer and reception area, WCs and offices.There is a small mezzanine above the offices used for additional storage. The workshop has a spray booth & associated extraction, 2 x vehicle ramps and a ceiling mounted Reznor space heater, which we have been advised are all in working order. The workshop is accessed via a single electronically operated loading door. Key considerations > Rarely available freehold vehicle repair garage / workshop with vacant possession > Gross internal area: 304.97 sq.m (3,283 sq.ft) > Forecourt and side yard: 164.11 sq.m (1,766 sq.ft) > 2 x vehicle ramps and spay booth with extraction > Separate office, reception area, WCs and spray booth > Eaves Height 3.36 m. Apex 5.56 m > Electrically operated loading load 3.04 m high x 4.14 m wide > Medium term development potential with possible future redevelopment of the Alma Road Industrial Estate > Excellent transport communications > Great Cambridge Road (A10) 1.6 kilometres (0.99 miles) > M25 motorway 3.75 kilometres (2.33 miles) https://www.gilmartinley.co.uk/properties/for-sale/car-repairs/brimsdown/enfield/en3/27956 Our ref: 27956 Freehold Vehicle Repair Garage / Workshop For Sale - Enfield EN3 Accommodation Accommodation Area sq.m. Area sq.ft. Comments Ground Floor 284.87 3,066 Mezzanine 20.10 216 Forecourt and Side Yard 164.11 1,766 Property Location The subject property is located off the east of Alexandra Road via a vehicular accessway to the southern side of Blu- Ray House within the well established Alma Road Industrial Estate, only 3.0 kilometres (1.86 miles) to the east of Enfield Town Centre.
    [Show full text]
  • Hard Shoulder Running E40 and Weaving Segments E314
    Arc Atlantique Traffic Management Corridor Annex 1 Evaluation reports www.easyway-its.eu TABLE OF CONTENTS 1. FL-01: Hard shoulder running E40 and weaving segments E314 2. FL-02: Hard shoulder running E19 Kleine Bareel – St.-Job-in-‘t-Goor 3. WL-03: Management and transit traffic on Walloon motorways 4. FR-05: Intelligent Truck Parking 5. FR-16: Traffic Management Plans 6. IE-01: MIU ITS Deployment 7. NL-01: Field test Amsterdam 8. PT-..: Monitoring Enhancement on critical segments – to be delivered 9. PT-03: System Enhancements 10. E01: AG-64 Traffic Control and Traffic Management ITS deployment 11. E02: AG-55 Traffic Control and Traffic Management ITS deployment 12. ES-20: Floating Car Data use 13. ES-21: Analysis and evaluation of different traffic management strategies in order to reduce the congestions in Bilbao peri-urban area 14. UK 02: M25 J 5 – 7 Variable Speed Limit, All lane Running / Hard Shoulder Running 15. UK 03: M25 J 23 – 27 Variable Speed Limit, All lane Running / Hard Shoulder Running 16. UK ..: Welsh National Traffic Data System – to be delivered Arc Atlantique Evaluation report – Annex 1 2/2 Hard Shoulder Running and Weaving Segments Belgium –E40/E314 – Brussel - Aken Project Reference: FL-01 Project Name: Hard shoulder running E40 and weaving segments E314 ITS Corridor: E40/E314 Brussel - Aken Project Location: Belgium – E40/E314 Leuven Area 1. DESCRIPTION OF THE PROBLEM ADDRESSED BY THE PROJECT 1.1 Nature of the Site The R0, E40 and E314 in this report are part of a highway connection between the cities of Brussels-Lummen (E314), and Brussels-Luik (E40).
    [Show full text]
  • Chigwell Lane M11 M11 Off-Slip
    Site Report Essex Highways Casualty ReductionDate Site April Report 201 8/19 Date April 2007 Locat ion: CHIGWELL LANE A1168 M11 MOTORWAY M11 District: EPPING Collision Investigation Period: 01/01/2014 – 30/06/2017 Site Ranking: 8 1.0 Site Plan with Collision Plot Chigwell Lane M11 Off-slip M11 Page 1 of 9 2.0 Site Description & Observations Details Description/Observations Road Name (s) Chigwell Lane A1168 jw M11 Northbound Off-slip Grid Reference 544308 - 195621 Speed Limit 40 Street Lit Yes Carriageway type Dual Gradient None Traffic Management / Advanced directional sign and ‘End of Motorway‘ signs on off-slip, Give Existing Traffic Way signs and carriageway markings at junction. Calming Utilities Present Unknown Existing TRO’s 40mph speed restriction. No U-turn Road Surface SCRIM Data (WIP): Good Condition Signing 40 roundel signs, No Entry signing at end of Off-slip Road Markings Clear and appropriate Visibility Good forward visibility to junction with off-slip Vegetation Vegetation within Off-slip embankment Highway Is the scheme within Yes Boundary / Land Highway boundary or (*if the land is not highway the No scheme should only proceed to & Ownership on land owned by feasibility design & land Check ? ECC(*) acquisition/dedication stage) Does the scheme require change to an existing No TRO or Speed Limit Other 3.0 Pers onal Injury Collision Analysis Cluster Site Collision COLLISIONS CASUALTIES Information FATAL SERIOUS SLIGHT FATAL SERIOUS SLIGHT 1 2 3 1 2 5 Identified Collision COLLISIONS CASUALTIES Pattern(s) at Cluster Site FATAL SERIOUS SLIGHT FATAL SERIOUS SLIGHT Vehicles exiting the Off-slip 0 2 2 0 2 4 failing to give way at the junctions and colliding with northbound road users on Chigwell Lane.
    [Show full text]