Major High-Rise Fires
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Emaar Properties (PJSC) Initiating Coverage UAE Real Estate 23 Sep
Emaar Initiating Properties (PJSC ) Coverage UAE 23 Sep 2012 Real Estate Price Target We initiate coverag e of EMAAR PROPERTIES, the largest real estate developer in Current Mkt.Price (AED) 3.58 GCC with a BUY rating and target price of AED 4.15 per share. The recent uptick in Target Price (AED) 4.1 5 investor sentiment towards Dubai real estate combined with Emaar’s traction in de- Upside / (Downside), % +15.9 risking its revenue sources from purely property development to mix of recurring revenue stream is in our opinion strong positives to narrowing the gap between Est. Dividend Yield, % +2.8 Emaar’s current market value and its estimated fair value Est. Total Return, % +18.7 Stock Information Dubai Real Estate Stabilizing DFM Code EMAAR Property and rentals in Dubai seem to have bottomed out since Q4’2011. Significant Bloomberg Code EMAAR DH Equity correction in prices since Q1’2009 has set a stage of attractive rental yields compared 3-M Avg. daily volume (‘000s)) 14,204 to other cosmopolitan cities in the region. Emaar remains the torch bearer of Dubai Shares outstanding (millions) 6,091 Real Estate and in many ways emblematic of what brand ‘Dubai’ stands for Market Cap. (AED millions) 21, 623 Emaar de-risking strategy is gaining traction 52W High (AED) 3.63 (19Sep 12) Emaar’s portfolio of recurring revenue assets now contributes roughly 40% of top-line 52W Low (AED) 2.33 (15Jan12) revenues compared to c.10% in 2008. Rental and Hospitality segment provide Price Performance revenue visibility; impart balance sheet liquidity and reduce overall business risk. -
List of World's Tallest Buildings in the World
Height Height Rank Building City Country Floors Built (m) (ft) 1 Burj Khalifa Dubai UAE 828 m 2,717 ft 163 2010 2 Shanghai Tower Shanghai China 632 m 2,073 ft 121 2014 Saudi 3 Makkah Royal Clock Tower Hotel Mecca 601 m 1,971 ft 120 2012 Arabia 4 One World Trade Center New York City USA 541.3 m 1,776 ft 104 2013 5 Taipei 101 Taipei Taiwan 509 m 1,670 ft 101 2004 6 Shanghai World Financial Center Shanghai China 492 m 1,614 ft 101 2008 7 International Commerce Centre Hong Kong Hong Kong 484 m 1,588 ft 118 2010 8 Petronas Tower 1 Kuala Lumpur Malaysia 452 m 1,483 ft 88 1998 8 Petronas Tower 2 Kuala Lumpur Malaysia 452 m 1,483 ft 88 1998 10 Zifeng Tower Nanjing China 450 m 1,476 ft 89 2010 11 Willis Tower (Formerly Sears Tower) Chicago USA 442 m 1,450 ft 108 1973 12 Kingkey 100 Shenzhen China 442 m 1,449 ft 100 2011 13 Guangzhou International Finance Center Guangzhou China 440 m 1,440 ft 103 2010 14 Dream Dubai Marina Dubai UAE 432 m 1,417 ft 101 2014 15 Trump International Hotel and Tower Chicago USA 423 m 1,389 ft 98 2009 16 Jin Mao Tower Shanghai China 421 m 1,380 ft 88 1999 17 Princess Tower Dubai UAE 414 m 1,358 ft 101 2012 18 Al Hamra Firdous Tower Kuwait City Kuwait 413 m 1,354 ft 77 2011 19 2 International Finance Centre Hong Kong Hong Kong 412 m 1,352 ft 88 2003 20 23 Marina Dubai UAE 395 m 1,296 ft 89 2012 21 CITIC Plaza Guangzhou China 391 m 1,283 ft 80 1997 22 Shun Hing Square Shenzhen China 384 m 1,260 ft 69 1996 23 Central Market Project Abu Dhabi UAE 381 m 1,251 ft 88 2012 24 Empire State Building New York City USA 381 m 1,250 -
Study on Security Cooperation in The
This publicaion has been produced with the assistance of the European Union. The contents of this publicaion are the sole responsibility of ATR Consuling and can in no way be taken to relect the views of the European Union. CONTENTs Execuive Summary 1 Acronyms 2 Acknowledgements 5 Background and 6 Context Concept and 7 Background of the Heart of Asia Building r Commitment 8 States to the Heart of Asia Process Among Membe Map 1: 9 Heart of Asia Member States Exising Studies 10 on the Heart of Asia Process Approach and 11 Methodology Approach 11 Research Quesions 11 Methodology 12 Findings 13 Security Cooperaion’ Looking Beyond the Tradiional Deiniion of ‘ 13 Security Threats 14 in the Region Security Cooperaion 17 Mechanisms in the Region Obstacles to 22 Efecive Security Cooperaion in the Region Opportuniies for 23 Intensiied Security Cooperaion Incenives for 25 Intensiied Security Cooperaion Policy Opions 26 for the Heart of Asia Conclusion 29 Appendix I: 31 Afghanistan Most Relevant 32 Security Threats to Afghanistan Exising Security 32 Cooperaion Mechanisms Obstacles to 35 Efecive Security Cooperaion Opportuniies aion and 38 Incenives for Intensiied Security Cooper Promising Policy 40 Opions for the Heart of Asia Process Map 2: 40 Proposed Route of TAPI Gas Pipeline Project Appendix II: 42 Azerbaijan Most Relevant 43 Security Threats Exising Security 44 Cooperaion Mechanisms Obstacles to Efecive Security Cooperaion 45 Opportuniies and Incenives for Intensiied Security Cooperaion 46 Promising Policy Opions for the Heart of Asia Process -
New Visions for Public Affairs, Volume 11, Spring 2019 || 1
New Visions for Public Affairs, Volume 11, Spring 2019 || 1 VOLUME 11, SPRING 2019 Contents Rising to Meet the Central Challenge of Our Time ........................................................................... 8 Vice President Joe Biden.................................................................................................................... 8 2018 Seoul Case Study Experience ................................................................................................. 10 Eileen Young ................................................................................................................................ 10 Hardening Soft Targets .................................................................................................................. 14 Daniel Henne ............................................................................................................................... 14 A Critical Review of Emergency and Disaster Management in the United Arab Emirates .............. 23 Abdulhadi A. Al Ruwaithi............................................................................................................. 23 Civic Hackathons as Deliberative Democracy: Reflections from Participation in the 2018 Delaware Open Data Challenge ..................................................................................................................... 36 Eli Turkel, Elizabeth Suchanic, and Randy Neil ................................................................................ 36 The Syrian Crisis: Failed Mediation -
Curriculam Vitae Sherief Hussain
SHERIEF HUSSAIN Mechanical Engineer – Site [email protected] | www.linkedin.com/in/sherief-hussain | +65 86487191 | Singapore | PROFILE Highly motivated, competent, resourceful and result oriented Mechanical Consulting Engineer with more than 10 years working experience in Building Construction Services (Public Heath/Sanitary, Fire Protection & HVAC) for the 5 star Hotel, Light rail transit system, Mixed-Use High-Rise Buildings & Residential Villas Project in Middle East Region (UAE) My field of expertise is Installation, Site Supervision, Project & Construction Management, Inspection, QA-QC, Coordination, Commissioning, Operation & Maintenance and Refurbishment works, also proven experience with delivering projects results within specified time frames to the highest standard and Quality such as most bold and iconic landmark projects of UAE – Burj Khalifa World Tallest Tower, Dubai Metro Rail, Abu Dhabi World Trade Center Towers etc. WORK EXPERIENCE (CONSULTING SIDE ) Mechanical Engineer - Site Aug 2018 – Oct 2019 WME Consultants Dubai, United Arab Emirates Mechanical Inspector - Site July 2016 – Aug 2018 WME Consultants Dubai, United Arab Emirates Project Details: The Address Downtown Dubai Hotel Refurbishment (Fire damaged) – Emaar Properties The Address Downtown Dubai refurbishment project, located in the Downtown Dubai area near to Dubai Mall, is a 63 storey premium luxury hotel building comprising of 224 guest rooms & suites, 628 serviced apartments, international restaurants & spa, 4 levels of basement car parks, front of house lobby areas and other facilities. The client has been taken the opportunity to enhance 2015 New Year\s Eve fire damaged building experience by improving the facilities. The existing systems have been reinstated rather than be upgraded to comply with current regulations unless the respective authorities require such upgrade. -
The Pride of Our Nation
THE PRIDE OF OUR NATION ANNUAL REPORT 2018 CONTENTS LETTER TO SHAREHOLDERS 03 BUSINESS OVERVIEW 08 FINANCIAL HIGHLIGHTS 10 PROPERTY BUSINESS 12 PROJECT HIGHLIGHTS 16 JOINT VENTURE PROJECTS 38 HOSPITALITY & LEISURE 72 SHOPPING MALLS & RETAIL 86 INTERNATIONAL OPERATIONS 99 BOARD OF DIRECTORS 109 PRINCIPAL OFFICERS 125 GROUP STRUCTURE 127 LETTER TO SHAREHOLDERS “You inspire us, year after year, to push ourselves, set new benchmarks, and create long-term value for the Company and our nation.” I thank you for your continued support to your Company. A defining factor that has highlighted our evolution, especially in recent years, is the true sense of ownership across all levels of operation by every member of the Emaar family. 2018 EMAAR ANNUAL REPORT | 03 While we have created, literally, the spirit of ownership for our customers FIRM FUNDMENTALS through our master-planned communities, I have always believed that organisations perform best when it builds an ‘ownership culture’ that Your Company recorded exceptional growth in 2018. That is the result touches every employee. of the agility and flexibility with which we have operated in today’s fast- changing environment. With an ownership mindset, every action they take is guided by the organisational values, which, in turn, enable cost consciousness, resource We recorded a net operating profit of AED 7.216 billion, a growth of 30 use optimisation and higher levels of efficiency and productivity. And that per cent over 2017, prior to considering the effect of the IPO of Emaar is what has enabled us to achieve exceptional financial performance, even Development and forex movement. -
Dubai: Unifinished Skyscraper City
DUBAI: UNIFINISHED SKYSCRAPER CITY World Similar DUBAI: BASIC INFORMATION Rank To Urban Area Population (2010) 2,500,000 151 Caracas. Changsha Projection (2025) 3,550,000 133 Curitiba, Casablanca Urban Land Area: Square Miles (2009) 600 Kansas City, London, Delhi, 50 Urban Land Area: Square Kilometers 1,550 Bankgkok Density: Per Square Mile (2007) 3,300 719 Portland, Dallas-Fort Worth Density: Per Square Kilometer (2007) 1,300 *Continuously built up area (Urban agglomeration) Land area & density rankings among the approximately 850 urban areas with 500,000+ population. Data from Demographia World Urban Areas (http://www.demographia.com/db-worldua.pdf) February 1, 2010 I picked up a copy of The Wall Street Journal-Europe on the concourse while boarding my Emirates Air flight from Paris to Dubai in late November of 2009. The lead story provided an unexpected relevance to the trip --- my first to Dubai. Dubai World, owned by the Dubai government, had announced a 6-month moratorium on payments of some of its $60 billion in debt. Since the announcement, stock markets have been dropping and recovering, company officials have attempted to calm borrowers and government officials have provided less assurance than Dubai’s investors might have preferred, though richer, neighboring Abu Dhabi backstopped Dubai with $10 billion in December. The United Arab Emirates: Dubai is one of the seven emirates of the United Arab Emirates (UAE), which like the United States and Canada is a federation. Broadly speaking, the emirates are as states or provinces. By far the richest is Abu Dhabi, with something like 10% of the world’s oil reserves. -
Other Skyscraper Fires
5/18/2021 9-11 Research: Other Skyscraper Fires .com <^> 9 - 1 1 R e s e a r c h .wtc7.net Home Background Attack Aftermath Evidence Misinformation Analysis Memorial Analysis New York City collapsing buildings Other Skyscraper Fires other high-rise fires other collapses WTC 1, 2 collapses Fires Have Never Caused Skyscrapers to Collapse design parameters role of fires fire severity Excepting the three 9-11 collapses, no fire, however severe, has ever caused a steel-framed high-rise building effects on steel collapse features to collapse. Following are examples of high-rise fires that were far more severe than those in WTC 1 and 2, explosive events and Building 7. In these precedents, the fires consumed multiple floors, produced extensive window demolition squibs frame shattering breakage, exhibited large areas of emergent flames, and went on for several hours. The fires in the WTC concrete pulverization towers did none of these things. dust volume steel shredding LINK symmetry mushrooming The One Meridian Plaza Fire speed of fall demolition proofs speed of fall One Meridian Plaza is a 38-floor skyscraper in Philadelphia that suffered a severe fire on February 23, 1991. volume of dust The fire started on the 22nd floor and raged for 18 hours, gutting eight floors and causing an estimated $100 breakup of top 1 2 3 collapse theories million in direct property loss. It was later described by Philadelphia officials as "the most The One Meridian Plaza fire column failure theory truss theory significant fire in this century". demolition theories basement bombs 4 nuclear devices The fire caused window breakage, cracking of granite, and failures of spandrel panel connections. -
Company Profile the Complete Lighting Solution Provider
Company Profile The complete lighting solution provider Bvlgari Resort Dubai - Dubai, UAE | Lighting Design Concept By: Metis Lighting | Architecture By: ACPV | Design Practice By: Delta Lighting Solutions Our Mission To enhance the built environment by providing innovative lighting Our Vision To be the lighting supplier of choice in the region Edraak - Amman, Jordan Beirut Doha Dubai Amman Abu Dhabi Jeddah Riyadh Kuwait Cairo Manama 2000 2003 2004 2005 2008 2010 2011 2016 2016 2019 Four Seasons Resort Dubai - Dubai, UAE With twenty years of experience, Huda Lighting has positioned itself The Story of as a leading lighting solution provider for the Middle East and North African markets, providing a high degree of lighting expertise to Huda Lighting support the region’s projects with the most suitable products and services for any type of project in the hospitality, retail, commercial, residential or industrial market segment. With the region’s developing market, Huda Lighting was able to expand its support covering more countries with an experienced team of over 200 employees across its ten branches. Over the years, Huda Lighting has evolved its range of products and services, making it more of a lighting solution provider, in many cases offering turnkey solutions for lighting, automation systems, wiring devices and other relevant products. Its consistently growing list of project references and corporate clients can only demonstrate the level of professionalism Huda Lighting has reached. Huda Lighting continues to strive towards its vision “To Be The Lighting Supplier of Choice In The Region” by spreading its presence to more major cities, while continuing to upgrade and diversify its products and services. -
Egress As Part of Fire Safety in High-Rise Buildings
MASTER EGRESS AS PART OF FIRE SAFETY IN THESIS HIGH-RISE BUILDINGS Redesign of Koningin Julianaplein Yang Sun | EGRESS AS PART OF FIRE SAFETY IN HIGH-RISE BUILDINGS MASTER OF SCIENCE THESIS Yang Sun January, 2013 The work described in this thesis was cooperated with DGMR Bouw B.V., their support was gratefully acknowledged. Egress as Part of Fire Safety in High-rise Buildings 1 Author: Yang Sun Student No.: 4121988 Place, date: Delft, January 2013 Graduation Committee: Committee chair Prof. Ir. Rob Nijsse TU Delft, Building Engineering External supervisor Bj rn Peters DGMR Bouw B.V., the Hague ö Supervisor Ir. Roel Schipper TU Delft, Building Engineering Supervisor Prof. Dr. Ir. Serge Hoogendoorn TU Delft, Transport and Planning Master Program of Building Engineering Building Technology and Physics Faculty of Civil Engineering and Geosciences Delft University of Technology DGMR Bouw B.V. Department of Fire Safety The Hague, the Netherlands 2 Abstract Egress as Part of Fire Safety in High-rise Buildings 3 ABSTRACT The process of evacuating some large high-rise buildings may take upwards of several hours. One question that needs to be asked, however, is whether it is feasible and desirable to completely evacuate the high-rise building in fires. This research seeks to remedy this problem by proposing one or more efficient egress plan(s) for high-rise buildings. Investigation into a number of Dutch projects, international fire codes and state-of-the-art literature laid the foundation for this study. Four egress plans have been presented from a worldwide perspective for a specific certain building: Koningin Julianaplein in The Hague, the Netherlands. -
High Rise: Our Expertise
HIGH-RISE OUR EXPERTISE 15,000 110 EMPLOYEES WORLDWIDE YEARS’ EXPERIENCE 70+ 5 NATIONALITIES CONTINENTS N°69 2 billion+ INTERNATIONAL CONTRACTOR OF SALES ENR TOP 250 RANKING Cover picture: Burj Khalifa, Dubai, UAE Picture below: New Orleans, Rotterdam, The Netherlands 02 BESIX GROUP EXCELLING IN CREATING SUSTAINABLE SOLUTIONS FOR A BETTER WORLD BESIX is a leading Belgian business group, operating on BESIX is an international reference in the building, maritime five continents in construction, real estate development works, environment, sports and leisure facilities, industrial and concessions. buildings, road, rail, port and airport sectors. The Group is currently working on dozens of projects in around Its iconic achievements include Dubai’s Burj Khalifa, the 25 countries on five continents. world’s tallest tower; the Grand Egyptian Museum on the Giza pyramids plateau; the Ferrari World Leisure Center in Abu Its policy of sector diversification is also bearing fruit. Dhabi, the Carpe Diem building in Paris’s La Défense district; Its Concessions & Assets activities have taken off in recent the Al Wakrah Stadium, built for the FIFA World Cup Qatar years. BESIX’s expertise allows it to handle projects from 2022; and the Jebel Ali water treatment plant, an ongoing financial structuring to design and construction through project that will treat Dubai’s entire wastewater to the highest to maintenance. For its part, the Real Estate Development environmental standards. activity led by BESIX RED offers innovative real estate solutions in the residential, commercial and office sectors in five European countries. BESIX’s unique expertise is ensured by it having an in-house Engineering Department, at the forefront of contemporary technologies. -
Fire Performance and Test Methods for ACP External Wall Cladding Technical Report
INFRASTRUCTURE TECHNOLOGIES Fire performance and test methods for ACP external wall cladding Technical Report Author: Nathan White Project number: FE2976 Document Number: EP196619 Date: 14 May 2020 Revision: Revision D Client: Department of Environment, Land, Water and Planning Commercial-in-confidence Inquiries Inquiries should be addressed to: Team Leader, Fire Engineering Author Client CSIRO Infrastructure CSIRO Infrastructure Department of Environment, Technology Technology Land, Water and Planning Private Bag 33 71 Normanby Road (DELWP) Clayton South, VIC 3169 Clayton, VIC 3190 Telephone +61 3 9545 2777 Telephone +61 3 9545 2777 Document Details Document: Technical Report Project: Fire performance and test methods for ACP external wall cladding Document Number: EP196619 Project number: FE2976 Document Status and Revision History VERSION STATUS DATE DISTRIBUTION FORMAT Revision A WORKING DRAFT 2 December CSIRO PDF Issued for peer review 2019 DELWP Revision B WORKING DRAFT 12 December CSIRO PDF Issued for peer review 2019 DELWP Revision C DRAFT 17 January CSIRO PDF Issued for peer review 2020 DELWP Revision D FINAL 14 May 2020 CSIRO PDF Issued with response to DELWP peer review comments Document Authorisation AUTHOR REVIEWED BY AUTHORISED BY Nathan White Alex Webb Alex Webb 14 May 2020 14 May 2020 14 May 2020 Copyright and disclaimer © 2020 CSIRO To the extent permitted by law, all rights are reserved and no part of this publication covered by copyright may be reproduced or copied in any form or by any means except with the written permission of CSIRO. Important disclaimer This document is a report prepared for Department of Environment, Land, Water and Planning.