Istanbul Metropolitan Integrated Metro Transport Scheme
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Railway Heritage of Istanbul and the Marmaray Project
International Journal of Architectural Heritage Conservation, Analysis, and Restoration ISSN: 1558-3058 (Print) 1558-3066 (Online) Journal homepage: https://www.tandfonline.com/loi/uarc20 Railway Heritage of Istanbul and the Marmaray Project Yonca Kösebay Erkan To cite this article: Yonca Kösebay Erkan (2012) Railway Heritage of Istanbul and the Marmaray Project, International Journal of Architectural Heritage, 6:1, 86-99, DOI: 10.1080/15583058.2010.506622 To link to this article: https://doi.org/10.1080/15583058.2010.506622 Published online: 03 Oct 2011. Submit your article to this journal Article views: 439 View related articles Citing articles: 3 View citing articles Full Terms & Conditions of access and use can be found at https://www.tandfonline.com/action/journalInformation?journalCode=uarc20 International Journal of Architectural Heritage, 6: 86–99, 2012 Copyright © Taylor & Francis Group, LLC ISSN: 1558-3058 print / 1558-3066 online DOI: 10.1080/15583058.2010.506622 RAILWAY HERITAGE OF ISTANBUL AND THE MARMARAY PROJECT Yonca Kösebay Erkan Kadir Has University, Istanbul, Turkey This study explores the significance of Istanbul’s railway heritage and discusses the criteria for evaluating the historical importance, architectural value, and social issues surrounding the city’s rail system, leading into an examination of the consequences of the Marmaray Project. The Marmaray Project is a commuter rail system designed to unify Istanbul’s two independent rail transportation systems, and it will connect Halkalı on the European side with Gebze on the Asian side of the city. With the beginnings of rail construction in the 1870s, the waters of the Bosphorus separated the Oriental Railway on the European side from the Anatolian and the Baghdad Railway, preventing a direct connection between Europe and Asia. -
Logistics Note Istanbul
LOGISTICS NOTE Inception and Training Workshop of the Project Minamata Initial Assessment Istanbul – Turkey, 26th - 27th March 2019 Venue Venue: Istanbul Marriott Hotel Sisli Abide-i Hurriyet Caddesi No.142 , Sisli Istanbul, 34381 Turkey ACCOMODATION OPTIONS Accomodation options: 1. Marriott Sisli Hotel (Venue of the workshop) Single room rate of 90 EUR/double room rate 100 EUR + 8 % VAT includes breakfast Contact: Ms. Kerim Bahtigul at [email protected] [email protected] Note: Please inicate that you are a participant of the Global MIA workshop on 26 and 27 March 2019 so that you can benefit from the special rate. 2. Radisson Blu Sisli (5 minutes walking distance): 90 € - room rates are per night, inclusive of breakfast, excluding %8 VAT Contacts: Kubra Colakel [email protected] Begum Bayram [email protected] 3. Hilton Bomonti (10-15 minutes walking distance): 90 € - room rates are per night, inclusive of breakfast, excluding %8 VAT. Contact: Nursu Ozgenc [email protected] LUNCHES, RECEPTION, COFFEE BREAKS AND RESTAURANTS The coffee breaks for the workshop will be offered by the organizers and served at the countries representatives next to the meeting room. Lunches will be at the expense and discretion of the participants. The express lunch menu at the Marriott hotel (workshop venue) is 45 TRY. Airport transfer and way to the meeting venue Please note that Istanbul has 2 airports. TAV Istanbul Ataturk Airport is located on the European side where the event will take place, while Sabiha Gokcen International Airport (SAW) is located in the Asian side of the city. -
İstiklal Caddesi İstanbul’S Most Prestigious Street: “Istiklal Street”
İSTANBUL’UN TURİZM DERGİSİ İstanbul’s Journal of Tourism SAYI ISSUE 3 NİSAN - MAYIS APRIL - MAY 2019 İstanbul’un En Prestijli Caddesi: İstiklal Caddesi İstanbul’s most prestigious street: “Istiklal Street” Beyoğlu, İstanbul’un önemli ilçelerinden biridir. İlçe, aynı zamanda şehirin en prestijli caddesine ev sahipliği yapar. Beyoğlu is one of the most important districts in İstanbul. The district houses the most prestigious street of the city as well. Ortodoks Hristiyanların Gastronomi Turizmi: Luciano Mortula’nın hac merkezi: “Aya Yorgi Dr. İlkay GÖK, “Çok gözünden: Manastırı ve Kilisesi” büyük bir mutfak mirasına sahibiz.” “İstanbul” The site of pilgrimage for Gastronomic (Culinary) Orthodox Christians: “Aya Through the eyes Tourism: Dr İlkay Gök: “We Yorgi Monastery of Luciano Mortula: do have a huge heritage of and Church” “İstanbul” cuisine.” İÇİNDEKİLER CONTENTS Sayı 3 Number: 3 Haliç’in ünlü panoraması: İlk sinema, ilk çift asansör, Karen Şarhon: 4 “Pierre Loti Tepesi” 26 ilk elektrik: “Suriye Pasajı” 52 “İstanbul benim için sihirli bir şehir.” Haliç’s famous panorama: First cinema, first dual elevator, “Pierre Loti Hill” first electricity: “Suriye Pasajı” Karen Şarhon: “İstanbul is an enchanted city to me.” Gastronomi Turizmi: 28 Dr. İlkay GÖK, “Çok büyük İstanbul’da baharın bir mutfak mirasına 56 habercisi: “Lale” sahibiz.” The herald of spring in İstanbul: Gastronomic (Culinary) Tourism: “Tulip” Dr İlkay Gök: “We do have a huge heritage of cuisine.” İstanbul’un en eski toplu Ortodoks Hristiyanların 34 ulaşım aracı: 8 hac merkezi: -
Technology Fast 50 Turkey 2020 Winners Powerful Connections Fast50.Deloitte.Com.Tr 1 Deloitte Technology Fast 50 Turkey 2020 Winners | Powerful Connections Contents
Technology Fast 50 2020 TURKEY 50 15 years of innovation Deloitte Technology Fast 50 Turkey 2020 Winners | Powerful connections Technology Fast 50 2020 TURKEY 50 15 years of innovation Technology Fast 50 Turkey 2020 Winners Powerful connections fast50.deloitte.com.tr 1 Deloitte Technology Fast 50 Turkey 2020 Winners | Powerful connections Contents Deloitte Foreword 3 Fast Facts 4 Winners List 5 2020 Big Star Awards 6 2020 Facebook Women in Tech Award 12 2020 Facebook Cross-Border Award 14 2020 Top 10 Companies 16 2020 Winners Profiles 22 Runner Ups List Winners 43 Program Partners 47 Technology Fast 50 Turkey Program 49 2 Deloitte Technology Fast 50 Turkey 2020 Winners | Powerful connections In this keystone year, I am thrilled to present This year we will be awarding for a second time, I want to extend my gratitude to Facebook for you the winners of the Fast 50 program the Cross-Border and Women in Tech special their continued cooperation and support in in Turkey. As these results will be the final awards. In addition, we added a “Runner Ups” bringing Fast 50 2020 Turkey together. pre-pandemic results, we once again see list to recognize companies in their 3rd years, an outstanding growth performance in the that are already promising great growths. I also would like to give thanks to our long- Turkish technology industry. 15 years ago, lasting NGO partners for their commitment to when Deloitte started this program in Turkey, Fast 50 program is Deloitte’s commitment the Turkish technology ecosystem. we hoped to bring the Turkish technology to a new generation of corporations that entrepreneurs to the world stage. -
80 Otobüs Zaman Çizelgesi Ve Hat Güzergah Haritası
80 otobüs saatleri ve hat haritası 80 Kazlıçeşme/yedık̇ ule - Emınönü̇ Web Sitesi Modunda Görüntüle 80 otobüs hattı (Kazlıçeşme/yedık̇ ule - Emınönü)̇ arası 3 güzergah içeriyor. Hafta içi günlerde çalışma saatleri: (1) Eminönü →Kazlıçeşme Marmaray: 07:25 - 18:50 (2) Eminönü Transit →Kazlıçeşme Marmaray: 19:25 (3) Kazlıçeşme Marmaray →Eminönü: 06:55 - 17:23 Size en yakın 80 otobüs durağınıbulmak ve sonraki 80 otobüs varış saatini öğrenmek için Moovit Uygulamasını kullanın. Varış yeri: Eminönü →Kazlıçeşme 80 otobüs Saatleri Marmaray Eminönü →Kazlıçeşme Marmaray Güzergahı 18 durak Saatleri: HAT SAATLERİNİ GÖRÜNTÜLE Pazartesi 07:25 - 18:50 Salı 07:25 - 18:50 Eminönü Çarşamba 07:25 - 18:50 Haliç Metro Ragip Gümüşpala Caddesi Perşembe 07:25 - 18:50 Cuma 07:25 - 18:50 Unkapanı / Aksaray Yönü Cumartesi Çalışmıyor Vefa / Aksaray Yönü Pazar Çalışmıyor İstanbul Büyükşehir Belediyesi Pertevniyal Valide Sultan Atatürk Boulevard, Turkey 80 otobüs Bilgi Yusufpaşa / Topkapı Yönü Yön: Eminönü →Kazlıçeşme Marmaray Tanburi Cemilbey Sokak, Turkey Duraklar: 18 Yolculuk Süresi: 27 dk Haseki Hat Özeti: Eminönü, Haliç Metro, Unkapanı / Aksaray Yönü, Vefa / Aksaray Yönü, İstanbul İNebey Büyükşehir Belediyesi, Pertevniyal Valide Çakırağa Cami Aralığı, Turkey Sultan, Yusufpaşa / Topkapı Yönü, Haseki, İNebey, Langa / Yedıkule Yönü, Davutpaşa / Langa / Yedıkule Yönü Yedıkule Yönü, İstanbul Hastanesi, Ağahamamı / Yedıkule Yönü, Gençosman / Yedıkule Yönü, Davutpaşa / Yedıkule Yönü Merhaba / Yedıkule Yönü, İMrahor, Borsa İstanbul Zeytinburnu Anadolu Lisesi, Horasancı -
Marmaray Project - Turkey
MARMARAY PROJECT - TURKEY Istanbul is a city where historical and cultural values must be preserved and at the same time modern railway facilities have to be installed to decrease the environmental impact of public transportation and increase the capacity, reliability and comfort of the railway systems. The Project provides an upgrading of the commuter rail system in Istanbul, connecting Halkalı on the European side to the Asian side with an uninterrupted, modern, high-capacity commuter rail system. Railway tracks in both sides of Istanbul Strait will be connected to each other through a railway tunnel connection under the Istanbul Strait. The line goes underground at Yedikule, continues through the Yenikapı and Sirkeci new underground stations, passes under the Istanbul Strait, connects to the Üsküdar new underground station and emerges at Sögütlüçesme. The entire upgraded and new railway system will be approximately 76 km long. The main structures and systems; include the immersed tube tunnel, bored tunnels, cut-and-cover tunnels, at - grade structures, three new underground stations, 37 surface stations (renovation and upgrading), operations control centre, yards, workshops, maintenance facilities, upgrading of existing tracks including a new third track on ground, completely new electrical and mechanical systems and procurement of modern railway vehicles. The idea of a railway tunnel under the Istanbul Strait was first raised in 1860. However, where the tunnel under the Istanbul Strait crosses the deepest parts of the Strait, the old-fashioned techniques would not allow the tunnel to be on or under the seabed, and therefore the design indicated a "floating" type of tunnel placed on pillars constructed on the seabed. -
DLA Piper. Details of the Member Entities of DLA Piper Are Available on the Website
EUROPEAN PPP REPORT 2009 ACKNOWLEDGEMENTS This Report has been published with particular thanks to: The EPEC Executive and in particular, Livia Dumitrescu, Goetz von Thadden, Mathieu Nemoz and Laura Potten. Those EPEC Members and EIB staff who commented on the country reports. Each of the contributors of a ‘View from a Country’. Line Markert and Mikkel Fritsch from Horten for assistance with the report on Denmark. Andrei Aganimov from Borenius & Kemppinen for assistance with the report on Finland. Maura Capoulas Santos and Alberto Galhardo Simões from Miranda Correia Amendoeira & Associados for assistance with the report on Portugal. Gustaf Reuterskiöld and Malin Cope from DLA Nordic for assistance with the report on Sweden. Infra-News for assistance generally and in particular with the project lists. All those members of DLA Piper who assisted with the preparation of the country reports and finally, Rosemary Bointon, Editor of the Report. Production of Report and Copyright This European PPP Report 2009 ( “Report”) has been produced and edited by DLA Piper*. DLA Piper acknowledges the contribution of the European PPP Expertise Centre (EPEC)** in the preparation of the Report. DLA Piper retains editorial responsibility for the Report. In contributing to the Report neither the European Investment Bank, EPEC, EPEC’s Members, nor any Contributor*** indicates or implies agreement with, or endorsement of, any part of the Report. This document is the copyright of DLA Piper and the Contributors. This document is confidential and personal to you. It is provided to you on the understanding that it is not to be re-used in any way, duplicated or distributed without the written consent of DLA Piper or the relevant Contributor. -
Urban Aerial Cable Cars As Mass Transit Systems Case Studies, Technical Specifications, and Business Models
Urban Aerial Public Disclosure Authorized Cable Cars as Mass Transit Systems Case studies, technical specifications, and business models Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Copyright © 2020 by the International Bank for Reconstruction and Development / The World Bank, Latin America and Caribbean region 1818H Street, N.W. Washington DC 20433, U.S.A. www.worldbank.org All rights reserved This report is a product of consultant reports commissioned by the World Bank. The findings presented in this document are This work is available under the Creative based on official sources of information, interviews, data, and Commons Attribution 4.0 IGO license previous studies provided by the client and on the expertise of (CC BY 4.0 IGO). the consultant. The information contained here has been compiled from historical records, and any projections based Under the Creative Commons thereon may change as a function of inherent market risks and Attribution license, you are free to copy, uncertainties. The estimates presented in this document may distribute, transmit, and adapt this therefore diverge from actual outcomes as a consequence of work, including for commercial future events that cannot be foreseen or controlled, including, purposes, under the following but not limited to, adverse environmental, economic, political, or conditions: Attribution—Please cite the market impacts. work as follows: World Bank Group. Urban Aerial Cable Cars as Mass Transit The World Bank does not guarantee the accuracy of the data Systems. Case studies, technical included in this report and accepts no responsibility whatsoever specifications, and business models. for any consequence of their use or interpretation. -
80T Otobüs Zaman Çizelgesi Ve Hat Güzergah Haritası
80T otobüs saatleri ve hat haritası 80T Kazlıçeşme/yedık̇ ule - Taksıṁ Web Sitesi Modunda Görüntüle 80T otobüs hattı (Kazlıçeşme/yedık̇ ule - Taksım)̇ arası 3 güzergah içeriyor. Hafta içi günlerde çalışma saatleri: (1) Kazlıçeşme Marmaray →Kazlıçeşme Marmaray: 06:00 - 21:20 (2) Kazlıçeşme Marmaray →Taksim Tünel: 19:00 - 20:20 (3) Taksim Tünel →Kazlıçeşme Marmaray: 19:30 - 22:20 Size en yakın 80T otobüs durağınıbulmak ve sonraki 80T otobüs varış saatini öğrenmek için Moovit Uygulamasını kullanın. Varış yeri: Kazlıçeşme 80T otobüs Saatleri Marmaray →Kazlıçeşme Marmaray Kazlıçeşme Marmaray →Kazlıçeşme Marmaray 41 durak Güzergahı Saatleri: HAT SAATLERİNİ GÖRÜNTÜLE Pazartesi 06:00 - 21:20 Salı 06:00 - 21:20 Kazlıçeşme Marmaray Çarşamba 06:00 - 21:20 Yedikule Cami Sokak, Turkey Perşembe 06:00 - 21:20 Cuma 06:00 - 21:20 İMrahor Cumartesi 06:00 - 21:20 Merhaba / Aksaray Yönü Pazar 06:20 - 21:20 Gençosman / Aksaray Yönü Tütünlük Sokak, Turkey Ağahamamı / Aksaray Yönü Kehribar Sokak, Turkey 80T otobüs Bilgi Yön: Kazlıçeşme Marmaray →Kazlıçeşme İstanbul Hastanesi Marmaray Duraklar: 41 Davutpaşa / Aksaray Yönü Yolculuk Süresi: 61 dk Horasancı Hasan Çık., Turkey Hat Özeti: Kazlıçeşme Marmaray, Yedikule, İMrahor, Merhaba / Aksaray Yönü, Gençosman Langa / Aksaray Yönü / Aksaray Yönü, Ağahamamı / Aksaray Yönü, İstanbul Hastanesi, Davutpaşa / Aksaray Yönü, İNebey Langa / Aksaray Yönü, İNebey, Pertevniyal Çakırağa Cami Sokak, Turkey Valide Sultan, İstanbul Büyükşehir Belediyesi, Vefa / Taksim Yönü, Unkapanı / Taksım Yönü, Pertevniyal Valide Sultan Şişhane2, -
Buyuk~Ehir Ulasim Koordinasyon Merkezi Karari Beledivesi Sayi 2016/1-9.A.2
UKOME KARARI T.C ISTANBUL BUYUKSEHIR BELEDIYE BASKANLIGI TARIH 13.01.2016 I S T .A N B U L BUYUK~EHIR ULASIM KOORDINASYON MERKEZI KARARI BELEDIVESI SAYI 2016/1-9.A.2 UKOME, Istanbul Buyii4ehir Belediye Ba~kanligi Genel Sekreter Sn . Dr. Hayri BARAtyLI Ba~kanliginda 13.01 .2016 gun ve saat 15 :00'da gundemindeki konulari gorn~mek fizere toplandi . Ilgi: a) 19.08.2015 tarih ve 2015/5-10 .c sayih UKOME Karari. b) 12.06 .2015 tarih ve 1701 sayili Sariyer Kaymakamligi yazisi .(TN:716271). c) 02.10 .2015 tarih ve 06 sayi_h VADISTANBUL TERAS Site Yonetimi talep yazisi (TN :1006109). d) Toplu Ula$im Hizmetler Mudurlugunun 13 .01 .2016 tarih ve 81 sayih yazisi He ekli raporu. TEKLIF: Sariyer cah~ma grubu Ayazaga Mahallesi, Rifat Evyap Lisesi ula*im sorununun giderilmesi teklifi . TOPLU ULA$IM HIZMETLERI MUDURLUGU RAPORU : Ilgi (d) Toplu Ula$im Hizmetleri Mudurlugu yazisi ekli raporunda ; Ilgi (a) UKOME karari He Sariyer bolgesi hatlari 1 hat 17 guzergah ve 308 araq olarak karar altina almmi~tir . Ilgi (b) yazida, M. Rifat EVYAP Mesleki ve Teknik Anadolu Lisesinin ula$im sorunlarinin bulundugu belirtilmektedir. Ilgi (c) yazida, VADISTANBUL Teras Sitesinde ikametin ba$lamasmdan dolayi ula$im ihtiyacinin olustugu belirtilmektedir. Toplu Ulasim Hizmetleri Miidnrliikii Dei?erlendirmesi ; Mudurlugumuz teknik ekiplerince yerinde yapilan arazi incelemesi ve buro cahsmalari neticesinde; • Ilgi (b) talepte belirtilen M . Rifat EVYAP Mesleki ve Teknik Anadolu Lisesinde 1000 ogrenci ogrenim gormekte olup, 100 idari personel gorev yapmaktadir ve en yakin ula$im sistemine (IETT ve minibus hatti) 800 metre uzaklikta bulundugu, • Bolgedeki egimin %7'den fazla olmasi mevcut toplu ula~im araclarma olan yaya eri$imini zorlamakta, bu sebeple ogrencilerin, personelin ve velilerin soz konusu okula erisiminde sikinti ya$andigi, • Ilgi (c) talepte belirtilen cendere caddesinde VADISTANBUL 1 .etabmda 1000 adet dairede ikamet ba~lanmi~ olup, ortalama 2000 konutluk projelerin insaati devam ettigi, tespit edilmistir . -
Siyahkalem-En.Pdf
Firm Founded in 1977, Siyahkalem Siyahkalem’s international experience Profile Inc. has pursued reliability and includes flood relief housing and consistency in the infrastructure, hospitals in Pakistan as well as a real estate and construction projects hospital in Somalia and a cultural it has executed domestically and center in Montenegro. internationally. Most recently Siyahkalem’s real In the last 10 years alone, Siyahkalem estate arm is developing KÖY, a has built 11,800 residential units, 21 luxury master planned residential schools, 3 hospitals, 16 mosques as community of 1200 units, in Esthetic well as numerous shopping centers, Zekeriyakoy, Istanbul. nurseries, sport facilities etc. Siyahkalem, with over 40 years of The company has constructed experience, executes all of its projects various infrastructure projects for with the highest environmental, its domestic and international health and safety considerations. governmental clients. With its management philosophy that puts ethics on par with business Siyahkalem has also executed the interests, ensuring the environmental construction of public buildings and social sustainability of our Housing that require a high degree of projects is a natural component of complex construction skills. These our business process. special projects include The National Archives. Complex and Mail Sorting In terms of the technical and Center in Istanbul as well as Military architectural quality of our work, we Stations in various border cities of strive to be at the leading edge of the and UrbanTurkey. -
Chapter 3 Road Network and Traffic Volume
The Study on Integrated Urban Transportation Master Plan for Istanbul Metropolitan Area in the Republic of Turkey Final Report Chapter 3 Chapter 3 Road Network and Traffic Volume 3.1 Road Network 3.1.1 Inter-regional Road Network 1) Existing Road Turkey is situated at the transit corridor between South-east Europe and the Middle East. Since “The Declaration for The Construction of International Arteries” (AGR) prepared by the United Nations Economic Commission for Europe (UN/ECE) in 1950 in Geneva, Turkey has developed international corridors connecting it to Southern Europe, because the international road network of AGR included an extension to Turkey. According to the provisions of AGR, two arteries should reach Turkey as E-Road. These are E-80 entering from the Bulgarian border (Kapikule) and E-90 entering from the Greek border (Ipsala). These two main routes link the International Road Network of Europe with the Middle East and Asia at southern and eastern borders of Turkey via Anatolia. Source: KGM, Ministry of Transportation Figure 3.1.1 International Road Network through Turkey, 2007 In addition to the E-Roads, the Trans-European Motorway (TEM) project is ongoing and it covers the whole country as an expressway network. The TEM highway network in Turkey starts from Edirne at the Bulgarian border and passes through Istanbul via the Fatih Sultan Mehmet Bridge and parts into two branches in Ankara going eastward and southward. Its eastern branch again parts into two branches in Askale. One of them reaches Trabzon in the Black Sea Region, and the other ends in Gurbulak at the Iranian border.