Powerlink Queensland

Total Page:16

File Type:pdf, Size:1020Kb

Powerlink Queensland Powerlink Queensland Transmission Annual Planning Report 2016 Please direct Transmission Annual Planning Report enquiries to: Stewart Bell Group Manager Strategy and Planning Investment and Planning Division Powerlink Queensland Telephone: (07) 3860 2374 Email: [email protected] Disclaimer: While care is taken in the preparation of the information in this report, and it is provided in good faith, Powerlink Queensland accepts no responsibility or liability for any loss or damage that may be incurred by persons acting in reliance on this information or assumptions drawn from it. Contents Transmission Annual Planning Report 2016 Executive Summary _________________________________________________________________________________________________ 7 1. Introduction _________________________________________________________ 13 1.1 Introduction ________________________________________________________________________________ 14 1.2 Context of the Transmission Annual Planning Report _______________________________________ 14 1.3 Purpose of the Transmission Annual Planning Report _______________________________________ 15 1.4 Role of Powerlink Queensland ______________________________________________________________ 15 1.5 Overview of approach to asset management _______________________________________________ 16 1.6 Overview of planning responsibilities and processes ________________________________________ 16 1.6.1 Planning criteria and processes _______________________________________________________________ 16 1.6.2 Integrated planning of the shared network __________________________________________________ 17 1.6.3 Planning of connections ______________________________________________________________________ 18 1.6.4 Planning of interconnectors __________________________________________________________________ 19 1.7 Powerlink’s asset planning criteria ___________________________________________________________ 19 1.8 Stakeholder engagement ____________________________________________________________________ 20 1.8.1 Customer and consumer engagement_______________________________________________________20 1.8.2 Non‑network solutions ______________________________________________________________________20 1.8.3 Focus on continuous improvement _________________________________________________________22 2. Energy and demand projections __________________________________________ 23 2.1 Overview ___________________________________________________________________________________ 24 2.2 Customer consultation ______________________________________________________________________ 27 2.3 Demand forecast outlook ___________________________________________________________________ 28 2.3.1 Demand and energy terminology ____________________________________________________________28 2.3.2 Energy forecast _______________________________________________________________________________30 2.3.3 Summer maximum demand forecast ________________________________________________________32 2.3.4 Winter maximum demand forecast _________________________________________________________34 2.4 Zone forecasts ______________________________________________________________________________ 35 2.5 Daily and annual load profiles _______________________________________________________________ 43 3. Committed and commissioned network developments________________________ 45 3.1 Transmission network ______________________________________________________________________ 46 3.2 Committed and commissioned transmission projects _______________________________________ 46 4. Future network development ____________________________________________ 51 4.1 Introduction ________________________________________________________________________________ 52 4.1.1 Integrated approach to network development _____________________________________________53 4.1.2 Forecast capital expenditure _________________________________________________________________53 4.1.3 Forecast network limitations _________________________________________________________________54 4.2 Proposed network developments ___________________________________________________________ 55 4.2.1 Far North zone _______________________________________________________________________________55 4.2.2 Ross zone _____________________________________________________________________________________56 4.2.3 North zone ___________________________________________________________________________________60 4.2.4 Central West and Gladstone zones _________________________________________________________62 4.2.5 Wide Bay zone ________________________________________________________________________________66 4.2.6 South West zone ____________________________________________________________________________67 4.2.7 Moreton zone _________________________________________________________________________________68 4.2.8 Gold Coast zone______________________________________________________________________________ 71 4.3 Summary of forecast network limitations ___________________________________________________ 73 3 Contents 4.4 Consultations _______________________________________________________________________________ 74 4.4.1 Current consultations – proposed transmission investments ______________________________ 74 4.4.2 Future consultations – proposed transmission investments ________________________________75 4.4.3 Summary of forecast network limitations beyond the five‑year outlook period __________75 4.4.4 Connection point proposals _________________________________________________________________75 4.5 NTNDP alignment __________________________________________________________________________ 75 5. Network capability and performance ______________________________________ 77 5.1 Introduction ________________________________________________________________________________ 78 5.2 Existing and committed scheduled and transmission connected generation _________________ 79 5.3 Sample winter and summer power flows ____________________________________________________ 81 5.4 Transfer capability __________________________________________________________________________ 81 5.4.1 Location of grid sections _____________________________________________________________________ 81 5.4.2 Determining transfer capability ______________________________________________________________ 81 5.5 Grid section performance ___________________________________________________________________ 82 5.5.1 Far North Queensland grid section _________________________________________________________86 5.5.2 Central Queensland to North Queensland grid section ___________________________________87 5.5.3 Gladstone grid section _______________________________________________________________________89 5.5.4 Central Queensland to South Queensland grid section ____________________________________ 91 5.5.5 Surat grid section _____________________________________________________________________________93 5.5.6 South West Queensland grid section _______________________________________________________94 5.5.7 Tarong grid section ___________________________________________________________________________96 5.5.8 Gold Coast grid section ______________________________________________________________________98 5.5.9 QNI and Terranora Interconnector _______________________________________________________ 100 5.6 Zone performance _________________________________________________________________________ 101 5.6.1 Far North zone ______________________________________________________________________________101 5.6.2 Ross zone ___________________________________________________________________________________ 102 5.6.3 North zone __________________________________________________________________________________103 5.6.4 Central West zone _________________________________________________________________________ 104 5.6.5 Gladstone zone _____________________________________________________________________________ 105 5.6.6 Wide Bay zone ______________________________________________________________________________ 107 5.6.7 Surat zone ___________________________________________________________________________________ 108 5.6.8 Bulli zone ____________________________________________________________________________________ 109 5.6.9 South West zone ____________________________________________________________________________110 5.6.10 Moreton zone ________________________________________________________________________________ 112 5.6.11 Gold Coast zone_____________________________________________________________________________ 113 6. Strategic planning _____________________________________________________115 6.1 Background ________________________________________________________________________________ 116 6.2 Possible network options to meet reliability obligations for potential new loads ___________ 117 6.2.1 Bowen Basin coal mining area _______________________________________________________________ 117 6.2.2 Bowen Industrial Estate _____________________________________________________________________ 118 6.2.3 Galilee Basin coal mining area _______________________________________________________________ 118 6.2.4 Central Queensland to North Queensland grid section transfer limit ___________________ 119 6.2.5 Central West to Gladstone area reinforcement ___________________________________________120 6.2.6 Surat Basin north west area _________________________________________________________________121 4 Contents Transmission Annual Planning Report 2016 6.3 Possible reinvestment options initiated
Recommended publications
  • Annual Report 2019/20
    Together we create energy solutions Annual Report 2019/20 1 Table of contents About this report 3 Chief Executive Officer’s review 13 Our performance 4 Performance indicators 18 About Stanwell 5 Strategic direction 20 Our vision 5 Our five-year plan 22 Our values 5 Our 2019/20 performance 24 Our assets 8 Corporate governance 34 Chair’s statement 10 Financial results 46 2 About this report This report provides an overview of the major initiatives and achievements of Stanwell Corporation Limited (Stanwell), as well as the business’s financial and non-financial performance for the year ended 30 June 2020. Each year, we document the nature and scope of our strategy, objectives and actions in our Statement of Corporate Intent, which represents our performance agreement with our shareholding Ministers. Our performance against our 2019/20 Statement of Corporate Intent is summarised on pages 24 to 33. Electronic versions of this and previous years’ annual reports are available online at www.stanwell.com 3 Our performance • Despite a challenging year due to the • We received Australian Renewable Energy combination of an over-supplied energy market, Agency (ARENA) funding to assess the feasibility regulatory upheaval, the COVID-19 pandemic, of a renewable hydrogen demonstration plant at bushfires and widespread drought, our people Stanwell Power Station. responded to these challenges, and remained safe, while playing a critical role in keeping the • We achieved gold status from Workplace lights on for Queenslanders. Health and Safety Queensland in recognition of the longevity and success of our health and • We are one of the most reliable energy providers wellbeing initiatives.
    [Show full text]
  • Ensuring Reliable Electricity Supply in Victoria to 2028: Suggested Policy Changes
    Ensuring reliable electricity supply in Victoria to 2028: suggested policy changes Associate Professor Bruce Mountain and Dr Steven Percy November 2019 All material in this document, except as identified below, is licensed under the Creative Commons Attribution-Non- Commercial 4.0 International Licence. Material not licensed under the Creative Commons licence: • Victoria Energy Policy Centre logo • Victoria University logo • All photographs, graphics and figures. All content not licenced under the Creative Commons licence is all rights reserved. Permission must be sought from the copyright owner to use this material. Disclaimer: The Victoria Energy Policy Centre and Victoria University advise that the information contained in this publication comprises general statements based on scientific research. The reader is advised and needs to be aware that such information may be incomplete or unable to be used in any specific situation. No eliancer or actions must therefore be made on that information without seeking prior expert professional, scientific and technical advice. To the extent permitted by law, the Victoria Energy Policy Centre and Victoria University (including its employees and consultants) exclude all liability to any person for any consequences, including but not limited to all losses, damages, costs, expenses and any other compensation, arising directly or indirectly from using this publication (in part or in whole) and any information or material contained in it. Publisher: Victoria Energy Policy Centre, Victoria University, Melbourne, Australia. ISBN: 978-1-86272-810-3 November 2019 Citation: Mountain, B. R., and Percy, S. (2019). Ensuring reliable electricity supply in Victoria to 2028: suggested policy changes. Victoria Energy Policy Centre, Victoria University, Melbourne, Australia.
    [Show full text]
  • Surat Basin Non-Resident Population Projections, 2021 to 2025
    Queensland Government Statistician’s Office Surat Basin non–resident population projections, 2021 to 2025 Introduction The resource sector in regional Queensland utilises fly-in/fly-out Figure 1 Surat Basin region and drive-in/drive-out (FIFO/DIDO) workers as a source of labour supply. These non-resident workers live in the regions only while on-shift (refer to Notes, page 9). The Australian Bureau of Statistics’ (ABS) official population estimates and the Queensland Government’s population projections for these areas only include residents. To support planning for population change, the Queensland Government Statistician’s Office (QGSO) publishes annual non–resident population estimates and projections for selected resource regions. This report provides a range of non–resident population projections for local government areas (LGAs) in the Surat Basin region (Figure 1), from 2021 to 2025. The projection series represent the projected non-resident populations associated with existing resource operations and future projects in the region. Projects are categorised according to their standing in the approvals pipeline, including stages of In this publication, the Surat Basin region is defined as the environmental impact statement (EIS) process, and the local government areas (LGAs) of Maranoa (R), progress towards achieving financial close. Series A is based Western Downs (R) and Toowoomba (R). on existing operations, projects under construction and approved projects that have reached financial close. Series B, C and D projections are based on projects that are at earlier stages of the approvals process. Projections in this report are derived from surveys conducted by QGSO and other sources. Data tables to supplement the report are available on the QGSO website (www.qgso.qld.gov.au).
    [Show full text]
  • ERM Power's Neerabup
    PROSPECTUS for the offer of 57,142,858 Shares at $1.75 per Share in ERM Power For personal use only Global Co-ordinator Joint Lead Managers ERMERR M POWERPOWEPOWP OWE R PROSPECTUSPROSPEOSP CTUCTUSTU 1 Important Information Offer Information. Proportionate consolidation is not consistent with Australian The Offer contained in this Prospectus is an invitation to acquire fully Accounting Standards as set out in Sections 1.2 and 8.2. paid ordinary shares in ERM Power Limited (‘ERM Power’ or the All fi nancial amounts contained in this Prospectus are expressed in ‘Company’) (‘Shares’). Australian currency unless otherwise stated. Any discrepancies between Lodgement and listing totals and sums and components in tables and fi gures contained in this This Prospectus is dated 17 November 2010 and a copy was lodged with Prospectus are due to rounding. ASIC on that date. No Shares will be issued on the basis of this Prospectus Disclaimer after the date that is 13 months after 17 November 2010. No person is authorised to give any information or to make any ERM Power will, within seven days after the date of this Prospectus, apply representation in connection with the Offer which is not contained in this to ASX for admission to the offi cial list of ASX and quotation of Shares on Prospectus. Any information not so contained may not be relied upon ASX. Neither ASIC nor ASX takes any responsibility for the contents of this as having been authorised by ERM Power, the Joint Lead Managers or Prospectus or the merits of the investment to which this Prospectus relates.
    [Show full text]
  • Renewable Energy Across Queensland's Regions
    Renewable Energy across Queensland’s Regions July 2018 Enlightening environmental markets Green Energy Markets Pty Ltd ABN 92 127 062 864 2 Domville Avenue Hawthorn VIC 3122 Australia T +61 3 9805 0777 F +61 3 9815 1066 [email protected] greenmarkets.com.au Part of the Green Energy Group Green Energy Markets 1 Contents 1 Introduction ........................................................................................................................6 2 Overview of Renewable Energy across Queensland .....................................................8 2.1 Large-scale projects ..................................................................................................................... 9 2.2 Rooftop solar photovoltaics ........................................................................................................ 13 2.3 Batteries-Energy Storage ........................................................................................................... 16 2.4 The renewable energy resource ................................................................................................. 18 2.5 Transmission .............................................................................................................................. 26 3 The renewable energy supply chain ............................................................................. 31 3.1 Construction activity .................................................................................................................... 31 3.2 Equipment manufacture
    [Show full text]
  • Queensland Commission of Audit's Final
    Queensland Commission of Audit Final Report - February 2013 Volume 2 Queensland Commission of Audit Final Report February 2013 - Volume 2 Final Report February 2013 - Volume © Crown copyright All rights reserved Queensland Government 2013 Excerpts from this publication may be reproduced, with appropriate achnowledgement, as permitted under the Copyright Act Queensland Commission of Audit Final Report - February 2013 Volume 2 TABLE OF CONTENTS FINAL REPORT VOLUME 1 Transmittal Letter ...................................................................................................... i Acknowledgements .................................................................................................. iii Explanatory Notes .................................................................................................... iv Terms of Reference .................................................................................................. v Report Linkages to Terms of Reference .................................................................. vii Table of Contents ..................................................................................................... ix EXECUTIVE SUMMARY AND RECOMMENDATIONS Executive Summary .............................................................................................. 1-3 List of Recommendations .................................................................................... 1-27 Glossary .............................................................................................................
    [Show full text]
  • Stanwell Corporation Limited's Assets
    The Energy Efficiency Opportunities program – experience from industry September 2011 Overview • Stanwell Corporation Limited • Electricity sector in Australia • Energy Efficiency Opportunities Act (EEO) – Overview and intend of legislation – EEO Framework – EEO versus Energy Audit/Energy Management System – EEO extension to the generation sector • EEO alignment with industry needs Stanwell Corporation Limited Stanwell Corporation Limited’s assets Stanwell Power Station 1,400 MW Tarong Power Station 1,400 MW Tarong North Power Station 443 MW Collinsville Power Station 195MW Swanbank E 385MW Northern Hydros and Wivenhoe Small 183 MW Hydro/Peaking Plant (Mackay Gas Turbine) Total 4,006 MW Electricity sector in Australia Businesses: 57 Revenue: $20.9bn Profit: $3.8bn Annual growth: 7.4% Wages: $1.0bn The Energy Efficiency Opportunities Act covers electricity generation sector – 01 July 2011 Overview of the EEO Act • Targets industrial energy efficiency • Coverage • Assess, identify and report • Program cycles • Objectives EEO Assessment Framework •Leadership •People •Information, data and analysis •Opportunity identification and evaluation •Decision making •Communicating outcomes How can EEO add value to companies? • Challenges systems and assumptions • Triple Bottom Line improvement • Reduces energy use and greenhouse gas emissions • Increases internal communication • Empowers in-house personnel • Board visibility • DRET 2010 report - Identified opportunities save pa – 141.9PJ energy use (2.5% Australia’s total) – 11.2million tonnes emissions (2% Australia’s totals) – $1.2billion EEO - alignment with industry needs • Early consultation with industry • Leverages off existing business activities • Provides extensive support material, skills and guidance • Information exchange • Promotion – case studies • Interaction – Listen, understand and act • Ideas for improvement thank you Gabriele Sartori +61 437 711 871 [email protected].
    [Show full text]
  • Department of Energy and Water Supply CS2731 09/13 ISSN 2201-2095
    Department of Energy and Water Supply CS2731 09/13 ISSN 2201-2095 Interpreter statement The Queensland Government is committed to providing accessible services to Queenslanders from all culturally and linguistically diverse backgrounds. If you have difficulty in understanding the annual report, you can contact us on 13 QGOV and we will arrange an interpreter to effectively communicate the report to you. Public availability Copies of the Department of Energy and Water Supply (DEWS) annual report are available online at www.dews.qld.gov.au. Limited printed copies are available by calling 13 QGOV. Enquiries about this publication should be directed to the Principal Planning and Governance Officer, Planning, Performance and Governance, DEWS. Email: [email protected] Phone: 07 3033 0534 This publication has been compiled by Planning and Performance, Business Corporate Partnerships in the Department of Agriculture, Fisheries and Forestry for the Department of Energy and Water Supply. © State of Queensland, 2013. The Queensland Government supports and encourages the dissemination and exchange of its information. The copyright in this publication is licensed under a Creative Commons Attribution 3.0 Australia (CC BY) licence. Under this licence you are free, without having to seek our permission, to use this publication in accordance with the licence terms. You must keep intact the copyright notice and attribute the State of Queensland as the source of the publication. Note: Some content in this publication may have different licence terms as indicated. For more information on this licence, visit http://creativecommons.org/licenses/by/3.0/au/deed.en. Contents Letter of compliance ...................................................................................................................................................................2 Director-General’s message ........................................................................................................................................................
    [Show full text]
  • Capital Program 2020 Update Copyright Disclaimer This Publication Is Protected by the Copyright Act 1968
    Capital Program 2020 update Copyright Disclaimer This publication is protected by the Copyright Act 1968. While every care has been taken in preparing this publication, to the extent permitted by law, the State of Queensland accepts Licence no responsibility and disclaims all liability (including without limitation, liability in negligence) for all expenses, losses This work, except as identified below, is (including direct and indirect loss), damages and costs incurred licensed by Queensland Treasury under a as a result of decisions or actions taken as a result of any data, Creative Commons Attribution-No Derivative information, statement or advice, expressed or implied, contained Works (CC BY-ND) 4.0 Australia licence. To view a copy of this within. To the best of our knowledge, the content was correct at the licence, visit: http://creativecommons.org.au/ time of publishing. You are free to copy and communicate this publication, Copies of this publication are available on our website at as long as you attribute it as follows: www.treasury.qld.gov.au and further copies are available © State of Queensland, Queensland Treasury, August 2020 upon request to: Third party material that is not licensed under a Creative Commons Queensland Treasury licence is referenced within this publication. All content not PO Box 15009, City East, QLD 4000 licensed under a Creative Commons licence is all rights reserved. Please contact Queensland Treasury / the copyright owner if you Phone: 13 QGOV (13 7468) wish to use this material. Email: [email protected] Web: www.treasury.qld.gov.au The Queensland Government is committed to providing accessible services to Queenslanders of all cultural and linguistic backgrounds.
    [Show full text]
  • Two Towers: a Comparison of the Regulatory Regimes Which Affect New Electricity Transmission Lines and Wind Farms in Queensland
    Complete Citation: Tranter, Mark (2006). Two towers: a comparison of the regulatory regimes which affect new electricity transmission lines and wind farms in Queensland. Environmental and Planning Law Journal, 23 (5). pp.351-364. ISSN 0813-300X. Accessed from USQ ePrints http://eprints.usq.edu.au Two Towers: A comparison of the regulatory regimes which affect new electricity transmission lines and wind farms in Queensland Mark Tranter* Wind farms represent a clean and sustainable method of generation of electricity, while high voltage overhead power transmission towers and lines represent the old fashioned approach to transmission of energy. Both share a common characteristic which is their visual impact on the environment. This article looks at two recent developments on the Darling Downs in South East Queensland, one a 75 turbine windfarm, the other a 90 km 330 kilovolt transmission line. The article looks at the regulatory framework which governs both developments in the local and Commonwealth jurisdictions. It draws more general conclusions about the ability of those affected by those developments to gain a merits review of their objections as well as the unequal regulatory playing field which favours the traditional method of electricity transmission as compared to the greener method of electricity generation. INTRODUCTION This article concerns two electricity related developments on the Eastern Darling Downs near Toowoomba in South Eastern Queensland. One is the proposal by Powerlink, the Queensland government owned transmission entity,1 to build a 90 km, 330KV dual circuit overhead transmission * Senior Lecturer (Law) Faculty of Business and Member, Australian Centre for Sustainable Catchments, University of Southern Queensland, Toowoomba.
    [Show full text]
  • Power System Incident Report Trip of 8811 Calvale – Tarong 275Kv Line
    POWER SYSTEM INCIDENT REPORT TRIP OF 8811 CALVALE – TARONG 275KV LINE, TARONG UNIT 2 AND COLUMBOOLA 132KV CB 73562 ON 05 NOVEMBER 2009 PREPARED BY: ESOPP DOCUMENT NO: 1.0 VERSION NO: 1.0 FINAL 1. INTRODUCTION At approximately 17:49hrs on Thursday 5th of November 2009, severe thunderstorms were experienced in the vicinity of Calvale – Tarong 275kV lines (Bureau of Meteorology - BOM issued a Severe Thunderstorm Warning) and one of the Calvale – Tarong lines - 8811 experienced a single phase trip and auto-reclose. The No.2 generating unit at Tarong Power Station (TPS) tripped from 350MW of load at around the same time. At approximately 17:50hrs, one of the 132kV feeders from T194 Columboola substation (Ergon Energy) to Condamine power station also tripped but there was no generation at Condamine power station at the time1. This report has been prepared under clause 4.8.15 of the National Electricity Rules to assess the adequacy of the provision and response of facilities and services and the appropriateness of actions taken to restore or maintain power system security. Information for this report has been provided by Powerlink, Tarong Energy, Ergon Energy and QGC Sales Pty. Ltd. Additional information has been obtained from AEMO’s Energy Management System and Market Management System. All references to time in this report refer to Market time (Australian Eastern Standard Time). 2. SUMMARY OF EVENTS At approximately 17:49hrs on Thursday 5th of November, severe thunderstorms were experienced in the vicinity of Calvale – Tarong 275kV lines. A market notice was issued at 13:47 hrs, reclassifying loss of 8810 & 8811 Calvale – Tarong double circuit 275kV lines as a credible contingency from 1345 hrs onwards.
    [Show full text]
  • Queensland Major Projects Pipeline 2019 Queensland Major Projects Pipeline
    2019 Queensland Major Projects Pipeline 2019 2019 Queensland Major Projects Pipeline Queensland Major Projects A JOINT INITIATIVE $M Total Pipeline 39,800,000,000 Annual Ave 7,960,000,000 Weekly Ave 153,000,000 Daily Ave 21,860,000 Hourly Ave 910,833 AT A GLANCE Major Projects Pipeline readon Unfunded split $41.3 billion total (over 5 years) Credibly Under Under Unlikely Prospective proposed Announced procurement construction* 37 39 15 36 15 52 projects valued at projects valued at projects valued at projects valued at projects valued at projects valued at $3.13bn $6.61bn $4.03bn $10.14bn $6.66bn $10.77bn Unfunded $13.77 billion Funded $27.57 billion *Under construction or completed in 2018/19 Total Pipeline Major Project Scale of Major Value Activity Recurring Projects Jobs Expenditure $8.3b per year The funded pipeline will support $6.5b 11,900 workers $41.3b North Queensland each year on average $23m per day $12.4b Fully-funding the pipeline Funding will support an extra 6.8b Central split Various Queensland 5,000 workers each year on average $23.4b $15.6b $2.2m Public Projects $41.3b Total South East A JOINT INITIATIVE $17.9b Queensland $159m per Private Projects working per week hour $M Total Pipeline 39,800,000,000 Annual Ave 7,960,000,000 Weekly Ave 153,000,000 Daily Ave 21,860,000 Hourly Ave 910,833 Major Projects Pipeline – Breakdown Unfunded split $41.3 billion total (over 5 years) Credibly Under Under Unlikely Prospective proposed Announced procurement construction* 37 39 15 36 15 52 projects valued at projects valued at projects
    [Show full text]