Oregon International Port of Coos Bay Coos Bay Rail Line Tunnel Drainage Rehabilitation Project Addendum No

Total Page:16

File Type:pdf, Size:1020Kb

Oregon International Port of Coos Bay Coos Bay Rail Line Tunnel Drainage Rehabilitation Project Addendum No OREGON INTERNATIONAL PORT OF COOS BAY COOS BAY RAIL LINE TUNNEL DRAINAGE REHABILITATION PROJECT ADDENDUM NO. 1 This addendum is issued to inform all potential responders to the Coos Bay Rail Line Tunnel Drainage Rehabilitation Invitation to Bid of clarifications of the Invitation to Bid. This addendum has been provided to all pre-qualified bidders for Phase II of the tunnel rehabilitation series of projects. This addendum is comprised of the items listed below, and additional Exhibits: • Table of Contents • Section 00120.01 – Instruction to Bidders • Section 00120.10 – Bid Documents • Section 00120.11 – Sample Contract • Section 00135 – Special Railroad Contract Considerations • Special Provisions • Exhibit F: Davis Bacon General Decision Number OR190064 Prevailing Wage Rate for Coos County in Oregon • Exhibit G: Davis Bacon General Decision Number OR190066 Prevailing Wage Rate for Douglas County in Oregon • Exhibit H: Davis Bacon General Decision Number OR190057 Prevailing Wage Rate for Lane County in Oregon • Exhibit I: Lateral Earth Pressure Diagram, Precast Channel, T19 • Exhibit J: UPRR Documents • Exhibit K: CBRL Documents – Freight Tariff CBR8000 • Exhibit L: CBRL Documents – CWR All bidders must acknowledge receipt of this addendum in their bids. Failure to do so may lead a bid to be declared nonresponsive. Clarifications and Instructions: 1. Replace existing TABLE OF CONTENTS section with revised TABLE OF CONTENTS section, marked “Revision 1, 5.21.19”, and attached to Addendum 1. 2. In Section 00120.01 – INSTRUCTION TO BIDDERS, Under CONTRACT TIME: Replace existing paragraph with: The number of days within which, or the dates by which, the Work is to be completed and ready for final payment. All Work for this Project, including all construction, clean-up and demobilization shall be completed by October 31, 2020. The Port intends to issue Notice to Proceed on August 16, 2019. This would translate to 442 calendar days of Contract Time. The final Contract will identify the required delivery date for the completion of the Project. Port of Coos Bay – Coos Bay Rail Line Tunnel Drainage Rehabilitation Project Addendum 1 Page 1 of 1 May 21, 2019 3. In Section 00120.10 – BID DOCUMENTS, Add the Bid Schedule which is broken down by tunnel. 4. Add – SPECIAL PROVISIONS section 5. In Section 00120.01 – INSTRUCTION TO BIDDERS, Under Paragraph 19.7: Replace with: All BIDDERS shall submit their Bid based on completing the Work in the time allotted for construction. Submittal of a Bid is acknowledgement that the BIDDER understands that the Bid is to complete all Work on time, including all construction, clean-up and demobilization, not later than October 31, 2020. The Port intends to issue Notice to Proceed on August 16, 2019. This would translate to 442 calendar days of Contract Time. 6. In Section 00120.11 – SAMPLE CONTRACT: Under paragraph 1.3 Period of Completion: Replace with: The Port intends to issue Notice to Proceed on August 16, 2019. Contractor shall commence the Work immediately. Except as otherwise set forth in this Agreement, all Work shall be completed on the Project by no later than October 31, 2020. This translates to 442 calendar days of Contract Time. If the Port issues NTP later than August 16, 2019, then the required Final Completion delivery date shall be extended accordingly, day for day. Liquidated damages will begin to accrue on the first day following the deadline, for any uncompleted Work remaining as of that date pursuant to Section 3.1.2 of this Agreement. 7. In Section 00135 – SPECIAL RAILROAD CONTRACT CONSIDERATIONS: Paragraph 2.3.2, Allowable Work Windows: Replace with: The Work will be performed under “live track” conditions, i.e. during construction windows allowed by the Owner’s railroad traffic schedule. For bidding purposes, assume that the Contractor will be allowed to access the main line from 7:00AM to 6:00PM each day, Mondays through Thursdays, and from 8:30AM Friday to 6:00PM Sunday on weekends. Any work on the rail line or along the Railroad Right of Way outside of these windows will require special arrangements coordinated with the Owner. 8. In Exhibits Section, Add the following Exhibits: • Exhibit F: Davis Bacon General Decision Number OR190064 Prevailing Wage Rate for Coos County in Oregon • Exhibit G: Davis Bacon General Decision Number OR190066 Prevailing Wage Rate for Douglas County in Oregon • Exhibit H: Davis Bacon General Decision Number OR190057 Prevailing Wage Rate for Lane County in Oregon • Exhibit I: Lateral Earth Pressure Diagram, Precast Channel, T19 • Exhibit J: UPRR Documents • Exhibit K: CBRL Documents – Freight Tariff CBR8000 • Exhibit L: CBRL Documents - CWR Port of Coos Bay – Coos Bay Rail Line Tunnel Drainage Rehabilitation Project Addendum 1 Page 2 of 1 May 21, 2019 Rev: 1 – 5.21.19 COOS BAY RAIL LINE 2019 TUNNEL DRAINAGE REHABILITATION TABLE OF CONTENTS BIDDING REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OF THE CONTRACT 00120 INVITATION TO BID 00120.01 INSTRUCTIONS TO BIDDERS 00120.10 BID DOCUMENTS 00120.11 SAMPLE CONTRACT GENERAL REQUIREMENTS 00130 GENERAL CONDITIONS 00135 SPECIAL RAILROAD CONTRACT CONSIDERATIONS 00175 FEDERAL FUNDING REQUIREMENTS SPECIAL PROVISIONS 00210 - MOBILIZATION 00245 - TEMPORARY WATER MANAGEMENT 00280 - EROSION AND SEDIMENT CONTROL 00290 - ENVIRONMENTAL PROTECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS 00320 - CLEARING AND GRUBBING 00350 - GEOSYNTHETIC INSTALLATION 00390 - RIPRAP PROTECTION 00391 - ROCK GABION WALL 00395 - TRACK STRUCTURE REPLACEMENT 00444 - CULVERT CROSSINGS 00540 - STRUCTURAL CONCRETE 00595 - REINFORCED CONCRETE BOX CULVERTS CONSTRUCTION DRAWINGS • TUNNEL 15 • TUNNEL 17 • TUNNEL 18 • TUNNEL 19 • TUNNEL 20 • TUNNEL 21 EXHIBITS EXHIBIT A - 2015 ODOT GRANT INFORMATION AND AWARD EXHIBIT B - FASTLANE GRANT AGREEMENT Oregon International Port of Coos Bay Coos Bay Rail Line 2019 Tunnel Drainage Rehabilitation Rev: 1 May 21, 2019 TABLE OF CONTENTS Rev: 1 – 5.21.19 EXHIBIT C - GEOTECHNICAL TEST PIT EXPLORATION RESULTS EXHIBIT D - COOS BAY RAIL LINE TRACK CHART - TUNNELS EXHIBIT E - PERMITS AND ENVIRONMENTAL COMPLIANCE EXHIBIT F - DAVIS BACON GENERAL DECISION NUMBER OR190064 PREVAILING WAGE RATE FOR COOS COUNTY IN OREGON EXHIBIT G - DAVIS BACON GENERAL DECISION NUMBER OR190066 PREVAILING WAGE RATE FOR DOUGLAS COUNTY IN OREGON EXHIBIT H - DAVIS BACON GENERAL DECISION NUMBER OR190057 PREVAILING WAGE RATE FOR LANE COUNTY IN OREGON EXHIBIT I - LATERAL EARTH PRESSURE DIAGRAM, PRECAST CHANNEL, T19 EXHIBIT J - UNION PACIFIC RAILROAD DOCUMENTS EXHIBIT K - CBRL DOCUMENTS - FREIGHT TARIFF CBR8000 EXHIBIT L - CBRL DOCUMENTS - CONTIUOUS WELDED RAIL Oregon International Port of Coos Bay Coos Bay Rail Line 2019 Tunnel Drainage Rehabilitation Rev: 1 May 21, 2019 TABLE OF CONTENTS BID SCHEDULE Estimated Estimated Item Description Unit Price Quantities Totals 1 Bonds and Insurance 1 Lump Sum 2 Mobilization 1 Lump Sum Tunnel 15 3 Erosion Control 1 Lump Sum 4 Pollution Control Plan 1 Lump Sum 5 Remove Existing Rail, Ties and OTM 2,435 Track Feet 6 Excavate Existing Ballast to Firm Subgrade 2,826 Cubic Yard 7 Exterior Ditch Maintenance 953 Cubic Yard 8 Rock Excavation 20 Cubic Yard 9 Disposal of Excavated Material 7,318 Ton 10 Disposal of Wood Ties 333 Ton 11 Patch Low Spots in Subgrade 18 Cubic Yard 12 Subgrade Protection 2,325 Track Feet 13 Place Geoweb Infill Material and Sub‐ballast 1,329 Ton 14 Place and Compact New Ballast 3,544 Ton 15 Install New CWR Track, Ties and OTM 2,435 Track Feet 16 Bioswale, 3 feet wide 143 Feet 17 Enhanced Streambed 206 Cubic Yard 18 Loose Riprap, Class 50 184 Cubic Yard 19 Removal of Structures and Obstructions 1 Lump Sum 20 Clear and Grub North Portal area 1 Lump Sum 21 60" Dia. Steel Pipe Culvert 1 Lump Sum 22 12" Dia. CSP Culvert 1 Lump Sum 23 Concrete Splash Wall 1 Lump Sum 24 Clean Existing Timber Culvert 1 Lump Sum Tunnel 15 Subtotal Tunnel 17 25 Erosion Control 1 Lump Sum 26 Pollution Control Plan 1 Lump Sum 27 Remove Existing Rail, Ties and OTM 1,350 Track Feet 28 Excavate Existing Ballast to Firm Subgrade 1,618 Cubic Yard 29 Exterior Ditch Maintenance 112 Cubic Yard 30 Disposal of Excavated Material 3,271 Ton Coos Bay Rail Line 2019 Tunnel Drainage Rehabilitation Issued For Bid BID DOCUMENTS Addendum #1 Oregon International Port of Coos Bay Page 1 of 4 May 2019 BID SCHEDULE Estimated Estimated Item Description Unit Price Quantities Totals 31 Disposal of Wood Ties 210 Ton 32 Patch Low Spots in Subgrade 13 Cubic Yard 33 Subgrade Protection 1,167 Track Feet 34 Place Geoweb Infill Material and Sub‐ballast 808 Ton 35 Place and Compact New Ballast 2,020 Ton 36 Install New CWR Track, Ties and OTM 1,350 Track Feet 37 Removal of Structures and Obstructions 1 Lump Sum Tunnel 17 Subtotal Tunnel 18 38 Erosion Control 1 Lump Sum 39 Pollution Control Plan 1 Lump Sum 40 Remove Existing Rail, Ties and OTM 1,832 Track Feet 41 Excavate Existing Ballast to Firm Subgrade 2,173 Cubic Yard 42 Exterior Ditch Maintenance 201 Cubic Yard 43 Rock Excavation 8 Cubic Yard 44 Disposal of Excavated Material 4,543 Ton 45 Disposal of Wood Ties 250 Ton 46 Patch Low Spots in Subgrade 15 Cubic Yard 47 Subgrade Protection 1,784 Track Feet 48 Place Geoweb Infill Material and Sub‐ballast 1,069 Ton 49 Place and Compact New Ballast 2,492 Ton 50 Install New CWR Track, Ties and OTM 1,832 Track Feet 51 Bioswale, 2 feet wide 180 Feet 52 Loose Riprap, Class 50 96 Cubic Yard 53 Removal of Structures and Obstructions 1 Lump Sum 54 30" Dia. CSP Culvert 1 Lump Sum 55 Concrete Splash Wall 1 Lump Sum Tunnel 18 Subtotal Tunnel 19 56 Erosion Control
Recommended publications
  • Short Line Railroading in the Northeastern United States: Its Relevance and Future in Connecting Industry to the North American Rail Network
    Syracuse University SURFACE Syracuse University Honors Program Capstone Syracuse University Honors Program Capstone Projects Projects Spring 5-1-2012 Short Line Railroading in the Northeastern United States: Its Relevance and Future in Connecting Industry to the North American Rail Network William Jay Hotaling Syracuse University Follow this and additional works at: https://surface.syr.edu/honors_capstone Part of the Operations and Supply Chain Management Commons Recommended Citation Hotaling, William Jay, "Short Line Railroading in the Northeastern United States: Its Relevance and Future in Connecting Industry to the North American Rail Network" (2012). Syracuse University Honors Program Capstone Projects. 163. https://surface.syr.edu/honors_capstone/163 This Honors Capstone Project is brought to you for free and open access by the Syracuse University Honors Program Capstone Projects at SURFACE. It has been accepted for inclusion in Syracuse University Honors Program Capstone Projects by an authorized administrator of SURFACE. For more information, please contact [email protected]. 1 Short Line Railroading in the Northeastern United States: Its Relevance and Future in Connecting Industry to the North American Rail Network A Capstone Project Submitted in Partial Fulfillment of the Requirements of the Renée Crown University Honors Program at Syracuse University William Jay Hotaling Candidate for B.S. Degree and Renée Crown University Honors May 2012 Honors Capstone Project in Supply Chain Management Capstone Project Advisor: _______________________ Professor Julie Niederhoff Capstone Project Reader: _______________________ Professor Minet Schindehutte Honors Director: _______________________ Stephen Kuusisto, Director Date: 25 April 2012 2 Abstract Short line railroads are vital links in the North American rail network. To remain profitable and viable they must keep abreast of technological advancement and increase cooperation both amongst themselves and with large railroads.
    [Show full text]
  • AWPA Book of Standards AWPA PROTECTING WOOD SINCE 1904
    2015 AWPA Book of Standards AWPA PROTECTING WOOD SINCE 1904 AMERICAN WOOD PROTECTION ASSOCIATION Cover Photo: Railroad ties being air-seasoned prior to preservative treatment. Since the mid-1800s, wood railroad crossties have been treated with a variety of wood preservatives to extend tie service life from only a few years to more than 33 years on average. Today, there are over 800 million treated wood railroad ties in service across North America, and 22 million or more ties are produced for new track construction and maintenance-of-way each year. Photo credit: Railway Tie Association (www.rta.org). IMPORTANT NOTICE The information provided in this document is directed solely to professionals who have the appropriate degree of experience to understand and interpret its contents in accordance with generally accepted procedures or other professional standards and applicable regulations. No recommendation as to specific products or vendors is made or implied. Improper application of some of the products and chemicals mentioned in AWPA Standards could be hazardous to health or safety. For directions regarding proper application and safe handling of treated wood products, the user should comply with provisions of the CONSUMER INFORMATION SHEET, CONSUMER SAFETY INFORMATION SHEET, and/or MATERIAL SAFETY DATA SHEET which pertains to the treated wood product under consideration. These documents should be available through the source from which you received your treated wood product. Those who are involved in the production and testing of treated wood products should comply with directions found upon pesticide labels and/or Material Safety Data Sheets which pertain to the pesticide or chemical under consideration.
    [Show full text]
  • Tribute to Retiring Executive Director Jim Gauntt
    RTA TRANSITION 25 YEARS THAT REVOLUTIONIZED AN INDUSTRY Editor’s Note: The below was developed more than 25 years working to ensure from an interview with RTA Executive the industry remains safe, efficient and, RTA Executive Director Jim Gauntt Director Jim Gauntt in November 2019 in a word, the “best” it can be. With a by Nisus Corp.’s Jim Gorman and Ken career spanning more than 40 years, he consideration that it might be in the best Laughlin. Additional comments were amassed a remarkable record of success, interests of RTA and its members. Gauntt collected from Crossties interviews. including publishing RTA’s Crossties reflected on the difficult choice to step magazine, conducting training sessions on away from and organization and industry When Railway Tie Association (RTA) tie grading, and hosting the RTA Annual he loves. “When you find there are fewer Executive Director James C. Gauntt Symposium and Technical Conference. years in front of you than behind, you announced his plans for retirement, railroad Gauntt is also the published author of ultimately realize you should give greatest and manufacturing industry colleagues were numerous articles, papers and publications consideration to your family and spend as saddened. on the subject of wood tie research and much of that time with them as you can. American Short Line and Regional treated wood tie performance, and is a The RTA Executive Committee helping Association President Chuck Baker tweeted frequent speaker on wood preserving and me lay the groundwork for a successful an immediate reaction to learning that a tie industry subjects. transition was absolutely essential in my search for Gauntt’s replacement had begun.
    [Show full text]
  • Contractor/Consultants Railway Tie Association Membership Directory 2020-2021
    1 2 The Railway Tie Association 2020-2021 Membership Directory The Railway Tie Association was Table of Contents organized in 1919 as The National Association of Railroad Tie Producers, Index Page which grew out of predecessor groups North America Producer Member Map 4 dating back to the late 1800’s. The name changed to The Railway Tie Association Key Listing of Producer Companies 5 in 1932. Producer Member Plants by Preservative Systems 7 The purpose of the Association Alphabetical Listing by Section: is to promote the economical and Direct Producers 9 environmentally sound use of wood crossties. The Association is involved Suppliers (Preservative) 27 in research into crosstie design, and Suppliers (Non-Preservative) 33 ongoing activities dealing with sound forest management, conservation of Contractor/Consultants 41 timber resources, timber processing, Waste Management/Recycling 51 wood preservation and safety of industry workers. Associate Members 57 Global Members 60 The objectives of the Association Honorary Members 63 include the research and development Index of Members 67 of crosstie design, manufacture and use; collecting and providing industry statistics; developing and For more information about membership contact: publishing specifications; promoting The Railway Tie Association and maintaining high standards of 115 Commerce Drive, Suite C quality for crossties; governmental Fayetteville, GA 30214 affairs; cooperate closely with related TEL: (770) 460-5553 organizations; conduct annual meetings; FAX: (770) 460-5573 support seminars and other educational EMAIL: [email protected] functions; and the printing of various publications. WEBSITE: www.rta.org DISCLAIMER: The Railway Tie Association proudly promotes the products and services of the wood tie industry in general.
    [Show full text]
  • Megaprojects, Development and Competitiveness: Building the Infrastructure for Globalization and Neoliberalism
    Athens Journal of Social Sciences - Volume 6, Issue 4 – Pages 263-290 Megaprojects, Development and Competitiveness: Building the Infrastructure for Globalization and Neoliberalism By Gerardo del Cerro Santamaria* This paper argues that megaprojects are inherently tied to the logic of growth, development, urban qualitative transformation, wealth creation, competitiveness and prosperity. Megaprojects constitute the infrastructure of globalization and neoliberalism and they actively contribute to a situation of increased planetary urbanization. The causal context of megaprojects – the logic of development and competitiveness – has consequences for the planning and management of megaprojects. In order to meet the goal of contributing to urban and national growth and development, megaprojects are usually shaped as public-private institutional arrangements participated by elites and pro- growth coalitions at various spatial scales that are able to provide the necessary funding and expert knowledge to implement these complex structures. The close links between megaprojects, development and competitiveness, and the increasing role of megaprojects in the configuration of megaregions worldwide, have an architectural reflection in the prominent importance of iconicity in megaproject design and construction. Thus, the paper analyzes megaprojects in a dual, interconnected way: as spatial settings and infrastructure units that obey specific planning, design and management priorities, and also as reflections or expressions - as consequences or crystallizations
    [Show full text]
  • September 10, 2015
    September 10, 2015 The United States Congress United States Capitol Washington, DC 20510 To the Members of the United States Senate and the United States House of Representatives: The undersigned organizations, representing millions of individuals, employees, businesses of all sizes, community development organizations and non-profit organizations, urge Congress to act immediately on a seamless, multiyear or permanent extension of the expired and expiring tax provisions, including appropriate enhancements. These tax provisions are critically important to U.S. jobs and the broader economy. Failure to extend these provisions is a tax increase. It will inject instability and uncertainty into the economy and weaken confidence in the employment marketplace. Acting promptly on this matter will provide important predictability necessary for economic growth. The expired provisions should be renewed as soon as possible this year. We urge all members of Congress to work together to extend seamlessly on a multiyear basis, and where possible enhance or make permanent, these important tax provisions. Sincerely, .decimal, Inc. Action Floor System LLC 11th Hour Staffing Inc. Action Machinery International, Inc. 1-Call Staffing LLC Action Manufacturing Company 401 Manufacturing Inc. Action Super Abrasive Products 4M Building Solutions, Inc. Actiontec Electronics, Inc. 50% Expensing Coalition Active Financing Working Group 5b Agribusiness Solutions Acts of Grace, Inc. dba Right at A&K Railroad Materials, Inc Home - Kingwood A. B. Carter, Inc. Acuity Brands, Inc. A.D.Bowman & Son Lumber Co., Inc. Addy Machinery Company A-1 Little John Inc Adrian Community Preschool AAON, Inc. Advanced Technology Services ABB Inc. Aero Industries, Inc. Abbey of New Claivaux Aeronautical Repair Station Association Abbott Aeropostale, Inc AbbVie Aerospace Industries Association Aberdeen Carolina & Western Railway Aerotech Machining Inc.
    [Show full text]
  • Tie Graders Learn, Compete & Excel at 2018
    2018 SPECIAL CONFERENCE @RTAHQ SEPTEMBER/OCTOBER 2018 For Live SHOWCASE Twitter Updates ISSUE #RTA100th THE MAGAZINE FOR PRODUCERS & USERS OF TREATED WOOD CROSSTIES & RELATED PRODUCTS SPECIAL REPORTS: Tie Graders Learn, Compete Industry Updates, Plant News & Excel At 2018 Seminar & More Market Outlook: Tie Forecast For 2018 & Beyond Annual RTA Conference: Presenters, Award Winners & More Be In The Know With Conference App: Focus On Sawmills & Safety Monthly Tie Trends & Insights From The Field RTA's Tie Grading Seminar winners include Eric Baughman of Stella Jones, left; Sean Woody of Norfolk Southern, top left; and Johnny Allison of Koppers Inc., above right. CROSSTIES TO YOUR SPECIFICATIONS WE DELIVER THE QUALITY YOU EXPECT... EVERY TIME Accurate, Measurable and Repeatable Preservative Retention Levels Our patented Tru-Core® dual pressure treatment process ensures that the retention levels of Borate and Creosote Petroleum Solution that you specify for your crossties, are achieved and verifiable. Koppers delivers quality you can rely on for every decay zone. Koppers Benefits n Nine strategically located treatment facilities in North America n Creosote Petroleum Solution (CPS) pressure treated ties or patented Tru-Core®1 dual treated Borate and CPS ties for extended life in the harshest decay zones n U.S. Treatment plants are AAR M-1003, ISO 14001 and RC14001 certified BUILDING GREAT LINES FROM THE GROUND UP.™ www.koppers.com 1-888-567-8437 1 Tru-Core® is manufactured under license from Kop-Coat Inc. 2 CROSSTIES • SEPTEMBER/OCTOBER 2018 Koppers-Crossties-Ad-1.18 final.indd 1 1/12/18 11:24 AM CONTENTS Volume 99, Number 4 • September/October 2018 On The Cover: Pg.
    [Show full text]
  • Experts Discuss Pressing Challenges & Great
    CONFERENCE RECAP RTA 2020 Virtual Conference Recap: Survive & Thrive Experts Discuss Pressing Challenges & Great Opportunities By Kristen McIntosh The Railway Tie Association (RTA) held aggregating data and producing our sales Goodin also addressed the importance its annual conference Oct. 20-22. Although and inventory reporting methods.” of RTA’s continued planning for in-person COVID-19 concerns kept association mem- Goodin reported that RTA is in a sound meetings in 2021. “We need to meet. It is bers from meeting in the typical in-person financial position thanks to fiscally respon- important for the health of the industries we format, this year’s virtual sessions drew sible management and the leadership of the serve, our businesses and our own mental quite a large and engaged audience, said RTA Executive Committee members and well-being to come together in a format Ashley Goodin, who joined RTA as execu- the dedicated support of sponsor partners. other than online. To that end, we are tive director in May. “I will continue to work with the Executive adjusting our 2021 meeting plans to Goodin was accompanied by RTA Committee to determine strategies, policies provide safe, in-person opportunities for President Bill Behan, president of Gross & networking, education and fellowship. I Janes Co., in leading the sessions, fielding can say from recent business and personal questions for presenters, and keeping ses- experiences that this can and has been sions on track. done in a safe, responsible manner. I will This year’s theme, “Survive & Thrive,” be working with RTA committees to make seemed particularly appropriate in light of sure we are making responsible choices the challenges 2020 presented.
    [Show full text]
  • An Economic Analysis of the U.S. Wooden Railway Tie Industry
    2018 Economic Impact Studies In Partnership with An Economic Analysis of the U.S. Wooden Railway Tie Industry A Report Prepared for the Railway Tie Association October 22, 2018 An Economic Analysis of the U.S. Wooden Railway Tie Industry For more information about the report, please contact: Chad Moutray, Ph.D., CBE NAM Chief Economist and Director Center for Manufacturing Research (202) 637-3148 [email protected] The Center for Manufacturing Research in Partnership with: Inforum www.inforum.umd.edu Prepared for: Railway Tie Association 115 Commerce Drive, Suite C Fayetteville, GA 30214 Blank Page An Economic Analysis of the U.S. Wooden Railway Tie Industry Table of Contents Abbreviations ...............................................................................................................................................iii List of Tables ................................................................................................................................................. iv List of Figures ................................................................................................................................................ iv Executive Summary ..................................................................................................................................... 1 1. Introduction ........................................................................................................................................... 5 2. Industry Overview ................................................................................................................................
    [Show full text]
  • The$Current$State$Of$Wood$Reuse
    ! The$Current$State$of$Wood$Reuse$and$Recycling$ in$North$America$and$Recommendations$for$ Improvements$ ! Dovetail!Partners! May!2013! The Current State of Wood Reuse and Recycling in North America and Recommendations for Improvements Authors: Jeff Howe, Steve Bratkovich, Jim Bowyer, Matt Frank, Kathryn Fernholz Dovetail Partners May 2013 Table of Contents EXECUTIVE(SUMMARY(............................................................................................................(4( ! BACKGROUND(......................................................................................................................(14( ( STATUS(OF(WOOD(REUSE(&(RECYCLING:(DISCUSSION(...........................................................(17( It#All#Begins#in#the#Forest#.....................................................................................................................................................#17! Wood#Combustion#as#Component#of#Reuse#and#Recycling#....................................................................................#19! Wood#Products#Manufacturing#and#Utilization#.........................................................................................................#20! Tracking#PostHConsumer#Wood#Reuse#and#Recycling#.............................................................................................#22! Generation of Waste in Canada and the U.S. ........................................................................... 23 Status of Wood Recycling in Canada .......................................................................................
    [Show full text]
  • Lessons from IT and Construction Projects
    ISSN (print):2182-7796, ISSN (online):2182-7788, ISSN (cd-rom):2182-780X Available online at www.sciencesphere.org/ijispm Megaproject complexity attributes and competences: lessons from IT and construction projects Maxwell Nyarirangwe University of the Witwatersrand, School of Construction Economics & Management Private Bag 20, Johannesburg, 2050 South Africa [email protected] Oluwayomi. K. Babatunde University of the Witwatersrand, School of Construction Economics & Management Private Bag 20, Johannesburg, 2050 South Africa [email protected] Abstract: Megaprojects have been associated with persistent underperformance technically, financially, socially and environmentally. This underperformance has been attributed to the inherent complexity attributes and the gaps in the form of the mismatch in the project management competences and processes used by the project management teams to deal with the complexity attributes. This study seeks to investigate the performance implications of these complexity attributes to recommend suitable management competences for the successful delivery of megaprojects. This conceptual study used an integrative literature review to analyze and synthesize findings from existing scientific articles related to the complexity constructs based on a comparative assessment of Information Technology (IT) and construction megaprojects. The Complex Adaptive Systems (CAS) Theory was also used to highlight some of the factors that influence megaproject performance towards identifying suitable management processes and competences, which are required to deal with megaprojects complexity. The key findings include a nomenclature of the main complexity attributes, their implications on the performance of IT and construction megaprojects, and, lastly, the management competences and processes that are required to deal with the complexity attributes for improved megaproject performance.
    [Show full text]
  • RTA Celebrates 100 Years Serving Wood Tie Industry
    CONFERENCE RECAP RTA Celebrates 100 Years Serving Wood Tie Industry RTA members gathered at the Hyatt the RTA Business Session followed by On Thursday, Regency Resort in Bonita Springs, Fla., keynote addresses. The Economic Session the morning just outside Fort Myers, Oct. 22-25 for offered insights on the impact of the rail kicked off with RTA’s milestone 100th Annual Conference supply industries to the U.S. economy. This the Research & Technical Symposium. was followed by the Procurement Session, Session, where Before getting down to business, RTA where a panel composed of sawmill mem- attendees learned members and guests enjoyed the Annual bers enlightened on concerns such as trade, about stormwater Golf Tournament, always a lighthearted yet supply and labor. The luncheon keynote permitting guide- competitive networking event that brings speaker addressed global market issues. lines, creosote old friends back together and invites new The Class I Engineering and Environmental re-registration, new developments in borate friends to get to know the group. A fan boat Forum highlighted major capital investment treatments and more. This session was tour was also a popular event, giving the projects the railroads are undertaking to followed by an update from the Association group the chance to experience the beauty of keep the rail infrastructure strong, improve of American Railroads and information on the Everglades. service and keep products on the move. The biochar as a tie disposal and energy recovery The Annual President’s Reception was Annual Awards Banquet followed and was strategy. The always-popular Railroad held in the exhibit booth area and spilled highlighted not only by the announcement Purchasing Forum was the final session outside onto a patio where everyone enjoyed of RTA’s award and scholarship winners but before the RTA presidency changed hands hors d’oeuvres, music and a chance to talk also by a champagne toast acknowledging from Koppers Inc.’s Tim Ries to Gross & with colleagues and friends.
    [Show full text]