The Zambezi River Basin a Multi-Sector Investment Opportunities Analysis Public Disclosure Authorized

Total Page:16

File Type:pdf, Size:1020Kb

The Zambezi River Basin a Multi-Sector Investment Opportunities Analysis Public Disclosure Authorized The Zambezi River Basin A Multi-Sector Investment Opportunities Analysis Public Disclosure Authorized V o l u m e 3 Public Disclosure Authorized State of the Basin Public Disclosure Authorized Public Disclosure Authorized THE WORLD BANK GROUP 1818 H Street, N.W. Washington, D.C. 20433 USA THE WORLD BANK The Zambezi River Basin A Multi-Sector Investment Opportunities Analysis Volume 3 State of the Basin June 2010 THE WORLD BANK Water ResouRces Management AfRicA REgion © 2010 The International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington DC 20433 Telephone: 202-473-1000 Internet: www.worldbank.org E-mail: [email protected] All rights reserved The findings, interpretations, and conclusions expressed herein are those of the author(s) and do not necessarily reflect the views of the Executive Directors of the International Bank for Reconstruction and Development/The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judge- ment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Rights and Permissions The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruction and Development/The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly. For permission to photocopy or reprint any part of this work, please send a request with complete in- formation to the Copyright Clearance Center Inc., 222 Rosewood Drive, Danvers, MA 01923, USA; telephone: 978-750-8400; fax: 978-750-4470; Internet: www.copyright.com. All other queries on rights and licenses, including subsidiary rights, should be addressed to the Office of the Publisher, The World Bank, 1818 H Street NW, Washington, DC 20433, USA; fax: 202-522-2422; e-mail: [email protected]. Cover and interior design: The Word Express Cover photos: © Photographer Len Abrams/World Bank © Photographer Marcus Wishart/World Bank © Photographer Vahid Alavian/World Bank Contents Acknowledgments..................................................................................................................................... xi AbbreviAtions.And.Acronyms................................................................................................................xiii the.ZAmbeZi.river.bAsin:.bAckground.And.context............................................................................1 1.1 Motivation for This Analysis ................................................................................................................. 1 1.2 Summary of Findings ............................................................................................................................. 3 1.3 Basic Characteristics of the Zambezi River Basin ............................................................................... 3 1.4 Population and Economy ....................................................................................................................... 7 1.5 Approach and Methodology .................................................................................................................. 7 1.5.1 Analytical framework .................................................................................................................. 8 1.5.2 The River/Reservoir System Model ............................................................................................. 9 1.5.3 The Economic Assessment Tool ..................................................................................................11 2.. biophysicAl.And.socioeconomic.context.......................................................................................13 2.1 Overview of Basin Hydrology ............................................................................................................. 13 2.1.1 Rainfall characteristics ............................................................................................................... 13 2.1.2 Runoff characteristics ................................................................................................................ 13 2.1.3 Subbasin characteristics ............................................................................................................. 15 2.2 Extreme Events....................................................................................................................................... 24 2.2.1 Floods ......................................................................................................................................... 24 2.2.2 Droughts .................................................................................................................................... 29 2.3 Climate Change ..................................................................................................................................... 30 2.4 Overview of the Basin Biophysics ....................................................................................................... 33 2.4.1 Biomes and river zones ............................................................................................................. 33 2.4.2 Bioregions and ecoregions .......................................................................................................... 34 2.4.3 Conclusion ................................................................................................................................. 40 2.5 Macroeconomic Overview .................................................................................................................... 40 2.5.1 Angola ........................................................................................................................................ 41 2.5.2 Botswana ................................................................................................................................... 43 2.5.3 Malawi ....................................................................................................................................... 43 2.5.4 Mozambique ............................................................................................................................... 43 2.5.5 Namibia ...................................................................................................................................... 44 2.5.6 Tanzania ..................................................................................................................................... 45 2.5.7 Zambia ....................................................................................................................................... 45 2.5.8 Zimbabwe ................................................................................................................................... 46 iii The Zambezi River Basin: A Multi-Sector Investment Opportunities Analysis 2.6 Socioeconomic Overview ..................................................................................................................... 46 2.6.1 The Upper, Middle, and Lower Zambezi River Basin .............................................................. 46 2.6.2 Demographic development ......................................................................................................... 47 2.6.3 Income and poverty .................................................................................................................... 50 2.6.4 Livelihood ................................................................................................................................... 51 2.6.5 Gender and youth ...................................................................................................................... 57 2.6.6 Health and education ................................................................................................................. 57 3.. beneficiAl.uses.of.wAter..................................................................................................................61 3.1 Energy and Hydropower ...................................................................................................................... 61 3.1.1 Southern African Power Pool (SAPP) ...................................................................................... 61 3.1.2 Existing hydropower plants in the Zambezi River Basin .......................................................... 64 3.1.3 Potential hydropower projects in the Zambezi River Basin ..................................................... 66 3.1.4 SAPP energy sector development .............................................................................................. 71 3.1.5 Strengths and challenges of hydropower development in the Zambezi River Basin ................. 72 3.1.6 Opportunities and constraints for hydropower development in the Zambezi River Basin ....... 74 3.1.7 Characteristics and parameters of hydropower plants ............................................................... 75 3.2 Irrigated Agriculture ............................................................................................................................ 95 3.2.1 Regional policies for agriculture and irrigation development
Recommended publications
  • Road Safety Review: Namibia Know Before You Go Driving Culture • Common Causes of Crashes Include Disregard of ‰‰ Driving Is on the Left
    Association for Safe International Road Travel Road Safety Review: Namibia Know Before You Go Driving Culture • Common causes of crashes include disregard of Driving is on the left. traffic regulations, speeding, and improperly Travelers staying less than 90 days may use a valid U.S. driver’s license. Travelers staying for more than 90 days, or those whose maintained vehicles. license is not in English, must have an International Driving • High beams: Drivers may flash their high beams as a Permit (IDP). greeting, or to warn of hazards. Siingle-car crashes, many of which are rollovers, occur frequently. • Driving under the influence is a serious problem. Manual and automatic transition vehicles are available for rent. Be especially alert when driving or walking on 4WD is recommended. weekend evenings. There are 25.0 road fatalities per 100,000 people, compared to • Taxi drivers may stop suddenly, run red lights, 10.3 in the US and 2.8 in the UK. speed, neglect to use turn signals or cut off other Resources for consular information and assistance are listed at drivers. asirt.org/citizens. • Pedestrians may unexpectedly cross roads. Road Conditions • Road construction and maintenance meet international standards. About 15% of roads are paved; gravel roads are typically in good to excellent condition. • Main access roads into Windhoek are paved. • Congestion during peak hours in Windhoek is common. • Most roads are undivided and few have shoulders. On gravel roads, it is especially important to maintain safe speeds. • Distances between destinations may be extremely long. Driver fatigue is a concern. • Road signs clearly indicate distances between towns.
    [Show full text]
  • An Analysis of Primary and Secondary Production in Lake Kariba in a Changing Climate
    AN ANALYSIS OF PRIMARY AND SECONDARY PRODUCTION IN LAKE KARIBA IN A CHANGING CLIMATE MZIME R. NDEBELE-MURISA A thesis submitted in partial fulfillment of the requirements for the degree of Doctor Philosophiae in the Department of Biodiversity and Conservation Biology, University of the Western Cape Supervisor: Prof. Charles Musil Co-Supervisor: Prof. Lincoln Raitt May 2011 An analysis of primary and secondary production in Lake Kariba in a changing climate Mzime Regina Ndebele-Murisa KEYWORDS Climate warming Limnology Primary production Phytoplankton Zooplankton Kapenta production Lake Kariba i Abstract Title: An analysis of primary and secondary production in Lake Kariba in a changing climate M.R. Ndebele-Murisa PhD, Biodiversity and Conservation Biology Department, University of the Western Cape Analysis of temperature, rainfall and evaporation records over a 44-year period spanning the years 1964 to 2008 indicates changes in the climate around Lake Kariba. Mean annual temperatures have increased by approximately 1.5oC, and pan evaporation rates by about 25%, with rainfall having declined by an average of 27.1 mm since 1964 at an average rate of 6.3 mm per decade. At the same time, lake water temperatures, evaporation rates, and water loss from the lake have increased, which have adversely affected lake water levels, nutrient and thermal dynamics. The most prominent influence of the changing climate on Lake Kariba has been a reduction in the lake water levels, averaging 9.5 m over the past two decades. These are associated with increased warming, reduced rainfall and diminished water and therefore nutrient inflow into the lake. The warmer climate has increased temperatures in the upper layers of lake water, the epilimnion, by an overall average of 1.9°C between 1965 and 2009.
    [Show full text]
  • Visa Information for Zambia a Guide on the Requirements
    UPDATED 24 JULY 2018 VISA INFORMATION FOR ZAMBIA A GUIDE ON THE REQUIREMENTS GENERAL INFORMATION ENTRY VISA – Please turn overleaf for a list of nationals requiring a visa prior to arrival and those exempt from visa requirements. Nationals not mentioned are eligible for a visa on arrival at our ports of entry. No entry visa required for SADC passports E-VISA APPLICATION – All persons who ordinarily require a visa to come to Zambia are eligible to apply for an e-Visa, LINK HERE ZAMBIAN MISSION ABROAD – Contact your local Zambia Diplomatic Mission to apply for a visa in person, list available HERE Check with your local embassy well before travelling or feel free to ask us and we will do our best to assist COST OF VISAS – Credit card facilities are not guaranteed at all points of entry - please carry sufficient US$’s to pay for visa’s if necessary ZAMBIA VISA COSTS (per passport - subject to change) SINGLE ENTRY $ 50 This visa is required should you wish to see the Falls from the Zimbabwe side or do a Chobe Day DOUBLE | MULTIPLE ENTRY – $ 80 Trip to Botswana – we suggest a multiple entry KAZA UNI-VISA – See further information below $ 50 KAZA UNI-VISA (40 nationalities are eligible) INFORMATION – Valid for 30 days & allows multiple cross-border visits between Zambia & Zimbabwe and one day-trip to Botswana. No overnight stays are allowed and multiple crossings to Botswana are not allowed on the same KAZA Uni-visa (not available online). AVAILABLE ON ARRIVAL – Livingstone International Airport, Victoria Falls International Airport, Harare
    [Show full text]
  • Dam Synchronisation and Flood Releases in the Zambezi River Basin Project Annex 4
    Doc No: FR – MR Transboundary Water Management in SADC Transboundary Water Management in SADC DAMDAM SYNCHRONISATION SYNCHRONISATION AND AND FLOOD FLOOD RELEASES RELEASES IN IN THETHE ZAMBEZI ZAMBEZI RIVER RIVER BASIN BASIN PROJECT PROJECT Final Report Executive Summary 31 March 2011 Annex 4 RecommendationsSWRSD Zambezi Basin Jointfor Venture Investments 31 March 2011 SWRSD Zambezi Basin Joint Venture This report is part of the Dam Synchronisation and Flood Releases in the Zambezi River Basin project (2010-2011), which is part of the programme on Transboundary Water Management in SADC. To obtain further information on this project and/or progamme, please contact: Mr. Phera Ramoeli Senior Programme Officer (Water) Directorate of Infrastructure and Services SADC Secretariat Private Bag 0095 Gaborone Botswana Tel: +267 395-1863 Email: [email protected] Mr. Michael Mutale Executive Secretary Interim ZAMCOM Secretariat Private Bag 180 Gaborone Botswana Tel: +267 365-6670 or +267 365-6661/2/3/4 Email: [email protected] DAM SYNCHRONISATION AND FLOOD RELEASES IN THE ZAMBEZI RIVER BASIN: ANNEX 4 OF FINAL REPORT Table of Contents TABLE OF CONTENTS.............................................................................................................................. III LIST OF TABLES ........................................................................................................................................ VI LIST OF FIGURES ....................................................................................................................................
    [Show full text]
  • Midlands Province
    School Province District School Name School Address Level Primary Midlands Chirumanzu BARU KUSHINGA PRIMARY BARU KUSHINGA VILLAGE 48 CENTAL ESTATES Primary Midlands Chirumanzu BUSH PARK MUSENA RESETTLEMENT AREA VILLAGE 1 MUSENA Primary Midlands Chirumanzu BUSH PARK 2 VILLAGE 5 WARD 19 CHIRUMANZU Primary Midlands Chirumanzu CAMBRAI ST MATHIAS LALAPANZI TOWNSHIP CHIRUMANZU Primary Midlands Chirumanzu CHAKA NDARUZA VILLAGE HEAD CHAKA Primary Midlands Chirumanzu CHAKASTEAD FENALI VILLAGE NYOMBI SIDING Primary Midlands Chirumanzu CHAMAKANDA TAKAWIRA RESETTLEMENT SCHEME MVUMA Primary Midlands Chirumanzu CHAPWANYA HWATA-HOLYCROSS ROAD RUDUMA VILLAGE Primary Midlands Chirumanzu CHIHOSHO MATARITANO VILLAGE HEADMAN DEBWE Primary Midlands Chirumanzu CHILIMANZI NYONGA VILLAGE CHIEF CHIRUMANZU Primary Midlands Chirumanzu CHIMBINDI CHIMBINDI VILLAGE WARD 5 CHIRUMANZU Primary Midlands Chirumanzu CHINGEGOMO WARD 18 TOKWE 4 VILLAGE 16 CHIRUMANZU Primary Midlands Chirumanzu CHINYUNI CHINYUNI WARD 7 CHUKUCHA VILLAGE Primary Midlands Chirumanzu CHIRAYA (WYLDERGROOVE) MVUMA HARARE ROAD WASR 20 VILLAGE 1 Primary Midlands Chirumanzu CHISHUKU CHISHUKU VILAGE 3 CHIEF CHIRUMANZU Primary Midlands Chirumanzu CHITENDERANO TAKAWIRA RESETTLEMENT AREA WARD 11 Primary Midlands Chirumanzu CHIWESHE PONDIWA VILLAGE MAPIRAVANA Primary Midlands Chirumanzu CHIWODZA CHIWODZA RESETTLEMENT AREA Primary Midlands Chirumanzu CHIWODZA NO 2 VILLAGE 66 CHIWODZA CENTRAL ESTATES Primary Midlands Chirumanzu CHIZVINIRE CHIZVINIRE PRIMARY SCHOOL RAMBANAPASI VILLAGE WARD 4 Primary Midlands
    [Show full text]
  • 38678 10-4 Roadcarrierp Layout 1
    Government Gazette Staatskoerant REPUBLIC OF SOUTH AFRICA REPUBLIEK VAN SUID-AFRIKA Vol. 598 Pretoria, 10 April 2015 No. 38678 N.B. The Government Printing Works will not be held responsible for the quality of “Hard Copies” or “Electronic Files” submitted for publication purposes AIDS HELPLINE: 0800-0123-22 Prevention is the cure 501272—A 38678—1 2 No. 38678 GOVERNMENT GAZETTE, 10 APRIL 2015 IMPORTANT NOTICE The Government Printing Works will not be held responsible for faxed documents not received due to errors on the fax machine or faxes received which are unclear or incomplete. Please be advised that an “OK” slip, received from a fax machine, will not be accepted as proof that documents were received by the GPW for printing. If documents are faxed to the GPW it will be the sender’s respon- sibility to phone and confirm that the documents were received in good order. Furthermore the Government Printing Works will also not be held responsible for cancellations and amendments which have not been done on original documents received from clients. CONTENTS INHOUD Page Gazette Bladsy Koerant No. No. No. No. No. No. Transport, Department of Vervoer, Departement van Cross Border Road Transport Agency: Oorgrenspadvervoeragentskap aansoek- Applications for permits:.......................... permitte: .................................................. Menlyn..................................................... 3 38678 Menlyn..................................................... 3 38678 Applications concerning Operating Aansoeke aangaande Bedryfslisensies:.
    [Show full text]
  • Transport & Infrastructure Quarter 1 2021 Stats Brief
    TRANSPORT & INFRASTRUCTURE QUARTER 1 2021 STATS BRIEF TRANSPORT & INFRASTRUCTURE, QUARTER 1, 2021 . STATS BRIEF 1 Published by STATISTICS BOTSWANA Private Bag 0024, Gaborone Tel: 3671300 Fax: 3952201 E-mail: [email protected] Website: www.statsbots.org.bw July 2021 Copyright © Statistics Botswana 2021 2 TRANSPORT & INFRASTRUCTURE, QUARTER 1, 2021 . STATS BRIEF TRANSPORT & INFRASTRUCTURE QUARTER 1 2021 STATS BRIEF TRANSPORT & INFRASTRUCTURE, QUARTER 1, 2021 . STATS BRIEF 3 INTRODUCTION This Stats Brief presents a summary of the latest Transport and Infrastructure Statistics for Quarter 1, 2021. It covers statistics relating to Air, Rail and Water Transport as well as Motor Vehicle Registrations. Aircraft movements increased by 3.6 percent in Q1 2021 from 4,306 movements recorded in the previous quarter. Domestic aircraft movements constituted 71.3 percent of the total, while international aircraft movements made up 28.7 percent. The volume of goods transported through rail this quarter went down by 11.6 percent. A total of P55.3 million was generated from the transportation of those goods, resulting in a decline of 12.0 percent from P62.8 million generated in the previous quarter Pontoon passengers increased from 17,268 in Q4 2020 to 19,254 in Q1 2021, registering an increase of 11.5 percent. Vehicles transported by the pontoon decreased by 11.0 percent from 14,308 in Q4 2020 to 10,254 in Q1 2021. For more information and further enquiries, contact the Directorate of Stakeholder Relations on +267 367 1300. This publication, and all other Statistics Botswana outputs/publications are available on the website at (http://www.statsbots.org.bw) and at the Statistics Botswana Information Resource Centre (Head-Office, Gaborone).
    [Show full text]
  • September 2019 Upcoming Events the New School Year Has Started Amid Many Changes
    Monthly Newsletter September 2019 Upcoming Events The new school year has started amid many changes. We are hold- ing labs and classes in the new Animal and Plant Sciences Center. The facility is comprised of a central building with seven state-of- ●9/2 Labor Day Holiday the-art labs, including a merchandizing lab, the Purple Tractor. ●9/5 Part Time Job Fair There is 42,000 sq. ft. of covered working space for livestock with pens, scales, working chutes, and an arena for class use that can be ●9/11 Lunch & Learn with Ross divided when the need arises. There are laboratory preparation areas, Veterinary School four greenhouses, and associated covered outdoor work spaces. Our students and faculty are busy making use of the new space. The ●9/16 Summer Camp Job Fair grand opening for the building will be homecoming day, Oct. ●9/18 MMI Workshop for Pre-Vet 19, 2019. We hope you can join us for this landmark occasion. DEAN’S CORNER ●9/20 Family Weekend Additional exciting news from the college is our significant investment in specialized ●9/25 Graduate & Professional technologies providing our faculty and students with the tools for a world-class educa- School Job Fair tion. These range from complex simulators, to drones with advanced capabilities, from robots, to advanced-capability video equipment, from feed analysis equipment, to ●9/26-28 National FFA Officer DNA, RNA, and protein imaging, from game cameras, to tracking collars, and much training more. We will be featuring several of these in the coming weeks on our Facebook page.
    [Show full text]
  • Nyaradzo Funeral Policy Biller Code
    Nyaradzo Funeral Policy Biller Code Weider inhere her European enchantingly, distillable and hereditable. Periwigged and novercal Felipe hobbyhorses, but Paddie anear parget her aloha. Davey append her monauls vauntingly, she splashes it consolingly. There are a few commercial farms within its borders and a handful of resettlement areas. Elderly locals know about this shopping center was also cover repatriation from plan international successfully completed a number. However, can be lessened considerably by the professional assistance from us. Now, Steward Bank and Ecocash yesterday launched a platform where Econet mobile network subscribers will be able to open bank accounts through cell phones in a minute. Sedombe River starts also at the southern heel of the same kopje. Vapory Tonnie incase biblically. We shall select locations where we know that the trees will be well cared for. Once you have completed the form, Doves, you can use the same accounts. Sherwood clinic is a funeral policy for affordable monthly premiums can. Great things never come from comfort zones. There are two school of the same name at this center, facilitated by Plan International. Bhamala or sell something today about your biller code merchant line. Here Wedbush Securities Inc. Senkwasi clinic is still present at any time quietly kills them signed under silobela constituency, before you can. He was our client and partner. You like give your biller code merchant code merchant number. Econet Wireless telecommunications group. Elderly locals know about this very well but only a handful of the younger generations have come about this piece of history. HOW TO ENTER: Complete your details in the form below, buying cattle for his butchery.
    [Show full text]
  • Rosa 451V02 Zimbabwe Flood
    ZIMBABWE: Flood Snapshot (as of 09 March 2017) Situational Indicators Flood Risk Areas Homeless people Homesteads damaged 1,985 2,579 Zambia Mashonaland Mazowe Central Districts Affected Fatalities Mazowe Bridge Mashonaland 45 246 West Zambezi Harare Funding Raised Dams Breached Victoria Falls USD M Gwai 14.5 140 Mashonaland *Government raised Dahlia East Matabeleland Odzi Midlands Hydrological Update North Manicaland Expected river level/flow at this time of season (m3/s) Zambezi river Odzi river Bulawayo Odzi Gorge River level/flow as at 03/03/2017 3 69.1m3/s as percentage of expected 1556m /s Increase in flows due Increase in flows. River level/flow as at 27/02/2017 Moderate flood risk in as percentage of expected to incoming runoff from Masvingo the upstream countries Manicaland Normal river level/flow Runde at this time of season Matabeleland South Mzingwane Confluence with Tokwe Botswana 107% Legend 91% 123% Limpopo Mozambique Runde river 87% Mazowe river Flood Affected Districts 429% Worst Affected Districts 168.4m3/s 133% 167.4m3/s Site where river flow measured South Africa Increase in flows causing Flows are now flooding problems in Chivi. 212% increasing and are There is high risk of flooding 352% above average. Situation Update in Runde up to the confluence with Save. Zimbabwe has appealed for assistance after declaring floods a national disaster. Almost 250 people have been killed and about 2,000 people have been left homeless, with around 900 351% people displaced to a camp in Tsholostho in Matabeleland North. Much of the heavy rains 367% received over the past month can be attributed to Tropical Cyclone DINEO, which crossed 857% southern and western Zimbabwe as a powerful storm system in mid-February.
    [Show full text]
  • The Zambezi River Basin a Multi-Sector Investment Opportunities Analysis
    The Zambezi River Basin A Multi-Sector Investment Opportunities Analysis V o l u m e 4 Modeling, Analysis and Input Data THE WORLD BANK GROUP 1818 H Street, N.W. Washington, D.C. 20433 USA THE WORLD BANK The Zambezi River Basin A Multi-Sector Investment Opportunities Analysis Volume 4 Modeling, Analysis and input Data June 2010 THE WORLD BANK Water REsOuRcEs Management AfRicA REgion © 2010 The International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington DC 20433 Telephone: 202-473-1000 Internet: www.worldbank.org E-mail: [email protected] All rights reserved The findings, interpretations, and conclusions expressed herein are those of the author(s) and do not necessarily reflect the views of the Executive Directors of the International Bank for Reconstruction and Development/The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judge- ment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Rights and Permissions The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruction and Development/The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly. For permission to photocopy or reprint any part of this work, please send a request with complete in- formation to the Copyright Clearance Center Inc., 222 Rosewood Drive, Danvers, MA 01923, USA; telephone: 978-750-8400; fax: 978-750-4470; Internet: www.copyright.com.
    [Show full text]
  • PARKS and WILD LIFE ACT Acts 14/1975, 42/1976 (S
    TITLE 20 TITLE 20 Chapter 20:14 PREVIOUS CHAPTER PARKS AND WILD LIFE ACT Acts 14/1975, 42/1976 (s. 39), 48/1976 (s. 82), 4/1977, 22/1977, 19/1978, 5/1979, 4/1981 (s. 19), 46/1981, 20/1982 (s.19 and Part XXVI), 31/1983, 11/1984, 35/1985, 8/1988 (s. 164), 1/1990, 11/1991 (s. 24), 22/1992 (s. 14); 19/2001; 22/2001; 13/2002. R.G.Ns 1135/1975, 52/1977, 126/1979, 294/1979, 265/1979, 294/1979, 748/1979; S.Is 675/1979, 632/1980, 640/1980, 704/1980, 773/1980, 781/1980, 786/1980, 139/1981, 140/1981, 181/1981, 183/1981, 639/1981, 860/1981, 139/1982, 140/1982, 337/1983, 454/1983, 123/1991 ARRANGEMENT OF SECTIONS PART I PRELIMINARY Section 1. Short title. 2. Interpretation. PART II PARKS AND WILD LIFE MANAGEMENT AUTHORITY 3. Establishment of Parks and Wild Life Management Authority. 4. Functions of Parks and Wild Life Management Authority. 5. Establishment and composition of Parks and Wild Life Management Authority Board. 6. Minister may give Board policy directions. 7. Minister may direct Board to reverse, suspend or rescind its decisions or actions. 8. Execution of contracts and instruments by Authority. 9. Reports of Authority. 10. Appointment and functions of Director-General and Directors of Authority. 11. Appointment of other staff of Authority. PART IIA FINANCIAL PROVISIONS 12. Funds of Authority. 13. Financial year of Authority. 14. Annual programmes and budgets of Authority. 15. Investment of moneys not immediately required by Authority. 16. Accounts of Authority.
    [Show full text]