M1 MOTORWAY(JUNCTIONS 1-4) TEMPORARYTRAFFIC RESTRICTIONS Notice is hereby given that Highways Company Limited intends to make an Order on the M1 Motorway in the Boroughs of Barnet and Harrow,under Section14(1)(a) of the Road Traffic Regulation Act 1984 because works areproposed to be executed on the road. The effect of the Order would be to authorise the phased overnight closureof:- 1) the northbound carriageway of the M1 between the commencement of the elevated section at circulatory (M1 Junction 1/A406) and Junction 4(A41); 2) the road leading to the northbound carriageway of the M1 at Junction 1(A406); 3) the road connecting to the M1 northbound entry slip road from the eastbound road connecting the EdgwareRoad roundabout to Staples Corner roundabout at Junction 1 (A406); 4) the fast link connecting from the southbound carriageway of the M1 to the clockwise carriageway of the A406 at Junction 1(A406); 5) the roads leading to the northbound carriageway,and from the southbound carriageway,ofthe M1 at Junction 2(A1); 6) theroads leading to and from both carriageways of the M1 at London Gateway Services, and 7) the road connecting from the southbound carriageway of the M1 to the southbound carriageway of the A41 at Junction 4(A41). These measures would be in the interests of road safety while contractors undertake bridge joint repair and all associated works. It is expected that the work would occur in several intermittent phases and last in total for approximately 8months being part of a package of works also including the M25 Junctions 26 -27 and the M11, starting on or after Monday 15th June 2020. The overnight closures would take place between the following hours (maximum period):- Mondays -Thursdays 22:00 -05:30 Fridays 23:00 -06:00 Saturdays 22:00 -06:00 Sundays 22:30 -05:30 Further details would be advised by on-road advanced signage and the website. The Order would come into force on 13 June 2020 and have amaximum duration of eighteen months, ceasing when the works arecomplete. Traffic affected by the closures would be diverted using alternative sections and junctions on the M1, and by using the A1, A41, and A406. The diversion in operation would vary according to the closureinforce. The temporary closures and diversion routes would be clearly indicated by traffic signs when they areinoperation during the works period. JDownham, an Official of Highways England Co. Ltd. Ref: HE/SE/2020/M25/81 Highways England Company Limited, (Company No. 9346363). Registered Office: Bridge House, Walnut Tree Close, Guildford, ,GU1 4LZ. Acompany registered in England and Wales. For enquiries, please contact the Customer Contact Centreon0300123 5000 or [email protected]. https://www.highwaysengland.co.uk