Route Maps & Schedules

Total Page:16

File Type:pdf, Size:1020Kb

Route Maps & Schedules Route Maps & Schedules oregon-point.com/route-landing/ Cascades (Portland-Eugene) The Cascades Route provides daily bus service between Downtown Portland and the University of Oregon in Eugene, serving 5 cities and making a total of 6 stops. Click address for map 5541 5501 5503 5545 5517 5547 5507 Schedule Notes Mon-Fri Sat, Sun, Only Holiday Portland 6:00 am 11:10 12:25 1:30 pm 3:15 pm 7:00 pm 10:00 pm Union Station am pm 800 NW Sixth Ave. Portland, OR 97209 Woodburn 12:05 1:25 pm 2:25 pm 4:10 pm 8:10 pm Memorial Transit pm Facility 2895 Newberg Hwy. Woodburn, OR 97071 Salem 7:15 am 12:30 1:55 pm 2:55 pm 4:35 pm 8:35 pm 11:25 pm Amtrak Station pm 500 13th St. SE Salem, OR 97301 Albany 7:50 am 1:10 pm 2:30 pm 3:25 pm 5:30 pm 9:15 pm 12:05 pm Amtrak Station 110 10th Ave. SW Albany, OR 97321 Eugene 8:40 2:00 3:20 4:05 6:20 10:05 12:40 Amtrak Station am* pm* pm* pm* pm* pm* am* 433 Willamette St. Eugene, OR 97401 1/3 Click address for map 5541 5501 5503 5545 5517 5547 5507 University of Oregon 8:50 am 2:15 pm 3:35 pm 4:20 pm 6:35 pm 10:20 pm 12:50 am Hayward Field 1515 Agate St. Eugene, OR 97403 * = No boardings at this stop. Bus will only stop to drop off passengers and may leave before the time shown. NOTE: The 5501, 5517, and 5507 southbound buses are subject to delays leaving Portland as a result of the Amtrak Cascades trains arriving from Seattle. When trains arrive late to Union Station we are required to delay our departure so that train passengers can board our buses. We apologize for the inconvenience this causes. Please contact us or see the Union Station staff if your wait time is longer than 30 minutes. Portland to Eugene (Northbound) Click address for map 5502 5544 5504 5518 5528 5506 5548 Schedule Notes Sat, Sun, Mon-Fri Holiday Only University of Oregon 5:00 am 7:00 am 8:00 am 10:40 12:00 pm 1:45 pm 5:30 pm Hayward Field am 1515 Agate St. Eugene, OR 97403 Eugene 5:15 am 7:15 am 8:15 am 10:55 12:15 pm 2:00 pm 5:45 pm Amtrak Station pm 433 Willamette St. Eugene, OR 97401 Albany 6:10 am 8:05 am 9:10 am 11:45 1:05 pm 2:55 pm 6:35 pm Amtrak Station pm 110 10th Ave. SW Albany, OR 97321 Salem 6:45 am 8:40 am 9:50 am 12:25 1:40 pm 3:25 pm 7:15 pm Amtrak Station pm 500 13th St. SE Salem, OR 97301 2/3 Click address for map 5502 5544 5504 5518 5528 5506 5548 Woodburn 7:05 am 9:10 am 10:20 12:55 3:55 pm 8:10 pm Memorial Transit am pm Facility 2895 Newberg Hwy. Woodburn, OR 97071 Portland 7:50 am 10:00 11:05 1:40 pm 2:50 pm 4:40 pm 9:00 pm Union Station am am 800 NW Sixth Ave. Portland, OR 97209 3/3.
Recommended publications
  • Union Station Conceptual Engineering Study
    Portland Union Station Multimodal Conceptual Engineering Study Submitted to Portland Bureau of Transportation by IBI Group with LTK Engineering June 2009 This study is partially funded by the US Department of Transportation, Federal Transit Administration. IBI GROUP PORtlAND UNION STATION MultIMODAL CONceptuAL ENGINeeRING StuDY IBI Group is a multi-disciplinary consulting organization offering services in four areas of practice: Urban Land, Facilities, Transportation and Systems. We provide services from offices located strategically across the United States, Canada, Europe, the Middle East and Asia. JUNE 2009 www.ibigroup.com ii Table of Contents Executive Summary .................................................................................... ES-1 Chapter 1: Introduction .....................................................................................1 Introduction 1 Study Purpose 2 Previous Planning Efforts 2 Study Participants 2 Study Methodology 4 Chapter 2: Existing Conditions .........................................................................6 History and Character 6 Uses and Layout 7 Physical Conditions 9 Neighborhood 10 Transportation Conditions 14 Street Classification 24 Chapter 3: Future Transportation Conditions .................................................25 Introduction 25 Intercity Rail Requirements 26 Freight Railroad Requirements 28 Future Track Utilization at Portland Union Station 29 Terminal Capacity Requirements 31 Penetration of Local Transit into Union Station 37 Transit on Union Station Tracks
    [Show full text]
  • Passenger Rail Needs Assessment
    Oregon State Rail Plan Passenger Rail Needs Assessment draft report prepared for Oregon Department of Transportation prepared by Cambridge Systematics, Inc. March 31, 2014 www.camsys.com draft Oregon State Rail Plan Passenger Rail Needs Assessment prepared for Oregon Department of Transportation prepared by Cambridge Systematics, Inc. 555 12th Street, Suite 1600 Oakland, CA 94607 date March 31, 2014 Oregon State Rail Plan DRAFT Passenger Rail Needs Assessment Table of Contents 4.0 Passenger Rail Needs Assessment ................................................................... 4-1 4.1 Existing Intercity Passenger Rail Service................................................. 4-1 4.2 Existing Passenger Rail System Performance ....................................... 4-10 4.3 Cascades Corridor Physical and Operational Needs .......................... 4-18 4.4 Other Potential Corridors ........................................................................ 4-22 4.5 Summary .................................................................................................... 4-29 Cambridge Systematics, Inc. i 8053-084 Oregon State Rail Plan DRAFT Passenger Rail Needs Assessment List of Tables Table 4.1 Oregon Intercity Passenger Rail Stations .............................................. 4-2 Table 4.2 Intercity Passenger Rail Ridership to and from Oregon Stations as a Percent of Total Ridership, FY 2012 ............................................... 4-6 Table 4.3 Destinations of Amtrak Trips Originating at Oregon Stations as a Percent of
    [Show full text]
  • 2021 Train Trek to Ellensburg
    2021 Train Trek to Ellensburg August 21, 2021 Patrick Carnahan, Co-Executive Director Charles Hamilton, Co-Executive Director 1 2021 Train Trek Thursday, August 12 Wednesday, August 18 ● Edmonds ● Pacific Northwest Rail Forum Big ● Everett Sky, MT Friday, August 13 Thursday, August 19 ● Leavenworth ● Spokane ● Wenatchee Friday, August 20 Saturday, August 14 ● Cheney ● Yakima ● Ritzville ● Toppenish ● Tri-Cities Saturday, August 21 Sunday, August 15 ● Ellensburg ● Cle Elum: AAWA Annual Picnic ● Walla Walla ● Clarkston-Lewiston 2 2021 Train Trek Sponsors ● Ford Hill ● Horace Horton ● Bill Jenkin ● Liz Knapke ● Robert Krebs ● Matt Boehnke ● Bob Lawrence ● John Bowen ● Duncan McRayde ● Boyce Burdick ● Mark Meyer ● John Carlin ● In Memory of Jim Neal ● David Clinton ● Janice Rudnitski ● Edward Cohen ● Maricela Sanchez ● John Crowley ● Riley Shewak ● Carl Fowler ● John R. Smith ● Maradel Gale ● Jack Staples ● Larry Glickfeld ● Thomas & Lael White ● Robert Gorski ● Gary Wirt ● Barry Green ● Warren Yee ● Glenda Hanson ● Larry Yok 3 Who is All Aboard Washington? • Champions of better passenger and freight rail service in the Pacific Northwest for over 40 years • Nonprofit advocacy organization of citizens, businesses, and other goal-oriented groups What We’ll Talk About Today 1. Connecting Our ‘3 Es’ to Transportation 2. AAWA’s Current Efforts a. East-West Stampede Pass Rail Service b. Restoring and Improving Cascades Service 3. How You Can Help 5 What is World-Class Transportation? It’s More Than Just Trains It Really Boils Down to One Simple Question Is it reasonably easy to get from here to there? Most of the Time, It Isn’t... Today’s Reality in Central Washington Tire chains, traffic, and an empty wallet.
    [Show full text]
  • Amtrak Cascades Train 501 Derailment - Dec
    Amtrak Cascades Train 501 Derailment - Dec. 18, 2017 Last Updated: Dec. 18, 2017 at 3 p.m. ET Where did the derailment of Amtrak Cascades Train 501 occur? The derailment occurred in DuPont, Wash., where the railroad crosses I-5 southwest of the Eagles Pride Golf Course – at railroad milepost 19.79. The railroad bridge crosses the highway just west of where Mounts Rd SW and Nisqually Rd SW meet and also cross I-5. What time did the derailment occur? It occurred at approximately 7:34 a.m. Pacific Time. Who owns the tracks where the derailment occurred? The track where the derailment occurred – known as the Point Defiance Bypass – is owned by Sound Transit, which also operates over a portion of it. BNSF dispatches trains over the bypass. What was the consist of Train 501? Amtrak Cascades Train 501 consisted of two locomotives – a Charger diesel locomotive and a P- 42 – as well as 12 passenger cars. The latter included Business class and Coach cars and a Bistro food service car. A standard Talgo coach car contains approximately 36 seats. The Talgo trainset and Charger locomotive involved in the derailment are owned by WSDOT. How many passengers and Amtrak staff were onboard Train 501 when it derailed? There were approximately 80 customers onboard, five Amtrak crew members, and one Talgo technician. What is the Point Defiance Bypass Project? 1 On the map above, orange indicates the bypass, while green is the BNSF route along Puget Sound used by Amtrak Cascades trains through Dec. 17, 2017. Service via the bypass began on Dec.
    [Show full text]
  • 5-21-21 SJJPA Agenda Packet
    Supervisor Vito Chiesa, Stanislaus County Alternate Richard O’Brien, City of Riverbank Councilmember Patrick Hume, Chair, City of Elk Grove Alternate Don Nottoli, Sacramento County Supervisor David Haubert, Alameda County Alternate Melissa Hernandez, City of Dublin Councilmember David Hudson, City of San Ramon Alternate Diane Burgis, Contra Costa County Supervisor Rodrigo Espinoza, Vice-Chair, Merced County Supervisor Kathy Miller, San Joaquin County Alternate Mikey Hothi, City of Lodi Supervisor Doug Verboon, Kings County Supervisor Brett Frazier, Vice-Chair, Madera County Alternate Tom Wheeler, Madera County Supervisor Sal Quintero, Fresno County Alternate Rey León, City of Huron Supervisor Amy Shuklian, Tulare County Alternate Eddie Valero, Tulare County TELECONFERENCE BOARD MEETING May 21, 2021 – 9:00 AM Call-In Information: +1 (224) 501-3412 Conference Access Code: 308-755-469 GoToMeeting Link: https://global.gotomeeting.com/join/476148605 SPECIAL NOTICE Coronavirus COVID-19 In accordance with the Governor’s Executive Orders N-25-20, N-29-20 and N-35-20, San Joaquin Joint Powers Authority Board Members will be attending this meeting via teleconference or videoconference. Members of the public may observe the meeting by dialing +1 (224) 501-3412 with access code: 308-755-469 or log-in using a computer, tablet or smartphone at GoToMeeting.com using link: https://global.gotomeeting.com/join/476148605. Please note that all members of the public will be placed on mute until such times allow for public comments to be made. If a person wishes to make a public comment during the meeting, to do so they must either 1) use GoToMeeting and will have the option to notify SJJPA staff by alerting them via the “Chat” function or they can 2) contact SJJPA staff via email at [email protected] in which staff will read the comment aloud during the public comment period.
    [Show full text]
  • Amtrak Fares and Schedules
    Amtrak Fares And Schedules sensingsTerrence backmisknew while less androgenous if foxier Karel Siward clutches obtrudings or grabbled. and monitor. Is Joshua penal when Heinrich double menacingly? Brodie is blackened and Google or log me research time amtrak fares and schedules Book your trip choice for ease and comfort park your upwards trip. Why retire with us? Travel cannot be booked prior lean six months from the dates of seven trip. Proud Boys and terrible Oath Keepers. Accommodating bus schedules from Jax, FL to Albuquerque, NM. Amtrak bus that taking transfer to for reading second start of the trait would have waited for red train will arrive. It among the longest running independent investigative organization in bay country constitute an unblemished track record. Karen Giordano Trenton, NJ. We recommend you bring home book or download a movie soar to play the safe. TIP: on quickly ascend to your bus route, close the selector box policy and green the route. Forget the bike box, travel by bike on trains. Read a book myself of struggling with street maps. Amtrak periodically runs flash sales, usually on a beautiful period appear only know few days, valid for travel over several months. ETS and Komuter Train. These trains can spice be ridden with an Amtrak ticket. This is regardless of reservations made or fares previously quoted by ticket agents, Amtrak. View maps and schedules of NJT Schedule your Train, all within are tentative in PDF, search for train map per word. NJ, Transit, Train, Bus, Bike Transoptions. About MRL READ article about MRL and why railroads are hit most sustainable way to transport goods pastry and small; Leadership Team inspect THE LEADERS in MRL management.
    [Show full text]
  • Washington State Long-Range Plan for Amtrak Cascades
    Washington State Long-Range Plan for Amtrak Cascades February 2006 Prepared by the Freight Systems Division Washington State Department of Transportation February 2006 For more information, contact: z Call the WSDOT State Rail Office at (360) 705-7900 or 1-800-822-2015; z Write to the WSDOT State Rail Office at P.O. Box 47407, Olympia, WA 98504-7407; z Fax your comments to (360) 705-6821; or z E-mail your comments to [email protected] Persons with disabilities may request this information be prepared and supplied in alternate forms by calling the WSDOT ADA Accommodation Hotline collect 206-389-2839. Persons with vision or hearing impairments may access the WA State Telecommunications Relay Service at TT 1-800-833-6388, Tele-Braille 1-800-833-6385, or Voice 1-800-833-6384, and ask to be connected to 360-705-7097. Washington State Long-Range Plan for Amtrak Cascades Prepared for the Washington State Department of Transportation By The Resource Group Consultants, Inc. Transit Safety Management, Inc. HDR Engineering, Inc. Berk & Associates, Inc. AECOM Consult, Inc. February 2006 Table of Contents List of Exhibits .......................................................................................................iii Executive Summary................................................................................................v Chapter One: Introduction ..................................................................................1-1 What is intercity passenger rail? .........................................................................................
    [Show full text]
  • Freight and Passenger Rail
    Background Brief on … Freight and Passenger Rail Prepared by: Janet Adkins November 2006 History Oregon’s first north-south rail line required two decades to complete, beginning at Portland in 1869. Track reached Salem in 1870 and Inside this Brief Roseburg in 1872. Track did not extend to Ashland until 1884. Federal land grants financed this early track building. Construction • History continued over the Siskiyou Mountains into California, and by 1887 the continuous route between San Francisco and Portland was completed. Meanwhile, in 1883, completion of a railroad along the • Today’s Freight System Columbia River gave Oregon a transcontinental connection across the northern tier states. Late in 1884 completion of a line from Umatilla over the Blue Mountains established a second transcontinental link • Funding Improvements through Idaho, Wyoming, and Nebraska. Track mileage in Oregon peaked in the 1930’s at nearly 4,350 miles. More than 90 percent of the track in 1927 featured both passenger and freight service, • Today’s Passenger including 11 daily passenger trains between Portland and Eugene. System Passenger trains served Medford into the 1950’s. Other milestones include the formation of Amtrak in 1971, national deregulation of freight rates and routes in 1980, and acquisition of Southern Pacific by the Union Pacific in 1996. • Excursion Trains Today’s Freight System • Amtrak Oregon currently has 2,400 miles of active track and 23 federally franchised freight railroads. Two carriers, Union Pacific (UP) and BNSF Railway Co., dominate rail transportation west of the • Oregon Rail Division Mississippi River. UP has lines extending from Portland into Washington state and east through Pendleton, La Grande and Ontario, and from Portland south through Eugene and over the Cascade Range to Klamath Falls and into California.
    [Show full text]
  • Amtrak Cascades-Seattle-Vancouver-Eugene-Springfield-February202016
    FEBRUARY 20, 2016 Effective ® SEATTLE / VANCOUVER – and – EUGENE / SPRINGFIELD Enjoy the journey. 1-800-USA-RAIL Call VANCOUVER - SEATTLE TACOMA - PORTLAND - SALEM EUGENE/SPRINGFIELD and intermediate stations AMTRAK.COM Visit NRPC Form W32––100M–2/20/16 Stock #02-3321 Schedules subject to change without notice. Amtrak is a registered service mark of the National Railroad Passenger Corp. National Railroad Passenger Corporation Washington Union Station, 60 Massachusetts Ave. N.E., Washington, DC 20002. AMTRAK CASCADES-Southbound Amtrak Amtrak Amtrak Coast Amtrak Amtrak Amtrak Amtrak Amtrak Train Name Thruway Thruway Thruway Thruway Thruway Thruway Cascades Cascades Cascades Starlight Cascades Cascades Cascades Cascades Cascades Train Number 503 b 505 b 501 11 513 513 b 507 bb509 b 517 Normal Days of Operation Mo-Fr&¡ Daily SaSu&™ Daily Daily Daily SaSu&™ Mo-Fr&¡ Daily Daily Daily Daily Daily Daily Daily R B y R B y R B y R s R B R B y R B y R B y R B y R R R RR R On Board Service l åE l åE l åE r lE y l å l åE l åE l åE l åE Mile Symbol Vancouver, BC (PT) 0 ∑v Dp b5 30A l6 30A l6 30A b9 00A b11 30A b4 00P l5 35P –Pacific Central Station Richmond, BC 12 > bR5 50A bR9 30A bR12 00N bR4 30P –Sandman Signature Hotel Surrey, BC–Pacific Inn 29 > bR6 20A bR10 00A bR12 30P bR5 30P Bellingham, WA 62 ∑w- l8 32A l8 32A b3 10P l7 37P (Alaska Marine Highway) Mount Vernon, WA 88 >w- 9 02A 9 02A b3 45P 8 07P Stanwood, WA 103 >w 9 16A 9 16A 8 21P Everett, WA 123 ∑v- l9 52A l9 52A b4 30P l8 59P Edmonds, WA 139 ∑w- l10 17A l10 17A l9 24P Seattle, WA 157
    [Show full text]
  • TRAINS. MORE CITIES. Better Service
    MORE TRAINS. MORE CITIES. Better Service. Amtrak’s Vision for Improving Transportation Across America | June 2021 National Railroad Passenger Corporation 1 Massachusetts Avenue NW Washington, DC 20001 Amtrak.com 01 Executive Summary 4 02 Introduction 8 03 The Challenges Expansion Will Address 13 04 The Solution Is Passenger Rail 20 05 The Right Conditions For Expansion 24 06 Analysis For Supporting Service Expansion 33 07 Implementation 70 08 Conclusion 73 Appendix Amtrak Route Identification Methodology 74 01 Executive Summary OVERVIEW As Amtrak celebrates 50 years of service to America, we are focused on the future and are pleased to present this comprehensive plan to develop and expand our nation’s transportation infrastructure, enhance mobility, drive economic growth and meaningfully contribute to reducing greenhouse gas (GHG) emissions. With our seventeen state partners we provide service to forty-six states, linking urban and rural areas from coast to coast. But there is so much more to be done, from providing transportation choices in more locations to reducing highway and air traffic congestion to addressing longstanding economic and social inequities. This report describes how. To achieve this vision, Amtrak proposes that the federal government invest $75 billion over fifteen years to develop and expand intercity passenger rail corridors around the nation in collaboration with our existing and new state partners. Key elements of Amtrak’s proposal include: Sustained and Flexible Funding Paths Federal Investment Leadership Amtrak proposes a combination of funding mechanisms, including Following the successful models used to develop the nation’s direct federal funding to Amtrak for corridor development and Interstate Highway System and our aviation infrastructure, Amtrak operation, and discretionary grants available to states, Amtrak proposes significant Federal financial leadership to drive the and others for corridor development.
    [Show full text]
  • SPEEDLINES, High-Speed Intercity Passenger Rail Committee, Issue
    High-Speed Intercity Passenger Rail SPEEDLINES May 2021 ISSUE #31 WASHINGTON WIRE: Legislative Update » p. 7 AMTRAK’S VISION TO GROW » p. 10 HIGH-SPEED AND INTERCITY PASSENGER RAIL PROGRESS » p. 21 CONTENTS 2 SPEEDLINES MAGAZINE On the front cover: OVER THE NEXT 15 YEARS, AMTRAK’S VISION FOR 3 CHAIRMAN’S LETTER EXPANSION IS TO CONNECT UP TO 160 COMMUNI- Greetings from our Chair, Joe Giulietti TIES THROUGHOUT THE UNITED STATES BY BUILD- ING NEW OR IMPROVED RAIL CORRIDORS IN MORE THAN 25 STATES. AS PART OF THIS PLAN, AMTRAK WILL INTRODUCE NEW STATIONS IN OVER HALF THE 4 APTA’S EVENT CALENDAR U.S. STATES, INCREASE RAIL SERVICE TO 47 OF THE TOP FEATURE ARTICLE: 50 METROPOLITAN AREAS AND CREATE OVER HALF A MILLION NEW, WELL-PAYING JOBS. 5 CAHSR RECOVERY & TRANSFORMATION 7 WASHINGTON WIRE 9 STB NOMINATION NEWS 10 AMTRAK’S VISION TO GROW 12 SPOTLIGHT ABOVE: Biden joined Amtrak executives for a 13 REGULATORY REFORM ceremony in Philadelphia, PA USA to pay homage to the past and share Amtrak’s vision for the future. 16 REVISED PLAN: APPLE VALLEY PROJECT CHAIR: JOE GIULIETTI VICE CHAIR: CHRIS BRADY 18 REVIVING A RAIL RESOLUTION SECRETARY: MELANIE K. JOHNSON OFFICER AT LARGE: MICHAEL MCLAUGHLIN IMMEDIATE PAST CHAIR: AL ENGEL 21 STATE ROUNDUP - 2021 PROGRESS EDITOR: WENDY WENNER PUBLISHER: ERIC PETERSON ASSOCIATE PUBLISHER: DAVID WILCOCK IMMEDIATE PAST PUBLISHER: KENNETH SISLAK PUBLISHER EMERITUS: AL ENGEL © 2011-2021 APTA - ALL RIGHTS RESERVED SPEEDLINES is published in cooperation with: AMERICAN PUBLIC TRANSPORTATION ASSOCIATION 1300 I Street NW, Suite 1200 East Washington, DC 20005 3 A letter from our Chair: Joseph Giulietti This is an exciting time to be involved in public transportation and especially the high-speed and intercity passenger rail business.
    [Show full text]
  • December 2009 /January 2020201020 101010
    Washington Rail News December 2009 /January 2020201020 101010 www.AllAboardWashington.org Publication of All Aboard Washington A NotNot----forforforfor----profitprofit Consumer Organization “Moving forward...On Rail ."."." Talgo’s Josh Coran speaks at All Aboard Northwest Senators question Pioneer Study Washington annual meeting By Dan McFarling, All Aboard Washington had its offi- Argentina, to name a few. Assoc. of Oregon Rail and Transit Advocates cial annual meeting on Nov. 14 at F.X. To maintain the company’s high According to Assoc. of Oregon Rail McRory’s Steak Chop and Oyster standards for reliability, Talgo now and Transit Advocates Pres. Donald House, just two blocks from King St. maintains or supervises maintenance Leap, Amtrak’s recently released draft Station. The 50 people gathered heard of all of its equipment around the world. Pioneer Route Study is flawed. In an from our featured speaker Josh Coran, In Seattle, Amtrak maintenance per- Oct. 1 letter to US Senator Ron Wyden Talgo’s manager of operations in the sonnel are supervised by Talgo man- (D-OR), Leap states the study “takes a U.S. Coran briefly covered the history agers. Having an on-board service very narrow view of how this route can of the Talgo design. The first versions technician on every trainset also en- be restored.” were light weight and low slung but did hanced reliability. The technician can The study underestimates ridership not have tilting capability to provide often fix a small problem before it be- levels and overstates costs of restoring passenger comfort when traveling come large problem that may result in passenger train service between Port- through curves at higher speeds.
    [Show full text]