Visa Information for Zambia a Guide on the Requirements

Total Page:16

File Type:pdf, Size:1020Kb

Visa Information for Zambia a Guide on the Requirements UPDATED 24 JULY 2018 VISA INFORMATION FOR ZAMBIA A GUIDE ON THE REQUIREMENTS GENERAL INFORMATION ENTRY VISA – Please turn overleaf for a list of nationals requiring a visa prior to arrival and those exempt from visa requirements. Nationals not mentioned are eligible for a visa on arrival at our ports of entry. No entry visa required for SADC passports E-VISA APPLICATION – All persons who ordinarily require a visa to come to Zambia are eligible to apply for an e-Visa, LINK HERE ZAMBIAN MISSION ABROAD – Contact your local Zambia Diplomatic Mission to apply for a visa in person, list available HERE Check with your local embassy well before travelling or feel free to ask us and we will do our best to assist COST OF VISAS – Credit card facilities are not guaranteed at all points of entry - please carry sufficient US$’s to pay for visa’s if necessary ZAMBIA VISA COSTS (per passport - subject to change) SINGLE ENTRY $ 50 This visa is required should you wish to see the Falls from the Zimbabwe side or do a Chobe Day DOUBLE | MULTIPLE ENTRY – $ 80 Trip to Botswana – we suggest a multiple entry KAZA UNI-VISA – See further information below $ 50 KAZA UNI-VISA (40 nationalities are eligible) INFORMATION – Valid for 30 days & allows multiple cross-border visits between Zambia & Zimbabwe and one day-trip to Botswana. No overnight stays are allowed and multiple crossings to Botswana are not allowed on the same KAZA Uni-visa (not available online). AVAILABLE ON ARRIVAL – Livingstone International Airport, Victoria Falls International Airport, Harare International Airport, Kazungula Ferry (borders Botswana and Zambia), and Kazungula road (borders Botswana and Zimbabwe) TIPS TIP 1 – Be sure to specifically ask for the special KAZA Uni-visa on first arrival at any of the above-mentioned Immigration points TIP 2 – If you aren’t eligible or the KAZA Uni-visa is not available, and you will be crossing international borders during your stay, be sure to buy a multiple entry visa for Zambia to save on re-entry costs ROVOS RAIL ARRIVALS SOUTH AFRICA INTO ZIMBABWE – Beitbridge Border only allows you to purchase a single-entry visa for Zimbabwe on the Rovos Rail Trip ZIMBABWE TO ZAMBIA RETURN – Purchasing the KAZA Uni-visa at Zambia Immigration after disembarking Rovos Rail is only necessary if you are crossing a border again, either back to Zimbabwe or into Botswana and back for a day trip. If the KAZA Uni-visa is unavailable, a Zambia double/multiple entry is necessary FOR MORE INFORMATION E | [email protected] T | +27 72 517 4880 W | www.theriverclubafrica.com Visa requirements, costs, availability and processes are subject to change without notice. Please enquire upon reservation for more information. THE RIVER CLUB Livingstone, Zambia [email protected] +27 72 517 4880 www.theriverclubafrica.com NATIONALS REQUIRING A VISA PRIOR TO TRAVEL Afghanistan Guinea Oman Albania Guinea-Bissau Pakistan Algeria India Papua New Guinea Armenia Indonesia Philippines Azerbaijan Iran Qatar Bahrain Iraq Saudi Arabia Bangladesh Jordan Senegal Benin Kosovo Sierra Leone Bulgaria Kuwait Somalia Burkina Faso Kyrgyzstan South Sudan Cameroon Lebanon Sri Lanka Central African Republic Liberia Syria Chad Libya Taiwan China Mali Tajikistan Côte d’Ivoire Mauritania Timor-Leste Egypt Morocco Togo Equatorial Guinea Nepal Tunisia Ethiopia Niger Turkmenistan Gabon Nigeria Uzbekistan Gambia North Korea Yemen E-Visas can be obtained online for the above nationals. NATIONALS EXEMPT FROM VISA Anguilla Kenya Ross Dependency Antigua and Barbuda Kiribati Saint Helena Bahamas Lesotho Saint Kitts and Nevis Barbados Malawi Saint Lucia Belize Malaysia Saint Vincent and Grenadines Bermuda Maldives Samoa Botswana Malta Seychelles Cayman Islands Marshall Islands Singapore Channel Islands Martinique Solomon Islands Cyprus Mauritius South Africa Dominica Mayotte Suriname Dominican Republic Montenegro Swaziland El Salvador Montserrat Tanzania Falkland Islands Mozambique Tokelau Federated States of Micronesia Namibia Tonga Fiji Nauru Trinidad and Tobago French Guiana Niue Turks and Caicos Island Gibraltar Norfolk Island Tuvalu Grenada Palau Uganda Guadeloupe Pitcairn Islands Vanuatu Ireland Reunion Virgin Islands Isle of man Romania Zimbabwe Jamaica Nationals not mentioned in either of the above tables are eligible for visas on arrival at Zambian border crossings. THE RIVER CLUB Livingstone, Zambia [email protected] +27 72 517 4880 www.theriverclubafrica.com .
Recommended publications
  • Road Safety Review: Namibia Know Before You Go Driving Culture • Common Causes of Crashes Include Disregard of ‰‰ Driving Is on the Left
    Association for Safe International Road Travel Road Safety Review: Namibia Know Before You Go Driving Culture • Common causes of crashes include disregard of Driving is on the left. traffic regulations, speeding, and improperly Travelers staying less than 90 days may use a valid U.S. driver’s license. Travelers staying for more than 90 days, or those whose maintained vehicles. license is not in English, must have an International Driving • High beams: Drivers may flash their high beams as a Permit (IDP). greeting, or to warn of hazards. Siingle-car crashes, many of which are rollovers, occur frequently. • Driving under the influence is a serious problem. Manual and automatic transition vehicles are available for rent. Be especially alert when driving or walking on 4WD is recommended. weekend evenings. There are 25.0 road fatalities per 100,000 people, compared to • Taxi drivers may stop suddenly, run red lights, 10.3 in the US and 2.8 in the UK. speed, neglect to use turn signals or cut off other Resources for consular information and assistance are listed at drivers. asirt.org/citizens. • Pedestrians may unexpectedly cross roads. Road Conditions • Road construction and maintenance meet international standards. About 15% of roads are paved; gravel roads are typically in good to excellent condition. • Main access roads into Windhoek are paved. • Congestion during peak hours in Windhoek is common. • Most roads are undivided and few have shoulders. On gravel roads, it is especially important to maintain safe speeds. • Distances between destinations may be extremely long. Driver fatigue is a concern. • Road signs clearly indicate distances between towns.
    [Show full text]
  • 2.3.6 Zambia Border Crossing of Kazungula
    2.3.6 Zambia Border Crossing of Kazungula Overview Daily Capacity Customs Clearance Other Relevant Information Overview Zambian Revenue Authority and Immigration staff are present at this crossing. It is a large office that is constantly congested with truck traffic. Access is good on tarmac roads from the north and south. From the North the nearest major center is Mongu. The eastern roads to Mongu are overall in good condition , even though the tarmac is damaged and has cracked in some places. Access from Livingstone is good and the road is in good condition. Pontoon operations are still operational though the World Bank funded bridge is now completed and awaits commissioning during the month of May 2021. Once the bridge has been commissioned, it is expected that traffic will increase at this border point as it is a shorter route from Livingstone City in Zambia to the City of Johannesburg in South Africa. Its about 900km from Kazungula border to Johannesburg via Botswana. Border Crossing Location and Contact Name of Border Crossing Zambia and Botswana: Kazungula Border Post Province or District Kazungula District, Southern Province Nearest Town or City with Distance from Border Crossing Livingstone (67 km) Latitude -17.78967 Longitude 25.26689 Managing Authority / Agency Zambian Revenue Authority (ZRA) Contact Person Mr. Emerson Chisuta, Station Master, (+260 978 582323) Travel Times Nearest International Airport Livingstone – Harry Mwaanga Nkumbula International Airport (73 km) Truck Travel Time: 3 hrs Car Travel time: 1.5hrs Nearest Port Durban, South Africa (1,825 km) Nearest location with functioning Livingstone (67 km) wholesale markets, or with significant manufacturing or Truck Travel Time: 3 hrs production capacity Car Travel time:1.5 hrs Other Information Roads are made of tarmac and in good condition.
    [Show full text]
  • Botswana Ministry of Works and Comwunications
    FINAL REPORT REPUBLIC OF BOTSWANA MINISTRY OF WORKS AND COMWUNICATIONS BOTSWANA - ZAMBIA ROAD PROJECT AID LOAN NO. 69o-T001 NATA - KAZUNGU-A I(OAD "PANDAMATENGA ACCESS ROAD CHOBE RIVER BY - PASS ROAD JULY 1978 Iq TA S TIPPET-m-S-ABBETT-MCCARFHY -STRATTON ENGINIEERSAND ARCHITECTS NEW YO:RK GABORONE FINAL REPORT REPUBLIC OF BOTSWANA MINISTRY OF WORKS AND COMMUNICATIONS BOTSWANA -ZAMBIA ROAD PROJECT AID LOAN NO. 690-H-001 NATA - KAZUNGULA ROAD PANDAMATENGA ACCESS ROAD CHOBE RIVER BY - PASS ROAD JULY 1978 TAMS TIPPETTS-ABB ETT-McCARTHY-STRATTON ENGINEERS AND ARCHITECTS NEW YORK GABORONE TABLEOF CONTENTS PAGE I. INTRODUCTION I A. DESCRIPTION OF PROJECT 1 B. FUNDING 2 C. CONTRACTUAL ARRANGEMENTS 2 D. MODIFICATIONS OF CONTRACT 2 II. STAFFING 4 III. TRAINING 4 IV. CONSTRUCTION EQUIPMENT 4 V. MATERIALS UTILIZED 5 A. SOILS 5 B. WATER 5 VI. PROTECT HISTORY 5 A. GENERAL 5 B. SEQUENCE OF EVENTS 6 C. PROJECT SCHEDULING AND DELAYS 9 D. REMEDIAL ACTION 11 E. PICTORIAL HISTORY 11 VII. FINANCIAL SUMMARY 12 APPENDICES A. CONSTRUCTION EQUIPMENT B. SOILS AND MATERIALS C. WATER WELL LOCATIONS D. SYNOPSIS OF KEY CORRESPONDENCE E. PROJECT PHOTOGRAPHS LIST OF FIGURES FIG. 1 ........................ LOCATION MAP FIG. 2 ........................ CONSTRUCTION PROGRESS CHART FIG; B-i THRU B-4 ............. MATERIALS UTILIZATION DIAGRAMS FIG. B-5 THRU B-13 ............ AVERAGE GRADATION CURVES UNITED STATES GOVERNMENT INSTRUCTIONS use routing symbols whenever possible. 2- a emo SENDER: Use brief, informal language. Conserve space. Subject Final Report Botswana -,Zambia Road Project Forward original and one copy. RECEIVER: Reply below the message, keep one copy, return one copy. DATE OF MESSAGE Routing Symbol TO fiS/ENGR kl7 4 C&RSC.
    [Show full text]
  • 38678 10-4 Roadcarrierp Layout 1
    Government Gazette Staatskoerant REPUBLIC OF SOUTH AFRICA REPUBLIEK VAN SUID-AFRIKA Vol. 598 Pretoria, 10 April 2015 No. 38678 N.B. The Government Printing Works will not be held responsible for the quality of “Hard Copies” or “Electronic Files” submitted for publication purposes AIDS HELPLINE: 0800-0123-22 Prevention is the cure 501272—A 38678—1 2 No. 38678 GOVERNMENT GAZETTE, 10 APRIL 2015 IMPORTANT NOTICE The Government Printing Works will not be held responsible for faxed documents not received due to errors on the fax machine or faxes received which are unclear or incomplete. Please be advised that an “OK” slip, received from a fax machine, will not be accepted as proof that documents were received by the GPW for printing. If documents are faxed to the GPW it will be the sender’s respon- sibility to phone and confirm that the documents were received in good order. Furthermore the Government Printing Works will also not be held responsible for cancellations and amendments which have not been done on original documents received from clients. CONTENTS INHOUD Page Gazette Bladsy Koerant No. No. No. No. No. No. Transport, Department of Vervoer, Departement van Cross Border Road Transport Agency: Oorgrenspadvervoeragentskap aansoek- Applications for permits:.......................... permitte: .................................................. Menlyn..................................................... 3 38678 Menlyn..................................................... 3 38678 Applications concerning Operating Aansoeke aangaande Bedryfslisensies:.
    [Show full text]
  • Transport & Infrastructure Quarter 1 2021 Stats Brief
    TRANSPORT & INFRASTRUCTURE QUARTER 1 2021 STATS BRIEF TRANSPORT & INFRASTRUCTURE, QUARTER 1, 2021 . STATS BRIEF 1 Published by STATISTICS BOTSWANA Private Bag 0024, Gaborone Tel: 3671300 Fax: 3952201 E-mail: [email protected] Website: www.statsbots.org.bw July 2021 Copyright © Statistics Botswana 2021 2 TRANSPORT & INFRASTRUCTURE, QUARTER 1, 2021 . STATS BRIEF TRANSPORT & INFRASTRUCTURE QUARTER 1 2021 STATS BRIEF TRANSPORT & INFRASTRUCTURE, QUARTER 1, 2021 . STATS BRIEF 3 INTRODUCTION This Stats Brief presents a summary of the latest Transport and Infrastructure Statistics for Quarter 1, 2021. It covers statistics relating to Air, Rail and Water Transport as well as Motor Vehicle Registrations. Aircraft movements increased by 3.6 percent in Q1 2021 from 4,306 movements recorded in the previous quarter. Domestic aircraft movements constituted 71.3 percent of the total, while international aircraft movements made up 28.7 percent. The volume of goods transported through rail this quarter went down by 11.6 percent. A total of P55.3 million was generated from the transportation of those goods, resulting in a decline of 12.0 percent from P62.8 million generated in the previous quarter Pontoon passengers increased from 17,268 in Q4 2020 to 19,254 in Q1 2021, registering an increase of 11.5 percent. Vehicles transported by the pontoon decreased by 11.0 percent from 14,308 in Q4 2020 to 10,254 in Q1 2021. For more information and further enquiries, contact the Directorate of Stakeholder Relations on +267 367 1300. This publication, and all other Statistics Botswana outputs/publications are available on the website at (http://www.statsbots.org.bw) and at the Statistics Botswana Information Resource Centre (Head-Office, Gaborone).
    [Show full text]
  • Zambia-Botswana
    Language: English Original: English PROJECT: KAZUNGULA BRIDGE PROJECT (SADC NORTH – SOUTH TRANSPORT CORRIDOR IMPROVEMENT) MULTINATIONAL: REPUBLIC OF ZAMBIA and REPUBLIC OF BOTSWANA PROJECT APPRAISAL REPORT Date: October 2011 Team Leader: P. Opoku-Darkwa, Transport Engineer, OITC.2 Team Members: M T Wadda-Senghore, Transport Engineer, OITC.2 N Kulemeka, Chief Social Development Specialist,ONEC3 K Ntoampe, Principal Environmentalist, ONEC.3 M Ayiemba, Chief Procurement Specialist, ZAFO N Jere, Procurement Specialist, ZMFO O M Agyei, Financial Management Specialist, GHFO Preparation Team Sector Director: G. Mbesherubusa Regional Director (ORSA): E. Faal Regional Director (ORSB): C. Ojukwu Sector Manager: A. Oumarou Mr. J Tihngang, Senior Investment Officer. OPSM.3 Mr. M. Chirwa, Principal PPP Infrastructure Specialist, ONRI.1 Peer Reviewers Mr. M Bernard, Principal Transport Economist, OITC.1 TABLE OF CONTENTS 1 STRATEGIC THRUST & RATIONALE .................................................................................................... 1 1.1 PROJECT LINKAGES WITH COUNTRIES STRATEGIES AND OBJECTIVES ................................... 1 1.2 RATIONALE FOR BANK’S INVOLVEMENT............................................................................... 1 1.3 DONORS COORDINATION ....................................................................................................... 1 2 PROJECT DESCRIPTION ........................................................................................................................... 2 2.1 PROJECT
    [Show full text]
  • The Zambezi River Basin a Multi-Sector Investment Opportunities Analysis Public Disclosure Authorized
    The Zambezi River Basin A Multi-Sector Investment Opportunities Analysis Public Disclosure Authorized V o l u m e 3 Public Disclosure Authorized State of the Basin Public Disclosure Authorized Public Disclosure Authorized THE WORLD BANK GROUP 1818 H Street, N.W. Washington, D.C. 20433 USA THE WORLD BANK The Zambezi River Basin A Multi-Sector Investment Opportunities Analysis Volume 3 State of the Basin June 2010 THE WORLD BANK Water ResouRces Management AfRicA REgion © 2010 The International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington DC 20433 Telephone: 202-473-1000 Internet: www.worldbank.org E-mail: [email protected] All rights reserved The findings, interpretations, and conclusions expressed herein are those of the author(s) and do not necessarily reflect the views of the Executive Directors of the International Bank for Reconstruction and Development/The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judge- ment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Rights and Permissions The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruction and Development/The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly.
    [Show full text]
  • September 2019 Upcoming Events the New School Year Has Started Amid Many Changes
    Monthly Newsletter September 2019 Upcoming Events The new school year has started amid many changes. We are hold- ing labs and classes in the new Animal and Plant Sciences Center. The facility is comprised of a central building with seven state-of- ●9/2 Labor Day Holiday the-art labs, including a merchandizing lab, the Purple Tractor. ●9/5 Part Time Job Fair There is 42,000 sq. ft. of covered working space for livestock with pens, scales, working chutes, and an arena for class use that can be ●9/11 Lunch & Learn with Ross divided when the need arises. There are laboratory preparation areas, Veterinary School four greenhouses, and associated covered outdoor work spaces. Our students and faculty are busy making use of the new space. The ●9/16 Summer Camp Job Fair grand opening for the building will be homecoming day, Oct. ●9/18 MMI Workshop for Pre-Vet 19, 2019. We hope you can join us for this landmark occasion. DEAN’S CORNER ●9/20 Family Weekend Additional exciting news from the college is our significant investment in specialized ●9/25 Graduate & Professional technologies providing our faculty and students with the tools for a world-class educa- School Job Fair tion. These range from complex simulators, to drones with advanced capabilities, from robots, to advanced-capability video equipment, from feed analysis equipment, to ●9/26-28 National FFA Officer DNA, RNA, and protein imaging, from game cameras, to tracking collars, and much training more. We will be featuring several of these in the coming weeks on our Facebook page.
    [Show full text]
  • Botswana & Zambia
    Presentation to the UN (OHRLLS) – 18th - th 20 M a y 2021 Developing Bankable Transport Infrastructure Projects: Case Studies, Experiences and Learning Materials for LLDCs and Transit Countries Presenter: Glory K. Jonga [email protected] 1 Case Studies 2 Kazungula Bridge Project: Botswana & Zambia • The North-South Corridor (NSC) is a key trade route in Africa. It is approximately 2800km long stretching from the mining region of Lubumbashi in the Democratic Republic of the Congo (DRC) to the port city of Durban in South Africa. Along the way it passes though the Copperbelt (Zambia’s industrial heartland) and Gaborone, the capital of Botswana. With spill over effects, the corridor further integrates Namibia, Zimbabwe, Lesotho and Eswatini. • The NSC is primarily road-based and the Kazungula crossing point at the Zambezi River at a confluence between Zambia, Botswana, Zimbabwe and Namibia was a critical bottleneck that prevented the efficient flow of goods due to the lack of a bridge across the river(a ferry was being used instead). • The development of a Bridge at the crossing was an opportunity to increase the capacity and speed of transit and also introduce an alternative mobility mode: railway transportation. • The Kazungula Bridge Project (KBP) is a multi-national project on the NSC within the Southern African Development Community (SADC) region and part of a corridor-long infrastructure improvement programme. The project was identified as a key project under SADC’s regional development plan and is spearheaded by the governments of Botswana and Zambia. 3 Kazungula Bridge Project: Botswana & Zambia 4 Kazungula Bridge • The project scope includes a bridge linking Botswana and Zambia over the Zambezi River to replace the existing ferry and juxtaposed one-stop border facilities at Kazungula.
    [Show full text]
  • SUCCESS STORIES Zambia | Story 2 – 2020
    SUCCESS STORIES Zambia | Story 2 – 2020 One region Stimulating tourism with a UniVisa 16 nations “The KAZA UniVisa has helped to build good relations and Towards a communication between SADC countries, and tourists are responding well to it. Most of our visitors are excited about common future the programme. And our visitors’ happiness is our happiness,” explains Cynthia Kabinga Ntentabunga, a worker at Harry From the beginning of time, the principles of Ubuntu have guided Mwanga Nkumbula International Airport. African societies. Best described as an African philosophy rooted in a deep The Kavango Zambezi Transfrontier Conservation Area Univisa (KAZA UniVisa) awareness of: “I am because of who we is a brainchild of the Southern Africa Development Community (SADC) that was all are”; the spirit of Ubuntu resonates adopted in 1998 together with the SADC Protocol on the Development of Tourism. in every fibre of SADCs existence – Charity Chewe, a tour operator from Winning Travel, said that the UniVisa has th past and present. The 40 anniversary been very helpful, especially with regards freeing up tourists to move more freely of SADC in 2020 commemorates a as they are now able to pay once to visit Zambia, Zimbabwe and Botswana – the journey of progress on the complex three countries currently on board. road to achieving peace and security, development and economic growth. Alexander Jones, a European tourist, said: “Getting a KAZA UniVisa saved me a This “SADC Success Stories 2020” lot of hassle, for it gave me an opportunity to visit Zambia and Zimbabwe… and series shines a spotlight on the positive to visit Botswana, which I had never planned.” Mandy Williams Cwambran, also a impacts achieved through regional European tourist, said that: integration in communities and in the lives of the people of the SADC region.
    [Show full text]
  • A History of the Botswana Defence Force, C. 1977-2007
    University of Calgary PRISM: University of Calgary's Digital Repository Graduate Studies The Vault: Electronic Theses and Dissertations 2021-01-11 Thebe ya Sechaba: A History of the Botswana Defence Force, c. 1977-2007 Mocheregwa, Bafumiki Mocheregwa, B. (2021). Thebe ya Sechaba: A History of the Botswana Defence Force, c. 1977-2007 (Unpublished doctoral thesis). University of Calgary, Calgary, AB. http://hdl.handle.net/1880/112986 doctoral thesis University of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission. Downloaded from PRISM: https://prism.ucalgary.ca UNIVERSITY OF CALGARY Thebe ya Sechaba: A History of the Botswana Defence Force, c. 1977 – 2007 by Bafumiki Mocheregwa A THESIS SUBMITTED TO THE FACULTY OF GRADUATE STUDIES IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE DEGREE OF DOCTOR OF PHILSOPHY GRADUATE PROGRAM IN HISTORY CALGARY, ALBERTA JANUARY, 2021 © Bafumiki Mocheregwa 2021 Abstract The protracted liberation struggles of Southern Africa that began in the 1960s, particularly in Rhodesia (Zimbabwe today) eventually prompted the Botswana government to establish its own defence force in 1977. Due to budgetary constraints and relative internal political stability, Botswana had relied on a small paramilitary force called the Police Mobile Unit (PMU) since the early 1960s for all defence – related issues. By the late 1970s, the sharp escalation of the struggle for Zimbabwe resulted in cross – border incursions by Rhodesian security forces who were pursuing armed freedom fighters.
    [Show full text]
  • Sadc-Success-Stories-Data.Pdf
    SADC SUCCESS STORIES Volume 2 2017 The SADC Vision ISBN 978-99968-448-6-7 The vision of SADC is one of a Common Future, a future within a regional community that will ensure economic wellbeing, improvement of the standards of living and quality of life, freedom and social justice, and peace and security for the people of southern Africa. Vision |i Message from the Executive Secretary of the SADC Secretariat Regional integration is not only critical and important but is a necessary tool and strategy for development. Regional integration, in simple words, is about cooperation and economies of scale. SADC Member States have agreed to co-operate by pooling their resources together and implement transboundary projects with greater impact, and more benefit for their citizens. Some of these projects are featured in this second edition of the SADC Success Stories. The SADC Success Stories Edition is one of our communication tools to reach out to SADC citizens and enhance awareness about the positive impacts of our protocols, agreements, policies and strategies. In 2016/17, a team of experts travelled the SADC region to collect stories that highlight the recorded achievements and successes in implementing SADC regional development and integration agenda. The stories cover achievements in the infrastructure, trade and industrialisation, climate change, finance, peace and security, water management, agriculture and transfrontier conservation sectors. The team’s mission included trips overland, by sea and air in order to paint an accurate picture of how SADC regional integration programmes are changing the lives of SADC citizens for the better. Just to highlight a few, at the Zambezi River, they saw the construction of the Kazungula Bridge that will soon form a major transport link in the heart of the SADC region.
    [Show full text]