Environmental Due Diligence Report

July 2018

TAJ: Strengthening Technical and Vocational Education and Training Project

(Part IV)

Prepared by the Project Administration Group, Ministry of Labor, Migration and Employment for the Asian Development Bank.

This environmental due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Environmental Safeguards Due Diligence Reports

Project number: 46535-001 Grant 0452/53/3309

TAJ: Strengthening Technical and Vocational Education and Training

Part IV

The Due Diligence Report for Social and Environmental Safeguards is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and maybe preliminary in nature.

July, 2018

1

Content

I. DDR "MOLME/SH/CW05-A": MINOR RENOVATION OF THE ADULT LEARNING CENTER IN 3 II. DDR "MOLME/SH/CW05-B ": MINOR RENOVATION OF THE TECHNICAL VOCATIONAL LYCEUM IN VOSE 20 III. DDR "MOLME/SH/CW05-D ": RENOVATION OF THE VOCATIONAL CONSTRUCTION LYCEUM IN 43 IV. DDR "MOLME/SH/CW05-C ": MINOR RENOVATION OF THE VOCATIONAL AGRICULTURAL LYCEUM IN KULYAB DISTRICT 70 V. DDR "MOLME/SH/CW06-A ": MINOR REHABILITATION OF THE TECHNICAL VOCATIONAL LYCEUM IN BOKHTAR 91 VI. DDR "MOLME/SH/CW06-B ": MINOR REHABILITATION OF THE TECHNICAL VOCATIONAL LYCEUM IN VAKHSH 112 VII. DDR MOLME/SH/CW06-C ": MINOR REHABILITATION OF ADULT LEARNING CENTER IN YAVAN 132 VIII. DDR "MOLME/SH/CW06 -D": MINOR REHABILITATION OF THE BRANCH OF VOCATIONAL ENTREPRENEURIAL CENTER IN NUREK 145 IX. DDR "MOLME/SH/CW06-E ":REHABILITATION OF TECHNICAL VOCATIONAL LYCEUM IN SHAARTUZ 162

2

Environmental Safeguards Due Diligence Report

Project number: 46535-001 Grant 0452/53/3309 Date: June 2018

TAJ: Strengthening Technical and Vocational Education and Training

"MOLME/SH/CW05-A": MINOR RENOVATION OF THE ADULT LEARNING CENTER IN FARKHOR

The Due Diligence Report for Social and Environmental Safeguards is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.

June 2018

3

Table of Content

I. INTRODUCTION ...... 6 1.1. Justification of the site ...... 6 II. DEFINING THE BORDERS ...... 7 2.1. Current condition of the site ...... 7 III. CONSTRUCTION ACTIVITIES ...... 13 3.1. Types of civil works ...... 13 IV. POTENTIAL IMPACTS AND MITIGATION MEASURES ...... 16 4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor ...... 19

Tables

Table 1: Types of rehabilitation works for renovation of a Technical Adult Learning Centre in ...... 13 Table 2: Potential impacts of the prosed activities and mitigation measures ...... 17

Figures

Figure 1: Location of the ALC in Farkhor district ...... 8 Figure 2: Aerial photo of the Adult Learning Centre branch in Farkhor district .....12

Photos

Photo 1: Building of ALC Branch in Farkhor - front view ...... 8 Photo 2: Building of ALC Branch in Farkhor - side view ...... 8 Photo 3: Building of ALC Branch in Farkhor - side view ...... 9 Photo 4: Building of ALC Branch in Farkhor - rear view ...... 9 Photo 5: Stairs to the second floor ...... 9 Photo 6: Annex in second floor ...... 9 Photo 7: Current condition of premises of the first floor (corridor, classrom, administration) ...... 10 Photo 8: Current condition of classrooms in the first floor ...... 10 Photo 9: Current condition of classrooms in the first floor ...... 10 Photo 10: Current condition of classrooms in the first floor ...... 10 Photo 11: Current condition of classrooms in the first floor ...... 10 Photo 12: Current condition of classrooms in the second floor ...... 11 Photo 13: Current condition of classrooms in the second floor ...... 11 Photo 14: Current condition of the workshop ...... 11 Photo 15: Current condition of ceilings of the workshop ...... 11 Photo 16: View to South from the ALC building...... 11 Photo 17: View to North from the ALC building ...... 11 Photo 18: View to West from ALC building ...... 12 Photo 19: View to South from ALC building ...... 12

4

ABBREVIATIONS

1 ADB Asian Development Bank 2 АСМ Asbestos containing materials 3 ALC Adult Learning Center 4 ALCF Adult Learning Center branch in Farkhor 5 CM Complaint Mechanism 6 EIA Environmental impact assessment 7 EMP Environmental Management Plan 8 FLM Fuel and lubrication materials 9 GFS Gypsum-fiber sheets 10 LLC Limited Liability Company 11 MFC Microfinance company 12 MOLME Ministry of Labor, Migration and Employment of the Republic of 13 PAG Project Administration Group 14 SI State institution 15 SSEMP Site-specific Environmental Management Plan

16 TVET Technical and Vocational Education and Training 17 WMP Waste Management Plan

5

I. INTRODUCTION

1.1. Justification of the site

1. Over the years of independence, the management of the Government has made efforts to develop the education sector and training of highly qualified specialists for various industries.

2. The Ministry of Labor, Migration and Employment of the Republic of Tajikistan pays special attention to the technical condition, the availability of educational facilities (institutions) in schools to enhance vocational education and training of learners and students.

3. The proposed Project on Strengthening Technical and Vocational Education and Training (Project) will have an impact on national workforce with a high proportion of skilled workers employed in Tajikistan's domestic economy. The project is aimed at meeting the needs of the Republic of Tajikistan. Within the framework of the project, unemployed and partially employed young people and the adult population in the Republic will be provided with job opportunities and income in the domestic and international labor markets by providing quality training.

4. The outcome of the Project will be a more effective, efficient, quality-assured, and flexible system for the delivery of technical vocational training. The project includes the achievement of five outputs, namely: (i) modernization of the methodology of the TVET system; (ii) improving the physical conditions of training institutions; (iii) increasing the volume and quality improvement of TVET delivery; (iv) expansion of equal access to TVET; and (v) strengthening the leadership and management of the TVET system.

5. In November 2015, a Grant Agreement was signed between the Republic of Tajikistan and ADB on project financing.

6. A general IEE/ EMP for the overall project was prepared and approved by September 2015. The project has been classified as category B in accordance with ADB's Safeguard policies.

7. As part of this Project, the Ministry of Labor, Migration and Employment of the Republic of Tajikistan shall sign a contract "MOLME/SH/CW05-A" with a construction firm to conduct minor renovation works at the Adult Learning Center branch in Farkhor.

8. The Contractor will undertake, in accordance with the contract, professionally and qualitatively, the rehabilitation works of the Adult Learning Center branch in Farkhor within the terms provided for in the Contract to be awarded.

9. The Environmental Management Plan (EMP), which is part of the IEE, is general and wide- ranging and covers all possible consequences associated with the project. Therefore, the Contractor is required to develop a Site-specific Environmental Management Plan (SSEMP) prior to the commencement of construction works.

10. The main objective of the plan is to document how the environmental mitigation measures and required management plans proposed for rehabilitating the project site will be brought into line with the project commitments.

11. In addition, during the implementation of the Project, the Contractor will strictly comply with ADB's safeguard requirements and national laws and regulations in the field of environmental 6

protection, and, under the terms of the contract, will develop and refine the working measures, plan and management system for environmental protection in areas of repair works.

II. DEFINING THE BORDERS

2.1. Current condition of the site

12. The Adult Learning Center (ALC) branch in Farkhor district which was selected under the STVET project consists of only one building.

13. It is an adobe brick masonry two-story building which was built in 1937, with an annex. There are 3 classrooms, 1 workshop and administrative premise in the ALC. Ceilings are wooden, the roof is covered with asbestos-cement slate sheets. The building inside and it's façade are in poor condition and do not meet modern construction standards.

14. The proposed plan is to construct a two-story entrance portal with a staircase to the second floor; do major repairs of classrooms and offices on the first and second floors; disassemble all annexes; replace entrance door; repair ceilings, cement floor screed, replace windows and doors, wirings, lamps and electric appliances; construct blind area and sidewalks; do proper landscaping.

15. As mentioned above asbestos cement sheets were used as roofing material for ALC building. Roof should be demolished and also replaced by non-hazardous materials which will not cause health risks for ALC students and staff. To mitigate the occupational and public health risks of inhalation of airborne asbestos fibers, when disassembling the roofs they will be removed and disposed by following the internationally-recognized Standard Practice for Maintenance, Renovation and Repair of Installed Asbestos Cement Products (American Society for Testing and Materials [ASTM] E 2394). An Asbestos Containing Materials Handling, Management and Disposal Plan shall be prepared by the Contractor.

2.2. Location of objects and access to the site

16. Farkhor is an administrative district within the of the Republic of Tajikistan. The district center is a small town, located 198 km South-East of . Farkhor district is situated in the Pyanj River valley, near the border with Afghanistan. From the North it borders with Dangara and Vose districts, from the East - with the Hamadoni area, from the West - with the Vakhsh and Rumi districts, from the South - with the Pyanj district of the Khatlon region of Tajikistan and the Darqad district of the Tahar Province of Afghanistan. The territory of Farkhor district is 1183.1 square meters.

17. The ALC branch in Farkhor is located at 8 F.Muhamadiev street. Figure 2 below shows location of the ALC branch building in Farkhor.

7

Dushanbe

Figure 1: Location of the ALC in Farkhor district

18. Photos below illustrate the current status of the building (inside and outside) which is proposed for rehabilitation under STVET project.

Photo 1: Building of ALC Branch in Farkhor - front Photo 2: Building of ALC Branch in Farkhor - side view view

8

Photo 3: Building of ALC Branch in Farkhor - side Photo 4: Building of ALC Branch in Farkhor view

Photo 5: Stairs to the second floor are old and do not meet the standards

Photo 6: Annex at the second floor

9

Photo 7: Current condition of first floor premises (corridor, classroom, administration)

Photo 9: Current condition of classrooms Photo 8: Current condition of classrooms at the first floor at the first floor

Photo 11: Current condition of classrooms at the Photo 10: Current condition of classrooms at the first floor first floor

10

Photo 13: Current condition of classrooms at the

second floor Photo 12: Ceilings of classrooms at the second floor

Photo 14: Current condition of the workshop Photo 15: Current condition of ceilings of the workshop

Photo 16: View to the South side from the ALC Photo 17: View to the North side from the ALC building building

11

Photo 18: View to West side from the ALC building Photo 19: View to the South side from the ALC building 19. The territory of the ALC is not fenced.

20. Transportation of equipment and construction materials to the sub-project site will be done along the F.Muhamadiev street. The contractor has to establish warning signs at appropriate points (at least at the distance of 20 m before construction site) during conduction of rehabilitation works and observe requirements to ensure traffic and pedestrian safety.

21. Figure 2 below shows project boundaries and nearby receptors (i.e. houses, schools, hospitals, or any other receptor) located close to the site, as well as access roads

The branch of the Adult Learning Center in Farkhor

LEGEND 1. Building of ALC branch in Farkhor – to be rehabilitated

2. Ancillary building of ALC (in damaged condition) not selected for rehabilitation

3. State insurance company “Tojiksugurta” (new built)

4. An empty building

5. Pharmacy and shops

6. Health Center of Farkhor

7. F. Muhamadiev street

Figure 2: Aerial photo of the Adult Learning Centre branch in Farkhor district

22. The nearest residential houses are located on the other side of the roads, at the distance of more than 100 meters from the ALC building. There is also a Health Center which is located at distance of 75 meters from the ALC building.

23. The following buildings and receptors are located around the ALC

12

From the North side • The Health Center of Farkhor located at the distance of 75 m;

From the West side: • State insurance company “Tojiksugurta” – located at the distance of 35 m;

From the South side: • Commercial buildings (Pharmacy, shops) – located at the distance of 70 m;

From East side • Ancillary building of ALC, not in use - located at the distance of 10 m

24. No construction of separate camp for the Contractor’s personnel is proposed here, because workers will be local.

25. Construction waste from the site can be disposed at the nearest landfill in Farkhor district located at a distance of about 5 km from the ALC construction site. The Contractor shall conclude for this purpose, an agreement with the local communal services and apply for relevant permits.

III. CONSTRUCTION ACTIVITIES

3.1. Types of civil works

16. The following construction activities are envisaged in frame of this sub-project - see Table 1 below:

Table 1: Types of rehabilitation works for renovation of the technical Adult Learning Centre in Farkhor district # Description Unit of Q-ty measure Dismantling works Section 1. Dismantion 1 Dismantling coating roof from wavy asbestos-cement lists 100 m2 3,06 2 Dismantling of rafters from boards 100 m2 3,06 3 Dismantling of wooden window door way openings 100 m² 0,24 4 Dismantling of wooden window openings with sill boards 100 m² 0,56 Dismantling of ceilings with solid wood fiber boards with a 5 100 m 3,03 thickness of 5 mm ² Dismantling of flooring of boards 100 m² 0,77 7 Dismantling of brick walls of unheated 100 m3 0,450 8 Dismantling of brick walls 100 m² 0,350 Punching openings in partitions with continuous leveling of slopes 9 100 m 0,0604 of brick walls ² 10 Fixing of plaster from the surfaces of walls 100 m² 4,25 11 Cleaning of premises from construction debris in the production of 100 m2 3,00 carpentry, carpentry Removal of construction debris for a distance of 10 km on a 12 T/km 25,13 Kamaz truck, fuel cost 25 somoni Finishing work Installation of door blocks in external and internal doorways in 1 100 m 0,24 stone walls with an opening area of up to 3 m2 ² # Description Unit of Q-ty measure 2 Installation of m / plastic window units with double-pane double- 100 m² 0,560 13

glazed area of the opening more than 2 m2 3 Installation of door mortise locks 100 un 0,12 4 Mounting of metal stained-glass windows 100 m2 0,160 Arrangement of suspended ceilings of the type on 5 100 m 3,96 the frame made of galvanized profile ² Improved plastering of walls and partitions with cement-lime 6 100 m 6,50 mortar ² Plastering of window surfaces and door lintels on concrete and flat 7 100 m 0,35 stone ² Solid leveling of the walls (single-layer plaster) from dry gypsum 8 6,50 mixes Rotband with thickness up to 3 mm 100 m² 9 Improved water-emulsion painting of walls, partitions and slopes 100 m² 6,50 Floors 10 Soil compaction by crushed stone 100 m² 0,484 11 Arrangement of underlying layers of concrete 1 m³ 4,842 Arrangement of heat and sound insulation in backfilled expanded 12 1 m 1,94 clay ³ 13 Arrangement of cement screeds 20 mm thick 100 m² 0,4842 14 Arrangementofcoatingsfor cement mortar tiles 100 m² 0,4842 15 Arrangement of cement screeds 20 mm thick 100 m² 0,432 16 Arrangement of cement screeds 100 m² 0,4322 17 Arrangement of coatings on a cement mortar from tiles 100 m² 0,4322 18 Piling lag 100 m² 1,474 19 Arrangement of coatings for boardwalks 100 m² 1,474 20 Arrangement of coatings for boardwalks 100 m 1,580 21 Improved oil painting of the floors 100 m² 1,580 22 Arrangement of cement screeds 20 mm thick 100 m² 0,0826 23 Arrangement of coastings on a cement mortar from tiles 100 m² 0,0826 Solid leveling of surfaces (single-layer plaster) from dry mortar 24 mixes with a thickness of 2mm ceilings of the lower part of the 100 m² 0,15 flight march 25 Improved water-emulsion painting of walls, partitions and slopes 100 m² 0,15 Laminate 26 Soil compaction with rubble 100 m² 0,771 27 Arrangement of underlying layers of concrete 1 m³ 7,71 29 Arrangement of heat and sound insulation in backfill 1 m³ 3,084 30 Arrangement of cement screeds 20 mm thick 100 m² 0,7710 Laying of laminate flooring by means of a locking connection with 31 100 m2 0,771 a soundproofing device 32 Arrangement of plinth wooden 100 m 0,83 33 Arrangement of cement screeds 20 mm thick 100 m² 0,7920 Laying of laminated floor coverings in the manner of glue (lock) 34 100 m2 0,792 connection with the device of soundproofing laying 35 Arrangementof plinth wooden 100 m 0,85 Cleaning of premises from construction debris in the production of 36 100 m 2,50 stone, plaster ² Faсade of building 37 Fixing of plaster from the surfaces of walls 100 m² 1,34 # Description Unit of Q-ty measure 38 Improved plastering with cement-mortar on wall stone 100 m² 3,07 Plastering of the surfaces of window and door slopes on concrete 39 100 m 0,35 and flat stone ² Decorating the walls from the shallow decorative solutions of the 40 100 m 3,07 facade wall (the front part of the building) ² Decoration of walls from the mucilaginous decorative solutions of 41 0,35 slopes of window blocks of the facade 100 m² Installation and disassembling of external inventorys caffolds with 42 100 m² 3,07 height up to 16m pipe –type for missalaneous finishing works 43 Installation of window boards made of PVC: in stone walls up to 100 m 0,30 14

0.51 m thick. Removal of construction debris for a distance of 10 km on a 43 T/km 6,164 Kamaz truck, fuel cost 25,somoni Delivery of construction materials to the distance of 200 km on 44 T/km 50 truck carrying capacity to 25 km cost 6,6 som, Civil works Section 2. Earth works 1 Reworking of soil manually 100 m³ 1,599 2 Earth Back filling of soil manually 100 m³ 1,15 3 Soil compaction by pneumatic rammer ,group of soil 2sinuses 100 m³ 1,15 Section 2. Foundations 4 Arrangement preparation from concrete 3,5 100 m³ 0,025 5 Arrangement monolithic reinforced concrete strip foundation of 100 m 0,3501 concrete kl. B15 FL-1 to 5 ³ 6 Arrangement of beams of foundation concrete reinforced concrete 0,0661 from concrete. B15 FB-1 and FB-2 100 m³ 7 Installation of B-1,2,3 issues 1 0,335 8 Arrangement of horizontal waterproofing of foundations with a 100 m 0,50 thickness of 20mm ² 9 Arrangement of waterproofing of lateral in one layer thick. 2mm 100 m² 0,17 Walls 10 Brickworks of internal ( filling of openings with brick) 1 m3 3,83 11 Brickwork of exterior walls 1 m3 44,65 12 Brickwork of exterior walls (build-up of walls made of brick h = 1 m3 16 1,0, 2,0 m) 13 Reinfocement of wall masonry with Cg-1 1 0,083 14 Arrangementof reinforced concrete racks in wooden formwork of 100 m 0,1644 concrete cl. B15 K-1,2,3 ³ 15 Arrangement of monolithic reinforced PR-1,2,3 from concrete 100 m 0,001 kl.B15 ³ 16 Arrangemen of monolithic reinforced concrete columns B-15BM- 100 m 0,3264 1,2,3 ³ 17 Arrangement porch of the main entrance of concrete cl. B15 100 m³ 0,013 Section 5. Ladder LM LMP -1,2 18 Arrangement of monolithic reinforced concrete stairs of marches 100 m 0,0138 and platforms LM-1 and LM-2 from concrete cl. IN 20 ³ Scaffolding 19 Crushed stone preparation. 50 mm 1 m³ 7 # Description Unit of Q-ty measure 20 Arrangement of blind area of concrete cl. B7.5 thickness. 100mm 1 m³ 7 Delivery of building materials on the distance. 10 km by car gr-yu 21 T/km 20 25tn fuel cost 6.6 somoni Delivery of building materials on the distance. 200 km by car gr-yu 22 T/km 25 25tn fuel cost 6.6 somoni Fire alarm 1 Revieving –control and guard- fire device un 1 2 Accumulator battery 12V, 7A hr un 1 3 Exit Scoreboard un 2 4 Electrooptic fire smoke detector un 20 5 Manual fire detector un 3 6 Combined warning system Mayak-12 KP un 2 7 Loop control device un 2 Cable with doparnymi veins 0,5 mm with insulation type KSVP - 8 m 230 2X0.5 15

9 Flexible wire up to 380 V PVC-4x0,75 40 Cable PVC- 10 3Х1,5 m 10

11 Universal connection box type UK-2B un 10 12 Corrugated pipe m 270 Internal electric lighting Installation work Materials and equipment 1 Switch board BA51-31 1n = 63A un 1,0 2 Illuminated shield Exinoxe -6 un 1,0 3 Emergency power supply CONVTRSION KIT un 2,0 4 Transportation and procurement and storage costs 2.82% Cables and wires 5 Cable with copper conductors with PVC insulation sec 3 1,5mm2 m 540 6 Cable with copper conductors with PVC insulation sec 3 2,5mm2 m 300 7 Cable with copper conductors with PVC insulation sec 3 4mm2 m 100 8 Cable with copper conductors with PVC insulation sec 5 25mm2 m 50 Lighting products Lamps with fluorescent lamps with the number of lamps in a lamp 9 un 8 up to 314 Lamps with fluorescent lamps with the number of lamps in a lamp 10 un 4 up to 118 Lamps with fluorescent lamps with the number of lamps in a lamp 11 un 8,00 up to 140 Lamps with fluorescent lamps with the number of lamps in a lamp 12 un 36 up to 418 Armstrong 13 DТsplКв lКmp ‘’EБIT ‘’ un 2 Electroadjusting products 14 Plug socket recessed type with concealed wiring double un 30 15 Single-button recessed switch with concealed wiring un 13,00 # Description Unit of Q-ty measure 16 Double -button recessed switch with concealed wiring un 4 17 Lamp power 18 W un 4 18 Lamp power 18 W un 160 19 Lamp power 36W un 8 Assembly products 20 Branch box on the wall un 147 Polyvinylchloride pipes 21 Pipe smooth rigid from PVC to d-20mm m 50,0 22 StООl strТp 404 m 30,0 23 Delivery of building materials on the distance. 10 km T 5

IV. POTENTIAL IMPACTS AND MITIGATION MEASURES

17. Potential impacts of proposed additional activities and relevant mitigation measures are described in the Table 2 below.

16

Table 2: Potential impacts of the prosed activities and mitigation measures Potential impacts Mitigation measures Temporary increase of Ensure that maximum and equivalent noise levels comply with sanitary background noise and regulations (not more than 55 dB). Instrumental noise measurements should vibration due construction be undertaken at least 2 times per month at the boundary and at the receptor works location.

Monitor and address complaints about the noise level.

Construction works (including drilling works) will be limited to restricted times agreed to in the permit – from 7am to 5 pm in week days and from 8 am to 4 pm on Saturday. No works at night time, Sunday and holidays are allowed.

The proposed works includes only drilling equipment for walls (for installation of windows, doors, radiators) which will not cause vibration Creation of dust Monitor dust emissions to ensure emissions are minimized. emissions and volatile organic compounds at Monitor and address complaints about dust / volatile organic compounds and construction site while other pollutants dismantling work, transportation of Construction works will be limited to restricted times - from 7am to 5 pm in construction materials week days and from 8am to 4 pm on Saturday. No works at night time, and waste Sunday and holidays are allowed.

Providing the construction workers with suitable personal protective equipment (respirators)

Contractor will monitor the exhaust gas content of its own vehicle fleet.

There will be no open burning of construction / waste material at the site There will be no excessive idling of construction vehicles at sites

Keep surrounding environment (side-walks, roads) free of debris to minimize dust

In case of dust creation by pneumatic drilling/wall destruction during installation of windows/doors/radiators etc. installation suppress dust by water spraying and/or installing dust screen enclosures at site. Construction waste Waste disposal facilities are available.

Boxes for construction debris will be installed in the site.

The construction waste will be disposed according to general EMP requirements and SSEMP (Waste Management Plan)

Construction waste will be collected and disposed properly by licensed collectors

Timely sorting of rehabilitated and removing construction waste in an organized way, and dispose them on an authorized landfill

Mineral construction and demolition wastes will be separated from general refuse, organic, liquid and chemical wastes by on-site sorting and stored in appropriate containers

Dispose off waste appropriately to prevent pollution of soil and groundwater

The approach to handling sanitary wastes and wastewater from building sites (installation or reconstruction) must be approved by 17

Potential impacts Mitigation measures the local authorities

Recycle valuable materials within the project or sold.

Aim to minimize waste through reducing and re-using (packaging) material

Do not allow any burning or burying of waste on site.

Prevent littering from construction staff at work sites by providing bins or waste bags in sufficient locations.

The records of waste disposal will be maintained as proof for proper management as designed;

Whenever feasible the contractor will reuse and recycle appropriate and viable materials. Toxic / hazardous waste Temporarily storage on site of all hazardous or toxic substances will be in management safe containers labeled with details of composition, properties and handling information The containers of hazardous substances should be placed in a leak-proof container to prevent spillage and leaching The wastes will be transported by specially licensed carriers and disposed in a licensed facility Paints with toxic ingredients or solvents or lead-based paints will not be used Soil contamination due  Construction materials that can impact the soil should be kept in a to accidental spillage special premise or in concrete ground. • Soils contaminated by accidental spills should be immediately collected and properly disposed at relevant landfill in accordance with the permit from local environmental departments ; • regular maintenance of the equipment should be done by Contractor and checking for any possible leaks from the joints etc. Asbestos containing Ensure that the standard practice of handling existing asbestos containing materials (ACM) materials is used to remove and decommission asbestos containing roofing materials.

ACM will not be used as a roofing/new material in construction works of building.

Any existing ACM to be handled and disposed according to the SSEMP (ACM management and disposal plan)

Health and labor safety  The local construction and environment inspectorates have been (occupational hazards) – notified of upcoming activities during construction and  All work will be carried out in a safe and disciplined manner designed operation to minimize impacts on workers.  Workers will comply with international good practice - providing the construction workers with suitable personal protective equipment (always hardhats, as needed masks and safety glasses, harnesses and safety boots)  Appropriate signposting of the sites will inform workers of key rules and regulations to follow. Following plans to be developed for construction and operation phases of the project: Emergency Response Plan and Health and Safety Plan

Direct or indirect hazards Transport along the F..Muhamadiev street consists of private cars and to public traffic and public transport, as well as taxis, minibuses, trucks. The traffic flow can be 18

Potential impacts Mitigation measures pedestrians by considered high. construction activities Contractor will observe the necessary precautions (speed limit, working hours from 7 am to 5 pm)

In compliance with national regulations the contractor will insure that the construction site is properly secured and construction related traffic regulated. This includes but is not limited to: Signposting, warning signs, barriers and traffic diversions: site will be clearly visible and the public warned of all potential hazards Traffic management system and staff training, especially for site access and near-site heavy traffic. Adjustment of heavy traffic to local traffic patterns, e.g. avoiding major transport activities during rush hours

4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor

18. The general Environmental Management plan (EMP) for all project sites is approved as part of Initial Environmental Examination (IEE) endorsed by State Environmental Committee of the Republic of Tajikistan and general management measures that apply to this sub-project should be followed by the Contractor.

19. In addition, the Contractor should prepare the following eight (8) Site-specific Environmental Management plans (SSEMP):

- Waste Management Plan; - Emergency Response Plan; - Health and Safety Protection Plan; - Plan for the Consideration of Complaints; - Dust Control Plan; - Noise Management Plan; - ACM Handing, Management and Disposal Plan; - Traffic and Road Safety Management Plan.

19

Environmental Safeguards Due Diligence Report

Project number: 46535-001 Grant 0452/53/3309 Date: June 2018

TAJ: Strengthening Technical and Vocational Education and Training

"MOLME/SH/CW05-B ": MINOR RENOVATION OF THE TECHNICAL VOCATIONAL LYCEUM IN VOSE

The Due Diligence Report for Social and Environmental Safeguards is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.

June 2018

20

Table of content

I. INTRODUCTION ...... 23 1.1. Justification of the site...... 23 II. DEFINING THE BORDERS ...... 24 2.1. Current condition of the site ...... 24 2.2. Location of objects and access to the site ...... 25 III. CONSTRUCTION ACTIVITIES ...... 30 3.1. Types of civil works ...... 30 III. POTENTIAL IMPACTS AND MITIGATION MEASURES ...... 39 4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor ...... 42

Tables

Table 1: Types of rehabilitation works for renovation of a Technical Vocational Lyceum in Vose district ...... 30 Table 2: Potential impacts of the prosed activities and mitigation measures ...... 39

Figures

Figure 1: . Location of Technical and Vocational Lyceum in Vose in scale of the country - in Vose district ...... 25 Figure 2: The rehabilitated facility is located in Vose ...... 26 Figure 3: Aerial photo of the Technical Vocational lyceum in Vose ...... 29

Photos

Photo 1: Entrance gate to the Lyceum ...... 26 Photo 2: Buildings of lyceum - side view (2 Right blocks Educational, left block Dormitory ...... 26 Photo 3: Educational building - entrance to the building ...... 27 Photo 4: Educational building - rear view ...... 27 Photo 5: Educational building - side view ...... 27 Photo 6: Current condition of classrooms ...... 27 Photo 7: Current condition of classrooms ...... 27 Photo 8: View to North from Educational building ...... 28 Photo 9: View to South from Educational building ...... 28 Photo 10: Training Workshops ...... 28 Photo 11: View of the campus of Lyceum, there is Dormitory building in the left side...... 28 Photo 12: Dormitory Building - front view ...... 28 Photo 13: Current condition of the foyer of Dormitory ...... 29 Photo 14: Current condition of Dormitory rooms ...... 29

21

ABBREVIATIONS

1 ADB Asian Development Bank 2 АСМ Asbestos containing materials 3 ALC Adult Learning Center 4 CM Complaint Mechanism 5 EIA Environmental impact assessment 6 EMP Environmental Management Plan 7 FLM Fuel and lubrication materials 9 GFS Gypsum-fiber sheets 10 LLC Limited Liability Company 11 MFC Microfinance company 12 MOLME Ministry of Labor, Migration and Employment of the Republic of Tajikistan 13 PAG Project Administration Group 14 SI State institution 15 SSEMP Site-specific Environmental Management Plan 16 TVLV Technical Vocational Lyceum in Vose 17 TVET Technical and Vocational Education and Training 18 WMP Waste Management Plan

22

I. INTRODUCTION

1.1. Justification of the site

1. Over the years of independence, the management of the Government has made efforts to develop the education sector and training of highly qualified specialists for various industries.

2. The Ministry of Labor, Migration and Employment of the Republic of Tajikistan pays special attention to the technical condition, the availability of educational facilities (institutions) in schools to enhance vocational education and training of learners and students.

3. The proposed Project on Strengthening Technical and Vocational Education and Training (Project) will have an impact on national workforce with a high proportion of skilled workers employed in Tajikistan's domestic economy. The project is aimed at meeting the needs of the Republic of Tajikistan. Within the framework of the project, unemployed and partially employed young people and the adult population in the Republic will be provided with job opportunities and income in the domestic and international labor markets by providing quality training.

4. The outcome of the Project will be a more effective, efficient, quality-assured, and flexible system for the delivery of technical vocational training. The project includes the achievement of five outputs, namely: (i) modernization of the methodology of the TVET system; (ii) improving the physical conditions of training institutions; (iii) increasing the volume and quality improvement of TVET delivery; (iv) expansion of equal access to TVET; and (v) strengthening the leadership and management of the TVET system.

5. In November 2015, a Grant Agreement was signed between the Republic of Tajikistan and ADB on project financing.

6. An IEE/ EMP for this project was prepared and approved in September 2015. The project has been assigned category B in accordance with ADB's Safeguard policies.

7. As part of this Project, the Ministry of Labor, Migration and Employment of the Republic of Tajikistan shall sign a contract "MOLME/SH/CW05-B" with a construction firm to conduct minor renovation of three buildings within the Technical Vocational Lyceum campus in Vose.

8. The Contractor will undertake, in accordance with the contract, professionally and qualitatively, the rehabilitation works of the Technical Vocational Lyceum in Vose within the terms provided for in the Contract to be awarded.

9. The Environmental Management Plan (EMP), which is part of the IEE, is general and wide- ranging and covers all possible consequences associated with the project. Therefore, the Contractor is required to develop a Site-specific Environmental Management Plan (SSEMP) prior to the commencement of construction works.

10. The main objective of the plan is to document how the environmental mitigation measures and required management plans proposed for rehabilitating the project site will be brought into line with the project commitments.

23

11. In addition, during the implementation of the Project, the Contractor will strictly comply with ADB's safeguard requirements and national laws and regulations in the field of environmental protection, and, under the terms of the contract, will develop and refine the working measures, plan and management system for environmental protection in areas of repair works.

II. DEFINING THE BORDERS

2.1. Current condition of the site

12. The Technical Vocational Lyceum of Vose district which was selected for the STVET project consists of 5 buildings.

13. Three buildings of the Lyceum were proposed for reconstruction under the STVET project (see Figure 3 below): (i) Educational building (first and second floors) (ii) Training and production workshop, and (iii) Dormitory building.

14. Educational building is four-story building, which was built in 1970. There are 20 classrooms in the building. It is a brick masonry building with asbestos-cement slate roof. Ceilings are made of concrete and windows and doors are old and made of wood.

15. The following rehabilitation works are being planned: major overhaul of the entrance portal and foyer; repair of the staircase to the second floor; repair of the foyer of the second floor; overhaul of four classrooms with replacement of windows and doors; major repairs of ceilings, walls, floors; replacement of wirings, lamps and electrical appliances; repair of external toilet.

16. Training and production workshop is a single story, free-standing building which was also built in 1970. There are 4 workshops in the building. Ceilings, doors and windows are wooden and in poor condition. Roof is covered with asbestos-cement slate.

17. As part of the rehabilitation works the following is being proposed: replace the roof, windows and doors, major repairs of ceilings, walls, floors, wirings, replace the lamps and electrical appliances, repair facades and do proper landscaping with the construction of blind areas and sidewalks.

18. The Dormitory is a brick masonry four-story building, which was built in 1970. There are 36 dormitory rooms and 6 service and 2 administrative premises. The roof is covered with asbestos-cement sheets. Ceilings are concrete and windows and doors are old and made of wood.

19. The following is being proposed for renovation of the dormitory: major overhaul of the entrance portal and foyer; Repair of the staircase with the replacement of the railing to the second floor; repair of dormitory rooms of the second floor with replacement of windows and doors; major repairs of ceilings, walls, floors, wiring, replacement of lamps and electrical appliances; repair of the lobby and corridor - the floors will be replaced with ceramic tiles; repair of facade, sanitary units, internal water supply and sewerage systems; repair of the external sewage line to the point of connection with urban systems.

20. All buildings do not meet modexrn building and sanitary standards and need to be renovated and reconstructed. 24

21. As mentioned above asbestos cement sheets were used as roofing material for Lyceum buildings. Roof should be demolished and also replaced by non-hazardous materials which will not cause risks for health of Lyceum students and staff. To mitigate the occupational and public health risks of inhalation of airborne asbestos fibers, when disassembling the roofs they will be removed and disposed by following the internationally-recognized Standard Practice for Maintenance, Renovation and Repair of Installed Asbestos Cement Products (American Society for Testing and Materials [ASTM] E 2394). An Asbestos Containing Materials Handling, Management and Disposal Plan shall be prepared by the Contractor.

2.2. Location of objects and access to the site

22. Vose district is the administrative district of the Khatlon region of the Republic of Tajikistan. The regional center is the Khulbuk settlement, located in the Yakhsu river valley (Pyanj river basin). The Vose district in the North borders Temurmalik and districts, in the East - with Kulyab district, in the West - with Dangara district, in the South - with Hamadoni and Farkhor districts of Khatlon region. Figure 1 and 2 below show the location of the Technical Vocational lyceum in Vose .

Figure 3: . Location of Technical and Vocational Lyceum in Vose in scale of the country

25

Figure 4: The rehabilitated facility is located in Vose

23. The Technical Vocational lyceum is located in the 4/10 A.Mirzoev street.

24. The photos below illustrate status (inside and outside) of the Technical Vocational lyceum buildings in Vose which are being proposed for rehabilitation under the STVET project.

Photo 20: Entrance gate to the Lyceum Photo 21: Buildings of lyceum - side view (two right blocks are the Educational building, left block is the dormitory

26

Photo 22: Educational building - entrance to the building

Photo 23: Educational building Photo 24: Educational building - side view

Photo 25: Current condition of classrooms

Photo 26: Current condition of classrooms

27

Photo 28: View to South from the Educational building Photo 27: View to North from the Educational building

Photo 29: Training Workshops

Photo 30: View of the campus of Lyceum, there Photo 31: Dormitory Building - front view is a Dormitory building on the left side

28

Photo 32: Current condition of the foyer of Photo 33: Current condition of Dormitory rooms Dormitory

25. Transportation of equipment and construction materials will be done along the A. Mirzoev and P-23 streets. The contractor has to establish warning signs at appropriate points (at least at the distance 20 m before construction site) during conduction of rehabilitation works and observe requirements to ensure traffic and pedestrian safety.

26. Figure 5 below shows project boundaries and nearby receptors (i.e. houses, schools, hospitals, etc.) located close to the site, as well as access roads

Legend 8a 1. Educational building – to be rehabilitated 2. Training and production workshop – to be rehabilitated 3. Dormitory – to be rehabilitated 4. Educational building 5. Sewing and weaving workshop 6. Lyceum stadium 7. Main gate 8. Main access road – A.Mirzoev street 8a. P-23 road 9. Gymnasium 10. The Committee of State Security in Vose district 11. Dental Clinic 12. The Post Office 13. Residential buildings

Figure 5: Aerial photo of the Technical Vocational lyceum in Vose

27. The Lyceum building proposed for the rehabilitation under STVET project is located at a distance of about 35-100 meters from nearest residential quarters.

From the North side of the Lyceum Educational Building the following is present: 29

 Road Crossing street A. Mirzoyev and P-23 located at the distance of 45 m;  Residential buildings located at the distance of 50 m and more; From the South side:  The Committee of State Security in Vose district located at the distance of more than 100 m; From the East side:  The Post Office at the distance of 45 m;  Dental Clinic at the distance of 80 m; From the West side:  Educational building Block B – adjoins to the building

From the North side of the Training and production workshop the following is present:  The Post Office at the distance of 85 m;  The buildings of the Lyceum at the distance 40-70 m; From the South side:  The Committee of State Security in Vose district located at the distance of 30 m; From the East side:  Dental Clinic at the distance of 40 m;

From the North side of the Dormitory the following is present:  Residential buildings located at the distance of 50 m and more; From the West side:  Gymnasium - at the distance of 35 m.

28. No construction of separate camp for the Contractor’s personnel is proposed here, because workers will be local. . 29. The construction waste can be disposed in the nearby waste disposal facilities. The Contractor shall conclude for this purpose, an agreement with communal services of Vose district and apply for relevant permits.

III. CONSTRUCTION ACTIVITIES

3.1. Types of civil works

30. The following construction activities are envisaged to be done under this sub-project - see Table 3 below:

Table 3: Types of rehabilitation works for renovation of a Technical Vocational Lyceum in Vose district № Description Unit of Q-ty measure

Repair Educational block (block B)

1st floor (block A and B) Dismantling works Dismantling of wooden fillings of openings window frames with 1 100 m2 0,48 sill boards № Description Unit of Q-ty measure

2 Dismantling of wooden fillings of doorway openings 100 m2 0,36 3 Dismantling tile ,laying floor solution 100 m2 0,19 30

4 Plastering of internal brick walls surface 100 m2 4,43 5 Cleaning the plaster ceilings 100 m2 1,512 6 Dismantling bricklaying of walls 10 m3 0,1 Delivery of construction materials to the distance of 15 km on 7 truck KAMAZ, cost of fuel 6,6somoni T/km 12,0

Repair works

Openings

8 Installation steel-plastic window blocks m2 48 9 Installation steel-plastic door blocks m2 13 № Description Unit of Q-ty measure Installation of window sills from PVC in stone walls wide. 30 cm 10 (1,2,3 floor) 100 m 0,36 Installation of wooden door blocks with an opening area of up to 11 3m2 100 m2 0,235

Finishing works

Finishing work

(internal) 12 Improved plastering of internal walls of ST-1 and Wall-2 100 m2 4,43 13 Plaster of the surfaces of window and door slopes on concrete 100 m2 0,75 and stone 14 Filling of walls surface -1 100 m2 3,77

15 Filling of the surface of door and window slopes of flat 100 m2 0,74 16 Painting with polyvinyl acetate water-emulsion structures of 100 m2 4,51 walls, partitions and slopes of - Wall 1 17 Wall cladding with ceramic tiles Wall-2 100 m2 0,657 Ceilings

Arrangement of suspended ceilings type on the 18 100 m2 0,4511 frame of galvanized profile PT-2 19 Installationof metal frames for ceilings Fl-3 1 m2 19 20 Boarding ofceiling from plastic CE-3 100 m2 0,19 Solid leveling of the ceilings (single-layer plaster) from dry 21 gypsum mixtures of ceilings CE -3 100 m2 1,5 Painting with polyvinyl acetate water- emulsion compositions 22 improved in plaster ceilings CE – 3 100 m2 1,5 Floors

23 Levelingthescreedfromacement-sandmortarM150 thicknessof 100 2 1,83 30mm Fl-3 24 Floorcoveringfromacementmortarmadeofceramic Fl-3 100 m2 0,19

25 FloorМoЯОrТnРКnd plТntС Пrom К tТlОs ‘’SОrКntТМ’’ Fl-1 100 m2 0,89 Laying of laminate flooring on a ready-made substrate type 26 100 m2 0,820 PERGO Fl-2 № Description Unit of Q-ty measure

27 Installation of plastic plinth PL-2 100 m 0,7 2-nd floor (block A)

28 Dismantling of wooden window openings with sill boards 100 m2 0,26 31

29 Dismantling of wooden window door way openings 100 m2 0,12 30 Stamping of plasters from the walls of brick internal 100 m2 4 31 Cleaning the plaster ceilings 100 m2 2,31 Removal of construction debris for a distance of 15 km on a 32 Kamaz truck, fuel cost 6.6 somoni T/km 11,0

Repair works Openings

33 Installation steel-plasticwindow blocks m2 26 34 Installation steel-plasticdoor blocks m2 4 Installation of window sill boards from PVC in stone walls is 35 100 m 0,202 wide. 30 cm (1,2,3 floor) № Description Unit of Q-ty measure Installation of wooden door blocks with an opening area of up to 36 100 m2 0,12 3m2 Finishing work

Finishing work

(internal) 37 ImproЯОd plКstОr oП ТntОrnКl аКlls -1 100 m2 4,00 38 Plaster of the surfaces of window and door slopes on concrete 100 m2 0,35 and stone 39 Surface filling of walls Wall-1 100 m2 4 40 Filling surfaces of door and window slopes Wall-1 100 2 0,35 41 Painting with polyvinyl acetate water-emulsion structures of 100 m2 4,35 walls, partitions and slopes of - Wall 1 Ceilings

Solid leveling of surfaces (single-layer plaster) from dry gypsum 42 100 m2 2,3 mixtures of ceilings PT-1 Painting with polyvinyl acetate water- emulsion compositions 43 100 m2 2,3 improved in plaster ceilings CE – 3 Floors 44 Levelingthescreedfromasement-sandmortarM150 thickness of 100 m2 2,31 30mm thick. Fl-1,Fl-2, Fl-3 45 Floor covering from a cement mortar made of ceramic and tiles 100 m2 0,80 ‘’SОrКnТtСвС ‘’Fl-1 46 Laying of laminate flooring on a ready-made substrate type 100 m2 1,610 PERGO Fl-2 47 Installation of plastic plinth PL-2 100 m 1,04 External

Sockle

48 Improved plaster with cement-lime mortar socle(axis A and 1) 100 m2 0,65 PКТntТnР soМlО аТtС dОМorКtТЯО ПКхКdО pКТnts (spКttОr)(axis A and 49 1) 100 m2 0,65

№ Description Unit of Q-ty measure

Porch

50 Arrangement of concrete ramp with thick.100mm 100 m2 0,7 51 The device of porch coverings from plates "Seranitnyh" 100 m2 0,70 Visor

52 Boarding of visor ceilings, cornices and columns of alukabond 100 m2 1,3 on metal profiles 2x40mm 32

53 Arrangement of gutter chutes 100 m 0,2 54 Installation of drainpipes 100 m 0,11 55 Installation of funnels 1 un. 3

Repair façade Dismantling of wooden window openings with sill boards( other 56 100 m2 2,12 floors ) 57 Installation of metal-plastic window blocks (other floors) m2 212 58 Plastering of the surfaces of window and door slopes on 100 m2 1,88 concrete and stone (other floors) 59 Improved plaster with cement-lime mortar on the stone walls 100 m2 21,8

№ Description Unit of Q-ty measure Painting of facades and slopes with decorative facade paints 60 100 m2 21,8 (spatter) (on axis A and 1) Installation and dismantling of external inventory scaffolds with a 61 100 m2 13 height of up to 16 m tubular for other finishing works 62 Arrangement of the footprint of strata. 100mm, width1m 1 m3 12,6 63 Arrangement of metallic enclosures staircase inside the building 100 m 0,12 Delivery of construction materials to the distance of 15 km on 64 68,00 truck KAMAZ, cost of fuel 6,6somoni Delivery of construction materials to the distance of 170km on 65 28,00 truck carrying capacity to 20m cost 6,6 som. Repair Roofs of educational blocks and dormitories Dismantling works 1 Dismantling of roofings from wavy asbestos-cement sheets (blocks 100 m2 8,28 A and B) 2 Change of the flooring with props from bars up to 50 mm thick and 100 m2 8,28 higher (blocks A and B) Changing the rafter legs of wooden structures from the beams 3 (blocks A and B 50% of the total volume of wooden elements) 100 m 10,83

Fire protection of the crates and doorway construction under the 4 1000 m2 1 roof (blocks A and B ) 5 Arrangement of dormer windows 1 un. 4 6 Arrangement of roofs from the zinced steel 100 m2 8,28 7 Arrangement of gutter chutes 100 m 1,52 8 Installation of drainpipes 100 m 1,44 9 Installation of funnels 1 un. 12

10 Installation and dismantling of external inventory forests with a 100 m2 14,16 height of up to 16 m tubular for other finishing works № Description Unit of Q-ty measure

Delivery of building materials on the distance. 15 km by car 11 16,00 Kamaz, fuel cost 6.6 somoni Delivery of building materials on the distance. up to 170 km by car 12 18,00 with lifting capacity up to 20 t cost of 6,6 som. Repair Dormitory (blocks B) 1-st floor (block B) Dismantling works

1 Dismantling of wooden fillings of openings window with sill boards 100 m2 0,21 2 Dismantling of wooden window door way openings 100 m2 0,08

33

3 Stamping of plasters from the walls of brick internal 100 m2 1,23 4 Cleaning of old plaster from ceilings 100 m2 0,73 Removal of construction debris for a distance of 15 km on a 5 Kamaz truck, fuel cost 6.6 somoni T/km 7,0

Repair works Openings 6 Installation of metal-plastic window blocks m2 21 7 Installation of steel- plastic doors blocks m2 3 № Description Unit of Q-ty measure 8 Installation of steel boards from PVC in stone walls thick. 30cm 100 m 0,16 9 Installation of wooden doors with the area of opening up to 3m2 100 m2 0,05 Finishing work Finishing work (internal) 10 Improved plaster of internal walls WL-1 100 m2 1,23 Plastering surfaces of door and window slopes in concrete and 11 100 m2 0,26 stone 12 Surface filling of walls WL- 1 100 m2 1,23 13 Surfaces filling of door and window slopes 100 m2 0,26

14 Painting with polyvinyl acetate water-emulsion structures of walls, 100 m2 1,50 partitions and slopes of - Wall 1 Ceiling 15 Solid leveling of surfaces (single-layer plaster) from dry gypsum 100 m2 0,7 mixtures of ceilings PT-1 Painting with polyvinyl acetate water-emulsion structures of walls, 16 100 m2 0,7 partitions and slopes of - Wall 1 Floors 17 Levellingthescreedfromasement-sandmortarM150 thick ness of 100 m2 0,73 30mm Wall-1 Floor covering from a cement mortar made of ceramicandtiles 18 100 m2 0,80 Wall-1 2nd floor (block B) № Description Unit of Q-ty measure

Dismantling of wooden fillings of openings window frames with sill 19 100 m2 0,26 boards 20 Dismantling of wooden fillings of doorway openings 100 m2 0,23 21 Beating plastering of brick interval walls surface internal 100 m2 6,96 22 Dismantling tile ,laying floor solution 100 m2 0,3 23 Punching openingsin brick structures 1 m3 0,6 24 Cleaning the old plaster ceilings 100 m2 2,46 Removal of construction debris for a distance of 15 km on a T/km 16,0 25 Kamaz truck, fuel cost 6.6 somoni Repairing works Openings 26 Installationofsteel- plasticwindows blocks m2 26 27 Installation of sill boards from PVC in stone walls thick. 30cm 100 m 0,202 28 Installation of wooden doors with the area of opening up to 3m2 100 m2 0,23 34

29 Bricklaying of walls from a brick 1 m3 4 Finishing work (internal) 30 Improved plastering of internal walls of ST-1 and Wall-1 100 m2 6,96 31 Plaster of the surfaces of window and door slopes on concrete and 100 m2 0,73 stone 32 Filling of walls surface -1 100 m2 6,96 № Description Unit of Q-ty measure 33 Filling of the surface of door and window slopes of flat 100 m2 0,73 34 Painting with polyvinyl acetate water-emulsion structures of walls, 100 m2 7,69 partitions and slopes of - Wall 1 Ceilings 35 Solid leveling of the ceilings (single-layer plaster) from dry mixes of 100 m2 2,8 rotbandWall-1 36 Painting with polyvinyl acetate water-based compositions 100 m2 2,8 improved on plaster ceilings PT-1 Floors Levellingthescreedfromasement-sandmortarM150 thickness of 37 100 m2 2,76 30mm -1, -2 38 Floor covering from a cement mortar made of ceramic Fl-1 100 m2 0,54 39 Laying of laminate flooring by means of a locking connection with 100 m2 2,220 a soundproofing device PERGO FL-2 40 Installation skirting from plastic PL-2 100 m 2,3 41 Manufacturing of truss farm Kz-1 1 T konstr. 0,280 42 Installation of doorway skeleton roofs for beams -1 1 m3 0,051 43 Arrangement of roof a visor for from the zinced steel 100 m2 0,075 44 Sheathing of parapet from alukabond of namalic profiles 240 mm 100 m2 0,131

Delivery of construction materials to the distance of 15 km on truck 45 T 55,00 KAMAZ, cost of fuel 6,6somoni № Description Unit of Q-ty measure

Electrik lighting and electric installation equipment Educational block and Dormitory Section 1. Dismantling works Installation of a lighting panel with an input automaton and 1 un. 1 distribution automatons.Exinoxe-12 Installation of a lighting panel with an input automaton and 2 un. 2 distribution automatons Exinoxe-6 3 Luminaire with fluorescent lamp G13 2x18 W 100 un. 0,35 4 Lamp with compact luminescent lamp with protection degree 100 un. 0,08 G160 2x18 W 5 Lamp with compact luminescent lamp with protection degree 100 un 0,05 IP65CD160-2 18 6 Luminaire with luminescent lamp G13 2x18 W 100 un. 0,36

7 Ceiling luminaire for compact luminescent lamps 118W 100 un. 0,09 compensated, degree of protection IP40 8 Luminaire with luminescent lamp G13 1x36Vt 100 un. 0,08 9 Display lamp ‘’EXIT’’25Vt 100 un. 0,05 10 CСКndОlТОrs 318 un. 0,12 11 CСКndОlТОrs 318 un. 0,1 35

12 Double – button hidden installation switch Cariva 100 un. 0,09 13 Single –button hidden installation switch Cariva 100 un. 0,46 14 Mounting socket outlet, 220V, 16A, with grounding contact, with 100 un. 0,77 curtains two-seater Cariva Cable laying with copper conductors with PVC insulation on the 15 100 m 19,5 walls Delivery of building materials on the distance. up to 15 km by car 16 T 3 with lifting capacity up to 15 T № Description Unit of Q-ty measure Section 2. Material resources on project data 1 Shield lighting with an input automaton and distribution un. 1 automatons Exinoxe-12 Shield lighting with an input automaton and distribution 2 un. 2 automatonsExinoxe-6 Lamp 3 М G13 2б18 un. 35 with luminescent lamps G13 218VT Lamp with compact luminescent lamp with protection degree 4 un 8 IP65 CD160-218 Lamp with compact luminescent lamp with protection degree 5 un. 5 IP65 CD160-218 6 CСКndОlТОrs 318 un 12 7 CСКndОlТОrs 318 un 10 8 Lamp with luminescent lamps G13 218VT un. 36 9 CОТlТnР lumТnКТrО Пor МompКМt lumТnОsМОnt lКmps 118А un. 9 compensated, degree of protection IP40 10 LampwithluminescentlampsG13 218VT un. 8 11 Display lamp ‘’EXIT ‘’25Vt un. 5 12 Emergency power supply K-303 un 13 13 Luminescent compact lamp with 18W power un 81 № Description Unit of Q-ty measure

14 Linear luminescent lamp G13, power 18 W un. 214 15 Luminescent lamp -36 un. 8 16 Single buttons witch 10A, 220B un 44 17 Double buttons witch 10A, 220B un. 9 18 Single waterproof switch 10A 220V un. 2 19 Socket outlet double 220V 16A un. 75 20 Socket outlet single 220V 16A un. 2 21 JunМtТon Лoб Пor СТddОn аТrТnР -202 un. 300 22 Box for the concealed installation of switches and sockets K-201 un 132 23 Cable with copper conductors with PVC insulation 5 16 mm2 T 50 24 Cable with copper conductors with PVC insulation 3 1,5 2 m 900 ()-LS 25 Cable with copper conductors with PVC insulation 3 2,5 2 m 800 ()-LS 26 Cable with copper conductors with PVC insulation 3 4 2 m 200 ()-LS Fire alarm Educational block Dormitory Section 1. Materials and equipment supplied by the customer Receiving control and guard - 1 – –ПТrО dОЯТМО ‘’GrКnТt ‘’TU 4372 un. 1 018-11858296-01 36

2 Accumulator battery 12V, 7/hr set. 1 3 Fire smoke detector –electronic Ipit =9/36(10%) И 212-41 un. 52 4 Fire manual detector (+10%) И-3 un. 7 5 Display lamp "EXIT" 30010014Iport = 0,025 un. 7 6 Combined warning system Mayak -12KP un. 9 7 Control device for stub lines UKSh-1 un. 5 № Description Unit of Q-ty measure Cable with single-core conductors D = 0.5 mm with insulation 8 from a composition of polyethylene with a sheath of white PVC 100 m 2,5 plastic KSPV - 2x0.5 9 Flexible wire up to 380V PVS-2x0.75 100 m 7 10 Cable PVC-31,5 100 m 0,15 11 Universal connecting box, UK-2P un. 10 Section 2. Materials not taken into account by the price list 1 The device for control and security fire and security "Granite-2" un 1 TU4372-018-11858296-01 2 Accumulator battery12, 7/ un. 1 3 Smoke detectoroptic-electronic detectorИ = 9 / 36 (10%) un. 52 IP 212-41 4 FireDetectorManual (+ 10%) IPR-3SU un. 7 5 Light-diode display "EXIT" 30010014Iport=0,025 un. 7 6 Combined warning system Mayak-12P un 9 7 Control device for stublinesШ-1 un. 5 8 Cable with single-core conductors D = 0.5 mm with insulation m 250 from a composition of polyethylene with a sheath of white PVC plastic KSPV - 2x0.5 № Description Unit of Q-ty measure

9 Flexible wire up VPVC -20,75 m 700 10 Cable PVC- 31,5 m 15 11 Pipe flexible gofrirovannaya D = 10mm GOFROSHLANG m 950 12 Universal connection UK-2P un 10 Repair Workshop Dismantling works 1 Dismantling of wooden window openings with sill boards 100 m2 0,04 2 Punching of openings in brick structures 1 m3 2,6 Removal of construction debris for a distance of 15 km on a 3 T/km 1,5 Kamaz truck, fuel cost 6.6somoni Repair works Openings 4 Installation metal –plastic window blocks m2 7 5 Installation of window sills from PVC in stone walls is wide. 30 cm 100 m 0,06 6 Installation of metal doors Dm-1 1 m2 4 Finishing work Finishing work (internal) 7 Improved plaster of internal walls CT-1 100 m2 1,16 Plaster of the surfaces of window and door slopes on concrete and 8 100 m2 0,05 stone 9 Surfaces filling of of walls Wall-1 100 m2 1,16 37

10 Filling surfaces of door and window slopes Wall-1 100 m2 0,05 Painting with polyvinyl acetate water-emulsion structures of walls, 11 100 m2 1,21 partitions and slopes of - Wall 1 Ceilings 12 Installation of metallic skeleton for ceilings Fl-1 1 m2 70,3 13 Boarding of ceilings from galvanized sheets PT-1 100 m2 0,703 № Description Unit of measure Q-ty Floors 14 Concrete screed with thick. Of 20 mm Fl-1 100 m2 0,7 15 Covering of floors of concrete with thick. 30mmFl-1 100 m2 0,7 External Plinth 16 Improved plaster with cement-lime mortar Socle 100 m2 0,111 17 PКТntТnР soМlО аТtС dОМorКtТЯО ПКхКdО pКТnts (spКttОr) (Пront 100 m2 0,111 facade) Parapet Sheathing of a parapet made of alucobond on metal profiles 18 100 m2 1,3 2x40mm 19 Arrangement of gutter chutes 100 m 0,11 № Description Unit of Q-ty measure

20 Installation of drainpipes 100 m 0,1 21 Installation of funnels 1 un 2 Façade 22 Improved plaster with cement-lime mortar on the stone walls 100 m2 1,19 23 Painting facades and slopes with decorative paints (spatter) 100 m2 1,19 Installation and dismantling of external inventory scaffold with a 24 100 m2 1,26 height of up to 16 m tubular for other finishing works Sidewalk 25 Arrangement of the underlying of crushed stone thick. 100mm 1 m3 6,2 26 Arrangement of cement mortar from mosaic tile 100 m2 0,62

27 Delivery of construction materials to the distance of 15 km on truck T 18,00 KAMAZ, cost of fuel 6,6somoni Electrical lighting and electrical equipment Workshop Section 1. Installation work Installation of a lighting panel with an input automaton and 1 un. 1 distribution automatons.Exinoxe-12 2 Box with a step-down transformer 220-12V YTPP un. 3 Lamp with compact fluorescent lamp with IP65 protection 3 100 un. 0,01 degree CD218-2x18 4 Installation LED Spotlight 100 un. 0,06 5 Display lamp ‘’EXIT’’25Vt 100 un. 0,01 6 Hidden installation double-button switch Cariva 100 un. 0,02 7 Hidden installation single-button switch Cariva 100 un. 0,01 Mounting socket outlet, 220V, 16A, with grounding contact, with 8 100 un. 0,08 curtains two-seater Cariva 9 Cable with copper vires insulation with PVC insulation by walls 100 m 2,5 10 Plastic pipes D=32mm 100 m 1,2 38

Steel strip D=40 4 11 100 m 0,5 SteelstripD 40 4mm Delivery of building materials on the distance. up to 15 km by car 1,5 12 T with lifting capacity up to 15 t

№ Description Unit of Q-ty measure Section 2. Material resources on project data Assembly of lighting panel with incoming switch and distribution 1 un 1 switchExinoxe-12 Box with a step-down transformer 220-12 2 un 3 Box with step-down transformer YATP-220/12 Lamp with compact luminescent lamp with protection degree 3 un 1 IP65 CD218-118 4 un 6 5 Display lamp "EXIT" 25 W un 1 6 18 W power un 2 7 Single-button switch 10A 220V un 1 № Description Unit of Q-ty measure

8 Double -button switch 10A 220V un 2 9 Socket outlet single 220V 16A un 8 10 Box for hidden installation of wiring KM-202 un 15 11 Box for hidden installation of switches and sockets K-201 un 11 Cable with copper conductors with PVC insulation 5 25 mm2 12 m 50 Cable with copper conductors with PVC insulation 3 1,5 mm2 13 m 60 Cable with copper conductors with PVC insulation 5 2,5 mm2 14 m 80 15 Cable with copper conductors with PVC insulation 56mm2 m 60 16 Plastic pipe diam. 32 mm m 120 17 Steel strip D=404 m 50 18 Armature Ø18 IL=2,5 un 5

1. III. POTENTIAL IMPACTS AND MITIGATION MEASURES

31. Potential impacts of proposed additional activities and relevant mitigation measures are described in the Table 4 below.

Table 4: Potential impacts of the prosed activities and mitigation measures Potential impacts Mitigation measures Temporary increase of Ensure that the maximum and equivalent noise levels comply with sanitary background noise and regulations (not more than 55 dBa). Instrumental noise measurements vibration due construction should be undertaken at least 2 times per month at the project boundary and works receptors

Monitor and address complaints about the noise level.

Construction works (including drilling works) will be limited to restricted times agreed to in the permit – from 7am to 5 pm in week days and from 8am to 4 pm on Saturday. 39

No works at night time, Sunday and holidays are allowed.

The proposed works includes only drilling equipment for walls (for installation of windows, doors, radiators) which will not cause vibration Creation of dust Monitor dust emissions to ensure emissions are minimized. emissions and volatile organic compounds at Monitor and address complaints about dust / volatile organic compounds and construction site while other pollutants dismantling work, transportation of Construction works will be limited to restricted times - from 7am to 5 pm in construction materials week days and from 8am to 4 pm on Saturday. No works at night time, and waste Sunday and holidays are allowed.

Providing the construction workers with suitable personal protective equipment (respirators)

Contractor will monitor the exhaust gas content of its own vehicle fleet.

There will be no open burning of construction / waste material at the site There will be no excessive idling of construction vehicles at sites

Keep surrounding environment (side-walks, roads) free of debris to minimize dust

In case of dust creation by pneumatic drilling/wall destruction during installation of windows/doors/radiators etc. installation suppress dust by water spraying and/or installing dust screen enclosures at site. Construction waste Waste disposal facilities are available.

Boxes for construction debris will be installed in the site.

The construction waste will be disposed according to general EMP requirements and SSEMP (Waste Management Plan)

Construction waste will be collected and disposed properly by licensed collectors

Timely sorting of rehabilitated and removing construction waste in an organized way, and disposal them on an authorized land field

Mineral construction and demolition wastes will be separated from general refuse, organic, liquid and chemical wastes by on-site sorting and stored in appropriate containers

Dispose off waste appropriately to prevent pollution of soil and groundwater

The approach to handling sanitary wastes and wastewater from building sites (installation or reconstruction) must be approved by the local authorities

Recycle valuable materials within the project or sold.

Aim to minimize waste through reducing and re-using (packaging) material

Do not allow any burning or burying of waste on site.

Prevent littering by construction staff at work sites by providing bins or waste bags in sufficient locations.

The records of waste disposal will be maintained as proof for 40

proper management as designed;

Whenever feasible the contractor will reuse and recycle appropriate and viable materials. Toxic / hazardous waste Temporarily storage on site of all hazardous or toxic substances will be in management safe containers labeled with details of composition, properties and handling information The containers of hazardous substances should be placed in a leak-proof container to prevent spillage and leaching The wastes will be transported by specially licensed carriers and disposed in a licensed facility Paints with toxic ingredients or solvents or lead-based paints will not be used Soil contamination due  Construction materials that can impact the soil should be kept in a to accidental spillage special premise or in concrete ground. • Soils contaminated by accidental spills should be immediately collected and properly disposed at relevant landfill in accordance with the permit from local environmental departments ; • regular maintenance of the equipment should be done by Contractor and checking for any possible leaks from the joints etc. Asbestos containing Ensure that the standard practice of handling existing asbestos containing materials (ACM) materials is used to remove and decommission asbestos containing roofing materials.

ACM will not be used as a roofing/new material in construction works of building.

Any existing ACM to be handled and disposed according to the SSEMP (ACM management and disposal plan)

Health and labor safety  The local construction and environment inspectorates have been (occupational hazards) – during construction and notified of upcoming activities operation  All work will be carried out in a safe and disciplined manner designed to minimize impacts on workers.  Workers will comply with international good practice - providing the construction workers with suitable personal protective equipment (always hardhats, as needed masks and safety glasses, harnesses and safety boots)  Appropriate signposting of the sites will inform workers of key rules and regulations to follow. Following plans to be developed for construction and operation phases of the project: Emergency Response Plan and Health and Safety Plan

Direct or indirect hazards Transport along the main street- A.Mirzoev and P-23 consists of private to public traffic and cars and public transport as well as taxis, vans, trucks. The volume of traffic pedestrians by is not very large. Contractor will observe the necessary precautions (speed construction activities limit, working hours from 7 am to 5 pm)

In compliance with national regulations the contractor will insure that the construction site is properly secured and construction related traffic regulated. This includes but is not limited to: Signposting, warning signs, barriers and traffic diversions: site will be clearly visible and the public warned of all potential hazards Traffic management system and staff training, especially for site access and near-site heavy traffic. Adjustment of heavy traffic to local traffic patterns, e.g. avoiding major transport activities during rush hours

41

4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor

32. The general Environmental Management plan (EMP) for all project sites is approved as part of Initial Environmental Examination (IEE) endorsed by State Environmental Committee of the Republic of Tajikistan and general management measures that apply to this sub-project should be followed by the Contractor.

33. In addition, the Contractor should prepare the following eight (8) Site-specific Environmental Management plans (SSEMP):

- Waste Management plan; - Emergency response plan; - Health and Safety Protection Plan; - Plan for the consideration of complaints; - Dust Control Plan; - Noise management plan; - ACM Handing, Management and Disposal Plan - Traffic and road safety management plan.

42

Environmental Safeguards Due Diligence Report

Project number: 46535-001 Grant 0452/53/3309 Date: June 2018

TAJ: Strengthening Technical and Vocational Education and Training

"MOLME/SH/CW05-D ": RENOVATION OF THE VOCATIONAL CONSTRUCTION LYCEUM IN KULOB

The Due Diligence Report for Social and Environmental Safeguards is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.

June 2018

43

TABLE OF CONTENT

I. INTRODUCTION ...... 46 1.1. Justification of the site ...... 46 II. DEFINING THE BORDERS ...... 47 2.1. Current condition of the site ...... 47 2.2. Location of objects and access to the site ...... 48 III. CONSTRUCTION ACTIVITIES ...... 53 3.1. Types of civil works ...... 53 IV. POTENTIAL IMPACTS AND MITIGATION MEASURES ...... 67 4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor ...... 69

Tables Table 1: Types of rehabilitation works for renovation of the Vocational Construction Lyceum in Kulob ...... 53 Table 2: Potential impacts of the prosed activities and mitigation measures ...... 67

Figures Figure 1: Location of Vocational Construction lyceum in Kulob in scale of the country - in Kulоb district ...... 48 Figure 2: Location of Vocational construction lyceum in Kulob...... 49 Figure 3: Aerial photo of the Vocational lyceum’s buildings and surrounding facilities/structures: ...... 52

Photos

Photo 1: Eductional building (side view) ...... 50 Photo 2: Classroom, current condition ...... 50 Photo 3: Educational building, inside view (corridor, classroom doors and stairs) 50 Photo 4: The workshop buildind, side view ...... 50 Photo 5: Current condition of the workshop (outside) ...... 50 Photo 6: Current condition of the workshop, inside view ...... 51 Photo 7: The Dormitory, side views ...... 51

44

ABBREVIATIONS

1 ADB Asian Development Bank 2 АСМ Asbestos containing materials 3 ALC Adult Learning Center 4 CM Complaint Mechanism 5 EIA Environmental impact assessment 6 EMP Environmental Management Plan 7 FLM Fuel and lubrication materials 9 GFS Gypsum-fiber sheets 10 LLC Limited Liability Company 11 MFC Microfinance company 12 MOLME Ministry of Labor, Migration and Employment of the Republic of Tajikistan 13 PAG Project Administration Group 14 SI State institution 15 SSEMP Site-specific Environmental Management Plan 16 VCLK Vocational Construction Lyceum in Kulob 17 TVET Technical and Vocational Education and Training 18 WMP Waste Management Plan

45

I. INTRODUCTION

1.1. Justification of the site

1. Over the years of independence, the management of the Government has made efforts to develop the education sector and training of highly qualified specialists for various industries.

2. The Ministry of Labor, Migration and Employment of the Republic of Tajikistan pays special attention to the technical condition, the availability of educational facilities (institutions) in schools to enhance vocational education and training of learners and students.

3. The proposed Project on Strengthening Technical and Vocational Education and Training (Project) will have an impact on national workforce with a high proportion of skilled workers employed in Tajikistan's domestic economy. The project is aimed at meeting the needs of the Republic of Tajikistan. Within the framework of the project, unemployed and partially employed young people and the adult population in the Republic will be provided with job opportunities and income in the domestic and international labor markets by providing quality training.

4. The outcome of the Project will be a more effective, efficient, quality-assured, and flexible system for the delivery of technical vocational training. The project includes the achievement of five outputs, namely: (i) modernization of the methodology of the TVET system; (ii) improving the physical conditions of training institutions; (iii) increasing the volume and quality improvement of TVET delivery; (iv) expansion of equal access to TVET; and (v) strengthening the leadership and management of the TVET system.

5. In November 2015, a Grant Agreement was signed between the Republic of Tajikistan and ADB on project financing.

6. An IEE/ EMP for this project was prepared and approved by September 2015. The project has been assigned category B in accordance with ADB's Safeguard policies.

7. As part of this Project, the Ministry of Labor, Migration and Employment of the Republic of Tajikistan shall sign a contract "MOLME/SH/CW05-C" with a construction firm for the rehabilitation of three buildings within the Vocational Construction Lyceum campus in Kulob.

8. The Contractor will undertake, in accordance with the contract, professionally and qualitatively, the rehabilitation works of the Vocational Construction Lyceum in Kulob within the terms provided for in the Contract to be awarded.

9. The Environmental Management Plan (EMP), which is part of the IEE, is general and wide- ranging and covers all possible consequences associated with the project. Therefore, the Contractor is required to develop a Site-specific Environmental Management Plan (SSEMP) prior to the commencement of construction works.

10. The main objective of the plan is to document how the environmental mitigation measures and required management plans proposed for rehabilitating the project site will be brought into line with the project commitments.

11. In addition, during the implementation of the Project, the Contractor will strictly comply with ADB's safeguard requirements and national laws and regulations in the field of environmental protection, and, under the terms of the contract, will develop and refine the

46

working measures, plan and management system for environmental protection in areas of repair works.

II. DEFINING THE BORDERS

2.1. Current condition of the site

12. The Vocational construction Lyceum in Kulob which was selected for STVET project consists of 6 buildings and other structures (shown below in Fig. 3-4). The following three buildings were proposed for rehabilitation: i. Educational building (Blocks A and B), ii. Training and workshop building and iii. Dormitory (building).

13. The educational building of the lyceum (located in the middle among other tree educational buildings), is one of the four educational buildings connected by a common passage. It is a two-story brick masonry building with asbestos cement slate roof and wooden windows and doors, which was built in 1974. The building has 12 classrooms and 9 administrative rooms.

14. The project proposes to repair the foyers at the first and second floors, renovate the stairs to the second floor, renovate classrooms including replacement of windows and doors; replace wirings, lamps and electrical appliances; repair toilets, which are in poor condition.

15. Training workshop. It is a two-story building which was built in 1974. It is a concrete- paneled building with ruberoid roof, windows and doors mostly absent and where they are remained they are wooden and in poor condition. In total there are 6 workshops in the building.

16. The project proposes to overhaul the roof, replace windows and doors, repair ceilings, walls, floors, wiring, replace lamps and electrical appliances, also repair facades and do general improvements with construction of a blind area and sidewalks.

17. The dormitory consists of three blocks, two of them which are most deteriorated were proposed for renovation works. This is a four-story building, built in 1974. It is a brick masonry building with a slate roof, with wooden windows and doors. There are 98 dormitory rooms in the building.

18. The proposed renovation activities include the following: overhaul the entrance portal and the foyer; repair of the staircase with replacement of the railing to the fourth floor; repair of living rooms at the second, third and fourth floors with replacement of windows and doors, major repairs of ceilings, walls, floors, wiring, replacement of lamps and electrical appliances; repair of the foyer and corridors - the floors will be replaced with ceramic tiles; repair of façade, sanitary units. internal water supply and sewerage systems, external sewage line to the point of connection with the existing urban system.

19. The buildings proposed for the rehabilitation are in poor condition, do not meet the modern construction standards and need relevant renovation and reconstruction.

20. Asbestos cement sheets were used as roofing material for mentioned buildings. Roof should be demolished and then replaced by non-hazardous materials which will not cause any risks for the health of Lyceum students and staff. In order to mitigate the occupational and public health risks of inhalation of airborne asbestos fibers, when disassembling the roofs they will be removed and disposed of following the internationally-recognized Standard Practice for Maintenance, Renovation and Repair of Installed Asbestos Cement Products (American Society for Testing and Materials [ASTM] E 2394). An Asbestos 47

Containing Materials Handling, Management and Disposal Plan will be prepared by the Contractor as part of the SSEMPs.

2.2. Location of objects and access to the site

21. , in scale of the country is shown in Figure 1 below. Kulob is a city in the Kulob District, Khatlon Province of Tajikistan, which is located 203 km south-east of the capital Dushanbe in the Yakhsu River valley (Pyanj river basin), at the foot of the Khazratishokh ridge. It is one of the largest cities in the country. In the North it borders with Khovaling and Muminobod districts, in the East - with Shuroabod district, in the West - with Vose district and in the South - with Khamadoni district of Khatlon Province.

Figure 6: Location of Vocational Construction lyceum in Kulob in scale of the country

22. The Vocational Construction Lyceum in Kulob, is located in the centre of Kulob city at the following address: Kulob city, 12, 1st May street.

23. Figure 7 below shows the location of the Vocational Construction Lyceum in Kulob.

48

Figure 7: Location of the Vocational Construction Lyceum in Kulob

24. Figure 3 and the photos below shows the lyceum to be rehabilitated, which consists of three buildings.

49

Photo 34: Educational building (outside view) Photo 35: Classroom, current condition

Photo 36: Educational building, inside view (corridor, classroom doors and stairs are in very poor condition)

Photo 38: Current condition of the workshop Photo 37: The side view of the (outside) workshop building,

50

Photo 39: Current poor condition of the workshop, inside view

Photo 40: The Dormitory, side views

25. The main road that will be used in the transportation of equipment and construction materials is 1st May Street. The contractor should establish relevant warning signs while conducting the rehabilitation works.

26. Figure 3 below shows the project site boundaries and nearby receptors (i.e. houses, etc.) located close to the site, as well as the access roads.

51

Vocational Construction lyceum in Kulob

LEGEND 1. Educational buildings

2. Training workshop

3. Dormitory block A and B

4. In this building on the ground floor there is the Regional Resource Center in Kulob which have been proposed to be rehabilitated under STVET project

5. Adult Learning Center

6. Private house

7-8 Residential buildings

9. Main gate

10. The main road – 1st May Street

11. The “Kulob-Pamir” Hote

Note: The dashed line shows the buildings which were proposed for the renovation under TVET project Figure 8: AОrТКl pСoto oП tСО VoМКtТonКl lвМОum’s ЛuТldТnРs Кnd surroundТnР ПКМТlТtТОs/struМturОs:

27. The nearest sensitive receptors around the area of buildings proposed for the rehabilitation are the following:

Area of dormitory: in the North there is a multi-story apartment building at the distance of 50 m, in the East and West sides of the dormitory there are residential buildings and a hotel which are located at the distance of more than 100 m from the dormitory.

Area of workshop: the nearest private house and apartment buildings in the North-West direction from the workshop are located at the distance of 25-50 meters.

Area of educational building: there are other educational buildings of the Lyceum, at a distance of 20 m. The remaining buildings within the boundaries of the Lyceum are located at the distance of 40-50 m/ Other buildings beyond the boundaries are located at a distance of more than 100 m towards all directions.

52

28. Nearest residential buildings: • “Borbad” microdistrict is located to the West and South side, at the distance of about 30-40 meters from the Lyceum; • The “Kulob-Pamir” Hotel is located opposite the Lyceum, at the distance of more than 100 meters.

29. No construction of separate camp for the Contractor’s personnel is proposed here, because workers will be local.

30. Construction waste from the site should be disposed at the nearest waste storage facility in Kulob which is located at a distance of about 4-5 km from the Lyceum site. The Contractor shall conclude an agreement with the communal services of Kulob (State Unitary Enterprise “Khojagii manziliyu kommunali”) and apply for relevant permits.

III. CONSTRUCTION ACTIVITIES

3.1. Types of civil works

31. Following construction activities are proposed for this sub-project - see

32. Table 5 below:

Table 5: Types of rehabilitation works for the renovation of Vocational Construction Lyceum in Kulob city No Description Unit Quantity 1 2 3 4 Repair Educational block Dismantling works 1 Removing door frames in partitions 100 un. 0,05 2 Dismantling of wooden window doorway openings 100 m2 0,233 3 Removing of window frames in stone walls with breaking of 100 un. 0,22 plastering in lintels 4 Dismantling of tiles laid on a floor solution 100 m2 0,23

5 Punching of openings in brick structures 1 m3 13,3 6 Stamping of plasters from the walls of brick internal ST-1 100 m2 6,85 7 Dismantling of flooring of boards Fl-2, Fl-4 100 m2 3,29 8 Removal of construction debris for a distance of 10 km on a Kamaz /km 33,0 truck. 10t, the cost of fuel is 6.6 somoni Repair works 9 Bricklaying of walls from a brick 1 3 2,2 Openings 10 Installation of metal-plastic window blocks m2 119 11 Installation of metal-plastic door blocks m2 20 12 Installation of window sills from PVC in stone walls is wide. 30 cm 100 m 0,68 13 Installation of wooden door blocks with an opening area of up to 3m2 100 m2 0,28 Finishing work

53

Finishing work (internal ) 14 Improved plastering of internal walls of ST-1 and ST-2 100 m2 8,5 15 Plaster of the surfaces of window and door slopes on concrete and 100 m2 0,95 stone No Description Unit Quantity 16 Cementing of surfaces of walls -1 100 m2 6,85 17 Puttying of the surfaces of door and window slopes 100 m2 0,88 18 Painting with polyvinyl acetate water-emulsion structures of walls, 100 m2 7,7 partitions and slopes of ST-1 19 Wall cladding with ceramic tiles ST-2 100 m2 1,74 Ceilings 20 SuspОndОd МОТlТnРs oП ‘’ArmstronР ‘’tвpО on ПrКmО Пrom РКlЯКnТгОd 100 m2 3,71 profile . 21 Installation of metallic skeletons for ceilings Cl-2 1 m2 23 22 Boarding of ceilings made of plastic 100 m2 0,23 Floors 23 Arrangement of the underlying layers of crushed stone with thick. Fl- 100 m2 0,23 1, Fl-2 24 Laying of laminate flooring on a ready-made substrate type PERGO 100 m2 2,074 Fl-2 25 Installation skirting made of plastic Fl-2 100 m 1,19 26 Arrangement of the underlying layers of crushed stone with thick. 1 m3 33 Fl21, Fl-4 27 Arrangement of concrete boarding thick. 100mm Fl-2, Fl-4 100 m2 3,28 28 Levelling the screed from a sement-sand mortar M150 thickness of 100 m2 3,51 30mm thick. Fl-2,Fl-3, Fl-4 29 Floor covering from a cement mortar made of ceramic and tiles 100 m2 1,96 ‘’SОrКnТtСвС ‘’Fl-1,Fl-2 30 Installation and disassembly of internal tubular inventory forests with 100 m2 8,5 room heights up to 6 m External Plinth 31 Arranging of concrete ramp 100 m3 0,015 32 DТssКsКmЛlТnР oП porМС Пrom tТlОs ‘’SОrКnТt’’ 100 m2 0,24 Visor 33 Making a farm visor 1 un. 0,600 34 Installation of wooden frames of the roof of the trumpet 1 m3 0,2 35 The device of roofs of a visor from the zinced steel 100 m2 0,17 36 Sheathing of visor ceilings, cornices and columns of alukabond on 100 m2 0,39 metal profiles 2x40mm -1 37 Delivery of building materials on the distance. 15km on a Kamaz car, 53,00 the cost of fuel is 6.6 somoni Internal water supply and sewerage networks Section 1. Dismantling works 1 Dismantling of pipelines from water and gas pipes with a diameter of 100 m 0,63 65, 50, 25, 15 mm 2 Dismantling of internal cast iron sewer pipes with a diameter of 100 m 0,05 50mm 3 Dismantling of internal cast iron sewer pipes with a diameter of 100 m 0,12 100mm 54

Section 1. System B1 4 Laying of steel water and gas pipelines with D=65mm 100 m 0,5 No Description Unit Quantity 5 Laying of steel water and gas pipelines with D=50mm 100 m 0,1 6 Laying of steel water and gas pipelines with D=25mm 100 m 0,15 7 Laying of steel water and gas pipelines with D=15mm 100 m 0,5 8 Installation of tap D=15mm 1 un. 1 9 Installation of watering tap with dia. 25mm 1 tap 2 10 Installation gate valve cast-Тron ПlКnРОd Ø65 1 un. 1 11 InstКllКtТon oП аКtОr СОКtОr ‘’ArТston ‘’ А=100l 10 set 0,2 12 Installation of firemen's cranes with a diameter of 50 mm 1 un. 2 Sanitary appliances 13 Replacement of wash sink 100 un. 0,03 14 Changing Genoa Chaise Bow 100 un. 0,07 15 Installation of traps 10 set 0,2 16 Hygienic shower installation 10 set 0,7 17 Installing mixers 10 un. 0,3 System K1 18 Plastic pipes D = 50mm plastic sheath 100 m 0,1 19 Plastic pipes D = 100mm plastic sheep 100 m 0,24 20 Installation of polyethylene fittings of tees 10 un. 2 21 Installation of polyethylene fittings 10 un. 1,7 22 Delivery of building materials on the distance. up to 15 km by car 12 with lifting capacity up to 15 t Outdoor water supply and sewerage Section 1. Excavation 1 Development of soil in the dump with excavators with a bucket 1000 m3 0,224 capacity of 0.4 m3 (wells for pipelines and wells) 2 Backfilling by hand for pipelines and manholes 100 m3 2,24 Section 2. System B1, B1, 1 3 LКвТnР oП stООl аКtОr Кnd РКs pТpОlТnОs Ø1084 1 km 0,036

4 LКвТnР oП stООl аКtОr Кnd РКs pТpОlТnОs Ø893 763 1 km 0,153

5 LКвТnР oП stООl аКtОr Кnd РКs pТpОlТnОs Ø893 1 km 0,051

6 Intallation tee flanРО МКst Тron аТtС ПТrО stКnd Ø100 mm 1 un. 0,042 7 Installation of fittings 1 un. 0,0186 8 Installation of valves 1 un. 2 9 InstКllКtТon oП ЯКlЯОs Ø80 1 un. 1 10 InstКllКtТon oП ЯКlЯОs Ø100 1 un. 1 11 Welding flanges to steel pipes 1 un. 4 12 АОldТnР ПlКnРОs to stООl pТpОs Ø80 mm 1 un. 6 13 АОldТnР ПlКnРОs to stООl pТpОs Ø100 mm 1 un. 2

55

14 Installation of fire hydrants 1 un. 1

No Description Unit Quantity 15 CuttТnР Тnto ОбТstТnР nОtаorks oП stООl pТpОs oП stООl ПТttТnРs Ø100 mm 1 un. 1 16 Application of reinforced anti-corrosion bitumen-rubber insulation on 1 km 0,051 stООl pТpОlТnОs Ø50 mm 17 Application of reinforced anti-corrosion bitumen-rubber insulation on 1 km 0,153 stООl pТpОlТnОs Ø80 Кnd 75 mm 18 Application of reinforced anti-corrosion bitumen-rubber insulation on 1 km 0,036 stООl pТpОlТnОs Ø100 mm 19 Arrangement of round wells from prefabricated reinforced concrete 10 m3 0,265 Section 1. System K1. 20 Development of soil in the dump with excavators with a bucket 1000 3 0,108 capacity of 0.4 m3 (wells for pipelines) 21 Backfilling by hand for pipelines and manholes 100 3 1,08 22 Change of individual sections of cast-iron sewer pipes with a 100 1,2 diameter of 150 mm 23 ClОКnТnР sОаОr pТpОs Ø160 mm 100 5 24 Delivery of building materials on the distance. 15 km by car Kamaz, 46 to 15 tn Electric lighting and electrical equipment Education block Section 2. Material resources on project data 1 Shield lighting with an input automaton of the type BA51-31 In = 32A un. 2 Exinoxe-6 2 Lamp with luminescent lamps G13 418VT un. 20 3 Lamp with luminescent lamps G13 418VT un. 8 4 Lamp with luminescent lamps G13 418VT un. 37 5 Lamp with compact luminescent lamp with protection degree IP65 un. 8 CD160-218 6 Lamp with compact luminescent lamp with protection degree IP65 un. 2 CD160-218 7 DТsplКв lКmp ‘’EБIT’’ 25 Vt un. 3 8 Emergency power supply K-303 un. 32 9 Luminescent compact lamp with capacity 18Vt un. 241 10 Linear fluorescent lamp G13, 18 W un. 188 11 Single button switch 10A, 220B un. 15 12 Double button switch 10A, 220B un. 6 13 Waterproof IP65 socket for 220V 16A un. 15 14 Waterproof IP65 socket for 220V 16A un. 15 15 Boxes for branching KM-202 un. 100 16 Boxes for branching KM-201 un. 40 17 Cable with copper conductors with polyvinyl chloride insulation with m 546 low flammability sec 31,5mm2 18 Cable with copper conductors with polyvinyl chloride insulation with m 200 low flammability sec 32,5mm2 19 Cable with copper conductors with polyvinyl chloride insulation with m 50 low flammability sec 510mm2 20 Cable with copper conductors with polyvinyl chloride insulation with m 60 low flammability sec 34mm2 No Description Unit Quantity

56

21 PlКstТМ pТpО Ø25 mm m 20 22 Ø16GoППОr Ø16mm m 800 23 Steel pipe D = 20 mm m 50 Fire alarm Educational block and Dormitory Materials not taken into account by the price list 1 Revieving –control and guard- ПТrО dОЯТМО ‘’GrКnТt-8 ‘’TU 4372-018- un. 1 11858296-01 2 Accumulator battery 12V, 7A hr un. 1 3 Electropic fire smoke detector Ipow=9,36 V(10 %)IP 212-41M un. 22 4 Manual fire detector un. 21 5 Manual fire detector (+10%) IPR-3SU un. 7 6 Light- diode detector 30010014Iport=0,025 un. 7 7 Combined warning system Mayak -12 KP un. 7 8 Control device for stub lines UKSh-1 un. 4 9 Cable with single-wire cores D=0,5mm with insulation from the m 500 composition of polyethylene with white PVC plastic cosing KSPB- 20,5 10 Flexible wire up V PVC -20,75 m 200 11 Cable PVC- 31,5 m 20 12 Pipe flexible gofirovannaya D = 10mm GOFROSHLANG m 700 13 Universal connection box UK-2P un. 20 Repair Dormitory (block Aand B ) 2,3 and 4 floor (block B) Dismantling works 1 Dismantling of wooden window doorway openings with sll 100 m2 1,05

2 Dismantling of wooden window doorway openings 100 m2 1,084

3 Stamping of plasters from the walls of brick internal 100 m2 15,7

4 Cleaning the old plastering of ceilings 100 m2 12,16

5 Dismantling the old doorway floors 100 m2 9,97

6 Removal of construction debris for a distance of 10 km on a Kamaz /km 120,0 truck, the cost of fuel is 6.6 somoni

Repair works

Openings

7 Masonry of walls (partitions) made of brick strata. 200mm 1 m3 91

8 Installation of metal –plastic window blocks m2 105

9 Installation of window boards from PVC in stone walls 25sm 100 m 0,83

10 Installation of wooden door blocks with an opening area of up to 3m2 100 m2 1,09

No Description Unit Quantity Repair works

57

Repair works (internal )

11 Improved plastering of internal walls 100 m2 31,69

12 Plastering of the surfaces of window and door slopes on concrete 100 m2 1,51 and flat stone

13 Plastering of wall surfaces 100 m2 31,69

14 Plastering of surface of door and window slopes flat 100 m2 1,07

15 Painting with polyvinyl acetate water-emulsion compositions of walls, 100 m2 32,76 partitions and slopes

Ceilings

16 Solid leveling of the ceilings (single-layer plaster) from dry mixes 100 m2 12,27

17 Painting with polyvinyl acetate water-based compositions improved 100 m2 12,27 in plaster ceilings

Floors

18 Levelling the screed from a sement-sand mortar M150 thickness of 100 m2 12,27 30mm Fl-1, Fl-2

19 Floor МoЯОrТnР Кnd plТntС Пrom К tТlОs ‘’SОrКntТМ’’ Fl-1 100 m2 2,55

20 Laying of laminate flooring on a ready-made base type PERGO Fl-2 100 m2 9,970

21 Installation skirting from plastic Fl-2 100 m 10,6

1,2,3 and 4 floor (block A)

Dismantling works

22 Dismantling of wooden window openings with sill boards 100 m2 0,953

23 Dismantling of wooden window doorway openings 100 m2 0,76

24 Fixing of plaster from the surfaces of break walls internal 100 m2 25,1

25 Cleaning of the old cementing of floors 100 m2 8,73

26 Dismantling of the old doorway floors 100 m2 7,00

27 Removal of construction debris for a distance of 10 km on a Kamaz /km 21,0 truck, fuel cost 6,6 somoni

Repair works

Openings

28 Masonry of walls (partitions) made of brick strata 1/2 100 m2 1,70

No Description Unit Quantity 29 Installation of metal –plastic window blocks m2 96

30 Installation of metal –plastic doorway blocks m2 61

31 Installation of window boards from PVC in stone walls 30sm 100 m 0,764

58

32 Installation of wooden door blocks with an opening area of up to 3m2 100 m2 0,681

Repair works

Repair works (internal )

33 Improved plastering of internal walls -1 -2 100 m2 27,37

34 Plastering of the surfaces of window and door slopes on concrete 100 m2 1,81 and flat stone

35 Plastering of wall surfaces Wl-1 100 m2 22,13

36 Plastering of surface of door and window slopes flat 100 m2 1,22

37 Painting with polyvinyl acetate water-emulsion compositions of walls, 100 m2 23,35 partitions and slopes Wl-1

38 Cladding of walls with ceramic tiles Wl-2 100 m2 5,24

Ceilings

39 Solid leveling of the ceilings (single-layer plaster) from dry mixes 100 m2 8,73

40 Painting with polyvinyl acetate water-based compositions improved 100 m2 8,73 in plaster ceilings Cl-1

41 Installation of metal frameworks for ceilings Cl-2 1 m2 145,2

42 Boarding of ceilings made of plastic Cl-2 100 m2 1,452

Floors

43 Levelling the screed from a sement-sand mortar M150 thickness of 100 m2 10,182 30mm Fl-1, Fl-2, and Fl- 3

44 Floor МoЯОrТnР Кnd plТntС Пrom К tТlОs ‘’SОrКntТМ’’ Fl-1 100 m2 1,91

45 Laying of laminate flooring on a ready-made base type PERGO Fl-2 100 m2 7,000

46 Installation skirting from plastic Fl-2 100 m 7,72

47 Floor covering from a cement mortar made of ceramic Fl-3 100 m2 1,452

48 Arrangement of metal fences for stairs 100 m 0,15

Roofs

49 Dismantling of roofings from wavy asbestos-cement sheets (blocks A 100 m2 10,40 and B)

No Description Unit Quantity 50 Change of the flooring with props from bars up to 50 mm thick and 100 m2 10,40 higher (blocks A and B)

51 Fire protection and doorway of the crates under the roof (blockA 1000 m2 1,04 and B)

52 The device of roofs from the zinced steel (block Aand B) 100 m2 10,4

53 The device of dormer windows (blocks A and B) 1 un. 6 59

External

Plinth

54 Improved plaster with cement-lime plinth solution (blocks A and B) 100 m2 0,95

55 Coloring the plinth with decorative facade paints (blocks A and B) 100 m 0,95

Repair façade

56 Improved plaster with cement-lime mortar on the stone walls (blocks 100 m2 8,4 A and B) (50% of the total volume)

57 Painting facades and slopes with decorative paints (spatter) (blocks 100 m2 16,85 Aand B )

58 Arrangement of gutter chutes (blocks Aand B ) 100 m 1,45

59 Installation of drainpipes (blocks Aand B ) 100 m 1,45

60 Installation of funnels (blocks A and B ) 1 un. 12

Visor

61 Installation of roofs of a visor from the zinced steel -1 100 m2 0,08

62 Sheathing of visor ceilings, cornices and columns of alukabond on 100 m2 0,16 metal profiles 2x40mm

Porch

63 Istallation of concrete screed thickness of 100 mm 100 m2 0,16

64 Installtion of porch coverings and the ramp from slabs "Seranitnyh" 100 m2 0,16

65 Installation and dismantling of external inventory forests with a height 100 m2 10,5 of up to 16 m tubular for other finishing works

66 Delivery of construction materials to the distance of 15 km on truck 55,00 carrying capacityto 15 km cost 6,46som

Internal networks of water supply and sewerage Dormitories System B1 1 LКвТnР oП stООl аКtОr Кnd РКs pТpОlТnОs аТtС Ø80 mm 100 m 0,50 2 LКвТnР oП stООl аКtОr Кnd РКs pТpОlТnОs аТtС Ø65 mm 100 m 0,2

No Description Unit Quantity 3 Laying of steel water and gas pipelines with D=50 mm 100 m 0,7

4 Laying of steel water and gas pipelines with D=32mm 0,05

5 Laying of steel water and gas pipelines with D=25mm 100 m 0,2

6 Laying of steel water and gas pipelines with D=15mm 100 m 0,7

7 Installation of cranes D = 15mm 1 un. 1 8 InstКllКtТon oП К РКtО Ø65 mm 1 un. 1 9 Installation of watering cranes, diameter 25 mm 1 cr. 8 10 Installation of water heater "Ariston" W = 100L 10 set 1,6 60

11 Installation of firemen's cranes with a diameter of 50 mm 1 cr. 22 Sanutary and technical devices 12 Replacement of wash sink 100 un. 0,2 13 Changing Genoa Chaise Bowl 100 un. 0,16 14 Installation of traps 10 set 1,2 15 Hygienic shower installation 10 set 1,6 16 Installing mixers 10 un. 3,6 17 Installation of shower trays of cast iron 10 set 1,6 18 Washing machine un. 8,00 System K1 19 Plastic pipes D = 50mm plastic sheath 100 m 0,25 20 Plastic pipesD=100mm plastic sheath 100 m 1,45 21 Installation of potyethylene embedded part of T-joints 10 un. 6,8 22 Installation of potyethylene embedded part of the bend 10 un. 5,6

23 Delivery of building materials on the distance. up to 15 km by car 12 with lifting capacity up to 15 t Electric lighting and electrical equipment 1 Input device: current transformers VRU-1D1250-100 un. 1 2 Shield lighting with an input automaton of the type BA51-31 In = 32A un. 7 Exinoxe-10 3 Shield lighting with an input automaton of the type BA51-31 In = 32A un. 1 Exinoxe-2 4 Box with a step-down transformer 220-12V YTPP un. 2 5 Lamp with compact luminescent lamp with protection degree IP65 un. 29 CD218-218 6 Lamp with compact luminescent lamp with protection degree IP65 un. 2 CD160-218 7 Lamp with luminescent lamps 218VT un. 47 8 CКndlОs 318 un. 84 9 CКndlОs 118 un. 84 10 Ceiling luminaire for compact fluorescent lamps 118W un. 8 compensated, degree of protection IP40 11 DТsplКв lКmp ‘’EБIT’’25Vt un. 11 No Description Unit Quantity 12 Luminescent compact lamp capacity 18Vt un. 421 13 Luminescent lamp Lb-18 un. 94 14 StКrtОr 8-220 un. 94 15 Single-button recessed switch10 220 un. 8 16 Double -button recessed switch10 220 un. 1 17 Single-button water proof recessed switch 10 220 un. 241 18 Socket outlet double 220V 16A un. 384 19 Socket outlet single 220V 16A un. 9 20 Boxes for branching KM-202 un. 1560 21 Boxes for branching KM-201 un. 280 22 Cable with copper conductors with PVC insulation sec 31,5mm2 m 2630 23 Cable with copper conductors with PVC insulation sec 32,5mm2 m 4530 61

24 Cable with copper conductors with PVC insulation sec 34mm2 m 1680 25 Cable with copper conductors with PVC insulation sec 52,5mm2 m 24 26 Cable with copper conductors with PVC insulation sec 56mm2 m 240 27 Cable with copper conductors with PVC insulation sec 510mm2 m 144 Fire alarm Dormitory Materials not taken into account by the price list 1 Revieving –control and guard- ПТrО dОЯТМО ‘’GrКnТt-2 ‘’TU 4372-018- un. 1 11858296-01 2 Accumulator battery 12V, 7A hr un. 1 3 Electropic fire smoke detector Ipow=9,36 V(10 %)IP 212-41M un. 211 4 Manual fire detector (+10%) IPR-3SU un. 10 5 Light- diode detector 30010014Iport=0,025 un. 11 6 Combined warning system Mayak -12 KP un. 17 7 Control device for stub lines UKSh-1 un. 10 8 Cable with single-wire cores D=0,5mm with insulation from the m 3165 composition of polyethylene with white PVC plastic cosing KSPB- 20,5 9 Flexible wire up V PVC -20,75 m 270 10 Cable PVC- 31,5 m 6 11 Pipe flexible gofirovannaya D = 10mm GOFROSHLANG m 3320 Repair Training and production workshop

Dismantling works

1 Dismantling of wooden window openings with sill boards 100 m2 5,85

2 Dismantling of wooden window doorway openings 100 m2 1,03

3 Dismantling of tiles laid on a floor solution PL-3 100 m2 2,913

4 Piercing of openings in brick structures 1 m3 6,27

No Description Unit Quantity 5 Fixing of plaster from the surfaces of break walls internal 100 m2 34,817

6 Removal of construction debris for a distance of 10 km on a Kamaz /km 65,0 truck, fuel cost 6,6 somoni

Repair works

Openings

7 Installation steel-plastic window blocks m2 585

8 Installation steel-plastic door blocks m2 43

9 Installation of metal-plastic partitions m2 20

10 Installation of window sills from PVC in stone walls is wide. 25cm 100 m 2,11

11 Installation of wooden door blocks with an opening area of up to 3m2 100 m2 0,42

62

12 Installation of metal doors 1 m2 59

Repair works

Repair works (internal )

13 Improved plaster of internal walls Wl-1 and Wl-2 100 m2 34,8

14 Plaster of the surfaces of window and door slopes on concrete and 100 m2 1,52 stone

15 Cementing of surfaces of walls Wall-1 100 m2 29,933

16 Puttying surfaces of door and window slopes Wall-1 100 m2 1,20

17 Painting with polyvinyl acetate water-emulsion structures of walls, 100 m2 31,1 partitions and slopes of - Wall 1

18 Wall cladding with ceramic tiles ST-2 100 m2 4,884

Ceilings

19 Installation of metal frames for ceilings PT-2 1 m2 111,4

20 Sheathing of ceilings made of plastic PT-2 100 m2 1,114

21 Solid leveling of surfaces (single-layer plaster) from dry gypsum 100 m2 15,6 mixtures of ceilings PT-1

22 Painting with polyvinyl acetate water-based compositions improved 100 m2 15,6 on plaster ceilings PT-1

Floors

23 Coatings on cement mortar from ceramic tiles Fl-2 100 m2 1,114

24 The device of concrete screeds in the thickness of 50 mm Fl-1 100 m2 12,76

No Description Unit Quantity 25 Grinding of concrete coatings Fl-1 100 m2 12,76

26 Leveling screed made of cement-sand mortar M150. 20 mm Fl-2, Fl- 100 m2 4,66 3

27 ArrКnРОmОnt oП Пloors Кnd plТntСs Пrom tСО ‘’SОrКnТt’’ Fl-1, Fl-2 100 m2 4,66

28 Installation and disassembly of internal tubular inventory forests with 100 m2 2,2 room heights up to 6 m

Internal

Porch

29 The device of concrete ramp 100 m3 0,015

30 The device of porch coverings from plates "Seranitnyh" 100 m2 0,18

Visor

31 Manufacturing of visor farm Vs-1 1 0,3

32 Arrangement of roof a visor from the zinced steel Vs-1 100 m2 0,12

63

33 Oil painting of metal surfaces visor Vs -1 100 m2 0,10

Facade

34 Improved plaster with cement-lime mortar on the stone walls 100 m2 7,18

35 Painting facades and slopes with decorative paints (spatter) 100 m2 8

36 Sheathing of alukabond on metal profiles 2x40mm 100 m2 1,24

37 Arrangement of gutter chutes 100 m 1,38

38 Installation of drainpipes 100 m 0,8

39 Installation of funnels 1 un. 8

40 Installation and dismantling of external inventory forests with a height 100 m2 13 of up to 16 m tubular for other finishing works

Plinth

41 Improved plaster with cement-lime mortar plinth 100 m2 0,345

42 PКТntТnР soМlО аТtС dОМorКtТЯО ПКхКdО pКТnts (spКttОr ) 100 m2 0,345

Roofs

43 Bricklaying of walls from a brick 1 m3 10,1

44 Installation of wooden rafters and running 1 m3 10,35

45 Installation of wooden frames of the roof from the beams (Diagonal 1 m3 6,06 leg, stand, ladder, mauerlat, lining, brace, filly)

46 Fire protection of wooden structures (rafters and girders, Diagonal 10 m3 1,641 leg, stand, ladder, mauerlat, lining, brace, filly)

No Description Unit Quantity 47 Fire protection of the crates under the roof 1000 m2 1,18

48 The device of roofs from the zinced steel from a laths from beams 100 m2 11,8

49 The device of dormer windows 1 un. 4

50 Roof railings with handrails 100 m 1,32

51 Arrangement of metal fences for stairs 100 m 0,1

52 Delivery of construction materials to the distance of 15 km on truck 67,00 carrying capacity to 15 km cost 6,6som

Internal water supply and sewerage networks Training and production workshop Pumping 1 Installation of centrifugal pumps with electric motor 1 un. 3 2 Installation Pump control panel CONTROL un. 1 3 Installation of expansion tank round capacity: 0.5 m3 1 un. 2,0 4 Installation of instrumentation 1 set 8 5 Installation of water meters VT-80 1 un. 1 6 Installation of valves, return valves, pipelines from steel pipes 1 un. 6

64

7 Installation of vibro-insulating inserts to pumps with a pressure of 1 10 un. 0,6 MPК, Ø65 8 Laying of water supply pipelines from steel water and gas 100 m 0,2 РКlЯКnТгОd pТpОs Ø114б4 mm 9 Laying of water supply pipelines from steel water and gas 100 m 0,15 РКlЯКnТгОd pТpОs Ø89б3 mm 10 Installation of fittings of welded steel 1 0,07 11 InstКllКtТon oП ПlКnРО МonnОМtТons on stООl pТpОlТnОs Ø65 mm 1 un. 10 Equipment 12 GRUNDFOS CONTROL Pump Control Panel set 1 13 Pressure switch FF4-4DAY0,22-4 bar set 6 System B1 14 Pipeline steel water Кnd РКs pТpО Ø80 mm 100 m 0,50 15 PТpОlТnО stООl аКtОr Кnd РКs pТpО Ø65mm 100 m 0,4 16 Pipeline steel water and gas pipe D=50mm 100 m 0,05 17 Pipeline steel water and gas pipe D=25mm 100 m 0,2 18 Pipeline steel water and gas pipe D=15mm 100 m 0,7 19 Installation of cranes D = 15mm 1 un. 3 20 Installation of watering cranes, diameter 25 mm 1 cr. 4 21 Installation of water heater "Ariston" W = 100L 10 set 0,4 22 Water heater installation 10 set 0,8 23 Installation of firemen's cranes with a diameter of 50 mm 1 cr. 4 Sanitary appliances 24 Washbasin changing 100 un. 0,09 No Description Unit Quantity 25 Changing Genoa Chaise Bowl 100 un. 0,08 26 Installation of traps 10 set 0,4 27 Hygienic shower installation 10 set 0,8 28 Installation of mixer 10 un. 1,3

29 Installation of shower trays 10 un. 0,4 30 Installation of shells 10 un. 0,3 System K1 31 Plastik pipes D 50mm chelebi plastic 100 m 0,25 32 Plastik pipes D 100mm chelebi plastic 100 m 0,65 33 Installation of polyethylene new style tee 10 un. 4,2 34 Installation of polyethylene new style 10 un. 3,2

35 Delivery of building materials on the distance. up to 15 km by car 25 with lifting capacity up to 15 t

Electrical lighting and electrical equipment Training and production workshop Material resources on project data 1 Input device: current transformers VRU-1D1250-100 un. 1 2 Switchgear: VRU-1D-250-219 UHL4 un. 1 3 Distribution cabinet with input switch SHCHR-12 un. 10 4 Shield lighting with an input automaton of the type Exinoxe-6 un. 3 5 Circuit-breaker for 25A 1ph un. 15 6 Plastic enclosure for circuit breakers, 1 modular un. 15 65

7 Luminaire with fluorescent lamp T5 218 un. 18 8 Luminaire with fluorescent lamp LB 258 W IP65 un. 150 9 Luminaire with fluorescent lamp G13 418 W un. 2 10 Ceiling luminaire for compact fluorescent lamps 2x18 W un. 51 compensated, degree of protection IP40 11 DТsplКв lКmp ‘’EБIT’’ Vt un. 6 12 Emergency power supply K-303 un. 10 13 Luminescent compact luminescent power 18 W un. 241 14 Lamp fluorescent lamp G13, 18 W un. 1958 15 Luminescent lamp LB-58 un. 130 16 Single-button switch 10 220 un. 12 17 Double –button switch 10 220 un. 12 18 Plug socket water- proof IP65 220 16 un. 64 19 Box for branching hidden wiring KM-202 un. 200 20 Box for the hidden installation of switches and sockets K-201 un. 100 21 Cable with copper conductors with PVC insulation 31,5 mm2 m 300

22 Cable with copper conductors with PVC insulation 31,5 mm2 m 1700

23 Cable with copper conductors with PVC insulation 32,5 mm2 m 200

24 Cable with copper conductors with PVC insulation 56 mm2 m 280

25 Cable with copper conductors with PVC insulation 34mm2 m 700 No Description Unit Quantity 26 Plactic pipe D=28mm m 580 27 GoППОr Ø16mm m 2400 28 Steel strip D = 40x4 mm m 500 29 ArmКturО Ø18 I L = 2,5 m un. 6 Fire alarm Education Training and production workshop Materials not taken into account by the price list 1 Revieving –control and guard- ПТrО dОЯТМО ‘’GrКnТt-2 ‘’TU 4372-018- un. 1 11858296-01 2 Accumulator battery 12V, 7A hr un. 1 3 Electropic fire smoke detector Ipow=9,36 V(10 %)IP 212-41M un. 17 4 Manual fire detector (+10%) IPR-3SU un. 2 5 Light- diode detector 30010014Iport=0,025 un. 2 6 Combined warning system Mayak -12 KP un. 3 7 Control device for stub lines UKSh-1 un. 2 8 Cable with single-wire cores D=0,5mm with insulation from the m 200 composition of polyethylene with white PVC plastic cosing KSPB- 20,5 9 380 -20,75 m 75 Flexible wire up V PVC -20,75 10 Cable PVC -31,5 10 11 Pipe flexible gofirovannaya D = 10mm GOFROSHLANG 275 12 Universal connection box UK 2 P un. 5

66

IV. POTENTIAL IMPACTS AND MITIGATION MEASURES

33. Potential impacts of proposed additional activities and relevant mitigation measures are described in the Table 6 below.

Table 6: Potential impacts of the prosed activities and mitigation measures Potential impacts Mitigation measures Temporary increase of Ensure that the maximum and equivalent noise levels comply with sanitary background noise and regulations (not more than 55 dBa). Instrumental noise measurements vibration due construction should be undertaken at least 2 times per month at the site boundaries and works at the receptors

Monitor and address complaints about the noise level.

Construction works (including drilling works) will be limited to restricted times agreed to in the permit – from 7am to 5 pm in week days and from 8am to 4 pm on Saturday. No works at night time, Sunday and holidays are allowed.

The proposed works includes only drilling equipment for walls (for installation of windows, doors, radiators) which will not cause vibration Creation of dust Monitor dust emissions to ensure emissions are minimized. emissions and volatile organic compounds at Monitor and address complaints about dust / volatile organic compounds and construction site while other pollutants dismantling work, transportation of Construction works will be limited to restricted times - from 7am to 5 pm in construction materials week days and from 8am to 4 pm on Saturday. No works at night time, and waste Sunday and holidays are allowed.

Providing the construction workers with suitable personal protective equipment (respirators)

Contractor will monitor the exhaust gas content of its own vehicle fleet.

There will be no open burning of construction / waste material at the site There will be no excessive idling of construction vehicles at sites

Keep surrounding environment (side-walks, roads) free of debris to minimize dust

In case of dust creation by pneumatic drilling/wall destruction during installation of windows/doors/radiators etc. installation suppress dust by water spraying and/or installing dust screen enclosures at site. Construction waste Waste disposal facilities are available.

Boxes for construction debris will be installed in the site.

The construction waste will be disposed according to general EMP requirements and SSEMP (Waste Management Plan)

Construction waste will be collected and disposed properly by licensed collectors

Timely sorting of rehabilitated and removing construction waste in an organized way, and disposal them on an authorized land field

Mineral construction and demolition wastes will be separated from general refuse, organic, liquid and chemical wastes by on-site sorting and stored in appropriate containers 67

Dispose off waste appropriately to prevent pollution of soil and groundwater

The approach to handling sanitary wastes and wastewater from building sites (installation or reconstruction) must be approved by the local authorities

Recycle valuable materials within the project or sold.

Aim to minimize waste through reducing and re-using (packaging) material

Do not allow any burning or burying of waste on site.

Prevent littering by construction staff at work sites by providing bins or waste bags in sufficient locations.

The records of waste disposal will be maintained as proof for proper management as designed;

Whenever feasible the contractor will reuse and recycle appropriate and viable materials. Toxic / hazardous waste Temporarily storage on site of all hazardous or toxic substances will be in management safe containers labeled with details of composition, properties and handling information The containers of hazardous substances should be placed in a leak-proof container to prevent spillage and leaching The wastes will be transported by specially licensed carriers and disposed in a licensed facility Paints with toxic ingredients or solvents or lead-based paints will not be used Soil contamination due  Construction materials that can impact the soil should be kept in a to accidental spillage special premise or in concrete ground. • Soils contaminated by accidental spills should be immediately collected and properly disposed at relevant landfill in accordance with the permit from local environmental departments ; • regular maintenance of the equipment should be done by Contractor and checking for any possible leaks from the joints etc. Asbestos containing Ensure that the standard practice of handling existing asbestos containing materials (ACM) materials is used to remove and decommission asbestos containing roofing materials.

ACM will not be used as a roofing/new material in construction works of building.

Any existing ACM to be handled and disposed according to the SSEMP (ACM management and disposal plan)

68

Health and labor safety  The local construction and environment inspectorates have been (occupational hazards) – during construction and notified of upcoming activities operation  All work will be carried out in a safe and disciplined manner designed to minimize impacts on workers.  Workers will comply with international good practice - providing the construction workers with suitable personal protective equipment (always hardhats, as needed masks and safety glasses, harnesses and safety boots)  Appropriate signposting of the sites will inform workers of key rules and regulations to follow. Following plans to be developed for construction and operation phases of the project: Emergency Response Plan and Health and Safety Plan

Direct or indirect hazards Transport along the 1st May street consists of private cars and public to public traffic and transport, as well as taxis, minibuses, trucks. pedestrians by construction activities Contractor will observe the necessary precautions (speed limit, working hours from 7 am to 5 pm)

In compliance with national regulations the contractor will insure that the construction site is properly secured and construction related traffic regulated. This includes but is not limited to: Signposting, warning signs, barriers and traffic diversions: site will be clearly visible and the public warned of all potential hazards Traffic management system and staff training, especially for site access and near-site heavy traffic. Adjustment of heavy traffic to local traffic patterns, e.g. avoiding major transport activities during rush hours

4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor

34. The general Environmental Management plan (EMP) for all project sites is approved as part of Initial Environmental Examination (IEE) endorsed by State Environmental Committee of the Republic of Tajikistan and general management measures that apply to this sub-project should be followed by the Contractor.

35. In addition, the Contractor should prepare the following eight Site-specific Environmental Management plans (SSEMP): - Waste Management Plan; - Emergency Response Plan; - Health and Safety Protection Plan; - Plan for the Consideration of Complaints; - Dust Control Plan; - Noise Management Plan; - ACM Handing, Management and Disposal Plan - Traffic and Road Safety Management Plan.

69

Environmental Safeguards Due Diligence Report

Project number: 46535-001 Grant 0452/53/3309 Date: June 2018

TAJ: Strengthening Technical and Vocational Education and Training

"MOLME/SH/CW05-C ": MINOR RENOVATION OF THE VOCATIONAL AGRICULTURAL LYCEUM IN KULYAB DISTRICT

The Due Diligence Report for Social and Environmental Safeguards is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.

June 2018

70

Table of content

I. INTRODUCTION ...... 73 1.1. Justification of the site...... 73 II. DEFINING THE BORDERS ...... 74 2.1. Current condition of the site ...... 74 2.2. Location of objects and access to the site ...... 75 III. CONSTRUCTION ACTIVITIES ...... 81 3.1. Types of civil works ...... 81 IV. POTENTIAL IMPACTS AND MITIGATION MEASURES ...... 88 4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor ...... 90

Tables

Table 1: Types of rehabilitation works for renovation of the Vocational Agricultural Lyceum in Kulyab (Dahana) ...... 81 Table 2: Potential impacts of the prosed activities and mitigation measures ...... 88

Figures

Figure 1: Kulyab district in the map of Tajikistan - in Kulyab district ...... 75 Figure 2: The rehabilitated facility is located in Kulyab (Dahana)...... 76 Figure 3: Figure 3. Aerial photo of the Vocational Agricultural Lyceum and surrounding facilities/structures: ...... 80

Photos

Photo 1: Educational building and dormitory to be rehabilitated - side views ...... 76 Photo 2: Photo 2. Educational building and dormitory - front view ...... 77 Photo 3: Current condition of Workshop...... 77 Photo 4: Current condition of classroom ...... 77 Photo 5: Current condition of ceilings in the classroom ...... 78 Photo 6: Current condition of rooms of the dormitory ...... 78 Photo 7: Training and production workshop proposed to be rehabilitated - front views .... 78 Photo 8: Training and production workshop -side views ...... 79 Photo 9: Current condition of workshop ...... 79

71

ABBREVIATIONS

1 ADB Asian Development Bank 2 АСМ Asbestos containing materials 3 ALC Adult Learning Center 4 CM Complaint Mechanism 5 EIA Environmental impact assessment 6 EMP Environmental Management Plan 7 FLM Fuel and lubrication materials 9 GFS Gypsum-fiber sheets 10 LLC Limited Liability Company 11 MFC Microfinance company 12 MOLME Ministry of Labor, Migration and Employment of the Republic of Tajikistan 13 PAG Project Administration Group 14 SI State institution 15 SSEMP Site-specific Environmental Management Plan 16 VALK Vocational Agricultural Lyceum in Kulyab 17 TVET Technical and Vocational Education and Training 18 WMP Waste Management Plan

72

I. INTRODUCTION

1.1. Justification of the site

1. Over the years of independence, the management of the Government has made efforts to develop the education sector and training of highly qualified specialists for various industries.

2. The Ministry of Labor, Migration and Employment of the Republic of Tajikistan pays special attention to the technical condition, the availability of educational facilities (institutions) in schools to enhance vocational education and training of learners and students.

3. The proposed Project on Strengthening Technical and Vocational Education and Training (Project) will have an impact on national workforce with a high proportion of skilled workers employed in Tajikistan's domestic economy. The project is aimed at meeting the needs of the Republic of Tajikistan. Within the framework of the project, unemployed and partially employed young people and the adult population in the Republic will be provided with job opportunities and income in the domestic and international labor markets by providing quality training.

4. The outcome of the Project will be a more effective, efficient, quality-assured, and flexible system for the delivery of technical vocational training. The project includes the achievement of five outputs, namely: (i) modernization of the methodology of the TVET system; (ii) improving the physical conditions of training institutions; (iii) increasing the volume and quality improvement of TVET delivery; (iv) expansion of equal access to TVET; and (v) strengthening the leadership and management of the TVET system.

5. In November 2015, a Grant Agreement was signed between the Republic of Tajikistan and ADB on project financing.

6. An IEE/ EMP for this project was prepared and approved in September 2015. The project has been assigned category B in accordance with ADB's Safeguard policies.

7. As part of this Project, the Ministry of Labor, Migration and Employment of the Republic of Tajikistan shall sign a contract "MOLME/SH/CW05-C" with a construction firm for the rehabilitation of two buildings within the Vocational Agricultural Lyceum campus in Kulyab (Dahana).

8. The Contractor will undertake, in accordance with the contract, professionally and qualitatively, the rehabilitation works of the Vocational Agricultural Lyceum in Kulyab (Dahana) within the terms provided for in the Contract to be awarded.

9. The Environmental Management Plan (EMP), which is part of the IEE, is general and wide- ranging and covers all possible consequences associated with the project. Therefore, the Contractor is required to develop a Site-specific Environmental Management Plan (SSEMP) prior to the commencement of construction works.

10. The main objective of the plan is to document how the environmental mitigation measures and required management plans proposed for rehabilitating the project site will be brought into line with the project commitments.

11. In addition, during the implementation of the Project, the Contractor will strictly comply with ADB's safeguard requirements and national laws and regulations in the field of environmental protection, and, under the terms of the contract, will develop and refine the working

73

measures, plan and management system for environmental protection in areas of repair works.

II. DEFINING THE BORDERS

2.1. Current condition of the site

12. The Vocational Agricultural Lyceum in Kulyab which was selected for the STVET project consists of 3 buildings and other structures. Two of them will be renovated, namely:

i) Educational building and dormitory ii) Training and production workshop

13. Educational building and dormitory. It is a brick masonry one-story building, which was built in 1959. There are 6 classrooms and 5 dorm rooms in the building. The roof of the building is covered with metal sheets, a small part of the roof covered with asbestos-cement slates. The building has wooden windows and doors in workshops, and metal-plastic in classrooms and dorm rooms. The following is being planned:  Overhaul the part of building, repair the lobby, overhaul the classes and rooms of the dormitory;  Replacement of windows and doors;  Replacement of electrical wiring, lighting fixtures and electrical appliances;  Installation of the entrance portal, balusters on the veranda;  Repair of the staircase with the device ramp for the for people with disabilities;  Repair of the roof, with the replacement of the asbestos-cement slate roof with metal sheets;  Overhaul of outdoor external toilet. Repair of the sidewalks.

14. Training and production workshop. It is a brick masonry one-story building, which was built in 1959. There are 2 workshops in the building. The roof of the building is covered by asbestos- cement slate. The building has wooden windows and doors. The following is being planned: renovation of the entire building; overhaul of the roof; renovation of floors; replacement of windows and doors, overhaul of ceilings and walls; replacement of electrical wiring, lighting fixtures and electrical appliances; repair of facades; accomplishment with the construction of blind areas of the building and sidewalks.

15. The buildings are in poor condition, do not meet the modern construction standards and are in need of renovation and reconstruction. All structures that do not meet the safety requirements will be demolished.

16. Asbestos cement sheets are being used on buildings as roofing material. Roof should be demolished and also replaced by non-hazardous materials which will not cause health risks for the Lyceum students and staff. To mitigate the occupational and public health risks of inhalation of airborne asbestos fibers, when disassembling the roofs they will be removed and disposed of following the internationally-recognized Standard Practice for Maintenance, Renovation and Repair of Installed Asbestos Cement Products (American Society for Testing and Materials [ASTM] E 2394). An Asbestos Containing Materials Handling, Management and Disposal Plan should be prepared by the Contractor as part of the SSEMPs.

74

2.2. Location of objects and access to the site

17. The Vocational Agricultural Lyceum is situated in Kulyab district of Khatlon region (location at a country scale is shown in Figure 1 below). The district center and Kulyab city is located in the valley of the Yakhsu river (the Pyanj river basin), at the foot of the Khazratishokh ridge, at the distance of 203 km South-East from Dushanbe. In the North it borders with Khovaling and Muminobod districts, in the East - with Shuroabod district, in the West - with Vose district, in the South - with Khamadoni district of Khatlon region. Dahana is a village near the administrative center of Kulyab districts, in the Khatlon region of the Republic of Tajikistan.

18. The Vocational Agricultural Lyceum is located in the Kulyab district, in Jamoat Dahana, Dahana village. The Vocational Agricultural Lyceum serves as the main venue for all students classes/studies.

Figure 9: Sub-project location - Kulyab district

19. Figure 10 below shows the location of the Vocational Agricultural lyceum in Kulyab (Dahana village).

75

Figure 10: The facility proposed for the rehabilitation is located in Dahana village of Kulyab district

20. The photos below illustrate the current status (inside and outside) of the Vocational Agricultural Lyceum buildings in Kulyab (Dahana) which are being proposed for rehabilitation under the STVET project.

Photo 41: View of educational building and dormitory proposed for the rehabilitation

76

Photo 42: Educational building and dormitory - front view

Photo 3. Educational building and dormitory: condition of the roof. Part of the roof consists of asbestos cement slates

Photo 43: Current condition of the Photo 44: Current condition of the classrooms of Workshop Lyceum

77

Photo 45: Current condition of ceilings in the classroom

Photo 46: Current condition of rooms in the dormitory

Photo 47: Training and production workshop building proposed for the rehabilitation - front views

78

Photo 48: Training and production workshop -side views

Photo 49: Current condition of workshop – inside view

21. The main road that will be used in the transportation of equipment and construction materials is RJ034 street. The contractor will establish warning signs when conducting rehabilitation works.

22. Figure 11 below shows the project site boundaries and nearby receptors (i.e. houses, etc.) located close to the site, as well as the access roads.

79

Vocational Agricultural Lyceum in Kulyab

LEGEND 1. Educational building and dormitory proposed for rehabilitation 2. Training and 2 production workshop 3 7 building proposed for rehabilitation 4 3. Administrative buildings of the Lyceum 4. Canteen 5. Stadium and 6 Garden of the Lyceum 8 6. Main access road- 5 RJ034 7. Main gate 1 8. School 9. Private houses 9

Figure 11: Aerial photo of the Vocational Agricultural Lyceum and surrounding facilities/structures

23. The Lyceum buildings proposed for the rehabilitation under the STVET project are located at the distance of 10-170 m or even more meters from residential quarters.

From the North side of the Educational building and Dormitory there are:  Canteen located at a distance of 140 m;  Administrative buildings of the Lyceum at a distance of 20 m; From the South side there are:  Private houses located at a distance of 25-50 m; From the East side:  Private houses located at a distance of 50 m; From the West side there is:  School at a distance of 40 m.

From the North side of the Training and production workshop there are:  Private houses located at a distance of 100 m and more; From the South side there are:  Canteen located at a distance of 10 m;  Educational building and dormitory located at a distance of 170 m; From the West side there are:  Administrative buildings of the Lyceum located at a distance of 70-80 m;  Educational building and dormitory located at a distance of 100 m and more;

24. There is no need for construction of a separate camp for the personnel of Contractor, because all workers will be local. 80

25. Construction waste from the site should be disposed at the nearest waste storage facility in Kulyab district which is located at a distance of about 4-5 km from the Lyceum site. Contractor shall conclude an agreement with the the communal services of Kulyab district (State Unitary Enterprise “Khojagii manziliyu kommunali”) and apply for relevant permits.

III. CONSTRUCTION ACTIVITIES

3.1. Types of civil works

26. Within the framework of this project, the following construction activities are envisaged - see Table 7 below

Table 7: Types of rehabilitation works for renovation of the Vocational Agricultural Lyceum in Kulyab (Dahana) No Description Unit Quantity

Repair and construction work Training and production workshop Section 1. Earth works Development of soil with loading on dump trucks with 1 excavators with a bucket with a capacity of 0.65 (0.5-1) m3, 1000 m3 2,392 group of soils II Removal of soil at a distance of 1 km by Kamaz truck, 2 T 3873 fuel cost 7 somoni (reserve) Arrangement of soil cushions on subsidence ground by the 3 1000 m3 1,137 method of layer-by-layer rolling Backfilling of pits with ground displacement up to 10 m by 4 bulldozers with a capacity of 79 (108) kW (hp), group of soils 1000 m3 0,875 2 5 Backfilling by hand of foundation pits group of soils 2 100 m3 1,914 6 Soil compaction with pneumatic rammer 100 m3 6,84 Section 2. Foundations 7 Arrangement of concrete preparation from concrete Kl. B3.5 100 m3 1,04 Arrangement of ribbon foundations reinforced concrete from 8 concrete cl. B15 Fl-1, Fl-2, Fl-3 and F-1 100 m3 1,89 Arrangement is a foundation beam FB-1 reinforced concrete 9 100 m3 0,05 of concrete cl. B15 10 Installation output B-1, B-2, B-3, B-4 and B-5 1 1,63 Arrangement of horizontal waterproofing of foundations with 11 100 m2 0,994 a thickness of 20 mm Waterproofing of the walls of the foundations lateral 12 bituminous coating in 2 layers along the leveled surface of 100 m2 9,46 the butovite Pit 13 Sealing of soil with pneumatic rammer (3 pcs.) 100 m3 0,035 14 Crushed stone preparation. 100 mm (3 pcs.) 1 m3 1,5 No Description Unit Quantity 15 Pit device (3 pcs.) 100 m3 0,143 Arrangement of blind area with a width of 1.2 m, thickness. 16 100 m3 0,23 0,15 m 81

Frame and walls Masonry of brick exterior walls of medium complexity with a 1 m3 17 136,1 floor height of more than 4 m Masonry of brick exterior walls of medium complexity with a 1 m3 18 height of up to 4 m 137,6 Masonry of bricks reinforced with a thickness of 120 mm of 100 m2 19 brick at a height of up to 4 m 1,155

20 Reinforcement of wall masonry with Cr-1 and Cr-2 grids 1 1,1 Arrangement monolithic w / w cores Sm-1, Sm-2, Sm-3 and 21 Sm-4 from concrete kl. B15 100 m3 0,162

The construction of monolithic reinforced concrete columns 22 100 m3 0,19 K-1 and K-2 from concrete kl. B15 23 Arrangement jumper -1, -2, -3 and -4 100 m3 0,120 Arrangement of a seismic belt of monolithic reinforced 24 100 m3 0,321 concrete, OP-1 and OP-2 Arrangement of beams of monolithic reinforced concrete, 25 100 m3 0,0293 Bm-1 Arrangement of overlappings with stacking of beams on 26 100 m2 6,40 walls with a rolling from boards 27 Brick fillings between beams 1 m3 11 Metal truss 28 Preparing communication CB-1 1 T 0,872 29 PrОpКrКtТon oП МommunТМКtТon -2 1 T 0,754 30 Preparation of the farm F-1 1 T 12,171 31 Mounting of the farm F-1 1 T 12,171 32 Mounting vertical communication SV-1 1 T 0,872 33 Mounting horizontal communication SV-2 1 T 0,754 34 Mounting run 1 T 8,687 35 Arrangement of a roof from a sandwich panel 100 m2 8,4 36 Sheathing parapet from alucabond on metal profile 100 m2 2,4 37 Arrangement of gutter chutes 100 m 0,84 38 Installation of drainpipes 100 m 0,35 Openings 39 Metal-plastic windows W-1 and Oak-2 m2 92 40 Metal-plastic doors Do-1, D-2 and D-3 m2 69 41 Installation of window boards from PVC in stone walls 100 m 0,26 42 Installation of metal gates Dm-2 1 T 3,6 Finishing work

(internal)

Improved plastering of walls and partitions with cement-lime 100 m2 43 17,01 mortar Plastering of the surfaces of window and door slopes on 100 m2 44 0,905 concrete and flat stone No Description Unit Quantity

45 Putty of the surface of walls 100 m2 10,46 46 Putty on the surface of door and window slopes of flat 100 m2 0,74 Painting with polyvinyl acetate water-emulsion compositions 47 100 m2 11,20 of walls, partitions and slopes 82

48 Wall cladding with ceramic tiles h = 3,7 m 100 m2 6,554 Ceilings Arrangement of suspended ceilings of the type 49 100 m2 5,02 on a frame made of galvanized profile 50 Installation of metal frames for ceilings PT-2 1 m2 66,3 51 Sheathing of ceilings made of plastic PT-2 100 m2 0,663 Floors 52 Soil compaction with rubble 100 m2 6,84 Arrangement of underlying layers of concrete strata. 100mm 53 1 m3 61,77 of concrete cl. B12.5 Arrangement of heat and sound insulation zasypnoy of fine- 54 1 m3 30,88 grained keromzitobeton cl. B12.5 in thickness. 40mm Arrangement leveling screed of cement-sand mortar M150 55 100 m2 6,17 thickness of 30 mm Arrangement of waterproofing a coating layer on bitumen 56 100 m2 0,663 mastic Arrangement leveling screed of cement-sand mortar M150 57 100 m2 0,663 thickness of 30 mm Arrangement of coatings on cement mortar from ceramic 58 100 m2 0,663 tiles Arrangement of coatings of floors and plinths from plates 59 "Seranitnyh" 100 m2 2,81 Laying of laminate flooring on a ready-made substrate type 60 100 m2 3,460 PERGO PL-2 61 Installation skirting from plastic PL-2 100 m 2,03 Installation and disassembly of internal tubular inventory 62 100 m2 5,9 forests with room heights up to 6 m Facade 63 Improved plastering of walls with cement-lime mortar 100 m2 4,4 64 Coloring the facade with decorative facade paints (rain) 100 m2 5,06 65 Improved plaster with cement-lime mortar plinth 100 m2 0,47 66 Facing the plinth with ceramic tiles 100 m2 0,47 Arrangement of porch coverings from porcelain stoneware 67 100 m2 0,30 tiles 68 Arrangement of concrete ramp 100 m3 0,23 Roof and roof visors Installation of wooden frames of the roof from the beams 69 (Diagonal leg, stand, ladder, mauerlat, lining, brace, filly) 1 m3 1 Fire protection of wooden structures (rafters and girders, 70 Diagonal leg, stand, ladder, mauerlat, lining, brace, filly) 10 m3 0,1

71 Fire protection of the crates under the roof 1000 m2 0,027 No Description Unit Quantity Arrangement of roofs from the zinced steel from a laths from 72 100 m2 0,27 beams Sheathing of visor from alucobond on metal profile 2x40mm 73 100 m2 0,4

Installation and dismantling of external inventory forests with 74 a height of up to 16 m tubular for other finishing works 100 m2 8,2

Delivery of building materials on a motor vehicle with a 75 carrying capacity of up to 25.0 tons. at the distance. 15 km. T 355

Internal water supply and sewerage networks Training and production workshop 83

System B1 1 Laying of steel and water-gas pipes D = 32 mm 100 m 0,46 2 Pipeline steel pipes for water and gas pipelines D = 25mm 100 m 0,2 3 Laying of steel and water-gas pipes D = 20mm 100 m 0,1 4 Gas pipe laying steel water-gas conducting D = 15mm 100 m 0,6 5 Installation of a pilot-drain cock D = 15mm 1 un 2 6 Installation of watering cranes, diameter 25 mm 1 un 2 7 Installation of water heater "Ariston" W = 100L 10 set 0,2 8 Installation of firemen's cranes with a diameter of 50 mm 1 un 2 Sanitary appliances

9 Installation of toilet bowls with siphon 10 set 1 10 Installation of washbasins of single 10 set 1 11 Installation of ladders 10 set 0,4 12 Hygienic shower installation 10 set 0,4 13 Installing Mixers 10 un 1,4 14 Installation of shower trays of cast iron 10 un 0,4 System K1 15 Plastic pipes D = 50mm plastic sheath 100 m 1,2 16 Plastic pipes D = 100mm plastic sheep 100 m 0,44 17 Installation of polyethylene fittings of tees 10 un 2,4 18 Installation of polyethylene fittings 10 un 2 Delivery of building materials on the distance. up to 15 km 19 T 18 by car with a carrying capacity of up to 25 tons Heating and ventilation Training and production workshop Ventilation Laying of air ducts from sheet, galvanized steel 0,7 mm, size 1 100 m2 2,56 800x800 mm Laying of air ducts from sheet, galvanized steel 0,7 mm, size 2 100 m2 0,1 500x500 mm 3 Installation of gratings 500x500 mm 1 un 12 4 Installation of fans 1 un 2 Heating Installation of the air conditioner model Gree GWH24RD- 5 K3NNA1C / I with the device of electrical circuits according un 9,0 to the requirements of the plant (kit) No Description Unit Quantity Delivery of building materials on the distance. up to 15 km 6 T 15 by car with a carrying capacity of up to 25 tons Electrical lighting and electrical equipment Training and production workshop Shield lighting with an input automaton and distribution 1 un 1 automatics Exinoxe-18 Lamp with compact fluorescent lamp with IP65 protection 2 un 22 degree CD160-2x18 Lamp with compact fluorescent lamp with IP65 protection 3 degree CD218-2x18 un 5 4 Lamp with fluorescent lamp G13 218 W un 8 5 Lamp with fluorescent lamp G13 418 W un 36 6 LED Spotlight un 12 7 Display lamp "EXIT" 25 W un 5 8 Emergency power supply K-303 un 3 84

9 Luminescent compact lamp rated at 18 W un 54 10 Lamp fluorescent lamp G13, 18 W un 160 11 The switch single-key 10 220 un 21 12 Doubl- button swich 10 220 un 12 13 Waterproof IP65 socket for 220V 16A un 66 14 Boxes for branching KM-202 un 200 Box for the concealed installation of switches and sockets K- 15 un 100 201 Cable with copper conductors with PVC insulation 3x1.5 16 m 420 mm2 VVGng (A) -LS Cable with copper conductors with PVC insulation 3x2.5 17 m 600 mm2 VVGng (A) -LS Cable with copper conductors with PVC insulation 3x4 mm2 18 m 200 VVGng (A) -LS Cable with copper conductors with PVC insulation 5 16 19 m 300 mm2 20 GoППОr Ø16mm m 1220 The fire alarm The educational-industrial shop 1 The device for control and security fire and security "Granite- 8" TU4372-018-11858296-01 un 1 2 Rechargeable battery 12V, 7A / h un 1 3 Smoke detector optic-electronic detector = 9 / 36 И un 24 (10%) И 212-41 4 The detector of fire heat S2000-IP-PA un 6 5 Fire Detector Manual (+ 10%) IPR-3SU un 2 6 LED display "EXIT" 30010014Iport = 0,025 un 6 7 Sounder combined Mayak-12KP un 3 8 The control device of plumes UKSH-1 un 2 9 Cable with single-core conductors D = 0.5 mm with insulation from a composition of polyethylene with a sheath m 480 of white PVC plastic KSPV - 2x0.5 10 Flexible wire up to 380V PVS-2x0.75 m 135 11 Cable PPV-3x1.5 m 15 12 Pipe flexible gofirovannaya D = 10mm GOFROSHLANG m 630 No Description Unit Quantity 13 Universal connecting box, UK-2P un 12

Cesspool Section 1. Earth work Development of a soil in a dump with excavators "dragline" 1 or "backward shovel" with a bucket with a capacity of 0.65 1000 m3 0,285 (0.5-1) m3 Removal of personal soil at a distance of 5 km T 138 Soil compaction with rubble under the bottom of the 2 100 m2 0,9 cesspool 3 Arrangement of concrete preparation 100 m3 0,0312 The construction of walls and flat bottoms with a thickness of 4 200 mm rectangular structures 100 m3 0,28 Waterproofing the external surface of the walls is cesspool; 5 lateral bituminous coating in 2 layers along the leveled 100 m2 0,7 surface of masonry, brick, concrete

85

Waterproofing the internal surfaces of the walls of the 6 100 m2 1,04 excavation Backfilling of trenches with displacement of ground up to 5 7 1000 m3 0,193 m by bulldozers with the capacity: 59 (80) kW (hp) Overlapping the cesspool 8 Installation of floor panels of cesspools 100 un 0,26 Waterproofing of the surface overlapping cesspool; 9 horizontal backing in 2 layers 100 m2 0,330 Delivery of building materials on the distance. 15 km by car 10 T 25,3 Kamaz, fuel cost 7 somoni Repair and construction works Dormitories Dismantling work Dismantling of wooden window openings with sill boards 1 100 m2 0,1433 2 Dismantling wooden doorway openings 100 m2 0,151 Fixing of plaster from the surfaces of walls of brick internal 3 100 m2 4,92 and external 4 Dismantling old wooden floors 100 m2 1,60 Dismantling of a blank filing of ceilings from plywood inside 5 100 m2 2,60 and outside Openings 6 Metal-plastic windows m2 14,3 7 Installation of window boards from PVC in stone walls 100 m 0,12 Installation of wooden door blocks with an opening area of 8 100 m2 0,151 up to 3m2 Finishing work (internal) Improved plastering of walls and partitions with cement-lime 9 100 m2 3,97 mortar Plastering of the surfaces of window and door slopes on 10 100 m2 0,29 concrete and flat stone 11 Filler of the surface of walls 100 m2 3,97 12 Filler surface of door and window slopes flat 100 m2 0,15 No Description Unit Quantity Painting with polyvinyl acetate water-emulsion compositions 13 100 m2 4,12 of walls, partitions and slopes Сeilinigs Lining of ceilings with plasterboard sheets on a wooden 14 frame 100 m2 1,6

15 Installation of metal frames for external ceilings 1 m2 100 16 Sheathing of ceilings made of plastic 100 m2 1 Floors 17 Soil compaction with rubble 100 m2 1,6 Arrangement of underlying layers of concrete strata. 100mm 18 1 m3 16 of concrete cl. B12.5 Arrangement of heat and sound insulation backfilling 19 1 m3 6,4 of fine-grained keromzitobeton cl. B12.5 in thickness. 40mm Arrangement of leveling screed of cement-sand mortar 20 M150 thickness of 30 mm 100 m2 1,6 Laying of laminate flooring on a ready-made substrate type 21 100 m2 1,600 PERGO PL-2

86

22 Installation of plinth from plastic PL-2 100 m 1,35 23 Arrangement of underlying layers of concrete strata. 100mm 1 m3 10 of concrete cl. B12.5 outdoor 24 Arrangement of coatings of floors and plinths from plates 100 m2 1,05 "Seranitnyh" Arrangement of underlying layers of concrete strata. 100mm 25 of concrete cl. B12.5 (Davomi Corridor) 1 m3 15 Facade Improved plastering of walls and columns with cement-lime 26 100 m2 1,362 mortar 27 Coloring the facade and columns with decorative facade 100 m2 1,61 paints (spatter) 28 Improved plaster with cement-lime mortar plinth 100 m2 0,16 29 Facing the plinth with seritanite tiles 100 m2 0,16 Coating of cornice from alucobond on metal profiles 30 100 m2 0,25 2x40mm Installation and dismantling of external inventory forests with 31 a height of up to 16 m tubular for other finishing works 100 m2 1,2

32 Trenching trenches for trays 100 m3 0,08 33 Device crushed stone preparation for trays thickness. 10 cm, 1 m3 2 breadth. 40 centimeters Arrangement of spillway structures from open prefabricated 34 reinforced conМrОtО trКвs on МrusСОd stonО (0,30,20,05 m) 100 3 0,02 35 Installation of metal fencing structures 1 T 1,6 36 Delivery of building materials on a motor vehicle with a T 65 carrying capacity of up to 25.0 tons. at the distance. 15 km. Electric lighting and electrical equipment Dormitories 1 Shield lighting with an input automaton and distribution un 1 automatics Exinoxe-18 No Description Unit Quantity 2 Luminaire with compact fluorescent lamp with IP65 un 8 protection degree CD218-2x18 3 Luminaire with fluorescent lamp G13 218 W un 2 4 Candles 418 un 7 5 Luminescent compact lamp with capacity 18 Vt un 44 6 Luminescent lamp G13, 18 Vt un 4 7 Single-button swich 10 220 un 9 8 Double-button swich 10 220 un 2 9 Waterproof socked 220 16 IP65 un 28 10 Boxes for branching KM-202 un 60 Box for the concealed installation of switches and sockets K- 11 un 39 201 Cable with copper conductors with PVC insulation 3x1.5 12 m 170 mm2 VVG ng (A) -LS Cable with copper conductors with PVC insulation 3x2.5 13 m 280 mm2 VVG ng (A) -LS Cable with copper conductors with PVC insulation 3x4 mm2 14 m 120 VVG ng (A) -LS Cable with copper conductors with PVC insulation 5 16 15 m 70 mm2 16 Gofroshlang Ø16 m 570

87

Fire alarm. Dormitory 1 The device for control and security fire and security "Granite- 8" TU4372-018-11858296-01 un 1 2 Rechargeable battery 12V, 7A / h un 1 3 Smoke detector optic-electronic detector = 9 / 36 un И 16 (10%) И 212-41 4 Fire Detector Manual (+ 10%) IPR-3SU un 2 5 Sounder combined Mayak-12KP un 3 6 The control device of plumes UKSH-1 un 1 7 Cable with single-core conductors D = 0.5 mm with insulation from a composition of polyethylene with a sheath m 160 of white PVC plastic KSPV - 2x0.5 8 Flexible wire up to 380V PVS-2x0.75 m 70 9 Pipe flexible gofirovannaya D = 10mm GOFROSHLANG m 230 10 Universal connecting box, UK-2P un 8

IV. POTENTIAL IMPACTS AND MITIGATION MEASURES

27. Potential impacts of proposed additional activities and relevant mitigation measures are described in the

28. Table 8 below.

Table 8: Potential impacts of the prosed activities and mitigation measures

Potential impacts Mitigation measures Temporary increase of Ensure that the maximum and equivalent noise levels comply with sanitary background noise and regulations (not more than 55 dBa). Instrumental noise measurements vibration due construction should be undertaken at least 2 times per month at the boundaries and at works receptors

Monitor and address complaints about the noise level.

Construction works (including drilling works) will be limited to restricted times agreed to in the permit – from 7am to 5 pm in week days and from 8am to 4 pm on Saturday. No works at night time, Sunday and holidays are allowed.

The proposed works includes only drilling equipment for walls (for installation of windows, doors, radiators) which will not cause vibration Creation of dust Monitor dust emissions to ensure emissions are minimized. emissions and volatile organic compounds at Monitor and address complaints about dust / volatile organic compounds and construction site while other pollutants dismantling work, transportation of Construction works will be limited to restricted times - from 7am to 5 pm in construction materials week days and from 8am to 4 pm on Saturday. No works at night time, and waste Sunday and holidays are allowed.

Providing the construction workers with suitable personal protective equipment (respirators)

Contractor will monitor the exhaust gas content of its own vehicle fleet.

There will be no open burning of construction / waste material at the site There will be no excessive idling of construction vehicles at sites 88

Keep surrounding environment (side-walks, roads) free of debris to minimize dust

In case of dust creation by pneumatic drilling/wall destruction during installation of windows/doors/radiators etc. installation suppress dust by water spraying and/or installing dust screen enclosures at site. Construction waste Waste disposal facilities are available.

Boxes for construction debris will be installed in the site.

The construction waste will be disposed according to general EMP requirements and SSEMP (Waste Management Plan)

Construction waste will be collected and disposed properly by licensed collectors

Timely sorting of rehabilitated and removing construction waste in an organized way, and disposal them on an authorized land field

Mineral construction and demolition wastes will be separated from general refuse, organic, liquid and chemical wastes by on-site sorting and stored in appropriate containers

Dispose off waste appropriately to prevent pollution of soil and groundwater

The approach to handling sanitary wastes and wastewater from building sites (installation or reconstruction) must be approved by the local authorities

Recycle valuable materials within the project or sold.

Aim to minimize waste through reducing and re-using (packaging) material

Do not allow any burning or burying of waste on site.

Prevent littering by construction staff at work sites by providing bins or waste bags in sufficient locations.

The records of waste disposal will be maintained as proof for proper management as designed;

Whenever feasible the contractor will reuse and recycle appropriate and viable materials. Toxic / hazardous waste Temporarily storage on site of all hazardous or toxic substances will be in management safe containers labeled with details of composition, properties and handling information The containers of hazardous substances should be placed in a leak-proof container to prevent spillage and leaching The wastes will be transported by specially licensed carriers and disposed in a licensed facility Paints with toxic ingredients or solvents or lead-based paints will not be used Soil contamination due  Construction materials that can impact the soil should be kept in a to accidental spillage special premise or in concrete ground. • Soils contaminated by accidental spills should be immediately collected and properly disposed at relevant landfill in accordance with the permit from local environmental departments ; 89

• regular maintenance of the equipment should be done by Contractor and checking for any possible leaks from the joints etc. Asbestos containing Ensure that the standard practice of handling existing asbestos containing materials (ACM) materials is used to remove and decommission asbestos containing roofing materials.

ACM will not be used as a roofing/new material in construction works of building.

Any existing ACM to be handled and disposed according to the SSEMP (ACM management and disposal plan)

Health and labor safety  The local construction and environment inspectorates have been (occupational hazards) – during construction and notified of upcoming activities operation  All work will be carried out in a safe and disciplined manner designed to minimize impacts on workers.  Workers will comply with international good practice - providing the construction workers with suitable personal protective equipment (always hardhats, as needed masks and safety glasses, harnesses and safety boots)  Appropriate signposting of the sites will inform workers of key rules and regulations to follow. Following plans to be developed for construction and operation phases of the project: Emergency Response Plan and Health and Safety Plan

Direct or indirect hazards Transport along the main street- RJ034 of Kulyab Dahana village consists to public traffic and of private cars and public transport as well as taxis, vans, trucks. The pedestrians by volume of traffic is not very large. Contractor will observe the necessary construction activities precautions (speed limit, working hours from 7 am to 5 pm)

In compliance with national regulations the contractor will insure that the construction site is properly secured and construction related traffic regulated. This includes but is not limited to: Signposting, warning signs, barriers and traffic diversions: site will be clearly visible and the public warned of all potential hazards Traffic management system and staff training, especially for site access and near-site heavy traffic. Adjustment of heavy traffic to local traffic patterns, e.g. avoiding major transport activities during rush hours

4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor

29. The general Environmental Management plan (EMP) for all project sites is approved as part of Initial Environmental Examination (IEE) endorsed by State Environmental Committee of the Republic of Tajikistan and general management measures that apply to this sub-project should be followed by the Contractor.

30. In addition, the Contractor should prepare the following eight (8) Site-specific Environmental Management plans (SSEMP): - Waste management plan; - Emergency response plan; - Health and Safety Management Plan; - Plan for the consideration of complaints; - Dust Control Plan; - Noise management plan; - ACM Handing, Management and Disposal Plan; - Traffic and road safety management plan. 90

Environmental Safeguards Due Diligence Report

Project number: 46535-001 Grant 0452/53/3309 Date: June 2018

TAJ: Strengthening Technical and Vocational Education and Training

"MOLME/SH/CW06-A ": MINOR REHABILITATION OF THE TECHNICAL VOCATIONAL LYCEUM IN BOKHTAR

The Due Diligence Report for Social and Environmental Safeguards is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.

June 2018

91

Table of content

I. INTRODUCTION ...... 94 1.1. Justification of the site...... 94 II. DEFINING THE BORDERS ...... 95 2.1. Current condition of the site ...... 95 III. CONSTRUCTION ACTIVITIES ...... 102 3.1. Types of civil works ...... 102 IV. POTENTIAL IMPACTS AND MITIGATION MEASURES ...... 108 4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor ...... 111

Tables

Table 1: Types of rehabilitation works for renovation of the new Regional Resource Centre in Bokhtar city ...... 102 Table 2: Potential impacts of the prosed activities and mitigation measures ...... 108

Figures

Figure 1: Location of Technical Vocational lyceum in Bokhtar in scale of the country ..... 96 Figure 2: Location of Technical Vocational lyceum in Bokhtar ...... 97 Figure 3: Aerial photo of the Technical Vocational Lyceum in Bokhtar and surroundingfacilities/structures ...... 101

Photos

Photo 1: Front view from the window of the Educational building of the Lyceum...... 97 Photo 2: Training and production building - front view ...... 98 Photo 3: Training and poduction building - view from, educational building.ousing area can be seen in the left on the building...... 98 Photo 4: Trainin g and production building - side view ...... 98 Photo 5: View to East from the Trainig Workshop ...... 98 Photo 6: Entrance to the Training Workshop ...... 98 Photo 7: Entrance portal of the Training Workshop - Current condition ...... 99 Photo 8: Doors to workshops - current condition ...... 99 Photo 9: Entrance portal - current condition ...... 99 Photo 10: Current condition of corridors ...... 99 Photo 11: Current condition of doors of the Production and Educational building ...... 99 Photo 12: Current condition of corridors of Production and Educational building ...... 99 Photo 13: Current condition inside of Production and Educational building ...... 100 Photo 14: Current condition inside of Production and Educational building ...... 100

92

ABBREVIATIONS

1 ADB Asian Development Bank 2 АСМ Asbestos containing materials 3 ALC Adult Learning Center 4 CM Complaint Mechanism 5 EIA Environmental impact assessment 6 EMP Environmental Management Plan 7 FLM Fuel and lubrication materials 9 GFS Gypsum-fiber sheets 10 LLC Limited Liability Company 11 MFC Microfinance company 12 MOLME Ministry of Labor, Migration and Employment of the Republic of Tajikistan 13 PAG Project Administration Group 14 SI State institution 15 SSEMP Site-specific Environmental Management Plan 16 TVLB Technical Vocational Lyceum in Bokhtar 17 TVET Technical and Vocational Education and Training 18 WMP Waste Management Plan

93

I. INTRODUCTION

1.1. Justification of the site

1. Over the years of independence, the management of the Government has made efforts to develop the education sector and training of highly qualified specialists for various industries.

2. The Ministry of Labor, Migration and Employment of the Republic of Tajikistan pays special attention to the technical condition, the availability of educational facilities (institutions) in schools to enhance vocational education and training of learners and students.

3. The proposed Project on Strengthening Technical and Vocational Education and Training (Project) will have an impact on national workforce with a high proportion of skilled workers employed in Tajikistan's domestic economy. The project is aimed at meeting the needs of the Republic of Tajikistan. Within the framework of the project, unemployed and partially employed young people and the adult population in the Republic will be provided with job opportunities and income in the domestic and international labor markets by providing quality training.

4. The outcome of the Project will be a more effective, efficient, quality-assured, and flexible system for the delivery of technical vocational training. The project includes the achievement of five outputs, namely: (i) modernization of the methodology of the TVET system; (ii) improving the physical conditions of training institutions; (iii) increasing the volume and quality improvement of TVET delivery; (iv) expansion of equal access to TVET; and (v) strengthening the leadership and management of the TVET system.

5. In November 2015, a Grant Agreement was signed between the Republic of Tajikistan and ADB on project financing.

6. A general IEE/ EMP for the overall project was prepared and approved by September 2015. The project has been classified as category B in accordance with ADB's Safeguard policies.

7. As part of this Project, the Ministry of Labor, Migration and Employment of the Republic of Tajikistan shall sign a contract "MOLME/SH/CW06-A" with a construction firm to conduct minor rehabilitation works at two buildings within the Technical Vocational Lyceum campus in Bokhtar.

8. The Contractor will undertake, in accordance with the contract, professionally and qualitatively, the rehabilitation works of the Technical Vocational Lyceum in Bokhtar within the terms provided for in the Contract to be awarded.

9. The Environmental Management Plan (EMP), which is part of the IEE, is general and wide- ranging and covers all possible consequences associated with the project. Therefore, the Contractor is required to develop a Site-specific Environmental Management Plan (SSEMP) prior to the commencement of construction works.

10. The main objective of the plan is to document how the environmental mitigation measures and required management plans proposed for rehabilitating the project site will be brought into line with the project commitments.

11. In addition, during the implementation of the Project, the Contractor will strictly comply with ADB's safeguard requirements and national laws and regulations in the field of environmental protection, and, under the terms of the contract, will develop and refine the working measures, plan and management system for environmental protection in areas of repair works.

94

II. DEFINING THE BORDERS

2.1. Current condition of the site

12. The Technical Vocational lyceum in Bokhtar which was selected for the STVET project consists of 4 buildings (shown below in Figure 14), from which two buildings have been proposed for rehabilitation:

 Educational and production building; and  Training and production workshop

13. Educational and production building, one-story brick masonry building, which was built in the 1960s. There are a workshop and an administrative premise inside the building. The building has a ruberoid roof, wooden windows and doors in very poor condition.

14. The following works are being planned:

 Overhaul three production classrooms  Construction of a partition in the corridor with the installation of doors.  Construction of a ceiling, cement screed of the floors, replacement of windows and doors.  Construction of the entrance portal.  Partial repair of the facade.  Replacement of wirings, lamps and electrical appliances.

15. Training workshop is also a one-story brick masonry building built in the 1960s. There 4 workshops and sanitary rooms (toilet and shower) in the building. The building has a ruberoid roof, wooden windows and doors.

16. The following works are being planned:

 Overhaul of the roof;  Construction of a partition in the corridor including installation of doors;  Construction of a ceiling, cement screed of the floors, replacement of windows and doors;  Construction of the entrance portal;  Partial repair of the façade;  Replacement of wirings, lamps and electrical appliances.

17. In addition, the following is being planned: overhaul of the roof, cement screed of the floors in the corridor, construction of the partition of the welding shop with construction of the entrance from the yard, construction of a deaf wall in the corridor, overhaul of sanitary units (showers and toilets), taking into account gender norms and requirements, replacement of windows and doors, major repairs of ceilings, walls, floors, wirings, replacement of lamps and electrical appliances, repair of facades, internal water supply and sewerage systems, repair of the external sewage line to the point of connection with the existing urban system.

2.2. Location of objects and access to the site

18. This sub-project is located in Bokhtar (former Kurgan-tube) city, administrative center of Khatlon region. It is located at the distance of 100 km, to the South, from Dushanbe, in the Vakhsh river valley. Bokhtar is located in the of the Khatlon region. In the North it borders with , in the East - with Sarband and Vakhsh districts, in the

95

West - with of Khatlon region. Figure 12 below shows the location of the Technical Vocational lyceum in Bokhtar city in the scale of country.

Figure 12: Location of Technical Vocational lyceum in scale of the country

19. The Technical Vocational lyceum is located at the following address: Bokhtar city, 44 B.Gafurov street.

20. Figure 13 below shows location of the Technical Vocational lyceum in Bokhtar city.

96

Figure 13: Location of Technical Vocational lyceum in Bokhtar

21. The Photo 50 below shows a view of the two buildings of the Lyceum proposed for rehabilitation under the STVET project.

Photo 50: Front view from the window of the Educational building of the Lyceum. Buildings proposed for rehabilitation - Training and production building (1), Training workshop (2) behind the rehabilitee buildings (1) and (2) can be seen one of the Educational buildings (3) and the Dormitory (4) of the Lyceum

97

22. The photos below illustrate status (inside and outside) of the Technical Vocational lyceum buildings.

Photo 52: Training and production building - view from, educational building.Housing area can be seen in the left on the building Photo 51: Training and production building - front view (Shown by arrow)

Photo 53: Training and production building - side Photo 54: View to East from the Training view Workshop

Photo 55: Entrance to the Training Workshop

98

Photo 56: Entrance portal of the Training Photo 57: Doors to workshops - current condition Workshop - Current condition

Photo 58: Entrance portal - current condition Photo 59: Current condition of corridors

Photo 60: Current condition of doors in the Photo 61: Current condition of corridors in the Production and Educational building Production and Educational building

99

Photo 62: Current condition inside of Production Photo 63: Current condition inside of Production and Educational building and Educational building

23. The main roads that will be used for the transportation of equipment and construction materials are J. Mirzokadyrova and Gafurov streets. The contractor will establish warning signs when conducting rehabilitation works.

24. Figure 3 below shows the project site boundaries and nearby receptors (i.e. houses, etc.) located close to the site, as well as the access roads.

100

LEGEND

1. Educational and production building – to be rehabilitated

2. Training and production workshop – to be rehabilitated

3. Educational buildings of the lyceum

4. Main Gate

5. Dormitory

6. Gafurov Street

7. J.Mirzokadyrova Street

8. Navruz Street 11 9. F.Saidov Street

10. Parking

11. Housing area

Figure 14: Aerial photo of the Technical Vocational Lyceum in Bokhtar and surrounding facilities/ structures

25. The Lyceum is located at the intersection of the following streets: from the North-West to South-East - Mirzakarimova and B. Gafurov streets, from the South-West to North-East - Navruz streets, North-West –F.Saidov street.

26. The nearest residential houses are located on the other side of the roads, at the distance of 40-80 m to 100 meters and more from the (i) Educational and production building and (ii) Training and production workshop, proposed for the rehabilitation under STVET project.

From the North side of the Lyceum there are:  Educational building at a distance of 20 m;  Dormitory at a distance of 80 m.

From the South side:  Educational buildings located at a distance of 40-80 meters from the site;

From the West side:

 Housing area located at a distance of 40-80 m and more.

101

27. No construction of a separate camp for the Contractor’s personnel is proposed here, because workers will be local.

28. The construction waste should be disposed in the nearby waste disposal facilities. The Contractor shall conclude for this purpose, an agreement with communal services of Bokhtar city and apply for relevant permits.

III. CONSTRUCTION ACTIVITIES

3.1. Types of civil works

29. Within the framework of this project, the following construction activities are envisaged - see Table 9 below:

Table 9: Types of rehabilitation works for the renovation of 2 buildings of Technical Vocational Lyceum in Bokhtar № Description Unit of Q-ty measure Repair of Educational block Dismantling works

1 Dismantling of wooden window openings with sill boards 100 m2 0,9 2 Dismantling of wooden window door way openings 100 m2 0,16 3 Punching of openings in brick structures 1 m3 1,3 4 Dismantling of brick walls 1 m3 2,7 5 Dismantling of board floor 100 m2 3,64

6 Fixing of plaster from the surfaces of break walls internal 100 m2 7,15

Removal of construction debris for a distance of 10 km on a 7 T/km 21,0 Kamaz truck, fuel cost 6,6somoni Repair works 8 Bricklaying of openings 1 m3 0,5 Openings 9 Installation steel-plasticwindow blocks m2 90 10 Installation steel-plasticdoor blocks m2 8 Installation of window sills from PVC in stone walls is wide. 11 100 m 0,43 25cm Installation of wooden door blocks with an opening area of up 12 100 m2 0,13 to 3m2 Finishing works internal 13 ImproЯОd plКstОr oП ТntОrnКl аКlls -1 100 m2 7,15 Plaster of the surfaces of window and door slopes on 14 100 m2 0,68 concrete and stone 15 Filling of surfaces of walls Wall-1 100 m2 7,15 16 Filling surfaces of door and window slopes Wall-1 100 m2 0,68 Painting with polyvinyl acetate water-emulsion structures of 17 100 m2 7,83 walls, partitions and slopes of ST-1

102

Ceilings 18 SuspОndОd МОТlТnРs oП tвpО ‘’ArmstronР ‘’ on ПrКmО Пrom 100 m2 3,64 galvanized profile . Floors Arrangement of the underlying layers of crushed stone with 19 1 m3 36,4 thick. Fl-1, Fl-2 Arrangement of concrete boarding thick. 100mm Fl-1, Fl-2 20 100 m2 3,64

№ Description Unit of Q-ty measure Levelingthescreedfromacement-sandmortarM150 thickness of 21 100 m2 3,64 30mm thick. Fl-1,Fl-2, Fl-3 Floor covering from a cement mortar made of ceramic from 22 100 m2 1,52 tТlОs ‘’SОrКnТtСвС ‘’Fl-2 Laying of laminate flooring on a ready-made substrate type 23 100 m2 2,120 PERGO Fl-2 24 Installation of plastic plinth Fl-1 100 m 1,03 External Porch 25 Arranging of concrete ramp 100 m3 0,01 26 CoЯОrТnР oП porМС Пrom tТlОs ‘’SОrКnТt’’ 100 m2 0,30 Visor 27 Manufacturing of visor farm Kz-1 1 un 0,650 28 Installation of wooden frames of the roof from the beams 1 m3 0,18 Arrangement roofs of a visor from the zinced steel andchute 29 100 m2 0,21 -1 Boarding of visor ceilings, cornices and columns of 30 100 m2 0,29 alukabond on metal profiles 2x40mm-1 31 OТl pКТntТnР oП mОtКl surПКМОs ЯТsor -1 100 m2 0,10 32 Delivery of building materials on the distance. 15km on a 125,00 Kamaz car, the cost of fuel is 6.6somoni Electric lighting and electrical equipment Education block Section 2. Material resources on project data Shield lighting with an input automaton and distributor type 1 un 1 BA51-31 In = 32A Exinoxe-6 Lamp with compact luminescent lamp with protection degree 2 un 1 IP65 CD160-218 3 Lamp with luminescent lamps G13 418VT un 30 4 Lamp with luminescent lamps 218VT un 11 5 Display lamp ‘’EXIT’’ 25 Vt un 1 6 Emergency power supply K-303 un 3 7 Luminescent compact lamp with power 18Vt un 2 8 Luminescent lamp G13,18Vt un 142 9 Single buttons witch 10A, 220B un 5 10 Double button switch 10A, 220B un 5 11 Waterproof IP65 socket for 220V 16A un 16 12 Junction box for hidden wiring KM-202 un 200 13 Box for the hidden installation of switches and sockets K-201 un 72 Cable with copper conductors with 14 PVC ТnsulКtТon 31,5 m 400 mm2 103

15 CКЛlО аТtС МoppОr МonduМtors аТtС PVC ТnsulКtТon 32,5 mm2 m 300 ()-LS

16 CКЛlО аТtС МoppОr МonduМtors аТtС PVC ТnsulКtТon 516mm2 m 280

17 CКЛlО аТtС МoppОr МonduМtors аТtС PVC ТnsulКtТon 34 mm2 m 160 ()-LS № Description Unit of Q-ty measure 18 PТpО МorruРКtТons Ø16mm m 460 Fire alarm Educational block Materials not taken into account by the price list Receiving control and guard - 1 – –ПТrО dОЯТМО ‘’GrКnТt ‘’TU 4372 un 1 018-11858296-01 2 Accumulator battery 12V, 7/hr un 1 Fire smoke detector electronic Ipit =9/36 (10%) 212- un 3 – И 17 41 4 Fire manual detector (+10%) И-3 un 1 5 Display lamp "EXIT" 30010014Iport = 0,025 un 1 6 Combined warning system Mayak -12KP un 4 7 The control device of plumes UKSH-1 un 1 Cable with single-core conductors D = 0.5 mm with insulation 8 from a composition of polyethylene with a sheath of white m 160 PVC plastic KSPV - 2x0.5 9 Flexible wire up to 380V PVS-2x0.75 m 70 10 Cable PVC-31,5 m 15 11 Pipe flexible corrugated D = 10mm GOFROSHLANG m 230 12 Universal connecting box ,UK -2P un 5 Repair Training and production building Dismantling works

1 Dismantling of wooden window door way openings with sll 100 m2 1,68 2 Dismantling of wooden window door way openings 100 m2 0,68 3 Dismantling of brick walls 1 m3 23,0 4 Stamping of plasters from the walls of brick internal 100 m2 14,5 5 Cleaning the old plastering of ceilings 100 m2 9,8 Removal of construction debris for a distance of 10 km on a 6 T/km 25,0 Kamaz truck, the cost of fuel is 6.6somoni Repair work 7 Lying of partitions from brick thick. 250. 1/2 bricks 1 m3 9,2 8 ClutМСОs oП ЛrТМk аКll stСТМk. ½ ЛrТМk 100 m2 0,88 Openings 9 Installation of metal – plastic window blocks m2 51 10 Installation of metal –plastic doorway blocks m2 12,2 11 Installation of metal –plastic partitions m2 8 12 In stallation of window boards from PVC in stone walls 25sm 100 m 0,8 Installation of wooden door blocks with an opening area of up to 13 100 m2 0,1 3m2 14 Installation of metal doors 1 m2 34 15 Installation of metal gate VR 1 0,8 Repair works 104

Repair works (internal ) 16 Improved plastering of internal walls 100 m2 14,8 Plastering of the surfaces of window and door slopes on 17 100 m2 0,98 concrete and flat stone № Description Unit of Q-ty measure 18 Surfaces filling of wall 100 m2 13,37 19 Filling of surface of door and window slopes 100 m2 0,88 Painting with polyvinyl water-emulsion compositions of walls, 20 100 m2 14,3 partitions and slopes 21 Lining of walls with ceramic tiles 100 m2 1,43 Ceilings 22 Installation of metal frameworks for ceilings 1 m2 42 23 Boarding of ceilings from plastic 100 m2 0,42 Solid leveling of the ceilings (single-layer plaster) from dry 24 100 m2 9,4 mixes Painting with polyvinyl water-emulsion compositions improved 25 100 m2 9,4 in plaster ceilings Floors 26 Covering from a cement mortar made of ceramic 100 m2 0,38 27 Arrangement of concrete screeds in the thickness of 50 mm 100 m2 5,93 28 Grinding of concrete coatings 100 m2 4,94 Levelling the screed from cement-sand mortar M150 thickness - 29 100 m2 1,78 20mm 30 Floor Кnd plТntС МoЯОrТnР Пrom К tТlОs ‘’SОrКntТМ’’ 100 m2 2,00 31 Laying of laminate flooring on a ready-made base type PERGO 100 m2 1,124 32 Installation of plastic plinht 100 m 0,69 Installation and disassembly of internal tubular inventory forests 33 100 m2 1,2 with room heights up to 6 m External Porch 34 Arrangement of concrete porch and ramp 100 m3 0,04 35 The device of porch coverings from plates "Seranitnyh" 100 m2 0,23 Visor 36 Manufacturing of visor farm Kz-1 1 un 0.1 37 Arrangement of roof a visor from the zinced steel 100 m2 0,054 38 OТl pКТntТnР oП mОtКl surПКМОs ЯТsor -1 100 m2 0,11 39 Arrangement of roof a visor from the zinced steel 100 m2 0,08 Boarding of a parapet made of alucobond on metal profiles 40 100 m2 0,1 2x40mm Façade 41 Dismantling of brick walls 1 m3 36,0 42 Bricklaying of walls 1 m3 49 43 Improved plaster with cement-lime mortar on the stone walls 100 m2 4,1

44 Painting facades and slopes with decorative paints (spatter) 100 m2 4,82

105

45 Boarding of cornice from alukabond on metal profiles 2x40mm 100 m2 1,5 № Description Unit of Q-ty measure 46 Arrangement of gutter chutes 100 m 1,7 47 Installation of drainpipes 100 m 0,42 48 Installation of funnels 1 un 11 Installation and dismantling of external inventory scaffolds with 49 100 m2 4,1 a height of up to 16 m tubular for other finishing works Plinth

50 Arrangment of Socle by concrete ( on perimeter 350x50 mm) 1 m3 3

51 Improved plaster with cement-lime mortar plinth 100 m2 0,578 52 Coloring the socle with decorative facade paints (rain) 100 m2 0,578 Roofs 53 Installation of wooden rafters and running 1 m3 8,04 Installation of wooden frames of the roof from the uneven bars 54 1 m3 8,13 (Rack, Leg, Mauerlat, lining, brace, filly) Fire protection of wooden structures (rafters and girders, 55 10 m3 1,617 diagonal leg, stand, ladder, mauerlat, lining, brace, filly) 56 Fire protection of the crates under the roof 1000 m2 1,151 The device of roofs from the zinced steel from a laths from 57 100 m2 11,51 beams Delivery of building materials on the distance. 15 km by car 58 185,00 Kamaz, fuel cost 6.6 somoni Outdoor water supply and sewerage Training and production workshop Section 1. Excavation Excavation of soil in the dump with excavators with a bucket 1 1000 m3 0,0126 capacity of 0.4 m3 (wells for pipelines and wells) 2 Hand fillingfor pipelines and wells 100 m3 0,126 Section 2. System B1 3 LКвТnР oП stООl аКtОr Кnd РКs pТpОlТnОs аТtС Ø763 1 km 0,014 4 MountТnР tОО ПlКnРО МКst Тron аТtС ПТrО stКnd Ø100 mm 1 un 0,046 5 Installation of valves 1 un 1 6 Welding flanges to steel pipes Ø65 mm 1 un 1 7 АОldТnР ПlКnРОs to stООl pТpОs Ø100 mm 1 un 2 8 Installation of fire hydrants 1 un 1 Application of reinforced anti-corrosion bitumen-rubber 9 1 km 0,014 ТnsulКtТon on stООl pТpОlТnОs Ø76 mm Arrangement of round wells from prefabricated reinforced 10 10 m3 0,133 concrete Section 3. System K1. Development of soil in the dump with excavators with a 11 1000 m3 0,216 bucket capacity of 0.4 m3 (pit for pipelines 12 Hand filling for pipelines 100 m3 2,16 Change of individual sections of cast iron sewer pipes with a 13 100 m 1,31 diameter of 160mm 14 ClОКnТnР oП sОаОr pТpОs Ø150 mm 100 m 0,2 15 Cleaning of sewerage wells diameter of 1000mm m3 3,1 Delivery of building materials on the distance. up to 15 km by 16 25 car with lifting capacity up to 15 t 106

№ Description Unit of Q-ty measure Internal water supply and sewerage networks Training and production workshop System B1 1 LКвТnР oП stООl аКtОr Кnd РКs pТpОlТnОs Ø65 100 m 0,25 2 Laying of steel water and gas pipelines with D=50mm 100 m 0,7 3 Laying of steel water and gas pipelines with D=32mm 0,05 4 Laying of steel water and gas pipelines with D=25mm 100 0,3 5 Laying of steel water and gas pipelines with D=15mm 100 0,3 6 Installation of taps D=15mm 1 un 1 7 Installation valve Ø65 mm 1 un 1 8 Installation of watering tap with dia. 25 mm 1 un 2 9 InstКllКtТon oП аКtОr СОКtОr ‘’ArТston ‘’ А=100l 10 set 0,3 10 Installation of fire taps diameter 50 mm 1 un 2 Sanitary appliances

11 Changing of washbasin 100 set 0,04 12 Changing of genoa chaise Bow 100 set 0,04 13 Installation of traps 10 set 0,2 14 Hygienic shower installation 10 set 0,9 15 Installing mixers 10 un 2,6 16 Installation of shower trays of cast iron 10 set 0,4 Sestem K1 17 Plastic pipes D = 50mm plastic cheleby 100 m 0,2 18 Plastic pipes D = 100mm plastic cheleby 100 m 0,5 19 Installationofpolyethyleneshaped parts oftees 10 un 1,9 20 Installationofpolyethylenefittings 10 un 1,7 Delivery of building materials on the distance. up to 15 km by 21 T 25 car with lifting capacity up to 15 t Electrical lighting and electrical equipment Training and production workshop Section 2. Material resources on project data 1 Distribution cabinet with an input switch SHCHRN-18 un 5 Shield lighting with an input automaton and distribution 2 un 2 automatics Exinoxe-6 Lamp with compact luminescent lamp with protection degree 3 un 8 IP65 CD160-218 Lamp with compact luminescent lamp with protection degree 4 un 12 IP65 CD218-218 5 Lamp with luminescent lamps 236VT un. 4 6 Lamp with luminescent lamps G13 218VT un 18 7 Lamp with luminescent lamps G13 236VT un 72 8 Display lamp ‘’EXIT’’ 25 un 3 9 Emergency power supply K-303 un 5 10 Luminescent compact lamp, 18 Vt un 42 11 Luminescent lamp G13, 18 Vt un 52 12 Luminescent lamp G13, 18 Vt un 144 № Description Unit of Q-ty measure 13 Single-button switch un 16 107

14 Single-button water proof recessed switch un 2 15 Double -button recessed switch un 12 16 Waterproof IP65 socket for 220V 16A un 44 17 Boxes for branching KM-202 un 200 18 Boxes for branching KM-201 un 74 Cable with copper conductors with polyvinyl chloride 19 m 400 ТnsulКtТon аТtС loа ПlКmmКЛТlТtв sОМ 31,5mm2 Cable with copper conductors with polyvinyl chloride 20 m 420 insulКtТon аТtС loа ПlКmmКЛТlТtв sОМ 32,5mm2 Cable with copper conductors with polyvinyl chloride 21 m 60 ТnsulКtТon аТtС loа ПlКmmКЛТlТtв sОМ 516mm2 Cable with copper conductors with polyvinyl chloride 22 m 200 insulation with low flammabilitв sОМ 34mm2 23 GoППОr Ø16mm m 1020 Fire alarm Training and production workshop Materials not taken into account by the price list Receiving control and guard- - - 1 – ПТrО dОЯТМО ‘’GrКnТt 8 ‘’TU 4372 un 1 018-11858296-01 2 Accumulator battery 12V, 7A hr un 1 un 3 Electro optic fire smoke detector Ipow=9,36 V(10 %)IP 212-41M 13

4 Fire heat detector un 21 5 Manual fire detector (+10%) IPR-3SU un 4 6 Light- dТodО dТsplКв“EБIT” 30010014Iport=0,025 un 3 7 Combined warning system Mayak -12 KP un 7 8 Control device for stub lines UKSh-1 un 3 Cable with single-wire cores D=0,5mm with insulation from the 9 composition of polyethylene with white PVC plastic KSPB- m 1000 20,5 10 Flexible wire up V PVC -20,75 m 200 11 Cable PVC- 31,5 m 10 12 Pipe flexible gofirovannaya D = 10mm GOFROSHLANG m 1200 13 Universal connection boxUK-2P un 50

IV. POTENTIAL IMPACTS AND MITIGATION MEASURES

30. Potential impacts of proposed additional activities and relevant mitigation measures are described in the Table 10 below.

Table 10: Potential impacts of the prosed activities and mitigation measures Potential impacts Mitigation measures Temporary increase of Ensure that the maximum and equivalent noise levels comply with sanitary background noise and regulations (not more than 55 dBa). Instrumental noise measurements vibration due construction should be undertaken at least 2 times per month at the project boundaries works and nearby receptors

Monitor and address complaints about the noise level.

Construction works (including drilling works) will be limited to restricted times agreed to in the permit – from 7am to 5 pm in week days and from 8am to 4 pm on Saturday. 108

No works at night time, Sunday and holidays are allowed.

The proposed works includes only drilling equipment for walls (for installation of windows, doors, radiators) which will not cause vibration Creation of dust Monitor dust emissions to ensure emissions are minimized. emissions and volatile organic compounds at Monitor and address complaints about dust / volatile organic compounds and construction site while other pollutants dismantling work, transportation of Construction works will be limited to restricted times - from 7am to 5 pm in construction materials week days and from 8am to 4 pm on Saturday. No works at night time, and waste Sunday and holidays are allowed.

Providing the construction workers with suitable personal protective equipment (respirators)

Contractor will monitor the exhaust gas content of its own vehicle fleet.

There will be no open burning of construction / waste material at the site There will be no excessive idling of construction vehicles at sites

Keep surrounding environment (side-walks, roads) free of debris to minimize dust

In case of dust creation by pneumatic drilling/wall destruction during installation of windows/doors/radiators etc. installation suppress dust by water spraying and/or installing dust screen enclosures at site. Construction waste Waste disposal facilities are available.

Boxes for construction debris will be installed in the site.

The construction waste will be disposed according to general EMP requirements and SSEMP (Waste Management Plan)

Construction waste will be collected and disposed properly by licensed collectors

Timely sorting of rehabilitated and removing construction waste in an organized way, and disposal them on an authorized land field

Mineral construction and demolition wastes will be separated from general refuse, organic, liquid and chemical wastes by on-site sorting and stored in appropriate containers

Dispose off waste appropriately to prevent pollution of soil and groundwater

The approach to handling sanitary wastes and wastewater from building sites (installation or reconstruction) must be approved by the local authorities

Recycle valuable materials within the project or sold.

Aim to minimize waste through reducing and re-using (packaging) material

Do not allow any burning or burying of waste on site.

Prevent littering by construction staff at work sites by providing bins or waste bags in sufficient locations.

The records of waste disposal will be maintained as proof for 109

proper management as designed;

Whenever feasible the contractor will reuse and recycle appropriate and viable materials. Toxic / hazardous waste Temporarily storage on site of all hazardous or toxic substances will be in management safe containers labeled with details of composition, properties and handling information The containers of hazardous substances should be placed in a leak-proof container to prevent spillage and leaching The wastes will be transported by specially licensed carriers and disposed in a licensed facility Paints with toxic ingredients or solvents or lead-based paints will not be used Soil contamination due to accidental spillage  Construction materials that can impact the soil should be kept in a special premise or in concrete ground. • Soils contaminated by accidental spills should be immediately collected and properly disposed at relevant landfill in accordance with the permit from local environmental departments ; • regular maintenance of the equipment should be done by Contractor and checking for any possible leaks from the joints etc. Asbestos containing Ensure that the standard practice of handling existing asbestos containing materials (ACM) materials is used to remove and decommission asbestos containing roofing materials.

ACM will not be used as a roofing/new material in construction works of building.

Health and labor safety  The local construction and environment inspectorates have been (occupational hazards) – during construction and notified of upcoming activities operation  All work will be carried out in a safe and disciplined manner designed to minimize impacts on workers.  Workers will comply with international good practice - providing the construction workers with suitable personal protective equipment (always hardhats, as needed masks and safety glasses, harnesses and safety boots)  Appropriate signposting of the sites will inform workers of key rules and regulations to follow. Following plans to be developed for construction and operation phases of the project: Emergency Response Plan and Health and Safety Plan

Direct or indirect hazards Transport along the B.Gafurov 44 street consists of private cars and public to public traffic and transport, as well as taxis, minibuses, trucks. The traffic volume is pedestrians by considerably high. construction activities Contractor will observe the necessary precautions (speed limit, working hours from 7 am to 5 pm)

In compliance with national regulations the contractor will insure that the construction site is properly secured and construction related traffic regulated. This includes but is not limited to: Signposting, warning signs, barriers and traffic diversions: site will be clearly visible and the public warned of all potential hazards Traffic management system and staff training, especially for site access and near-site heavy traffic. Adjustment of heavy traffic to local traffic patterns, e.g. avoiding major transport activities during rush hours

110

4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor

31. The general Environmental Management plan (EMP) for all project sites is approved as part of Initial Environmental Examination (IEE) endorsed by State Environmental Committee of the Republic of Tajikistan and general management measures that apply to this sub-project should be followed by the Contractor.

32. In addition, the Contractor should prepare the following seven (7) Site-specific Environmental Management plans (SSEMP): - Waste Management Plan; - Emergency Response Plan; - Health and Safety Protection Plan; - Plan for the Consideration of Complaints; - Dust Control Plan; - Noise Management Plan; - Traffic and Road Safety Management Plan.

111

Environmental Safeguards Due Diligence Report

Project number: 46535-001 Grant 0452/53/3309 Date: June 2018

TAJ: Strengthening Technical and Vocational Education and Training

"MOLME/SH/CW06-B ": MINOR REHABILITATION OF THE TECHNICAL VOCATIONAL LYCEUM IN VAKHSH

The Due Diligence Report for Social and Environmental Safeguards is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.

June 2018

112

Table of content

I. INTRODUCTION ...... 115 1.1. Justification of the site...... 115 II. DEFINING THE BORDERS ...... 116 2.1. Current condition of the site ...... 116 2.2. Location of objects and access to the site ...... 116 III. CONSTRUCTION ACTIVITIES ...... 122 3.1. Types of civil works ...... 122 IV. POTENTIAL IMPACTS AND MITIGATION MEASURES ...... 128 4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor ...... 131

Tables Table 1: Types of rehabilitation works for renovation of the Technical Vocational lyceum in Vakhsh ...... 122 Table 2: Potential impacts of the prosed activities and mitigation measures ...... 128

Figures Figure 1: Location of Technical and Vocational Lyceum of Vakhsh in scale of the country ...... 117 Figure 2: Location of proposed to rehabilitation facility in ...... 117 Figure 3: Aerial photo of the Vocational lyceum’s buildings and surrounding facilities/structures ...... 121

Photos Photo 1: Main gate of the Lyceum ...... 118 Photo 2: Main gate of the Lyceum, Educational and Workshop building shown by arrow ...... 118 Photo 3: Educational and workshop building - side view ...... 118 Photo 4: Educational and workshop building - side view ...... 118 Photo 5: Entrance of the end part of Education and workshop building ...... 118 Photo 6: Entrance to the workshop from the yard of Lyceum ...... 118 Photo 7: Current conditions of corridors of Educational and workshop building...... 119 Photo 8: Current condition of workshop ...... 119 Photo 9: Buildings of Dormitory. The block which have been proposed for rehabilitation shown by arrow ...... 119 Photo 10: Dormitory - side view ...... 120 Photo 11: Current condition of the roof of Dormitory ...... 120

113

ABBREVIATIONS

1 ADB Asian Development Bank 2 АСМ Asbestos containing materials 3 ALC Adult Learning Center 4 CM Complaint Mechanism 5 EIA Environmental impact assessment 6 EMP Environmental Management Plan 7 FLM Fuel and lubrication materials 9 GFS Gypsum-fiber sheets 10 LLC Limited Liability Company 11 MFC Microfinance company 12 MOLME Ministry of Labor, Migration and Employment of the Republic of Tajikistan 13 PAG Project Administration Group 14 SI State institution 15 SSEMP Site-specific Environmental Management Plan 16 TVLV Technical Vocational Lyceum in Vakhsh 17 TVET Technical and Vocational Education and Training 18 WMP Waste Management Plan

114

I. INTRODUCTION

1.1. Justification of the site

1. Over the years of independence, the management of the Government has made efforts to develop the education sector and training of highly qualified specialists for various industries.

2. The Ministry of Labor, Migration and Employment of the Republic of Tajikistan pays special attention to the technical condition, the availability of educational facilities (institutions) in schools to enhance vocational education and training of learners and students.

3. The proposed Project on Strengthening Technical and Vocational Education and Training (Project) will have an impact on national workforce with a high proportion of skilled workers employed in Tajikistan's domestic economy. The project is aimed at meeting the needs of the Republic of Tajikistan. Within the framework of the project, unemployed and partially employed young people and the adult population in the Republic will be provided with job opportunities and income in the domestic and international labor markets by providing quality training.

4. The outcome of the Project will be a more effective, efficient, quality-assured, and flexible system for the delivery of technical vocational training. The project includes the achievement of five outputs, namely: (i) modernization of the methodology of the TVET system; (ii) improving the physical conditions of training institutions; (iii) increasing the volume and quality improvement of TVET delivery; (iv) expansion of equal access to TVET; and (v) strengthening the leadership and management of the TVET system.

5. In November 2015, a Grant Agreement was signed between the Republic of Tajikistan and ADB on project financing.

6. IEE/ EMP for this project was prepared and approved by September 2015. The project has been assigned category B in accordance with ADB's Safeguard policies.

7. As part of this Project, the Ministry of Labor, Migration and Employment of the Republic of Tajikistan shall sign a contract "MOLME/SH/CW06-B" with the construction firm for the minor rehabilitation of two buildings within the Technical Vocational Lyceum campus in Vakhsh.

8. The Contractor will undertake, in accordance with this contract, professionally and qualitatively, the rehabilitation works of the Technical Vocational Lyceum in Vakhsh within the terms provided for in the Contract to be awarded.

9. The Environmental Management Plan (EMP), which is part of the IEE, is general and wide- ranging and covers all possible consequences associated with the project. Therefore, the Contractor is required to develop a Site-specific Environmental Management Plan (SSEMP) prior to the commencement of construction works.

10. The main objective of the plan is to document how the environmental mitigation measures and required management plans proposed for rehabilitating the project site will be brought into line with the project commitments.

11. In addition, during the implementation of the Project, the Contractor will strictly comply with ADB's safeguard requirements and national laws and regulations in the field of environmental protection, and, under the terms of the contract, will develop and refine the working measures, plan and management system for environmental protection in areas of repair works.

115

II. DEFINING THE BORDERS

2.1. Current condition of the site

12. Vocational construction Lyceum in Vakhsh which was selected for the STVET project consists of 5 buildings and other structures (see Figure 17 below). Following two buildings were proposed for the rehabilitation: i). Educational and workshop building (workshop, laboratory) - first floor; ii). Dormitory (one block).

13. Educational and workshop building (workshop, laboratory). It is a two-story brick masonry building with asbestos-cement slate roof which was built in 1970s. It has concrete ceilings and wooden windows and doors. They are in a poor condition. In total there are 6 workshops and 8 premises in the building.

14. Following works are being proposed under the STVET project: repair foyer at the first floor, production classrooms of processing of vegetables; construction of a partitions on a column rows; construction of entrance portal at the end part of the building; renovate the floors, ceilings and stairs; partially renovate the fasade; replace windows and doors; replace wirings, lamps and electrical appliances

15. The Dormitory consists of three blocks, one of them which is the most deteriorated, was proposed for the renovation works. It is a three-story brick masonry building with a asbestos- cement slate roof, with wooden windows and doors in poor condition, which was built in 1970s. There are 38 dormitory rooms in this building.

16. The proposed renovation activities include following: overhaul the entrance portal and the corridor; repair of living rooms at all floors with replacement of windows and doors, major repairs of ceilings, walls, floors, wiring, replacement of lamps and electrical appliances; repair of the foyer and corridors - the floors will be replaced with serane tiles; repair of façade, sanitary units taking into account gender norms and requirements; internal water supply and sewerage systems, external sewage line to the point of connection with urban systems.

17. The buildings are in poor condition, do not meet the modern construction standards and need relevant renovation and reconstruction.

18. Asbestos cement sheets are being used on buildings as roofing material. Roof should be demolished and also replaced by non-hazardous materials which will not cause risks for health of Lyceum students and staff. To mitigate the occupational and public health risks of inhalation of airborne asbestos fibers, when disassembling the roofs they will be removed and disposed of following the internationally-recognized Standard Practice for Maintenance, Renovation and Repair of Installed Asbestos Cement Products (American Society for Testing and Materials [ASTM] E 2394). An Asbestos Containing Materials Handling, Management and Disposal Plan will be prepared by the Contractor as part of the SSEMPs.

2.2. Location of objects and access to the site

19. Vakhsh district is an administrative district in the Khatlon region of the Republic of Tajikistan. The district center is a Vakhsh urban settlement, located at the distance of 25 km to the south of the Bokhtar town (former Kurgan-tyube). The Vakhsh district is located in the valley of Vakhsh river. In the North it borders the , in the East - borders the Dangara and Farkhor districts, in the south – borders the Rumi district, in the west - borders the Bokhtar district of Khatlon region. The territory of the Vakhsh district is 1101.4 km². Location of this sub-project in in country scale is shown in Figure 15 below.

116

Figure 15: Location of Technical and Vocational Lyceum of Vakhsh in scale of the country

20. Figure 16 below shows the location of the Technical Vocational lyceum in Vakhsh.

Figure 16: Location of proposed to rehabilitation facility in Vakhsh district

21. The Vocational Construction lyceum in Vakhsh is located at the 1 B.Gafurov Street of the Vakhsh town,.

117

22. Photos below illustrate current status of the building (inside and outside) which is being proposed for the rehabilitation.

Photo 65: Main gate of the Lyceum, Educational and Photo 64: Main gate of the Lyceum Workshop building shown by red arrow

Photo 66: Educational and workshop building - Photo 67: Educational and workshop building - side view side view

Photo 68: Entrance of the end part of Education and workshop building Photo 69: Entrance to the workshop from the yard of Lyceum

118

Photo 70: Current conditions of corridors of Educational and workshop building

Photo 71: Current condition of workshop

Photo 72: Buildings of Dormitory. The block which have been proposed for rehabilitation shown by arrow

119

Photo 73: Dormitory - side view

Photo 74: Current condition of the roof of Dormitory

23. Transportation of equipment and construction materials will be done using B.Gafurov street. The contractor has to establish warning signs at appropriate points (at least at the distance 20 m before construction site) during conduction of rehabilitation works and observe requirements to ensure traffic and pedestrian safety.

24. Figure 3 below shows project boundaries and nearby receptors (houses, schools, hospitals, or any other receptor) located close to the site, as well as access roads

120

LEGEND 1. Educational and production building- proposed for rehabilitation under of STVET Project 2. Dormitory – to be rehabilitated 3. Administrative and educational building 4. Canteen 5. Lyceum stadium 6. Main Gate 7. Main success road – B.Gafurov Street 8. Residential buildings 9. Central district hospital Figure 17: Aerial photo of the Vocational lyceum’s buildings and surrounding facilities/structures

25. The Lyceum building proposed for the rehabilitation under the STVET project is located at a distance of about 50-120 meters from residential quarters.

From the North side of the Educational and production building of the Lyceum there are:  Residential buildings at a distance of 50 and more meters; From the South side:  Residential buildings at a distance of 95 and more meters; From the West side:  Empty distressed building of the administrative and educational building of the Lyceum at a distance 50 m; From the East side:  Residential buildings at a distance 75-80 and more meters;

From the North side of the Dormitory of the Lyceum there are:  Residential buildings at a distance of 50 and more meters; From the South side:  Other Dormitory building at a distance of 50 meters;  Central district hospital at a distance 120 m; From the West side:  Residential buildings at a distance 65 and more meters. From the East side:  Administrative and educational building at a distance of 50 m

121

26. There will be no need for workers accommodation camps since all the employees are local.

27. The construction waste can be disposed in the nearby waste disposal facilities. The Contractor shall conclude for this purpose, an agreement with communal services of Bokhtar city and take relevant permits.

III. CONSTRUCTION ACTIVITIES

3.1. Types of civil works

28. Within the framework of this project, the following construction activities are envisaged - see Table 11 below:

Table 11: Types of rehabilitation works for renovation of the Technical Vocational lyceum in Vakhsh # Description Unit of Q-ty measure Education block Dismantling works 1 Dismantling wooden openings sill boards 100 m2 3,1 2 Dismantling wooden doorway openings 100 m2 0,775 3 Dismantling brick partitions into separate bricks 100 m2 0,85 4 Dismantling of brick walls 1 m3 23,3 5 Punching of openings in brick structures 1 m3 31,1 6 Dismantling of tiles laid on a floor solution 100 m2 0,774 7 Fixing of plaster from the surfaces of walls 100 m2 19,642 8 Cleaning of the ceiling surfaces from an old filler with a sandblaster from the 100 m2 2,12 stairs 9 Removal of construction debris for a distance of 15 km on a Kamaz truck. 15 10t, the cost of fuel is 6.4 somoni # Description Unit of Q-ty measure Repair works 10 Masonry of brick exterior walls of medium complexity with a height of up to 1 m3 30 4 m 11 Wall masonry from cement blocks on a solution 1 m3 3,2 12 Masonry of walls (partitions) made of brick strata 1/2 brick at a height of up 100 m2 1,12 to 4 m Openings 13 Metal-plastic windows (1st 2nd floor) m2 514,5 14 Metal-plastic transom (1st floor) m3 50,4 15 Metal-plastic doors (1st floor) m3 17,13 16 Installation of window sills from PVC in stone walls is wide 100 m 2,13 17 Installation of wooden door blocks with an opening area of up to 3m2 100 m2 0,288 18 Installation of wooden door blocks with an opening area of up to 3m2 100 m2 0,347 19 Installation of metal doors 100 un 0,02 Floors Fl-1 20 Leveling screed made of cement-sand mortar M150. 40 mm 100 m2 4,41 21 Laying of laminate flooring by means of a locking connection with a 100 m2 4,41 soundproofing device 22 Skirting boards made of plastic 100 m 2,35 Fl- 2 23 Leveling screed made of cement-sand mortar M150. 40 mm 100 m2 2,57 24 Arrangement of coatings on tile glue from tiles seranite 100 m2 2,57 25 Arrangement of plinths from tiles "Seranite" 100 m 1,00 122

Fl-3 26 Leveling screed made of cement-sand mortar M150. 50 mm 100 m2 2,71 27 Arrangement of coatings for grinding concrete 100 m2 2,71 Bathroom 28 Leveling screed made of cement-sand mortar M150. 30 mm 100 m2 0,7737 29 Arrangement of coatings on tile glue from ceramic tiles 100 m2 0,7737 Repair works Repair works (internal ) 30 Improved plaster of walls and partitions in cement-mortar solution 100 m2 24,075 31 Plaster of the surfaces of window and door slopes on concrete and stone 100 m2 1,34 32 Improved plastering of the beams with a cement-lime mortar 100 m2 1,845 33 Surface filling of walls 100 m2 21,94 34 Filling surface of door and window slopes flat 100 m2 1,34 35 Filling of surface beams 100 m2 1,845 36 Plaster of the surfaces of ceilings 100 m2 2,12 37 Improved water-emulsion painting of walls, partitions and slopes 100 m2 25,12 38 Improved water-emulsion painting of walls, partitions and slopes 100 m2 2,12 39 Cladding of bathroom walls with ceramic tiles 100 m2 2,1412 40 Arrangement of suspended ceilings of the type on a frame 100 m2 8,06 made of galvanized profile 41 Installation of frame elements for the lining of bathroom ceilings 1 m3 0,6 42 Cladding of ceilings of plastic bathrooms 100 m2 0,7737 External 43 Improved plaster with cement-lime mortar on the stone walls 100 m2 9,7 44 Plastering of the surfaces of window and door slopes on concrete and flat 100 m2 0,67 stone 45 Painting facades with decorative facade paints (spatter) 100 m2 10,35 # Description Unit of Q-ty measure 46 Installation and dismantling of external inventory forests with a height of up 100 m2 9,7 to 16 m tubular for other finishing works Plinth 47 Improved plaster with cement-lime mortar walls 100 m2 0,62 48 Coloring the socle with decorative facade paints (spatter) 100 m2 0,62 49 Arrangement of monolithic ramps of concrete cl. B15 100 m3 0,005 50 Facing ramp, fender, steps and padstepenki granite tiles 100 m2 0,115 51 Arrangement of metal fences without handrails 100 m 0,07 Scaffolding 52 Arrangement of concrete otmoska from concrete M-150 1 m3 23 53 Delivery of building materials on the distance. 15 km by car Kamaz, fuel T/km 223 cost 6.4 somoni Electric lighting and electrical equipment 1 Shield lighting with an input automaton of the type BA51-31 In = 32A un 1 Exinoxe-18 2 Lamp with compact luminescent IP65 CD160-218 un 14 3 Lamp with luminescent lamps G13 418VT un 4 4 Lamp with luminescent lamps 218VT un 12 5 Lamp with luminescent lamps G13 4x18 LRN418-4x18 un 66 6 Lamp with luminescent lamps LB 2x36 IP65 ARCTIK-236-2-36 un 18 7 Lamp with luminescent lamps LB 2x36 IP65 LZV436 Prizmatik-4x36 un 24 8 DТsplКв lКmp ‘’EБIT’’25 Vt IP20 un 4 9 Emergency power supply K-303 un 4 10 Single button switch un 15 11 Double button switch un 16 12 Power socket un 46 13 Box for branching hidden wiring KM-202 un 200 14 Box for the hidden installation of switches and sockets K-201 un 77 15 Cable with copper conductors with PVC insulation 31,5 mm2 m 1000 16 Cable with copper conductors with PVC insulation 32,5 mm2 ()- m 460 123

LS 17 Cable with copper conductors with PVC insulation 34mm2 m 250 18 Cable with copper conductors with PVC insulation 54 mm2 ()- m 60 LS 19 Cable with copper conductors with PVC insulation 516mm2 ()- m 60 LS 20 Luminescent compact lamp 18Vt un 36 21 Luminescent compact lamp G13 ,18Vt un 288 22 Luminescent lamp LB-36Vt un 132 23 GoПrКsСlКnР Ø16mm m 1710 Fire alarm 1 Revieving –control and guard- ПТrО dОЯТМО ‘’GrКnТt-5‘’TU 4372-018- un 1 11858296-01 2 Accumulator battery 12V, 7/hr un 1 3 Fire smoke detector –electronic Ipit =9/36(10%) И 212-41 un 43 4 Fire manual detector (+10%) И-3 un 2 5 Display lamp "EXIT" 30010014Iport = 0,025 un 5 6 Combined warning system Mayak -12KP un 5 7 The control device of plumes UKSH-1 un 2 8 Cable with single-core conductors D = 0.5 mm with insulation from a m 390 composition of polyethylene with a sheath of white PVC plastic KSPV - 2x0.5 # Description Unit of Q-ty measure 9 Flexible wire up to 380V PVS-2x0.75 m 150 10 Cable PVC-31,5 m 15 11 Universal connecting box ,UK -2P un 20 12 PТpО МorruРКtТons Ø16mm m 540 Internal water supply and sewerage networks 1 Laying of steel water and gas pipelines D=80mm 100 m 0,08 2 Laying of steel water and gas pipelines with D=65mm 100 m 0,4 3 Laying of steel water and gas pipelines with D=50mm 100 m 0,7 4 Laying of steel water and gas pipelines with D=25mm 100 m 0,3 5 Laying of steel water and gas pipelines with D=15mm 100 m 0,4 6 Installation valve 158 D=50mm 1 un 2 7 Installation valve 158 D=25,mm 1 un 3 8 Installation valve 158 D=15mm 1 un 20 9 Installation valve 306 80mm 1 un 1 10 InstКllКtТon oП аКtОr СОКtОr ‘’ArТston ‘’ А=100l 10 set 0,3 11 Installation water heater flowing N = 8kW 10 set 0,1 12 Installation of watering tap with dia. 25mm 1 un 3 13 Installation of a drain cock 15 1 un 1 14 Installation of mixer 10 un 1,7 15 Installation of firemen's cranes∅ with a diameter of 50 mm 1 un 4 Sanutary and technical devices 16 Installation of wash sink 10 set 0,6 17 Installation of bowls with a tank 10 un 0,6 18 Installation of traps with dia. 100mm 10 set 0,3 19 Installashion of cost-iron trays of the shower 10 set 0,5 System K1 20 Plastik pipes D 50mm chelebi plastic 100 m 0,25 21 Plastik pipes D 100mm chelebi plastic 100 0,5 Polyethylene fittings of tees 22 RОЯТsТon oП PVC Ø100mm un 1 23 PVC cleaning Ø100mm un 5 24 Tee plastic D = 100mm un 16 25 Tee plastic disguise D = 100x50mm un 9 124

26 Plastic outlet T90g D = 100mm plastic sheath un 3 27 Plastic outlet T45g D = 100mm plastic sheath un 12 28 Tee plastic D = 50mm un 4 29 Plastic outlet T90g D = 50mm un 4 30 Delivery of construction materials to the distance of 15 km on truck 6 carrying capacityto 15 km cost 6,4 som Dormitory Dismantling works 1 Dismantling of wooden window doorway openings with sill boards 100 m2 1,03 2 Dismantling wooden doorway openings 100 m2 0,7 3 Dismantling of flooring of boards 100 m2 4,15 4 Dismantling of floor coverings from tiles laid on a solution 100 m2 1,58 5 Covering plaster of the external and internal surfaces of walls 100 m2 20,81 Cleaning of the ceiling surfaces from an old filler with a sandblaster from the 100 m2 4,9 6 stairs 7 Dismantling roofing from wavy and semi-wavy asbestos cement sheets 100 m2 10,5 8 Removal of construction debris for a distance of 10 km on a Kamaz truck, 75 the cost of fuel is 6.4somoni # Description Unit of Q-ty measure Repair works Masonry of brick walls reinforced with a thickness of 1/2 brick at a height of 100 m2 0,59 9 up to 4 m Openings 10 Metal plastic windows m2 100 11 Metal-plastic door m3 41 12 Installation of window boards from PVC in stone walls 100 m 0,68 13 Installation of wooden door blocks with an opening area of up to 3m2 100 m2 0,435 Floors Fl-1 14 Arrangement of the underlying layers of crushed stone 1 m3 6,32 Arrangement of the underlying layers of concrete from concrete grade M- 1 m3 6,32 15 150 16 Levelling the screed from a sement-sand mortar M150 thickness of 20 mm 100 m2 2,51 Laying of laminate flooring by means of a locking connection with a 100 m2 2,51 17 soundproofing device 18 Installation skirting from plastic 100 m 1,17 Fl-2 19 Arrangement of the underlying layers of crushed stone 1 m3 5,48 Arrangement of the underlying layers of concrete from concrete grade M- 1 m3 5,48 20 150 21 Levelling the screed from a sement-sand mortar M150 thickness of 20mm 100 m2 1,645 22 Arrangement of coatings on tile glue from tiles seranite 100 m2 1,645 23 Floor covering from К tТlОs ‘’SОrКntТМ’’ 100 m 1,42 Fl-3 24 Levelling the screed from a sement-sand mortar M150 thickness of 30mm 100 m2 1,58 25 Arrangement of coatings on tile glue from ceramic tiles 100 m2 1,58 Fl-4 26 Arrangement of coatings on tile glue from tiles seranite 100 m2 0,79 Roofs 27 Change of rafter legs, rack and rod from the uneven beams 100 m 10,67 28 Change of parts of mauerlates 100 m 1 29 Change of the plank from the beams 100 m2 7,35 30 Fire protection of wooden structures (rafters and girders, Diagonal leg, 10 m3 0,953 stand, ladder, mauerlat, lining, brace, filly) 31 Fire protection of the crates under the roof 1000 m2 1,05 125

32 Arrangement of roofs from the zinced steel from a laths from beams 100 m2 10,5 33 Installation of drainpipes 100 m 0,9 34 Installation of funnels 1 un 9 Repair works Repair works (internal) 32 Improved plastering of walls and partitions with cement-lime mortar 100 m2 16,69 Plastering of the surfaces of window and door slopes on concrete and flat 100 m2 1,23 33 stone 34 Plastering of wall surfaces 100 m2 9,9 35 Plastering of surface of door and window slopes flat 100 m2 1,23 36 Plastering of ceilings surface 100 m2 4,91 37 Improved water-emulsion painting of walls, partitions and slopes 100 m2 11,13 # Description Unit of Q-ty measure 38 Improved water –emulsion painting of ceilings 100 m2 4,91 39 Cladding of walls with ceramic tiles 100 m2 6,79 40 Installation of frame elements for the lining of bathroom ceilings 1 m3 1 41 Cladding of ceilings of plastic bathrooms 100 m2 1,58 External 42 Improved plaster with cement-lime mortar on the stone walls 100 m2 4,13 43 Plastering of the surfaces of window and door slopes on concrete and flat 100 m2 0,52 stone 44 Painting facades with dОМorКtТЯО ПКхКdО pКТnts (spКttОr) 100 m2 4,65 Plinth 45 Arrangement of plinth 1 m3 1,3 46 Improved plaster with cement-lime mortar with stone walls 100 m2 0,21 47 Coloring the socle with decorative facade paints( spatter ) 100 m2 0,2 48 Arrangement monolithic ramps of concrete cl. B15 100 m3 0,007 49 Facing ramp, fender, steps and padstepenki granite tiles 100 m2 0,15 50 Arrangement of metal fences without handrails 100 m 0,14 51 Installation and dismantling of external inventory forests with a height of up 100 m2 4,13 to 16 m tubular for other finishing works Scaffolding 52 Arrangement of concrete otmoska from concrete M-150 1 m3 7,6 Delivery of building materials on the distance. 15 km by car Kamaz, fuel T/km 223 53 cost 6.4 somoni Internal electric lighting and electrical equipment 1 Shield lighting with an input automaton of the type BA51-31 In = 32A un 1 Exinoxe-12 2 Lamp with compact luminescent lamp with protection degree IP65 CD160- un 34 218 3 Lamp with compact luminescent lamp with protection degree IP65 CD218- un 1 218 4 Lamp with luminescent lamps 218VT un 18 5 CКndlОs 318 un 13 6 Ceiling lamp for luminescent compact lamp RKL218-1-18 un 7 7 "ЫХ" 25 IP20 un 4 DТsplКв lКmp ‘’EБIT’’ 25 Vt IP20 8 Emergency power supply K-303 un 6 9 Single button switch un 43 10 Power socket un 14 11 Box for branching hidden wiring KM-202 un 220 12 Box for the hidden installation of switches and sockets K-201 un 109 13 Cable with copper conductors with PVC insulation 31,5 mm2 m 600 14 Cable with copper conductors with PVC insulation 32,5 mm2 m 630

126

15 Cable with copper conductors with PVC insulation 34 mm2 m 300 16 Cable with copper conductors with PVC insulation 516mm2 80 17 Luminescent compact lamp 18 Vt un 116 18 Luminescent compact lamp G13 18 Vt un 36 19 GoПrКsСlКnР Ø16 m 1500 Fire alarm 1 Receiving –control and guard –ПТrО dОЯТМО ‘’GrКnТt ‘’TU 4372-018-11858296- un 1 01 2 Accumulator battery 12V, 7/hr un 1 3 Fire smoke detector –electronic Ipit =9/36(10%) И 212-41 un 25 4 Fire manual detector (+10%) И-3 un 3 # Description Unit of Q-ty measure 5 Display lamp "EXIT" 30010014Iport = 0,025 un 3 6 Combined warning system Mayak -12KP un 6 7 The control device of plumes UKSH-1 un 3 8 Cable with single-core conductors D = 0.5 mm with insulation from a m 250 composition of polyethylene with a sheath of white PVC plastic KSPV - 2x0.5 9 Flexible wire up to 380V PVS-2x0.75 m 150 10 Cable PVC-31,5 m 15 11 Universal connecting box ,UK -2P un 10 12 PТpО МorruРКtТons Ø16mm m 400 Internal water supply and sewerage networks 1 LКвТnР oП stООl аКtОr Кnd РКs pТpОlТnОs Ø65 100 m 0,25 2 Laying of steel water and gas pipelines with D=50mm 100 m 0,15 3 Laying of steel water and gas pipelines with D=32mm 100 m 0,1 4 Laying of steel water and gas pipelines with D=25mm 100 m 0,8 5 Laying of steel water and gas pipelines with D=15mm 100 m 2,3 6 Installation valve 15h8p D = 50mm 1 un 4 7 Installation valve 15h8p D = 32mm 1 un 18 8 Installation valve 15h8p D = 25mm 1 un 15 9 Installation valve 15h8p D = 15mm 1 un 30 10 Installation valve 306 D=65 mm 1 un 1 11 InstКllКtТon oП аКtОr СОКtОr ‘’ArТston ‘’ А=100l 10 set 1,1 12 Installation of watering cranes, diameter 25 mm 1 un 10 13 Installation of a drain cock 15 1 un 1 14 Installation of mixer 10 un 4,9 15 Installation of firemen's cranes∅ with a diameter of 50 mm 1 un 8 Sanitary and technical devices 16 Washing machine un 6 17 Installation of wash sink 10 set 2,5 18 Installation of washers in two compartments 10 set 0,3 19 Installation of bowls with a tank 10 un 1,2 20 Installation of traps diam. 100mm 10 set 1,1 21 Installation of shower trays of cast iron 10 set 0,6 System K1 22 Plastic pipes D = 50mm plastic sheath 100 m 0,7 23 Plastic pipes D = 100mm plastic sheep 100 m 0,95 24 Delivery of building materials on the distance. 15 km by car Kamaz, fuel 6 cost 6.4 somoni Outdoor networks water supply and sewerage 1 Development of a trench excavator "backhoe" with a bucket capacity of 0.4 1000 m3 0,303 m3 in the dump, a group of soils: 2 2 Updating the soil manually gr. soils 2 100 m3 0,09 127

3 Sealing of soil with pneumatic rammer, for pipelines group of soils 1 100 m3 0,7 4 Arrangement of sand base for pipelines 10 m3 2,3 5 Transport costs for transportation of sand on races. up to 10 km /km 43,01 6 Stacking of steel water pipes with a diameter of 100 mm 1 km 0,333 7 Welding of flanges to steel pipes with a diameter of 100 mm 1 14 8 Installation of shaped pieces of cast iron in diameter: 50-100 mm 1 T 0,015 9 Backfilling of trenches with displacement of ground up to 5 m by bulldozers 1000 m3 0,303 with the capacity: 59 (80) kW (hp) Sewerage K1 # Description Unit of Q-ty measure 10 Development of a trench excavator "backhoe" with a bucket capacity of 0.4 1000 m3 0,978 m3 in the dump, a group of soils: 2 11 Updating the soil manually gr. soils 2 100 m3 0,29 12 Sealing of soil with pneumatic rammer, for pipelines group of soils 1 100 m3 1,173 13 Arrangement of sand base for pipelines 10 m3 3,9 14 Transport costs for transportation of sand on races. up to 10 km T/km 72,93 15 LКвТnР oП pТpОlТnОs Пrom prОssurО polвОtСвlОnО pТpОs PE80SDR21 Ø160 100 m 3,91 mm 16 Backfilling of trenches with displacement of ground up to 5 m by bulldozers 1000 m3 0,303 with the capacity: 59 (80) kW (hp) 17 Cleaning of sewage wells Ø1000mm 1 m3 3 18 Cleaning of sewer pipes Ø 150 mm 100 m 0,2 19 Arrangement of round precast reinforced concrete sewage wells with a 10 m3 0,87 diameter of 1 m in dry soils D = 1000 mm 20 Delivery of building materials on the distance. 15 km by car Kamaz, fuel 49 cost 6.4 somoni

IV. POTENTIAL IMPACTS AND MITIGATION MEASURES

29. Potential impacts of proposed additional activities and relevant mitigation measures are described in the Table 12 below.

Table 12: Potential impacts of the prosed activities and mitigation measures

Potential impacts Mitigation measures Temporary increase of Ensure that the maximum and equivalent noise levels comply with sanitary background noise and regulations (not more than 55 dBa). Instrumental noise measurements vibration due construction should be undertaken at least 2 times per month works Monitor and address complaints about the noise level.

Construction works (including drilling works) will be limited to restricted times agreed to in the permit – from 7am to 17 pm in week days and from 8am to 16 pm on Saturday. No works at night time, Sunday and holidays are allowed.

The proposed works includes only drilling equipment for walls (for installation of windows, doors, radiators) which will not cause vibration Creation of dust Monitor dust emissions to ensure emissions are minimized. emissions and volatile organic compounds at Monitor and address complaints about dust / volatile organic compounds and construction site while other pollutants dismantling work, 128 transportation of Construction works will be limited to restricted times - from 7am to 17 pm in construction materials week days and from 8am to 16 pm on Saturday. No works at night time, and waste Sunday and holidays are allowed.

Providing the construction workers with suitable personal protective equipment (respirators)

Contractor will monitor the exhaust gas content of its own vehicle fleet.

There will be no open burning of construction / waste material at the site There will be no excessive idling of construction vehicles at sites

Keep surrounding environment (side-walks, roads) free of debris to minimize dust

In case of dust creation by pneumatic drilling/wall destruction during installation of windows/doors/radiators etc. installation suppress dust by water spraying and/or installing dust screen enclosures at site. Construction waste Waste disposal facilities are available.

Boxes for construction debris will be installed in the site.

The construction waste will be disposed according to general EMP requirements and SSEMP (Waste Management Plan)

Construction waste will be collected and disposed properly by licensed collectors

Timely sorting of rehabilitated and removing construction waste in an organized way, and disposal them on an authorized land field

Mineral construction and demolition wastes will be separated from general refuse, organic, liquid and chemical wastes by on-site sorting and stored in appropriate containers

Dispose off waste appropriately to prevent pollution of soil and groundwater

The approach to handling sanitary wastes and wastewater from building sites (installation or reconstruction) must be approved by the local authorities

Recycle valuable materials within the project or sold.

Aim to minimize waste through reducing and re-using (packaging) material

Do not allow any burning or burying of waste on site.

Prevent littering by construction staff at work sites by providing bins or waste bags in sufficient locations.

The records of waste disposal will be maintained as proof for proper management as designed;

Whenever feasible the contractor will reuse and recycle appropriate and viable materials. Toxic / hazardous waste Temporarily storage on site of all hazardous or toxic substances will be in management safe containers labeled with details of composition, properties and handling information The containers of hazardous substances should be placed in a leak-proof 129

container to prevent spillage and leaching The wastes will be transported by specially licensed carriers and disposed in a licensed facility Paints with toxic ingredients or solvents or lead-based paints will not be used Soil contamination due  Construction materials that can impact the soil should be kept in a to accidental spillage special premise or in concrete ground. • Soils contaminated by accidental spills should be immediately collected and properly disposed at relevant landfill in accordance with the permit from local environmental departments ; • regular maintenance of the equipment should be done by Contractor and checking for any possible leaks from the joints etc. Asbestos containing Ensure that the standard practice of handling existing asbestos containing materials (ACM) materials is used to remove and decommission asbestos containing roofing materials.

ACM will not be used as a roofing/new material in construction works of building.

Any existing ACM to be handled and disposed according to the SSEMP (ACM management and disposal plan)

Health and labor safety  The local construction and environment inspectorates have been (occupational hazards) – during construction and notified of upcoming activities operation  All work will be carried out in a safe and disciplined manner designed to minimize impacts on workers.  Workers will comply with international good practice - providing the construction workers with suitable personal protective equipment (always hardhats, as needed masks and safety glasses, harnesses and safety boots)  Appropriate signposting of the sites will inform workers of key rules and regulations to follow. Following plans to be developed for construction and operation phases of the project: Emergency Response Plan and Health and Safety Plan

Direct or indirect hazards Transport along the B.Gafurov 1 street consists of private cars and public to public traffic and transport, as well as taxis, minibuses, trucks. The volume of traffic is not pedestrians by very large. construction activities Contractor will observe the necessary precautions (speed limit, working hours from 7 am to 5 pm)

In compliance with national regulations the contractor will insure that the construction site is properly secured and construction related traffic regulated. This includes but is not limited to: Signposting, warning signs, barriers and traffic diversions: site will be clearly visible and the public warned of all potential hazards Traffic management system and staff training, especially for site access and near-site heavy traffic. Adjustment of heavy traffic to local traffic patterns, e.g. avoiding major transport activities during rush hours

130

4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor

30. The general Environmental Management plan (EMP) for all project sites is approved as part of Initial Environmental Examination (IEE) endorsed by State Environmental Committee of the Republic of Tajikistan and general management measures that apply to this sub-project should be followed by the Contractor.

31. In addition, the Contractor should prepare the following eight (8) Site-specific Environmental Management plans (SSEMP): - Waste Management Plan; - Emergency Response Plan; - Health and Safety Protection Plan; - Plan for the Consideration of Complaints; - Dust Control Plan; - Noise Management Plan; - ACM Handing, Management and Disposal Plan - Traffic and Road Safety Management Plan.

131

Environmental Safeguards Due Diligence Report

Project number: 46535-001 Grant 0452/53/3309 Date: June 2018

TAJ: Strengthening Technical and Vocational Education and Training

"MOLME/SH/CW06-C ": MINOR REHABILITATION OF ADULT LEARNING CENTER IN YAVAN

The Due Diligence Report for Social and Environmental Safeguards is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.

June 2018

132

Table of content I. INTRODUCTION ...... 135 1.1. Justification of the site ...... 135 II. DEFINING THE BORDERS ...... 136 2.1. Current condition of the site ...... 136 2.2. Location of objects and access to the site ...... 136 III. CONSTRUCTION ACTIVITIES ...... 141 3.1. Types of civil works ...... 141 IV. POTENTIAL IMPACTS AND MITIGATION MEASURES ...... 142 4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor ...... 144

Tables Table 1: Types of rehabilitation works for renovation of the Adult Learning Centre branch in Yavan ...... 141 Table 2: Potential impacts of the prosed activities and mitigation measures ...... 142

Figures Figure 1: Location of ALCY in scale of the country - in Yavan district ...... 137 Figure 2: The rehabilitated facility is located in Yavan ...... 137 Figure 3: Aerial photo of the ALC branch in Yavan building and surrounding facilities/structures: ...... 140

Photos Photo 1: Main gate of Gymnasium number 1 of Yavan district where the ALC of Yavan is located ...... 138 Photo 2: Front view of Building of Gymnasium number 1 of Yavan, ALC occupies part of 4th floor - marked with red dash line ...... 138 Photo 3: Rear view of Building of Gymnasium number 1 of Yavan, ALC occupies part of 4th floor - marked with red dash line ...... 138 Photo 4: Current condition of corridors of ALC ...... 138 Photo 5: Current condition of classrooms ...... 138 Photo 6: Current condition of classrooms ...... 138 Photo 5: Current condition of classrooms ...... 139 Photo 6: Current condition of classrooms ...... 139 Photo 7: View to East-South side from ALC ...... 139 Photo 8: View to West-South side from ALC ...... 139 Photo 9: View to West side from ALC ...... 139

133

ABBREVIATIONS

1 ADB Asian Development Bank 2 АСМ Asbestos containing materials 3 ALC Adult Learning Center 4 ALCY Adult Learning Center branch in Yavan 5 CM Complaint Mechanism 6 EIA Environmental impact assessment 7 EMP Environmental Management Plan 8 FLM Fuel and lubrication materials 9 GFS Gypsum-fiber sheets 10 LLC Limited Liability Company 11 MFC Microfinance company 12 MOLME Ministry of Labor, Migration and Employment of the Republic of Tajikistan 13 PAG Project Administration Group 14 SI State institution 15 SSEMP Site-specific Environmental Management Plan

16 TVET Technical and Vocational Education and Training 17 WMP Waste Management Plan

134

I. INTRODUCTION

1.1. Justification of the site

1. Over the years of independence, the management of the Government has made efforts to develop the education sector and training of highly qualified specialists for various industries.

2. The Ministry of Labor, Migration and Employment of the Republic of Tajikistan pays special attention to the technical condition, the availability of educational facilities (institutions) in schools to enhance vocational education and training of learners and students.

3. The proposed Project on Strengthening Technical and Vocational Education and Training (Project) will have an impact on national workforce with a high proportion of skilled workers employed in Tajikistan's domestic economy. The project is aimed at meeting the needs of the Republic of Tajikistan. Within the framework of the project, unemployed and partially employed young people and the adult population in the Republic will be provided with job opportunities and income in the domestic and international labor markets by providing quality training.

4. The outcome of the Project will be a more effective, efficient, quality-assured, and flexible system for the delivery of technical vocational training. The project includes the achievement of five outputs, namely: (i) modernization of the methodology of the TVET system; (ii) improving the physical conditions of training institutions; (iii) increasing the volume and quality improvement of TVET delivery; (iv) expansion of equal access to TVET; and (v) strengthening the leadership and management of the TVET system.

5. In November 2015, a Grant Agreement was signed between the Republic of Tajikistan and ADB on project financing.

6. An IEE/ EMP for the overall project was prepared and approved by September 2015. The project has been classified as category B in accordance with ADB's Safeguard policies.

7. As part of this Project, the Ministry of Labor, Migration and Employment of the Republic of Tajikistan shall sign a contract "MOLME/SH/CW06-C" with a construction firm for minor rehabilitation of the Adult Learning Center branch in Yavan.

8. The Contractor will undertake, in accordance with the contract, professionally and qualitatively, the rehabilitation works of the Adult Learning Center branch in Yavan within the terms provided for in the Contract to be awarded.

9. The Environmental Management Plan (EMP), which is part of the IEE, is general and wide- ranging and covers all possible consequences associated with the project. Therefore, the Contractor is required to develop a Site-specific Environmental Management Plan (SSEMP) prior to the commencement of construction works.

10. The main objective of the plan is to document how the environmental mitigation measures and required management plans proposed for rehabilitating the project site will be brought into line with the project commitments.

11. In addition, during the implementation of the Project, the Contractor will strictly comply with ADB's safeguard requirements and national laws and regulations in the field of environmental protection, and, under the terms of the contract, will develop and refine the working measures, plan and management system for environmental protection in areas of repair works.

135

II. DEFINING THE BORDERS

2.1. Current condition of the site

12. The Adult Learning Centre branch in Yavan which was selected for the STVET project is located in the building of the Gymnasium №1 of Yavan district. It occupies the left 4th floor of the Gymnasium wing of the Educational building. It is a four story brick masonry building (where the ALC is located) with concrete ceilings, wooden doors and windows and built in 1970s. The roof is covered with asbestos cement slate. The ALC has 6 classrooms.

13. Following works are being proposed under the STVET project: repair all classrooms including replacement of windows and doors; replace wirings, lamps and electrical appliances, repair ceilings and floors - the floors will be replaced with ceramic tiles; repair toilets and corridors.

14. The premises proposed for the rehabilitation are in poor condition, do not meet the modern construction standards and need relevant renovation and reconstruction.

15. Dismantling or replacement of any ACM during rehabilitation of the Lyceum buildings is not expected.

2.2. Location of objects and access to the site

16. Location of this sub-project is in Yavan district of Khatlon region (country scale shown in Figure 18 below). The Yavan district is an administrative district of the Khatlon region of the Republic of Tajikistan. The district center is a Yavan urban settlement, located in the valley of Yavan River (the Vakhsh River basin), at the distance of 54 km to the southwest. from Dushanbe and 88 km to the north of Bokhtar (former Kurgan-Tyube). In the North it borders the Rudaki and Vahdat districts, in the East – borders the Nurek and Dangara districts, in the West and South-West – borders the Khuroson and Jomi districts of Khatlon region.

136

Figure 18: Location of ALC in the scale of country

17. Figure 19 below shows the location of the Adult Learning center in Yavan.

Figure 19: The rehabilitated facility is located in Yavan

18. The Adult Learning Centre branch is located at the 1 Bobiev Street in Yavan town.

137

19. Photos below illustrate the current status of the building (inside and outside) which is being proposed for rehabilitation.

Photo 75: Main gate of Gymnasium number 1 of Photo 76: Front view of Building of Gymnasium Yavan district where the ALC of Yavan is located number 1 of Yavan, ALC occupies part of 4th floor - marked with red dash line

Photo 77: View of Building of Gymnasium No 1 in Photo 78: Current condition of corridors of ALC Yavan, ALC occupies part of the 4th floor - marked with red dash line

Photo 79: Current condition of classrooms Photo 80: Current condition of classrooms

138

Photo 81: Current condition of classrooms Photo 82: Current condition of classrooms

Photo 83: View to East-South side from ALC Photo 84: View to West-South side from ALC

c Photo 85: View to West side from ALC

20. Transportation of equipment and construction materials will be done using J. Bobiev street. The contractor has to establish warning signs at appropriate points (at least at the distance

139

20 m before construction site) during conduction of rehabilitation works and observe requirements to ensure traffic and pedestrian safety.

21. Figure 20 below shows project boundaries and nearby receptors (houses, schools, hospitals, or any other receptor) located close to the site, as well as access roads

Adult Learning Center Brunch in Yavan

LEGEND

1. ALC branch in Yavan- to be rehabilitated

2. State Gymnasium No. 1 of the Yavan District

3. Dormitory of State Gymnasium No. 1 of the Yavan District

4. Main access road- J. Bobiev Street

5. The Canteen of Gymnasium № 2

Figure 20: Aerial photo of the ALC branch in Yavan building and surrounding facilities/structures

22. The ALC is located in the building of State Gymnasium No. 1 on the fourth floor. The nearest building is the Dormitory building and cross the road there is the Gymnasium №2 building.

23. The following buildings and receptors are located around the ALC:

From the North side • The Dormitory of Gymnasium No 1 is located at a distance of 20 m;

From the South side: • The Canteen of Gymnasium № 2 is located at a distance of 50 m.

24. The nearest residential houses are located on the other side of the roads, at the distance of 50-60 m to 100 meters and more from the ALC branch building.

25. No construction of separate camp for the Contractor’s personnel is proposed here, because workers will be local.

26. The construction waste should be disposed in the nearby waste disposal facilities. The Contractor shall conclude for this purpose, an agreement with communal services of Yavan city and apply for relevant permits.

140

III. CONSTRUCTION ACTIVITIES

3.1. Types of civil works

27. Within the framework of this project, the following construction activities are envisaged - see Table 13 below:

Table 13: Types of rehabilitation works for renovation of the Adult Learning Centre branch in Yavan # Description Unit of Q-ty measure Repair Educational block Dismantling works 1 Dismantling of wooden window openings with sill boards 100 m2 0,9 2 Dismantling wooden doorway openings 100 m2 0,36 3 Dismantling of brick walls 1 m3 1,8 4 Punching of openings in brick structures 1 m3 1,8 5 Fixing of plaster from the surfaces of internal brick walls 100 m2 9,45 Removal of construction debris for a distance of 10 km on a 6 Kamaz truck, fuel cost 6,6 T/km 12,0 somoni Repair works 7 Masonry of the openings form the brick 1 m3 11,5 Openings 8 Instalation of metal plastic window blocks m2 90 9 Instalation of metal plastic door blocks (bathrooms ) m2 9,5 Installation of window boards from PVC in stone walls thik. 25 10 100 m 0,94 sm Installation of wooden door blocks with an opening area of up to 11 100 m2 0,215 3m2 12 Installation metallic external doors 1 m2 5,1 Finishing works Repair works (internal ) 13 Improved plastering of walls 100 m2 10,67 Plastering of the surfaces of window and door slopes on concrete 14 100 m2 0,70 and flat stone 15 Plastering of surface of walls and bathrooms to a height of 1.9 m 100 m2 9,94 16 Plastering of surface of door and window slopes flat 100 m2 0,66 Painting with polyvinyl acetate water-emulsion compositions of 100 m2 10,6 17 walls, partitions and slopes Cladding of walls with ceramic tiles (bathrooms to a height of 1.9 18 100 m2 0,79 m) Ceilings 19 Installation of metallic skeletons for ceilings 1 m2 23 20 Boarding of ceilings made of plastic 100 m2 0,23 alvanized 21 SuspОndОd МОТlТnРs oП ‘’ArmstronР ‘’tвpО on ПrКmО Пrom Р 100 m2 4,9 profile Floors 22 Levelling the screed from a sement-sand mortar M150 thickness 100 m2 5,13 of 30mm thick

141

23 Arrangement of the underlying layers of crushed stone with thick. 100 m2 0,23

Floor covering from a cement mortar made of ceramic and tiles 24 100 m2 2,27 ‘’SОrКnТtСвС 3 Кnd 5 Laying of laminate flooring on a ready-made substrate type 25 100 m2 2,750 PERGO Fl-2 4,6,7 and 8 26 Installation skirting made of plastic 2,4,6,7 and 8 100 m 1,37 Installation and disassembly of internal tubular inventory forests 27 100 m2 0,6 with room heights up to 6 m Delivery of building materials on the distance. 15km on a Kamaz 28 T 80,00 car, the cost of fuel is 6.6 somoni

IV. POTENTIAL IMPACTS AND MITIGATION MEASURES

28. Potential impacts of proposed additional activities and relevant mitigation measures are described in the Table 14 below.

Table 14: Potential impacts of the prosed activities and mitigation measures Potential impacts Mitigation measures Temporary increase of Ensure that the maximum and equivalent noise levels comply with sanitary background noise and regulations (not more than 55 dBa). Instrumental noise measurements vibration due construction should be undertaken at least 2 times per month. works Monitor and address complaints about the noise level.

Construction works (including drilling works) will be limited to restricted times agreed to in the permit – from 7am to 5 pm in week days and from 8 am to 4 pm on Saturday.

No works at night time, Sunday and holidays are allowed.

The proposed works includes only drilling equipment for walls (for installation of windows, doors, radiators) which will not cause vibration

The drilling works should be done during the breaks and after classes in order to not disturb the students studies

The Noise Management plan should be developed by Contractor Creation of dust Monitor dust emissions to ensure emissions are minimized. emissions and volatile organic compounds at Monitor and address complaints about dust / volatile organic compounds and construction site while other pollutants dismantling work, transportation of Construction works will be limited to restricted times - from 7am to 5 pm in construction materials week days and from 8 am to 4 pm on Saturday. No works at night time, and waste Sunday and holidays are allowed.

Providing the construction workers with suitable personal protective equipment (respirators)

Contractor will monitor the exhaust gas content of its own vehicle fleet.

There will be no open burning of construction / waste material at the site There will be no excessive idling of construction vehicles at sites

Keep surrounding environment (side-walks, roads) free of debris to minimize dust 142

In case of dust creation by pneumatic drilling/wall destruction during installation of windows/doors/radiators etc. installation suppress dust by water spraying and/or installing dust screen enclosures at site.

The Dust control plan should be developed by Contractor Construction waste Waste disposal facilities are available.

Boxes for construction debris will be installed in the site.

The construction waste will be disposed according to general EMP requirements and SSEMP (Waste Management Plan)

Construction waste will be collected and disposed properly by licensed collectors

Timely sorting of rehabilitated and removing construction waste in an organized way, and disposal them on an authorized land field

Mineral construction and demolition wastes will be separated from general refuse, organic, liquid and chemical wastes by on-site sorting and stored in appropriate containers

Dispose off waste appropriately to prevent pollution of soil and groundwater

The approach to handling sanitary wastes and wastewater from building sites (installation or reconstruction) must be approved by the local authorities

Recycle valuable materials within the project or sold.

Aim to minimize waste through reducing and re-using (packaging) material Do not allow any burning or burying of waste on site.

Prevent littering by construction staff at work sites by providing bins or waste bags in sufficient locations.

The records of waste disposal will be maintained as proof for proper management as designed;

Whenever feasible the contractor will reuse and recycle appropriate and viable materials. Toxic / hazardous waste Temporarily storage on site of all hazardous or toxic substances will be in management safe containers labeled with details of composition, properties and handling information The containers of hazardous substances should be placed in a leak-proof container to prevent spillage and leaching The wastes will be transported by specially licensed carriers and disposed in a licensed facility Paints with toxic ingredients or solvents or lead-based paints will not be used Soil contamination due Construction materials that can impact the soil should be kept in a special to accidental spillage premise or in concrete ground.

Soils contaminated by accidental spills should be immediately collected and properly disposed at relevant landfill in accordance with the permit from local environmental departments ; regular maintenance of the equipment should be done by Contractor and checking for any possible leaks from the joints 143

etc. Health and labor safety The local construction and environment inspectorates have been notified of (occupational hazards) – upcoming activities during construction and operation All work will be carried out in a safe and disciplined manner designed to minimize impacts on workers. Workers will comply with international good practice - providing the construction workers with suitable personal protective equipment (always hardhats, as needed masks and safety glasses, harnesses and safety boots) Appropriate signposting of the sites will inform workers of key rules and regulations to follow. Following plans to be developed for construction and operation phases of the project: Emergency Response Plan and Health and Safety Plan

Direct or indirect hazards Transport along the .J.Bobiev street consist of private cars and public to public traffic and transport, as well as taxis, minibuses, trucks. The volume of traffic is not pedestrians by very large. construction activities Contractor will observe the necessary precautions (speed limit, working hours from 7 am to 5 pm)

In compliance with national regulations the contractor will insure that the construction site is properly secured and construction related traffic regulated. This includes but is not limited to:

 Signposting, warning signs, barriers and traffic diversions: site will be clearly visible and the public warned of all potential hazards

 Traffic management system and staff training, especially for site access and near-site heavy traffic.

 Adjustment of heavy traffic to local traffic patterns, e.g. avoiding major transport activities during rush hours

4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor

29. The general Environmental Management plan (EMP) for all project sites is approved as part of Initial Environmental Examination (IEE) endorsed by State Environmental Committee of the Republic of Tajikistan and general management measures that apply to this sub-project should be followed by the Contractor.

30. In addition, the Contractor should prepare the following seven (7) Site-specific Environmental Management plans (SSEMP): - Waste Management Plan; - Emergency Response Plan; - Health and Safety Protection Plan; - Plan for the Consideration of Complaints; - Dust Control Plan; - Noise Management Plan; - Traffic and Road Safety Management Plan.

- If asbestos is found on the building, an Asbestos Management and Disposal Plan must be prepared and followed by the Contractor.

144

Environmental Safeguards Due Diligence Report

Project number: 46535-001 Grant 0452/53/3309 Date: June 2018

TAJ: Strengthening Technical and Vocational Education and Training

"MOLME/SH/CW06 -D": MINOR REHABILITATION OF THE BRANCH OF VOCATIONAL ENTREPRENEURIAL CENTER IN NUREK

The Due Diligence Report for Social and Environmental Safeguards is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.

June 2018

145

Table of content I. INTRODUCTION ...... 148 1.1. Justification of the site ...... 148 II. DEFINING THE BORDERS ...... 149 2.1. Current condition of the site ...... 149 2.2. Location of objects and access to the site ...... 149 III. CONSTRUCTION ACTIVITIES ...... 154 3.1. Types of civil works ...... 154 IV. POTENTIAL IMPACTS AND MITIGATION MEASURES ...... 159 4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor ...... 161

Tables Table 1: Types of rehabilitation works for renovation of the Adult Learning Centre branch in Nurek ...... 155 Table 2: Potential impacts of the prosed activities and mitigation measures ...... 159

Figures Figure 1: Location of BVECN in scale of the country - in Nurek district ...... 150 Figure 2: The rehabilitated facility is located in Nurek ...... 150 Figure 3: Aerial photo of the Branch of Vocational and Entrepreneurial Center in Nurek and surrounding facilities/structures ...... 153

Photos Photo 1: The building of BVECN - front view ...... 151 Photo 2: The building of BVECN - side view ...... 151 Photo 3: Current condition of stairs case ...... 151 Photo 4: Current condition of corridors ...... 151 Photo 5: Current condition of classrooms ...... 152 Photo 6: The building of workshop - view from Administrative and educational building ...... 152 Photo 7: Current condition of Training and production workshop ...... 153

146

ABBREVIATIONS

1 ADB Asian Development Bank 2 АСМ Asbestos containing materials 3 ALC Adult Learning Center 4 BVECN Branch of Vocational and Entrepreneurial Center in Nurek 5 CM Complaint Mechanism 6 EIA Environmental impact assessment 7 EMP Environmental Management Plan 8 FLM Fuel and lubrication materials 9 GFS Gypsum-fiber sheets 10 LLC Limited Liability Company 11 MFC Microfinance company 12 MOLME Ministry of Labor, Migration and Employment of the Republic of Tajikistan 13 PAG Project Administration Group 14 SI State institution 15 SSEMP Site-specific Environmental Management Plan

16 TVET Technical and Vocational Education and Training 17 WMP Waste Management Plan

147

I. INTRODUCTION

1.1. Justification of the site

1. Over the years of independence, the management of the Government has made efforts to develop the education sector and training of highly qualified specialists for various industries.

2. The Ministry of Labor, Migration and Employment of the Republic of Tajikistan pays special attention to the technical condition, the availability of educational facilities (institutions) in schools to enhance vocational education and training of learners and students.

3. The proposed Project on Strengthening Technical and Vocational Education and Training (Project) will have an impact on national workforce with a high proportion of skilled workers employed in Tajikistan's domestic economy. The project is aimed at meeting the needs of the Republic of Tajikistan. Within the framework of the project, unemployed and partially employed young people and the adult population in the Republic will be provided with job opportunities and income in the domestic and international labor markets by providing quality training.

4. The outcome of the Project will be a more effective, efficient, quality-assured, and flexible system for the delivery of technical vocational training. The project includes the achievement of five outputs, namely: (i) modernization of the methodology of the TVET system; (ii) improving the physical conditions of training institutions; (iii) increasing the volume and quality improvement of TVET delivery; (iv) expansion of equal access to TVET; and (v) strengthening the leadership and management of the TVET system.

5. In November 2015, a Grant Agreement was signed between the Republic of Tajikistan and ADB on project financing.

6. An IEE/ EMP for the overall project was prepared and approved by September 2015. The project has been classified as category B in accordance with ADB's Safeguard policies.

7. As part of this Project, the Ministry of Labor, Migration and Employment of the Republic of Tajikistan shall sign a contract "MOLME/SH/CW06-D " with a construction firm to conduct minor rehabilitation works at building the Branch of Vocational and Entrepreneurial Center in Nurek.

8. The Contractor will undertake, in accordance with the contract, professionally and qualitatively, the rehabilitation works of the Branch of Vocational and Entrepreneurial Center in Nurek within the terms provided for in the Contract to be awarded.

9. The Environmental Management Plan (EMP), which is part of the IEE, is general and wide- ranging and covers all possible consequences associated with the project. Therefore, the Contractor is required to develop a Site-specific Environmental Management Plan (SSEMP) prior to the commencement of construction works.

10. The main objective of the plan is to document how the environmental mitigation measures and required management plans proposed for rehabilitating the project site will be brought into line with the project commitments.

148

11. In addition, during the implementation of the Project, the Contractor will strictly comply with ADB's safeguard requirements and national laws and regulations in the field of environmental protection, and, under the terms of the contract, will develop and refine the working measures, plan and management system for environmental protection in areas of repair works.

II. DEFINING THE BORDERS

2.1. Current condition of the site

12. The following buildings of The Vocational and Entrepreneurial Center Branch in Nurek district are proposed for rehabilitation: (i) Administrative and educational building (second floor), and (ii) Training and production workshop.

13. Administrative and educational building. The building was built in 1987. It is a two-story building, which is constructed from partially brick masonry, partially prefabricated concrete blocks, with concrete ceilings and asbestos-cement slate roof. The Branch of the Vocational and Entrepreneurial Centre occupies the second floor of the building.

14. The following rehabilitation works are being planned:

 overhaul all classrooms and premises of second floor  repairing of sanitary units. internal water supply and sewerage systems, external sewage line to the point of connection with the existing urban system.  repairing the staircase  replacement of lamps and electrical appliances  the floors will be replaced with ceramic tiles

15. Training and production workshop was also built in 1987 and has concrete wall and several metal pillars supporting a canopy covered with metal sheets,.

16. The following works are being proposed: construction of three additional walls with installation of metal plastic doors and windows; repair of roof and ceiling; repair of floors.

17. The buildings proposed for the rehabilitation are in poor condition, do not meet the modern construction standards and need relevant renovation and reconstruction.

18. As mentioned above asbestos cement sheets were used as roofing material for the Lyceum buildings. Roof should be demolished and also replaced by non-hazardous materials which will not cause risks for health of Lyceum students and staff. To mitigate the occupational and public health risks of inhalation of airborne asbestos fibers, when disassembling the roofs they will be removed and disposed by following the internationally-recognized Standard Practice for Maintenance, Renovation and Repair of Installed Asbestos Cement Products (American Society for Testing and Materials [ASTM] E 2394). An Asbestos Containing Materials Handling, Management and Disposal Plan shall be prepared by the Contractor.

2.2. Location of objects and access to the site

19. Nurek district is an administrative district in the Khatlon region of the Republic of Tajikistan. 149

The district center is the Nurek city, located at the distance of 70 km south-east of the Dushanbe. The district is located in the valley of the Vakhsh River. In the West it borders with Yavan district, in the South - with Dangara and Temurmalik districts, in the East - with Baljuvan district of Khatlon region, and in the North - with Vahdat and Faizabad (Regions of Republican Subordination).

20. Location of this sub-project in country scale is shown in Figure 21 below.

Dushanbe

Figure 21: Location of BVECN in scale of the country - in Nurek district

21. Figure 22 below shows the location of the Branch of Vocational and Entrepreneurial Center in Nurek. The BVECN is located in the Energetik village of Nurek district, on 2 Ayni Street.

Figure 22: The rehabilitated facility is located in Nurek

22. Photos below illustrate current status of the buildings (inside and outside) proposed for the rehabilitation under STVET project. 150

Photo 86: The building of BVECN - front view Photo 87: The building of BVECN - side view

Photo 88: Current condition of stairs case

Photo 89: Current condition of corridors

151

Photo 90: Current condition of classrooms

Photo 91: The building of workshop - view from Administrative and educational building

152

Photo 92: Current condition of Training and production workshop

23. Transportation of equipment and construction materials will be done using Ayni street. The contractor has to establish warning signs at appropriate points (at least at the distance 20 m before construction site) during conduction of rehabilitation works and observe requirements to ensure traffic and pedestrian safety.

24. Figure 3 below shows project boundaries and other receptors (other houses, schools, hospitals, or any other receptor) located close to the site, as well as access roads.

The Branch of Vocational and Entrepreneurial Center in Nurek

6 LEGEND 1. Administrative and educational building – to be rehabilitated 4 2. Production and educational workshop – to 5 be rehabilitated 3 3. Business center 4. Department of MOLME in 6 7 Nurek 1 5. Vocational Training center of Ministry of Education 6. Residential houses 2 7. Ayni street

6

Figure 23: Aerial photo of the Branch of Vocational and Entrepreneurial Center in Nurek and surrounding facilities/structures

153

25. The nearest sensitive receptor are the Vocational Training Center of the Ministry of Education located at the distance of 55 meters and residential houses located at a distance of 40-100 m.

26. From the North side of the Administrative and Educational building of BVECN there are:  Business center - at the distance of 20 meters;  Department of MOLME in Nurek - at the distance of 40 meters  Residential houses - at the distance of 80 m

From the East side:  Vocational Training Center of Ministry of Education – at the distance of 55 meters  Residential houses - at the distance of 100 meters

From the South side:  Housing area located at the distance of 90 m and more

From the East side:  Housing area located at the distance of 67 m

27. From the North side of the Production and workshop building of BVECN there are:  Administrative and educational building of BVECN located at the distance of 35 meters;

From the East side:  Residential houses - at the distance of 130 meters

From the South side:  Housing area located at the distance of 53 m and more

From the East side:  Housing area located at the distance of 40 m

28. No construction of separate camp for the Contractor’s personnel is proposed here, because workers will be local.

29. The construction waste should be disposed in the nearby waste disposal facilities. The Contractor shall conclude for this purpose, an agreement with communal services of Nurek city and apply for relevant permits.

III. CONSTRUCTION ACTIVITIES

3.1. Types of civil works 30. Within the framework of this project, the following construction activities are envisaged - see Table 15 below:

154

Table 15: Types of rehabilitation works for renovation of the Adult Learning Centre branch in Nurek # Description Unit of Q-ty measure Education block Dismantling works 1 Dismantling wooden openings sill boards 100 m2 0,915 2 Dismantling wooden doorway openings 100 m2 0,33 3 Cleaning of smooth surfaces of walls with a sandblaster from the ground 100 m2 1,04 and forests 4 Cleaning of the ceiling surfaces from an old filler with a sandblaster from the 100 m2 0,4 stairs 5 Dismantling of metal staircases into links with a recess of links from the 100 m 0,05 nests 6 Removal of construction debris for a distance of 15 km on a Kamaz truck. T 25 10t, the cost of fuel is 6.4 somoni Repair works 7 Masonry of brick walls reinforced with a thickness of 1/2 brick at a height of 100 m2 0,22 up to 4m Openings

8 Metal-plastic windows m2 91,52 9 Metal-plastic doors m3 3,36 10 Installation of window sills from PVC in stone walls is wide 100 m 0,58 11 Installation of wooden door blocks with an opening area of up to 3m2 100 m2 0,3312 Floors Fl-1 12 Leveling screed made of cement-sand mortar M150. 40 mm 100 m2 2,15 13 Laying of laminate flooring by means of a locking connection with a 100 m2 2,15 soundproofing device 14 Skirting boards made of plastic 100 m 1,82 Fl- 2 15 Leveling screed made of cement-sand mortar M150 thick 40 mm 100 m2 1,3

16 Arrangement of coatings on tile glue from tiles seranite 100 m2 1,3 17 Arrangement of plinths from tiles "Seranitnyh" 100 m 1,05 18 Arrangement of metal fences for stair flights 100 m 0,05 Repair works 19 Surface filling of walls 100 m2 8,1 20 Plaster of the surfaces of ceilings 100 m2 0,4 21 Filling surface of door and window slopes flat 100 m2 1,04 22 Improved water-emulsion painting of walls, partitions and slopes 100 m2 9,14 23 Improved water-emulsion painting of walls, partitions and slopes 100 m2 0,4 24 Arrangement of suspended ceilings of the type on a frame 100 m2 2,96 made of galvanized profile 25 Cladding of bathroom walls with ceramic tiles 100 m2 0,67 26 1 m3 0,1 Installation of frame elements for the lining of bathroom ceilings 27 Cladding of ceilings of plastic bathrooms 100 m2 0,1 Visor 28 Manufacturing visor truss 1 T 0,563 29 Installation of wooden frames of the roof of the trumpet 1 m3 0,14 30 Arrangement of roofs of a visor from the zinced steel 100 m2 0,13

155

31 Sheathing of the ceilings of the visor aisle from alucobond on the metal 100 m2 0,2 profile 2x40mm 32 Delivery of building materials on the distance. 50 km on a Kamaz car, the T/km 75 cost of fuel is 6.4 somoni Electric lighting and electrical equipment 1 Shield lighting with an input automaton of the type BA51-31 In = 32A un 1 Exinoxe-12 2 Lamp with compact luminescent lamp 5 318Vt un 9 3 Lamp with compact luminescent lamp with protection degree IP65 - un 7 RKL218-118 Vt 4 Lamp with luminescent lamps G13 418VT un 28 5 Ceiling lamp for luminescent compact lamp RKL218-1-18 un 4 6 Ceiling lamp for luminescent compact lamp RKL218-1-18 un 2 7 DТsplКв lКmp ‘’EБIT’’ 25 Vt un 3 8 Emergency power supply K-303 un 4 9 Luminescent compact lamp with capacity 18 Vt un 19 10 Luminescent luminescent lamp G13 18 Vt un 130 11 Single button switch 10 220 un 18 12 Double button switch 10 220 un 5 13 Socket outlet double 220V 16A un 28 14 Box for branching hidden wiring KM-202 un 100 15 Box for the hidden installation of switches and sockets K-201 un 51 16 Cable with copper conductors with PVC insulation 516mm2 m 50 17 CКЛlО аТtС МoppОr МonduМtors аТtС PVC ТnsulКtТon 31,5 mm2 m 500 18 CКЛlО аТtС МoppОr МonduМtors аТtС PVC ТnsulКtТon 32,5 mm2 m 300 19 CКЛlО аТtС МoppОr МonduМtors аТtС PVC ТnsulКtТon 34 mm2 m 100 20 Plastic pipe with diam. 32m m 50 Fire alarm 1 Receiving –control and guard –ПТrО dОЯТМО ‘’GrКnТt ‘’TU 4372-018-11858296- un 1 01 2 AММumulКtor ЛКttОrв 12V, 7/Сr un 1 3 Fire smoke detector –ОlОМtronТМ IpТt =9/36(10%) И 212-41 un 25 4 Fire manual detector (+10%) И-3 un 2 5 DТsplКв lКmp "EБIT" 30010014Iport = 0,025 un 2 6 Combined warning system Mayak -12KP un 3 7 The control device of plumes UKSH-1 un 2 8 Cable with single-core conductors D = 0.5 mm with insulation from a m 405 composition of polyethylene with a sheath of white PVC plastic KSPV - 2x0.5 9 Flexible wire up to 380V PVS-2x0.75 m 80 10 Cable PVC-31,5 m 10 11 Universal connecting box ,UK -2P un 10 12 PТpО МorruРКtТons Ø10mm m 485 Internal water supply and sewerage networks 1 Laying of steel water and gas pipelines D=50, 65 mm 100 m 0,48 2 Laying of steel water and gas pipelines with D=20mm 100 m 0,15 3 Laying of steel water and gas pipelines with D=15mm 100 m 0,2 4 Installation valve 15h8p D = 50mm 1 un 1 156

5 Installation valve 15h8p D = 20mm 1 un 2 6 Installation valve 15h8p D = 15mm 1 un 6 7 Installation of watering cranes, diameter 50 mm 1 un 2 8 InstКllКtТon oП аКtОr СОКtОr ‘’ArТston ‘’ А=100l 10 set 0,1 Sanitary and technical devices 9 Installation of wash sink 10 set 0,2 10 Installing mixers 10 un 0,6 11 Installation of floor cups with a tank highly disposable 10 set 0,2 System K1 12 Development of soil manually group of soils 2 100 m3 0,2 13 Backfilling of soil manually 100 m3 0,2 14 Plastic pipes D = 50mm plastic sheath 100 m 0,07 15 Plastic pipes D = 100mm plastic sheep 100 m 0,15 16 Plastic pipes D = 150mm plastic sheep 100 m 0,19 17 Installation of polyethylene fittings of tees 10 un 0,6 18 Installation of polyethylene fittings 10 un 2 19 Arrangement of round prefabricated concrete sewerage wells of 1.5 m in 10 m3 0,106 soils of dry 20 Arrangement of round precast reinforced concrete sewage wells with a 10 m3 0,076 diameter of 1 m in dry soils D = 1000 mm Workshop Dismantling work 1 Dismantling of metal structures of coatings 1 T 0,7 Earth works 2 Development of soil manually in trenches up to 2 m deep without fastenings 100 m3 0,2 with slopes, group of soils: 3 3 Backfilling by hand of trenches, sinuses of pits and pits, group of soils: 2 100 m3 0,075 Foundations 4 Arrangement of concrete preparation 100 m3 0,02 5 Arrangement of the tape foundations: ferro-concrete from concrete kl. B15 100 m3 0,104 Fm-1 6 Installation Issue B-1 1 0,018 7 Arrangement monolithic ramp of concrete Kl. B15 100 m3 0,01 8 Installation of cement screeds 20 mm thick 100 m2 0,08 9 Waterproofing lateral bituminous coating in 2 layers on the leveled surface 100 m2 0,36 of the Frame and walls 10 Masonry of brick exterior walls of medium complexity with a height of up to 4 1 m3 28,3 m 11 Reinforcement of masonry walls and other structures 1 0,0424 12 The device monolithic reinforced concrete cores Sm-1 of concrete Kl. B15 100 m3 0,0336 13 Device jb belts in the formwork OP from concrete B15 100 m3 0,053 Roofs

14 Manufacturing of metal trusses from profiles 40x20mm, 40x40mm 1 т 0,583 15 Installation of rafters from metal profiles 40х20мм 1 т 0,583 16 Mounting runs of metal profiles 40x20mm 1 т 0,383 17 Priming of metal surfaces in one coat with GF-021 primer 100 m2 0,38 18 Painting of metal primed surfaces with varnish ХВ-784 100 m2 0,38

157

19 The device of a roof from profnastil t = 0,7mm 100 m2 0,75 20 Arrangement of gutter chut 100 m 0,13 21 Guttering of drain pipes made of galvanized roofing steel 100 m 0,08 22 Installation of funnels with a diameter of 150 mm 1 un 2 Openings 23 MОtКl plКstТМ аТndoаs -1,-2 -3,-4,0-5 m2 14,4 24 Installation of window sills from PVC in stone walls is wide. 30 cm (1,2,3 100 m.p. 0,08 floor) 25 Installation of metal door 1 m2 5

Floors 26 The device of couplers made of concrete B15 with a thickness of 20 mm 100 m2 0,464

Finishing work 27 Plastering of surfaces with cement-lime or cement mortar in stone and 100 m2 0,872 concrete: improved walls 28 Plaster of the surfaces of window and door slopes on concrete and stone: 100 m2 0,07 flat 29 Filling of walls surface Wall-1 100 m2 0,872 30 Plastering of door surfaces and window lintels 100 m2 0,07 31 Improved water-emulsion painting of walls, partitions and slopes 100 m2 0,942 32 Suspended ceilings on a metal frame made of metal sheets 1 m2 46,4 External 33 Improved plaster with cement-lime mortar in stone: walls 100 m2 0,99 34 Plaster of the surfaces of window and door slopes on concrete and stone 100 m2 0,07 35 Finishing of facades with fine-grained decorative paints (spatter) 100 m2 1,06 36 Plastering surfaces plinth marble chips 100 m2 0,1 37 Sheathing of a parapet made of alucobond on metal profiles 2x40mm 100 m2 0,46 Scaffolding 38 Arrangement of the underlying layers of crushed stone 1 m3 3,4 39 Arrangement of concrete otmostka from concrete M-100 1 m3 3,4 40 Delivery of construction materials to the distance of 50 km on truck T/km 50 carrying capacityto 15 km cost 6,4 som Electric lighting and electrical installation 1 Distribution board with an input automaton of the type SRN-12 un 1 2 Box with a step-down transformer un 3 3 LED spotlight is not 100W un 6 4 Automatic power socked 3f in 32A un 3 5 Lamp with compact luminescent lamp IP65 CD218-2-18 un 1 6 Luminescent compact lamp with 18W power un 2 7 Double -button switch 10A 220V un 5 8 Socket outlet double 220V 16A un 9 9 Box for hidden installation of wiring KM-202 un 10 10 Box for hidden installation of switches and sockets K-201 un 9 11 CКЛlО аТtС МoppОr МonduМtors аТtС PVC ТnsulКtТon 525 mm2 m 50 12 CКЛlО аТtС МoppОr МonduМtors аТtС PVC ТnsulКtТon 31,5 mm2 m 40 13 CКЛlО аТtС МoppОr МonduМtors аТtС PVC ТnsulКtТon 32,5 mm2 m 60 14 CКЛlО аТtС МoppОr МonduМtors аТtС PVC ТnsulКtТon 56mm2 m 50 15 Plastic pipe diam. 32 mm m 100 16 ArmКturО Ø18 I L=2,5 kg 30 17 Steel strip D = 40x4 mm kg 88,2 158

IV. POTENTIAL IMPACTS AND MITIGATION MEASURES

31. Potential impacts of proposed additional activities and relevant mitigation measures are described in the Table 16 below.

Table 16: Potential impacts of the prosed activities and mitigation measures Potential impacts Mitigation measures Temporary increase of Ensure that the maximum and equivalent noise levels comply with sanitary background noise due regulations (not more than 55 dBa). Instrumental noise measurements construction works should be done at least 2 times per month.

Monitor and address complaints about the noise level.

Construction works (including drilling works) will be limited to restricted times agreed to in the permit – from 7am to 5 pm in week days and from 8 am to 4 pm on Saturday.

No works at night time, Sunday and holidays are allowed.

The proposed works includes only drilling equipment for walls (for installation of windows, doors, radiators) which will not cause vibration

The drilling works should be done during the breaks and after classes in order to not disturb the students studies

The Noise Management plan should be developed by Contractor Creation of dust Monitor dust emissions to ensure emissions are minimized. emissions and volatile organic compounds at Monitor and address complaints about dust / volatile organic compounds and construction site while other pollutants dismantling work, transportation of Construction works will be limited to restricted times - from 7am to 5 pm in construction materials week days and from 8am to 4 pm on Saturday. No works at night time, and waste Sunday and holidays are allowed.

Providing the construction workers with suitable personal protective equipment (respirators)

Contractor will monitor the exhaust gas content of its own vehicle fleet.

There will be no open burning of construction / waste material at the site There will be no excessive idling of construction vehicles at sites

Keep surrounding environment (side-walks, roads) free of debris to minimize dust

In case of dust creation by pneumatic drilling/wall destruction during installation of windows/doors/radiators etc. installation suppress dust by water spraying and/or installing dust screen enclosures at site.

The Dust control plan should be developed by Contractor Construction waste Waste disposal facilities are available.

Boxes for construction debris will be installed in the site.

The construction waste will be disposed according to general EMP requirements and SSEMP (Waste Management Plan)

Construction waste will be collected and disposed properly by licensed collectors 159

Timely sorting of rehabilitated and removing construction waste in an organized way, and disposal them on an authorized land field

Mineral construction and demolition wastes will be separated from general refuse, organic, liquid and chemical wastes by on-site sorting and stored in appropriate containers

Dispose off waste appropriately to prevent pollution of soil and groundwater

The approach to handling sanitary wastes and wastewater from building sites (installation or reconstruction) must be approved by the local authorities

Recycle valuable materials within the project or sold.

Aim to minimize waste through reducing and re-using (packaging) material

Do not allow any burning or burying of waste on site.

Prevent littering by construction staff at work sites by providing bins or waste bags in sufficient locations.

The records of waste disposal will be maintained as proof for proper management as designed;

Whenever feasible the contractor will reuse and recycle appropriate and viable materials. Toxic / hazardous waste Temporarily storage on site of all hazardous or toxic substances will be in management safe containers labeled with details of composition, properties and handling information The containers of hazardous substances should be placed in a leak-proof container to prevent spillage and leaching The wastes will be transported by specially licensed carriers and disposed in a licensed facility Paints with toxic ingredients or solvents or lead-based paints will not be used Soil contamination due  Construction materials that can impact the soil should be kept in a to accidental spillage special premise or in concrete ground. • Soils contaminated by accidental spills should be immediately collected and properly disposed at relevant landfill in accordance with the permit from local environmental departments ; • regular maintenance of the equipment should be done by Contractor and checking for any possible leaks from the joints etc. Asbestos containing Ensure that the standard practice of handling existing asbestos containing materials (ACM) materials is used to remove and decommission asbestos containing roofing materials.

ACM will not be used as a roofing/new material in construction works of building.

Any existing ACM to be handled and disposed according to the SSEMP (ACM management and disposal plan)

160

Health and labor safety  The local construction and environment inspectorates have been (occupational hazards) – during construction and notified of upcoming activities operation  All work will be carried out in a safe and disciplined manner designed to minimize impacts on workers.  Workers will comply with international good practice - providing the construction workers with suitable personal protective equipment (always hardhats, as needed masks and safety glasses, harnesses and safety boots)  Appropriate signposting of the sites will inform workers of key rules and regulations to follow. Following plans to be developed for construction and operation phases of the project: Emergency Response Plan and Health and Safety Plan Direct or indirect hazards Transport along the Aini 2 street consists of private cars and public to public traffic and transport, as well as taxis, minibuses, trucks. The volume of traffic is small pedestrians by construction activities Contractor will observe the necessary precautions (speed limit, working hours from 7 am to 5 pm)

In compliance with national regulations the contractor will insure that the construction site is properly secured and construction related traffic regulated. This includes but is not limited to: Signposting, warning signs, barriers and traffic diversions: site will be clearly visible and the public warned of all potential hazards Traffic management system and staff training, especially for site access and near-site heavy traffic. Adjustment of heavy traffic to local traffic patterns, e.g. avoiding major transport activities during rush hours

4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor

32. The general Environmental Management plan (EMP) for all project sites is approved as part of Initial Environmental Examination (IEE) endorsed by State Environmental Committee of the Republic of Tajikistan and general management measures that apply to this sub-project should be followed by the Contractor.

33. In addition, the Contractor should prepare the following seven (7) Site-specific Environmental Management plans (SSEMP):

- Waste Management Plan; - Emergency Response Plan; - Health and Safety Protection Plan; - Plan for the Consideration of Complaints; - Dust Control Plan; - Noise Management Plan; - ACM Handing, Management and Disposal Plan - Traffic and Road Safety Management Plan.

161

Environmental Safeguards Due Diligence Report

Project number: 46535-001 Grant 0452/53/3309 Date: June 2018

TAJ: Strengthening Technical and Vocational Education and Training

"MOLME/SH/CW06-E ":REHABILITATION OF TECHNICAL VOCATIONAL LYCEUM IN SHAARTUZ

The Due Diligence Report for Social and Environmental Safeguards is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.

June 2018

162

Table of content I. INTRODUCTION ...... 165 1.1. Justification of the site...... 165 II. DEFINING THE BORDERS ...... 166 2.1. Current condition of the site ...... 166 2.2. Location of objects and access to the site ...... 166 III. CONSTRUCTION ACTIVITIES ...... 173 3.1. Types of civil works ...... 173 IV. POTENTIAL IMPACTS AND MITIGATION MEASURES ...... 180 4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor ...... 183

Tables Table 1: Types of rehabilitation works for renovation of the Technical Vocational Lyceum in Shaartuz ...... 173 Table 2: Potential impacts of the prosed activities and mitigation measures ...... 181

Figures Figure 1: Location of Technical Vocational lyceum in Shaartuz in scale of the country - in Shaartuz district ...... 167 Figure 2: The rehabilitated facility is located in Shaartuz ...... 168 Figure 3: Aerial photo of the Technical Vocational Lyceum in Shaartuz and surrounding facilities/structures ...... 172

Photos Photo 1: Main entrance of Lyceum ...... 168 Photo 2: Educational building of Lyceum - view from street ...... 168 Photo 3: Educational and workshop building - rear view ...... 169 Photo 4: Educational and workshop building - front view ...... 169 Photo 5: : Educational and workshop building - front view ...... 169 Photo 6: Educational and workshop building - view to right side ...... 169 Photo 7: Current condition of foyer of Educational and workshop building ...... 169 Photo 8: Current condition of staircase ...... 169 Photo 9: Current condition of corridors ...... 170 Photo 10: Current condition of workshops ...... 170 Photo 11: Current condition of floors of Educational and workshop building ...... 170 Photo 12: : Current condition of ceilings of Educational and workshop building ...... 170 Photo 13: The building of Dormitory - side view ...... 171 Photo 14: Curret condition of walls of Dormitory ...... 171 Photo 15: The building of dormitory - the block which proposed for rehabilitation shown by arrow ...... 171 Photo 16: The building of dormitory - back view. There living migrants at the moment ... 171

163

ABBREVIATIONS

1 ADB Asian Development Bank 2 АСМ Asbestos containing materials 3 ALC Adult Learning Center 4 CM Complaint Mechanism 5 EIA Environmental impact assessment 6 EMP Environmental Management Plan 7 FLM Fuel and lubrication materials 9 GFS Gypsum-fiber sheets 10 LLC Limited Liability Company 11 MFC Microfinance company 12 MOLME Ministry of Labor, Migration and Employment of the Republic of Tajikistan 13 PAG Project Administration Group 14 SI State institution 15 SSEMP Site-specific Environmental Management Plan 16 TVLS Technical Vocational Lyceum in Shaartuz 17 TVET Technical and Vocational Education and Training 18 WMP Waste Management Plan

164

I. INTRODUCTION

1.1. Justification of the site

1. Over the years of independence, the management of the Government has made efforts to develop the education sector and training of highly qualified specialists for various industries.

2. The Ministry of Labor, Migration and Employment of the Republic of Tajikistan pays special attention to the technical condition, the availability of educational facilities (institutions) in schools to enhance vocational education and training of learners and students.

3. The proposed Project on Strengthening Technical and Vocational Education and Training (Project) will have an impact on national workforce with a high proportion of skilled workers employed in Tajikistan's domestic economy. The project is aimed at meeting the needs of the Republic of Tajikistan. Within the framework of the project, unemployed and partially employed young people and the adult population in the Republic will be provided with job opportunities and income in the domestic and international labor markets by providing quality training.

4. The outcome of the Project will be a more effective, efficient, quality-assured, and flexible system for the delivery of technical vocational training. The project includes the achievement of five outputs, namely: (i) modernization of the methodology of the TVET system; (ii) improving the physical conditions of training institutions; (iii) increasing the volume and quality improvement of TVET delivery; (iv) expansion of equal access to TVET; and (v) strengthening the leadership and management of the TVET system.

5. In November 2015, a Grant Agreement was signed between the Republic of Tajikistan and ADB on project financing.

6. An IEE/ EMP for the overall project was prepared and approved by September 2015. The project has been classified as category B in accordance with ADB's Safeguard policies.

7. As part of this Project, the Ministry of Labor, Migration and Employment of the Republic of Tajikistan shall sign a contract "MOLME/SH/CW06-E" with a construction firm for rehabilitation of the Technical Vocational lyceum in Shaartuz (TVLS).

8. The Contractor, in accordance with the contract, undertakes to carry out, professionally and qualitatively, the rehabilitation works of the Technical Vocational lyceum in Shaartuz (TVLV) within the terms provided for in the Contract to be awarded.

9. The Environmental Management Plan (EMP), which is part of the IEE, is general and wide- ranging and covers all possible consequences associated with the project. Therefore, the Contractor is required to develop a Site-specific Environmental Management Plan (SSEMP) prior to the commencement of construction works.

10. The main objective of the plan is to document how the environmental mitigation measures and required management plans proposed for rehabilitating the project site will be brought into line with the project commitments.

11. In addition, during the implementation of the Project, the Contractor will strictly comply with ADB's safeguard requirements and national laws and regulations in the field of environmental protection, and, under the terms of the contract, will develop and refine the working measures, plan and management system for environmental protection in areas of repair works.

165

II. DEFINING THE BORDERS

2.1. Current condition of the site

12. The Technical Vocational Lyceum of Shaartuz district which was selected for STVET project consists of 9 buildings (see below Figures 3-4). The following two buildings are proposed for the rehabilitation:

 Educational and workshop building

 Dormitory (right block).

13. Educational and workshop building is a brick masonry two-story building which was built in 1959. The building has 14 classrooms and 4 workshops. Ceilings are made of concrete, the roof is covered with asbestos-cement slate sheets and the doors and windows are old and made of wood.

14. The following rehabilitation works are being proposed :  overhaul the workshop for electrical welding;  construct partition in the corridor with the installation of doors;  repair ceilings, cover floors with cement, replacement of windows and door;  construction of the entrance portal;  partial repair of facades, repair of stairs;  replacement of windows and doors;  replacement of electrical wiring.

15. The dormitory consists of three blocks and only the right block is being proposed to be rehabilitated due to the high level of deterioration. The dormitory is a four-story brick masonry building with a slate roof, wooden windows and doors, built in 1976. The right block has 30 dormitory rooms.

16. The proposed renovation activities include the following: overhaul of 3 floors, repair of living rooms with replacement of windows and doors, major repairs of ceilings, walls, floors, wiring, replacement of lamps and electrical appliances; repair of the foyer and corridors - the floors will be replaced with ceramic tiles; repair of façade, sanitary units. internal water supply and sewerage systems, external sewage line to the point of connection with the existing urban system.

17. The buildings are in poor condition, do not meet the modern construction standards and are in need of renovation and reconstruction.

18. Asbestos cement sheets are being used on buildings as roofing material. Roof should be demolished and also replaced by non-hazardous materials which will not cause risks for health of Lyceum students and staff. To mitigate the occupational and public health risks of inhalation of airborne asbestos fibers, when disassembling the roofs they will be removed and disposed of following the internationally-recognized Standard Practice for Maintenance, Renovation and Repair of Installed Asbestos Cement Products (American Society for Testing and Materials [ASTM] E 2394). An Asbestos Containing Materials Handling, Management and Disposal Plan will be prepared by the Contractor as part of the SSEMPs.

2.2. Location of objects and access to the site

19. district is an administrative district in the Khatlon region of the Republic of Tajikistan. The district center is a Shahartuz , urban settlement located in the valley of the Kafirnigan River, the right tributary of the Pyanj river. Shahrituz is located at the distance of 166

112 km south-west of the Bokhtar town of and 2 km from railway station. The distance to Dushanbe is 230 km. In the North it borders on Surkhandarya region of Uzbekistan, in the East - with Kubodiyon district, in the West - with Nosiri-Khusrav district of Khatlon region of Tajikistan, in the South - with Khulm province of Balkh province of Afghanistan. Location of this sub-project in Khatlon region, in country scale is shown in Figure 24 below.

Figure 24: Location of Technical Vocational lyceum in Shaartuz in scale of the country

20. The Technical Vocational lyceum in Shaartuz is located on following address: 3 Ziyodaliev Street.

21. Figure 25 below shows the location of the Technical Vocational lyceum in Shaartuz

167

Figure 25: The rehabilitated facility is located in Shaartuz

22. Photos below illustrate current status of the building (inside and outside) which is being proposed for rehabilitation.

Photo 94: Educational building of Lyceum - view Photo 93: Main entrance of Lyceum from street

168

Photo 95: Educational and workshop building Photo 96: Educational and workshop building - front view

Photo 97: : Educational and workshop building - Photo 98: Educational and workshop building - view front view to right side

Photo 99: Current condition of foyer of Photo 100: Current condition of staircase Educational and workshop building

169

Photo 101: Current condition of corridors

Photo 102: Current condition of workshops

Photo 103: Current condition of floors of Photo 104: : Current condition of ceilings of Educational and workshop building Educational and workshop building

170

Photo 106: Current condition of walls of the Photo 105: The building of Dormitory - side view Dormitory

Photo 107: The building of dormitory - the block Photo 108: The building of the dormitory - back which is proposed for the rehabilitation (red view. arrow)

23. The Figure 26 below shows the sub-project site boundaries and nearby receptors (other houses, etc.) located close to the site, as well as access roads.

171

Technical Vocational Lyceum of Shaartuz

LEGEND

1. Educational and production building – to be rehabilitated

2. Dormitory buildings – block 6 marked with an arrow is proposed for the rehabilitation

3. Educational buildings of the Lyceum 4. Warehouse space

5. Garage

6. Workshops and warehouses

7. Main Gate

8. Gate

9. Main access road – Ziyodaliev Street

10. Highway A384

11. Residential houses

Figure 26: Aerial photo of the Technical Vocational Lyceum in Shaartuz and surrounding facilities/structures

24. Lyceum building proposed for the rehabilitation under STVET project is located at the distance from 25 to 100 meters and more from the residential houses.

From the North side of the Educational and production building there are:  Empty building of the former boiler house – at the distance of 30 m; From the South side there are:  Residential houses are located at the distance more than 60 m;  Educational buildings of the Lyceum are located at the distance of 50 -100 m; From the West side:  Residential houses are located at the distance of 25-40 m;

From the North side of the Dormitory there are:  Residential houses are located at the distance of 45 and more m; 172

From the South side there are:  Residental houses are located at the distance of 25 m; From the East side:  Residential houses are located at the distance of 60-70 and more meters From the West side:  Other Dormitory blocks are at a distance of 5-30 m

25. The blocs of the dormitory are located outside the Lyceum, but not far from the Lyceum border, 130 meters from the main gate of the Lyceum. Dormitories are located in the zone of private houses.

26. Transportation of equipment and construction materials will be done using Ziyodaliev Street and Highway A384. The contractor has to establish warning signs at appropriate points (at least at the distance 20 m before construction site) during conduction of rehabilitation works and observe requirements to ensure traffic and pedestrian safety.

27. No construction of separate camp for the Contractor’s personnel is proposed here, because workers will be local.

28. The construction waste can be disposed in the nearby waste disposal facilities. The Contractor shall conclude for this purpose an agreement with communal services of Shaartuz district and apply for relevant permits.

III. CONSTRUCTION ACTIVITIES

3.1. Types of civil works

29. Within the framework of this project, the following construction activities are envisaged - see Table 17 below:

Table 17: Types of rehabilitation works for renovation of the Technical Vocational Lyceum in Shahrtuz No Description Unit Quantity Repair Training block first floor

Dismantling works 1 Dismantling of wooden window doorway openings with sill boards(2nd floor 100 m2 1,54 only front facade) 2 Dismantling wooden doorway openings 100 m2 0,53 3 Piercing of openings in brick structures 1 m3 21,30 4 Dismantling of wooden partitions 100 m2 0,24 5 Dismantling of brick walls 1 m3 2,50 6 Dismantling of tiles laid on a floor solution PL-1, PL-4 100 m2 1,83 7 Fixing of plaster from the surfaces of walls of brick internal and external 100 m2 9,22

8 Cleaning of the old putty ceiling PT-2 100 m2 5,43 9 Removal of construction debris for a distance of 10 km on a Kamaz truck. T/km 65,00 10t, the cost of fuel is 6.6 somoni Repair work 10 Clutches of brick walls reinforced with a thickness of 1/2 bricks 100 m2 0,41 Openings

No Description Unit Quantity 11 Installation of metal-plastic window blocks (2nd floor only front facade) m2 206,40

12 Installation of metal-plastic door blocks m2 16,24 173

13 nstallation of window sills from PVC in stone walls is wide. 30 cm (2nd floor 100 m 1,14 only front facade) 14 Installation of wooden door blocks with an opening area of up to 3m2 100 m2 0,32

15 Installation of metal doors Dm-1 1 m2 2,73 16 Installation of metal gate -1 1 T 1,16 Finishing work (internal) Walls 17 Improved plastering of internal walls of ST-1 and ST-2 100 m2 10,83 18 Plastering of the surfaces of window and door slopes on concrete and stone 100 m2 1,37 (2nd floor only frontal facade) 19 PuttвТnР oП surПКМОs oП аКlls -1 100 m2 9,22 20 Puttying of the surfaces of door and window slopes 100 m2 0,74 21 Painting with polyvinyl acetate water-emulsion structures of walls, partitions 100 m2 9,96 and slopes of ST-1 22 Wall cladding with ceramic tiles ST-2 100 m2 1,62 Ceiling 23 Arrangement of suspended ceilings type on the frame of 100 m2 2,57 galvanized profile PT-1 24 Installation of metal frames for ceilings PT-2 1 m2 31,00 25 Sheathing of ceilings made of plastic PT-2 100 m2 0,31 26 Solid leveling of surfaces (single-layer plaster) from dry gypsum mixtures of 100 m2 5,43 ceilings 27 Painting with polyvinyl acetate water-based compositions improved in plaster 100 m2 5,43 ceilings Floors 28 Leveling the screed from the cement-printed mortar M150 in thickness 20 100 m2 0,31 -4 29 Arrangement of coatings for cement mortar tiles -4 100 m2 0,31 30 Arrangement of leveling screed made of cement-sand mortar M150. 30 mm 100 m2 2,88

31 Laying of laminate flooring on a ready-made base type PERGO PL-3 100 m2 1,36 32 Installation skirting from plastic PL-3 100 m 1,06 33 Arrangement of concrete screeds of thickness 50 mm PL-2 100 m2 5,14 34 Grinding of concrete coatings PL-2 100 m2 5,14 35 Arrangement of coatings of floors and plinths from plates "Seranitnyh" PL-1 100 m2 1,29

External Porch 36 Arrangement of concrete porches 100 m3 0,01 37 Arrangement of porch coverings from plates "Seranitnyh" 100 m2 0,03 Visor 38 Installation of wooden frames of the roof from the beams 1 m3 0,15 39 Device roofs visor made of galvanized steel and trough 100 m2 0,03 40 Coating of ceilings of a visor, karnza from alukabond on metal profiles 100 m2 0,05 2x40mm Facade No Description Unit Quantity 41 Improved plaster with cement-lime mortar on the stone walls 100 m2 8,81

42 Coloring facades and slopes with decorative facade paints (spatter) 100 m2 9,28

43 Coating of alcabond carnza on metal profiles 2x40mm 100 m2 1,36

174

44 Arrangement of gutter chutes 100 m 1,55 45 Installation of drainpipes 100 m 0,56 46 Installation of funnels 1 un 8,00 47 Installation and dismantling of external inventory forests with a height of up to 100 m2 9,00 16 m tubular for other finishing works Plinth 48 Socket installation 1 m3 4,54 49 Improved plaster with cement-lime mortar plinth 100 m2 0,91 50 Painting socle with decorative facade paints 100 m2 0,91 Roof 51 Arrangemeng is brickwork (under Mauerlat and racks of roofs) 1 m3 4,15 52 Installation of wooden rafters and running 1 m3 9,39 53 Installation of wooden frames of the roof from the uneven bars (Rack, Leg, 1 m3 1,95 Mauerlat, lining, brace, filly) 54 Fire protection of wooden structures (rafters and girders, diagonal leg, stand, 10 m3 1,13 ladder, mauerlat, lining, brace, filly) 55 Fire protection of the crates under the roof 1000 m2 1,09 56 Arrangement of roofs from the zinced steel from a laths from beam 100 m2 10,94 Scaffolding 57 Arrangement of the footprint of strata. 100 mm in length. 1000 mm 1 m3 15,2

58 Delivery of building materials on the distance. 15 km by car Kamaz, fuel cost T 185,00 6.6 somoni Internal water supply and sewerage networks Educational building first floor Section 1. Dismantling of work 1 DТsmКntlТnР oП pТpОlТnОs Пrom аКtОr Кnd РКs pТpОs аТtС К dТКmОtОr oП 893, 100 m 1,25 65, 50, 25, 15 mm 2 Disassembly of internal cast iron sewer pipes with a diameter of 50mm 100 m 0,15 3 Disassembly of internal cast iron sewer pipes with a diameter of 100mm 100 m 0,42 Section 1. System B1 4 Pipe laying steel electric-аОldОd = 893 mm 100 m 0,1 5 Laying of pipe steel water-gas conducting D = 65 mm 100 m 0,28 6 Pipeline steel pipes for water and gas pipelines D = 50 mm 100 m 0,27 7 Pipeline steel pipes for water and gas pipelines D = 25mm 100 m 0,3 8 Gas pipe laying steel water-gas conducting D = 15mm 100 m 0,3 9 Installation of cranes D = 15mm 1 un 1 10 Installation of watering cranes, diameter 25 mm 1 un 2 11 Installation of water heater "Ariston" W = 100L 10 set 0,3 12 Installation of firemen's cranes with a diameter of 50 mm 1 un 4 13 Washbasin changing 100 set 0,02 14 Changing Genoa Chaise Bowl 100 set 0,06 15 Installation of ladders 10 set 0,3 16 Hygienic shower installation 10 set 0,6 17 Installation of shower trays 10 set 0,1 No Description Unit Quantity 18 Installing Mixers 10 un 0,3 System K1 19 Plastic pipes D = 50mm plastic sheath 100 m 0,15 20 Plastic pipes D = 100mm plastic sheep 100 m 0,42 21 Installation of polyethylene fittings of tees un 2 22 Installation of polyethylene fittings un 1,7

175

23 Delivery of building materials on the distance. up to 15 km by car with a T 12 carrying capacity of up to 25 tons Outdoor water supply and sewerage Section 1. Excavation 1 Development of soil in the dump with excavators with a bucket capacity of 0.4 1000 m3 0,1975 m3 (wells for pipelines and wells) 2 Backfilling by hand for pipelines and manholes 100 m3 1,975 Section 2. System B1 3 PТpОlТnО stООl аКtОr Кnd РКs pТpО Ø100 mm 1 km 0,241 6 InstКllКtТon tОО ПlКnРО МКst Тron аТtС ПТrО stКnd Ø300б100 mm 1 0,1 8 InstКllКtТon oП РКtО ЯКlЯО Ø100 mm 1 un 4 11 Welding flanges to steel pipes 1 un 8 14 Installation of fire hydrants 1 un 2 18 Application of reinforced anti-corrosion bitumen-rubber insulation on steel 1 km 0,241 pТpОlТnОs Ø100 mm 19 Arrangement of round wells from prefabricated reinforced concrete 10 m3 0,53 Section 3. System K1 20 Development of soil in the dump with excavators with a bucket capacity of 0.4 1000 m3 0,268 m3 (wells for pipelines and wells) 21 Hand filling for pipelines 100 m3 2,68 22 Piping of polyethylene pipes Ø160 mm 100 m 1,25 23 Piping of polyethylene pipes Ø200 mm 100 m 1,07 24 Arrangement of round precast reinforced concrete sewage wells 10 m3 0,80 25 Delivery of building materials on the distance. up to 15 km by car with a 57 carrying capacity of up to 25 tons Electric lighting and electrical equipment Section 2. Material resources on project data 1 Input device: current transformers VRU-1D-250-100 un 1 2 Shield lighting with an introductory machine and distribution automatics un 1 Exinoxe-12 3 Shield lighting with an introductory machine and distribution automatics un 2 Exinoxe-6 4 Circuit-breaker for 25A 1ph un 10 5 Plastic enclosure for circuit breakers, 1 modular un 10 6 Luminaire with compact fluorescent lamp with IP65 protection degree CD160- un 7 2x18 7 Luminaire with compact fluorescent lamp with IP65 protection degree CD218- un 3 2x18 8 Luminaire with fluorescent lamp G13 2x18 W un 15 9 LumТnКТrО аТtС ПluorОsМОnt lКmp G13 418 А un 21 10 LumТnКТrО аТtС ПluorОsМОnt lКmp LB 258 А IP65 un 50 11 Ceiling luminaire for compact fluorescent lamps 2x18 W compensated, un 4 degree of protection IP40 12 Display lamp ‘’EXIT’’25Vt un 3

No Description Unit Quantity 13 Emergency power supply K-303 un 10 14 Luminescent compact luminescent power 18 W un 24 15 Linear fluorescent lamp G13, 18 W un 114 16 Luminescent lamp LB-58 un 100 17 Single-button switch un 14 18 Double –button switch un 10 19 Single-button waterproof switch un 2

176

20 Socket outlet double 220V 16A un 42 21 Boxes for branching KM-202 un 150 22 Box for the concealed installation of switches and sockets K-201 un 68 23 Cable with copper conductors with PVC insulation 3x1.5 mm2 VVGng (A) -LS m 700

24 Cable with copper conductor sec. 3x25 mm2 m 420 25 Cable with copper conductor sec. 5x16 mm2 m 60 26 Cable with copper conductors with PVC insulation 3x4 mm2 VVGng (A) -LS m 100

27 GoППОr Ø16mm m 1220 Fire alarm Education block 1 Receiving –control and guard –ПТrО dОЯТМО ‘’GrКnТt ‘’TU 4372-018-11858296- un 1 01 2 Accumulator battery 12V, 7/hr un 1 3 Fire smoke detector –electronic Ipit =9/36(10%) И 212-41 un 16 4 Detector of fire heat S2000-IP-PA un 12 5 Fire manual detector (+10%) И-3 un 3 6 LED dТsplКв "EБIT" 30010014Iport = 0,025 un 3 7 Sounder combined Mayak-12KP un 3 8 The control device of plumes UKSH-1 un 1 9 Cable with single-core conductors D = 0.5 mm with insulation from a m 280 composition of polyethylene with a sheath of white PVC plastic KSPV - 2x0.5 10 Flexible wire up to 380V PVS-2x0.75 m 100 11 Cable PVC-31,5 m 15 12 Pipe flexible gofirovannaya D = 10mm GOFROSHLANG m 300 13 Universal connecting box, UK-2P un 10 Repair of the hostel (block B) 1, 2, 3 and 4 floor (block B) Dismantling of work 1 Dismantling of wooden window doorway openings with sill boards 100 m2 0,953 2 Dismantling of wooden window doorway opening 100 m2 1,35 3 Piercing of openings in brick structures 1 m3 3,52 4 Dismantling of brick walls 1 m3 1,50 5 Fixing of plaster from the surfaces of walls of brick internal and external 100 m2 33,93 6 Cleaning of old putty ceilings 100 m2 9,16 7 Dismantling of old floors 100 m2 6,99 8 Removal of construction debris for a distance of 15 km on a Kamaz truck, fuel T/km 122,0 Мost 6,6

No Description Unit Quantity Repair work 9 Clutches of brick walls reinforced with a thickness of 1/2 bricks 100 m2 1,40 10 Bricklaying of brick 1 m3 1,00 Openings 11 Installation of metal-plastic window blocks m2 95,31 12 Installation of metal-plastic door blocks m2 65,00 13 Installation of window sills from PVC in stone walls is wide. 30 cm 100 m 0,764 14 Installation of wooden door blocks with an opening area of up to 3m2 100 m2 0,68 15 Installation of metal doors Dm-1 1 m2 2,10 177

Finishing work (internal) Walls 16 ImproЯОd plКstОr oП ТntОrnКl аКlls -1, -2 100 m2 27,26 17 Plaster of the surfaces of window and door slopes on concrete and stone 100 m2 1,30 18 Puttв on tСО surПКМО oП аКlls -1 100 m2 22,02 19 Putty on the surface of door and window slopes of flat 100 m2 1,06 20 Painting with polyvinyl acetate water-emulsion structures of walls, partitions 100 m2 23,08 and slopes of ST-1 21 Wall cladding with ceramic tiles ST-2 100 m2 5,24 Ceilings 22 Solid leveling of surfaces (single-layer plaster) from dry gypsum mixtures of 100 m2 9,16 ceilings PT-1 23 Painting with polyvinyl acetate water-based compositions improved on plaster 100 m2 9,16 ceilings PT-1 24 Installation of metal frames for ceilings PT-2 1 m2 146,00 25 Sheathing of ceilings made of plastic PT-2 100 m2 1,46 Floors 26 Leveling the screed from the cement-printed mortar M150 in thickness. 30 100 m2 10,61 mm 27 Arrangement of coatings of floors and plinths from plates "Seranitnyh" PL-1 100 m2 2,24 28 Laying of laminateflooring on a reade-made substrate type PERGO PL-2 100 m2 6,99 29 Installation skirting from plastic PL-2 100 m 7,92 30 Arrangement of coatings on cement mortar from tiles of ceramic PL-3 100 m2 1,46 31 Dismantling of metal staircases 100 m 0.16 32 Arrangement of metal fences for stairs 100 m 0,16 Roofs 33 Dismantling roofing from wavy asbestos-cement sheets (Block B) 100 m2 4,45 34 Installation of wooden rafters and running a diagonal leg 1 m3 2,38 35 Installation of wooden frames of the roof from the uneven bars (Rack, Leg, 1 m3 2,50 Mauerlat, lining, brace, filly) 36 Fire protection of wooden structures (rafters and girders, diagonal leg, stand, 10 m3 0,50 ladder, mauerlat, lining, brace, filly) 37 Change of the flooring with props from bars up to 50 mm thick and higher 100 m2 4,45 (block B) 38 Fire protection of curtains and wooden structures under the roof (Block B) 1000 m2 0,445 No Description Unit Quantity 39 Arrangement of roofs from the zinced steel (block B) 100 m2 4,45 40 Device of dormer windows (block B) 1 un 2 External Plinth 41 Improved plaster with cement-lime mortar plinth (block B) 100 m2 0,384 42 Painting the plinth with decorative facade paints (block B) 100 m2 0,384 Facade repair 43 Improved plaster with cement-lime mortar on the stone walls (block B) 100 m2 6,67 44 PКТntТnР ПКМКdОs Кnd slopОs аТtС dОМorКtТЯО ПКхКdО pКТnt (rКТn) (Лlock B) 100 m2 7,15 45 Arrangement of gutter chutes (block B) 100 m 0,73 46 Installation of drainpipes (block B) 100 m 0,6 47 nstallation of funnels for drainage (block B) I un 5

178

Visor 48 Arrangement of roofs a visor from the zinced steel Kr-1 100 m2 0,07 49 Parapet cladding from alucabonds on metal profiles 2x40mm 100 m2 0,1 50 Manufacturing of trumpet farm Kr-2 1 m 0,122 51 Arrangement of roofs of a visor from the zinced steel Kr-2 100 m2 0,034 52 OТl pКТntТnР oП mОtКl surПКМОs ЯТsor -2 100 m2 0,11 Porch 53 Arrangement of concrete ramp 100 m3 0,005 54 Arrangement of concrete screed thickness of 100 mm 100 m2 0,12 55 Arrangement of porch coverings and the ramp from slabs "Seranitnyh" 100 m2 0,16 56 Installation and dismantling of external inventory forests with a height of up to 100 m2 7,6 16 m tubular for other finishing works 57 Delivery of building materials on the distance. 15 km by car Kamaz, fuel cost T 115 6.6 somoni Internal water supply and sewerage networks Hostels (Block B) System B1 1 PТpОlТnО stООl аКtОr Кnd РКs pТpО Ø100 mm 100 m 0,08 2 PТpОlТnО stООl pТpОs Пor аКtОr Кnd РКs Ø65 mm 100 m 0,1 3 Pipeline steel pipes for water and gas pipelines D = 50 mm 100 m 0,25 4 Pipeline steel pipes for water and gas pipelines D = 32 mm 0,05 5 Pipeline steel pipes for water and gas pipelines D = 25 mm 100 m 0,7 6 Pipeline steel pipes for water and gas pipelines D = 15 mm 100 m 1,2 7 Installation of cranes D = 15mm 1 un 1 8 Installation of watering cranes, diameter 25 mm 1 un 8 9 Installing a flow-through electrolaser 10 set 0,4 10 Installation of water heater "Ariston" W = 100L 10 set 0,8 11 Installation of firemen's cranes with a diameter of 50 mm 1 un 4 Sanitary appliances

12 Washbasin changing 100 set 0,2 13 Changing Genoa Chaise Bowl 100 set 0,16 14 Installation of ladders 10 set 0,8 15 Hygienic shower installation 10 set 1,6 16 Installing Mixers 10 un 3,2 17 Installation of shower trays 10 set 1,2 No Description Unit Quantity System K1 18 Plastic pipes D = 50mm plastic sheath 100 m 0,7 19 Plastic pipes D = 100mm plastic sheep 100 m 1,05 20 Installation of polyethylene fittings of tees un 79 21 Installation of polyethylene fittings un 72 22 Delivery of building materials on the distance. up to 15 km by car with a T 14 carrying capacity of up to 25 tons Electric lighting and electrical equipment Dormitories (Block B) Section 2. Material resources on project data 1 Input device: current transformers VRU-1D-250-100 un 3 2 Shield lighting with an input automaton and distribution automatics Exinoxe- un 4 18 3 Box with a step-down transformer 220-12V YTPP un 1 4 Luminaire with compact fluorescent lamp with IP65 protection degree CD160- un 40 2x18 179

5 Luminaire with compact fluorescent lamp with IP65 protection degree CD218- un 2 2x18 6 Luminaire with fluorescent lamp G13 2x18 W un 24 7 CСКndОlТОrs 318 un 36 8 CСКndОlТОrs 118 un 36 9 CОТlТnР lumТnКТrО Пor МompКМt ПluorОsМОnt lКmps 118А МompОnsated, degree un 8 of protection IP40 10 Display lamp "EXIT" 25 W un 5 11 Emergency power supply K-303 un 8 12 Luminescent compact lamp with 18W power un 236 13 Linear fluorescent lamp G13, 18 W un 48 14 Single-button switch 10 220 un 94 15 Double –button switch un 4 16 Waterproof single-button switch 10 220 un 4 17 Waterproof single-button switch 10 220 un 4 18 Socket outlet double 220V 16A un 180 19 Boxes for branching KM-202 un 600 20 Box for the concealed installation of switches and sockets K-201 un 286 21 Cable with copper conductors with PVC insulation 3x1.5 mm2 VVGng (A) -LS m 1500

22 Cable with copper conductors with PVC insulation 3x2.5 mm2 VVGng (A) -LS m 2000

23 Cable with copper conductors with PVC insulation 3x4 mm2 VVGng (A) -LS m 400 24 Cable with copper conductors with PVC insulation 5x.25mm2 VVng (A) -LS m 120

25 Plastic pipe diam. 25 mm m 120 26 Steel strip D = 40x4 mm m 50 27 ArmКturО Ø18 I L=2,5 un 9 Fire alarm of the hostel (block B) Section 2. Materials not taken into account by the price list 1 Receiving –control and guard –ПТrО dОЯТМО ‘’GrКnТt ‘’TU 4372-018-11858296- un 1 01 2 Accumulator battery 12V, 7/hr un 1 No Description Unit Quantity 3 Fire smoke detector –electronic Ipit =9/36(10%) И 212-41 un 88 4 Fire manual detector (+10%) И-3 un 5 5 Display lamp "EXIT" 30010014Iport = 0,025 un 5 6 Combined warning system Mayak -12KP un 8 7 The control device of plumes UKSH-1 un 4 8 Cable with single-core conductors D = 0.5 mm with insulation from a m 930 composition of polyethylene with a sheath of white PVC plastic KSPV - 2x0.5 9 Flexible wire up to 380V PVS-2x0.75 m 260 10 Cable PVC-31,5 m 20 11 Pipe flexible gofirovannaya D = 10mm GOFROSHLANG m 1190 12 Universal connecting box, UK-2P un 5

IV. POTENTIAL IMPACTS AND MITIGATION MEASURES

30. Potential impacts of proposed additional activities and relevant mitigation measures are described in the Table 18 below.

180

Table 18: Potential impacts of the prosed activities and mitigation measures Potential impacts Mitigation measures Temporary increase of Ensure that the maximum and equivalent noise levels comply with sanitary background noise and regulations (not more than 55 dBa). Instrumental noise measurements vibration due construction should be undertaken at least 2 times per month works Monitor and address complaints about the noise level.

Construction works (including drilling works) will be limited to restricted times agreed to in the permit – from 7am to 5 pm in week days and from 8 am to 4 pm on Saturday.

No works at night time, Sunday and holidays are allowed.

The proposed works includes only drilling equipment for walls (for installation of windows, doors, radiators) which will not cause vibration Creation of dust Monitor dust emissions to ensure emissions are minimized. emissions and volatile organic compounds at Monitor and address complaints about dust / volatile organic compounds construction site while and other pollutants dismantling work, transportation of Construction works will be limited to restricted times - from 7am to 5 pm in construction materials week days and from 8am to 4 pm on Saturday. No works at night time, and waste Sunday and holidays are allowed.

Providing the construction workers with suitable personal protective equipment (respirators)

Contractor will monitor the exhaust gas content of its own vehicle fleet.

There will be no open burning of construction / waste material at the site There will be no excessive idling of construction vehicles at sites

Keep surrounding environment (side-walks, roads) free of debris to minimize dust

In case of dust creation by pneumatic drilling/wall destruction during installation of windows/doors/radiators etc. installation suppress dust by water spraying and/or installing dust screen enclosures at site. Construction waste Waste disposal facilities are available.

Boxes for construction debris will be installed in the site.

The construction waste will be disposed according to general EMP requirements and SSEMP (Waste Management Plan)

Construction waste will be collected and disposed properly by licensed collectors

Timely sorting of rehabilitated and removing construction waste in an organized way, and disposal them on an authorized land field

Mineral construction and demolition wastes will be separated from general refuse, organic, liquid and chemical wastes by on-site sorting and stored in appropriate containers

Dispose off waste appropriately to prevent pollution of soil and groundwater

The approach to handling sanitary wastes and wastewater from building sites (installation or reconstruction) must be approved by 181

the local authorities

Recycle valuable materials within the project or sold.

Aim to minimize waste through reducing and re-using (packaging) material

Do not allow any burning or burying of waste on site.

Prevent littering by construction staff at work sites by providing bins or waste bags in sufficient locations.

The records of waste disposal will be maintained as proof for proper management as designed;

Whenever feasible the contractor will reuse and recycle appropriate and viable materials.

Toxic / hazardous waste Temporarily storage on site of all hazardous or toxic substances will be in management safe containers labeled with details of composition, properties and handling information The containers of hazardous substances should be placed in a leak-proof container to prevent spillage and leaching The wastes will be transported by specially licensed carriers and disposed in a licensed facility Paints with toxic ingredients or solvents or lead-based paints will not be used

Soil contamination due  Construction materials that can impact the soil should be kept in a to accidental spillage special premise or in concrete ground. • Soils contaminated by accidental spills should be immediately collected and properly disposed at relevant landfill in accordance with the permit from local environmental departments ; • regular maintenance of the equipment should be done by Contractor and checking for any possible leaks from the joints etc.

Asbestos containing Ensure that the standard practice of handling existing asbestos containing materials (ACM) materials is used to remove and decommission asbestos containing roofing materials.

ACM will not be used as a roofing/new material in construction works of building.

Any existing ACM to be handled and disposed according to the SSEMP (ACM management and disposal plan) Health and labor safety (occupational hazards)  The local construction and environment inspectorates have been notified of upcoming activities – during construction and operation  All work will be carried out in a safe and disciplined manner designed to minimize impacts on workers.  Workers will comply with international good practice - providing the construction workers with suitable personal protective equipment (always hardhats, as needed masks and safety glasses, harnesses and safety boots)  Appropriate signposting of the sites will inform workers of key rules and regulations to follow. Following plans to be developed for construction and operation phases of the project: Emergency Response Plan and Health and Safety Plan Direct or indirect Transport along the Ziyodajiev 3 street and Highway A384 consists of 182

hazards to public traffic private cars and public transport, as well as taxis, minibuses, trucks. The and pedestrians by volume of traffic is not very large construction activities Contractor will observe the necessary precautions (speed limit, working hours from 7 am to 5 pm)

In compliance with national regulations the contractor will insure that the construction site is properly secured and construction related traffic regulated. This includes but is not limited to: Signposting, warning signs, barriers and traffic diversions: site will be clearly visible and the public warned of all potential hazards Traffic management system and staff training, especially for site access and near-site heavy traffic. Adjustment of heavy traffic to local traffic patterns, e.g. avoiding major transport activities during rush hours

4.1. Site-specific Environmental Management plans (SSEMP) to be prepared by the Contractor

31. The general Environmental Management plan (EMP) for all project sites is approved as part of Initial Environmental Examination (IEE) endorsed by State Environmental Committee of the Republic of Tajikistan and general management measures that apply to this sub-project should be followed by the Contractor.

32. In addition, the Contractor should prepare the following 8 Site-specific Environmental Management plans (SSEMP): - Waste management plan; - Emergency response plan; - Health and Safety Protection Plan; - Plan for the consideration of complaints; - Dust Control Plan; - Noise management plan; - Traffic and road safety management plan. - ACM Handing, Management and Disposal Plan

183