ISSUE NO. 44

WEEK BEGINNING 29/10/2019

Office of Rail Safety Manager Level 15, 700 Collins St

Issued on behalf of Metro and V/Line

Weekly Operational Notice THE WEEKLY OPERATIONAL NOTICE

THE WEEKLY OPERATIONAL NOTICE is issued every Tuesday. An acknowledgement of its receipt is not necessary. Every person whose duty requires them to have a copy is held responsible for obtaining one of each issue, and for communicating to their staff any instructions applicable to them. If not received at the usual time or in doubt as to your obligations, contact your Supervisor.

TEMPORARY REDUCTIONS OF SPEED OF TRAINS Notice to Drivers, Second Persons, Force Protection Coordinators and others.

(a) (i) Repairs and renewals are being effected at the following places and, until further notice, the speed of trains must, if required, be reduced as shown. Each location will be protected when necessary, either by hand signals, or by special signals. Crews must keep a good look-out at these locations for such signals, which must be exhibited in accordance with these rules. (ii) In the absence of such signals, trains may be run at the ordinary rate of speed. (b) Drivers are reminded that repairs of lines necessitating reductions of speed, of which it has not been able to give notice, may be necessary at other places beside those mentioned in this notice. They must, therefore, be always on the lookout and be prepared to stop or to run at reduced speed whenever and wherever hand signal are exhibited. (c) Work Group Supervisors and others in charge of works at the following places where the requirements render it necessary that the speed of train be reduced, must understand that this information does not in any way relieve them of the responsibility of seeing that Competent hand signallers, furnished with the necessary Hand Signals and Audible Track Warners are stationed at the places named for the purpose of signalling in accordance with these rules, or that the special way Warning and Caution signals are exhibited, as each case may require. Special permanent way warning and Caution signals are exhibited at the locations contained in the following tables. For instructions regarding the use of these signals see Rule 7, Section 15 of the Rules and Operating Procedures 1994. (d) Unless otherwise specified, all reductions of speed shown in this notice apply until the issue of the next Weekly Operational Notice. Any temporary reduction of speed which appeared in the last issue of the Weekly Operational Notice, and which is not included in this edition, may be regarded as cancelled. (e) Subject to any temporary modifications in the foregoing or other current instructions, the permanent way reductions of speed and the speed limitations shown in the Working Time-tables, and all additions to and amendments thereof, must be carefully observed. Signallers, Train crews, Work Group Supervisors, Gangers and others must promptly report their Supervisors, any case in which they observe trains running in excess of the speed laid down at or between any of the points where speed is appointed to be reduced. These reports must be forwarded to the Safety Manager of the relevant company.

Victorian Railways advertisement. Page 2 of 29 Weekly Operational Notice No. 44/2019 METROPOLITAN RAIL NETWORK TEMPORARY SPEED RESTRICTIONS

KM TSR AS FROM STATIONS BETWEEN KM END CIRCULAR REASON START SPEED INNER AREA N/A WESTERN LINES Middle Footscray - West Footscray Diverge movements through new track 11/10/19 7.200 7.000 65 TS.126/19 (Up Line) work South Kensington - Footscray 24/04/19 3.600 3.700 60* TS.009/19 . Up Through Suburban Line * Circular TS.109/2018 Is cancelled and replaced by TS.009/2019 a/c alteration to speed restriction.

Spotswood - Seddon P60 SPAD mitigation for the inadequate signal 22/08/19 7.930 6.735 TS.109/19 (Up Line) G35 spacing between W292 and W286. NOTE: As the speed reduction is for SPAD mitigation only, the ‘N’ and ‘NS’ boards are placed at the same point. Williams Landing - Hoppers 01/10/19 Crossing (East Line) 25.600 25.700 80 TS.122/19 Condition of Rail at Bridge Transition (Up & Down trains) Werribee 16/03/18 (East & West Lines) 31.160 34.442 60 TS.029/18 Operational requirements. (Up & Down Trains) * Circular TS.071/2017 is cancelled and replaced by TS.029/18 a/c speed increased to 60 KPH. TS.087/17 is Cancelled and replaced a/c East Line Speed reduced to 30kph vide TS.071/17 on 15/05/17. Area of speed restriction extended; 28/05/15 speed reduced from 65 to 60 kph. Circular TS.109/2018 is cancelled and replaced by TS.009/19 a/c speed increased to 60 KPH. NORTHERN LINES Broadmeadows - Roxburgh Park 05/07/19 17.512 18.325 80 TS.084/19 Smeaton Avenue warning times (Down Line) Operational requirements a/c Signalling Roxburgh Park - Broadmeadows *29/07/19 21.246 18.325 110 TS.103/19 (28/05/2007) and warning times for (Up Line) Dunkeld St & Smeaton Ave. * Circular TS.036/2017 Is Cancelled And Replaced A/C Speed Reduced To 80 Kph. Circular TS.001/2017 Is Cancelled And Replaced a/c Area Of Speed Restriction Reduced And Speed Increased To 100 Kph. TS.011/2019 is cancelled and replaced by TS.036/2019 a/c area of restriction increased. TS.036/2019 is cancelled and replaced by TS.037/2019 a/c area of restriction reduced. TS.037/2019 is cancelled and replaced by TS.047/2019 a/c speed reduction. TS. 047/2019 is cancelled and replace by TS.096/2019 a/c adjacent speed restriction. TS.096/2019 is cancelled and replaced by TS.103/2019 a/c area reduced and speed increased. Craigieburn #01/11/17 25.296 25.545 80 TS.108/17 Signalling issue (28/03/2011). (Down line) # Circular TS.077/2017 Is Cancelled And Replaced TS.108/17 a/c Area Of Restriction Reduced And Reverts To Area Of TS.023/2011. TS.023/2011 Cancelled And Replaced by TS.077/17 a/c Area Of Restriction Extended And Speed Reduced. TS.018/11 amended by TS.023/2011 on 15/05/11

Page 3 of 29 Weekly Operational Notice No. 44/2019 Thornbury - Croxton Normanby Ave & Woolton Ave Level *05/07/18 10.551 10.151 50 TS.083/19 (Up Line) crossing approach. * TS.003/18 cancelled and replaced by TS.008/18 a/c provision of reminder ‘C’ Board at Up end of Thornbury Station. TS.121/17 cancelled & replaced by TS.003/18, reverting to TS.051/2015. TS.051/2015 cancelled and replaced by TS.111/17 a/c condition of sleepers in Thornbury pit. TS.111/17 cancelled and replaced by TS.112/17 reverting to TS.051/15. Circular TS.112/2017 cancelled and replaced by TS.121/17 a/c RFD fault. *TS.008/18 is cancleed and replaced by TS.083/19 a/c speed and area of restriction reduced. High St Approach and Ruthven – Reservoir 10/09/19 15.845 15.142 55 TS.118/15 Signal T 456 obstructed by temporary (Up trains) overhead structure. TS.050/2019 is cancelled and replaced by TS.118/2019 a/c speed reduced to 55kph EASTERN LINES Ringwood – Ringwood East 27/08/08 26.940 27.260 70 TS.082/08 Level crossing approach. (Down Line) Croydon - Ringwood East 28/11/16 28.080 27.465 70 TS.101/16 Dublin Road Level Crossing warning time. (Up Line) Kooyong – Tooronga 23/01/14 8.376 9.285 60 TS.008/14 Toorak Rd. Level crossing approach. (Down Line) SOUTHERN LINES

South Yarra - Hawksburn P65 15/08/19 5.316 6.525 TS.107/19 CTD Project Signalling Changes. (Up & down Caulfield Local Line) G30 NOTE: As the speed reduction is for signal approach speed only, the ‘N’ and ‘NS’ boards are placed at the same point. Bonbeach - Carrum Signal sighting distance on temporary 30/08/19 36.735 35.806 50 TS.112/19 (Up Line) slewed track. TS.102/2019 is cancelled & replaced by TS.112/2019 a/c Speed Reduced. Carrum 27/07/19 35.975 35.975 40 TS.100/19 Signal sighting issue - F1131 (Down Line) Seaford - Carrum 17/10/18 37.936 37.536 80 TS.091/18 SPAD Mitigation (Up Line) * Circular TS.046/2018 Is Cancelled And Replaced By TS.091/18 a/c Area Of Restriction Reduced. Circular TS.007/17 is cancelled and replaced by TS.046/18 a/c Track Slew at Seaford. Frankston mechanical Frankston; Up & Down lines and 26/03/15 43.669 43.869 30 TS.026/15 conflicting short overlap and no signal Nos. 1, 2, 3 & 4 Rds. enforcement overlap protection. Track condition suitable for 50kph between 61.162km to 63.209km due to a series of geometry faults. When 13/03/15 *Tyabb – Hastings 61.162 63.209 50 TS.022/15 track condition is improved to provided a line speed above 85kph a signalling assessement shall be completed to confirm level crossing approach times. * TS.031/08 amended by TS.036 on 25/04/08; amended by TS.001/11 on 28/01/11; amended by TS.007/11 on 23/02/11; amended by TS.022/2015 on 13/03/15. Passive Pedestrian crossing non- 08/07/19 Somerville (Up Trains) 55.781 55.781 70 TS.087/19 compliant sighting distance. Passive Pedestrian crossing non- 08/07/19 Somerville (Down Trains) 55.781 55.781 50 TS.086/19 compliant sighting distance.

Page 4 of 29 Weekly Operational Notice No. 44/2019 BOOKED OUT OF SERVICE

LOCATION CIRCULAR EQUIPMENT CAUSE Newport (‘E’ ) - 615 Points Condition of Siding Lyndhurst V/Line TON.522/2010 Crosslocks Nos. 678 & 679 Track condition Track not returned to Brighton Beach (25/07/10) SW.170/2010 No. 1 track service after UBU Project. Newport Workshops Garden Clearance requirements in SW.168/2018 No. 2Track Platform No. 2 Rd 2. Circular SW.453/2018 & SW.060/2019 are cancelled and replaced by SW.196/2019 A/C No. 3 track restored to service. TS.196/2019 Cancelled A/c No. 1 Garden Platform Track Restored to Service. Parcels Dock Siding and points Nos. 38, 40U & 40D, 41, 43 & 48, Points Nos. 227 & 471 (in lead Signalling Strategy/ Flinders Street SW.301/2014 between City Circle & Burnley Rationalisation Project Loop Viaducts and tracks Nos. 6 – 9A inclusive). No. 1A track and Flinders Street (22/10/18) SW.399/2018 Points Nos. 052, 053 & 055. Fouling Point Deficiencies (Disarrangement of Interlocking) Flinders Street (17/06/13) SW.279/2013 ^No. 1 West Track Track condition ^ A water hydrant line installed a/c urgent works is foul of the Booked Out portion of line & a deficient fouling point between track numbers 136T & 45T has been identified andMUST not be booked back into service without the permission of the Chief Engineer and the Track Delivery Manager. No impact to operational lines. Works Siding (Down end of No. Pakenham (25/11/13) - Condition of rail (rust) 3 Rd) Stony Point SW.528/2019 Down End WSA Hand Points Condition of turnout Points No. 14U & 14D. (Between Signalling Strategy/Junction Southern Cross (Spencer Street) SW.301/2014 No. 8 South Track and the City Rationalisation Project Circle Loop Viaduct line). Ashburton (26/11/14) SW.153/2015 Siding Sleeper condition 54 Hour Rule Condition of Werribee SW.248/2015 Points Nos. 9 & 25 Points (Rust) Footscray TBA Emergency Crossover Condition of Points Points Nos. 424D & 424U Broadmeadows SW.400/2018 Fouling Point Deficiencies (Disarrangement of Interlocking) Nos. 2 & 3 Tracks Insufficient track centres Flemington Racecourse SW.413/2018 Points No.438 & No. 436 for train preparation. Lilydale SW.196/2018 Points No. 207D Track Condition. Track Condition suitable SW.445/2018 Siding ‘C’ for Tamping and Grinding Upper Ferntree Gully consists only. SW.484/2018 Points No. 19 Fouling Point Deficiencies Enquiries concerning the above should be directed to 9610 3673.

Page 5 of 29 Weekly Operational Notice No. 44/2019 SAFEWORKING NOTICES EAST MALVERN – GLEN WAVERLEY

ISSUE OF NEW SIGNALLING DIAGRAM. Commencing forthwith, the following signal diagram is effective.

NEW DIAGRAM DIAGRAM TITLE OF DIAGRAM CANCELLED NUMBER 45/19 EAST MALVERN TO GLEN WAVERLEY 1/19 Signalling Diagram No. 45/19 has been issued to correct an error in the track configuration within the sidings at Glen Waverley. Metro SW.553/2019 ______SYDENHAM

REMOVAL OF REDUNDANT SIGNALLING CIRCUITS CBI AND WESTCAD SOFTWARE DATA UPDATE MELTON HIGHWAY GRADE SEPARATION PROJECT Between 16:00 hours on Sunday 3rd November 2019 and 03:00 hours on Monday 4th November 2019, the following works will be undertaken to remove redundant signalling circuits and control system indications as part of the Melton Highway Grade Separation Project. • Removal of 703T and the extension of track circuit 702T. • Removal of Melton Highway pedestrian crossing circuits. • Decommission signal module 19S04 in 733MB (used for control and indications of Melton Highway Level Crossing). The Sydenham WestLOCK data and the Calder Park WestRACE data will be updated to refect the changes. The Sunbury WestCAD A & B (located at Craigieburn Signal Box) and the Sunbury WestCAD C & PRIDE (located at Watergardens Station) will be updated to reflect the removal of the Melton Highway level and Pedestrian crossings. The above works will be conducted under cover of an Absolute Occupation. Note: A Network Safety representative will not be in attendance to sign the certificate of Signalling. Metro SW.558/2019 ______

Page 6 of 29 Weekly Operational Notice No. 44/2019 VICTORIAN COUNTRY RAIL NETWORK TEMPORARY SPEED RESTRICTIONS ESTIMATED STATIONS KM KM TSR AS FROM CIRCULAR REASON REMOVAL BETWEEN START END SPEED DATE SOUTH WESTERN LINES - Warrnambool Line For the implementation of TPWS 30/06/2019 Geelong - Warn Ponds 78.992 80.065 55 TS0236/18 01/10/2019 equipment at Marshall Operational Restriction as SPAD South Geelong - 13/11/2018 81.700 81.650 40 TS0325/18 mitigation for UP train approaching 15/11/2020 Marshall MSL24 - MSL26 Overhead Bridge Works / Princes Marshall - 11/11/2018 139.710 140.250 80 TS0321/18 Hwy signage issues due to VicRoads 1/01/2019 Warrnambool changing road approach to LX. Inadequate sighting distance at Occo 21/01/2019 Colac - Camperdown 176.200 176.650 60 TS0037/19 30/06/2020 crossing. Down direction Inadequate sighting distance at Occo 13/11/2018 Camperdown - Terang 213.035 213.435 65 TS0326/18 31/12/2019 crossing 213.435 DOWN trains only Werribee - Geelong Line North Geelong - Track condition at 133 points Geelong 15/02/2019 72.200 72.250 30 TS0126/19 31/03/2019 Geelong (East Track) & Heat mitigation. WESTERN LINES (STANDARD GAUGE) Dimboola - Rainbow Line 1/02/2019 Dimboola - Rainbow 367.200 377.800 15 TS0189/19 Sleeper condition 30/04/2020 Poor sleeper condition identified 12/07/2019 Dimboola - Yaapeet 375.200 426.500 15 TS0250/19 during Trackwalking. Sleeper renewal 02/12/2020 required Excess rail, poor sleeper condition low 29/11/2018 Jeparit - Ellam 406.000 410.000 10 TS0356/18 29/11/2020 ballast profile causing line defects. Maryborough - Ararat Line 24/06/2019 Maryborough - Avoca 198.600 198.800 40 TS0231/19 Vertical curve radius 30/12/2020 30/08/2018 Maryborough - Avoca 204.999 205.405 25 TS0262/18 Box Culvert requires load assessment 30/12/2018 30/08/2018 Avoca - Ararat 208.969 209.375 25 TS0263/18 Box Culvert requires load assessment 30/12/2018 30/08/2018 Avca - Ararat 222.346 222.750 25 TS0265/18 Box Culvert requires load assessment 30/12/2018 Line of Sight restricted at 3 13/09/2019 Avoca - Ararat 240.760 243.920 25 TS0294/19 occupation crossings, 240.960, 1/04/2020 241.506, 243.720 Line of Sight restricted at 2 09/09/2019 Avoca - Ararat 252.157 254.590 25 TS0292/19 occupation crossings: 252.357, 01/04/2020 254.390 Line of sight restricted at 2 07/12/2018 Ararat - Avoca 257.902 259.065 25 TS0372/18 occupation crossings: 258.102, 30/12/2019 258.456. Line of sight restriction at 2 Wiltshire Block Point 09/09/2019 262.487 264.190 25 TS0293/19 occupation crossings: 262.687, 01/04/2020 - Ararat 262.820

Page 7 of 29 Weekly Operational Notice No. 44/2019 Murtoa - Hopetoun Line Warracknabeal - 05/05/2010 348.319 383.895 40 TS0078/10 Line of sight at Level crossings 31/12/2016 Beulah Level crossing track circuit altered Murtoa - 09/10/2016 348.730 349.330 10 TS0147/16 (shortened)> 18/07/16 Track 31/12/2016 Hopetoun geometry fault also. 24/04/2014 Beulah - Hopetoun 383.895 409.311 40 TS0170/14 Line of sight at Level crossings 31/12/2016 INTERSTATE CORRIDOR - WOLSELEY LINE Refer to ARTC WebRams Access WESTERN LINES (BROAD GAUGE) Ballarat - Ararat Line Defective culvert barrel and walls with active cracking, cracks are 23/06/2019 Ballarat - Ararat 122.700 123.200 50 TS0227/19 30/12/2019 developing under regular traffic operations. Sunshine - Ballarat Line Extended warning time required Caroline Springs 24/10/2019 23.315 28.028 140 TS0329/19 at Hopkins Road and Troupes Road 02/12/2019 - Melton following widening Caroline Springs Increased warning time required at 24/10/2019 24.441 25.552 140 TS0331/19 02/12/2019 - Melton Hopkins Road due to widening Turnout V crossing defect, and Rockbank Loop - required extension to Troupes Road 24/10/2019 29.600 30.800 80 TS0333/19 02/12/2019 Melton Loop level crossing warning time due to widening Rockbank Loop - V/Nose repaired, speed increased 24/10/2019 30.700 30.800 80 TS0332/19 31/10/2019 Melton Loop approved by engineering. DOWN TRAINS ONLY, Due to level crossing widening and current Melton - Parwan 08/07/2019 37.069 38.020 100 TS0242/19 signalling infrastructure, a data 01/12/2019 Loop change to account for approach time is not planned until Parwan Loop - UP TRAINS ONLY, Due to level 08/07/2019 39.162 38.000 120 TS0243/19 01/12/2019 Melton crossing Bungaree East - BLU works required for tamping, top 08/10/2019 Bungaree West 98.000 98.358 130 TS0315/19 31/12/2019 part of BLU project. (South Track) Ballarat - Maryborough Line MBP works have installed a set of Talbot - 24/01/2019 223.400 225.000 15 TS0084/19 gauge splitter points that are not 31/12/2019 Maryborough type approved. NORTH WESTERN LINES Bendigo - Swan Hill Line Level Crossing circuitry Nth Bendigo requirements for Thunder St and 01/04/2016 Junction - 164.327 166.258 60 TS0042/16 30/06/2017 Weeroona Ave Level Crossing Eaglehawk approach times. Eaglehawk - Hopkins St Level crossing, short 27/02/2009 171.300 171.700 30 TS0020/09 31/12/2016 Raywood stacking. Line of sight for down trains Eaglehawk - 02/05/2017 183.100 183.520 60 TS0171/17 approaching Fitzpatrick Rd Level 31/12/2020 Tandarra Crossing. Bendigo - Swan 21/01/2019 195.000 195.400 60 TS0017/19 Sight distance restricted by angles 30/06/2020 Hill Bendigo - Swan Sight distrance restricted by angles 21/01/2019 195.400 195.800 60 TS0019/19 30/06/2020 Hill - Greenhills Road

Page 8 of 29 Weekly Operational Notice No. 44/2019 Bendigo - Swan 21/01/2019 205.840 206.250 60 TS0020/19 Sight distance restricted by angles 30/06/2020 Hill Tandarra - Bridge defects as per inspections 31/10/2018 206.100 206.600 50 TS0300/18 30/06/2019 Dingee carried out by civil inspectors. Bendigo - Swan 21/01/2019 206.650 206.240 60 TS0021/19 Sight distance restricted by angles 30/06/2020 Hill Rough riding on curve at the Dingee - 13/11/2018 228.300 229.100 60 TS0322/18 transition of curve. Poor riding at 15/11/2019 Pyramid Hill 80kph over turnout. Bendigo - Swan Sight distance restricted by angles - 21/01/2019 235.850 236.260 60 TS0022/19 30/06/2020 Hill Mologa Durham Ox Rd. Bendigo - Swan Sight distance restricted by angles - 21/01/2019 236.660 236.250 60 TS0023/19 30/06/2020 Hill Mologa Durham Ox Road. Sight distance restricted by angles Bendigo - Swan 21/01/2019 239.160 246.950 60 TS0024/19 - Prices, O'Tools, Griffin & Abbattoirs 30/06/2020 Hill Rd Sight distance restricted by angles Bendigo - Swan 21/01/2019 247.350 239.560 60 TS0025/19 - Prices, O'Tools, Griffin & Abbattoirs 30/06/2020 Hill Road Pyramid - Siting distance due to Worsley Rd - 21/01/2019 275.560 275.970 60 TS0026/19 30/06/2020 Kerang Down Trains only Pyramid - Siting distance due to Worsley Rd - 21/01/2019 276.370 275.960 60 TS0027/19 30/06/2020 Kerang UP trains only. Pyramid - Siting distance due to McPhail Rd. 21/01/2019 280.480 280.890 60 TS0028/19 30/06/2020 Kerang Down trains only. Pyramid - Siting distance due to McPhail Rd. 21/01/2019 281.290 280.880 60 TS0029/19 30/06/2020 Kerang Up trains only. Kerang-Swan Level Crossing Approach Warning 17/09/2018 289.600 291.200 80 TS0288/18 15/10/2018 Hill time. Kerang - Mystic Siting distance restriction due to 21/01/2019 292.900 293.310 60 TS0030/19 30/06/2020 Park White Lane - DOWN trains ONLY Kerang - Mystic Sighting distance due to White lane. 10/05/2017 293.710 293.300 60 TS0190/17 31/05/2018 Park UP trains ONLY. Line of sight issues at Lake Road Kerang - Lake 21/01/2019 307.890 310.550 60 TS0031/19 Crossing. This TSR applies to DOWN 30/06/2020 Boga trains only. Kerang - Mystic Siting distance restricted by Lake 21/01/2019 310.970 308.280 60 TS0032/19 30/06/2020 Park Rd & Gorton Dr. Up Trains ONLY Kerang - Lake Line of sight restricted Bailey Road 28/10/2019 320.240 322.700 60 TS0336/19 30/06/2021 Boga and Jeffer Road DOWN TRAINS ONLY Kerang - Lake Line of sight restricted Bailey Rd,& 13/03/2019 322.900 320.640 60 TS0139/19 30/06/2019 Boga Jeffer Road. Up trains ONLY. Siting distance restriction due to Farm Lake Boga - 21/01/2019 337.462 341.450 60 TS0035/19 Rd, Maher Rd & Aerodrome Extension 30/06/2020 Swan Hill Rd - DOWN Trains ONLY. Boort - Manangatang Line Barraport - Rough ride - Geometry faults. 29/11/2018 323.200 323.400 10 TS0355/18 31/03/2019 Gredgwin Line, and Top Mysia Block Patrolman geometry faults, Point - 31/08/2019 328.600 334.300 20 TS0280/19 sleeper condition. Protection for 01/06/2020 Quambatook Culvert at KP: 334.300. Block Point Dunolly - Inglewood Line Up end points Inglewood Arnold Block (Eaglehawk) in poor condition. 23/01/2019 Point - 248.700 250.000 20 TS0068/19 Update: 07/12/16: Non 01/01/2021 Inglewood conforming sighting distance at Sullivan St and Calder Highway

Page 9 of 29 Weekly Operational Notice No. 44/2019 Dunolly - Mildura Line IEV100 Faults; Non conforming St Arnaud - 09/11/2018 336.000 338.400 20 TS0316/18 short closure rail & Crossing 30/05/2019 Ouyen requires renewing. AK Car Fault repaired, Turnout 20/09/2019 Birchip - Ouyen 410.800 410.820 30 TS0302/19 Decommissioned State (Curyo) 20/09/2020 remains Sighting distance restricted by angles & vegetation affecting, Curyo - Rickards, Adcock, Dorans & 29/11/2018 415.850 422.100 60 TS0358/18 31/03/2020 Woomelang Watchupga-Culgoa Rd Level crossings. Applies to trains in the DOWN direction only. Sighting distance restricted by angles (Road) & vegetation Woomelang - affectingg Rickards, Adcock, Doran 29/11/2018 416.250 422.450 60 TS0359/18 31/03/2020 Curyo & Watchupga-Culgoa Rd level crossings. Applies to trains in the UP direction only. Sighting distance restricted by angle of road and vegetation at Woomelang - 29/11/2018 436.200 437.000 60 TS0360/18 Pearce and Barbarys Rd level 31/03/2020 Lascelles crossing. Also geometry fault in level crossing. Echuca - Deniliquin Line

N/A Gheringhap - Ballarat Line Lethbridge - Non conforming line of sight at 24/01/2019 101.259 103.100 40 TS0073/19 31/12/2019 Meredith Quarry Lane and Lower Plains Rd Gheringhap - Lal 23/01/2019 111.000 127.000 40 TS0074/19 Deterioration of track conditions. 31/12/2019 Lal Gheringhap - Top and Line faults through 23/01/2019 134.700 135.000 30 TS0075/19 31/12/2019 Ballarat turnout Inglewood - Wycheproof Line Korong Vale - 05/09/2018 317.400 318.800 10 TS0280/18 Level crossing design deficiency. 05/09/2019 Teddywaddy Korong Vale - Boort Line Mysia Block Point - 18/07/2019 307.000 309.200 20 TS0251/19 Sleeper condition 18/09/2019 Quambatook Block Point Korong Vale - Poor sleeper condition. Geometry 11/07/2019 343.000 455.900 25 TS0249/19 11/07/2020 Manangatang faults. Korong Vale - 11/01/2019 405.000 405.700 15 TS0010/19 Extrremely poor sleeper condition. 01/04/2019 Manangatang Ouyen - Panitya Line Level crossing line of sight 14/06/2011 Ouyen - Walpeup 471.478 488.500 40 TS0062/11 31/12/2016 restrictions. NORTHERN LINES Southern Cross - Sunshine Line South 18/03/2019 Kensington 5.300 6.000 40 TS0143/19 Defective Retaining wall 18/06/2019 (Down Track) Sunbury - Bendigo Line Castlemaine - Huck bolt in V Xing broken 14/08/2019 Ravenswood 138.000 138.400 100 TS0269/19 and currently replaced with a 13/09/2019 (West Track) threaded V Xing bolt

Page 10 of 29 Weekly Operational Notice No. 44/2019 Huck bolt in V Xing broken Ravenswood - and currently replaced with a 04/09/2019 Kangaroo Flat 147.300 147.600 100 TS0289/19 30/11/2019 threaded V Xing bolt. (Down end (West Track) Ravenswood Loop) Track condition and huck bolt Elphinstone - broken in V Xing at 113.400 km 14/08/2019 Castlemaine 113.200 116.000 110 TS0270/19 13/09/2019 and replaced with a threaded V (West Track) Xing bolt NORTH EAST BROAD GAUGE LINE Donnybrook - Seymour Wallan - Kilmore Platform edging is in a very 30/09/2019 East (Down 53.435 53.500 60 TS0309/19 poor condition per Engineering 30/06/2020 Track) assessment. Seymour - Shepparton Line Seymour - 26/10/2019 129.000 139.000 80 TS0334/19 Consolidation TSR for tie renewal 31/10/2019 Shepparton Seymour - Sight distance restricted by 21/01/2019 131.850 132.260 60 TS0038/19 30/06/2020 Shepparton angles Seymour - Sight distance restricted by 21/01/2019 132.650 132.240 60 TS0039/19 30/06/2020 Shepparton angles Seymour - Sighting distance restricted by 21/01/2019 141.720 142.130 60 TS0040/19 30/06/2020 Shepparton angles Seymour - Sight distance restricted by 21/01/2019 142.530 142.120 60 TS0041/19 30/06/2020 Shepparton angles Culvert failure under mainline leading to unappropriated loading Murchison East - 29/03/2019 149.200 149.600 40 TS0155/19 capacity and inadequate drainage 30/04/2019 Toolamba function that may cause washing away during flood Seymour - Sight distance restricted by 21/01/2019 155.340 155.750 60 TS0042/19 30/06/2020 Shepparton angles Seymour - Sight distance restricted by 21/01/2019 156.150 155.740 60 TS0043/19 30/06/2020 Shepparton angles Seymour - sitting distance restricted by 08/05/2017 156.150 155.760 60 TS0180/17 01/01/2018 Shepparton angles Seymour to Aracadia Road LX - Sight distance 21/01/2019 158.480 158.890 80 TS0044/19 30/06/2020 Shepparton restricted by angles Seymour to Arcadia Road LX - Sight distance 21/01/2019 159.290 158.880 80 TS0045/19 30/06/2020 Shepparton restricted by angles Level Crossing sighting issues Toolamba - 01/05/2017 171.280 171.690 60 TS0151/17 for DOWN trains only. (Sighting 02/03/2017 Mooroopna Distance reviewed) Seymour - Sighting distance restricted by 21/01/2019 173.070 173.480 60 TS0046/19 30/06/2020 Shepparton angles Seymour - Sight distance restricted by 21/01/2019 173.880 173.470 60 TS0047/19 30/06/2020 Shepparton angles Shepparton - 01/07/2019 192.833 193.233 30 TS0239/19 Culvert in poor condition 31/03/2020 Tocumwal GOULBURN VALLEY LINES Toolamba - Echuca Line Toolamba - 12/11/2018 167.400 231.200 30 TS0320/18 Sleeper Condition 30/06/2019 Echuca INTERSTATE CORRIDOR MELBOURNE - ALBURY LINE Refer to ARTC WebRams Access

Page 11 of 29 Weekly Operational Notice No. 44/2019 EASTERN LINE Pakenham - Sale Line Nar Nar Goon - Track Condition, Exceedence, 26/09/2018 Tynong (North 70.700 70.900 80 TS0296/18 Geometry Faults and Underlying 20/08/2019 Track) issues. Hernes Oak 29/08/2019 Loop - Morwell 141.218 141.228 40 TS0279/19 Armco Pipe Corrosion 01/02/2020 Loop Cross levels - Tops of Skeleton Bridge and through both turnouts Morwell - 08/08/2019 145.800 147.900 80 TS0263/19 of GIFT and APM, excessive 08/09/2020 Maryvale wear on turnouts. Extended 08/08/2019 due to rail condition. Embankment landslip due to Morwell - 21/08/2019 153.600 154.500 100 TS0274/19 extreme weekend weather 26/09/2019 Traralgon conditions Traralgon to 13/11/2018 165.000 165.100 70 TS0327/18 Line of sight issue. 25/08/2020 Bairnsdale Traralgon - 13/11/2018 183.500 183.510 70 TS0328/18 Line of sight issue. 25/08/2020 Bairnsdale Traralgon to 13/11/2018 213.000 214.000 70 TS0329/18 Line of sight issue. 25/08/2020 Bairnsdale Lins of sight issues due to vegetation and short visual 13/11/2018 Sale - Stratford 218.590 218.755 60 TS0330/18 12/05/2019 warning for heavy vehicles crossing occupation crossing. TSR for the implementation of TPWS equipment to enforce 10 26/06/2019 Sale - Bairnsdale 221.102 221.392 50 TS0226/19 31/07/2019 km/h restriction on the Avon River Bridge (for down trains only) Sight Distance Restricted by 13/11/2018 Sale - Bairnsdale 224.350 225.800 60 TS0331/18 27/04/2019 angles Traralgon to Line of sight issue. VL's to 13/11/2018 230.244 230.254 70 TS0332/18 25/08/2020 Bairnsdale Bairnsdale - Proposed Mitigation Line of sight issues for the up Stratford - direction only, due to BIO Site 13/11/2018 233.985 233.996 70 TS0333/18 12/05/2019 Bairnsdale vegetation reserve on the curve approach to occupation crossing. Stratford - 13/11/2018 236.800 236.820 70 TS0334/18 Line of sight issues 31/12/2020 Bairnsdale Traralgon - Line of sight issue. VL’s to 13/11/2018 239.990 240.000 70 TS0335/18 15/11/2020 Bavirnsdale Bairnsdale - Proposed Mitigation Traralgon to Line of sight issue. VL’s to 13/11/2018 254.500 254.510 40 TS0336/18 25/08/2020 Bairnsdale Bairnsdale - Proposed Mitigation

Page 12 of 29 Weekly Operational Notice No. 44/2019 Speed Restrictions and Track Warnings -

Segment: Somerton Loop - Austrak - Seymour Loop No At or Between Kms Date Pass/Oth Dir Boards Reason Craigieburn and Donnybrook South 229/2019 31.77km to 31.8km 3/09/2019 80/80 Yes Track geometry - Condition Comment: ** APPLIES TO BOTH NE VICTORIAN LINE (EAST AND WEST TRACK) **

Geometry issues. Estimated removal date: 31/12/2019 Beveridge and Wallan Loop 237/2019 40.6km to 42.2km 19/09/2019 100/100 Yes Operational sign - Condition Comment: ** APPLIES TO NE VICTORIAN EAST LINE ONLY **

Late reaction on lights and bells. Estimated removal date: 01/12/2019 Heathcote Junction and Wandong 225/2019 57.79km to 58.208km 29/08/2019 80/80 Yes Track geometry - Condition Comment: ** APPLIES TO NE VICTORIAN EAST LINE ONLY **

Mudholes and geometry defects. Estimated removal date: 31/12/2019 Tallarook North and Seymour Loco 469/2018 98.76km to 99.809km 23/12/2018 60/60 Yes Ballast - Condition (Mudhole) Comment: ** APPLIES TO NE VICTORIAN EAST LINE ONLY **

Multiple mud holes across both 38700 and 38500 and actual km's of TSR is 94.89 to 101.95. If amending refer to both TSRs. Estimated removal date to be in align with planned works. 31/12/2019 Seymour Loco and Seymour Loop 470/2018 99.809km to 101.95km 23/12/2018 60/60 Yes Ballast - Condition (Mudhole) Comment: ** APPLIES TO NE VICTORIAN EAST LINE ONLY **

Multiple mud holes across both 38700 and 38500 and actual km's of TSR is 94.89 to 101.95. If amending refer to both TSRs. Estimated removal date to be in align with planned works. 31/12/2019

Segment: Seymour Loop - Benalla Junction No At or Between Kms Date Pass/Oth Dir Boards Reason Avenel and Longwood Loop 206/2019 111.47km to 112.12km 5/08/2019 80/80 Yes Track geometry - Condition Comment: ** APPLIES TO NE VICTORIAN WEST LINE ONLY **

Estimated removal date: 01/12/2019 Avenel and Longwood Loop 156/2019 118.75km to 122.602km 18/06/2019 80/80 Yes Track - Condition (Other) Comment: ** APPLIES TO NE VICTORIAN EAST LINE ONLY **

Further geometry and mudholes. Estimated Removal Date : 16/12/2019

28/10/2019 18:06 1

Page 13 of 29 Weekly Operational Notice No. 44/2019 Speed Restrictions and Track Warnings -

Longwood Loop and Balmattum 182/2019 138.93km to 140.94km 11/07/2019 80/80 Yes Track geometry - Condition Comment: ** APPLIES TO NE VICTORIAN WEST LINE ONLY **

Geometry defects within track. Estimated removal date: to be in align with planned works. 22/7 extended due to mudholes and further geometry defects 06/12/2019 Longwood Loop and Balmattum 130/2019 140.46km to 145.952km 17/05/2019 80/80 Yes Track geometry - Condition Comment: ** APPLIES TO NE VICTORIAN EAST LINE ONLY **

Estimated removal date: 01/12/2019 Longwood Loop and Balmattum 19/2019 149.04km to 156.93km 21/01/2019 80/80 Yes Track geometry - Condition Comment: ** APPLIES TO NE VICTORIAN WEST LINE ONLY **

Length of speed restriction increased due to further geometry defects within track. Estimated removal date: 01/12/2019 Longwood Loop and Violet Town Loop 217/2019 149.14km to 153.692km 20/08/2019 80/80 Yes Track geometry - Condition Comment: ** APPLIES TO NE VICTORIAN EAST LINE ONLY **

Geometry defects and multiple mudholes. Estimated removal date: 01/12/2019 Euroa and Violet Town Loop 110/2019 162.8km to 162.95km 17/04/2019 80/80 Yes Track geometry - Condition Comment: ** APPLIES TO NE VICTORIAN WEST LINE ONLY **

Multiple geometry defects. Estimated removal date: 01/12/2019 Euroa and Violet Town Loop 235/2019 163.1km to 164.4km 18/09/2019 60/60 Yes Worksite Comment: ** APPLIES TO NE VICTORIAN EAST LINE ONLY **

Worksite. Estimated removal date: 15/11/2019 Violet Town Loop and Benalla Platform 81/2018 171.45km to 171.48km 27/03/2018 60/60 Yes Track - Condition (Other) Comment: ** APPLIES TO NE VICTORIAN EAST LINE ONLY **

Condition of turnout. Estimated removal date: 01/12/2019 Violet Town Loop and Benalla Platform 154/2019 177.17km to 177.18km 14/06/2019 80/80 Yes Track geometry - Condition Comment: ** APPLIES TO NE VICTORIAN EAST LINE ONLY **

Geometry defect within road crossing. Estimated removal date: 31/01/2020 Violet Town Loop and Benalla Platform 262/2018 189.31km to 194.78km 4/07/2018 60/60 Yes Points and crossing - Other

28/10/2019 18:06 2

Page 14 of 29 Weekly Operational Notice No. 44/2019 Speed Restrictions and Track Warnings -

Comment: ** APPLIES TO NE VICTORIAN WEST LINE ONLY **

Decayed bearers on bridge, pumping mudholes and gometry defects within crossing. Distance reduced 05/02/2019. Estimated removal date: 31/03/2020

Segment: Benalla Junction - Albury No At or Between Kms Date Pass/Oth Dir Boards Reason Glenrowan Loop and Alumatta 72/2019 233.1km to 233.14km 15/03/2019 80/80 Yes Points and crossing - Geometry Comment: ** APPLIES TO NE VICTORIAN EAST LINE ONLY **

Top, both ends of crossing. Estimated removal date: 31/01/2020 Wangaratta and Bowser 213/2019 236.3km to 236.75km 14/08/2019 80/80 Yes Track - Condition (Other) Comment: ** APPLIES TO NE VICTORIAN WEST LINE ONLY **

Estimated removal date: 11/11/2019 Bowser and Springhurst 5/2018 247.3km to 247.5km 12/01/2018 40/40 Yes Track - Condition (Other) Comment: ** APPLIES TO NE VICTORIAN WEST LINE ONLY **

Track condition on West track. Further deterioation of track with top & twist in road crossing. Estimated removal date: 09/12/2019 Chiltern Loop and Wodonga Loop 140/2019 281.3km to 284.2km 30/05/2019 80/80 Yes Track - Condition (Other) Comment: ** APPLIES TO NE VICTORIAN WEST LINE ONLY **

To be tamped during October 30 hour shut and TSR to be removed in following weeks once track has settled. Estimated removal date: 01/11/2019

Segment: Benalla Junction - Yarrawonga No At or Between Kms Date Pass/Oth Dir Boards Reason Benalla Junction and Yarrawonga 114/2013 195.938km to 260km 14/03/2013 50/50 No Track - Condition (Other) Comment: This will become the permanent line speed

28/10/2019 18:06 3

Page 15 of 29 Weekly Operational Notice No. 44/2019 Speed Restrictions and Track Warnings -

Segment: Maroona - Portland No At or Between Kms Date Pass/Oth Dir Boards Reason Maroona and Grone Kalari Siding 14/2018 235km to 382.55km 25/01/2018 60/60 Yes Sleeper/fastening assembly - Condition Comment: Poor sleeper condition in hot temperatures. Estimated removal date: 30/06/2020

Segment: Tottenham Loop - Tottenham Yard (Box) No At or Between Kms Date Pass/Oth Dir Boards Reason Tottenham Loop and Tottenham Yard (Box) 440/2018 9.97km to 10.2km 19/11/2018 20/20 Yes Track - Condition (Other) Comment: Standard gauge Newport bound effectected.. Broad gauge independent crossover at Tottenham Junction have server cross levels through it. All traffic Newport to Melbourne and Melbourne to Newport speed of 20km/hr over crossover. Estimated removal date: 25/03/2019

Segment: Newport - Anakie Loop No At or Between Kms Date Pass/Oth Dir Boards Reason Paisley and Tdg Siding 177/2019 14.2km to 15.2km 9/07/2019 80/80 Yes Track geometry - Condition Comment: Line and Gauge issues in T/O at CRT siding, also rough top in track around the curve. Estimated removal date: 01/12/2019 SCT - Laverton and Manor Loop 251/2019 32.1km to 32.6km 10/10/2019 40/40 Yes Track - Condition (Other) Comment: Top fault in downside of Werribee ST. level crossing. Picked up by AK car.

Segment: Gheringhap Loop - Maroona No At or Between Kms Date Pass/Oth Dir Boards Reason Gheringhap Loop and Inverleigh 382/2018 83km to 83.6km 24/09/2018 60/60 Yes Ballast - Condition (Mudhole) Comment: Multiple mudholes with Oltop and twist defects. Expired TSR 370/2017 refers. Estimated removal date: 01/12/2019 Wingeel Loop and Werneth B/Pt. 252/2017 120km to 120.25km 15/08/2017 40/40 Yes Points and crossing - Other Comment: Points defect. Estimated removal date: 01/12/2019. Berrybank Loop and Tooli Loop 264/2019 152.1km to 152.5km 16/10/2019 60/60 Yes Track - Condition (Other) Comment: Pumping fault. Estimated Removal Date : 16/12/2019 Tooli Loop and Vite Vite 209/2019 179.5km to 180km 8/08/2019 60/60 Yes Track geometry - Condition Comment: Track geometry. Estimated removal date: 30/11/2019

28/10/2019 18:06 1

Page 16 of 29 Weekly Operational Notice No. 44/2019 Speed Restrictions and Track Warnings -

Vite Vite and Fiery Creek Block Point 198/2019 197.1km to 198.2km 26/07/2019 60/60 Yes Ballast - Condition (Mudhole) Comment: Mudhole. Estimated removal date: 31/10/2019 Tatyoon Loop and Tatyoon Loop 621/2010 231.421km to 231.422km 24/12/2010 0/0 No Track Warning Comment: Tatyoon Loop a speed restriction of 25KMH applies to up trains only and only while a train is stationary in loop track due to sighting distance for road traffic. Notice Boards are erected. Tatyoon Loop and Maroona 626/2010 233.226km to 244.452km 25/12/2010 0/0 No Track Warning Comment: A Speed restriction of 30kmh applies to down trains only while a train is stationary in loop track at Tatyoon due to sighting distance for road traffic, [ This amends T/W 213 1998 ].Notice Boards are erected.

Segment: Maroona - Ararat No At or Between Kms Date Pass/Oth Dir Boards Reason Langi Logan and Ararat 23/2019 265.22km to 265.25km 26/01/2019 60/60 Yes Worksite Comment: Turnout replacement Ararat. Estimated removal date: 30/11/2019

Segment: Pyrenees Loop - Murtoa No At or Between Kms Date Pass/Oth Dir Boards Reason Stawell and Deep Lead Loop 638/2010 241.47km to 241.48km 27/12/2010 0/0 No Track Warning Comment: Stawell siding booked out by V/line. Deep Lead Loop and Glenorchy 643/2010 254.81km to 256.62km 29/12/2010 0/0 No Track Warning Comment: Effective immediately departure speed for all movements departing the Deep Lead Loop number 2 road are restricted to 40km/h account track geometry.

Segment: Ararat - Pyrenees Loop No At or Between Kms Date Pass/Oth Dir Boards Reason Ararat and Pyrenees Loop 422/2018 266.7km to 267.58km 2/11/2018 20/20 Yes Road/pedestrian/other crossing - Cond. Comment: Short warning times on level crossing due to third party equipment upgrade. Only effects Melbourne bound trains exiting the loop road at Pyrenees loop. Estimated removal date: 31/12/2019

28/10/2019 18:06 2

Page 17 of 29 Weekly Operational Notice No. 44/2019 Speed Restrictions and Track Warnings -

Segment: Murtoa - Dimboola No At or Between Kms Date Pass/Oth Dir Boards Reason Murtoa and Murtoa Loop 186/2019 298.8km to 301.67km 12/07/2019 50/50 Yes Ballast - Condition (Mudhole) Comment: Mudhole. Estimated removal date: 31/10/2019 Murtoa Loop and Dooen 633/2010 308.8km to 309.18km 27/12/2010 0/0 No Track Warning Comment: Jung siding booked out due to turnout and track condition.

Segment: Dimboola - Serviceton No At or Between Kms Date Pass/Oth Dir Boards Reason Dimboola and Gerang Gerung 644/2010 364.545km to 366.365km 29/12/2010 0/0 No Track Warning Comment: Effective immediately departure speed for all movements departing the Dimboola Loop number 2 road are restricted to 40 km/h account track geometry. Gerang Gerung and Kiata 221/2019 385.32km to 385.34km 24/08/2019 60/60 Yes Track geometry - Condition Comment: Track geometry. Estimated removal date: TBA Kiata and Nhill 645/2010 388.435km to 390.293km 29/12/2010 0/0 No Track Warning Comment: Effective immediately departure speed for all movements departing the Salisbury Loop number 2 road are restricted to 35km/h account track geometry. Tarranginnie and Miram 43/2017 415.95km to 418.45km 17/02/2017 80/80 Yes Track - Condition (Other) Comment: Rough track due to geometry defects in mud holes. Estimated removal date: 31/10/2019 Miram and Kaniva 646/2010 433.292km to 435.106km 29/12/2010 0/0 No Track Warning Comment: Effective immediately the departure speed for all movements departing the Kaniva Loop number 2 road are restricted to 35km/h account track geometry.

28/10/2019 18:06 3

Page 18 of 29 Weekly Operational Notice No. 44/2019 SAFEWORKING NOTICES NORTH GEELONG C - GRAIN LOOP – NORTH SHORE

SIGNALLING ALTERATIONS TRANSFER OF SIGNALLING Between 0700 hours Friday 25th October 2019 and 1900 hours 27th October 2019 or completion of the works as described in this circular, the following works will be undertaken at North Geelong C – Grain Loop and North Shore. Prior to the Commissioning Activities at North Geelong C resuming, the following alterations will be undertaken between North Geelong C Signalbox and North Shore Sidings to transfer the control of and operation of the Signalling to Centrol. SIGNALLING AREA OF CONTROL ALTERATIONS For the transfer of responsibility of the of the Signalling Functions at North Geelong C Signalbox to the North Geelong C Signaller at Centrol the following shall apply for the transfer of the Absolute Occupation for the commissioning works described in this Circular. • The Signaller at North Geelong C will confirm that the Track Force Protection Co – ordinator is in possession of the Absolute Occupations between North Geelong C, North Shore Yard including the Corio Independent Goods Line, and the North Geelong Grain Loop as shown on the following separately issued SWO Circulars. -- SWO-PR-0205/2019, East Yard Link - issued at Centrol. -- SWO-PR-0210/2019, Melbourne Loop Line – issued at North Geelong C. -- SWO-PR-0211/2019, Arrival and Departure Tracks – issued at North Geelong C. -- SWO-PR-0212/2019, Through Goods & CIGL – North Shore– issued at North Geelong C. -- SWO-PR-0213/2019, Main Line and Grain Loop– issued at North Geelong C. • The Signaller at North Geelong C Signalbox will issue a Train Authority to the Train Controller at Centrol confirming the issue of the above Absolute Occupations and formalising the transfer of responsibility of the controlled area. • The Train Controller at Centrol will then repeat back the Train Authority. • The Signaller at North Geelong C Signalbox may then cease duty. • Arrangements will be put in place for the Signallers copy of the Absolute Occupation issued at North Geelong C to be transferred to the Train Controller at Centrol. ALTERATIONS FOR MANUAL OPERATIONS The operation of Rail Vehicle Movements at North Geelong C as described on circular SW.0170/2019 will no longer apply and this circular is cancelled. SIGNALLING VISUAL DISPLAY UNIT – CENTROL A Signalling VDU will be brought into use at Centrol for the indication and control of the points, releases, signals and track circuits for the North Geelong C Controlled Area as previously advised on SW.0162/2019

Page 19 of 29 Weekly Operational Notice No. 44/2019 NORTH GEELONG C - POINT ALTERATIONS • Points NGC 51 forming the crossover between the Dual Gauge Main line and the arrival and departure tracks will be operated by Dual Control Point Machines. • Points NGC 67 forming the connection from the Dual Gauge Main Line towards the Melbourne Loop Line will be operated by a Dual Control Point Machine. • NGC 65 at the exit from North Geelong Yard will be operated by a Dual Control Point Machine. • Points NGC 53 and the derail and wheel crowder at the Up end of the Arrival Track will be operated with two Dual Control Point Machines. • Derail and Wheel Crowder NGC 55 at the Up end of the Departure Track will be operated by a Dual Control Point Machine. NORTH GEELONG C - CONTROL RELEASE ALTERATIONS • NGC 42 release for movements towards the Dual Gauge Main Line will be provided. • NGC 44 release for movements towards the arrival Track will be provided. • NGC 46 release for movements towards the departure track will be provided. • GLG 54 release for movements towards the Melbourne Loop Line and Signal GLG 62 operated by the Geelong Corridor Signaller will be provided. • CGL 50 release for movements from the East Yard toward the Corio Independent Goods Line will be provided. • The Grain Shed Release operated the Grain Shed Operator to the Signaller North Geelong C will be provided. NEW UPGRADED AND EXISTING SIGNALS

SIGNAL TYPE APPLICABLE ROUTES ADDITIONAL INFORMATION NGC 58 Up Dwarf Departure Track to Low Speed Caution North Geelong Yard or NGC 64 Clear Low Speed NGC 60 Up Dwarf Arrival Track to Low Speed Caution North Geelong Yard or NGC 64 Clear Low Speed NGC 62 Up Home Up Dual Gauge Line Normal, Medium and Low Speeds towards NGC 64 NGC 64 Up Home Dual Gauge Line towards Normal, Medium and Low Speeds Melbourne Loop Line – Requires release GLG 54 from Geelong V and S Indicators Corridor Signaller Theatre Box Route indicator Grain Loop – Requires release from Grain Unloading Shed Q – Corio Quay Corio Independent Goods Line G – Grain Loop Corio Quay Line R – Melbourne Loop I – Corio Independent Goods Line NGC 66 Down Dwarf North Geelong Yard to Arrival or Departure Tracks Low Speed Caution NGC 68 Down Home Melbourne Loop Line to Medium Speed Dual Gauge Line – requires 72/8 release from ARTC Low Speed Arrival or Departure Track NGC 70 Down Home Corio Independent Goods Line to Normal, Medium and Dual Gauge Line – requires 72/8 release from ARTC Low Speeds Arrival or Departure Track V and S Indicators

CGL Up Corio Independent Goods Line to Low Speed 26 Home Through siding (Broad Gauge) Directional Arrows Dual Gauge Sidings V and S indicator (No alterations) CGL Down Through Siding to Medium Speeds 30 Home Corio Independent Goods Line Signal CGL 42 (No alterations)

Page 20 of 29 Weekly Operational Notice No. 44/2019 SIGNAL TYPE APPLICABLE ROUTES ADDITIONAL INFORMATION CGL Down Dual Gauge Sidings to Medium Speed 32 Home Corio Independent Goods Line Signal CGL 42 (No alterations) CGL Down Home Dual Gauge Independent Line to Medium, 42 Dual Gauge – Signal NGC 70 Low Speed To East Yard (Broad Gauge only) V and S indicator (No alterations) CGL Down Home Grain Loop along Dual Gauge Medium, 44 to Signal NGC 70 Low Speeds (No alterations) CGL Down Banner Works in conjunction with 44 BI indicator Home Signal CGL 44 CGL Down Home Along Grain Loop to Medium, 46 KP 37.396 Home Signal CGL 44 Low Speeds

CGL Up Dwarf East Yard lead to Low Speed 48 Independent Line – CGL 26 Corio Quay Sidings (No alterations) CGL Down Dwarf Dual Gauge Corio Quay Siding to Clear Low Speed 54 Dual Gauge – Signal NGC 70 Low Speed East Yard (Broad Gauge only) V and S indicators (No alterations) Directional arrows NEW ALTERED AND EXISTING POINTS These points will be operated by Dual Control Point Machines

POINTS DESCRIPTION ADDITIONAL INFORMATION NGC 51 Double ended points from Arrival/Departure tracks towards the Dual Gauge Main Line or North Geelong Yard NGC 53 Broad Gauge Points Works in conjunction with Derail and Wheel Up end of Departure Track Crowder in the Departure Track Operates with two point machines NGC 55 Derail and Wheel Crowder in the Arrival Track NGC 65 Catch Points at exit from North Geelong Yard NGC 67 Dual Gauge Main Line towards Corio Independent Goods Line or Melbourne Loop Line CGL Dual Gauge Line Works with catch points 27 towards Through siding or Dual Gauge Sidings in Dual Gauge Sidings (No alterations) CGL Down end Derail and Wheel Crowder 29 through Siding (No alterations) CGL Independent Goods Line to East yard Works with CGL 49 derail and Crowder on 37 (No alterations) siding track Dual Control Point Machine CGL Independent Goods Line to Corio Quay Works with CGL 47 derail and Crowder on 39 (No alterations) siding track Dual Control Point Machine CGL Dual Gauge Line Dual Control Point Machine 41 Junction of Grain Loop (No alterations) CGL Dual Gauge Line Dual Control Point Machine 43 To Grain Loop, Corio Independent Goods Line (No alterations) CGL Motorised Gates on Grain Loop 45 (No alterations) CGL Dual Gauge Catch points leading Dual Control Point Machine 47 from Corio Quay Siding (No alterations) CGL Derail and Wheel Crowder Dual Control Point Machine 49 on lead from East Yard (No alterations) CGL Motorised Gates 51 on Corio Quay Siding (No alterations)

Page 21 of 29 Weekly Operational Notice No. 44/2019 NORTH GEELONG C - LEVEL CROSSING ALTERATIONS • The existing Flashing lights and Boom Barriers at the Separation Street Level Crossing will remain in service. • Manual operation of the Separation Street Level Crossing will be provided through the operation of lever NGC 63 on the Signalling VDU. NORTH GEELONG C COMMUNICATIONS • Local Train Radio Channel 1 will be retained for communications between Train Crews and the North Geelong C Signaller at Centrol. • A second Local Train Radio Channel is also provided for the issuing of Caution Orders and Safeworking Authorities. • The Signaller will request Train Crews to change to the Safeworking Channel when required to issue safeworking authorities. • The Safeworking Channel allocated for the North Geelong C Controlled area and the Geelong Corridor is currently displayed as NEWswGEL. GEELONG GRAIN LOOP • The Grain Loop will be provided with Rail Vehicle detection, new track sections will be operated by Counter Equipment. • Axle Counters will in place from KP 66.468 at a point clear of points CGL 41 to a point opposite Banner Indicator CGL 44BI at KP 68.219. • Reset of these Axle Counter Track Sections will be described in Section 36. GRAIN UNLOADING SHED • The ‘Rail Access Release’ will be provided and interfaced with the existing operation of the Grain Shed Door within the North Geelong Grain Loop. • The operation of the Grain Shed Doors at both ends of the unloading shed will be detected in the Signalling equipment. • At the Grain unloading shed local controls will be provided and be operated by the Grain shed personnel. • Operation of the Rail Access Release will provide release for Signal NGC 64. • The Rail Access Release and control of Signal NGC 64 is interlocked with the grain shed door. • Signal NGC 64 cannot be operated to proceed unless the Grain Shed Doors are detected open and the operator provides the ‘Rail Access Release’. • The ‘Rail Access Release’ cannot be cancelled by the Grain Shed Operator whilst signal NGC 64 has a call on it or is at Proceed. • The ‘Rail Access Release’ will remain in place after the train passes signal NGC 64 and not cancel allowing, in liaison with the Grain Shed Operator, a second train to be signalled on a low speed aspect if required, upon the train clearing the grain shed, the Grain Shed Operator may cancel the ‘Rail Access Release’, or retain it at ‘Proceed’ for a second train to enter. RAIL SECURITY GATES • Indication and Control of Gates CGL 45 will be provided on the Signalling VDU. • The local keyswitch for manual operation of the Rail Gates will be retained.

Page 22 of 29 Weekly Operational Notice No. 44/2019 CORIO QUAY SIDING • Indication and control of Gates CGL 51, Catch Points CGL 47, Dwarf CGL 54 and the Axle Counter Track Circuits for the Corio Quay Siding will be provided on the Signalling VDU. • On completion of the Testing and Commissioning Activities the Corio Quay Siding will not be available for any Rail Operations. • Points CGL 39 will be secured in the normal position by a point clip and independent padlock, the key to which will be held by the Geelong V/Line Signal Supervisor. NORTH SHORE YARD • The Broad Gauge Through Siding will be provided with rail vehicle detection, and the status of points and signals will be displayed the signal control system, including the hand points at the up end of the Through Siding. • Release COR 48 to be provided operated by the North Geelong C Signaller to allow operation of signal COR 38 by the Geelong Corridor Signaller toward the Through Siding. • Signal COR 38 at St Georges Rd, and signal CGL 26 at North Shore will not be interlocked with track occupancy and will continue to display a ‘Low Speed’ aspect for routes to the Through Siding irrespective if the route is occupied or not. • Release COR 48 and signal CGL 26 are interlocked to ensure that either one or the other can only be operated at any one time, and that either cannot be immediately provided after a movement has entered the Through Siding without a time period occurring to ensure opposing trains are not simultaneously signalled into the Through Siding. • A set of hand points No 7 Points are located midway along the Through Siding. • Normal position of No 7 points (set for Through Siding) will detected and indicated on the Signal Control System. A lack of detection is not to have any impact on the operation of signal COR 38 or signal CGL 26. • A CCTV camera will be commissioned at North Shore focussed toward the sidings to observe track occupancy of the various non detected tracks within the vicinity. • Track A within North Shore Yard has been modified from a Standard Gauge Track to a Broad Gauge Track. In clear length is 728 metres. No or run around access provided for this track. Access to Track A for Broad Gauge Rail Vehicle Movements is currently not available and upon completion of works adjacent to Track A, advice will be issued by separately issued circular to permit Rail Movements. • Track B and Track C remain unmodified as Standard Gauge Tracks. In clear length is 645 metres for both Tracks. A Standard Gauge Headshunt is provided at the up end of Track B and C, in clear length is 243 metres. NEW SIGNALLING DIAGRAM Insert a reference on Signalling Diagram No 30/18 “Corio to North Shore”.

An updated diagram will be issued in due course. AMENDMENT 1994 BOOK OF RULES AND OPERATING PROCEDURES Updated procedures in Section 34 and Section 36 of the 1994 Book of Rules and Operating Procedures as amended will be issued on separate circulars.

Page 23 of 29 Weekly Operational Notice No. 44/2019 NETWORK SERVICE PLAN

NETWORK OPERATING REQUIREMENTS

TRAIN OPERATING DATA The following sections of the Network Service Plan will be re issued.

NA_NSP_02.02 – R01-2019 NORTH GEELONG C – NORTH SHORE (VIA CIGL)

NA_NSP_02.03 – R02-2019 NORTH GEELONG C – GRAIN LOOP

NA_NSP_02.09 – R01-2019 NORTH GEELONG – MARYBOROUGH SW.0162/2019 AND SW.0170/2019 ARE CANCELLED V/Line SW.0176/2019 ______

SW.0177/2019 IS CANCELLED AND REPLACED BY THIS CIRCULAR MELBOURNE YARD

WAGON STORAGE YARD - SOUTH HUMP AVOIDING TRACK ABOLISHED Effective 0700 hours Monday 28th October 2019 the following track and signalling alterations will apply WAGON STORAGE YARD • The Wagon Storage yard will be abolished and tracks progressively removed • Baulks will be fitted opposite Dwarf Signal MYD 128 • Points MYD 141 will be permanently secured in the normal position, with a point clip locked with an independent padlock the key to which will be held by the Signal Maintenance Technician. The point machine will be electrically isolated. SOUTH HUMP AVOIDING TRACK • The South Hump Avoiding Track will be abolished and tracks progressively removed • Baulks will be fitted opposite Dwarf Signal MYD 234 • Points MYD 129 will be permanently secured in the normal position, with a point clip locked with an independent padlock the key to which will be held by the Signal Maintenance Technician. The point machine will be electrically isolated. SIGNALLING DIAGRAM Insert a reference on Signalling Diagram No 122/14 “West Tower” An updated diagram will be issued in due course SW.0177/2019 is cancelled V/Line SW.0178/2019 ______

Page 24 of 29 Weekly Operational Notice No. 44/2019 NORTH GEELONG C

SIGNALLING ALTERATIONS Effective Sunday 27th October 2019 on completion of the Signalling Alterations as described on Circular SW.0176/2019, the following additional alterations will apply at North Shore and within the North Geelong C Controlled Area POINTS COR 35 • Points COR 35 on the East Line at North Shore secured in the normal position by lockable point clip and independent padlock, to key to which is held by the Signal Maintenance Supervisor. RAIL SECURITY GATES CGL 45 • Indication and Control of Gates CGL 45 are provided on the Signalling VDU. • Gates CGL 45 electrically and mechanically secured in the Open Position by a chain and independent padlock, to key to which is held by the Signal Maintenance Supervisor. V/Line SW.0180/2019 ______

AMENDMENT WOLO PROCEDURES

BOOK OF RULES AND OPERATING PROCEDURES Effective forthwith the following updates to the following Operating Procedure in Section 34 of the Book of Rules and Operating Procedures (as amended) will apply

RULE BOOK REFERENCE & TITLE DETAILS OF CHANGES Procedure updated to Rev 19.01 to reflect • 2019 – 2020 Updated Wolo Information 136 – WOLO PROCEDURES • Wolo Examples update to latest templates. Refer: TON-0295/2019 for a summary of changes. Operating Procedure No 34 – 136 Rev 18.01 as issued on SW.0429/2018 is cancelled and replaced by this Circular V/Line SW.0179/2019 ______

AMENDMENT EPSOM

SECTION 34 BOOK OF RULES AND OPERATING PROCEDURES Commencing forthwith, updates to the following Operating Procedures in Section 34 of the Book of Rules and Operating Procedures (as amended) will apply RULE BOOK REFERENCE & TITLE DETAILS OF CHANGES

Procedure updated to Rev 19.01 to reflect 108 – EPSOM • Updated following testing of VDU indications to confirm Down Trains complete past Epsom Block Point.

Operating Procedure No 34 – 108 Rev 16.01 as issued on SW.0129/2016 is cancelled and replaced by this Circular V/Line SW.0181/2019 ______

Page 25 of 29 Weekly Operational Notice No. 44/2019 AMENDMENT NORTH GEELONG C

BOOK OF RULES AND OPERATING PROCEDURES Effective forthwith following the completion of the Signalling Commissioning as described on SW.0176/2019 updates to the following Operating Procedures in Section 34 of the Book of Rules and Operating Procedures (as amended) will apply

RULE BOOK REFERENCE & TITLE DETAILS OF CHANGES Procedure updated to Rev 19.01 to reflect • Alterations to the location to provide releases for Geelong Corridor Signaller 57 – NORTH SHORE YARD • Procedure reformatted • Procedure updated to include Midway Sidings • Network Services Reviews • Track A changes to Broad Gauge. Operating Procedure No 34 -57 as issued on SW.0159/2010 is cancelled and replaced by this Circular Operating Procedure No 34 -57A as issued on SW.0167/2008 is cancelled and replaced by this Circular Operating Procedure No 34 -57B as issued on SW.0167/2008 is cancelled and replaced by this Circular Operating Procedure No 34 - 57C as issued on SW.0167/2008 is cancelled Procedure updated to Rev 19.01 to reflect • Alterations for the North Geelong C Area 58 – NORTH GEELONG C • Procedure reformatted • Network Services Review Operating Procedure No 34 -58 as issued on SW.0010/2009 is cancelled and replaced by this Circular Procedure updated to Rev 19.01 to reflect 59 – GEELONG GRAIN LOOP AND INDEPENDENT • Alterations for North Geelong C area and Grain Loop GOODS LINE • Procedure reformatted • Network Services Review Operating Procedure No 34 -59 as issued on SW.0167/2008 is cancelled and replaced by this Circular Procedure updated to Rev 19.01 to reflect 60 – NORTH GEELONG YARD • Altered references for North Geelong C • Network Services Review Operating Procedure No 34 -60 Rev 16.01 as issued on SW.0111/2008 is cancelled and replaced by this Circular V/Line SW.0182/2019 ______

Page 26 of 29 Weekly Operational Notice No. 44/2019 SW.0106/2016 IS CANCELLED AND REPLACED BY THIS CIRCULAR. NORTH GEELONG C – NORTH SHORE

AUTHORISATION FOR THE USE OF TRACK WARRANTS Effective forthwith Track Warrants are authorised to be used on the following defined Running Lines controlled by the North Geelong C Signaller at Centrol.

CORRIDOR SAFE WORKING SYSTEM TRACK South Western Region Dual Gauge Main Line and Grain Loop Automatic Block Signalling Single embraced by Signal Posts NGC 62, CGL 46, CGL 44 and NGC 70.

Corio Independent Goods Line Automatic Block Signalling Single embraced by Signal Posts NGC 62, CGL 26, CGL 30, CGL 32, CGL 42 and NGC 70.

The use of Track Warrants in the above areas will be undertaken in accordance with the instructions contained in Section 34 – 135 No 21.

SW.0106/2016 is cancelled and replaced by this circular. V/Line SW.0183/2019 ______NOTICE OF INTENT TO WORK

ARARAT STABLING SIDING Commencing Friday, 1st November 2019 until Friday, 3rd January 2020 (inclusive) between 07:00 Hours and 19:00 Hours each day (or as Train Stabling permits), the Ararat Stabling Siding will be Booked Out. V/ Line Delivery will carry out construction of a 2nd stabling road in Ararat Stabling facility. These works will be conducted under Book Out of Track procedure. The Book Out of the Stabling Siding will be returned to allow for stabling of Trains. Prior to works taking place, communications are to be made with the Train Controller - Room BT Centrol (9619 1067). Refer to Section 34–135-No22 “Booking Out of Track” Per NOI # 14092 Contact: Jure Mandic 0458 419 093 V/Line TON.0292/2019 ______

Page 27 of 29 Weekly Operational Notice No. 44/2019 BALLARAT – RFR

NOTICE OF INTENT TO WORK DAYLESFORD ROAD LEVEL CROSSING - BALLAN (KP 80.769)

As requested, commencing from Saturday, 2nd November 2019 through until (and including) Friday, 6th December 2019, between the hours of 01:16 and 04:30 (or as train running permits), oversized vehicles will require to traverse Daylesford Road Level Crossing at KP 80.769 on the Ballarat RFR corridor. These movements will be coordinated via the implementation of a Track Warrant between Signal BGL704 at BUNGAREE and Up Home Signal BBL726 at BANK BOX LOOP to create a controlled environment for the passage of these vehicles. Should Absolute Occupation be in force, the TFPC In-Charge of the Over-Dimensional Load will request for a Permit to Foul from the TFPC In-Charge of the Absolute Occupation. Such a request will need to be in accordance with Section 34 - 135 - No’ 28. Per NOI # 14195 Contact: Robert Schuller - 0448 305 206 Luke McKeown - 0402 753 411 (SKILLED Rail) V/Line TON.0293/2019 ______

NETWORK SERVICE PLAN

ADDENDA – NA_NSP_03 – R53-2019 The Network Service Plan Addenda has been updated to include the following approved Rollingstock: RAIL OPERATORS ROLLING STOCK

V/LINE Heritage Certifications Updated.

STEAMRAIL K190 certification updated to 22/10/2020. T364 certification updated to 22/10/2020. 68 BW certification updated to 22/10/2020. VZVF 1 certification updated to 22/10/2020.

Additional Road / Rail Vehicle approved to operate on the V/Line Network under V/Line Accreditation.

ROAD / RAIL VEHICLES On Hire/Lease to V/Line LOADED REGISTRATION PLANT / RADIO DESCRIPTION OF MAXIMUM LENGTH MASS REMARKS NUMBER NUMBER NUMBER VEHICLE SPEED (KM/H) (METRES) (TONNES) Leibherr A922 Road / Rail Maintenance XV 18IE α β Unit 256 N/A 25 22.0 8.96 Rail Excavator Services Note α Operates in closed work site only after site specific risk assessment. Note β Not to be operated in Tunnels.

Page 28 of 29 Weekly Operational Notice No. 44/2019 JOHN HOLLAND 4 x Track Machines owned by John Holland removed from John Holland accreditation. 41219, 41120, 6-40-001, 41230. V/Line TON.0294/2019 ______NETWORK SERVICE PLAN

NETWORK OPERATING REQUIREMENTS – NA_NSP_01–R06-2019 The Network Service Plan, Network Operating Requirements has been updated to reflect – Update WOLO (Heat Speed Restrictions) information, due to updated Section 34 – 136 Wolo Procedure as issued via SW.0179/2019. The changes listed below show changes to the 2019-2020 temperatures from 2018-2019. EXCESSIVE TEMPERATURES The speed of any train must not exceed the maximum speed set down for any or vehicle on the train, on any other temporary or permanent speed restriction in force, or on any other lesser speed determined by the General Manager Asset Management and no case may exceed the speeds indicated in the following table as described in the Operating Procedures contained in Section 34 – 136

INITIATING WOLO WOLO SPEED CORRIDOR LINE SECTION WEATHER STATION TEMPERATURE FREIGHT PASS Werribee – Dennington Warrnambool – Den- Warrnambool 36 nington ¶ Bendigo – Echuca North Bendigo Junction Bendigo 36 50 60 – Goornong Goornong – Echuca Echuca 36 50 60 Dunolly – MANANGA- Lalbert – Ultima Kerang 33 40 TANG Ultima – Manangatang Swan Hill 33 40 ARARAT – MARYBOR- Ararat – Ararat 33 40 OUGH Maryborough (SG) Note ¶ WOLO – No Restrictions

Reprint pages • NA_NSP_01–R07-2019 to reflect the changes as published on the Network Service Plan – Network Operating Requirements. V/Line TON.0295/2019 ______

Page 29 of 29 Weekly Operational Notice No. 44/2019