Company Profile and Projects

Total Page:16

File Type:pdf, Size:1020Kb

Company Profile and Projects Company Profile and Projects COMPANY PROFILE Infratech Development Holding (IDH) is a trading company founded in 2014 in Floriana (Malta) by italian experts in Project Financing and Public-Private-Partenership. The company has a share of more than $ 60 million and controls two other companies in Belaruss: • ISSE, wich is an engineering servise company; • Infratech, wich is an engineer company. An important italian company in the construction of technological systems (ELEF) is another significant shareholder. IT Transportation Engineering, a leading italian expert in the field of Transport Planning, normally works as a business partner of IDH. The company, trough its expert, over the 25 years, he has worked in the field of Transportation Engineering, with a particular focus in the following area: • Strategicplanning and tactics in the field of transport system and regional development; • Technical feasibility, economic, financial and transport infrastructure; • Design of transport systemand related infrastructure: • Highways; • Railways; • Metropolitan; • Light Rail Train (LRT) • Trams; • Harbors; • Interports; • Public transport service networks; • Interports. In addition, WWI has developed over the years special and important experience in the field of Project Financing (PF) scheme. Its wide range of work experiences has conducted in numerous project both in Italy and in 20 foreign countries (Albania, Bulgaria, Cameroon, Chad, Central African Republic, Ukraine, India, Romania, Venezuela, Czech Republic, Iraq, Kosovo, Serbia, Switzerland, Brasil, Belarus, Kurdistan, Panama, Honduras and Costa Rica). HOLDING STRUCTURE HOLDING STRUCTURE COMING INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations National road 106 (Reggio Calabria-Taranto) upgrade froma two lanes road to four lanes motorway - Total length: 410 Km - Total investment costs: about 8,500 mil € INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations Vesuvio Red Train International project competition for Vesuvio National Park railway Length: 3,725 m Stops: 5 from Cook Station (245.15 m o.s.l.) to Due Vulcani Station (830 m o.s.l.) Average slope: 15.7% INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations Ligth Rail Transit (LRT) System in Sullmaniyah Gvernrate-Iraq Total tram network length: about 57 Km Total investment costs: about 600 mil $ INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations Orte-Venezia new motorway Project Finance Proposal Total length: 396 Km Total investment costs: about 7.500 mil € INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations Salerno West Door (International Proposals Tender) INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations Ragusa-Catania new Highway Project Financial Proposal INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations Campobasso-San Vittore new highway Project Financial Proposal INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations Connection between national Minsk-2 airport and Minsk Zeleniy Bor new urban area New railway link: about 25 Km for about 3,300 mil € New motorway link: about 25 Km for about 1,500 mil € New urban services and roads: about 80 Km for about 500 mil € INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations Minsk Metropolitan Area Master Plan PPP Proposal New ring: about 90 Km of length About new 20-30 metro stations New railway by-pass: about 15 Km of length Total investment costs about 13,000 mil € INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations Bari-Lecce new highway Project Finance Proposal Length of about 150 Km Investment cost of about 1,600 mil € INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations Taranto-Brindisi new highway Project Finance Proposal Length of about 74 Km Investment cost of about 1,100 million € INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations Casal Monastero Modal Interchange INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations Motor Recreation and Education Park Malta Box building General Plan Hotel INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations Malta Intermodal Transport System Intermodal Transport System - Layout Typical stop solutions for two alignment Typical stop solutions INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations Leonardo ‘s ATC (Air Traffic Control) Capabilities A-SMGCS FEET MANAGEM RR M APRON MANAGEMENT RR RR GAINS Context scenario Control room of Ciampino (Rome-Italy) Leonardo Air Traffic Management & Airport Systems INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations EASTERN SABAH SAFETY ZONE (ESSZONE) - Integrated Maritime and Terrestrial Defence System - A Scalable, Modular, Comprehensive and Integrated Solution for the Surveillance, Protection and Defence of the Coast of Eastern Sabah A complex and comprehensive system of monitoring, control, protection and defense INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations D Line Rome Underground Project Finance Proposal Length: about 22 Km Total investment costs: about 3,300 million € INFRASTRUCTURE PROJECT Holding experiences in the international project finance proposals and/or infrastucture project elaboration partecipations 2017 • Leonardo ‘s ATC (Air Traffic Control) Capabilities • “Mobility Study of Vecchiano Municipality (PI)” 2016 2009 • Vessel Traffic Service (VTS) - Maritime Security – Traffic Management - • Feasibility Study of modernization and upgrade works of the railway Client: Italian Ministry of Infrastructures and Transportation -User: line Rome-Viterbo, extraurban section Plan Paradiso-Viterbo”; Italian Coast Guard ; • “Plurimodal Transport System within the framework of the Intermodal • Motor Recreation and Education Park Malta. Corridor Pontino”; • “Financial Planning Study of the Line D Rome Underground Project”; 2015 • “Evaluation of the Financial Profitability of EGI S.p.A real estate • Malta Intermodal Transport System properties”; • Preliminary Design of the road link SS 3 Flaminia - Sv. Ponzano Romano 2014 (A1)”; • EASTERN SABAH SAFETY ZONE (ESSZONE) - Integrated Maritime and • “Pre-feasibility study on water resources in southern Albania”; Terrestrial Defence System - A Scalable, Modular, Comprehensive and • “Urban requalification project of Catania’s San Berlino Quarter in Integrated Solution for the Surveillance, Protection and Defence of the Sicily”; Coast of Eastern Sabah • “Assistance to Public Enterprise Roads of Serbia”; • “Approval procedures of the Ministry of Infrastructure of “Project 2013 Finance Poposal for Highway link Termoli-S.Vittore: Section • “Interoceanic multimodal corridor Puerto Cortes-San Pedro Sula- Campobasso-S.Vittore”; Tegucigalpa-Golfo de Fonseca (Isla El tigre)” for 5.000 million € and 525 • “Approval procedures of the Ministry of Infrastructure (CIPE) of the km of lenght; “Project Finance Proposal for Highway link Ragusa-Catania”; • CRISS Project Regional integrated Center for Road Safety” • “Traffic study for Casal Monastero Intermodal infrastructure on the B 2008 Underground Line extention” as document for Definitie Project; • “Traffic Flows of the Satellite System for O/D matrix evaluation of the • “Financial plan for Concession Tender of B1 Rome underground line Region of Emilia Romagna”; parking infrastructures (Annibaliano, Conca d’Oro and Piazzale Jonio); • “Restructuring and urban transformation project of the former industrial area ex Mira Lanza, situated in Pontinia (LT)”; 2012 • “Integration of Environmental Impact Studies of Ragusa-Catania • “Feasibility Study for highway and metro connections between Highway link”; national Minsk Airport and Minsk Zeleniy Bor new urban area”; • “International Design Competition for the Railway line in the National • “Traffic study for Ragusa_Catania Highway link” for Project Financing Park of Vesuvio; proposal; • “Benefit/Cost Analysis of Anagnina-Tor Vergata-Torre Angela tram • “Traffic study for Campobasso-S.Vittore Highway link – the first line”; intervention part” for Project Financial proposal; • “International Idea Competition in Urban Planning Pian Scairolo • “Preliminary traffic studies for A19-Palermo bypass-A29 Highway
Recommended publications
  • Useful Informatin
    How to get Rome from the “Leonardo Da Vinci” Fiumicino Airport The main airport Leonardo da Vinci (Fiumicino) is located about 26 km from the city centre. The centre of city is easily reached: FROM AND TO FIUMICINO AIRPORT BY TRAIN At the airport’s railway station the Shuttle-Train Leonardo Express direct service (without calling at other stations) takes just 31 minutes to get to Termini Station (intersecting with the Metro Lines A & B) and leaves every half hour from 6.36 a.m. to 11.36 p.m. FROM AND TO FIUMICINO BY TAXI Taxis licensed by Rome City Council are white and have a sign bearing the word “TAXI” on their roofs and by the identifying licence number on the doors, on the back and inside the car. The symbol of the Rome City Council is clearly visible on the front doors and the license inside the back left. Other vehicles waiting on exiting the airport may well be driven by unauthorized persons and the fare could therefore be a great deal higher. Taxis for Rome are found at the exits of both the domestic and international arrival terminals. Fares: • to and from Fiumicino Airport – Ostiense Railway Station €45 • to and from Fiumicino Airport – The Aurelian Wall €48 • to and from Fiumicino Airport – Tiburtina Railway Station €55 A maximum fare of €70 has moreover been set for journeys starting from inside the Rome Ring Road (Grande Raccordo Anulare) and heading to Fiumicino airport in the event that the taxi metre should display a higher sum. The number to dial a taxi is: +39 06 0609 / +39 06 3570 Click for further information: http://www.3570.it http://www.agenziamobilita.roma.it/en/app.html http://www.agenziamobilita.roma.it/en/taxi-fares-in-rome.html Events srl Congress&Communication – Via Mantegna 1, 60019 Senigallia (AN) P.I./C.F.
    [Show full text]
  • International Students Guide 2021 2022
    Istituzione di Alta Formazione Artistica Musicale autorizzata con D.M. 144 del 1° agosto 2012 Ministero dell’Istruzione, dell’Università e della Ricerca STUDENT GUIDE Useful Information Before your departure and upon your arrival ---------------------------------------------------------------- Saint Louis College of Music Via Baccina, 47 - Via Urbana, 49/a - Via del Boschetto, 106 – Via Cimarra 19/b (00184, Roma) Tel +39 (0)6 4870017 - Fax +39 (0)6 91659362 www.slmc.it / www.saintlouiscollege.eu / [email protected] Sede legale: Via Cimarra 19b Roma Partita IVA 05731131008 – Registro Società del Tribunale di Roma n. 918703 . S i n c e 1 9 7 6 ---------------------------------------------------------------- Welcome to Saint Louis!………………………………………………………………… pag. 3 About Us….……………………………………………………………………………… pag. 3 Academic Programs……………………………………………………………………… pag. 3 Academic Calendar……………………………………………………………………… pag. 4 National Holidays and Breaks…………………………………………………………… pag. 4 Locations ………………………………………………………………………………… pag. 4 International Office ……………………………………………………………………… pag. 4 Orientation day…………………………………………………………………………… pag. 5 Dedicated services for Erasmus+ students ……………………………………………… pag. 5 CFA, ECTS and grading system ………………………………………………………… pag. 5 PRACTICAL INFORMATION Accommodation before arrival...………………………..……………………………… pag. 6 Visa / Residence Permit / Residence Registration ……………………………………… pag. 6 Codice fiscale…………………………………………………………………………… pag. 8 Health insurance ………………………………………………………………………… pag. 9 How to get to Saint Louis ………………………………………………………………
    [Show full text]
  • Carta Della Qualità Dei Servizi Del Trasporto Pubblico E Dei Servizi Complementari Atac 2019 Indice
    Carta della qualità dei servizi del trasporto pubblico e dei servizi complementari Atac 2019 Indice Capitolo 1 – La Carta dei Servizi 3 1.1 La Carta dei Servizi: obiettivi 3 1.2 I Contratti di Servizio con Roma Capitale 3 1.3 Le Associazioni e il processo partecipativo 4 1.4 Le fonti normative e di indirizzo 4 Capitolo 2 – Atac si presenta 5 2.1 I principi dell’Azienda 5 3.2 Il trasporto pubblico su metropolitana 9 3.3 Sosta 19 3.4 Sicurezza 22 Capitolo 4 - L’attenzione alla qualità 23 4.1 La rendicontazione dell’attività di monitoraggio permanente 23 4.2 Gli indicatori di qualità erogata e programmata 23 4.3 Le segnalazioni degli utenti 30 4.4 Indagini di customer satisfaction 31 Capitolo 5 - La politica per il Sistema di Gestione di Atac SpA 34 5.1 Strategia aziendale 34 5.2 Salute e sicurezza degli utenti e tutela del patrimonio aziendale 34 5.3 Il rispetto dell’ambiente e l’uso razionale dell’energia 34 Capitolo 7 - Comunicazione e informazione 50 7.3 Nucleo Operativo sul Territorio 50 7.4 Altri canali di informazione e comunicazione 50 Appendice A - Diritti, doveri e condizioni generali di utilizzo dei servizi 57 2 Capitolo 1 La Carta dei Servizi 1.1 La Carta dei Servizi: obiettivi renza 1 agosto 2015; - Contratto di servizio per i servizi complementari al tra- La Carta della Qualità dei Servizi è il documento attraver- so il quale ogni ente erogatore di pubblici servizi assume una serie di impegni nei confronti della propria utenza, settembre 2017 con decorrenza 1 gennaio 2017.
    [Show full text]
  • DLA Piper. Details of the Member Entities of DLA Piper Are Available on the Website
    EUROPEAN PPP REPORT 2009 ACKNOWLEDGEMENTS This Report has been published with particular thanks to: The EPEC Executive and in particular, Livia Dumitrescu, Goetz von Thadden, Mathieu Nemoz and Laura Potten. Those EPEC Members and EIB staff who commented on the country reports. Each of the contributors of a ‘View from a Country’. Line Markert and Mikkel Fritsch from Horten for assistance with the report on Denmark. Andrei Aganimov from Borenius & Kemppinen for assistance with the report on Finland. Maura Capoulas Santos and Alberto Galhardo Simões from Miranda Correia Amendoeira & Associados for assistance with the report on Portugal. Gustaf Reuterskiöld and Malin Cope from DLA Nordic for assistance with the report on Sweden. Infra-News for assistance generally and in particular with the project lists. All those members of DLA Piper who assisted with the preparation of the country reports and finally, Rosemary Bointon, Editor of the Report. Production of Report and Copyright This European PPP Report 2009 ( “Report”) has been produced and edited by DLA Piper*. DLA Piper acknowledges the contribution of the European PPP Expertise Centre (EPEC)** in the preparation of the Report. DLA Piper retains editorial responsibility for the Report. In contributing to the Report neither the European Investment Bank, EPEC, EPEC’s Members, nor any Contributor*** indicates or implies agreement with, or endorsement of, any part of the Report. This document is the copyright of DLA Piper and the Contributors. This document is confidential and personal to you. It is provided to you on the understanding that it is not to be re-used in any way, duplicated or distributed without the written consent of DLA Piper or the relevant Contributor.
    [Show full text]
  • GMT Report2012.Qxp
    GLOBAL METRO PROJECTS REPORT 2012 Metropolitan railways (metros) are high capacity electric transport systems that operate on dedicated routes, and can thereby achieve high service speed and frequency. Over the last few years, metros (also known as subway, underground or tube) have evolved as an efficient and effective urban mobility solution in addressing the growing concerns of urbanisation and climate change. This is supported by the fact that despite high capital requirements the sector witnessed a compound annual growth rate (CAGR) of 6.7 per cent between 2005 and 2010. In high density urban areas, metros form the backbone of integrated public transport systems and offer proven economic, social and environmental benefits. Given the huge investment requirement and long life span, metro systems have always been a driving force for technological and financial innovations. Government and metro operators are constantly seeking solutions to improve reliability and customer service, lower fuel and maintenance costs, as well as increase efficiency and safety levels in operations. The Global Metro Projects Report provides updated information on the world's top 101 metro projects that present significant capital investment opportunities. These projects have a total existing network length of about 8,900 km and a proposed length of over 8,000 km. The report covers 51 countries representing about 80 per cent of the world’s gross domestic product. It presents the key information required to assess investment opportunities in the development of new lines, extension and upgrade of existing lines, rolling stock procurement and refurbishment, power and communication systems upgrades, fare collection, as well as station construction and refurbishment.
    [Show full text]
  • Final Exploitation Plan
    D9.10 – Final Exploitation Plan Jorge Lpez (Atos), Alessandra Tedeschi (DBL), Julian Williams (UDUR), abio Massacci (UNITN), Raminder Ruprai (NGRID), Andreas Schmitz ( raunhofer), Emilio Lpez (URJC), Michael Pellot (TMB), Zden,a Mansfeldov. (ISASCR), Jan J/r0ens ( raunhofer) Pending of approval from the Research Executive Agency - EC Document Number D1.10 Document Title inal e5ploitation plan Version 1.0 Status inal Work Packa e WP 1 Deliverable Type Report Contractual Date of Delivery 31 .01 .20 18 Actual Date of Delivery 31.01.2018 Responsible Unit ATOS Contributors ISASCR, UNIDUR, UNITN, NGRID, DBL, URJC, raunhofer, TMB (eyword List E5ploitation, ramewor,, Preliminary, Requirements, Policy papers, Models, Methodologies, Templates, Tools, Individual plans, IPR Dissemination level PU SECONO.ICS Consortium SECONOMICS ?Socio-Economics meets SecurityA (Contract No. 28C223) is a Collaborative pro0ect) within the 7th ramewor, Programme, theme SEC-2011.E.8-1 SEC-2011.7.C-2 ICT. The consortium members are: UniversitG Degli Studi di Trento (UNITN) Pro0ect Manager: prof. abio Massacci 1 38100 Trento, Italy abio.MassacciHunitn.it www.unitn.it DEEP BLUE Srl (DBL) Contact: Alessandra Tedeschi 2 00113 Roma, Italy Alessandra.tedeschiHdblue.it www.dblue.it raunhofer -Gesellschaft zur Irderung der angewandten Contact: Prof. Jan J/r0ens 3 orschung e.V., Hansastr. 27c, 0an.0uer0ensHisst.fraunhofer.de 80E8E Munich, Germany http://www.fraunhofer.de/ UNIVERSIDAD REL JUAN CARLOS, Contact: Prof. David Rios Insua 8 Calle TulipanS/N, 28133, Mostoles david.riosHur0c.es
    [Show full text]
  • International Society for Soil Mechanics and Geotechnical Engineering
    INTERNATIONAL SOCIETY FOR SOIL MECHANICS AND GEOTECHNICAL ENGINEERING This paper was downloaded from the Online Library of the International Society for Soil Mechanics and Geotechnical Engineering (ISSMGE). The library is available here: https://www.issmge.org/publications/online-library This is an open-access database that archives thousands of papers published under the Auspices of the ISSMGE and maintained by the Innovation and Development Committee of ISSMGE. Geotechnical Aspects of Underground Construction in Soft Ground – Viggiani (ed) © 2012 Taylor & Francis Group, London, ISBN 978-0-415-68367-8 Dewatering tests results for underground C Line stations construction Massimo Grisolia & Giuseppe Iorio Department of Civil, Architectural and Environmental Engineering, University of Rome “Sapienza”, Italy Antonio Zechini RomaMetropolitane S.r.l., Rome, Italy ABSTRACT: The new C Line of Rome Underground -T4, T5 and T6A lots- mainly runs into volcanic deposits deriving from the Colli Albani apparatus, widely extended in south-eastern areas of Rome. The local hydrogeological framework is very complex due to the large variations of permeability in function of granulometry, cementation processes and secondary fracturing of pyroclastic strata. The bottom of the excavation of the underground stations lies 25/30 meters below the groundwater level. In order to allow dry conditions and to prevent bottom heave during excavation, the groundwater level is lowered by deep wells systems. Some dewatering field tests showed how the local stratigraphy
    [Show full text]
  • Undergrounds
    UNDERGROUNDS TYPE OVERBURDEN max SPAN LENGTH SPECIAL START END JOB CLIENT GROUND OF [m] [m] [m] INTERVENTIONS TASK Ryad metro (Saudi Arabia) Sands and 2014 In progress - Package 2 - IDOM 20 9,00 5000 EPB A limestones Underground works Doha metro (Qatar) - Red 2014 In progress Line North - "AL Diwani" COWI Calcarenites 25 25,00 400 F, D underground station Rome metro - Line C, Fori Tufs and 2013 In progress Imperiali - Venezia Metro C S.c.p.a. pozzolanas, sandy 15-30 8,80 2x3500 EPB P extension silts Milan metro - Line 4 - Linate Airport-S. Babila-S. 6.50 and 2012 In progress Cristoforo - Running METRO 4 Sands and gravels 20 2x15000 EPB F, D 9.15 tunnels and 6 underground stations Copenagnen metro, Copenaghen Metro Limestones, glacial 2011 In progress Cityringen - Underground 30 6.2 2x19000 EPB F, D Team deposits works Milan metro - Line 5 - Garibaldi-S.Siro extension 2010 In progress GARBI Linea 5 Sands and gravels 15 7.3 2x8000 EPB D - Running tunnels and 4 underground stations Rome metro - Line C, T3 Tufs and section - Running tunnels 2008 In progress Metro C S.c.p.a. pozzolanas, sandy 15-30 8.8 2x3198 EPB F,D and 3 underground silts stations Thessaloniki metro (GREECE) - Line tunnels Silty clays, sandy 2006 In progress SALINI-IMPREGILO 30 6.2 2x7700 EPB F, D and 13 underground clays, gravelly clays stations Naples metro - Line 6 - Tufs and 2001 In progress Running tunnels and ANSALDO 15 8.2 3000 EPB F, D pozzolanas stations Warsaw metro - Line 2 - 2010 2013 ASTALDI/GOULERMAK Clay and sand 7-24 6,00 2x4800 EPB D Underground works Milan
    [Show full text]
  • Presentazione Standard Di Powerpoint
    Italian Infrastructure Day 2014 Milan September 9, 2014 Index ■ Company at a Glance . Projects in execution ■ Highlights . Focus on revenues & profitability . New Orders & upcoming opportunities ■ Financials . NFP . Cash Flow ■ Main Events Italian Infrastructure Day 2014 2 Company at a Glance GROUP HIGHLIGHTS Workforce Pure player in heavy civil engineering and construction Construction Backlog by Geography as at June 2014 More than 31K employees Middle — Focused on large heavy civil engineering, where the group is among Asia & East 8% from 88 different the global leaders and is able to generate returns better than closest Oceania large European peers 4% nationalities. Italy Contract structures allow Global player present in over 40 countries with over 31,000 Africa 35% employees 28% flexible and dynamic LatAm approach to workforce — Approx. 67% of construction backlog outside of Italy North 13% Europe America 11% — Well balanced geographic presence between Developed Markets and 1% Emerging Markets Total: €29.2bn — Several untapped opportunities for geographic expansion where the Backlog 1H 2014 Revenues by Geography Group is today underrepresented (Australia, US) Highly diversified backlog Italy Large and well diversified backlog provides visibility on future 11% which has reached €29.2 results bn at June 2014, of which Highly experienced, pro-active management team focused on value €22 bn is Construction creation Backlog Rest of world — Proven track record in achieving targets 89% Total: €2,1bn Italian Infrastructure Day 2014 3 Projects in execution: worldwide experience, technical competence June 2014 Backlog Breakdown Riachuelo Construction Backlog by Geography By Segment Middle Concessions Asia & East 8% Oceania 25% 4% Italy Tocoma Dam Africa 35% 28% Construction 75% LatAm North 13% Europe America 11% 1% Total: €29.2bn Total: €29.2bn Tokwe Mukorsi Dam 19 Hydro & DAM projects in execution in 4 Continents Africa Asia Latin America North America .
    [Show full text]
  • 10 Min to the Center of Rome) and Trams 5, 14 and 19 (25 Min), in a Neighborhood Near the Historic Center, with All Services, Inhabited by True Roman Families
    Cozy and well equipped suitable up to 5 persons. A 5 min. by metro C stop "Teano" (10 min to the center of Rome) and trams 5, 14 and 19 (25 min), in a neighborhood near the historic center, with all services, inhabited by true Roman families. The apartment • apartment of 63 square meters, cozy and clean, on the fourth floor (with elevator) of a true Roman building immersed in the archaeological park of Villa Gordiani, composed of 2 large bedrooms (one double and one twin/double), a living room with adjoining kitchen, a bathroom with shower and 2 balconies. It offers free wi-fi, TV, hi-fi, radio, gas water heater, hairdryer, washing machine, iron and ironing board and two drying racks. • The apartment is newly renovated and decorated in a young and modern style. The rooms are equipped with wardrobe with hangers, clothes hangers, writing desk and chair; the kitchen has a fridge, oven and gas cooker, table for 6, gatherers differentiated and everything needed to cook and eat for breakfast, lunch and dinner; The living room offers TV and sofa bed. • Equipped with linen, towels and tablecloths with sufficient changes throughout your stay in the wonderful city of Rome, it offers free all the necessary comforts, including cot, thematic books, guides. • 5 minutes from the Metro stop Teano (line C), leading in 10 minutes (3 stops) to the center (near the Basilica of San Giovanni in Laterano). Trams 5 and 14 lead in 25 minutes to Termini Station (metro A and B), and tram 19, passing through San Lorenzo and the campus, leading to Villa Borghese, the Gallery of Modern Art and Piazza Risorgimento (San Pietro).
    [Show full text]
  • Metro De Roma Y Trenes Metropolitanos
    Metro de Roma y trenes metropolitanos www.audioguiaroma.com Aurelia Límite de la tarifa urbana 3 líneas de Metro 3 líneas de Suburbanas 8 líneas regionales (Trenitalia) Conexión estaciones Lín. A Funcionan como extensiones del Funcionan como todos los trenes, con Conexión trenes nacionales Lín. B y B-1 Metro y se utiliza el mismo billete horarios exactos. Dentro del tramo urbano emplean el mismo billete que el Metro: Lín. C Roma-Viterbo FL 1 Orte - Tiburtina - Termini - Fiumicino En construcción Roma-Giardinetti FL 2 Tivoli - Tiburtina Roma-Lido FL 3 Viterbo - Tiburtina FL 4 Frascati, Albano, Velletri - Termini FL 5 Civitavecchia - Termini Viterbo ROMA FL 6 Frosinone - Termini VITERBO Orte Viterbo Fara Sabina-M. Piana Bella di M. FL 1 FL 7 Latina - Termini FL 3 Sacrofano Montebello Monterotondo... FL 8 Nettuno - Termini La Giustiniana LEONARDO Servicio directo: EXPRESS Prima Porta Fiumicino Aeroporto - Termini Bracciano La Celsa Vigna di Valle Labaro Settebagni Anguillara Centro Rai Cesano Fidene M C Olgiata Saxa Rubra Nuevo Salario La Storta / Formello Grottarossa La Giustiniana Due Ponti M B1 Ipogeo degli Ottavi Tor di Quinto Jonio M D Ottavia Monte Antenne San Filippo Neri Campi Sportivi Conca d’Oro Monte Mario Acqua Acetosa Libia Nomentana Gemelli Balduina Euclide S. Agnese Tiburtina Rebibbia M B Appiano / Proba Petronia Annibaliano Ponte Mammolo Valle Aurelia Flaminio QuintilianiMonti PietralataTiburtini Battistini Cipro Ottaviano S.PietroLepanto Piazza del Popolo S.Maria del Soccorso Mus.Vaticanos M A Bologna Risorgimento Baldo Spagna Policlinico Cornelia Termini degli UbaldiValle Aurelia S. Pietro Barberini Castro Pretorio Aurelia Prenestina Serenissima Palm.Togliatti Tor SapienzaLa Rustica CittàLa RusticaSalone UIR Ponte diLunghezza Nona San Pietro Chiesa Repubblica Tivoli Civitavecchia Laziali Nuova FL 2 FL 5 Venezia Cavour S.Bibiana Colosseo Porta Maggiore Vittorio Ponte CasilinoLodi PignetoMalatesta Sonnino Emanuele Teano Quattro Venti Manzoni S.Elena Gardenie Villini Circo Mirti Massimo Alessi Nievo S.
    [Show full text]
  • The Impact of Land Use Characteristics for Sustainable Mobility: the Case Study of Rome
    Eur. Transp. Res. Rev. (2012) 4:153–166 DOI 10.1007/s12544-012-0077-6 ORIGINAL PAPER The impact of land use characteristics for sustainable mobility: the case study of Rome Stefano Gori & Marialisa Nigro & Marco Petrelli Received: 31 March 2011 /Accepted: 21 February 2012 /Published online: 14 March 2012 # The Author(s) 2012. This article is published with open access at SpringerLink.com Abstract 1 Introduction Background Sustainable mobility requires actions to reduce the need for travel, to promote modal shift, to reduce trip Recently important changes in urban features strongly modi- lengths and to increase efficiency of transport system. Public fied the quantity and the quality of the mobility system: the transport could play an important role to solve part of the continuous spread of residences and activities have increased needs previously reported. Starting from these remarks, the the length of trips and the use of private transport; the usual present paper analyse the role, the importance and the impact mobility habits have been changed by more complex behav- of land use characteristics to develop services able to compete iours (trip chaining). The automobile is often considered the with automobile use. This analysis is carried out by studying only transport mode while transit became less and less used the real world case of the city of Rome in Italy. with strong impacts on environment and sustainability. Results The results of the test carried out highlight the These changes are mainly due to the results of the evolution importance of density of residences and activities, the need of urban areas according to the different stages of develop- for a good quality access system to the transit services stops ment of the transport modes technology: the first stage is and the importance of the configuration of the transit net- known as “urban concentration” with small urban area char- work, identifying the best way to connect the different acterized by high density; the second stage is the “suburban- districts of the urban area.
    [Show full text]