Jonathan Werner M.A.Sc., PMC, P.Eng. ASSOCIATE Jonathan

Jonathan Werner M.A.Sc., PMC, P.Eng. ASSOCIATE Jonathan

Entuitive | Simplifying the Complex Jonathan Werner M.A.Sc., PMC, P.Eng. ASSOCIATE Jonathan Werner is an Associate at Entuitive with over 25 years of experience in structural analysis and design of bridges, subway stations and other structures. Jonathan has an extensive background in contract administration, project management, foundation investigations, bridge inspections, and structural evaluations, as well as experience on Design Build, P3 and Program Management assignments. Jonathan’s portfolio includes roles varying from inspection, deck rehabilitation, fatigue investigation, Owner’s Engineer and preliminary design on several long span/viaduct bridge projects. Some of his most notable projects include Gordie Howe IT’S HOW WE WORK AS A TEAM THAT “ International Bridge, Port Mann/Highway 1 Bridge over the Fraser DETERMINES THE SUCCESS OF THE River in Vancouver (Gateway Program), the Blue Water Bridges PROJECT. ” in Sarnia, the Sault Sainte Marie International Bridge, and the Thousand Islands Bridges. Before joining Entuitive, Jonathan held leadership positions including Project Engineering Coordinator for the $100 million York University Subway Station on the TTC Spadina Line, Lead Bridge Engineer on the $3 billion Gateway Program in Vancouver, British Columbia, and Project Manager or Structural on several projects. Awards Education Sanford Fleming Medal of Academic Master of Applied Science in Civil Engineering, University of Waterloo Excellence Bachelor of Applied Science in Civil Engineering, University of Waterloo Memberships Professional Engineers Ontario Association of Professional Engineers & Geoscientists of BC Qualified Designer (Building Structural) – Ontario Ministry of Municipal Affairs and Housing Tunnelling Association of Canada www.entuitive.com Jonathan Werner | 1 SELECTED RELEVANT EXPERIENCE Entuitive | Simplifying the Complex New Bridge Design Bridge Inspection, Evaluation and Rehabilitation Port Severn Swing Bridge, Public Works and Government Services Lorne Bridge over the Grand River, City of Brantford, Brantford, Canada, Port Severn, Canada* Ontario, Canada* Hwy 23 Structure Replacement and Rehabilitation, Ministry of Rehabilitation of Concession Street and Victoria Street Bridges over Transportation Ontario, Mitchell, Canada* the Grand River, Region of Waterloo, Canada* Highway 401 Bridges, Leslie to Warden, Canada* Blue Water Bridges Annual Inspections, Point Edward (Sarnia), Canada* Highway 401 and Homer Watson Interchange, Ministry of Transportation Ontario & Region of Waterloo, Canada* Hastings Swing Bridge Rehabilitation, Hastings, Canada* Ravenshoe Road (YR 32) Bridge over Zephyr Creek, York Region, Sault Ste. Marie Emergency Swing Dam, Parks Canada, Sault Ste. Canada* Marie, Canada* QEW/Red Hill Creek Expressway Bridges, Ministry of Transportation Highway 7 Rehabilitation, Ministry of Transportation Ontario, Ontario, Canada* St. Mary’s, Canada* Highway 401/RR 58, Ministry of Transportation Ontario, Canada* Thousand Islands Suspension Bridge, Viaduct and Arch Inspection/ Rehabilitation, St. Lawrence Seaway Authority, Canada* Highway 401 East Bound Collectors – Kipling to Jane, Ministry of Transportation Ontario, Canada* International Bridge, Deck Rehabilitation Design & Construction Liaison - Joint International Bridge Authority, Sault Ste Marie Hurst Drive Extension over Lover’s Creek, City of Barrie, Canada* Michigan & Ontario, Canada* Highway 21 / Adam’s Drain Culvert, Ministry of Transportation International Bridge, Deck Replacement/Rehabilitation Study - Joint Ontario, Canada* International Bridge Authority, Sault Ste Marie Michigan & Ontario, Highway 72/Frog Rapids, Sioux Lookout, Ministry of Transportation Canada* Ontario, Canada* Rehabilitation of Big Creek Bridge, Delhi, Ontario, Ministry of East Morrison Creek Pedestrian Bridges, Town of Oakville, Canada* Transportation Ontario, Canada* Highway 401/Burnham Street Underpass, Cobourg, Ministry of Rehabilitation of Boston Creek Bridge, Willow Grove, Ontario, Ministry Transportation, Canada* of Transportation Ontario, Canada* Trimble Road Bridge, Township of Glanbrook, Canada* International Bridge Annual Inspection, Joint International Bridge Authority, Sault Sainte Marie, Canada* Highway 69 – CNR Grade Separation (SBL and NBL), Ministry of Transportation Ontario, Canada* Whiteman Creek Bridge Repairs, Ministry of Transportation Ontario, Canada* Highway 69 – Blackstone/Crane Lake Road, Ministry of Transportation Ontario, Canada* Highway 400 / Dunlop Street Underpass, Ministry of Transportation Ontario, Canada* Red Hill Creek Expressway (RHCE) at the QEW, Region of Hamilton Wentworth and Ministry of Transportation Ontario, Canada* Highway 17 & White River, West White River and Wabikoba Creek Bridges, CH. Heist, Ontario, Canada* Bridge 2-S01, Fredericton-Moncton Highway Project, Department of Transportation – Province of New Brunswick, Canada* Dundas / Bronte Creek, Region of Halton, Canada* Bridge 3-S03, Fredericton-Moncton Highway Project, Department of Dundas / CNR, Region of Halton, Canada* Transportation – Province of New Brunswick, Canada* Walker Bridge over the Mallet River, County of Wellington, Canada* Bridge 3-S04, Fredericton-Moncton Highway Project, Department of Highway 11 / Concession 8 and 14th Line in Orillia Township, Ministry Transportation – Province of New Brunswick, Canada* of Transportation Ontario, Canada* Highway 17 (new) - Noonday Road Bridge, Ministry of Transportation Lawrence Avenue East over Highland Creek, Toronto, Canada* Ontario, Canada* Truss Repairs on Grand River Bridge in Cayuga, Ministry of Highway 17 (new) - Lower Echo River Bridge, Ministry of Transportation Ontario, Canada* Transportation Ontario, Canada* Rehabilitation of Cooksville Creek Culvert and Retaining Walls at Highway 6 and Twenty Mile Creek, Ministry of Transportation Ontario, Dundas Street East, Mississauga, Canada* Canada* Overlea Blvd. Bridge over Don River, Toronto, Canada* Portage Road – CN Grade Separation, Region of Niagara, Canada* Jane and Steeles over BlackCreek, Toronto, Canada* Highway 7/8 Bridges East of New Hamburg; Ministry of Transportation Ontario, Canada* Dundas / Cawthra Bridge, Region of Peel, Canada* Highway 401 and Highway 10; Ministry of Transportation Ontario, York Mills Road Bridge, Toronto, Canada* Canada* St. David’s Overpass at Highway 406; Ministry of Transportation Highway 403 and 16 Mile Creek (EBL); Ministry of Transportation Ontario, Canada* Ontario, Canada* www.entuitive.com Jonathan Werner | 2 SELECTED RELEVANT EXPERIENCE Entuitive | Simplifying the Complex Rail and Transit Structures Design and Rehabilitation Silvercreek Rail Grade Separation (Subway), Guelph, Canada* TTC Finch West LRT, TTC Transit City, Toronto, Canada* Weston Tunnel, Georgetown South Rail Corridor Expansion, GO Transit, Canada* Toronto-York Spadina Subway Extension, Toronto Transit Commission, Canada* TTC Triennial Contract, Toronto Transit Commission, Canada* Union Station Rail Corridor – Infrastructure Improvement Program, GO Transit, Canada* West Toronto Diamond Project, GO Transit, Canada* TTC Structural Engineering Services Contract, Toronto Transit Commission, Canada* Dufferin Jog Elimination at Queen Street, Toronto, Canada* TTC Brimley RT Station Design Feasibility Study, Toronto Transit Commission, Canada* TTC Bayview Subway Station Construction Phase (Phase 4), Toronto Transit Commission, Canada* TTC Bayview Subway Station Detailed Design Phase, Toronto Transit Commission, Canada* Program Management and Owner’s Engineer Gordie Howe International Bridge, Windsor, Canada* Hwy 407 East Owner’s Engineer Phase 1, Ontario, Canada* Hwy 407 ETR Independent Auditor, Ontario, Canada* Gateway Program, Vancouver, BC, Canada* Jacques Cartier Bridge, SMDB Group, Montreal, Canada* Other Projects Niagara Falls Decomissioned Hydro Tunnels, Niagara Falls, Canada* Port Loring Water treatment Plant, Conoco Phillips Canada, Canada* Shoreham Drive over Black Creek Duct Support Structure, Toronto Hydro, Canada* Lawrence Avenue East over Highland Creek Duct Support Structure, Toronto, Canada * Milton Quarry Primary Crusher, Dufferin Aggregates, Canada* Pickering’s Millennium Square Waterfront Development, Victor Ford and Assoc., Canada* * Project led by Jonathan Werner while employed at a previous firm www.entuitive.com Jonathan Werner | 3.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us