Tajikistan TAJ1 Project Name: Railway Kolkhozabad

Total Page:16

File Type:pdf, Size:1020Kb

Tajikistan TAJ1 Project Name: Railway Kolkhozabad Tajikistan TAJ1 Project Name: Railway Kolkhozabad - Dusti - Nizhniy Panj - Kunduz (IGA) Location: The beginning of the route is in the settlement Kolkhozabad district of Khatlon region on the existing railway station Kurgan-Tube - Termez, the end of the route - the boundary of the Republic of Tajikistan to the Islamic State of Afghanistan and then to the town of Kunduz Brief Description: • Start the proposed railway line Kolkhozabad - Dusti - Nizhniy Panj - Kunduz (IGA), located 5 km south-west of the railway station Kolkhozabad on the existing railway station Kurgan- Tube - Termez and then laid in a southerly direction, crossing the channel Jilikul at 1 and 2 km passes along the main canal Yakkadin and goes to the village. Dusti in the south-easterly direction at 30 kilometres. In this segment of the railway route intersects 5 roads of local importance. Going round the village. Dusti from the south, the route of the railway runs parallel with the 32 km highway of Kurgan-Tube - Dusti - Nizhniy Panj, crossing it at Km 39 +500, rising to 45 kilometres Karadumskomu array and then descends to the right bank. Panj. • Near the newly built and put into operation in Afghanistan road bridge across the River Panj proposed to construct a new railway bridge 700 meters long scheme 16,5 m +6 h110m 16.5 m. The length of new railway line on a plot Kolkhozabad-Dusti - Nizhniy Panj be 50 km and 65 km further on the territory of the Islamic State of Afghanistan to the town of Kunduz. To ensure the cargo and passenger traffic in the village. Nizhniy Panj planned to build a railway station with a cargo terminal with an estimated value of $ 2 million. Also projected railway line will cross over 10 irrigation and waste channels. • The length of the route of the railway on the territory of the Republic of Tajikistan is approximately 50 km Technical category proposed new railway line: 4 Construction length of all, including: 115 km the across RT 50 km on the territory of IGA 65 km Steering deviation: 0.9% Width subgrade: 6 m Minimum curve radii: 600 m Estimated volume of earthworks: 3751 thousand m3 Estimated cost of construction of railway line on the territory of Tajikistan, including: 67.51 mil USD Train one-way bridge: 14.3 mil USD Building regulatory structures of length 350 m: 0.21 mil USD Railway station with a freight terminal: 2 mil USD •Bridges small (less than 50m) - 12 pcs. •Railway bridge across the Panj River - 1pc length 700 m. It is planned to attract foreign investment in the form of concessional loans, grants and technical assistance to develop a Feasibility Study and the participation of the Government of the Republic of Tajikistan (equity) TAJ2 Project Name: Railway Vahdat - Jirgatal - Kyrgyzstan border Location: The beginning of the route taken in the station area Wahdat / Ilyakov Vahdat district Federal districts on the existing railway station in Dushanbe - Vahdat - Ilyakov, the end of the route - the boundary of the Republic of Tajikistan to the Kyrgyz Republic Brief Description: • In the beginning of the route adopted by Art. Ilyakov. Then the route goes along the river valleys and Ilyakov Obigarm in the direction of the existing road through many settlements. This area is characterized by a mountain, not very rugged terrain with an altitude of 850 to 1900 m above sea level. There are a lot of lateral tributaries, which provide mudslides. Mountain slopes of individual plots (rn Dubeda - Subulak) subject to landslides. • Land of Obi Garm to Nurabad is the most complex both in terrain and in respect of geological and hydrogeological conditions. On this part of the proposed route passes in the direction of the road, carried out from the reservoir inundation zone Rogun, crossing numerous streams, mud beds, mountain ranges, which would require the construction of bridges, viaducts, overpasses, tunnels and other man-made structures. • In general, the route of the proposed railway line on the territory of Tajikistan, in difficult mountainous terrain, replete with a large number of watercourses, mud beds, mountain ranges and crossover areas. To ensure regulatory compliance during the construction of roads (the maximum allowable longitudinal slope and the minimum curve radii), to perform the large volume of earthworks, including - blasting, construction of at least 20 major bridges longer than 100 m through p. Surkhob and side tributaries, a large number of overpasses and viaducts, bridges, culverts, retaining walls and other artificial structures. Intersection crossover sites would require construction of at least 8 tunnels total estimated length of 16 km. • The length of the route of the railway on the proposed variant of the territory of Tajikistan is approximately 296 km Technical category railway : IV Building length : 296 km including tunnels : 16,1 km Maximum longitudinal gradient : 2,7% Minimum radius of the curve in terms of : 200 m Bridges in large (over 100m) : 21/2500 pcs/rm Bridges small (less than 100m) : 47/1410 pcs/rm Bridge Reservoir Rogun : 1/800 pcs/rm River bank work (BUR): 6400 pm Overpasses: 12/8950 pcs/rm Retaining walls: 59200/325,6 p.m./th.m3 Conduit pipe: 1180 pc Railway stations : 6 pc Repair items : 5 pc Roads to service the railway : 151 km Crossings : 18 pc The demolition of private buildings : 30 houses Alienation of irrigated arable land : 54 ha Approximate volume of earthworks : 149,5 mil m3 including blasting : 65,8 mil m3 Construction of access roads to the mine coal Nazarailok : 50 km Estimated cost of construction : 1 610,0 mil including tunnels : 193,2 mil It is planned to attract foreign investment in the form of concessional loans, grants and technical assistance to develop a Feasibility Study and the participation of the Government of the Republic of Tajikistan (equity) . TAJ3 Rehabilitation and reconstruction of highways Gulistan - Farkhar - Panj – Dusti Location: The beginning of the route - village Vosseyskogo Gulistan district of the Khatlon region, the end of the route – village Dusti Kumsangir district of Khatlon region. Brief Description: • Start highway Gulistan - Farkhar - Panj - Dusti is located in the village. Gulistan and then the road runs in a south-westerly direction. The road Gulistan - Farkhar - Panj - Dusti was built in 1932. This road is important for the development of the economy. The road length of 133 km, connects the southern Khatlon region in the south-west of the country, and also connects two routes AH7 and AH66 under the scheme of the Asian Highway (ASHD) • Currently, completion of the bridge over the River. Panji linking the Afghan port of Sher Khan with the Tajik Nizhniy Panj. Started to operate international transport corridor "North- South, connecting Russia, China and Central Asia, Afghanistan, Iran and other nations of South Asia. In addition, the significantly increased volumes of freight and passenger traffic from the south-eastern areas of China via Kulma, the Gorno-Badakhshan Autonomous Oblast of Tajikistan in the Khatlon region, and later in Afghanistan and Iran. • The proposed route will significantly reduce the transportation of cargo and passengers Tajikistan has huge potential for development of the mining industry, energy, mountain tourism, however, poor roads hampering their development. • The increase in freight traffic in poor maintenance and inadequate funding of road sector does not allow to adequately carry out international transport. In addition, the annual floods have destroyed some sections of the road. The road, built in irrigated agricultural zone and the pass Karatau (780 m above sea level), subject to periodic flooding, debris drifts and destruction subgrade, artificial structures and pavement. Throughout the route on the road has more than 50 small and medium-sized man-made structures across rivers, irrigation canals and Sai, the technical condition which requires repair work. Increased traffic on the road Gulistan - Farkhar - Panj - Dusti, in its present condition and the inadequacy of its geometric parameters required, does not allow at present to ensure the smooth passage of vehicles. • Rehabilitation and reconstruction of the highway 133 miles long. Investment cost: Reconstruction of the roadbed, 133 km - 12358 thousand USD Device pavement, 931,000 m 2 - 12382 thousand USD Construction of artificial structures - 10860 thousand USD Situation of the road - 600 thousand USD Total - 36200 thousand USD It is planned to attract foreign investment in the form of concessional loans, grants and technical assistance to develop a Feasibility Study and the participation of the Government of the Republic of Tajikistan (equity) TAJ4 Rehabilitation and reconstruction of highways Khorog - Murghab - Kulma through Ishkashim with bridge into Afghanistan near the village Ishkashim and village Langar Location: Top tracks - Khorog Shugnan GBAO, the end of the route - Kulma (the border of China). Brief Description: • The road Khorog - Murghab - Kulma through Ishkashim from a bridge into Afghanistan near the village Ishkashim and-village Langar length of 522 km, is part of the Euro - Asian road network, connecting Central Asia with China and is of great importance, both for the economic development of Tajikistan and the Islamic State of Afghanistan. This road will link the international transit corridors TRACECA (T34) and routes of the European Agreement on Main International Traffic Arteries (E008, E009), and will also help improve living standards and reducing poverty in the region, cooperation in mutually beneficial trade relations. The project will have a positive impact on the economies of neighboring states by creating an international transport corridor linking Tajikistan with neighboring countries and to realize the internal and inter-regional trade potential, setting the way for flexible mobility of labor and capital flows and development of export-import relations. №№ Name of work Cost, U.S. $ thousand 1. Reconstruction of the subgrade 123178 2. Unit pavment 39 102 3. Construction of artificial structures 73 050 4.
Recommended publications
  • From the Ground up Case Studies in Community Empowerment
    REBUILDING BROKEN LIVES After gaining Independence in 1991, Tajikistan endured economic collapse, civil war, and widespread hunger. To help rural people back on their feet, ADB financed a pilot microcredit-based livelihood project for women and farmers. Implemented through two international NGOs, the Aga Khan Foundation and CARE International, the experiment encountered many challenges, but produced several positive outcomes The women’s group composes a peaceful scene, without a hint of the tumultuous circumstances that spawned it. In a drab building in Vahdat district in western Tajikistan, a dozen women, mostly young, are bent over a long table, their fingers busy with embroidery. Along a wall behind them, older women are stitching a floral- patterned kurpacha, the thick, multipurpose Tajik quilt. Some of the girls are teenagers, who are only dimly aware of the horrors that followed Tajikistan’s unsought independence in 1991. But Zebo Oimatova, 52, a benevolent figure in traditional kurta (robe) and headscarf who is watching over the room like a mother hen, remembers it all—economic ruin, villages torn apart by civil war, the hardscrabble existence and, finally, a chance to rebuild shattered lives. In 2002, Ms. Oimatova, a warm-hearted woman of simple sincerity, was elected chairperson of a women’s federation, a community-based organization created under a pilot Asian Development Bank (ADB)-financed project to provide microcredit for women to start small businesses and farmers to improve crops. Despite being overawed—“I thought I could not manage the job because I am only average and not so well educated,” she confesses—Ms. Oimatova has seen her group grow from a handful to over 2,500 members and, importantly, become self-sufficient.
    [Show full text]
  • TAJIKISTAN TAJIKISTAN Country – Livestock
    APPENDIX 15 TAJIKISTAN 870 км TAJIKISTAN 414 км Sangimurod Murvatulloev 1161 км Dushanbe,Tajikistan / [email protected] Tel: (992 93) 570 07 11 Regional meeting on Foot-and-Mouth Disease to develop a long term regional control strategy (Regional Roadmap for West Eurasia) 1206 км Shiraz, Islamic Republic of Iran 3 651 . 9 - 13 November 2008 Общая протяженность границы км Regional meeting on Foot-and-Mouth Disease to develop a long term Regional control strategy (Regional Roadmap for West Eurasia) TAJIKISTAN Country – Livestock - 2007 Territory - 143.000 square km Cities Dushanbe – 600.000 Small Population – 7 mln. Khujand – 370.000 Capital – Dushanbe Province Cattle Dairy Cattle ruminants Yak Kurgantube – 260.000 Official language - tajiki Kulob – 150.000 Total in Ethnic groups Tajik – 75% Tajikistan 1422614 756615 3172611 15131 Uzbek – 20% Russian – 3% Others – 2% GBAO 93619 33069 267112 14261 Sughd 388486 210970 980853 586 Khatlon 573472 314592 1247475 0 DRD 367037 197984 677171 0 Regional meeting on Foot-and-Mouth Disease to develop a long term Regional control strategy Regional meeting on Foot-and-Mouth Disease to develop a long term Regional control strategy (Regional Roadmap for West Eurasia) (Regional Roadmap for West Eurasia) Country – Livestock - 2007 Current FMD Situation and Trends Density of sheep and goats Prevalence of FM D population in Tajikistan Quantity of beans Mastchoh Asht 12827 - 21928 12 - 30 Ghafurov 21929 - 35698 31 - 46 Spitamen Zafarobod Konibodom 35699 - 54647 Spitamen Isfara M astchoh A sht 47
    [Show full text]
  • Environmental and Social Impact Assessment Public Disclosure Authorized Nurek Hydropower Rehabilitation Project Phase 2 Republic of Tajikistan
    Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FINAL Environmental and Social Impact Assessment Public Disclosure Authorized Nurek Hydropower Rehabilitation Project Phase 2 Republic of Tajikistan May 2020 Environmental and Social Impact Assessment Nurek HPP Rehabilitation Contents 1 Introduction .................................................................................................................................... 1 1.1 Background ........................................................................................................................... 1 1.2 Purpose of the ESIA ............................................................................................................... 3 1.3 Organization of the ESIA ....................................................................................................... 3 2 Project description .......................................................................................................................... 4 2.1 Description of Nurek HPP ..................................................................................................... 4 2.2 The Project ............................................................................................................................ 7 Dam Safety ............................................................................................................... 9 Details of work to be performed ............................................................................. 9 Refurbishment
    [Show full text]
  • The World Bank the STATE STATISTICAL COMMITTEE of the REPUBLIC of TAJIKISTAN Foreword
    The World Bank THE STATE STATISTICAL COMMITTEE OF THE REPUBLIC OF TAJIKISTAN Foreword This atlas is the culmination of a significant effort to deliver a snapshot of the socio-economic situation in Tajikistan at the time of the 2000 Census. The atlas arose out of a need to gain a better understanding among Government Agencies and NGOs about the spatial distribution of poverty, through its many indicators, and also to provide this information at a lower level of geographical disaggregation than was previously available, that is, the Jamoat. Poverty is multi-dimensional and as such the atlas includes information on a range of different indicators of the well- being of the population, including education, health, economic activity and the environment. A unique feature of the atlas is the inclusion of estimates of material poverty at the Jamoat level. The derivation of these estimates involves combining the detailed information on household expenditures available from the 2003 Tajikistan Living Standards Survey and the national coverage of the 2000 Census using statistical modelling. This is the first time that this complex statistical methodology has been applied in Central Asia and Tajikistan is proud to be at the forefront of such innovation. It is hoped that the atlas will be of use to all those interested in poverty reduction and improving the lives of the Tajik population. Professor Shabozov Mirgand Chairman Tajikistan State Statistical Committee Project Overview The Socio-economic Atlas, including a poverty map for the country, is part of the on-going Poverty Dialogue Program of the World Bank in collaboration with the Government of Tajikistan.
    [Show full text]
  • Misuse of Licit Trade for Opiate Trafficking in Western and Central
    MISUSE OF LICIT TRADE FOR OPIATE TRAFFICKING IN WESTERN AND CENTRAL ASIA MISUSE OF LICIT TRADE FOR OPIATE Vienna International Centre, PO Box 500, 1400 Vienna, Austria Tel: +(43) (1) 26060-0, Fax: +(43) (1) 26060-5866, www.unodc.org MISUSE OF LICIT TRADE FOR OPIATE TRAFFICKING IN WESTERN AND CENTRAL ASIA A Threat Assessment A Threat Assessment United Nations publication printed in Slovenia October 2012 MISUSE OF LICIT TRADE FOR OPIATE TRAFFICKING IN WESTERN AND CENTRAL ASIA Acknowledgements This report was prepared by the UNODC Afghan Opiate Trade Project of the Studies and Threat Analysis Section (STAS), Division for Policy Analysis and Public Affairs (DPA), within the framework of UNODC Trends Monitoring and Analysis Programme and with the collaboration of the UNODC Country Office in Afghanistan and in Pakistan and the UNODC Regional Office for Central Asia. UNODC is grateful to the national and international institutions that shared their knowledge and data with the report team including, in particular, the Afghan Border Police, the Counter Narcotics Police of Afghanistan, the Ministry of Counter Narcotics of Afghanistan, the customs offices of Afghanistan and Pakistan, the World Customs Office, the Central Asian Regional Information and Coordination Centre, the Customs Service of Tajikistan, the Drug Control Agency of Tajikistan and the State Service on Drug Control of Kyrgyzstan. Report Team Research and report preparation: Hakan Demirbüken (Programme management officer, Afghan Opiate Trade Project, STAS) Natascha Eichinger (Consultant) Platon Nozadze (Consultant) Hayder Mili (Research expert, Afghan Opiate Trade Project, STAS) Yekaterina Spassova (National research officer, Afghan Opiate Trade Project) Hamid Azizi (National research officer, Afghan Opiate Trade Project) Shaukat Ullah Khan (National research officer, Afghan Opiate Trade Project) A.
    [Show full text]
  • Tourism in Tajikistan As Seen by Tour Operators Acknowledgments
    Tourism in as Seen by Tour Operators Public Disclosure Authorized Tajikistan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DISCLAIMER CONTENTS This work is a product of The World Bank with external contributions. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent. ACKNOWLEDGMENTS......................................................................i The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other INTRODUCTION....................................................................................2 information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. TOURISM TRENDS IN TAJIKISTAN............................................................5 RIGHTS AND PERMISSIONS TOURISM SERVICES IN TAJIKISTAN.......................................................27 © 2019 International Bank for Reconstruction and Development / The World Bank TOURISM IN KHATLON REGION AND 1818 H Street NW, Washington, DC 20433, USA; fax: +1 (202) 522-2422; email: [email protected]. GORNO-BADAKHSHAN AUTONOMOUS OBLAST (GBAO)...................45 The material in this work is subject to copyright. Because The World Bank encourages dissemination of its knowledge, this work may be reproduced, in whole or in part, for noncommercial purposes as long as full attribution to this work is given. Any queries on rights and li- censes, including subsidiary rights, should be addressed to the Office of the Publisher, The World Bank, PROFILE AND LIST OF RESPONDENTS................................................57 Cover page images: 1. Hulbuk Fortress, near Kulob, Khatlon Region 2. Tajik girl holding symbol of Navruz Holiday 3.
    [Show full text]
  • "A New Stage of the Afghan Crisis and Tajikistan's Security"
    VALDAI DISCUSSION CLUB REPORT www.valdaiclub.com A NEW STAGE OF THE AFGHAN CRISIS AND TAJIKISTAN’S SECURITY Akbarsho Iskandarov, Kosimsho Iskandarov, Ivan Safranchuk MOSCOW, AUGUST 2016 Authors Akbarsho Iskandarov Doctor of Political Science, Deputy Chairman of the Supreme Soviet, Acting President of the Republic of Tajikistan (1990–1992); Ambassador Extraordinary and Plenipotentiary of the Republic of Tajikistan; Chief Research Fellow of A. Bahovaddinov Institute of Philosophy, Political Science and Law of the Academy of Science of the Republic of Tajikistan Kosimsho Iskandarov Doctor of Historical Science; Head of the Department of Iran and Afghanistan of the Rudaki Institute of Language, Literature, Oriental and Written Heritage of the Academy of Science of the Republic of Tajikistan Ivan Safranchuk PhD in Political Science; associate professor of the Department of Global Political Processes of the Moscow State Institute of International Relations (MGIMO-University) of the Ministry of Foreign Affairs of Russia; member of the Council on Foreign and Defense Policy The views and opinions expressed in this Report are those of the authors and do not represent the views of the Valdai Discussion Club, unless explicitly stated otherwise. Contents The growth of instability in northern Afghanistan and its causes ....................................................................3 Anti-government elements (AGE) in Afghan provinces bordering on Tajikistan .............................................5 Threats to Central Asian countries ........................................................................................................................7 Tajikistan’s approaches to defending itself from threats in the Afghan sector ........................................... 10 A NEW STAGE OF THE AFGHAN CRISIS AND TAJIKISTAN’S SECURITY The general situation in Afghanistan after two weeks of fierce fighting and not has been deteriorating during the last few before AGE carried out an orderly retreat.
    [Show full text]
  • LITACA-II MTE Final Report.Pdf
    Mid-Term Evaluation Report Livelihood Improvement in Tajik – Afghan Cross Border Areas (LITACA-II) Report Information Report Title: Mid-Term Evaluation of Livelihood Improvement in Tajik- Afghan Cross-Border Areas; LITACA Phase II (2018 – 2020) Evaluation Team: Dilli Joshi, Independent Evaluation Specialist Ilhomjon Aliev, National Evaluation Specialist Field Mission: 4–29 February, 2020 Table of Contents Abbreviations Executive summary .............................................................................................................................. i 1. Introduction .................................................................................................................................. 1 1.1 LITACA-II Goals, outcomes and outputs ........................................................................... 1 1.2 Project Theory of Change ..................................................................................................... 3 1.3 Objectives of the LITACA-II Mid-Term Evaluation ......................................................... 5 1.4 Purpose of the Mid-Term Evaluation ................................................................................. 5 1.5 Scope of the Mid-Term Evaluation ...................................................................................... 5 1.6 Organisation of the Mid-Term Evaluation ......................................................................... 5 2. Evaluation Approach and Methodology.................................................................................
    [Show full text]
  • Project Document Blank
    TABLE OF CONTENTS TABLE OF CONTENTS .............................................................................................................................................. 2 LIST OF FIGURES ..................................................................................................................................................... 3 LIST OF TABLES ...................................................................................................................................................... 4 LIST OF ACRONYMS AND ABBREVIATIONS ............................................................................................................. 5 I. DEVELOPMENT CHALLENGE ........................................................................................................................... 8 INTRODUCTION .............................................................................................................................................................. 8 GEOGRAPHICAL CONTEXT ................................................................................................................................................. 8 SOCIO-ECONOMIC CONTEXT ............................................................................................................................................ 10 ENVIRONMENTAL CONTEXT ............................................................................................................................................. 12 KOFIRNIGHAN RIVER BASIN ...........................................................................................................................................
    [Show full text]
  • International Development Association
    FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: PAD3295 INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT APPRAISAL DOCUMENT ON A PROPOSED GRANT IN THE AMOUNT OF SDR 26.8 MILLION (US$37 MILLION EQUIVALENT) Public Disclosure Authorized TO THE REPUBLIC OF TAJIKISTAN FOR THE TAJIKISTAN SOCIO-ECONOMIC RESILIENCE STRENGTHENING PROGRAM May 30, 2019 Public Disclosure Authorized Social, Urban, Rural and Resilience Global Practice Europe and Central Asia Region This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. Public Disclosure Authorized CURRENCY EQUIVALENTS (Exchange Rate Effective April 30, 2019) Currency Unit = SDR SDR 0.722 = US$1 US$ 1.385 = SDR 1 FISCAL YEAR January 1–December 31 Regional Vice President: Cyril E. Muller Country Director: Lilia Burunciuc Senior Global Practice Director: Ede Jorge Ijjasz-Vasquez Practice Manager: Kevin Tomlinson Task Team Leader(s): Robert Wrobel, Gloria La Cava ABBREVIATIONS AND ACRONYMS AKDN Agha Khan Development Network PDO project development objective BFM beneficiary feedback mechanism PIU project implementation unit CAE centers for additional education CASA-1000 Central Asia South Asia Electricity PPSD Project Procurement Strategy Transmission and Trade Project Document CDD community-driven development POM Project Operations Manual CPF Country Partnership Framework REDP Rural Economy Development CYAS Committee for Youth Affairs and Project Sports under the Government of REP Rural Electrification Project the Republic of Tajikistan RMR Risk Mitigation Regime CSP community support project RSP Resilience Strengthening Program DHS Demographic and Health Survey RRA Risk and Resilience Assessment DFID U.K.
    [Show full text]
  • Terms of Reference Research Consultancy To
    TERMS OF REFERENCE RESEARCH CONSULTANCY TO STUDY GRANT EFFECTIVENESS IN KHATLON, TAJIKISTAN 1. Nature of the consultancy: Research on grant effectiveness in the Khatlon region of Tajikistan Objective: The International Organization for Migration (IOM) in Tajikistan, through Department for International Development, the UK Government funding, has been implementing a community stabilization project along the Tajik-Afghan border since 2014. The Tajik-Afghan Integration, Resilience, and Reform Building Programme (TAIRR) is now in its third phase. The project consists from several components, which are aimed at increasing resilience to the interrelated issues of crime and conflict on the Afghan/Tajik border through strengthening Tajik-Afghan border, improving livelihood opportunities and access to information on safe migration and reintegration. It has been implementing this project in 9 districts of Khatlon and 8 districts of GBAO of Tajikistan (Dusti, Jayhun, Panj, Qubodiyon, Shaartuz, Nosiri Khusrav, Farhor, Khamadoni, Sh. Shohin districts). One of the main outputs of the project is to understand, and, ideally enhance, the effectiveness of grants issued by international donors to the population living in the project area. To this end, the IOM intends to undertake research on grant effectiveness in the Khatlon region. Research intends to gather information on grants issued between 2014 and 2019 to any target group living in the Khatlon region. Analysis should focus on any impact related to, for instance (but not only): rural and agricultural development; livelihood strategies and the creation of employment; education and emancipation of men, women, youth, and vulnerable groups; access to food; and, impact on migration. Target: Provision of a full data set on grant effectiveness.
    [Show full text]
  • World Bank Document
    CAPACITY ENHANCEMENT NEEDS ASSESSMENT SERIES 35077 Public Disclosure Authorized ASSESSING CAPACITY FOR COMMUNITY-BASED DEVELOPMENT Public Disclosure Authorized A PILOT STUDY IN TAJIKISTAN Mary McNeil and Kathleen Kuehnast with Anna O’Donnell Public Disclosure Authorized December 2004 Public Disclosure Authorized Acknowledgments This paper is the result of the World Bank Institute’s pilot study of a new methodological approach for assessing community capacity. The study was conducted in the Central Asian country of Tajikistan in the summer of 2003 with the support of Counterpart International’s country office in Dushanbe. We extend our appreciation to the Government of Tajikistan for their interest in the pilot study, and their willingness to participate in stakeholder meetings on the pilot’s design and results. We would like to thank Counterpart International for the coordination of the project and their identification of an excellent group of researchers. We appreciate the diligent work of the lead trainers, Janna Ryssakova and Christina Vladu, who demonstrated their expert training skills in making a diverse group of researchers into a team. David Mikosz provided invaluable assistance in organizing multi-stakeholder workshops in Tajikistan, and in conducting interviews with a wide range of stakeholders leading up to the pilot’s implementation. The pilot was developed with the support of the Tajikistan country team and ECCSD. We would like to thank Dennis de Tray, Director, ECCU8, Cevdet Denizer, Country Manager, Tajikistan, and Lilia Burunciuc, Country Program Coordinator, ECCU8, for allowing us to undertake the pilot, as well as Tajikistan’s NSIFT (National Social Investment Fund) for co-hosting the results of the multi-stakeholder workshop in Dushanbe in October 2003.
    [Show full text]