Creation of a Network of Ultrafast Charging Stations for Electric Vehicles in the Kemerovo Region
Total Page:16
File Type:pdf, Size:1020Kb
Creation of a network of ultrafast charging stations for electric vehicles in the Kemerovo region Project's cost 270 mln RUR Investment requirement 270 mln RUR Implementation period 5.0 y. Name Creation of a network of ultrafast charging stations for electric vehicles in the Kemerovo region Project type Инвестиционные предложения Description The goal of the Clean Energy EZS is to create a network of fast charging stations where all electric cars can be charged with 100% renewable energy sources. The project plans to create 10 electromobile gas stations along the roads of the Kemerovo region: Kemerovo, Novokuznetsk, Sheregesh, Mezhdurechensk, Prokopyevsk, Kiselevsk, Leninsk-Kuznetsk, Yurga, Belovo, Anzhero-Sudzhensk. Required Investment: - Investments of 270 million rubles. they will allow in a short time to create a network of 10 stations with the necessary infrastructure, launch an affiliate program for distributors, thereby, the company will receive additional competitive advantages. - With investments of 61 million rubles. two charging stations will be built (at the exits from Novokuznetsk and Kemerovo, along the Leninsk-Kuznetsk highway, a back office will be created and the first contract with a distributor will be concluded. -Investments of 35 million rubles. will allow to build the first charging station (at the exit from Novokuznetsk in the direction of Kemerovo), create a back office. Of which: 2%, construction and installation works; 97% - equipment (charging columns, energy storage system, modular design with a canopy, LED video screen, video surveillance system, online ticket office.); 1% other expenses. The business model of the Clean Energy gas station is very similar to a conventional gas station: it is the sale of energy in kWh for electric car drivers. Users can choose to pay per kilowatt hour or choose a tariff plan with a fixed monthly fee and a lower price per kilowatt hour. To implement this project, it is necessary to obtain permission to rent land, develop project documentation, obtain permission from Rostekhnadzor, conclude an electricity supply agreement with a grid organization for backup connection, purchase expensive equipment and build the stations themselves. The EES “Clean Energy” strategy provides for the implementation of the project in three stages: 1. Stage - Investment - will take from 1 to 3 years: a. selection of a suitable place for the construction of the station and execution of all necessary documents on the land where the station will be installed. b. development of design estimates for the future station and obtaining approval. c. obtaining permission from Rostekhnadzor. d. execution of contracts with the electricity supplier to connect the backup power station. e. acquisition of all necessary equipment and personnel search. f. site preparation and station construction. g. commissioning of the entire system. 2. Stage - Production - 1-10 years: a. customer service b. systematization of all production processes: processing transactions, maintaining stations in working condition, processing payments and setting up other work processes, and the beginning of revenue generation. c. Creation of a recognizable brand of EZS “Clean Energy” brand, creation of a client base. If the creation of a network of gas stations will be a great success in the Kemerovo region, then this business can be scaled up in other regions. Stage 3. - Scaling - Expand the network throughout the region of Western Siberia. Company Website: ezs.su Project proponent "Spare parts of Siberia", LLC Address Mezhdurechensk city Branch of economic Transport and communication Production superfast charging stations for electric vehicles Reaching the design capacity (years) 5 Project's degree of elaboration Business plan Implementation stage Pre-investment Financial evaluation Total cost 270 000 000 ₽ The need for investment 270 000 000 ₽ Own funds 0 Jobs 10 Implementation period 5.0 Payback time 5 Additional materials ЭЗС Чистая энергия. Презентация.pptx Contact information Contacts (name) Kamkin Mikhail, CEO Contacts (phone) 8-913-078-1315 Contacts (address) [email protected] City Novokuznetsk area.