5-21-21 SJJPA Agenda Packet

Total Page:16

File Type:pdf, Size:1020Kb

5-21-21 SJJPA Agenda Packet Supervisor Vito Chiesa, Stanislaus County Alternate Richard O’Brien, City of Riverbank Councilmember Patrick Hume, Chair, City of Elk Grove Alternate Don Nottoli, Sacramento County Supervisor David Haubert, Alameda County Alternate Melissa Hernandez, City of Dublin Councilmember David Hudson, City of San Ramon Alternate Diane Burgis, Contra Costa County Supervisor Rodrigo Espinoza, Vice-Chair, Merced County Supervisor Kathy Miller, San Joaquin County Alternate Mikey Hothi, City of Lodi Supervisor Doug Verboon, Kings County Supervisor Brett Frazier, Vice-Chair, Madera County Alternate Tom Wheeler, Madera County Supervisor Sal Quintero, Fresno County Alternate Rey León, City of Huron Supervisor Amy Shuklian, Tulare County Alternate Eddie Valero, Tulare County TELECONFERENCE BOARD MEETING May 21, 2021 – 9:00 AM Call-In Information: +1 (224) 501-3412 Conference Access Code: 308-755-469 GoToMeeting Link: https://global.gotomeeting.com/join/476148605 SPECIAL NOTICE Coronavirus COVID-19 In accordance with the Governor’s Executive Orders N-25-20, N-29-20 and N-35-20, San Joaquin Joint Powers Authority Board Members will be attending this meeting via teleconference or videoconference. Members of the public may observe the meeting by dialing +1 (224) 501-3412 with access code: 308-755-469 or log-in using a computer, tablet or smartphone at GoToMeeting.com using link: https://global.gotomeeting.com/join/476148605. Please note that all members of the public will be placed on mute until such times allow for public comments to be made. If a person wishes to make a public comment during the meeting, to do so they must either 1) use GoToMeeting and will have the option to notify SJJPA staff by alerting them via the “Chat” function or they can 2) contact SJJPA staff via email at [email protected] in which staff will read the comment aloud during the public comment period. Public comments will be limited to two (2) minutes per comment and no more than 240 words. This Agenda shall be made available upon request in alternative formats to persons with a disability, as required by the Americans with Disabilities Act of 1990 (42 U.S.C. § 12132) and the Ralph M. Brown Act (California Government Code § 54954.2). Persons requesting a disability related modification or accommodation in order to participate in the meeting should contact San Joaquin Regional Rail Commission staff, at 209-944-6220, during regular business hours, at least twenty- four hours prior to the time of the meeting. All proceedings before the Authority are conducted in English. Any writings or documents provided to a majority of the Authority regarding any item on this agenda will be made available for public inspection at the offices of the San Joaquin Regional Rail Commission located at 949 E. Channel Street, Stockton, California, 95202 during normal business hours or by calling (209) 944-6220. The Agenda and meeting materials are also available on the San Joaquin Joint Powers Authority Website: http://www.sjjpa.com/Home. 1. C all to Order, Pledge of Allegiance, Roll Call Ch air Hume 2. Consent Calendar 2.1 Approve Minutes from March 26, 2021 Board Meeting ACTION 2.2 Next Board Meeting Location INFORMATION 2.3 SJJPA Operating Expense Report INFORMATION 2.4 Washington Update INFORMATION 2.5 Administrative Items INFORMATION 3. Public Comments Persons wishing to address the Authority on any item of interest to the public regarding SJJPA and the San Joaquin Rail Service shall state their names and addresses and make their presentation. The Authority cannot take action on matters not on the agenda unless the action is authorized by Section 54954.2 of the Government Code. If a person wishes to make a public comment during the meeting, to do so they must either 1) use GoToMeeting using link: https://global.gotomeeting.com/join/476148605 and will have the option to notify SJJPA staff by alerting them via the “Chat” function or they can 2) contact SJJPA staff via email at [email protected] in which staff will read the comment aloud during the public comment period. Public comments will be limited to two (2) minutes per comment and no more than 240 words. 4. Approve a Resolution of the Governing Board of the San Joaquin ACTION Joint Powers Authority Authorizing the Executive Director to Submit and Execute Any and All Grant Applications, Agreements, Certifications and Assurances and Any Other Documents Necessary to the California State Transportation Agency to obtain State Rail Assistance (SRA) Funding in the Amount of $3,120,000 for the Stockton Regional Rail Maintenance Facility Expansion Project (David Ripperda) 5. Approve two (2) Resolutions of the Governing Board of the San ACTION Joaquin Joint Powers Authority Authorizing the Executive Director to enter into a Preliminary Engineering Services Agreement with the BNSF Railway Company (BNSF) and to Submit a Grant Application to the California State Transportation Agency for the Stockton Wye Project and Authorizing the Executive Director to Execute Any and All Documents Related to the Project Action 1. Approve a Resolution of the Governing Board of the San Joaquin Joint Powers Authority Authorizing the Executive 2 of 141 Director to enter into a Preliminary Engineering Services Agreement with BNSF for the Stockton Wye Project in an amount not to exceed $1,000,000 and Authorizing the Executive Director to Execute Any and All Documents Related to the Project Action 2. Approve a Resolution of the Governing Board of the San Joaquin Joint Powers Authority Authorizing the Executive Director to Submit and Execute Any and All Grant Applications, Agreements, Certifications and Assurances and Any Other Documents Necessary to the California State Transportation Agency to obtain State Rail Assistance (SRA) Funding in the Amount of $1,000,000 for the Stockton Wye Project and Authorizing the Executive Director to Execute Any and All Documents Related to the Project (David Ripperda/Autumn Gowan) 6. Approve a Resolution of the Governing Board of the San Joaquin ACTION Joint Powers Authority Authorizing the Executive Director to enter into a Reimbursement Agreement with BNSF to Design and Construct the Control Point (CP) Lake to CP West Escalon 2nd Main Track Project and the Modesto Empire Junction Universal Crossover Project in an amount not to exceed $18,250,000 and Authorizing the Executive Director to Execute Any and All Documents Related to the Project (David Ripperda/Autumn Gowan) 7. Approve a Resolution of the Governing Board of the San Joaquin ACTION Joint Powers Authority Authorizing the Executive Director to enter into a Reimbursement Agreement with BNSF for Environmental Permitting and Preliminary Design for the BNSF 2nd Main Track Project for an Amount Not to Exceed $1,750,000 and Authorizing the Executive Director to Execute Any and All Documents Related to the Project (David Ripperda/Autumn Gowan) 8. Approve a Resolution of the Governing Board of the San Joaquin ACTION Joint Powers Authority Approving an Agreement with Paragon Partner, Inc. for Right of Way Services for the Capital Projects Program for an Amount Not-to-Exceed $50,000 and Authorizing the Executive Director to Execute Any and All Documents Related to the Project (Autumn Gowan) 3 of 141 9. Approve a Resolution of the Governing Board of the San Joaquin ACTION Joint Powers Authority Approving an Agreement with Winter Consulting Group for Bay Area Region Marketing & Outreach Services, Not-To-Exceed $144,797, and Authorizing the Executive Director to Execute Any and All Documents Related to the Project (David Lipari/Autumn Gowan) 10. Approve a Resolution of the Governing Board of the San Joaquin ACTION Joint Powers Authority Approving Professional and Contracted Service Amendments for Fiscal Year 2021/2022 and Authorizing and Directing the Executive Director to Execute All Amendments Not-To-Exceed the Following Amounts: a) Buchanan, Ingersoll & Rooney LLP = $195,000 b) DB Engineering & Consulting USA Inc = $400,000 c) Jeffrey Scott Agency = $212,330 d) KP Public Affairs LLC = $204,000 e) Legal Services; Burke Williams & Sorensen LLP and Neumiller & Beardslee = $80,000 (Autumn Gowan) 11. Approve a Resolution of the Governing Board of the San Joaquin ACTION Joint Powers Authority Adopting the Final 2021 San Joaquin Joint Powers Authority Business Plan Update and Authorizing and Directing the Executive Director to Execute Any and All Documents Associated with the Master Fund Transfer Agreement Supplements for Operations, Administration, and Marketing Budgets for Fiscal Year 2021/2022 (Paul Herman) 12. Approve a Resolution of the Governing Board of the San Joaquin ACTION Joint Powers Authority Authorizing the Executive Director to Negotiate with Marsh (Existing Insurance Brokers) to Procure any Necessary Liability Insurance Coverage Related to the Caltrans Interagency Transfer Agreement, with a cost not to exceed $500,000 (Stacey Mortensen) 13. San Joaquins Service Restoration of the 5th Roundtrip (Trains INFORMATION 714 and 717 - Oakland-Bakersfield) (Paul Herman) 4 of 141 14. San Joaquins Service Update INFORMATION (David Lipari) 15. Station LOVE Program Update – Modesto Station INFORMATION (Freddy Rodriguez/Autumn Gowan) 16. Executive Director’s Report INFORMATION 17. Board Member Comments 18. Adjournment The next regular meeting is scheduled for: July 23, 2021 – 9:00 am 5 of 141 SAN JOAQUIN JOINT POWERS AUTHORITY Meeting of May 21, 2021 Item 2.1 ACTION Minutes of SJJPA Board Meeting March 26, 2021 The regular meeting of the San Joaquin Joint Powers Authority (SJJPA) was held at 9:00 am on March 26, 2021 in accordance with the Governor’s Executive Orders N-25-20, N-29-20 and N-35-20. The San Joaquin Joint Powers Authority Board Members attended this meeting via teleconference or videoconference. 1 Call to Order, Pledge of Allegiance, Roll Call Chair Pat Hume called the meeting to order at 9:00 am and led the audience in the Pledge of Allegiance.
Recommended publications
  • Route Maps & Schedules
    Route Maps & Schedules oregon-point.com/route-landing/ Cascades (Portland-Eugene) The Cascades Route provides daily bus service between Downtown Portland and the University of Oregon in Eugene, serving 5 cities and making a total of 6 stops. Click address for map 5541 5501 5503 5545 5517 5547 5507 Schedule Notes Mon-Fri Sat, Sun, Only Holiday Portland 6:00 am 11:10 12:25 1:30 pm 3:15 pm 7:00 pm 10:00 pm Union Station am pm 800 NW Sixth Ave. Portland, OR 97209 Woodburn 12:05 1:25 pm 2:25 pm 4:10 pm 8:10 pm Memorial Transit pm Facility 2895 Newberg Hwy. Woodburn, OR 97071 Salem 7:15 am 12:30 1:55 pm 2:55 pm 4:35 pm 8:35 pm 11:25 pm Amtrak Station pm 500 13th St. SE Salem, OR 97301 Albany 7:50 am 1:10 pm 2:30 pm 3:25 pm 5:30 pm 9:15 pm 12:05 pm Amtrak Station 110 10th Ave. SW Albany, OR 97321 Eugene 8:40 2:00 3:20 4:05 6:20 10:05 12:40 Amtrak Station am* pm* pm* pm* pm* pm* am* 433 Willamette St. Eugene, OR 97401 1/3 Click address for map 5541 5501 5503 5545 5517 5547 5507 University of Oregon 8:50 am 2:15 pm 3:35 pm 4:20 pm 6:35 pm 10:20 pm 12:50 am Hayward Field 1515 Agate St. Eugene, OR 97403 * = No boardings at this stop. Bus will only stop to drop off passengers and may leave before the time shown.
    [Show full text]
  • Union Station Conceptual Engineering Study
    Portland Union Station Multimodal Conceptual Engineering Study Submitted to Portland Bureau of Transportation by IBI Group with LTK Engineering June 2009 This study is partially funded by the US Department of Transportation, Federal Transit Administration. IBI GROUP PORtlAND UNION STATION MultIMODAL CONceptuAL ENGINeeRING StuDY IBI Group is a multi-disciplinary consulting organization offering services in four areas of practice: Urban Land, Facilities, Transportation and Systems. We provide services from offices located strategically across the United States, Canada, Europe, the Middle East and Asia. JUNE 2009 www.ibigroup.com ii Table of Contents Executive Summary .................................................................................... ES-1 Chapter 1: Introduction .....................................................................................1 Introduction 1 Study Purpose 2 Previous Planning Efforts 2 Study Participants 2 Study Methodology 4 Chapter 2: Existing Conditions .........................................................................6 History and Character 6 Uses and Layout 7 Physical Conditions 9 Neighborhood 10 Transportation Conditions 14 Street Classification 24 Chapter 3: Future Transportation Conditions .................................................25 Introduction 25 Intercity Rail Requirements 26 Freight Railroad Requirements 28 Future Track Utilization at Portland Union Station 29 Terminal Capacity Requirements 31 Penetration of Local Transit into Union Station 37 Transit on Union Station Tracks
    [Show full text]
  • Climate Adaptation Report
    Caltrans CCAP: District Interviews Summary October 2019 San Joaquin Council of Governments Climate Adaptation & Resiliency Study Climate Adaptation Report APRIL 2, 2020 1 Climate Adaptation Report March 2020 Contents Acknowledgements ....................................................................................................................................... 3 Executive Summary ....................................................................................................................................... 4 Introduction .................................................................................................................................................. 5 Methodology ................................................................................................................................................. 7 Vulnerability Assessment: Key Findings ...................................................................................................... 10 Gaps and Recommendations ...................................................................................................................... 16 Integrating Transportation Resilience into the Regional Transportation Plan (RTP).............................. 17 Next Steps ................................................................................................................................................... 18 Appendix A: Detailed Vulnerability Assessment Report ............................................................................. 20 Introduction
    [Show full text]
  • Venture Trainsets Redefining the Intercity Rail Experience
    Venture Trainsets Redefining the intercity rail experience usa.siemens.com/mobility Venture Trainsets | Mobility Next generation rail, built for North America. With our latest, intercity trainset, Built, tested, and proven Siemens is redefining what intercity rail While designed and built for tomorrow, the can be. It’s an unsurpassed passenger Venture trainsets are a proven product. Our experience that’s also raising the bar for vehicles are in use throughout North America efficiency with service-proven vehicles and have been built on a tested and designed for tomorrow and in production service-proven platform. Benefiting from today. In short, the Venture is a 21st century decades of experience in North America, trainset that’s being embraced by passengers, we’ve developed them to meet the unique operators, and agencies alike. needs of the market. All vehicles are designed and validated in accordance with FRA Riders will enjoy new levels of comfort and regulations, APTA standards and PRIIA 305 convenience along with the latest amenities. specifications for next generation equipment. The Venture features spacious interiors and flexibility for multiple configurations of First in safety economy, business, cafe and cab cars. Providing the most protection for the riding Integrated crash energy management public is our top priority. That’s why Venture provides next generation safety. trainsets feature the safest rail car design on Reduce operating costs and enhance the market. All carbodies incorporate Crash sustainability with the clean and green Energy Management (CEM) crumple zones Charger diesel-electric locomotive. Light to absorb energy at both ends of the car. and powerful, it delivers maximum Our design also includes a controlled performance and reliability up to collapse feature to enhance safety in the 125 mph.
    [Show full text]
  • Northeast Corridor Chase, Maryland January 4, 1987
    PB88-916301 NATIONAL TRANSPORT SAFETY BOARD WASHINGTON, D.C. 20594 RAILROAD ACCIDENT REPORT REAR-END COLLISION OF AMTRAK PASSENGER TRAIN 94, THE COLONIAL AND CONSOLIDATED RAIL CORPORATION FREIGHT TRAIN ENS-121, ON THE NORTHEAST CORRIDOR CHASE, MARYLAND JANUARY 4, 1987 NTSB/RAR-88/01 UNITED STATES GOVERNMENT TECHNICAL REPORT DOCUMENTATION PAGE 1. Report No. 2.Government Accession No. 3.Recipient's Catalog No. NTSB/RAR-88/01 . PB88-916301 Title and Subtitle Railroad Accident Report^ 5-Report Date Rear-end Collision of'*Amtrak Passenger Train 949 the January 25, 1988 Colonial and Consolidated Rail Corporation Freight -Performing Organization Train ENS-121, on the Northeast Corridor, Code Chase, Maryland, January 4, 1987 -Performing Organization 7. "Author(s) ~~ Report No. Performing Organization Name and Address 10.Work Unit No. National Transportation Safety Board Bureau of Accident Investigation .Contract or Grant No. Washington, D.C. 20594 k3-Type of Report and Period Covered 12.Sponsoring Agency Name and Address Iroad Accident Report lanuary 4, 1987 NATIONAL TRANSPORTATION SAFETY BOARD Washington, D. C. 20594 1*+.Sponsoring Agency Code 15-Supplementary Notes 16 Abstract About 1:16 p.m., eastern standard time, on January 4, 1987, northbound Conrail train ENS -121 departed Bay View yard at Baltimore, Mary1 and, on track 1. The train consisted of three diesel-electric freight locomotive units, all under power and manned by an engineer and a brakeman. Almost simultaneously, northbound Amtrak train 94 departed Pennsylvania Station in Baltimore. Train 94 consisted of two electric locomotive units, nine coaches, and three food service cars. In addition to an engineer, conductor, and three assistant conductors, there were seven Amtrak service employees and about 660 passengers on the train.
    [Show full text]
  • Perseverance & Progress Work Program and Budget
    2020/2021 Work Program and Budget Perseverance & Progress Built on solid ground, SJRRC will continue through this unprecedented crisis with vision and momentum. ® Table of Contents ® Executive Summary............................3 SJJPA..............................................11 ® Planning.............................................4 Organizational Chart.........................13 Operations.........................................6 Capital Budget.................................14 Stockton Diamond..............................8 ACE Operating Budget.....................15 Capital Projects..................................9 SJJPA Operating Budget .................16 The San Joaquin Regional Rail Commission Board of Directors Christina Fugazi Debby Moorhead Scott Haggerty Chair, City of Stockton Commissioner, City of Manteca Commissioner, Alameda County Leo Zuber Nancy Young John Marchand Vice Chair, City of Ripon Commissioner, City of Tracy Commissioner, City of Livermore Bob Elliott Doug Kuehne Commissioner, San Joaquin County Commissioner, City of Lodi Stacey Mortensen Executive Director 2020/2021 Work Program and Budget 2 Executive Summary The San Joaquin Regional Rail Commission is built on a ing forward and provides much needed jobs for many private solid foundation of political leadership, staff commitment planners, engineers, architects, and construction contractors. and adaptability. The difficult years of the 1998 ACE start- The Valley Rail Program will continue to press forward in the up, the 2003 dot.com implosion, and the 2009 full recession coming year with multiple environmental processes to keep have prepared the agency to deal with the unknowns of the the entire Program on-track and set to deliver transforma- coming year. Staff is prepared to work with less, cover extra tional service expansion for both ACE and the San Joaquins. workload and find ways to leverage and share resources with Also, included in the Capital Program are key passenger other partners.
    [Show full text]
  • Passenger Rail Needs Assessment
    Oregon State Rail Plan Passenger Rail Needs Assessment draft report prepared for Oregon Department of Transportation prepared by Cambridge Systematics, Inc. March 31, 2014 www.camsys.com draft Oregon State Rail Plan Passenger Rail Needs Assessment prepared for Oregon Department of Transportation prepared by Cambridge Systematics, Inc. 555 12th Street, Suite 1600 Oakland, CA 94607 date March 31, 2014 Oregon State Rail Plan DRAFT Passenger Rail Needs Assessment Table of Contents 4.0 Passenger Rail Needs Assessment ................................................................... 4-1 4.1 Existing Intercity Passenger Rail Service................................................. 4-1 4.2 Existing Passenger Rail System Performance ....................................... 4-10 4.3 Cascades Corridor Physical and Operational Needs .......................... 4-18 4.4 Other Potential Corridors ........................................................................ 4-22 4.5 Summary .................................................................................................... 4-29 Cambridge Systematics, Inc. i 8053-084 Oregon State Rail Plan DRAFT Passenger Rail Needs Assessment List of Tables Table 4.1 Oregon Intercity Passenger Rail Stations .............................................. 4-2 Table 4.2 Intercity Passenger Rail Ridership to and from Oregon Stations as a Percent of Total Ridership, FY 2012 ............................................... 4-6 Table 4.3 Destinations of Amtrak Trips Originating at Oregon Stations as a Percent of
    [Show full text]
  • San Joaquin Regional Rail Commission Teleconference Board Meeting
    Chair, Christina Fugazi, City of Stockton Commissioner, Nancy Young, City of Tracy Vice Chair, Leo Zuber, City of Ripon Commissioner, Kathy Miller, San Joaquin County Commissioner, Jose Nuño, City of Manteca Commissioner, Melissa Hernandez, Alameda County Commissioner, Lily Mei, City of Fremont Commissioner, Mikey Hothi, City of Lodi Executive Director, Stacey Mortensen SAN JOAQUIN REGIONAL RAIL COMMISSION TELECONFERENCE BOARD MEETING June 4, 2021 – 8:00 am Call-In Information: +1 (646) 749-3122 Access Code: 185-391-325 GoToMeeting Link: https://global.gotomeeting.com/join/185391325 SPECIAL NOTICE Coronavirus COVID-19 In accordance with the Governor’s Executive Order N-29-20, San Joaquin Regional Rail Commission Board Members will be attending this meeting via teleconference or videoconference. Members of the public may observe the meeting by dialing +1 (646) 749- 3122 with access code: 185-391-325 or log-in using a computer, tablet or smartphone at GoToMeeting.com using link: https://global.gotomeeting.com/join/185391325 Please note that all members of the public will be placed on mute until such times allow for public comments to be made. If a person wishes to make a public comment during the meeting, to do so they must either 1) use GoToMeeting and will have the option to notify SJRRC staff by alerting them via the “Chat” function or they can 2) contact SJRRC staff via email at [email protected] in which staff will read the comment aloud during the public comment period. Emailed public comments should be limited to approximately 240 words as comments will be limited to two (2) minutes per comment.
    [Show full text]
  • West Contra Costa High-Capacity Transit Study
    West Contra Costa High-Capacity Transit Study FINAL TECHNICAL MEMORANDUM #4 Summary and Evaluation of Prior Studies September 2015 West Contra Costa High-Capacity Transit Study Document Version Control Revision Updated By Organization Description of Revision Date Incorporate feedback from BART 8/14/2015 Doris Lee Parsons Brinckerhoff Board Member City of Richmond staff requested that South Richmond Transportation 8/20/2015 Doris Lee Parsons Brinckerhoff Connectivity Plan be included. Tech memo updated to note that this plan is covered in Section 2.15 Incorporated edits to address SMG 8/27/2015 Doris Lee Parsons Brinckerhoff and TAC feedback 9/16/15 Tam Tran Parsons Brinckerhoff Made minor edits related to tense Document Sign-off Name Date Signature Rebecca Kohlstrand 09/16/15 ii Draft Summary and Evaluation of Prior Studies September 2015 West Contra Costa High-Capacity Transit Study Table of Contents 1 Introduction ......................................................................................................... 1 1.1 West Contra Costa County Transportation Setting ........................................... 1 1.2 Study Purpose .................................................................................................. 2 1.3 Purpose of this Technical Memorandum ........................................................... 3 2 Review OF Prior Studies .................................................................................... 4 2.1 BART West Contra Costa Extension Study, 1983 ...........................................
    [Show full text]
  • RPP Packet Attachments
    Sacramento Area 1415 L Street, tel: 916.321.9000 Suite 300 fax: 916.321.9551 Council of Sacramento, CA tdd: 916.321.9550 Governments 95814 www.sacog.org Regional Planning Partnership Wednesday, October 23, 2019, 2:00 to 3:30 p.m. SACOG Rivers Room, 1415 L Street, Suite 300, Sacramento, CA Meeting Information: https://www.gotomeet.me/GoToMeetingSACOG1 You can also dial in using your phone: Dial-in #: 877-568-4106 Access Code: 732-591-877 The purpose of the Partnership is to assist SACOG with its transportation and air quality planning and programming processes, with an emphasis on technical issues, by providing consultation with a broad range of public and private constituencies. It also provides a forum for local agencies in the region’s transportation and land use industry to contribute to the policy-making and fund programming activities of SACOG, and to improve coordination within the region. The Regional Planning Partnership (RPP) consists of the five local air districts, representatives of the U.S. Environmental Protection Agency (EPA), California Air Resources Board (ARB), Federal Highway Administration (FHWA), Federal Transit Administration (FTA), and state and local transportation agencies. The RPP meets bimonthly. Each RPP meeting is open to the public and held at the SACOG offices. 1. Introductions (Renée DeVere-Oki, 5 minutes) o Welcome o What is the RPP? o Introductions in room, phone, computer. Please enter your name upon logging in. 2. The SACOG Regional Agencies Partnership Update o Updates from Staff (12 minutes) . Topics in Transit – (Barbara VaughanBechtold, 5 minutes) Update on any current topics in transit and SACOG’s Transit Coordinating Committee.
    [Show full text]
  • San Joaquin Joint Powers Authority Agenda March 24, 2017
    Supervisor Vito Chiesa, Chair, Stanislaus County Alternate Richard O’Brien, City of Riverbank Councilmember Don Tatzin, Vice-Chair, City of Lafayette Alternate Federal Glover, Contra Costa County Councilmember Patrick Hume, Vice-Chair, City of Elk Grove Alternate Don Nottoli, Sacramento County Supervisor Rodrigo Espinoza, Merced County Alternate Mike Villalta, City of Los Banos Supervisor Scott Haggerty, Alameda County Alternate Tom Blalock, BART Councilmember Bob Johnson, City of Lodi Alternate Bob Elliott, San Joaquin County Supervisor Doug Verboon, Kings County Alternate Justin Mendes, City of Hanford Supervisor Brett Frazier, Madera County Alternate Andrew Madellin, City of Madera Supervisor Sal Quintero, Fresno County Alternate Michael Derr, City of Selma Supervisor Amy Shuklian, Tulare County Alternate Bob Link, City of Visalia AGENDA March 24, 2017 – 1:30 PM Stanislaus County Board of Supervisors Chambers 1010 10th Street (Basement), Modesto CA This Agenda shall be made available upon request in alternative formats to persons with a disability, as required by the Americans with Disabilities Act of 1990 (42 U.S.C. § 12132) and the Ralph M. Brown Act (California Government Code § 54954.2). Persons requesting a disability related modification or accommodation in order to participate in the meeting should contact San Joaquin Regional Rail Commission staff, at 209-944-6220, during regular business hours, at least twenty-four hours prior to the time of the meeting. All proceedings before the Authority are conducted in English. Any writings or documents provided to a majority of the Authority regarding any item on this agenda will be made available for public inspection at the offices of the San Joaquin Regional Rail Commission located at 949 E.
    [Show full text]
  • Accessibility in Rail Facilities
    9/7/2017 Accessibility in Rail Facilities Kenneth Shiotani Senior Staff Attorney National Disability Rights Network 820 First Street Suite 740 Washington, DC 20002 (202) 408-9514 x 126 [email protected] September 2017 1 ADA Transportation Provisions Making Transportation Accessible was a major focus of the statutory provisions of the ADA PART B - Actions Applicable to Public Transportation Provided by Public Entities Considered Discriminatory [Subtitle B] SUBPART I - Public Transportation Other Than by Aircraft or Certain Rail Operations [Part I] 42 U.S.C. § 12141 – 12150 Definitions – fixed route and demand responsive, requirements for new, used and remanufactured vehicles, complementary paratransit, requirements in new facilities and alterations of existing facilities and key stations SUBPART II - Public Transportation by Intercity and Commuter Rail [Part II] 42 U.S.C. § 12161- 12165 Detailed requirements for new, used and remanufactured rail cars for commuter and intercity service and requirements for new and altered stations and key stations 2 1 9/7/2017 What Do the DOT ADA Regulations Require? Accessible railcars • Means for wheelchair users to board • Clear path for wheelchair user in railcar • Wheelchair space • Handrails and stanchions that do create barriers for wheelchair users • Public address systems • Between-Car Barriers • Accessible restrooms if restrooms are provided for passengers in commuter cars • Additional mode-specific requirements for thresholds, steps, floor surfaces and lighting 3 What are the different ‘modes’ of passenger rail under the ADA? • Rapid Rail (defined as “Subway-type,” full length, high level boarding) 49 C.F.R. Part 38 Subpart C - NYCTA, Boston T, Chicago “L,” D.C.
    [Show full text]