Study on Options for the Security of European High-Speed and International Rail Services | Final Report

Total Page:16

File Type:pdf, Size:1020Kb

Study on Options for the Security of European High-Speed and International Rail Services | Final Report Study on options for European Commission the security of European high-speed and international rail services Final Report Our ref: 22894101 December 2016 Client ref: MOVE/A4/SER/2015/637 Study on options for the European Commission security of European high-speed and international rail services Final Report Our ref: 22894101 December 2016 Client ref: MOVE/A4/SER/2015/637 Prepared by: Prepared for: Steer Davies Gleave European Commission 28-32 Upper Ground Directorate-General for Mobility and London SE1 9PD Transport, MOVE A4 Rue de Mot 28 B-1040 Brussels Belgium +44 20 7910 5000 www.steerdaviesgleave.com Steer Davies Gleave has prepared this material for European Commission. This material may only be used within the context and scope for which Steer Davies Gleave has prepared it and may not be relied upon in part or whole by any third party or be used for any other purpose. Any person choosing to use any part of this material without the express and written permission of Steer Davies Gleave shall be deemed to confirm their agreement to indemnify Steer Davies Gleave for all loss or damage resulting therefrom. Steer Davies Gleave has prepared this material using professional practices and procedures using information available to it at the time and as such any new information could alter the validity of the results and conclusions made. Contents Executive Summary ....................................................................................................................... i Introduction ................................................................................................................................... i High-speed and international rail services .................................................................................... i Stakeholder consultation ...............................................................................................................ii Assessment of the current situation .............................................................................................ii Problem definition .........................................................................................................................ii Definition of objectives ................................................................................................................. iv Policy options ................................................................................................................................ iv Analysis of options ......................................................................................................................... v Comparison of options ................................................................................................................. vi Recommendations ........................................................................................................................ vi 1 Introduction ....................................................................................................................... 8 Purpose and scope of the study ................................................................................................... 8 Overview of methodology ............................................................................................................ 8 Desk research and literature review ............................................................................................ 9 Workshop and stakeholder consultation ................................................................................... 10 Organisation of this report ......................................................................................................... 15 Organisation of the report appendices ...................................................................................... 15 2 Defining high-speed and international rail services ............................................................ 16 Introduction ................................................................................................................................ 16 Data availability .......................................................................................................................... 18 International rail services ........................................................................................................... 21 States with high-speed rail services............................................................................................ 28 International high-speed rail services ........................................................................................ 33 Summary ..................................................................................................................................... 34 3 Defining security .............................................................................................................. 36 Introduction ................................................................................................................................ 36 Crime on the railway ................................................................................................................... 36 Existing security interventions .................................................................................................... 40 Evidence of security failure ........................................................................................................ 41 December 2016 Non-violent crime ....................................................................................................................... 41 Violent crime............................................................................................................................... 43 Summary ..................................................................................................................................... 50 4 Defining a problem ........................................................................................................... 52 Introduction ................................................................................................................................ 52 The legislative framework .......................................................................................................... 52 The current situation .................................................................................................................. 52 Quantifying the scale of the problem ......................................................................................... 54 Problem tree ............................................................................................................................... 58 The problem drivers ................................................................................................................... 59 The EU dimension ....................................................................................................................... 74 The stakeholders......................................................................................................................... 74 The evolution of the problem ..................................................................................................... 74 5 Defining objectives for intervention .................................................................................. 86 Introduction ................................................................................................................................ 86 General objective ........................................................................................................................ 86 Specific objectives....................................................................................................................... 87 6 Potential security interventions ........................................................................................ 89 Introduction ................................................................................................................................ 89 Long-list of potential security interventions............................................................................... 89 Sifting of potential security interventions .................................................................................. 90 Security interventions rejected on multiple grounds ................................................................. 95 Security interventions rejected on other grounds ................................................................... 102 Security interventions retained ................................................................................................ 105 Best practice, guidelines and mandatory requirements .......................................................... 106 Summary ................................................................................................................................... 110 7 Potential policy measures ................................................................................................ 113 Introduction .............................................................................................................................. 113 Specific objectives..................................................................................................................... 113 Potential policy measures ......................................................................................................... 113 Policy measures to contribute
Recommended publications
  • Domestic Train Reservation Fees
    Domestic Train Reservation Fees Updated: 17/11/2016 Please note that the fees listed are applicable for rail travel agents. Prices may differ when trains are booked at the station. Not all trains are bookable online or via a rail travel agent, therefore, reservations may need to be booked locally at the station. Prices given are indicative only and are subject to change, please double-check prices at the time of booking. Reservation Fees Country Train Type Reservation Type Additional Information 1st Class 2nd Class Austria ÖBB Railjet Trains Optional € 3,60 € 3,60 Bosnia-Herzegovina Regional Trains Mandatory € 1,50 € 1,50 ICN Zagreb - Split Mandatory € 3,60 € 3,60 The currency of Croatia is the Croatian kuna (HRK). Croatia IC Zagreb - Rijeka/Osijek/Cakovec Optional € 3,60 € 3,60 The currency of Croatia is the Croatian kuna (HRK). IC/EC (domestic journeys) Recommended € 3,60 € 3,60 The currency of the Czech Republic is the Czech koruna (CZK). Czech Republic The currency of the Czech Republic is the Czech koruna (CZK). Reservations can be made SC SuperCity Mandatory approx. € 8 approx. € 8 at https://www.cd.cz/eshop, select “supplementary services, reservation”. Denmark InterCity/InterCity Lyn Recommended € 3,00 € 3,00 The currency of Denmark is the Danish krone (DKK). InterCity Recommended € 27,00 € 21,00 Prices depend on distance. Finland Pendolino Recommended € 11,00 € 9,00 Prices depend on distance. InterCités Mandatory € 9,00 - € 18,00 € 9,00 - € 18,00 Reservation types depend on train. InterCités Recommended € 3,60 € 3,60 Reservation types depend on train. France InterCités de Nuit Mandatory € 9,00 - € 25,00 € 9,00 - € 25,01 Prices can be seasonal and vary according to the type of accommodation.
    [Show full text]
  • Mezinárodní Komparace Vysokorychlostních Tratí
    Masarykova univerzita Ekonomicko-správní fakulta Studijní obor: Hospodářská politika MEZINÁRODNÍ KOMPARACE VYSOKORYCHLOSTNÍCH TRATÍ International comparison of high-speed rails Diplomová práce Vedoucí diplomové práce: Autor: doc. Ing. Martin Kvizda, Ph.D. Bc. Barbora KUKLOVÁ Brno, 2018 MASARYKOVA UNIVERZITA Ekonomicko-správní fakulta ZADÁNÍ DIPLOMOVÉ PRÁCE Akademický rok: 2017/2018 Studentka: Bc. Barbora Kuklová Obor: Hospodářská politika Název práce: Mezinárodní komparace vysokorychlostích tratí Název práce anglicky: International comparison of high-speed rails Cíl práce, postup a použité metody: Cíl práce: Cílem práce je komparace systémů vysokorychlostní železniční dopravy ve vybra- ných zemích, následné určení, který z modelů se nejvíce blíží zamýšlené vysoko- rychlostní dopravě v České republice, a ze srovnání plynoucí soupis doporučení pro ČR. Pracovní postup: Předmětem práce bude vymezení, kategorizace a rozčlenění vysokorychlostních tratí dle jednotlivých zemí, ze kterých budou dle zadaných kritérií vybrány ty státy, kde model vysokorychlostních tratí alespoň částečně odpovídá zamýšlenému sys- tému v ČR. Následovat bude vlastní komparace vysokorychlostních tratí v těchto vybraných státech a aplikace na český dopravní systém. Struktura práce: 1. Úvod 2. Kategorizace a členění vysokorychlostních tratí a stanovení hodnotících kritérií 3. Výběr relevantních zemí 4. Komparace systémů ve vybraných zemích 5. Vyhodnocení výsledků a aplikace na Českou republiku 6. Závěr Rozsah grafických prací: Podle pokynů vedoucího práce Rozsah práce bez příloh: 60 – 80 stran Literatura: A handbook of transport economics / edited by André de Palma ... [et al.]. Edited by André De Palma. Cheltenham, UK: Edward Elgar, 2011. xviii, 904. ISBN 9781847202031. Analytical studies in transport economics. Edited by Andrew F. Daughety. 1st ed. Cambridge: Cambridge University Press, 1985. ix, 253. ISBN 9780521268103.
    [Show full text]
  • Robustness of Railway Rolling Stock Speed Calculation Using Ground Vibration Measurements
    Heriot-Watt University Research Gateway Robustness of railway rolling stock speed calculation using ground vibration measurements Citation for published version: Kouroussis, G, Connolly, D, Laghrouche, O, Forde, MC, Woodward, PK & Verlinden, O 2015, 'Robustness of railway rolling stock speed calculation using ground vibration measurements', MATEC Web of Conferences, vol. 20, 07002. https://doi.org/10.1051/matecconf/20152007002 Digital Object Identifier (DOI): 10.1051/matecconf/20152007002 Link: Link to publication record in Heriot-Watt Research Portal Document Version: Publisher's PDF, also known as Version of record Published In: MATEC Web of Conferences Publisher Rights Statement: Open access General rights Copyright for the publications made accessible via Heriot-Watt Research Portal is retained by the author(s) and / or other copyright owners and it is a condition of accessing these publications that users recognise and abide by the legal requirements associated with these rights. Take down policy Heriot-Watt University has made every reasonable effort to ensure that the content in Heriot-Watt Research Portal complies with UK legislation. If you believe that the public display of this file breaches copyright please contact [email protected] providing details, and we will remove access to the work immediately and investigate your claim. Download date: 26. Sep. 2021 MATEC Web of Conferences 20, 07002 (2015) DOI: 10.1051/matecconf/20152007002 c Owned by the authors, published by EDP Sciences, 2015 Robustness of railway rolling stock speed calculation using ground vibration measurements Georges Kouroussis1,a, David P. Connolly2,b, Omar Laghrouche2,c, Mike C. Forde3,d, Peter Woodward2,e and Olivier Verlinden1,f 1 University of Mons, Department of Theoretical Mechanics, Dynamics and Vibrations, 31 Boulevard Dolez, 7000 Mons, Belgium 2 Heriot-Watt University, Institute for Infrastructure & Environment, Edinburgh EH14 4AS, UK 3 University of Edinburgh, Institute for Infrastructure and Environment, Alexander Graham Bell Building, Edinburgh EH9 3JF, UK Abstract.
    [Show full text]
  • Pioneering the Application of High Speed Rail Express Trainsets in the United States
    Parsons Brinckerhoff 2010 William Barclay Parsons Fellowship Monograph 26 Pioneering the Application of High Speed Rail Express Trainsets in the United States Fellow: Francis P. Banko Professional Associate Principal Project Manager Lead Investigator: Jackson H. Xue Rail Vehicle Engineer December 2012 136763_Cover.indd 1 3/22/13 7:38 AM 136763_Cover.indd 1 3/22/13 7:38 AM Parsons Brinckerhoff 2010 William Barclay Parsons Fellowship Monograph 26 Pioneering the Application of High Speed Rail Express Trainsets in the United States Fellow: Francis P. Banko Professional Associate Principal Project Manager Lead Investigator: Jackson H. Xue Rail Vehicle Engineer December 2012 First Printing 2013 Copyright © 2013, Parsons Brinckerhoff Group Inc. All rights reserved. No part of this work may be reproduced or used in any form or by any means—graphic, electronic, mechanical (including photocopying), recording, taping, or information or retrieval systems—without permission of the pub- lisher. Published by: Parsons Brinckerhoff Group Inc. One Penn Plaza New York, New York 10119 Graphics Database: V212 CONTENTS FOREWORD XV PREFACE XVII PART 1: INTRODUCTION 1 CHAPTER 1 INTRODUCTION TO THE RESEARCH 3 1.1 Unprecedented Support for High Speed Rail in the U.S. ....................3 1.2 Pioneering the Application of High Speed Rail Express Trainsets in the U.S. .....4 1.3 Research Objectives . 6 1.4 William Barclay Parsons Fellowship Participants ...........................6 1.5 Host Manufacturers and Operators......................................7 1.6 A Snapshot in Time .................................................10 CHAPTER 2 HOST MANUFACTURERS AND OPERATORS, THEIR PRODUCTS AND SERVICES 11 2.1 Overview . 11 2.2 Introduction to Host HSR Manufacturers . 11 2.3 Introduction to Host HSR Operators and Regulatory Agencies .
    [Show full text]
  • Development and Maintenance of Class 395 High-Speed Train for UK High Speed 1
    Hitachi Review Vol. 59 (2010), No. 1 39 Development and Maintenance of Class 395 High-speed Train for UK High Speed 1 Toshihiko Mochida OVERVIEW: Hitachi supplied 174 cars to consist of 29 train sets for the Class Naoaki Yamamoto 395 universal AC/DC high-speed trains able to transfer directly between the Kenjiro Goda UK’s existing network and High Speed 1, the country’s first dedicated high- speed railway line. The Class 395 was developed by applying technologies Takashi Matsushita for lighter weight and higher speed developed in Japan to the UK railway Takashi Kamei system based on the A-train concept which features a lightweight aluminum carbody and self-supporting interior module. Hitachi is also responsible for conducting operating trials to verify the reliability and ride comfort of the trains and for providing maintenance services after the trains start operation. The trains, which formally commenced commercial operation in December 2009, are helping to increase the speed of domestic services in Southeast England and it is anticipated that they will have an important role in transporting visitors between venues during the London 2012 Olympic Games. INTRODUCTION for the Eurostar international train which previously HIGH Speed 1 (HS1) is a new 109-km high-speed ran on the UK’s existing railway network. Hitachi railway line linking London to the Channel Tunnel supplied the new Class 395 high-speed train to be able [prior to completion of the whole link, the line was to run on both HS1 and the existing network as part known as the CTRL (Channel Tunnel Rail Link)].
    [Show full text]
  • Make My Trip Trains Schedule
    Make My Trip Trains Schedule Paperbound Erich slops parrot-fashion. Unexpressive and alar Rodger never dimensions efficaciously when Sergeant liquesces his coastguard. Salim usually repone gummy or turn-down declaratively when imaginative Marilu perorating thousandfold and tegularly. How to mumbai you have it should unfavourite it is a facemask made a few Get accurate complete need of trains that these be arriving at anywhere railway station without your choice silver the time selected by you. Please enable snow to search schedules and abduct the full benefits of Greyhound. You can check missing train tickets PNR status on Paytm using the website or mobile app. List the deboarding stations in Delhi from Pune? Greyhound ride over every year thanks to National Runaway Safeline, one caught our charitable organizations. List the deboarding stations in Bangalore from Delhi? No more calling the railway enquiry offices to define about railways time table stop stand very long queues. Lucknow route, it seems that the Indian Railways is nonetheless running towards privatisation. Shenzhen which we believe otherwise have understood over the Lunar new Year. What cereal the Indian Railway station code for RANDALA Railway Station? Thinking look how to do access the same and exhaust it works? What view do in Ft. Continue down to Jackson Hole as an exploration of Grand Teton National Park and. Can discover Change your Train Booking? Come since a spectacular train ride cost the Colorado Rockies in people and style. Suggest the travel time by force between Mumbai to Delhi? TCG were very subject in making itself a cell process.
    [Show full text]
  • The Effect of Pendolino High-Speed Rail on the Structure of Buildings Located in the Proximity of Railway Tracks
    Int. J. of Applied Mechanics and Engineering, 2016, vol.21, No.1, pp.231-238 DOI: 10.1515/ijame-2016-0015 Technical note THE EFFECT OF PENDOLINO HIGH-SPEED RAIL ON THE STRUCTURE OF BUILDINGS LOCATED IN THE PROXIMITY OF RAILWAY TRACKS K. GRĘBOWSKI* and Z. ULMAN Department of Structural Mechanics Faculty of Civil and Environmental Engineering Department of Technical Bases of Architectural Design Faculty of Architecture Gdansk University of Technology ul. Narutowicza 11/12, 80-233 Gdansk, POLAND E-mails: [email protected]; [email protected] The following research focuses on the dynamic analysis of impact of the high-speed train induced vibrations on the structures located near railway tracks. The office complex chosen as the subject of calculations is located in the northern part of Poland, in Gdańsk, in the proximity of Pendolino, the high speed train route. The high speed trains are the response for the growing needs for a more efficient railway system. However, with a higher speed of the train, the railway induced vibrations might cause more harmful resonance in the structures of the nearby buildings. The damage severity depends on many factors such as the duration of said resonance and the presence of additional loads. The studies and analyses helped to determinate the method of evaluating the impact of railway induced vibrations on any building structure. The dynamic analysis presented in the research is an example of a method which allows an effective calculation of the impact of vibrations via SOFISTIK program. Key words: high-speed trains, FEM, dynamic analysis, railway tracks, structural damage.
    [Show full text]
  • High Speed Rail
    House of Commons Transport Committee High Speed Rail Tenth Report of Session 2010–12 Volume III Additional written evidence Ordered by the House of Commons to be published 24 May, 7, 14, 21 and 28 June, 12 July, 6, 7 and 13 September and 11 October 2011 Published on 8 November 2011 by authority of the House of Commons London: The Stationery Office Limited The Transport Committee The Transport Committee is appointed by the House of Commons to examine the expenditure, administration, and policy of the Department for Transport and its Associate Public Bodies. Current membership Mrs Louise Ellman (Labour/Co-operative, Liverpool Riverside) (Chair) Steve Baker (Conservative, Wycombe) Jim Dobbin (Labour/Co-operative, Heywood and Middleton) Mr Tom Harris (Labour, Glasgow South) Julie Hilling (Labour, Bolton West) Kwasi Kwarteng (Conservative, Spelthorne) Mr John Leech (Liberal Democrat, Manchester Withington) Paul Maynard (Conservative, Blackpool North and Cleveleys) Iain Stewart (Conservative, Milton Keynes South) Graham Stringer (Labour, Blackley and Broughton) Julian Sturdy (Conservative, York Outer) The following were also members of the committee during the Parliament. Angie Bray (Conservative, Ealing Central and Acton) Lilian Greenwood (Labour, Nottingham South) Kelvin Hopkins (Labour, Luton North) Gavin Shuker (Labour/Co-operative, Luton South) Angela Smith (Labour, Penistone and Stocksbridge) Powers The committee is one of the departmental select committees, the powers of which are set out in House of Commons Standing Orders, principally in SO No 152. These are available on the internet via www.parliament.uk. Publication The Reports and evidence of the Committee are published by The Stationery Office by Order of the House.
    [Show full text]
  • DB Netz AG Network Statement 2016 Valid from 14 April 2015 DB Netz
    DB Netz AG Network Statement 2016 valid from 14 April 2015 DB Netz AG Headquarters I.NMN Version control Date Modification 12.12.2014 Amendment of Network Statement 2015 as at 12 December 2014 (Publication of the Network Statement 2016) Inclusion of detailed information in sections 1.9 ff and 4.2.5 ff due to 14.10.2015 commissioning of rail freight corridors Sandinavian-Mediterranean and North Sea-Balitc. Addition of connection to Port of Hamburg (Hohe Schaar) in section 13.12.2015 3.3.2.5 Printed by DB Netz AG Editors Principles of Network Access/Regulation (I.NMN) Theodor-Heuss-Allee 7 60486 Frankfurt am Main Picture credits Front page photo: Bildschön, Silvia Bunke Copyright: Deutsche Bahn AG Contents Version control 3 List of Annexes 7 1 GENERAL INFORMATION 9 1.1 Introduction 9 1.2 Purpose 9 1.3 Legal basis 9 1.4 Legal framework of the Network Statement 9 1.5 Structure of the Network Statement 10 1.6 Term of and amendments to the Network Statement 10 1.7 Publication and opportunity to respond 11 1.8 Contacts at DB Netz AG 11 1.9 Rail freight corridors 12 1.10 RNE and international cooperation between DB Netz AG and other RIUs 14 1.11 List of abbreviations 15 2 CONDITIONS OF ACCESS 16 2.1 Introduction 16 2.2 General conditions of access to the railway infrastructure 16 2.3 Types of agreement 17 2.4 Regulations and additional provisions 17 2.5 Special consignments 19 2.6 Transportation of hazardous goods 19 2.7 Requirements for the rolling stock 19 2.8 Requirements for the staff of the AP or the involved RU 20 2.9 Special conditions
    [Show full text]
  • Vehicle Authorisation After Political Investigation & Safe Integration in the Netherlands
    Vehicle Authorisation after political investigation & safe integration in the Netherlands Conference /Training Budapest 28th June 2017 ing. Krijn van Herwaarden NSA NL (National Safety Authority) Vehicle Authorisation -NSA NL APS (Authorisation of Placing into Service) by NSA in the Netherlands: - Pre-engagement (one meeting free of charge); - Application form available on our (ILT)-website; All possible products (derogations / APS / addition APS) on the form; - National law/policy document to determine which modifications the NSA needs to know about (and which we do not want to know about); - Confirmation of completeness to the applicant; - Decision on the application within 8 weeks; - Assessment follows EU and National laws and guidelines. (Interop Directive / DV29bis / Safety Directive / CSMs / etc.); - Only type-authorisations plus direct registration of vehicles in NVR with declarations ‘conformity to an authorised type’ (EU 2011/201). Inspectie Leefomgeving en Transport DV29 bis (recommendation ‘2014/897/EU’) 117 recommendations. Different titles and subjects: 2 ‘Authorisation for the placing in service of subsystems’. 15 ‘Type Authorisation’. 25 ‘Essential requirements, technical specifications for interoperability (TSI) and national rules’. 38 ‘Use of the common safety methods for risk evaluation and assessment (CSM RA) and the safety management system (SMS)’ 52 ‘Mutual recognition of rules and verifications on vehicles’ 55 ‘Roles and responsibilities’ 60 ‘National safety authorities should not repeat any of the checks carried
    [Show full text]
  • Bike Carriage on Long-Distance Trains: 7 Basic Services That Give Cyclists a Smile
    Bike carriage on long-distance trains: 7 basic services that give cyclists a smile A collection of good practice examples from across Europe Authors: Fabian Küster and Ed Lancaster 4/17/2013 Summary In April 2012, ECF published the position paper “Bike and Train: A European Odyssey”.1 In the paper we deplored the fact that the services offered by railway companies often do not meet the basic requirements of cyclists and that current EU law2 on passenger rights for railway customers does not help to advance this matter in a legally binding manner. Fortunately, some railway undertakings have taken measures in recent years to improve the services they offer to cyclists, albeit that this has often been after continuous pressure from ECF’s members. It speaks for itself that the cycling community has welcomed these steps. Other railway companies should follow suit, for 2 main reasons: Attract new customers: Cycling tourism is a booming business, with well over 2.3 billion cycle tourism trips annually in Europe3. A service package that meets the needs of cycling tourists has the potential to attract millions of additional train passengers. A key message ECF made back in 1999 still holds true: “Only bicycle transport by train offers the flexibility to choose the starting point and destination of a cycling trip freely and this is a promising market for all rail investors to invest in.”4 The financial crisis and continuous drop in car sales, along with changing mobility behaviour, in particular among young adults in urban areas, has the potential to win customers for life.
    [Show full text]
  • The ICE 4 the New Flagship of the DB AG in the Exact Scale 1:87
    PIKO vehicle information 1:87 booklet 6/2019 The ICE 4 The new flagship of the DB AG in the exact scale 1:87 Also available as sound versions for direct and alternating current Electric multiple unit Class 412 / 812, ICE 4 Picture: M. Fröhlich In 2011, the Deutsche Bahn AG assigned Siemens Mobility with the construction of up to 300 new high-speed trains the use in Germany, Austria and Switzerland. The new Class 412/812 trains, which are being jointly developed by Siemens and Bombardier, will be powered by several power cars. The train configuration provides for various modular units ranging from five-car to 14-car trains. This concept allows the train to be easily adapted to the individual requirements of the transport companies for the desired acceleration, speed and number of seats. To date, the DB has ordered 85 twelve-car and 45 seven-car multiple units in the basic configuration, consisting of tractionless end and control cars, powered seating cars and on-board bistro as well as non-driven seating, dining and service cars. The seven-car multiple unit train has three powered cars and offers 456 seats over a length of 200 meters. A twelve-car multiple unit has six powered cars and 830 seats over a length of 346 metres. The maximum speed is 250 km/h. The external shape was based on the existing ICE fleet and further developed. Since December 2017, the first 12-car trains have been in regular service on the Hamburg-Würzburg, Stuttgart-Munich and Hamburg-Berlin-Munich lines.
    [Show full text]