FINAL ENVIRONMENT IMPACT ASSESSMENT REPORT NEW MOLASSES BASED DISTILLERY (100 KLPD) For KARAN SUGARS PVT. LTD. GAT No: 487/488 A/2 & 488A/3, HARWAD, TAL: SHIROL, DIST: KOLHAPUR. (M.S) Prepared By Mantras Green Resources Ltd. (Engineers & Environmental Consultant) NABET/QCI Accredited Consultant Sr. No 96th (List 5 September, 2014) An ISO 9001:2008 Certified. B-5,B-7, Flushing Meadows, Plot No. 63, Mahatma nagar Nashik-422007 Ph- +253 2355665/2355086 E-Mail:
[email protected] [email protected] September 2014 TOR Index TOR Description Page No/ point Annexure no 1 Layout maps indicating existing unit as well as proposed unit indicating Refer annexure storage area, plant area, greenbelt area, utilities etc XLVII, VIII 2 Details of proposed products along with manufacturing capacity Chapter-2 page No. 4 3 Number of working days of the distillery unit. 330 days Chapter-2 page No. 14 4 Details of raw materials, its source with availability of molasses Chapter-2 page No. 13 5 Manufacturing process details of distillery along with process flow chart Chapter-2 Page No. 5 - 10 6 Sources and quantity of fuel (rice husk/bagasse/ coal etc.) for the boiler. Chapter-2 page No. 11 Measures to take care of SO2 emission. A copy of Memorandum of Understanding (MoU) signed with the coal suppliers should be submitted. 7 Storage facilities for raw materials, prepared alcohol, fuels and fly ash. Annexure XL VIII 8 One season site-specific micro-meteorological data using temperature, Chapter 3 relative humidity, hourly wind speed and direction and rainfall and AAQ data (except monsoon) for PM10, PM2.5, SO2, NOX , CO and HC (methane & non methane) shall be collected.