Rating Action: Moody's Affirms Wuhan Metro's A3 Rating; Outlook Stable

Total Page:16

File Type:pdf, Size:1020Kb

Rating Action: Moody's Affirms Wuhan Metro's A3 Rating; Outlook Stable Rating Action: Moody's affirms Wuhan Metro's A3 rating; outlook stable 07 Apr 2020 Hong Kong, April 07, 2020 -- Moody's Investors Service has affirmed Wuhan Metro Group Co., Ltd.'s A3 issuer rating and senior unsecured rating, as well as its (P)A3 senior unsecured medium-term note rating. At the same time, Moody's has maintained the stable outlook on the ratings. RATINGS RATIONALE "The affirmation reflects our assessment that Wuhan Metro's credit profile will continue to be supported by the strong recurring funding support from the government, despite service suspensions and reduced ridership due to the coronavirus outbreak in 2020," says Ada Li, a Moody's Vice President and Senior Credit Officer. Wuhan Metro's A3 issuer rating primarily combines (1) its ba2 Baseline Credit Assessment (BCA); and (2) Moody's assessment of a very high likelihood of support from, and a high level of dependence on, the Wuhan government and ultimately the Government of China (A1 stable), when needed, which provides a five-notch uplift to its final rating. This assessment of "Very High" support is underpinned by (1) the company's primary role of developing the metro system in Wuhan city, which is not commercially viable but is nationally important (public policy); (2) its controlling ownership by the Wuhan and central governments; and (3) the track record of very strong government support for the company. Moody's also considers that there is a "High" dependence level on the central government, reflecting that Wuhan Metro and the central government are exposed to common political and economic event risks. Wuhan Metro's ba2 BCA reflects its weak profitability and very high financial leverage, which in turn mirror its policy mandate with limited commercial purpose. Its BCA is constrained by (1) the company's ramping up of the metro system; (2) the risks associated with the construction and ramp-up of its metro and primary land development projects; (3) the lack of a market-oriented fare-setting mechanism for the industry as a whole; and (4) the company's more volatile earnings from its non-metro businesses, such as primary land development. On the other hand, the BCA is supported by strong recurring financial and operational support from the Wuhan municipal government and robust demand for metro services in Wuhan city. On 23 January, the Government of China (A1 stable) suspended all public transport within the city of Wuhan in Hubei province in an attempt to halt the spread of the coronavirus. Wuhan Metro's services were suspended for 64 days and partially reopened on 28 March. While Wuhan Metro has resumed six lines out of nine lines covering 262.71km (77.5% of network) it recorded just 273,900 passenger rides on 3 April, or 8.2% of 2019 average daily passenger rides. The service suspensions and reduced passenger travel incentives have lowered ridership and fare revenue. The additional passenger quarantine requirements implemented after service resumption have increased operating costs and further lowered the metro system's efficiency. Meanwhile, Moody's expects Wuhan Metro's primary land development and construction pipeline will be deferred until the city has fully restored its labor force and resumed productivity. Nevertheless, Moody's expects the Wuhan government and ultimately the Chinese government to continue providing cash subsidies and equity injections to offset the impact from reduced fare and land development revenue. After considering government grants and subsidies, Moody's estimates Wuhan Metro's funds from operations interest coverage will remain around 1.2x in 2020, largely unchanged to the level projected for 2019. However, the timely implementation of government fiscal support could be affected by local governments' priority to combat the coronavirus outbreak and to increase healthcare resources. Moreover, fiscal resources available for additional support remain constrained by the weakened local government revenue and delays in land sales, due to the severe disruptions in Wuhan, and due to the slowdown in China's overall economic growth. In addition, Moody's expects Wuhan Metro's liquidity position remains manageable, while its funding cost will benefit from the government-led monetary easing and financial support measures. At the end of September 2019, Wuhan Metro reported RMB14.7 billion in cash against short-term debt of RMB2.3 billion. It also has RMB113.2 billion of uncommitted undrawn credit facilities. The rapid and widening spread of the coronavirus outbreak globally, deteriorating China and global economic outlook, falling oil prices, and asset price declines are creating a severe and extensive credit shock across many sectors, regions and markets. The combined credit effects of these developments are unprecedented. The metro sector in China has been significantly affected by the shock given government containment measures and its sensitivity to passenger traffic demand and sentiment. Moody's regards the coronavirus outbreak as a social risk under our ESG framework, given the substantial implications for public health and safety. In particular, Wuhan Metro's operation remains vulnerable to further spread of coronavirus, and the pace of regional economic activities resumption. The rating also considers the following environmental, social and governance (ESG) factors. Wuhan Metro's exposure to environmental risk is low, given the important role mass transit operations play in reducing carbon emissions when compared to other modes of transport. Wuhan Metro's exposure to governance risks is low. The company's overall business profile and financial profile are underpinned by its public service nature, and it is subject to a high level of government supervision and an established fiscal allocation mechanism. The stable outlook reflects (1) the stable outlook on China's sovereign rating; and (2) the consideration that Wuhan Metro's BCA is appropriately positioned at the current level. FACTORS THAT COULD LEAD TO AN UPGRADE OR DOWNGRADE OF THE RATINGS The ratings could be upgraded if (1) the likelihood of support for Wuhan Metro increases, or (2) Wuhan Metro's standalone credit profile improves significantly. Moody's could raise Wuhan Metro's BCA if the company's business and financial profile improves. Credit metrics that would indicate upgrade pressure on its BCA include (1) adjusted debt/capitalization falling below 50%, and (2) adjusted funds from operations (FFO) interest coverage (including government grants) exceeding 3.0x on a sustained basis. The ratings could be downgraded if (1) the likelihood of support for Wuhan Metro decreases, (2) Wuhan Metro's standalone credit profile weakens meaningfully or (3) there is a material weakening of Wuhan Metro's policy functions. Moody's would consider lowering the company's BCA if (1) there is a significant deterioration in financial profile after considering recurring government fiscal support; (2) material delays in receiving government financial support; or (3) the company takes on higher-risk, commercial or leveraged non-metro businesses. Credit metrics that would indicate downgrade pressure on its BCA include (1) adjusted debt/capitalization exceeding 75%, and (2) adjusted FFO interest coverage (including government grants) falling below 1.0x on a sustained basis. The methodologies used in these ratings were Mass Transit Enterprises Methodology published in December 2017 and available at https://www.moodys.com/researchdocumentcontentpage.aspx?docid=PBM_1105431 , and Government-Related Issuers Methodology published in February 2020 and available at https://www.moodys.com/researchdocumentcontentpage.aspx?docid=PBC_1186207 . Alternatively, please see the Rating Methodologies page on www.moodys.com for a copy of these methodologies. Wuhan Metro Group Co., Ltd. (Wuhan Metro) is the sole platform to own and operate the metro system in Wuhan, the capital city of Hubei Province. As of the end of September 2019, Wuhan Metro runs 9 metro lines with a total length of around 338 kilometers. The company also engages in primary land development, property development and investment, advertising and retail, and telecommunications network leasing. As of the end of 2019, the company was 88.06% owned by the Wuhan State-owned Assets Supervision and As of the end of 2019, the company was 88.06% owned by the Wuhan State-owned Assets Supervision and Administration Commission (SASAC) and 11.94% owned by the China Development Bank Development Funds, which is ultimately 100% owned by the China Development Bank (A1 stable). REGULATORY DISCLOSURES For further specification of Moody's key rating assumptions and sensitivity analysis, see the sections Methodology Assumptions and Sensitivity to Assumptions in the disclosure form. Moody's Rating Symbols and Definitions can be found at: https://www.moodys.com/researchdocumentcontentpage.aspx? docid=PBC_79004. For ratings issued on a program, series, category/class of debt or security this announcement provides certain regulatory disclosures in relation to each rating of a subsequently issued bond or note of the same series, category/class of debt, security or pursuant to a program for which the ratings are derived exclusively from existing ratings in accordance with Moody's rating practices. For ratings issued on a support provider, this announcement provides certain regulatory disclosures in relation to the credit rating action on the support provider and in relation to each particular credit rating action for securities that derive their credit ratings
Recommended publications
  • 8Th Metro World Summit 201317-18 April
    30th Nov.Register to save before 8th Metro World $800 17-18 April Summit 2013 Shanghai, China Learning What Are The Series Speaker Operators Thinking About? Faculty Asia’s Premier Urban Rail Transit Conference, 8 Years Proven Track He Huawu Chief Engineer Record: A Comprehensive Understanding of the Planning, Ministry of Railways, PRC Operation and Construction of the Major Metro Projects. Li Guoyong Deputy Director-general of Conference Highlights: Department of Basic Industries National Development and + + + Reform Commission, PRC 15 30 50 Yu Guangyao Metro operators Industry speakers Networking hours President Shanghai Shentong Metro Corporation Ltd + ++ Zhang Shuren General Manager 80 100 One-on-One 300 Beijing Subway Corporation Metro projects meetings CXOs Zhang Xingyan Chairman Tianjin Metro Group Co., Ltd Tan Jibin Chairman Dalian Metro Pak Nin David Yam Head of International Business MTR C. C CHANG President Taoyuan Metro Corp. Sunder Jethwani Chief Executive Property Development Department, Delhi Metro Rail Corporation Ltd. Rachmadi Chief Engineering and Project Officer PT Mass Rapid Transit Jakarta Khoo Hean Siang Executive Vice President SMRT Train N. Sivasailam Managing Director Bangalore Metro Rail Corporation Ltd. Endorser Register Today! Contact us Via E: [email protected] T: +86 21 6840 7631 W: http://www.cdmc.org.cn/mws F: +86 21 6840 7633 8th Metro World Summit 2013 17-18 April | Shanghai, China China Urban Rail Plan 2012 Dear Colleagues, During the "12th Five-Year Plan" period (2011-2015), China's national railway operation of total mileage will increase from the current 91,000 km to 120,000 km. Among them, the domestic urban rail construction showing unprecedented hot situation, a new round of metro construction will gradually develop throughout the country.
    [Show full text]
  • Transportation Systems 2018 – 2020
    Transportation Systems 2018 – 2020 DE | EN | FR Liebherr-Transportation Systems News from the Company | p. 12 - 31 Locations Partners in Rapid Development | p. 20 The Liebherr Group Insights | p. 38 ff. From left to right: Holger Dörre, Adrian Gunis, Stefan Pachowsky, Dirk Junghans Dear reader, In the face of growing environmental awareness worldwide plus, for the first time, series-ready cold vapor systems using and the increasing changes in mobility, it seems likely that the CO2 as the refrigerant. transport of passengers and freight by rail will continue to play a significant role as part of the overall transportation systems of The outlook for our Hydraulics division is also very positive. the future. However, the demands made in terms of reliability, In this sector, Liebherr has been able to expand its product efficiency and environmental compatibility are also increasing portfolio considerably once again, including dampers for level in parallel. The rail system must therefore be continuously regulation systems. In addition, we are also working within the further developed and made fit for purpose for the future so framework of a research project with partners in the UK on that it can survive in the long term as part of an integrated the development of a system for the active radial suspension. transportation network. The aim of this project is to considerably reduce wear on rails and wheels. Liebherr-Transportation Systems is ready to face the associ- ated challenges, and is consistently pushing forward with the We have also further expanded our customer service activities, development of innovative technologies and products with a and not only in the well developed markets of Europe and North high customer benefit in all product areas.
    [Show full text]
  • Evolution of Urban Rail Signaling System Technology in China
    Evolution of Urban Rail Signaling System Technology in China Mr. Dongjie Li Traffic Control Technology Co., Ltd. July-2019 Overview of China Rail 01 Transit Development CONTENTS Evolution of Signaling 02 System Technology of TCT « Overview of China Rail 01 Transit Development Overview of China Rail Transit Development 1969 2018 2020 We are experiencing a rapid development stage The first rail 132 urban rail 6000km transit line in lines China Beijing Subway Line 1 83% adopt By 2020, the total « built in July, 1965 and CBTC system, with operation mileage opened in January, operation mileage will be up to 6000km. 1971, with 10.7km. 4354.30km « Evolution of Signaling 02 System Technology of TCT Evolution of Signaling System product of TCT 2019 Intelligent rail transportation system 40 years R&D of signaling system 2018 Interoperable Fully automatic operation system Cloud Platform for urban rail systems 2017 Train Intelligent Detection System Rail transit 2016 Vehicle-vehicle communication based Train Trans-disciplinary control system Multi-field LTE based DCS system LCF-500 2015 Interoperable signalling system for network LCF-400 2014 Fully automatic operation 2011 Train operation centred Integrated automation Signaling System 2009 Information security LCF-300 2008 STM CBTC Pilot plant test LCF-200 2002-09 LCF-100 Beijing BaTong Line 1 LCF-200 Passenger dedicated Railway LCF-100 2004 CBTC R&D Subject communication device 1998 LCF-100 through appraisal Product 1996 Urban rail R&D ATP 1993 SJ-93 communication device Railway test 1990"Eighth
    [Show full text]
  • 5G for Trains
    5G for Trains Bharat Bhatia Chair, ITU-R WP5D SWG on PPDR Chair, APT-AWG Task Group on PPDR President, ITU-APT foundation of India Head of International Spectrum, Motorola Solutions Inc. Slide 1 Operations • Train operations, monitoring and control GSM-R • Real-time telemetry • Fleet/track maintenance • Increasing track capacity • Unattended Train Operations • Mobile workforce applications • Sensors – big data analytics • Mass Rescue Operation • Supply chain Safety Customer services GSM-R • Remote diagnostics • Travel information • Remote control in case of • Advertisements emergency • Location based services • Passenger emergency • Infotainment - Multimedia communications Passenger information display • Platform-to-driver video • Personal multimedia • In-train CCTV surveillance - train-to- entertainment station/OCC video • In-train wi-fi – broadband • Security internet access • Video analytics What is GSM-R? GSM-R, Global System for Mobile Communications – Railway or GSM-Railway is an international wireless communications standard for railway communication and applications. A sub-system of European Rail Traffic Management System (ERTMS), it is used for communication between train and railway regulation control centres GSM-R is an adaptation of GSM to provide mission critical features for railway operation and can work at speeds up to 500 km/hour. It is based on EIRENE – MORANE specifications. (EUROPEAN INTEGRATED RAILWAY RADIO ENHANCED NETWORK and Mobile radio for Railway Networks in Europe) GSM-R Stanadardisation UIC the International
    [Show full text]
  • China Clean Energy Study Tour for Urban Infrastructure Development
    China Clean Energy Study Tour for Urban Infrastructure Development BUSINESS ROUNDTABLE Tuesday, August 13, 2019 Hyatt Centric Fisherman’s Wharf Hotel • San Francisco, CA CONNECT WITH USTDA AGENDA China Urban Infrastructure Development Business Roundtable for U.S. Industry Hosted by the U.S. Trade and Development Agency (USTDA) Tuesday, August 13, 2019 ____________________________________________________________________ 9:30 - 10:00 a.m. Registration - Banquet AB 9:55 - 10:00 a.m. Administrative Remarks – KEA 10:00 - 10:10 a.m. Welcome and USTDA Overview by Ms. Alissa Lee - Country Manager for East Asia and the Indo-Pacific - USTDA 10:10 - 10:20 a.m. Comments by Mr. Douglas Wallace - Director, U.S. Department of Commerce Export Assistance Center, San Francisco 10:20 - 10:30 a.m. Introduction of U.S.-China Energy Cooperation Program (ECP) Ms. Lucinda Liu - Senior Program Manager, ECP Beijing 10:30 a.m. - 11:45 a.m. Delegate Presentations 10:30 - 10:45 a.m. Presentation by Professor ZHAO Gang - Director, Chinese Academy of Science and Technology for Development 10:45 - 11:00 a.m. Presentation by Mr. YAN Zhe - General Manager, Beijing Public Transport Tram Corporation 11:00 - 11:15 a.m. Presentation by Mr. LI Zhongwen - Head of Safety Department, Shenzhen Metro 11:15 - 11:30 a.m. Tea/Coffee Break 11:30 - 11:45 a.m. Presentation by Ms. WANG Jianxin - Deputy General Manager, Tianjin Metro Operation Corporation 11:45 a.m. - 12:00 p.m. Presentation by Mr. WANG Changyu - Director of General Engineer's Office, Wuhan Metro Group 12:00 - 12:15 p.m.
    [Show full text]
  • Leading New ICT Building a Smart Urban Rail
    Leading New ICT Building A Smart Urban Rail 2017 HUAWEI TECHNOLOGIES CO., LTD. Bantian, Longgang District Shenzhen518129, P. R. China Tel:+86-755-28780808 Huawei Digital Urban Rail Solution Digital Urban Rail Solution LTE-M Solution 04 Next-Generation DCS Solution 10 Urban Rail Cloud Solution 15 Huawei Digital Urban Rail Solution Huawei Digital Urban Rail Solution Huawei LTE-M Solution for Urban Rail Huawei and Alstom the Completed World’s Huawei Digital Urban Rail LTE-M Solution First CBTC over LTE Live Pilot On June 29th, 2015, Huawei and Alstom, one of the world’s leading energy solutions and transport companies, announced the successful completion of the world’s first live pilot test of 4G LTE multi-services based on Communications- based Train Control (CBTC), a railway signalling system based on wireless ground-to-train CBTC PIS CCTV Dispatching communication. The successful pilot, which CURRENT STATUS IN URBAN RAIL covered the unified multi-service capabilities TV Wall ATS Server Terminal In recent years, public Wi-Fi access points have become a OCC of several systems including CBTC, Passenger popular commodity in urban areas. Due to the explosive growth Information System (PIS), and closed-circuit in use of multimedia devices like smart phones, tablets and NMS LTE CN television (CCTV), marks a major step forward in notebooks, the demand on services of these devices in crowded the LTE commercialization of CBTC services. Line/Station Section/Depot Station places such as metro stations has dramatically increased. Huge BBU numbers of Wi-Fi devices on the platforms and in the trains RRU create chances of interference with Wi-Fi networks, which TAU TAU Alstom is the world’s first train manufacturer to integrate LTE 4G into its signalling system solution, the Urbalis Fluence CBTC Train AR IPC PIS AP TCMS solution, which greatly improves the suitability of eLTE, providing a converged ground-to-train wireless communication network Terminal When the CBTC system uses Wi-Fi technology to implement for metro operations.
    [Show full text]
  • Use Style: Paper Title
    2019 4th International Conference on Education and Social Development (ICESD 2019) ISBN: 978-1-60595-621-3 Wuhan Subway Economic Development in the Perspective of "Innovation, Coordination, Green, Open, Sharing" Concept 1,a 2,b, Fang WANG and Xiao-sheng LEI * 1Hubei University of Traditional Chinese Medicine, Wuhan, Hubei, China 2Hubei University of Traditional Chinese Medicine, Wuhan, Hubei, China [email protected], [email protected] *Corresponding author Keywords: Development Concept, Wuhan, Subway Economy. Abstract. Since the 18th congress of the communist party of China, the "innovation, coordination, green, open and shared" development concept has been a profound change in the overall situation of China's development. In this context, the Wuhan Metro has developed rapidly, This paper analyzes the current situation, characteristics and influence of the development of subway economy in Wuhan from the perspective of development concept, and puts forward some suggestions for the future development of subway economy. Introduction For a long time, China has faced problems such as uneven, inadequate, uncoordinated and unsustainable development, and it has already faced the "ceiling dilemma". In recent years, China is facing the downward pressure of the economy. In order to change the development mode and solve the development problems, the 18th National Congress put forward five development concepts of “innovation, coordination, green, openness and sharing”, which have important guidance for the future development of social economy. Xiong'an New District is an innovative, coordinated, green ecological, open and co-constructed shared future urban model. Wuhan, following the glory of history, is becoming a reactivated city, and it must follow this development philosophy.
    [Show full text]
  • Global Report Global Metro Projects 2020.Qxp
    Table of Contents 1.1 Global Metrorail industry 2.2.2 Brazil 2.3.4.2 Changchun Urban Rail Transit 1.1.1 Overview 2.2.2.1 Belo Horizonte Metro 2.3.4.3 Chengdu Metro 1.1.2 Network and Station 2.2.2.2 Brasília Metro 2.3.4.4 Guangzhou Metro Development 2.2.2.3 Cariri Metro 2.3.4.5 Hefei Metro 1.1.3 Ridership 2.2.2.4 Fortaleza Rapid Transit Project 2.3.4.6 Hong Kong Mass Railway Transit 1.1.3 Rolling stock 2.2.2.5 Porto Alegre Metro 2.3.4.7 Jinan Metro 1.1.4 Signalling 2.2.2.6 Recife Metro 2.3.4.8 Nanchang Metro 1.1.5 Power and Tracks 2.2.2.7 Rio de Janeiro Metro 2.3.4.9 Nanjing Metro 1.1.6 Fare systems 2.2.2.8 Salvador Metro 2.3.4.10 Ningbo Rail Transit 1.1.7 Funding and financing 2.2.2.9 São Paulo Metro 2.3.4.11 Shanghai Metro 1.1.8 Project delivery models 2.3.4.12 Shenzhen Metro 1.1.9 Key trends and developments 2.2.3 Chile 2.3.4.13 Suzhou Metro 2.2.3.1 Santiago Metro 2.3.4.14 Ürümqi Metro 1.2 Opportunities and Outlook 2.2.3.2 Valparaiso Metro 2.3.4.15 Wuhan Metro 1.2.1 Growth drivers 1.2.2 Network expansion by 2025 2.2.4 Colombia 2.3.5 India 1.2.3 Network expansion by 2030 2.2.4.1 Barranquilla Metro 2.3.5.1 Agra Metro 1.2.4 Network expansion beyond 2.2.4.2 Bogotá Metro 2.3.5.2 Ahmedabad-Gandhinagar Metro 2030 2.2.4.3 Medellín Metro 2.3.5.3 Bengaluru Metro 1.2.5 Rolling stock procurement and 2.3.5.4 Bhopal Metro refurbishment 2.2.5 Dominican Republic 2.3.5.5 Chennai Metro 1.2.6 Fare system upgrades and 2.2.5.1 Santo Domingo Metro 2.3.5.6 Hyderabad Metro Rail innovation 2.3.5.7 Jaipur Metro Rail 1.2.7 Signalling technology 2.2.6 Ecuador
    [Show full text]
  • New Subway Breaks Cover at Innotrans
    THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tautonline.com NOVEMBER 2018 NO. 971 NEW SUBWAY BREAKS COVER AT INNOTRANS Highlights from the world’s biggest mobility fair Success at the Global Light Rail Awards FTA demands Honolulu ‘rescue plan’ Five shortlisted for Tyne & Wear Metro Zürich Stuttgart at 150 11> £4.60 Further improving Celebrating one of an LRT world-leader the tramway greats 9 771460 832067 Congratulations to all those honoured at this year’s Global Light Rail Awards and a big thank you to the evening’s supporters: HEADLINE SUPPORTER ColTram Next year’s event will be held in London on 2 October 2019 2019 Register your interest by emailing [email protected] or by calling +44 (0)1733 367600 CONTENTS The official journal of the Light Rail Transit Association 410 NOVEMBER 2018 Vol. 81 No. 971 www.tautonline.com EDITORIAL EDITOR – Simon Johnston [email protected] 404 ASSOCIATE EDITOr – Tony Streeter [email protected] WORLDWIDE EDITOR – Michael Taplin [email protected] 422 NewS EDITOr – John Symons [email protected] SenIOR CONTRIBUTOR – Neil Pulling WORLDWIDE CONTRIBUTORS Tony Bailey, Richard Felski, Ed Havens, Andrew Moglestue, Paul Nicholson, Herbert Pence, Mike Russell, Nikolai Semyonov, Alain Senut, Vic Simons, Witold Urbanowicz, Bill Vigrass, Francis Wagner, Thomas Wagner, Philip Webb, Rick Wilson PRODUCTION – Lanna Blyth Tel: +44 (0)1733 367604 [email protected] NEWS 404 SYSTEMS FACTFILE: ZÜRich 422 Achievement and excellence at the Global Neil Pulling explores the recent projects and DESIGN – Debbie Nolan Light Rail Awards; Two openings in a week future prospects for a city that continues to ADVertiSING grow Wuhan’s metro by over 50km; Honolulu invest in high-quality urban transport.
    [Show full text]
  • Markets Monthly #3 – 09/04/2020: Cumulative Issuance Usd810bn: China Increases After Jan, Feb Lull: Calls for Green Stimulus G
    Markets Monthly #3 – 09/04/2020: Cumulative issuance USD810bn: China increases after Jan, Feb lull: Calls for green stimulus grow: CBI Asia focus: LGS in super green loan: New CBI online events programme and more! Welcome to the Markets Monthly! We are still fine tuning our new format from January and would love to hear your feedback on how we reflect the market, analysis, new deals and selected reading. For more information on the Climate Bonds Database on Market Data mail to: [email protected] Don’t Miss! Climate Bonds Connected – New Online Programme Climate Bonds Connected is our new online programme to stay connected with us for all the latest transition, green & sustainable finance developments. It includes webinars, podcasts and blogs on a variety of topics. Look out for our first Markets Monthly Podcast due next week. Don’t miss our popular EU Taxonomy Explored – Talk with TEG Experts series. Every Thursday at 15:00 CEST (14:00 BST). Thursday 9th Electricity and Energy Generation, Thursday 16th Manufacturing. Full April, May June schedule available here. Coming up: Focus on Asia In partnership with HSBC, we will launch our ASEAN Green Finance State of the Market report on 16th April. Sign up for the launch webinar here. Later in April we will publish our Vietnam Green Infrastructure Opportunities (GIIO) report. This will be followed by our inaugural Vietnam Green Infrastructure Investment Opportunities (GIIO) report (dates and webinar tba) and new reports on green finance in Japan, China and Hong Kong which are all in the pipeline. Green Bond Pricing in the Primary Market: H2 (Q3-Q4) 2019 The report monitors the performance of 36 EUR and 13 USD denominated benchmark size green bonds with a total value of USD36bn issued during H2 2019 with spotlight on Green Sovereigns and emerging greenium.
    [Show full text]
  • Projects Presented Under the EU-China Connectivity Platform
    Projects presented under the EU-China Connectivity Platform The attached list is a compilation of transport infrastructure projects presented at Expert Group meetings of the EU-China Connectivity Platform between 2016 and 2019.1 Disclaimer: The TEN-T related projects included in the attached list have been presented by the Member States concerned on a voluntary basis, in order to explore solutions to cover a potential financing gap, without prejudice of the final decision on financing which could be taken. The importance of level playing field among investors and project promoters, of geographically balanced list of projects, reciprocity and compliance with applicable EU rules and standards was recalled during the Expert Group meetings. Projects in China # Project name Location 1 Multi-modal Water and Rail Transport Project for Hubei Province, Yichang City Yangtze River Three Gorges 2 Jiangsu (Suzhou) International Railway Logistics Center Jiangsu Province, Suzhou City 3 Lanzhou New Area Mutilmodal Logistics and Transport Gansu Province, Lanzhou City Infrastructure Project 4 Highway-Railway Multimodal Transport Area of Qianbei Guizhou Province, Modern Logistics New Town Zunyi City 5 Chongqing Fuling Longtou Port Railway Collection and Chengdu in Sichuan Province Distribution Centre 6 Reconstruction and Extension of airport projects: Urumqi Airport Reconstruction and Extension Project Xinjiang Uygur Autonomous Region Xi'an Airport Shenyang Airport 2nd Runway Project Shenyang in Liaoning Province Guangzhou Airport 7 Construction of metro
    [Show full text]
  • EU-China Connectivity Platform
    Council of the European Union Brussels, 11 June 2018 (OR. en) PUBLIC 9693/18 LIMITE TRANS 240 COASI 142 RELEX 506 NOTE From: General Secretariat of the Council To: Delegations Subject: EU-China Connectivity Platform In view of the Intermodal Transport Working Party on 12 June 2018, delegations will find attached: - a table in Annex I relating to the global list of projects jointly agreed between the EU and China; - the list of the projects in Annex II, both in China, the EU and neighbouring countries which are proposed by the Chinese party for a more in depth assessment at the occasion of the next pilot expert group. ______________________ 9693/18 VK/vk 1 DGE 2A LIMITE EN Conseil UE ANNEX I List of projects to be considered in the framework of the EU-China Connectivity platform i – In MS and neighbouring countries. 1. The North Sea Baltic Corridor (Latvia) 2. The V0 Rail Cargo Line Bypassing Budapest (Hungary) 3. The Hungary-Serbia Railway (Hungary) 4. The Rijeka-Zagreb-Budapest project (Croatia) 5. Projects in the Orient/East-Med Corridor in the Western Balkans Region 6. The Corridor 5c Highway Project in Bosnia and Herzegovina 7. The Railroad Project from Koper to Divaca (Slovenia) 8. Genoa Port breakwater project (Italy) 9. Trieste Integrated Rail Hub (Italy) 10. Adjusting Odra River Waterway (E30) to the international waterway standards (Poland) 11. Construction of Silesian Channel (Poland) 12. Construction of middle and lower Vistula cascade ( waterways E40 and E70) (Poland) 13. Warszawa- Brzesc connection – extending E-4o waterway (Poland) 14. Development of the Košice Intermodal terminal (Slovakia) 15.
    [Show full text]