Republic Of Ministry Of Electricity Planning and Studies Office

Future Power Plant Projects Converting Gas Turbine Power Plants to Combined Cycle • And Solar Energy Power Plants • Eng. Hashim Al shididy • Al-Amarh Gas Power Plant

Converting Remarks Execution years Capacity to be added (MW) Al-Amarh Gas Power Plant to Combined Cycle (4*125)+250) = 750 Turbine GE Frame 9 The project should be completed no later than GPS South of Iraq – 2018 City Contractor carry out 250 N : 31°41'47.20“ O&M for simple E : 47°15'23.46“ Cycle4*125 and add Iraq_BaseMap.jpg combined cycle 250 MW Fuel Type : Total 750 MW LDO/NG Khor Al Zubair Gas Power Plant

Converting Remarks Execution years Capacity to be Khor Al Zubair added (MW) Gas Power Plant to Combined Cycle (2*125)+125) = 375 MW Turbine GE Frame 9 The project should be completed no later than N : 30 12'41.8“ South of Iraq – 2018 ° E : 47 48‘54.78“ City Contractor carry out O&M ° for simple Cycle2*125 and 125 Iraq_BaseMap.jpg add combined cycle 125 Fuel Type : NG MW Total 375MW AL-Sadr 1 - Gas Power Plant

Capacity to be Converting Remarks Execution years added (MW) Al- Sadr Gas Power Plant/1 to Combined Cycle (2*160)+160) = 480MW Turbine : Siemens N : 33°25'5.2" E : 44°27'44.3“ Middle of Iraq The project should be completed East of no later than 2018 Contractor carry out O&M for 160 Fuel Type : LDO/NG Iraq_BaseMap.jpg simple Cycle 2*160 MW and add combined cycle 160 MW Total 480MW AL-Sadr 2 - Gas Power Plant

Capacity to be Converting Remarks Execution years added (MW) Al- Sadr Gas Power Plant/2 to Combined Cycle (2*169)+169) = 507MW Turbine : Siemens The project should be N : 33 24'56.8" completed no later than ° E : 44 27'55.4“ Middle of Iraq East 2018 ° of Baghdad Contractor carry out 169 Fuel Type : LDO/NG O&M for simple Cycle Iraq_BaseMap.jpg 2*169 MW and add combined cycle 169 MW Total 507MW AL-Quds - Gas Power Plant

Capacity to be Converting Remarks Execution years added (MW) Al-Quds Gas Power Plant to Combined Cycle (4*125)+250) = 750 Turbine: GE Frame 9 The project should be N : 33°29'26.56" completed no later than E : 44°21'16.54“ Middle of Iraq – East of 2018 Baghdad Contractor carry out O&M Fuel Type : 250 for simple Cycle 4*125 MW LDO/NG/CO Iraq_BaseMap.jpg and add combined cycle 250 MW Total 750MW Al- - Gas Power Plant

Capacity to be Converting Remarks Execution years added (MW) Al- Najaf Gas Power Plant to Combined Cycle (2*125)+125) = 375 Turbine : GE Frame 9 N : 32°'38'.49" The project should be E : 44°22'58.16'‘ NAJAF City – Middle completed no later than 2018 Contractor carry out O&M for 125 Fuel Type : simple Cycle 2*125 MW and Iraq_BaseMap.jpg LDO/NG/CO add combined cycle 125 MW Total 375 MW Al- - Gas Power Plant

Capacity to be Remarks Execution years added (MW) Converting Al- Hillah Gas Power Plant to Combined Cycle (2*125)+125) = 375

Turbine : GE Frame 9 The project should be N : 32°32'38.8” completed no later than E : 44°19'24.2" 2018 BABIL City Contractor carry out Fuel Type : 125 O&M for simple Cycle LDO/NG/HFO Iraq_BaseMap.jpg 2*125 MW and add combined cycle 125 MW Total 375 MW - Gas Power Plant

Converting Karbala Gas Power Capacity to be Remarks Execution years Plant to Combined added (MW) Cycle (2*125)+125) = 375 MW

Turbine : GE Frame 9 The project should be N : 32°26'18.6" completed no later than E : 44°07'43.2" KARBALA City 2018 Contractor carry out Fuel Type : Iraq_BaseMap.jpg O&M for simple Cycle 125 LDO/NG/CO 2*125 MW and add combined cycle 125 MW Total 375 MW Al – Haydariyah 1 - Gas Power Plant

Capacity to be Remarks Execution years Converting added (MW) Al – Haydariyah Gas Power Plant/ 1 to Combined Cycle (4*125)+250) = 750 Turbine : GE Frame 9 The project should be completed no later than N : 32°14'13.6" AL-NAJAF City 2018 E : 44°16'8.0” Contractor carry out 250 Iraq_BaseMap.jpg O&M for simple Cycle Fuel Type : 4*125 MW and add LDO/NG/HFO combined cycle 250 MW Total 750 MW Al- Diwaniyah - Gas Power Plant

Converting Capacity to be Al- Diwaniyah Gas Remarks Execution years added (MW) Power Plant to Combined Cycle (4*125)+250) = 750

Turbine : GE Frame 9 The project should be N : 31°58'35.11" completed no later than E : 44°41'31.72" DIWANIYAH City 2018 South of Iraq Contractor carry out O&M 250 Fuel Type : for simple Cycle 4*125 MW LDO/NG Iraq_BaseMap.jpg and add combined cycle 250 MW Total 750 MW South Baghdad 1 - Gas Power Plant

Capacity to be Remarks Execution years Converting added (MW) South Baghdad Gas Power Plant/1 to Combined Cycle (2*125)+125) = 375 Turbine : GE Frame 9 The project should be completed no later than N : 33°06'00.30" BAGHDAD City 2018 E : 44°41'31.72" Contractor carry out 125 Iraq_BaseMap.jpg O&M for simple Cycle Fuel Type : HFO 2*125 MW and add combined cycle 125 MW Total 375 MW Al- Mansuriya - Gas Power Plant

Capacity to be Remarks Execution years added (MW) Converting Al- Mansuriya Gas Power Plant/2 to Combined Cycle Turbine : ALSTOM (4*182)+364) The project should be DYALA City completed no later than 2018 E : 34°08'32" East of Iraq Contractor carry out O&M N : 44°56'14” for simple Cycle 4*182 MW 364 Iraq_BaseMap.jpg and add combined cycle Fuel Type : NG 364 MW Total 1092 MW - Gas Power Plant

Capacity to be Remarks Execution years Converting added (MW) Kirkuk Gas Power Plant to Combined Cycle (265+292)+278) Turbine : Siemens The project should be completed no later than E : 35°19'50.76" KIRKUK – North of 2018 N : 44°19'19.25“ Iraq Contractor carry out O&M 278 for simple Cycle Fuel Type : NG Iraq_BaseMap.jpg 265+292=557 MW and add combined cycle 278 MW Total 835 MW Dibis- Gas Power Plant

Converting Capacity to be Remarks Execution years Dibis Gas Power added (MW) Plant to Combined Cycle (2*169)+169)= 507

Turbine : Siemens E : 35°40'52.6" KIRKUK North of Iraq N : 44°3'47.8“ Contractor carry out O&M for Fuel Type: 169 simple Cycle 2*169 MW and add LDO/NG/HFO Bad Security combined cycle 169 MW Total 507 MW Situation Iraq_BaseMap.jpg Okaz - Gas Power Plant

Capacity to be Remarks Execution years added (MW) Converting Okaz Gas Power Plant to Combined Cycle (2*125)+125) = 375 Turbine : GE Frame 9 E : 34°16' 16.0" Al-ANBAR – West of N : 41°7' 54.0” Iraq Contractor carry out O&M for simple Cycle 2*125 MW and add combined cycle 125 Fuel Type : LDO/NG Bad 125 MW Security Total 375 MW Iraq_BaseMap.jpg Situation Al- Qayyarah - Gas Power Plant

Converting Capacity to be Remarks Execution years Al- Qayyarah Gas added (MW) Power Plant to Combined Cycle (6*125)+375)

Turbine : GE Frame 9 E : 35°46'51.10'' Nineveh City – North N : 43°15'00.45“ of Contractor carry out O&M for Iraq simple Cycle 6*125 MW and 375 Fuel Type: LDO/NG/HFO add combined cycle 375 MW Total 1125 MW Bad Security Iraq_BaseMap.jpg Situation - Gas Power Plant

Capacity to be Remarks Execution years added (MW) Converting Baiji Gas Power Plant to Combined Cycle (6*169)+507)

Turbine : Siemens E : 35°1'27.2" N : 43°27'2.1“ SALADIN City – Contractor carry out O&M North of Iraq for simple Cycle 6*169MW Fuel Type: LDO/NG/HFO Bad and add combined cycle 507 507 MW Security Total 1521 MW Iraq_BaseMap.jpg Situation SOLAR (PV ) POWER PLANTS Solar Photovoltaic (PV) projects sites information Nearest station 132 Voltage level Extension line Available power Suggested site. Governorate. GPS kV (kV) length (km)* (MW) 499038 3459463 499090 3458795 Sawa-1(has been 1 Muthanna Sawa 33 4 30 500017 3458870 assinged) 499975 3459536

498303 3455830 499767 3455 139 Sawa-2 (has been 497735 3455449 2 Muthanna Sawa 132 1 50 assinged) 499149 3454699

32.152695 44.193233 32.152874 44.221863 3 Haydariya Najaf Haydariya Jawahiry 132 4.5 100 32.146380 44.193289 32.146559 44.221416

425936 3647127 433020 3642547 4 Iskandariya Babil Iskandariya Lattifiya 132 0.5 150 428225 3644921 432927 3644450

575948 3662338 576869 3662727 5 Jissan Wassit Jissan 132 0.5 50 577258 3661805 576336 3661417 618143 3607396 618977 3606854 6 Sheikh sa'ad Wassit Sheikh sa'ad 132 0.25 50 618411 3606029 617570 3606574

7 Diyala university Diyala Ba'quba south 33 15 To be determind 3687950 427200 3687875 428050 8 Abu ghraib Baghdad Agargoff 132 3 30 3688300 428000 3688150 427250

33592851 42244158 33590265 42241201 9 -1 Anbar Mukhliss kafi Heet 132 0.25 40 33592761 42235437 33594904 4224194

353926 3712126 351927 3712163 10 Anbar Ramadi east 132 13 100 351937 3713413 353937 3713376

388463 3670125 387463 3670125 11 A'miriyat Alfaluja Anbar Habbaniya 132 5 100 387463 3670875 388463 3670875 427842 336550 427442 336421 427408 336633 12 Heet Anbar Heet 132 2 teal overhead circuits. 100 427468 336810

3779285 0254251 3779637 0253397 13 Haditha-2 Anbar New haditha 132 2 (1x800mm2) underground cables. 50

Lat N 33 ̊ 2’48.54" Lon E 40 ̊ 15’ 5.17" 14 Rutba Anbar Rutba 132 2 teal overhead circuits. 50

396118 3692326 395711 3692371 395156 3692613 394968 3693588 15 Faluja Anbar Faluja cement 132 2 (1x800mm2) underground cables. 40 395982 3692842