High Speed Traffic

Total Page:16

File Type:pdf, Size:1020Kb

High Speed Traffic Railway Statistics - Synopsis Statistik der Bahnen - Synthese Statistique des chemins de fer - Synthèse Railway Statistics - Synopsis Provisional results StatistikVorläufige der Bahnen Ergebnisse - Synthese Résultats provisoires Statistique des chemins de fer - Synthèse 2019 Edition Provisional results Vorläufige Ergebnisse Résultats provisoires Length of lines worked at end of year Stock at end of year Train performance Revenue rail traffic (3) Surface area Population Population Locomotives Average staff strength Passenger Freight Railway of which double of which Railcars and Train Gross train Country km² (1) (1) density Total including Light Coaches & Railway's Passengers carried Passenger.kilometres Tonnes carried Tonne.kilometres company track or more electrified lines Multiple kilometres tonne. kilometres Rail trailers (2) wagons D% D% D% D% D% Units thousands millions millions millions millions thousands millions inhab./km² in kilometres Motortractors 18/17 millions 18/17 18/17 18/17 18/17 Europe (including Turkey) Europa 346 258 144 184 182 414 40 596 55 062 100 363 553 182 2 075 5 101 6 253 464 8 012 618 139 2 827 3 127 196 EU UE 208 138 87 546 113 445 15 979 44 234 85 150 249 468 974 3 079 916 529 5 979 427 393 801 250 372 Austria 83,88 8,80 104,88 GKB (2018) 91 0 0 na na na na na na na na ÖBB (2018) 4 864 2 155 3 560 1 013 555 2 818 17 576 42,16 1,14 133,87 62 157 261,41 6,41 11 477 2,63 112,96 50,98 31 732 WB (2018) na na na na na na na 6,55 34,64 1 100 31,58 WLB CARGO (2017) na na na 4,71 674 Belgium 30,53 11,38 372,83 INFRABEL (2016) 3 602 na na 10,94 LINEAS (2018) 211 7 046 2,08 10,60 na 9 33,20 3,12 6 461 14,23 SNCB/NMBS (2018) na na na na na na 246,94 3,62 10 710 3,32 THALYS (2017) na 27 na 0,59 na na na 1 564 Bulgaria 111,00 7,08 63,75 BDZ CARGO (2018) 142 4 120 2,98 - 8,25 4,06 4 106 6,66 6,95 1 830 12,14 BDZ PP (2018) 199 285 756 5,83 - 2,05 20,79 4 382 21,34 0,63 1 479 2,92 BRC (2018) 41 320 0,37 - 4,60 1,48 1 953 2,94 - 22,61 898 - 26,87 BULMARKET (2018) 26 220 0,20 18,18 0,61 674 1,23 - 18,67 306 - 2,10 High Speed Traffic NRIC (2018) 4 030 990 2 870 11,24 - 1,47 Croatia 56,59 4,12 72,88 HZ CARGO (2018) 187 5 326 1,51 - 8,64 na na 6,87 - 19,62 1 781 - 9,59 HZ INFRA (2018) 2 605 254 970 4,80 - 0,72 Passenger.kilometres (billions) HZ PASSENGER (2018) 76 122 497 1,82 - 2,93 15,24 2 192 20,27 2,21 756 1,48 Czech Republic 78,87 10,59 134,33 CD (2018) 1 488 1 208 3 881 22 578 22,55 2,93 147,94 45 525 179,23 2,61 8 225 5,75 66,41 2,43 11 617 5,90 SZDC (2018) 9 406 2 014 3 216 17,31 - 0,66 Denmark 42,92 5,76 134,31 DSB (2018) 51 416 2 033 7,00 - 1,89 53,58 188,91 0,37 5 776 - 0,91 Estonia 45,23 1,32 29,13 EVR (2017) 1 033 94 132 2,02 KORAIL 2017; THSRC 2017; Finland 338,42 5,51 16,28 FTA (2018) 5 925 686 3 330 0,12 0,00 14,87 11,10 VR (2018) 407 468 1 226 8 741 4,44 0,23 53,09 30 655 87,50 2,10 4 535 6,18 39,43 2,67 11 030 6,89 DB AG 2018; France 549,09 67,11 122,21 GETLINK (2018) 58 58 58 2,58 SNCF MOBILITES (2018) 1 316 3 507 18 118 12 347 80,25 - 2,63 398,57 184 254 1 218,75 - 2,63 89 621 - 3,92 34,27 - 12,92 14 842 - 6,48 31,10 SNCF RESEAU (2017) 29 190 16 495 16 741 54,30 JR 2017; 101,40 Germany 357,38 82,69 231,37 DB AG (2018) 33 440 18 542 20 285 3 966 16 785 18 055 80 608 316,90 2,62 769,44 336 912 2 087,83 0,59 84 708 2,65 255,50 - 5,72 88 237 - 4,76 SNCF 2018; 56,70 Greece 131,96 10,75 81,49 OSE (2018) 2 292 577 679 1,18 - 2,07 TRAINOSE (2016) na na na na 0,67 na na 15,60 na 1,10 na RENFE 2018; Hungary 93,03 9,79 105,21 FOX (2017) 6 0 6 na 0,25 269 na na GYSEV CARGO (2018) na na 0,23 0,00 1,06 na 7,38 12,96 1 296 24,38 16,10 GYSEV/RÖEE (2018) 506 17 466 47 22 129 1,87 0,00 6,00 na 7,83 0,35 311 0,97 MAV (2018) 7 246 1 202 2 675 833 468 2 176 35,54 - 3,57 86,51 25 209 112,29 0,41 5 518 0,82 Ireland 70,28 4,81 68,46 CIE (2017) 1 888 466 53 40 530 663 442 3,80 17,74 na 45,50 2 122 0,55 100 Italy 301,34 60,54 200,89 FS (2018) 16 781 7 721 12 018 1 620 971 8 449 15 508 81,66 12,73 277,67 na 521,52 0,99 45 615 0,71 na 21 335 - 7,40 CR 2018; 678,65 Italy 2017: NTV (2017) na na na 0,94 14,90 na 12,80 5 290 Latvia 64,49 1,94 30,12 LDZ (2018) 1 860 367 251 175 2 0 5 607 10,40 - 7,05 7,58 21 593 0,16 - 0,50 42 - 1,89 49,26 12,50 12 186 22,21 Trenitalia (FS) Lithuania 65,29 2,83 43,32 LG (2018) 1 911 452 152 214 58 192 7 772 7,28 - 16,34 16,29 31 308 5,17 16,97 468 10,38 56,78 7,86 16 885 9,54 + NTV; 15,00 Luxembourg 2,59 0,60 230,25 CFL (2017) 275 0 262 na na na na na na na na CFL CARGO (2017) na na na na 9,58 2 055 Netherlands 41,54 17,13 412,40 NS (2018) 100 3 875 3 235 33,33 122,52 125,63 38 774 na 18 535 0,18 SJ 2018; 3,50 PRORAIL (2014) 2 833 1 883 1 943 na Poland 312,68 37,97 121,45 PKP (2018) 18 536 8 618 11 811 363 74 2 114 na 49,37 - 0,83 na na 46,13 7,70 11 097 6,79 na na na Portugal 92,23 10,30 111,69 CP (2018) 42 249 na na 28,53 na 126,28 3,48 4 104 1,77 RZD 2018; 5,40 IP SA (2018) 2 546 611 1 639 2,52 - 0,28 ONCF 2018; 0,05 Romania 238,39 19,58 82,15 CFR (2018) 10 765 2 917 4 029 23,28 - 0,49 Other Europe* ; CFR CALATORI (2018) 780 292 2 282 12,88 - 0,47 50,31 8 420 53,74 - 5,60 4 932 - 3,24 12,93 CFR MARFA (2018) 868 29 875 5,81 - 3,04 na na 24,57 - 9,81 4 602 - 8,67 CTV (2018) 29 30 0,18 7,88 0,92 1 123 1,11 - 15,92 563 - 14,70 GFR (2018) 214 4 175 2,58 - 5,91 5,26 6 409 12,91 - 7,70 3 392 - 3,75 REGIO CALA (2018) 4 99 0,63 6,15 na 6,23 289 UNICOM TRANZIT (2015) 54 1 242 0,82 1,42 2 019 2,38 948 Slovakia 49,04 5,44 110,93 ZSR (2018) 3 627 1 018 1 587 13,67 - 1,09 Other Europe * : CD 2018, CP 2018, EUROSTAR 2017, NS 2018, PKP ZSSK (2018) 235 209 1 289 5,94 - 0,67 33,50 8 73,81 1,84 3 815 1,46 2017, SZ 2018, TCDD 2018, THALYS 2017, VR 2018 ZSSK CARGO (2018) 490 11 841 5,55 - 3,29 9,04 12 528 34,39 - 3,59 6 729 - 3,98 Slovenia 20,27 2,07 101,94 SZ (2018) 1 209 331 610 151 357 347 2 748 7,49 1,18 17,71 8 351 13,55 0,99 656 0,89 18,39 - 1,61 4 512 - 0,50 Spain 505,94 46,59 92,09 ADIF (2018) 15 290 5 725 9 673 12,22 - 1,83 FGC (2018) 276 91 149 10 90 309 98 1,41 2,53 9,83 1 454 87,42 3,41 972 4,47 0,54 - 9,67 37 - 5,03 LFP (2018) 52 50 50 0,09 0,00 RENFE (2018) 337 2 432 3 411 11 242 14,49 1,82 183,90 64 101 507,09 3,94 26 931 3,34 18,32 - 6,69 6 324 - 4,33 Railway Statistics Synopsis Sweden 447,42 10,06 22,48 SJ (2018) na na 884 2,95 2,00 46,58 na 6 398 0,50 TRAFIKVERKET (2018) 9 708 1 986 8 110 1,15 3,89 UK 243,61 66,02 271,02 ATOC (2014) 244 11 107 12 286 na 528,58 22 143 na 62 297 EUROSTAR INTL (2017) 26 na 1,48 4,83 na 10,30 8 051 HS1 (2018) 113 113 113 na NETWORK RAIL (2018) 15 848 11 781 6 012 40,70 5,45 NIR (2017) 333 333 0 na na na na na na na 15,00 na na na ETFA AELE 8 166 2 286 6 490 1 340 1 488 5 871 5 732 43,25 247 18 414 528 22 910 54 17 270 UIC’s RAIL Information System and Analyses enables Norway 385,18 5,28 13,70 BANE NOR (2017) 4 134 269 2 459 4,51 NSB (2017) 34 490 394 2,81 34,17 8 761 64,03 3 096 online access to data and statistical indicators Switzerland 41,29 8,45 204,67 BLS (2017) 420 154 420 95 258 273 2,22 17,37 3 283 na 1 004 provided by its members: https://uic-stats.uic.org 2019 BLS CARGO (2018) na na 0,09 15,19 4,11 4 809 1,12 - 10,88 276 18,80 RHB (2017) 384 12 384 46 47 387 408 1,31 7,86 1 561 12,04 349 0,50 20 edition SBB CFF FFS (2018) 3 228 1 851 3 227 1 165 693 4 817 5 324 32,31 - 1,36 183,56 452,39 0,76 18 461 0,41 51,92 - 1,87 16 974 2,03 Contact: [email protected] Tausende Einwohner je in Kilometer D% Millionen D% D% D% D% ETF Publication 2019 © Millionen Lokomotiven Personen-wagen Tausend Millionen Millionen Millionen Millionen km² km² davon davon Triebwagen Güterwagen 18/17 18/17 18/17 18/17 18/17 Gesamt- einschl.
Recommended publications
  • Nasjona Signalplan 2020
    National Signalling Plan 2020 1 LIST OF CONTENTS 1 INTRODUCTION AND SUMMARY ................................................................................................. 3 1.1 INTRODUCTION ............................................................................................................................ 3 1.2 SUMMARY ................................................................................................................................... 5 2 NATIONAL SIGNALLING PLAN ..................................................................................................... 6 2.1 GRAPHIC OVERVIEW – YEAR OF COMMISSIONING ........................................................................... 6 2.2 GRAPHIC REPRESENTATION IN MAP .............................................................................................. 6 3 DESCRIPTION PER LINE SECTION .............................................................................................. 8 4 DOCUMENT INFORMATION .......................................................................................................... 9 4.1 TERMINOLOGY ............................................................................................................................ 9 4.2 REFERENCES .............................................................................................................................. 9 A significant proportion of the signalling systems on the Norwegian railway network are nearing the end of their life expectancy. This is an overall plan for the
    [Show full text]
  • Platform of Rail Infrastructure Managers in Europe
    P R I M E Platform of Rail Infrastructure Managers in Europe General Presentation November 2019 1 Main features . Acts as the European Network of Infrastructure Managers as established by the 4th Railway Package to: . develop Union rail infrastructure . support the timely and efficient implementation of the single European railway area . exchange best practices . monitor and benchmark performance and contribute to the market monitoring . tackle cross-border bottlenecks . discuss application of charging systems and the allocation of capacity on more than one network Added value . ‘Influencing’ function: industry able to affect draft legislation . ‘Early warning’ function: EC/ERA and industry - interaction and mutual understanding of respective ‘business’ . ‘Stress-test’ function: EC to test legislative proposals re their ‘implementability‘ . ‘Learning’ function: EC and IM to improve ‘Business’ function: Benchmarking of best practice to enhance IMs effectiveness and capabilities 2 The Evolution of PRIME – timeline Today September October March 2014 June 2016 The European Network of Rail IMs 2013 2013 First 8 IMs to EC proposes 26 participants, 40 members, 5 observers sign the 7 participants Declaration of 5 subgroups, 6 subgroups, Declaration of 2 subgroups: Intent to all IMs cooperation with 2 cooperation platforms Intent KPIs and benchmarking to set up PRIME regulators ad hoc working groups Implementing Acts ad hoc security group, PRIME PRIME PRIME 3 Members As of 20 December 2018: EU Industry Members Industry observers 20. Lietuvos geležinkeliai, LT European Commission 1. Adif, ES 1. CER (member) 2. Bane NOR, NO 21. LISEA, FR 2. EIM 3. Banedanmark, DK 22. MÁV Zrt , HU 3. RNE ERA (observer) 4.
    [Show full text]
  • MEDIA PLANNER 2019 Irjinternational Railway Journal
    MEDIA PLANNER 2019 IRJInternational Railway Journal YOUR GLOBAL MEDIA PARTNER MEDIA PLANNER 2019 THE IRJ BRAND IRJ The global source of railway news THE IRJ BRAND Since its launch in 1960 as the world’s first truly global railway trade publication, International Railway Journal (IRJ) has set the bar for news coverage, analysis and in-depth reports on the latest technologies and trends to keep railway managers, engineers, and suppliers around the world up-to-date with developments in the global rail industry. HIGHLY RESPECTED EDITORIAL TEAM IRJ’s highly respected and knowledgeable team of journalists, regional editors and correspondents travel the world to produce in-depth and insightful reports on the latest railway and transit projects. IRJ sets a high standard for impartial reporting and bold design, while its easy-to-navigate website consistently carries a high-volume of quality news articles, making it a leading online news destination for the rail industry. EXTENSIVE GLOBAL REACH IRJ’s standing in the market is reflected in its extremely loyal readership and steadily-growing website traffic. According to our latest ABC audit1, 84% of IRJ’s total circulation of 10,324 railway professionals is requested compared with just 20.6%2 for our nearest competitors. IRJ’s growing global reach encompasses our monthly print magazine, interactive digital edition, news-leading website, daily and weekly newsletters, social media, webinars, and conferences. YOUR MEDIA PARTNER IRJ is one of the few constants in a rapidly-changing world, with new markets emerging, organisations restructuring, suppliers merging, and the continuous evolution of digital technologies. IRJ is your ideal partner to help your business grow and prosper.
    [Show full text]
  • Upcoming Projects Infrastructure Construction Division About Bane NOR Bane NOR Is a State-Owned Company Respon- Sible for the National Railway Infrastructure
    1 Upcoming projects Infrastructure Construction Division About Bane NOR Bane NOR is a state-owned company respon- sible for the national railway infrastructure. Our mission is to ensure accessible railway infra- structure and efficient and user-friendly ser- vices, including the development of hubs and goods terminals. The company’s main responsible are: • Planning, development, administration, operation and maintenance of the national railway network • Traffic management • Administration and development of railway property Bane NOR has approximately 4,500 employees and the head office is based in Oslo, Norway. All plans and figures in this folder are preliminary and may be subject for change. 3 Never has more money been invested in Norwegian railway infrastructure. The InterCity rollout as described in this folder consists of several projects. These investments create great value for all travelers. In the coming years, departures will be more frequent, with reduced travel time within the InterCity operating area. We are living in an exciting and changing infrastructure environment, with a high activity level. Over the next three years Bane NOR plans to introduce contracts relating to a large number of mega projects to the market. Investment will continue until the InterCity rollout is completed as planned in 2034. Additionally, Bane NOR plans together with The Norwegian Public Roads Administration, to build a safer and faster rail and road system between Arna and Stanghelle on the Bergen Line (western part of Norway). We rely on close
    [Show full text]
  • List of Numeric Codes for Railway Companies (RICS Code) Contact : [email protected] Reference : Code Short
    List of numeric codes for railway companies (RICS Code) contact : [email protected] reference : http://www.uic.org/rics code short name full name country request date allocation date modified date of begin validity of end validity recent Freight Passenger Infra- structure Holding Integrated Other url 0006 StL Holland Stena Line Holland BV NL 01/07/2004 01/07/2004 x http://www.stenaline.nl/ferry/ 0010 VR VR-Yhtymä Oy FI 30/06/1999 30/06/1999 x http://www.vr.fi/ 0012 TRFSA Transfesa ES 30/06/1999 30/06/1999 04/10/2016 x http://www.transfesa.com/ 0013 OSJD OSJD PL 12/07/2000 12/07/2000 x http://osjd.org/ 0014 CWL Compagnie des Wagons-Lits FR 30/06/1999 30/06/1999 x http://www.cwl-services.com/ 0015 RMF Rail Manche Finance GB 30/06/1999 30/06/1999 x http://www.rmf.co.uk/ 0016 RD RAILDATA CH 30/06/1999 30/06/1999 x http://www.raildata.coop/ 0017 ENS European Night Services Ltd GB 30/06/1999 30/06/1999 x 0018 THI Factory THI Factory SA BE 06/05/2005 06/05/2005 01/12/2014 x http://www.thalys.com/ 0019 Eurostar I Eurostar International Limited GB 30/06/1999 30/06/1999 x http://www.eurostar.com/ 0020 OAO RZD Joint Stock Company 'Russian Railways' RU 30/06/1999 30/06/1999 x http://rzd.ru/ 0021 BC Belarusian Railways BY 11/09/2003 24/11/2004 x http://www.rw.by/ 0022 UZ Ukrainski Zaliznytsi UA 15/01/2004 15/01/2004 x http://uz.gov.ua/ 0023 CFM Calea Ferată din Moldova MD 30/06/1999 30/06/1999 x http://railway.md/ 0024 LG AB 'Lietuvos geležinkeliai' LT 28/09/2004 24/11/2004 x http://www.litrail.lt/ 0025 LDZ Latvijas dzelzceļš LV 19/10/2004 24/11/2004 x http://www.ldz.lv/ 0026 EVR Aktsiaselts Eesti Raudtee EE 30/06/1999 30/06/1999 x http://www.evr.ee/ 0027 KTZ Kazakhstan Temir Zholy KZ 17/05/2004 17/05/2004 x http://www.railway.ge/ 0028 GR Sakartvelos Rkinigza GE 30/06/1999 30/06/1999 x http://railway.ge/ 0029 UTI Uzbekistan Temir Yullari UZ 17/05/2004 17/05/2004 x http://www.uzrailway.uz/ 0030 ZC Railways of D.P.R.K.
    [Show full text]
  • The Implementation of the ERTMS on the Norwegian Railway Network
    The Implementation of the ERTMS on the Norwegian Railway Network A Case Study of a Large Infrastructure Project Using an Actor-Network Theory Approach MSc in Economics and Business Administration- Accounting, Strategy and Control A Master´s Thesis Written By Kine Strømstad- 124657 Hedvig Öster Haagensen- 124576 Number of characters: 236 846 Number of normal pages: 113 Number of pages in total: 148 Supervisor: Michael Werner Date of Submission: 15th of May 2020 Abstract A megaproject is a phenomenon that describe large infrastructure projects that are characterized by being highly complex and resource demanding. This study draws upon the implementation of the ERTMS on the Norwegian railway network to understand why budgeted costs and timeframes often are exceeded in such projects. Specifically, this study draws upon Actor-Network theory to understand the dynamic nature of the implementation of the ERTMS. The knowledge derived from the study can be used by the specific case company to understand internal processes better, making them more informed lated in the implementation process. The overall research question is proposed as following: How can the implementation of the ERTMS in Norway be explained and improved by applying Actor-Network theory? To answer the research question, a qualitative approach has been applied and thorough interviews have been conducted with representatives from the company, and within the project organization. By answering the research questions, the thesis provided contributions to the literature relating to cost manage in large infrastructure projects and the Actor-Network management accounting literature. The key actors in this study appeared to be the legislative forces who initiated the implementation of the ERTMS on the Norwegian Railway, and the various actors within the project organization.
    [Show full text]
  • Rail Infrastructure Managers in Europe
    P R I M E Platform of Rail Infrastructure Managers in Europe General Presentation November 2017 1 Main features . Acts as the European Network of Infrastructure Managers as established by the 4th Railway Package . The only platform allowing direct exchange between IMs and the EC, and co-chaired by both . Allowing discussion of legislative initiatives at a very early stage . Allowing all IMs to cooperate and establish common priorities . Comprehensive scope encompasses all strategic (regulatory, operational and financial) aspects relevant for IMs Added value . ‘Influencing’ function: industry able to affect draft legislation . ‘Early warning’ function: EC/ERA and industry - interaction and mutual understanding of respective ‘business’ . ‘Stress-test’ function: EC to test legislative proposals re their ‘implementability‘ . ‘Learning’ function: EC and IM to improve ‘Business’ function: Benchmarking of best practice to enhance IMs effectiveness and capabilities 2 The Evolution of PRIME – timeline Today September October March 2014 June 2016 European Network of December 2013 2013 Rail IMs 2018 EC proposes First 8 IMs to 26 participants, Deadline set in Declaration of sign the 7 participants 5 subgroups, 31 members, 5 observers 4th Package: Intent to all IMs Declaration of 2 subgroups: cooperation with 6 subgroups, All main IMs to set up PRIME Intent KPIs and benchmarking regulators 2 cooperation platforms participating Implementing Acts ad hoc security group, ad hoc working groups PRIME PRIME PRIME PRIME 3 Members As of 15 November 2017: EU Industry Members Observers European Commission 1. Adif, ES 16. Lietuvos geležinkeliai, LT 1. ERA 2. Bane NOR, NO 17. LISEA, FR 2. CER 3. Banedanmark, DK 18.
    [Show full text]
  • Freight Transport by Rail the National Rail Administration’S Strategy Short Version
    Freight transport by rail The National Rail Administration’s strategy SHORT VERSION 1 Contents Background – development 4 Challenges and critical parameters 5 Goals for rail freight transport 6 Recommended strategy for developing rail freight transport 7 Main strategic moves 7 Prioritisation of measures for increased freight transport 10 2 Foreword Freight transport by rail brings new challenges and new opportunities Executive Director - Strategic Planning Anita Skauge. Rail freight transport has undergone a period of strong, very pleasing growth in recent years. This has brought new challenges for railway infrastructure. As part of its work on a new National Transport Plan (2010 – 2019), the National Rail Administration has therefore developed a strategy that describes necessary infrastructure- related and organisational moves in the years to come, making it possible for rail freight transport to continue growing. In its work to develop the strategy, the National Rail Administration has held discussions with both railway undertakings and other interested parties. Implementation of the strategy will be included as part of the transport departments’ planning proposals for the National Transport Plan [NTP] in December 2007 and, obviously, is otherwise dependent on the annual budgets. The departments’ NTP proposals will be sent out for a wide consultation in parallel with the transmission of the proposal to Norway’s Ministry of Transport and Communications. Anita Skauge Executive Director - Strategic Planning 3 Background – development Developments
    [Show full text]
  • Nordea 1, SICAV Société D’Investissement À Capital Variable À Compartiments Multiples
    Statement of Changes in Investments for the Unaudited Semi-Annual Report 2019 Nordea 1, SICAV Société d’Investissement à Capital Variable à compartiments multiples Investment Fund under Luxembourg Law 562, rue de Neudorf L-2220 Luxembourg Grand Duchy of Luxembourg R.C.S. number: Luxembourg B-31442 Statement of Changes in Investments Table of Contents Nordea 1 - Alpha 7 MA Fund 3 Nordea 1 - Alpha 10 MA Fund 5 Nordea 1 - Alpha 15 MA Fund 7 Nordea 1 - Asian Focus Equity Fund 9 Nordea 1 - Balanced Income Fund 10 Nordea 1 - Chinese Equity Fund 13 Nordea 1 - Danish Bond Fund 14 Nordea 1 - Danish Covered Bond Fund (Formerly Nordea 1 - Danish Mortgage Bond Fund) 15 Nordea 1 - Danish Short-Term Bond Fund 16 Nordea 1 - Emerging Consumer Fund 17 Nordea 1 - Emerging Market Bond Fund 18 Nordea 1 - Emerging Market Bond Opportunities Fund 21 Nordea 1 - Emerging Market Corporate Bond Fund 24 Nordea 1 - Emerging Market Hard Currency Bond Fund 26 Nordea 1 - Emerging Market Local Debt Fund 29 Nordea 1 - Emerging Market Local Debt Fund Plus 30 Nordea 1 - Emerging Markets Debt Total Return Fund 31 Nordea 1 - Emerging Markets Focus Equity Fund 32 Nordea 1 - Emerging Markets Small Cap Fund 33 Nordea 1 - Emerging Stars Bond Fund 35 Nordea 1 - Emerging Stars Equity Fund 38 Nordea 1 - European Corporate Bond Fund 39 Nordea 1 - European Corporate Bond Fund Plus 42 Nordea 1 - European Corporate Stars Bond Fund 45 Nordea 1 - European Covered Bond Fund 47 Nordea 1 - European Covered Bond Opportunities Fund 49 Nordea 1 - European Cross Credit Fund 51 Nordea 1 - European
    [Show full text]
  • Konsulentaftale Vedr. Analyse Til Kombiterminal Projekt
    Transportudvalget 2019-20 TRU Alm.del - endeligt svar på spørgsmål 483 Offentligt BANEDANMARK KONSULENTAFTALE VEDR. ANALYSE TIL KOMBITERMINAL PROJEKT September 2018 FORORD Analysens baggrund, problemstilling, formål og tilgang Baggrund og problemstilling Formål Banedanmark ejer i dag i alt tre kombiterminaler i Danmark, som er udlejet I juni 2018 blev der indgået en aftale med Rambøll om de specifikke opgaver, på driftskontrakter der udløber i efteråret 2020. Kombiterminalerne som har til formål at medvirke til at give TRM, TBST og BDK et tilstrækkeligt anvendes til omladning af gods mellem vej og bane, og de spiller derfor en grundlag for at kunne beslutte fremtidige kontraktformer for terminalerne. central rolle for udførsel af godstransporter i Danmark, samt af udviklingen af den transportform. Der er et stort fokus på at få transporteret mere gods Tilgang på bane i fremtiden, og der er derfor behov for at finde en kontraktmodel I tilgangen til opgaven har de centrale leverancer for Rambøll været; for driften af terminalerne, der bedst muligt opfylder en række kriterier i den kontekst. Kortlægning af potentielle kombiterminal-operatører og –ejere for hver af de • tre statsejede kombiterminaler (Leverance 1) Grundlaget for opgaven er et kommissorium aftalt mellem • Tilrettelæggelse og gennemførsel af markedsdialog med repræsentanter for Transportministeriet (TRM), Trafik- og Boligstyrelsen (TBST) samt alle relevante interessenter (Leverance 2) Banedanmark (BDK). I foråret 2018 blev der aftalt en opdatering af • Gennemførsel af markedsanalyse for godstransport, herunder kortlægning af kommissoriet og identificeret en række leverancer som udestod og som var historisk udvikling, trends, perspektiver på udvikling samt indsigt i centrale for projektets gennemførsel, og det blev besluttet at få ydelserne sammenlignelige projekter fra andre lande (Leverance 2) udført ved brug af ekstern bistand.
    [Show full text]
  • Standard Information for Traffic Management Overview
    Traffic Management Information Standard information for Traffic Management Overview Traffic Management Information Content Foreword ........................................................................................................................................ 5 PART 1 – OVERVIEW .................................................................................................................... 6 1 Introduction .............................................................................................................................. 6 2 General information – summaries ............................................................................................ 7 2.1 Border information .......................................................................................................... 12 2.2 Border agreements ......................................................................................................... 13 3 Traffic Management in case of disturbance ............................................................................ 14 3.1 Communication ............................................................................................................... 14 3.2 Operational scenarios ..................................................................................................... 14 4 Traffic restrictions................................................................................................................... 15 5 Dangerous goods .................................................................................................................
    [Show full text]
  • (CCS) and Migration to ERTMS
    FEASIBILITY STUDY REFERENCE FEASIBILITY STUDY REFERENCE SYSTEM ERTMS FinalSYSTEM Report ERTMS DigitalisationFinal Report of CCS (Control Command and Signalling) and MigrationDigitalisation to ERTMS of CCS (Control Command and Signalling) and Migration to ERTMS European Railway Agency - 2017 23 OP European Railway Agency - 2017 23 OP 14 AUGUST 2018 14 AUGUST 2018 FEASIBILITY STUDY REFERENCE SYSTEM ERTMS Contact ANDRÉ VAN ES Arcadis Nederland B.V. P.O. Box 220 3800 AE Amersfoort The Netherlands Our reference: 083702890 A - Date: 2 November 2018 2 of 152 FEASIBILITY STUDY REFERENCE SYSTEM ERTMS CONTENTS 1 INTRODUCTION 9 1.1 EU Context of Feasibility Study 9 1.2 Digitalisation of the Rail Sector 9 1.3 Objectives of Feasibility Study 11 1.4 Focus of Feasibility Study 11 1.5 Report Structure 12 2 SCOPE AND METHODOLOGY 13 2.1 Methodology 13 2.2 Scope Addition 15 2.3 Wider Pallet of Interviewed Parties 15 2.4 Timeframes 19 3 INFRASTRUCTURE MANAGERS 20 3.1 Findings and Trends Infrastructure Managers 20 3.2 Reasons for Replacing Non-ETCS Components 28 3.3 Short-Term versus Long-Term 31 4 OPERATING COMPANIES 33 4.1 Dutch Railways (NS) 33 4.2 DB Cargo 35 4.3 RailGood 36 4.4 European Rail Freight Association 37 4.5 Findings and Trends Operating Companies 38 5 RAIL INDUSTRY SUPPLIERS 40 5.1 Supplier 1 40 5.2 Supplier 2 41 5.3 Supplier 3 42 5.4 Supplier 4 42 5.5 Supplier 5 42 Our reference: 083702890 A - Date: 2 November 2018 3 of 152 FEASIBILITY STUDY REFERENCE SYSTEM ERTMS 5.6 Findings and Trends Suppliers 43 6 RAILWAY INDUSTRY DEVELOPMENT INITIATIVES
    [Show full text]