2019 Construction Program

Total Page:16

File Type:pdf, Size:1020Kb

2019 Construction Program 2019 Construction Program PennDOT Engineering District 1 SERVING CRAWFORD, ERIE, FOREST, MERCER, VENANGO, AND WARREN COUNTIES Tom Wolf, Governor Leslie S. Richards, Secretary of Transportation James A. Foringer, P.E., District Executive Contact Information PennDOT Engineering District 1 255 Elm Street PO Box 398 Oil City, PA 16301 (814) 678-7085 Business Hours: 8:00 AM — 4:30 PM Monday — Friday PennDOT’s Engineering District 1 is responsible for the state-maintained transportation network in this region. This includes 3,689 miles of roadway and 2,064 bridges in the six-county area. 2 Overall 2019 Construction Program • Projected 2019 Program: $125.44M • 2018 Program: $92.84M 3 District 1 2019 Construction Program Thank you for your interest in the Pennsylvania Department of Transportation District 1 Construction Program for 2019. This publication is intended to provide a general overview of projects that currently are under construction, and those scheduled to be awarded or begin construction in 2019. The 2019 Construction Book is divided into seven sections: one representing projects spanning the entire district or multiple counties and one representing each of the six counties in the district. Award dates, expected completion dates, project descriptions, project locations, costs, and maintenance of traffic are listed. The listed estimated cost for a project is for the construction phase only. County maps have also been included for reference. Please keep this book on hand throughout the upcoming construction season. Note: All information is correct as of the distribution date of this booklet. However, all dates and costs are estimated and, therefore, are subject to change. 4 Districtwide & Multi-County Projects 5 Carryover Projects—Districtwide Map ID: Districtwide Districtwide Title: Districtwide Guiderail 1-17-GR1 Districtwide Guiderail 1-17-GR2 SR (Section): N/A N/A MPMS ID: 107876 107878 Project Type: Safety Project Safety Project Contractor: Penn Line Service, Inc. Green Acres Contracting Co., Inc. Contract cost: $1,856,208 $1,221,894 PennDOT Tim F. Scott Tim F. Scott Contact: Project This project includes the repair and This project includes the repair and Description: replacement of guiderail on various state replacement of guiderail on various state routes in various municipalities in Erie, Forest routes in various municipalities in Mercer and and Warren counties. Venango counties. Maintenance of A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: maintained using flaggers. maintained using flaggers. Daylight traffic control only. Daylight traffic control only. Access to drives will be maintained. Access to drives will be maintained. Estimated Summer 2019 Summer 2019 Completion: 6 2019 Projects—Districtwide Map ID: Districtwide Multiple Counties Title: 2019-2020 Highway Lighting D1 Northwest 2019 AWPM SR (Section): N/A N/A MPMS ID: 112506 106576 Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Ronald Johnson Diana Craft Contact: Project This project includes the repair and This project includes installing, repairing and Description: replacement of highway lighting throughout replacing reflective pavement markings on District 1 in 2019 and 2020. various state routes and in various municipalities in Crawford, Forest, Venango and Warren counties in 2019. Maintenance of A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: maintained during installation or replacement maintained during installation or replacement of the markers. of the markers. Daylight traffic control only. Daylight traffic control only. Access to drives will be maintained. Access to drives will be maintained. Open for Bid: 2/21/2019 2/28/2019 Estimated December 2020 Fall 2019 Completion: 7 Crawford County Projects 8 9 Carryover Projects—Crawford Map ID: 6 7 21 Title: SR 1007: Bidley Crns Brdg PA 27 over Oil Creek Trib Big "I" Roundabout SR (Section): 1007 (B03) 27 (B04) 6 (S01) MPMS ID: 505 74605 106367 Project Type: Bridge Project Bridge Project Safety Project Contractor: Shingledecker's Welding, Inc Horizon Construction Group, Inc. S. E. T., Inc. Contract cost: $669,527 $623,719 $6,126,811 PennDOT Peter G. Valentino Peter G. Valentino Chad J. Tarr Contact: Project This project includes the replacement of the This project includes the replacement of the This project includes safety improvements to Description: State Route 1007 (Brown Hill Road) Bidley State Route 27 (West Central Avenue) Bridge the intersection of US Routes 6/322 Corners Bridge over Federal Run in Athens over the Oil Creek Tributary in Oil Creek (Conneaut Lake Road) with US 19 and PA 98 Township, Crawford County. Township, Crawford County. (Perry Highway) in Vernon Township, Crawford County. The bridge is 44 feet in length. Existing structure is being replaced with a box culvert. Work involves the construction of a roundabout along with minor roadway The bridge is 19 feet in length. alignment and profile changes, appropriate signing and pavement markings. Maintenance of A detour will be required during construction. A detour will be required during construction. A minimum of one lane of traffic will be maintained using flaggers. Traffic: Check our website for detailed information: Check our website for detailed information: www.penndot.gov/District1 or www.penndot.gov/District1 or Daylight traffic control only. www.511PA.com. www.511PA.com. Access to drives will be maintained. Estimated June 2019 Fall 2019 Fall 2020 Completion: 10 2019 Projects—Crawford Map ID: 1 2 3 Title: SR 4008 over Conneaut Ck PA 198 Bridge ov Cuss Trib SR 198 Bridge Seg. 260 SR (Section): 4008 (B03) 198 (B09) 198 (B02) MPMS ID: 78857 90030 105842 Project Type: Bridge Project Bridge Project Bridge Project Estimated Cost: $800,000 $180,000 See project 90030 PennDOT Matthew Antrilli Kenneth Sanoski Kenneth Sanoski Contact: Project This project includes the rehabilitation of the This project includes the replacement of the This project includes the replacement of the Description: State Route 4008 (Fisher Road) Bridge over State Route 198 (Foster Road) Bridge over State Route 198 (Foster Road) Bridge in Conneaut Creek in Spring Township, the Cussewago Creek Tributary in Summerhill Township, Crawford County. Crawford County. Summerhill Township, Crawford County. The bridge is 13 feet in length and will be The project also includes stream bank The bridge is 12 feet in length and will be replaced with a box culvert. replaced with a box culvert. restoration. Project is being contractually combined with Project is being contractually combined with project 90030. The bridge is 115 feet in length. project 105842. This is the lead project. Allison Park Contractors, Inc. will be the contractor for this project. Maintenance of A detour will be required during construction. A detour will be required during construction. A detour will be required during construction. Traffic: Check our website for detailed information: Check our website for detailed information: Check our website for detailed information: www.penndot.gov/District1 or www.penndot.gov/District1 or www.penndot.gov/District1 or www.511PA.com. www.511PA.com. www.511PA.com. Open for Bid: 4/25/2019 Project has been awarded Project has been awarded Estimated Fall 2019 Summer 2019 Summer 2019 Completion: 11 2019 Projects—Crawford Map ID: 4 5 8 Title: US 6 Br over French Ck SR 1037: Federal Run Brdg SR 1003/Woodcock Ck Trib SR (Section): 6 (B18) 1037 (B02) 1003 (B00) MPMS ID: 57940 57974 93169 Project Type: Bridge Project Bridge Project Bridge Project Estimated Cost: $5,000,000 $800,000 $1,600,000 PennDOT Mark Nicholson Stephen Schettler Kenneth Sanoski Contact: Project This project includes the replacement along This project includes the replacement of the This project includes the restoration/ Description: with a detour of the US Route 6 (Main Street) State Route 1037 (Little Cooley Road) rehabilitation of the State Route 1003 (Shutz Bridge over French Creek in the Borough of Porters Road Bridge over Little Federal Run Road) Bridge over Woodcock Creek Tributary Cambridge Springs, Crawford County. in Bloomfield Township, Crawford County. in Woodcock Township, Crawford County. The bridge is 203 feet in length. The bridge is 23 feet in length. The bridge is 273 feet in length. Maintenance of A detour will be required during construction. A detour will be required during construction. A detour will be required during construction. Traffic: Check our website for detailed information: Check our website for detailed information: Check our website for detailed information: www.penndot.gov/District1 or www.penndot.gov/District1 or www.penndot.gov/District1 or www.511PA.com. www.511PA.com. www.511PA.com. Open for Bid: 8/8/2019 3/28/2019 12/5/2019 Estimated Fall 2020 Fall 2020 Fall 2020 Completion: 12 2019 Projects—Crawford Map ID: 9 10 11 Title: 2019 Crawford & Forest Shotcrete Group S 322 Br/Crooked Ck Trib US 322: Pymatuning Res Br SR (Section): 2016 (B14) 322 (B00) 322 (B03) MPMS ID: 106580 78683 374 Project Type: Bridge Project Bridge Project Bridge Project Estimated Cost: $360,000 $645,000 $1,000,000 PennDOT Kenneth Sanoski Matthew Antrilli Matthew Antrilli Contact: Project This project includes the application of This project includes the replacement of the This project includes the replacement of the Description: shotcrete to the insides of metal culvert US Route 322 (28th Division Highway) Bridge US Route 322 (28th Division Highway) Bridge pipes/bridges to prolong their life. over the Crooked Creek Tributary in West over Pymatuning Reservoir Tributary in West Fallowfield Township, Crawford County. Shenango Township, Crawford County. Various locations are included on state routes throughout Crawford, Forest, and Warren The bridge is 14 feet in length. The bridge is 21 feet in length. counties in 2019. Maintenance of A minimum of one lane of traffic will be A detour will be required during construction. Temporary single-lane half-width construction. maintained using flaggers.
Recommended publications
  • Metrorail/Coconut Grove Connection Study Phase II Technical
    METRORAILICOCONUT GROVE CONNECTION STUDY DRAFT BACKGROUND RESEARCH Technical Memorandum Number 2 & TECHNICAL DATA DEVELOPMENT Technical Memorandum Number 3 Prepared for Prepared by IIStB Reynolds, Smith and Hills, Inc. 6161 Blue Lagoon Drive, Suite 200 Miami, Florida 33126 December 2004 METRORAIUCOCONUT GROVE CONNECTION STUDY DRAFT BACKGROUND RESEARCH Technical Memorandum Number 2 Prepared for Prepared by BS'R Reynolds, Smith and Hills, Inc. 6161 Blue Lagoon Drive, Suite 200 Miami, Florida 33126 December 2004 TABLE OF CONTENTS 1.0 INTRODUCTION .................................................................................................. 1 2.0 STUDY DESCRiPTION ........................................................................................ 1 3.0 TRANSIT MODES DESCRIPTION ...................................................................... 4 3.1 ENHANCED BUS SERViCES ................................................................... 4 3.2 BUS RAPID TRANSIT .............................................................................. 5 3.3 TROLLEY BUS SERVICES ...................................................................... 6 3.4 SUSPENDED/CABLEWAY TRANSIT ...................................................... 7 3.5 AUTOMATED GUIDEWAY TRANSiT ....................................................... 7 3.6 LIGHT RAIL TRANSIT .............................................................................. 8 3.7 HEAVY RAIL ............................................................................................. 8 3.8 MONORAIL
    [Show full text]
  • __History of Kew Depot and It's Routes
    HISTORY OF KEW DEPOT AND ITS ROUTES Page 1 HISTORY of KEW DEPOT and the ROUTES OPERATED by KEW Compiled and written by Hugh Waldron MCILT CA 1500 The word tram and tramway are derived from Scottish words indicating the type of truck and the tracks used in coal mines. 1807 The first Horse tram service in the world commences operation between Swansea and Mumbles in Wales. 12th September 1854 At 12.20 pm first train departs Flinders Street Station for Sandridge (Port Melbourne) First Steam operated railway line in Australia. The line is eventually converted to tram operation during December 1987 between the current Southbank Depot and Port Melbourne. The first rail lines in Australia operated in Newcastle Collieries operated by horses in 1829. Then a five-mile line on the Tasman Peninsula opened in 1836 and powered by convicts pushing the rail vehicle. The next line to open was on 18/5/1854 in South Australia (Goolwa) and operated by horses. 1864 Leonard John Flannagan was born in Richmond. After graduating he became an Architect and was responsible for being the Architect building Malvern Depot 1910, Kew Depot 1915 and Hawthorn Depot 1916. He died 2nd November 1945. September 1873 First cable tramway in the world opens in Clay Street, San Francisco, USA. 1877 Steam tramways commence. Victoria only had two steam tramways both opened 1890 between Sorrento Pier to Sorrento Back Beach closed on 20th March 1921 (This line also operated horse trams when passenger demand was not high.) and Bendigo to Eaglehawk converted to electric trams in 1903.
    [Show full text]
  • Part 1: Downtown Transit Center and Circulator Shuttle
    Howard Research and Development Corporation Downtown Columbia Downtown Transit Center and Circulator Shuttle Feasibility Study: Part 1 - Downtown Transit Center & Downtown Circulator Shuttle (Part of CEPPA #5) DRAFTDecember 2011 Table of Contents Introduction ................................................................................................................................................................. iv Chapter 1. Downtown Columbia Transit Center ....................................................................................................... 1 Chapter 2. Downtown Columbia Circulator Shuttle ............................................................................................... 12 Appendix A. Regional Transit System Evaluation .............................................................................................. 21 Appendix B. Regional Transit Market Analysis .................................................................................................. 46 Appendix C. Transit Circulator Design ................................................................................................................ 64 Appendix D. Transit Center Site Evaluation ...................................................................................................... 764 Appendix E. Transit Development Plan ............................................................................................................... 79 DRAFT Page i• Nelson\Nygaard Consulting Associates Inc. Table of Figures Figure 1 Existing
    [Show full text]
  • Operations and Financial Analysis
    OPERATIONS AND FINANCIAL ANALYSIS APRIL 22, 2015 PREPARED BY: LOUIS BERGER WATER SERVICES TABLE OF CONTENTS A) EXECUTIVE SUMMARY B) OPERATIONS ANALYSIS C) FINANCIAL ANALYSIS D) APPENDICES EXECUTIVE SUMMARY Introduction Louis Berger was tasked by the Baltimore City Department of Transportation (BCDOT) to evaluate the Charm City Circulator (CCC) bus operation and analyze financial performance, and develop route operations alternatives that maximize ridership while minimizing costs. Objective The objective is to develop and evaluate alternatives to eliminate the annual deficits while providing maximum service to riders within existing financial resources. Description of Current System Existing Condition The CCC consists of four routes, Purple, Orange, Green and Banner providing “Fast. Friendly. Free.” service throughout downtown Baltimore 362 days per year, with hours of service varying by day type and by season. Key characteristics of each route: Purple Route- runs north - south from Federal Hill to Historic Mount Vernon. Ten (10) minute headways require six (6) buses to operate. Heaviest ridership of all the routes. Orange Route- runs east – west from Historic Fell’s Point and Harbor Point in the east beyond University of Maryland, Baltimore in the west. Ten (10) minute headways require five (5) buses to operate. Ridership is second best in the system. Green Route- roughly U shaped route serves Johns Hopkins University Hospital East Baltimore Campus (JHUH) connecting south to Harbor Point and Harbor East, then northwest to park and ride lots, looping down near City Center then back around. Ten (10) minute headways require six (6) buses. Longest route, least productive in terms of riders. Banner Route- angles southeast of the city past Federal Hill to Fort McHenry.
    [Show full text]
  • Chapter 12: Transportation Page 231 CITY of WESTMINSTER Transportation 2009
    Transportation 2009 2009 COMPREHENSIVE PLAN Transportation 2009 Chapter 12: Transportation Page 231 CITY OF WESTMINSTER Transportation 2009 What is the Transportation Element? Community Vision for At the 1997 session, the General Assembly passed five Transportation pieces of legislation and budget initiatives known collectively as "Smart Growth." Maryland has adopted the principles of Smart Growth to be incorporated into the According to the 2008 Community Survey, Comprehensive Plan. Westminster drivers are concerned with the difficulties they encounter turning on and The following Smart Growth principle relates to the Transportation Element: off roads due to issues with visibility or merging. Some residents suggested that the Facilitate an adequate mix of transportation modes City should consider the addition of lanes, roundabouts, or left turn signals. A second To reduce traffic congestion throughout the City challenge with driving in Westminster is the To coordinate land use and transportation high volume of traffic. Residents describe traffic to be an issue on Route 140 during To create resiliency, and connectivity within the City commuting times in the early morning or road networks early evening because of the high number of To ensure connectivity between pedestrian, bike, commuters that leave Westminster everyday to work outside of Carroll County. transit, and road facilities From the timing to the synchronization, Revitalize existing neighborhoods into safe, residents listed challenges with traffic lights walkable, and livable communities throughout Westminster. In some cases, it is not the use of a traffic light, but rather the To mix land uses and build compactly, thus reducing lack of a traffic light that most concerned trips and make walking a more viable alternative residents.
    [Show full text]
  • Route(S) Description 26 the Increased Frequency on the 26 Makes the Entire Southwestern Portion of the Network Vastly More Useful
    Route(s) Description 26 The increased frequency on the 26 makes the entire southwestern portion of the network vastly more useful. Please keep it. The 57, 60, and 61 came south to the area but having frequent service in two directions makes it much better, and riders from these routes can connect to the 26 and have much more areas open to them. Thank you. Green Line The increased weekend service on the Green line to every twenty minutes is a good addition of service for Campbell which is seeing markedly better service under this plan. Please keep the increased service. Multiple Please assuage public concerns about the 65 and 83 by quantifying the impact the removal of these routes would have, and possible cheaper ways to reduce this impact. The fact is that at least for the 65, the vast majority of the route is duplicative, and within walking distances of other routes. Only south of Hillsdale are there more meaningful gaps. Mapping the people who would be left more than a half mile (walkable distance) away from service as a result of the cancellation would help the public see what could be done to address the service gap, and quantifying the amount of people affected may show that service simply cannot be justified. One idea for a route would be service from winchester transit center to Princeton plaza mall along camden and blossom hill. This could be done with a single bus at a cheaper cost than the current 65. And nobody would be cut off. As far as the 83 is concerned, I am surprised the current plan does not route the 64 along Mcabee, where it would be eq..
    [Show full text]
  • Historic Highway Bridges in Maryland: 1631-1960: Historic Context Report
    HISTORIC HIGHWAY BRIDGES IN MARYLAND: 1631-1960: HISTORIC CONTEXT REPORT Prepared for: Maryland State Highway Administration Maryland State Department of Transportation 707 North Calvert Street Baltimore, Maryland 21202 Prepared by: P.A.C. Spero & Company 40 West Chesapeake Avenue, Suite 412 Baltimore, Maryland 21204 and Louis Berger & Associates 1001 East Broad Street, Suite 220 Richmond, Virginia 23219 July 1995 Revised October 1995 Acknowledgements "Historic Highway Bridges in Maryland: 1631-1960: Historic Context Report" has been prepared with the generous assistance of the Maryland Department of Transportation, State Highway Administration's Environmental Management Section and Bridge Development Division, and the historic and cultural resources staff of the Maryland Historical Trust. The preparers of this report would like to thank Cynthia Simpson, Rita Suffness, and Bruce Grey of the State Highway Administration Environmental Management Section, and Jim Gatley, Alonzo Corley, and Chris Barth of the State Highway Administration Bridge Development Division for their aid in providing access to key research materials. Thanks are also extended to Ron Andrews, Beth Hannold, Bill Pencek, Mary Louise de Sarran, and Barbara Shepard--all of the staff of the Maryland Historical Trust, and to the members of the Advisory Committee appointed to review this report. In addition we extend special appreciation to Rita Suffness, Architectural/Bridge Historian for the Maryland State Highway Administration, for providing us with numerous background materials, analyses, research papers, histories, and a draft historic bridge context report which she authored, for use in preparing this report. The final report was prepared by P.A.C. Spero & Company. Research, analysis, graphics preparation, and report writing were conducted by Paula Spero, Michael Reis, James DuSel, Kate Elliot, Laura Landefeld, and Deborah Scherkoske of P.A.C.
    [Show full text]
  • Prince George's County Transit System Map Thebus
    M ON TG MA D OM IN R ERY S ILL ST T M ND BO GORMAN 5 AV 2 N E M RD MANGU D C V 201 A !( A P P L InsetT 1 B E S L E 1 T D 5 IL M C N O Prince George's County TransitHER Anne Arundel County H US FederalN Courthouse RY W S LN T Y O E N C N GreenbeltV H L E ER A R A Southern District R P Y V D LN R A A R T T S I A D " 1 R G H R D 5 RO 3 T A C E I M 5 LT N BE W EN S GRE " Laurel Regional E N T Greenbelt L v® Hospital T T R P C TheBus System Map E VA K N N D N US Y E Metrorail Station A N C D T RD O 11 I R R S N D L E A T U G D L E J E E ID O R V O O R A R D !(197 C IVY LN W S D 11 15X 16 A E E P G W N D 2 B 5 E E O V E H O A L IVY D T D LN D O D R R I R 3 L R O R QU 5 N E O S £1 IS P H D ¤ S R W N I T N Y W L G HU H O D R D IL T R D O 15X N P O L E N SC S O D RE 11 R N T R N C L B U R W Y R A G 197 C O E K !( R T D E N R O N A D O P A E L S L YW H L I R N E M D B O C ER L L Muirkirk I D E 95 H E A C T B I H R §¨¦ M L I E G n¤ D C G N MARC Station G K T H S I Y O E A N R R N K I V H E G A N Y A R P R M W D R S I P H LA N S T Y K V S T E V P O O IE I R R O W T N I N C BREEZEWO N O I L OD CT F R A G R C R R R M T K H W A AP E L L P S D I D I E N L P W T O L M L N O UIRKI T A B N D E RK RD L E C E C B N T E T RD P B E N K E O L L B L A N M E T K E T D 1 BRE 16 A N £¤ A EZE D A E R N WOO I E M D DR S M L K E E O M H N A O N A E E C R N S I S M O H I R T T L T H S O W W I G M D L T N Y O E D C V A U T A L B E R PARATRANSIT DISTRICT 1 O N A D P S T K R O D B IT H E M L E W Y C O I A L L D L F R L Beltway Plaza 495V A E E E D ¨¦§E I R A R S R R BR
    [Show full text]
  • Romania's Long Road Back from Austerity
    THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tautonline.com MAY 2016 NO. 941 ROMANIA’S LONG ROAD BACK FROM AUSTERITY Systems Factfile: Trams’ dominant role in Lyon’s growth Glasgow awards driverless contract Brussels recoils from Metro attack China secures huge Chicago order ISSN 1460-8324 £4.25 Isle of Wight Medellín 05 Is LRT conversion Innovative solutions the right solution? and social betterment 9 771460 832043 AWARD SPONSORS London, 5 October 2016 ENTRIES OPEN NOW Best Customer Initiative; Best Environmental and Sustainability Initiative Employee/Team of the Year Manufacturer of the Year Most Improved System Operator of the Year Outstanding Engineering Achievement Award Project of the Year <EUR50m Project of the Year >EUR50m Significant Safety Initiative Supplier of the Year <EUR10m Supplier of the Year >EUR10m Technical Innovation of the Year (Rolling Stock) Technical Innovation of the Year (Infrastructure) Judges’ Special Award Vision of the Year For advanced booking and sponsorship details contact: Geoff Butler – t: +44 (0)1733 367610 – @ [email protected] Alison Sinclair – t: +44 (0)1733 367603 – @ [email protected] www.lightrailawards.com 169 CONTENTS The official journal of the Light Rail Transit Association MAY 2016 Vol. 79 No. 941 www.tautonline.com EDITORIAL 184 EDITOR Simon Johnston Tel: +44 (0)1733 367601 E-mail: [email protected] 13 Orton Enterprise Centre, Bakewell Road, Peterborough PE2 6XU, UK ASSOCIATE EDITOR Tony Streeter E-mail: [email protected] WORLDWIDE EDITOR Michael Taplin 172 Flat 1, 10 Hope Road, Shanklin, Isle of Wight PO37 6EA, UK. E-mail: [email protected] NEWS EDITOR John Symons 17 Whitmore Avenue, Werrington, Stoke-on-Trent, Staffs ST9 0LW, UK.
    [Show full text]
  • Prince George's County Transit System Map Thebus
    5 2 E MANGUM RD N Prince George's County Transit V D C 201 A A P !( P T L B S E In1 set 1 L E T D 5 IL M N O A n n e A r u n d e l C o u n t y H US FedN eral Courthouse W S Y T E O N N L V E A R P A V G reenbelt SouthDern District R A T A R T S I A D 1 H G R DR " TheBus 5 O System Map C 3 R T A I E 5 M N ELT W B S EN GRE " E N T L T Greenbelt T R C P E K N N Y A T Metrorail Station D I R S 11 R L D A E U L G D J E ID O R V R O O A C W S D A IVY LN E E 15X G W N 11 16 P 2 D 5 E B E O V E H O A L T IVY L D D N I R O D RO 3 L R Q 5 N U S OI P H S R W ST N IN L G Y 1 H H ¤£ U D D RO IL T R N 1O 5X L CEN S O D ES T R N CR L 11 W B Y A R E K C R T R OD N E A E O L S P 197 W Y I H L E (! R N D B C R L L E I D E H T E C H M E L D G K T Y O R E N R K H I A N V P R A W M S P T H L N 16 Y A S S T K O E O P VI I R R O EW Muirkirk T N I N C L BREEZEWOOD CT N O F IR A R G C 95 T R H R W R MA MARC Station K E A P n¤ S D D L P L § I I P E ¨¦ N T L W L L N O T A C B N OD L E N E C B T E B T E N K O L L B T K N M T E BRE D A N A A EZ E E S I M o n t g o m e r y C o u n t y WOO M L K E E D DR H O N N A E E C R N I S O S L R T T H W I H S O W D G T M N D Y O E U C V T E R A L O N A D S T K R B I H T E E Y C A L F R V L A 1 495 E E Beltway Plaza E I ¤£ BR § R S A ¨¦ P NCHVILLE RD T O D D I R (!212 N R " T 5 193 R D 8 5 D 6 G R ! T 9 RE ( C 0 EN T H B R R E 201 A T LT H R D E P A H D !( K V A B A M L E V E E V E A A V E L E V T A H E 15X E W A V O V H G A D L A T N 7 I S H D R 193 5 N G 3 O REENB T N ELT RD N 6 ! ( 1 6 6 2 SEMINO H 5 U 6 LE ST W 16C Y RUATAN
    [Show full text]
  • 2020 Construction Program
    2020 Construction Program PennDOT Engineering District 1 SERVING CRAWFORD, ERIE, FOREST, MERCER, VENANGO, AND WARREN COUNTIES Tom Wolf, Governor Yassmin Gramian, P.E., Secretary of Transportation James A. Foringer, P.E., District Executive 1 2020 Construction Book Contents Section Page(s) COVID-19 Response 3 District and County contact information 4 Construction Book Overview 5 2020 comparison to 2019 6 Crawford County Projects 7 - 15 Erie County Projects 16 - 25 Forest County Projects 26 - 29 Mercer County Projects 30 - 38 Venango County Projects 39 - 43 Warren County Projects 44 - 49 Districtwide and Multi County Projects 50 - 53 District Press Office Contacts 53 2 COVID-19 Response Responding to the COVID-19 pandemic has created unprecedented times for the Pennsylvania Department of Transportation (PennDOT) statewide as well as in the District 1 Northwest Region, which includes Crawford, Erie, Forest, Mercer, Venango, and Warren counties. PennDOT now faces a unique situation as we review our construction, design and maintenance contract plans, determine the new project timelines, and revise the scope of work, all while upholding our responsibility to provide a safe and efficient transportation system. Because travel overall is down, less fuel is being purchased. We are seeing significant decreases in revenues. This is forcing us to adjust the county maintenance operations we can perform and limiting expenditures by significantly reducing resurfacing efforts. We are focusing on lower cost preservation activities such as patching, crack sealing, skin patching, and seal coats needed to preserve the system. These core activities will remain our focus throughout 2020 and into 2021 as revenue is expected to be down by at least 30 percent.
    [Show full text]
  • Transportation Network Directory
    TTrraannssppoorrttaattiioonn NNeettwwoorrkk DDiirreeccttoorryy for People with Disabilities and Seniors A Comprehensive Community Guide to Public, Private, and Non‐Profit Transportation Montgomery County, Maryland September, 2014 SEE BACK FOR INFORMATION ON REQUESTING ALTERNATIVE FORMATS SUCH AS BRAILLE AND LARGE PRINT. www.montgomerycountymd.gov/tnd INTRODUCTION This guide, Transportation Network Directory for People with Disabilities and Seniors, is a comprehensive listing of public, private and non-profit transportation in the Washington Metropolitan Region, State of Maryland, and beyond that can be used by everyone in the community with an emphasis on people with disabilities and older adults. The Commission on People with Disabilities of the Montgomery County Department of Health and Human Services and the Department of Transportation compiled this listing of useful transportation services to assist County residents to better coordinate their transportation needs. Now finding information about transportation services is easier than ever with this resource guide. You will find that this guide is divided into 19 informative sections. The Public Transportation section covers such important services as: Call ‘N’ Ride, Medicaid Transportation, Same-Day-Access Program, MetroAccess, Ride On and Metrobus transportation. To assist us in alleviating traffic congestion, we encourage you to use public transportation whenever you can. These programs offer subsidies and reduced fares for older adults and people with disabilities. To find out more information about these services, read the brief description and call the offices listed for additional information. If you need a companion to drive you to necessary appointments, look in the section on Escorted Transportation to find information about various services available to take you to your appointments.
    [Show full text]