Jonathan Werner M.A.Sc., PMC, P.Eng. ASSOCIATE Jonathan

Total Page:16

File Type:pdf, Size:1020Kb

Jonathan Werner M.A.Sc., PMC, P.Eng. ASSOCIATE Jonathan Entuitive | Simplifying the Complex Jonathan Werner M.A.Sc., PMC, P.Eng. ASSOCIATE Jonathan Werner is an Associate at Entuitive with over 25 years of experience in structural analysis and design of bridges, subway stations and other structures. Jonathan has an extensive background in contract administration, project management, foundation investigations, bridge inspections, and structural evaluations, as well as experience on Design Build, P3 and Program Management assignments. Jonathan’s portfolio includes roles varying from inspection, deck rehabilitation, fatigue investigation, Owner’s Engineer and preliminary design on several long span/viaduct bridge projects. Some of his most notable projects include Gordie Howe IT’S HOW WE WORK AS A TEAM THAT “ International Bridge, Port Mann/Highway 1 Bridge over the Fraser DETERMINES THE SUCCESS OF THE River in Vancouver (Gateway Program), the Blue Water Bridges PROJECT. ” in Sarnia, the Sault Sainte Marie International Bridge, and the Thousand Islands Bridges. Before joining Entuitive, Jonathan held leadership positions including Project Engineering Coordinator for the $100 million York University Subway Station on the TTC Spadina Line, Lead Bridge Engineer on the $3 billion Gateway Program in Vancouver, British Columbia, and Project Manager or Structural on several projects. Awards Education Sanford Fleming Medal of Academic Master of Applied Science in Civil Engineering, University of Waterloo Excellence Bachelor of Applied Science in Civil Engineering, University of Waterloo Memberships Professional Engineers Ontario Association of Professional Engineers & Geoscientists of BC Qualified Designer (Building Structural) – Ontario Ministry of Municipal Affairs and Housing Tunnelling Association of Canada www.entuitive.com Jonathan Werner | 1 SELECTED RELEVANT EXPERIENCE Entuitive | Simplifying the Complex New Bridge Design Bridge Inspection, Evaluation and Rehabilitation Port Severn Swing Bridge, Public Works and Government Services Lorne Bridge over the Grand River, City of Brantford, Brantford, Canada, Port Severn, Canada* Ontario, Canada* Hwy 23 Structure Replacement and Rehabilitation, Ministry of Rehabilitation of Concession Street and Victoria Street Bridges over Transportation Ontario, Mitchell, Canada* the Grand River, Region of Waterloo, Canada* Highway 401 Bridges, Leslie to Warden, Canada* Blue Water Bridges Annual Inspections, Point Edward (Sarnia), Canada* Highway 401 and Homer Watson Interchange, Ministry of Transportation Ontario & Region of Waterloo, Canada* Hastings Swing Bridge Rehabilitation, Hastings, Canada* Ravenshoe Road (YR 32) Bridge over Zephyr Creek, York Region, Sault Ste. Marie Emergency Swing Dam, Parks Canada, Sault Ste. Canada* Marie, Canada* QEW/Red Hill Creek Expressway Bridges, Ministry of Transportation Highway 7 Rehabilitation, Ministry of Transportation Ontario, Ontario, Canada* St. Mary’s, Canada* Highway 401/RR 58, Ministry of Transportation Ontario, Canada* Thousand Islands Suspension Bridge, Viaduct and Arch Inspection/ Rehabilitation, St. Lawrence Seaway Authority, Canada* Highway 401 East Bound Collectors – Kipling to Jane, Ministry of Transportation Ontario, Canada* International Bridge, Deck Rehabilitation Design & Construction Liaison - Joint International Bridge Authority, Sault Ste Marie Hurst Drive Extension over Lover’s Creek, City of Barrie, Canada* Michigan & Ontario, Canada* Highway 21 / Adam’s Drain Culvert, Ministry of Transportation International Bridge, Deck Replacement/Rehabilitation Study - Joint Ontario, Canada* International Bridge Authority, Sault Ste Marie Michigan & Ontario, Highway 72/Frog Rapids, Sioux Lookout, Ministry of Transportation Canada* Ontario, Canada* Rehabilitation of Big Creek Bridge, Delhi, Ontario, Ministry of East Morrison Creek Pedestrian Bridges, Town of Oakville, Canada* Transportation Ontario, Canada* Highway 401/Burnham Street Underpass, Cobourg, Ministry of Rehabilitation of Boston Creek Bridge, Willow Grove, Ontario, Ministry Transportation, Canada* of Transportation Ontario, Canada* Trimble Road Bridge, Township of Glanbrook, Canada* International Bridge Annual Inspection, Joint International Bridge Authority, Sault Sainte Marie, Canada* Highway 69 – CNR Grade Separation (SBL and NBL), Ministry of Transportation Ontario, Canada* Whiteman Creek Bridge Repairs, Ministry of Transportation Ontario, Canada* Highway 69 – Blackstone/Crane Lake Road, Ministry of Transportation Ontario, Canada* Highway 400 / Dunlop Street Underpass, Ministry of Transportation Ontario, Canada* Red Hill Creek Expressway (RHCE) at the QEW, Region of Hamilton Wentworth and Ministry of Transportation Ontario, Canada* Highway 17 & White River, West White River and Wabikoba Creek Bridges, CH. Heist, Ontario, Canada* Bridge 2-S01, Fredericton-Moncton Highway Project, Department of Transportation – Province of New Brunswick, Canada* Dundas / Bronte Creek, Region of Halton, Canada* Bridge 3-S03, Fredericton-Moncton Highway Project, Department of Dundas / CNR, Region of Halton, Canada* Transportation – Province of New Brunswick, Canada* Walker Bridge over the Mallet River, County of Wellington, Canada* Bridge 3-S04, Fredericton-Moncton Highway Project, Department of Highway 11 / Concession 8 and 14th Line in Orillia Township, Ministry Transportation – Province of New Brunswick, Canada* of Transportation Ontario, Canada* Highway 17 (new) - Noonday Road Bridge, Ministry of Transportation Lawrence Avenue East over Highland Creek, Toronto, Canada* Ontario, Canada* Truss Repairs on Grand River Bridge in Cayuga, Ministry of Highway 17 (new) - Lower Echo River Bridge, Ministry of Transportation Ontario, Canada* Transportation Ontario, Canada* Rehabilitation of Cooksville Creek Culvert and Retaining Walls at Highway 6 and Twenty Mile Creek, Ministry of Transportation Ontario, Dundas Street East, Mississauga, Canada* Canada* Overlea Blvd. Bridge over Don River, Toronto, Canada* Portage Road – CN Grade Separation, Region of Niagara, Canada* Jane and Steeles over BlackCreek, Toronto, Canada* Highway 7/8 Bridges East of New Hamburg; Ministry of Transportation Ontario, Canada* Dundas / Cawthra Bridge, Region of Peel, Canada* Highway 401 and Highway 10; Ministry of Transportation Ontario, York Mills Road Bridge, Toronto, Canada* Canada* St. David’s Overpass at Highway 406; Ministry of Transportation Highway 403 and 16 Mile Creek (EBL); Ministry of Transportation Ontario, Canada* Ontario, Canada* www.entuitive.com Jonathan Werner | 2 SELECTED RELEVANT EXPERIENCE Entuitive | Simplifying the Complex Rail and Transit Structures Design and Rehabilitation Silvercreek Rail Grade Separation (Subway), Guelph, Canada* TTC Finch West LRT, TTC Transit City, Toronto, Canada* Weston Tunnel, Georgetown South Rail Corridor Expansion, GO Transit, Canada* Toronto-York Spadina Subway Extension, Toronto Transit Commission, Canada* TTC Triennial Contract, Toronto Transit Commission, Canada* Union Station Rail Corridor – Infrastructure Improvement Program, GO Transit, Canada* West Toronto Diamond Project, GO Transit, Canada* TTC Structural Engineering Services Contract, Toronto Transit Commission, Canada* Dufferin Jog Elimination at Queen Street, Toronto, Canada* TTC Brimley RT Station Design Feasibility Study, Toronto Transit Commission, Canada* TTC Bayview Subway Station Construction Phase (Phase 4), Toronto Transit Commission, Canada* TTC Bayview Subway Station Detailed Design Phase, Toronto Transit Commission, Canada* Program Management and Owner’s Engineer Gordie Howe International Bridge, Windsor, Canada* Hwy 407 East Owner’s Engineer Phase 1, Ontario, Canada* Hwy 407 ETR Independent Auditor, Ontario, Canada* Gateway Program, Vancouver, BC, Canada* Jacques Cartier Bridge, SMDB Group, Montreal, Canada* Other Projects Niagara Falls Decomissioned Hydro Tunnels, Niagara Falls, Canada* Port Loring Water treatment Plant, Conoco Phillips Canada, Canada* Shoreham Drive over Black Creek Duct Support Structure, Toronto Hydro, Canada* Lawrence Avenue East over Highland Creek Duct Support Structure, Toronto, Canada * Milton Quarry Primary Crusher, Dufferin Aggregates, Canada* Pickering’s Millennium Square Waterfront Development, Victor Ford and Assoc., Canada* * Project led by Jonathan Werner while employed at a previous firm www.entuitive.com Jonathan Werner | 3.
Recommended publications
  • Appendix 2 Stakeholder Engagement and Communications
    Appendix 2 Stakeholder Engagement and Communications December 2010 APPENDIX 2 Stakeholder Engagement and Communications December 2010 Prepared for: Prepared by: 20 Bay Street, Suite 901 Toronto ON M5J 2N8 In Association with: APPENDIX 2 STAKEHOLDER ENGAGEMENT AND COMMUNICATIONS TABLE OF CONTENTS APPENDIX 2A: STAKEHOLDER ENGAGEMENT AND COMMUNICATION ...................................................... 1 1. STAKEHOLDER ENGAGEMENT AND COMMUNICATIONS ................................................................. 1 1.4. Overview of Engagement Methodology ................................................................................... 2 2. STAKEHOLDER ENGAGEMENT HIGHLIGHTS TO DATE ....................................................................... 3 2.1. Non‐Government Stakeholder List and Study Database ........................................................... 3 2.2. Electrification Study Website .................................................................................................... 3 2.3. Stakeholder Workshop # 1 ........................................................................................................ 4 2.4. Metrolinx Planning and Transportation Leaders Forum ........................................................... 4 2.5. GO Transit Customer Service Advisory Committee Meeting ..................................................... 4 2.6. Update Meeting (Georgetown Corridor) ................................................................................... 4 2.7. Municipal Transit Leaders Briefing
    [Show full text]
  • Appendix 8B Incremental Capital Cost Estimates December 2010 APPENDIX 8B
    Appendix 8B Incremental Capital Cost Estimates December 2010 APPENDIX 8B Incremental Capital Cost Estimates December 2010 Prepared for: Prepared by: 20 Bay Street, Suite 901 Toronto ON M5J 2N8 In Association with: APPENDIX 8B INCREMENTAL CAPITAL COST ESTIMATES TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................. 1 1. INTRODUCTION ................................................................................................................ 1 2. BASIS OF ESTIMATE .......................................................................................................... 2 3. POWER SYSTEMS .............................................................................................................. 3 3.1. Methodology ................................................................................................................................. 3 3.2. Inclusions ...................................................................................................................................... 3 3.3. Assumptions .................................................................................................................................. 4 4. TRACK AND TRACK ELEMENTS .......................................................................................... 5 4.1. Methodology ................................................................................................................................. 5 4.2. Inclusions .....................................................................................................................................
    [Show full text]
  • The Toronto Railway Club1931
    NEWS Since TheThe TorontoTorontoNEWS RailwayRailway ClubClub1931 Volume 27, Number 3, Fall 2008 COMING NEWS EVENTS Put these dates on your calendar! Annual Golf Tournament The Club’s popular annual golf tournament took place at the beautiful Glen Eagle Club 74th Annual Dinner in Bolton on Friday, June 13 under ideal conditions - sunny skies and warm temperatures! The tournament had approximately 244 golfers teeing off in a 9 am shotgun start with Friday, December 5, 2008, great prizes up for grabs at many of the holes. Fairmont Royal York Hotel, Toronto. See details on page 4. The tournament wrapped up with an excellent hot dinner of steak, chicken and schnitzel, Annual Meeting followed by the awarding of golf prizes and Monday, Jan. 26, 2009 a large assortment of raffle prizes. Toronto Annual Meeting and election of officers, Railway Club President Susan Reid Tanaka 5 pm at Union Station. (shown at left) welcomed the golfers and guests and thanked the members of the Annual Valentine’s Dinner- tournament organizing committee: Al Lusk, Dance Bernie Maskerine, Christopher Jones, Dan Saturday, February 14, 2009 Jagos, Bob McKeracher, James Allan, Paul Fairmont Royal York Hotel, Toronto. Kerry, Brian Kirk, Ron Hogan, Dennis Ryan and Kirk McDonald. On behalf of the Annual Golf Tournament Club, Susan also thanked the many suppliers Friday, June 19, 2009 who generously donated an magnificent array Glen Eagle Golf Club, Bolton, Ontario of prizes. The prize donors are listed on page three. More photos next page! Other Events: CANADIAN RAILWAY CLUB - 101st Annual Dinner Friday, February 6, 2009, Hotel Bonaven- ture, Montreal.
    [Show full text]
  • Canada Rail Opportunities Scoping Report Preface
    01 Canada Rail Opportunities Canada Rail Opportunities Scoping Report Preface Acknowledgements Photo and image credits The authors would like to thank the Agence Métropolitaine de Transport following organisations for their help and British Columbia Ministry of Transportation support in the creation of this publication: and Infrastructure Agence Métropolitaine de Transport BC Transit Alberta Ministry of Transport Calgary Transit Alberta High Speed Rail City of Brampton ARUP City of Hamilton Balfour Beatty City of Mississauga Bombardier City of Ottawa Calgary Transit Edmonton Transit Canadian National Railway Helen Hemmingsen, UKTI Toronto Canadian Urban Transit Association Metrolinx Edmonton Transit OC Transpo GO Transit Sasha Musij, UKTI Calgary Metrolinx Société de Transport de Montréal RailTerm TransLink SNC Lavalin Toronto Transit Commission Toronto Transit Commission Wikimedia Commons Wikipedia Front cover image: SkyTrain in Richmond, Vancouver Canada Rail Opportunities Contents Preface Foreword 09 About UK Trade & Investment 10 High Value Opportunities Programme 11 Executive Summary 12 1.0 Introduction 14 2.0 Background on Canada 15 2.1 Macro Economic Review 16 2.2 Public-Private Partnerships 18 3.0 Overview of the Canadian Rail Sector 20 4.0 Review of Urban Transit Operations and Opportunities by Province 21 4.1 Summary Table of Existing Urban Transit Rail Infrastructure and Operations 22 4.2 Summary Table of Key Project Opportunities 24 4.3 Ontario 26 4.4 Québec 33 4.5 Alberta 37 4.6 British Columbia 41 5.0 In-Market suppliers 45 5.1 Contractors 45 5.2 Systems and Rolling Stock 48 5.3 Consultants 49 6.0 Concluding Remarks 51 7.0 Annexes 52 7.1 Doing Business in Canada 52 7.2 Abbreviations 53 7.3 Bibliography 54 7.4 List of Reference Websites 56 7.5 How can UKTI Help UK Organisations Succeed in Canada 58 Contact UKTI 59 04 Canada Rail Opportunities About the Authors David Bill Helen Hemmingsen David is the International Helen Hemmingsen is a Trade Officer Development Director for the UK with the British Consulate General Railway Industry Association (RIA).
    [Show full text]
  • Developing Toronto's Transit Network Plan: Phase 1
    EX13.3 STAFF REPORT ACTION REQUIRED Developing Toronto's Transit Network Plan: Phase 1 Date: March 3, 2016 To: Executive Committee City Manager, Deputy City Manager, Cluster B and Chief Planner & From: Executive Director, City Planning Division Wards: All Reference Number: SUMMARY Significant investment has been made by all three orders of government to expand the transit network and address years of underinvestment in a critical infrastructure system for Toronto. The Toronto York-Spadina Subway Extension (TYSSE), Eglinton LRT (Mount Dennis to Kennedy) and Finch West LRT will be in service by 2021. In order to sustain recent progress, planning for new transit expansion projects must keep pace given the lead times to plan, design and build complex infrastructure. The purpose of this report is to recommend advancing planning and technical analysis on SmartTrack, Scarborough Subway Extension, Relief Line and Waterfront Transit, in order to set the stage for upcoming discussions on funding and financing new transit. In particular, this report recommends: • Finalizing the SmartTrack concept by narrowing the planning analysis to focus on key elements: an optimized Eglinton West LRT extension to Pearson Airport; and two SmartTrack/GO RER integration options that propose an urban service frequency at 11 existing GO RER stations with 4 to 8 new stations on the Kitchener GO and Stouffville/Lakeshore East GO Corridors; • Approving Pape to Downtown via Queen/Richmond as the preferred corridor for the Relief Line, and proceed to determine the preferred alignment and stations; • Completing the review of corridor options and related work for the Scarborough Subway Extension, and develop recommendations to integrate the proposed, optimized Eglinton East LRT into the University of Toronto Scarborough Campus secondary plan; and identify areas in need of an Avenue Study to facilitate intensification along the proposed LRT corridor.
    [Show full text]
  • West Toronto Diamond
    West Toronto Diamond Brent Archibald, P.Eng. Vic Anderson, MSc (London), DIC, P.Eng. Joanne Crabb, P.Eng.,ing., PE Jonathan Werner, M.A.Sc., P.Eng. Paper prepared for presentation at the Bridges: Economic and Social Linkages Session of the 2007 Annual Conference of the Transportation Association of Canada Saskatoon, Saskatchewan Abstract This paper describes the West Toronto Diamond project in Ontario, Canada. This project has been designed to eliminate at-grade diamond crossings of the Canadian National Railway (CN) and the Canadian Pacific Railway (CPR) tracks in the Junction area of Toronto, an area which takes its name from the confluence of these railways. Since the 1880’s, rail traffic here has been constrained by these diamond crossings involving the CN and CPR mainlines and a CPR Wye track. The project will result in a quantum improvement in the levels of service and safety provided by the Railways at this site. The project involves relocating the CN tracks below the CPR tracks, while at the same time maintaining all rail operations with a minimum of interruption to the Railways’ activities. The site is physically constrained and hence, in order to accomplish this goal, Delcan’s design includes the sliding of 4 mainline railway bridge spans, weighing a total of some 10,000 tonnes, into their final positions. Each slide occupies only a few hours, as it is powered by computerized high-speed tandem hydraulic jacks, moving these massive structures on steel / aluminum bronze slide paths, enabling the bridge spans to move quickly and continuously into position during brief possessions of the tracks.
    [Show full text]
  • Smarttrack/GO RER Integration Initial Business Case
    Re: EX16.1 Attachment 1 SmartTrack/GO RER Integration Initial Business Case Developing Toronto's Transit Network Plan to 2031 June 21, 2016 INTEGRATED GO RER - SMARTTRACK OPTIONS INITIAL BUSINESS CASE JUNE 2016 Table of Contents Page 1 TABLE OF CONTENTS 1.0 Executive Summary .................................................................................................. 4 2.0 Introduction ............................................................................................................. 10 3.0 Methodology............................................................................................................ 12 4.0 Options for Integrated GO RER-SmartTrack ........................................................... 13 5.0 Deliverability and Operations .................................................................................. 19 6.0 Strategic Case ......................................................................................................... 26 7.0 Financial Case ........................................................................................................ 39 8.0 Economic Case ....................................................................................................... 41 9.0 Conclusion and Next Steps ..................................................................................... 44 10.0 Appendix .............................................................................................................. 45 Page 2 Glossary of Terms Appraisal Analysis of a program, investment or
    [Show full text]
  • Georgetown South Service Expansion and Union-Pearson Rail Link DRAFT Environmental Project Report Part 1 April 14, 2009 PAGE 96
    Georgetown South Service Expansion and Union-Pearson Rail Link DRAFT Environmental Project Report Part 1 April 14, 2009 4.4.1.4 Transit Bus transit services are provided to all the GO stations in the corridor by the TTC. Table 4.4.1.4-1 provides a summary of TTC (transit and streetcar) services at Etobicoke North GO station, Weston GO station and Bloor GO station. In addition, Dundas West subway station on the Bloor-Danforth Subway line is adjacent to Bloor GO station. Table 4.4.1.4-1 Summary of TTC Services at GO Stations in the Corridor Number of Buses Number of Buses Route Operating During Operating During Station Route Name No. the AM Peak Hour the PM Peak Hour (7:00 – 8:00) (4:00 – 5:00) Etobicoke North 37 Islington 2 2 GO Station 45 Kipling 3 3 52 Lawrence 2 2 West Weston GO 58 Malton 2 2 Station 59 Maple Leaf 1 1 79 Scarlett Road 1 1 89 Weston 2 1 40 Junction 2 2 168 Symington 2 2 504 King Bloor GO Station 4 3 (Streetcar) 505 Dundas 2 2 (Streetcar) Mississauga Transit also provides services to Pearson Airport. Additionally at Pearson Airport, Airport Express Services, Greyhound Bus services, Coach Canada Bus services and other private bus operators also provide services to the airport. GO Transit bus service provides services at, Etobicoke North GO station and Pearson Airport. For the most part, bus schedules are integrated with the rail schedules to reduce wait time. The extent of services provided to Pearson Airport by GO Transit, Mississauga Transit and TTC are relatively modest and focused on employee demand rather than passenger and well wisher demand.
    [Show full text]
  • UP Express Electrification EA Land Use Assessment Report FINAL
    UP Express Electrification EA Land Use Assessment Report FINAL Project No. 1124019.00 March, 2014 UP Express Electrification EA Land Use Assessment Report Executive Summary The purpose of this report is to: 1) establish baseline land use conditions and 2) to assess land use impacts of the proposed electrification of the Union Pearson Express (UP Express) as part of the UP Express Electrification EA. This Land Use Report contains Parts A and B. Part A includes the Land Use Baseline Conditions Report, and Part B includes the Land Use Impact Assessment Report. The UP Express service will commence operation with train sets comprised of Diesel Multiple Units (DMUs). The UP Express Electrification EA is investigating land use impacts associated with replacing these DMUs with Electric Multiple Units (EMUs), as well as impacts associated with the implementation of facilities (the two Paralleling Stations, Maintenance Facility and Traction Power Station) necessary to support the electrified service. With respect to baseline land use conditions along the UP Express route (from the future UP Express Union Station to UP Express Pearson station, along the existing Union Station and Kitchener Rail Corridors), baseline conditions include existing land uses within the study area (general land use categories, as well as the locations of social facilities) and planned land uses (studies and zoning) within the study area. Land use along the Kitchener/UP Express rail corridor generally consists of developed/redeveloped residential and industrial/commercial areas, with some recreational areas and cycling trails (notably the West Toronto Railpath) within the Study Area. Based on background review and field reconnaissance carried out as part of the baseline conditions phase, there are 86 schools, child care centres and long term care centres in the vicinity of the Study Area.
    [Show full text]
  • Transportation Information Update*
    Transportation Information Update* Editor: Joseph Monteiro** January 2009, No. 53 Associate Editor: Gerald Robertson** Speech from the Throne The speech form the throne does not specifically mention transport. However, the economic stimulus plan described therein indicates that “Our government is taking immediate action to build Canada through new investment in infrastructure.” It also indicates that “Our government is acting to support industries in difficulty - including .... tourism ... - and to protect families and communities who depend on those jobs.” Speech from the Throne, January 26, 2009, www.gc.ca Budget 2009 – Budget in Brief One of the important highlights of Budget 2009 was its attention to infrastructure. Budget 2009 accelerates and expands the recent historic federal investment in infrastructure with almost $12 billion in new infrastructure. Some of the infrastructure projects mentioned with regard to transport and the funds provided for it are: 1) Railways: VIA Rail Canada ($407 m); two First Nations railways ($7.9 m); and railway safety ($72 m); 2) Bridges and Harbours: Champlain Bridge ($12 m); two of the busiest U.S–Canada border crossings ($14.5m ); other federal bridges ($ 42m); and Pangnirtung Harbour in Nunavut and small craft harbours ($217m). 3) Border Service Funding: Prescott, Ontario; Huntingdon, Kingsgate, and the Pacific Highway in British Columbia. 4) Airport security improvement: Canadian Air Transportation Security Authority, new air passenger assessment system and a new security program for air cargo. 5) Tourism Budget: Canadian Tourism Commission - Olympic ($40 m); cruise ship tourism along the Saint Lawrence and Saguenay Rivers ($12m); and marquee festivals ($100m). Budget 2009 – Budget in Brief, January 27, www.budget.gc.ca Current Developments in Brief AIR TRANSPORTATION 1.
    [Show full text]
  • Risk Assessment and Management Study – Final Report
    North Toronto Subdivision Rail Corridor Risk Assessment and Management Study Final Report Issue and Revision Record Date Originator Checker Approver Description 0 2014-05-15 M. Parkhill P. O’Connor D. Grigg Final Doc. No.: HMM336678-RR-230-0001, Rev. 0 © HMM 2014/05 Key Findings and Recommendations The key objective of this report is to provide the City of Toronto with credible and defensible information on which City staff can rely as they develop recommendations for the Dupont Street Regeneration Area Study. The following definitions apply to the recommendations: “Sensitive land uses” means buildings, amenity areas, or outdoor spaces where routine or normal activities occurring at reasonably expected times would experience one or more adverse effects generated by an event or activity at a nearby major facility. Sensitive land uses may be a part of the natural or built environment. Examples may include, but are not limited to: residences, day care centres, and educational and health facilities. “Principal buildings” includes any building where people live, work, shop, sleep, play, or are gathered for other reasons; in other words, a high occupancy building. “Ancillary buildings” includes parking structures, waste storage, or other storage facilities related to the principal use; in other words, a low occupancy building. Railways are federally or provincially regulated and the City of Toronto has no jurisdiction over rail corridors and railway operations. The City is responsible to ensure land use compatibility along rail corridors, and manage future risks. HMM has reviewed CPR’s North Toronto Subdivision between Ossington Avenue and Kendal Avenue and focused on the most effective way to manage the risks to people and property along the rail corridor using best practices.
    [Show full text]
  • West Toronto Diamond Rail-Rail Grade Separation
    2016 Canadian Consulting Engineering Awards / Category B – Transportation West Toronto Diamond Rail-Rail Grade Separation Metrolinx needed to accommodate projected growth, including the new UP Express airport train—just in time for the Toronto 2015 Pan Am Games. Parsons provided detailed design and engineering services during construction for a new kilometer-long rail underpass separating commuter rail tracks from freight train tracks at one of Canada’s busiest rail crossings. Using accelerated bridge construction, four railway bridges were built site-adjacent and slid laterally into place during four short-duration track closures. West Toronto Diamond Rail-Rail Grade Separation PROJECT OUTLINE 75-WORD DESCRIPTION Include the client name and the client’s objective, your role in the project, project complexity and/or use of innovation, and the project’s social, economic and/or environmental benefits. Metrolinx needed to accommodate projected growth, including the new UP Express airport train—just in time for the Toronto 2015 Pan Am Games. Parsons provided detailed design and engineering services during construction for a new kilometer-long rail underpass separating commuter rail tracks from freight train tracks at one of Canada’s busiest rail crossings. Using accelerated bridge construction, four railway bridges were built site-adjacent and slid laterally into place during four short-duration track closures. A northbound UP Express train enters the West Toronto Rail Grade Separation structure on its way to Pearson International Airport carrying passengers from the Toronto Union Station transit hub approximately seven kilometers to the south. The GO Transit Galt track (to Milton) is visible on the extreme left.
    [Show full text]