Regional Roads

Total Page:16

File Type:pdf, Size:1020Kb

Regional Roads REGIONAL ROADS 2021/22 (Approved Comments Budget) State Black Spot Program - Regional and Metropolitan State Roads Great Southern Albany Highway SLK 343.44 - 344.70 (Shire of Plantagenet) $100,000 Stage 1 (Total cost to State $650,000). Widen and seal shoulders and construct turning bulges at Beattie Road and West Beattie Road. Total Great Southern Region $100,000 South West Region Brockman Highway SLK 57.80 - 60.30 (Shire of Augusta Margaret River) $50,000 Stage 3. Stage 4 to be funded in future years (Total cost to State $3,000,000). Widen and seal shoulders. Pinjarra Road/Old Mandurah Road (Shire of Murray) $550,000 Offset left turning lane to Old Mandurah Road to reduce vehicle masking and to improve sight distance. Pinjarra Road/Murray Street (Shire of Murray) $340,000 Stage 1 (Total cost to State $2,300,000). Install roundabout. Total South West Region $940,000 Mid West - Gascoyne Region Northampton Kalbarri Road SLK 11.46 - 12.06 (Shire of Northampton) $25,000 Stage 1 (Total cost to State $1,810,000). Widen floodway, extend culvert, install signs and delineation. Carnarvon Road/Cornish Street & Angelo Street (Shire of Carnarvon) Stage 6. Stages 1-5 funded in previous years (Total cost to State $20,000 Install roundabout. $2,620,000). Brand Highway/Barret Drive (City of Greater Geraldton) Stage 2. Stage 1 funded in previous years (Total cost to State Widen Brand Highway between Lockyer Road and Barrett Drive in Wandina, construct left turn pocket into $790,000 $2,790,000). Barrett Drive. Total Mid West - Gascoyne Region $835,000 Goldfields - Esperance Region South Coast Highway SLK 464.65 - 465.05 (Shire of Esperance) $100,000 Stage 1 (Total cost to State $1,646,000). Reduce vertical curve on approach to Telegraph Road intersection. Total Goldfields - Esperance Region $100,000 Page 1 of 3 REGIONAL ROADS 2021/22 (Approved Comments Budget) State Black Spot Program - Regional and Metropolitan State Roads Kimberley Region Derby Highway (SLK 40.18 - 40.42) (Shire of Derby-West Kimberley) Widen and seal to 2.0m, modify intersection with Waycott Street, construct turning lanes, median islands and $825,000 Stage 2. Stage 1 funded in 2020/21 (Total cost to State $2,750,000). pedestrian refuge points, upgrade existing footpath and street lighting, install signs and pavement markings. Total Kimberley Region $825,000 Wheatbelt Region Collie Lake King Road/Rajander Road (Shire of West Arthur) Stage 3. Stages 1 and 2 funded in previous years (Total cost to State $ $1,000,000 Widen intersection and all approaches. 1,100,000). Collie Lake King Road/Farrell Road (Shire of West Arthur) Stage 3. Stages 1 and 2 funded in previous years (Total cost to State $ $1,000,000 Widen intersection and all approaches. 1,100,000). Great Eastern Highway-Christmas Road (Shire of Northam) Reserve project ( Total cost to State $ 500 000) Widen Christmas Road approach to intersection and widen left turn on Great Eastern Highway. Great Eastern Highway-Clydesdale Road (Shire of Northam) Reserve project ( Total cost to State $ 430 000) Widen Clydesdale Road approach to intersection and widen left turn on Great Eastern Highway. Total Wheatbelt Region $2,000,000 Budget and Program Management Various $200,000 Urgent post fatal crash treatments. Total Budget and Program Management $200,000 Metropolitan Region Thomas Road/Kargotich Road (Shire of Serpentine-Jarrahdale) Install roundabout. $1,450,000 Staged project. Construction in 2021/22. Co-funded by Australian Government. Albany Highway (Gosnells Town Centre-City of Gosnells) $250,000 Staged project. Construction in 2021/22. Install variable speed limit signs. Tonkin Highway/Forrest Road (City of Armadale) $500,000 Staged project. Construction in 2021/22. Install traffic signals. Page 2 of 3 REGIONAL ROADS 2021/22 (Approved Comments Budget) State Black Spot Program - Regional and Metropolitan State Roads Mill Point Road/Mends Street (City of South Perth) $300,000 Staged project. Construction in 2021/22. Install a raised safety platform and traffic signal modifications. Cedric Street/Cedric Street on-ramp/Karrinyup Road (City of Stirling) $550,000 Staged project. Construction in future years. Install right turn lane extension, new left turn lane, corner island and upgrade pedestrian facilities. Albany Highway/Nicholson Road (City of Canning) $300,000 Staged project. Construction in future years. Intersection safety improvements. Ennis Avenue/Dixon Road (City of Rockingham) $200,000 Staged project. Construction in future years. Intersection safety improvements. Great Eastern Highway/Scott Street (Shire of Mundaring) $50,000 Staged project. Construction in future years. Intersection safety improvements. Shepperton Rd/Mint Street (Town of Victoria Park) $350,000 Staged project. Construction in future years. Intersection safety improvements. Guildford Road/7th Avenue (City of Bayswater) $100,000 Staged project. Construction in future years. Safety improvements. Leach Highway/Braibrise Road (City of Canning) $200,000 Staged project. Construction in future years. Intersection safety improvements. West Coast Highway/ Hale Road (City of Stilring) $200,000 Staged project. Construction in future years. Intesection safety improvements. Albany Highway/Hamilton Street (City of Canning) Intersection safety improvements. $150,000 Staged project. Construction in future years. Mitchell Freeway - Powis Street to Vincent Street (City of Vincent) $100,000 Staged project. Construction in future years. Install northbound safety barrier. Roe Highway - Nicholson Road to South Street (City of Canning) $100,000 Staged project. Construction in future years. Install safety barrier. Various Post fatal crash safety treatments. $200,000 On-going annual allocation. Total Metropolitan Region $5,000,000 Total - State Black Spot Program - Regional and Metropolitan State Roads $10,000,000 Page 3 of 3.
Recommended publications
  • Risky Roads Survey Results 2014 Metropolitan Local Government Areas: Risky Roads Survey Results 2014 2014
    Metropolitan Regional Local Government Areas: Risky Roads Survey Local Results 2014 Government Areas 2014 Risky Roads Survey Results 2014 Metropolitan Local Government Areas: Risky Roads Survey Results 2014 2014 in those areas. Alarmingly in regions like the Wheatbelt two out of three road deaths were local Executive Summary residents on local roads. While we can all do our part to improve the attitudes of drivers we must also work towards The RAC represents over 800,000 Western Australian members and advocates on their behalf on improving the road environment to meet the needs of road users now and into the future. matters including affordable motoring, environmental sustainability, public transport and safe road The results from the Risky Roads campaign are publicly available at www.rac.com.au/riskyroads use. The RAC represents all road users on the WA Road Safety Council and has strong alliances with local government, Main Roads WA (MRWA) and community road safety organisations. Having a safe road environment is important for all road users because the right infrastructure can be the difference between a fatal crash and a minor collision. Last year on average one person died on WA roads nearly every two days. The RAC’s Risky Roads campaign is WA’s biggest public infrastructure survey and is undertaken to provide a snapshot of community perceptions, insight for road authorities and assist in identifying trends in traffic flow, infrastructure and safety. The 2014 campaign ran during April and May, providing Western Australians’ the opportunity to express their views and nominate sub-standard roads and intersections throughout the state.
    [Show full text]
  • Annual Report
    Annual Report Welcome and Highlights The 2014-15 Annual and Sustainability Report reviews Main Roads’ operational, financial and business performance for the financial year ending 30 June 2015. It showcases our performance against our aspiration to: Provide world class outcomes for our customers through a safe, reliable and sustainable road-based transport system. As part of our commitment to best practice reporting, this report is developed in accordance with the principles of the Global Reporting Initiative. Our report has been structured around the following key areas: A Snapshot of our Year – an overview of our performance and future direction Our Leaders – find out who our eadership team are Our Operational Performance – learn about the service we provide Our Business Activities – find out about the innovative approaches we used to support the delivery of our services Governance – understand how we exercise fairness, transparency and accountability in the management of our business and people Statement of Compliance To the Honourable Dean Nalder MLA BBus, GradDip (AppFin&Inv) Minister for Transport In accordance with section 63 of the Financial Management Act 2006, we hereby submit for your information and presentation to Parliament the Report of Main Roads Western Australia for the 2014-15 financial year ending 30 June 2015. The Report has been prepared in accordance with the provisions of the Financial Management Act 2006. Stephen Troughton Reece Waldock Managing Director of Main Roads Commissioner of Main Roads 20 August 2015 20 August 2015 Main Roads Western Australia Annual Report 2015 1 COMMISSIONER OF MAIN ROADS: Notes to the Financial Statements About Us Our Role We are one of the largest geographically spread road agencies in the world responsible for more than 18,400 kilometres of road spread over 2.5 million square kilometres.
    [Show full text]
  • LAKELANDS, MANDURAH — TRAFFIC MANAGEMENT Grievance MR D.A
    Extract from Hansard [ASSEMBLY — Thursday, 8 May 2014] p3048b-3050a Mr David Templeman; Mr Dean Nalder LAKELANDS, MANDURAH — TRAFFIC MANAGEMENT Grievance MR D.A. TEMPLEMAN (Mandurah) [9.14 am]: My grievance this morning is to the Minister for Transport and concerns a very important issue for the residents of the booming Mandurah suburb of Lakelands and the parents and students who access the two schools in that locality. Lakelands is a major suburb in north Mandurah. In the past 10 years, it has grown from a community of a few dozen people to a population of more than 3 000 residents. The demographics include many first home buyers, a large number of young families with children and retirees. It has a very large retirement village called Lattitude Lakelands, which, in itself, houses more than 400 residents. The suburb is located between Mandurah Road on the west and the Perth–Mandurah rail line to the east. The only entrance into and out of Lakelands from Mandurah Road is Catalina Drive. Catalina Drive carries the traffic into and out of the suburb and there are no traffic lights at its intersection with Mandurah Road. Indeed, Catalina Drive is extremely busy. There are two schools in the area—Mandurah Baptist College, with 1 200 students and Lakelands Primary School, which, when it is fully operational next year, will have more than 450 students, compounding the volume of traffic and the safety concerns of the residents of Lakelands. At peak times Catalina Drive is expected to carry residents leaving the suburb for work and other day-to-day pursuits and their return, as well as the huge number of parents who drop off their children at Mandurah Baptist College.
    [Show full text]
  • The Vistas Traffic Impact Assessment 3.1 Mbopens
    Final Gold Right Pty Ltd Lots 805, 806, 3 Karnup Transport Assessment (TA) Refresh June 2017 Final | This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 238546-00 Arup Final Arup Pty Ltd ABN 18 000 966 165 29 Jun 2017 Arup Level 14, 2 The Esplanade Perth www.arup.com Updated TA to refelct revised layout (realignment of Aquamarine Parade) and City of Rockingham and Main Roads WA preferred traffic solution Gold Right Pty Ltd Lots 805, 806, 3 Karnup Transport Assessment (TA) Refresh Contents Page 1 Introduction 5 2 Background 8 2.1 Transport Assessment Report (TA), prepared by Transcore (February, 2013) 8 2.2 Interim Scenario Access Modelling Assessment, prepared by Arup (May, 2015) 9 2.3 Modelling Update and Transport Assessment Refresh, prepared by Arup (December 2015) 10 2.4 Further advice received from Main Roads WA and City of Rockingham 11 3 Existing Situation 12 3.1 Existing Road Network 12 3.2 Existing Public Transport Facilities 14 3.3 Existing pedestrian and cyclist facilities 15 4 Structure Plan Proposal 17 4.1 Proposed Future Access Arrangements 18 5 Traffic Model Development 20 5.1 Matrix Development 20 5.2 Network Development 25 6 Proposed Internal Transport Network 27 6.1 Road Hierarchy 27 6.2 Internal Structural Plan Road and Intersections 36 6.3 Internal Public Transport Network 38 6.4 Internal Pedestrian and Cyclist Facilities 40 7 Recommendations to the External Transport Network 43 7.1 Analysis of External Transport Network 43 7.2 Summary of Analysis Results 56 8 Conclusion 61 Table 1 Mandurah Road/Singleton Beach Road Intersection Crash Data 14 Table 2: Mandurah Road/Crystaluna Drive Intersection Crash Data ...................
    [Show full text]
  • Tuesday 13 April 2021 at 5.30Pm
    NOTICE OF MEETING COMMITTEE OF COUNCIL Members of the Committee of Council are advised that a meeting of the Committee will be held in the Council Chambers, 83 Mandurah Terrace, Mandurah on: Tuesday 13 April 2021 at 5.30pm MARK R NEWMAN Chief Executive Officer 8 April 2021 Committee Members Councillor P Jackson (Chairperson) Councillor M Darcy Councillor J Green Councillor C Knight Councillor D Pember Councillor L Rodgers Councillor P Rogers Councillor A Zilani Mayor R Williams Committee of Council Agenda: 13 April 2021 Page 1 AGENDA 1 OPENING OF MEETING AND ANNOUNCEMENT OF VISITORS 2 APOLOGIES 3 IMPORTANT NOTE: Members of the public are advised that the decisions of this Committee are referred to Council Meetings for consideration and cannot be implemented until approval by Council. Therefore, members of the public should not rely on any decisions of this Committee until Council has formally considered the resolutions agreed at this meeting. 4 RESPONSES TO QUESTIONS TAKEN ON NOTICE 5 PUBLIC QUESTION TIME Public Question Time provides an opportunity for members of the public to ask a question of Council. For more information regarding Public Question Time please visit the City’s website mandurah.wa.gov.au or telephone 9550 3787. 6 ANNOUNCEMENTS Modification to Standing Orders Local Law 2016 - electronic attendance at meeting. 7 PRESENTATIONS People and Community - Homelessness Strategy 8 DEPUTATIONS Any person or group wishing to make a Deputation to the Committee meeting regarding a matter listed on this agenda for consideration must complete an application form. For more information regarding making a deputation please visit the City’s website mandurah.wa.gov.au or telephone 9550 3787.
    [Show full text]
  • Little Stiller Distillery”
    LITTLE STILLER PTY LTD ATF MANA FAMILY TRUST “LITTLE STILLER DISTILLERY” 7 MANDURAH TERRACE, MANDURAH, WA 6210 Public Interest Assessment (PIA) Page 1 of 87 Table of Contents Introduction ................................................................................................................................................................5 The Applicant...............................................................................................................................................................5 Overview……................................................................................................................................................................5 Part 2 Manner of Trade................................................................................................................................................6 2.1 - Facilities and services .……………………..................................................................................................................6 2.1 - Venue Layout……...................................................................................................................................................6 2.1 - Liquor Storage......................................................................................................................................................13 2.1 - Waste Storage….………………..................................................................................................................................14 2.1 - Number of Seats...................................................................................................................................................14
    [Show full text]
  • Metropolitan Road Fact Sheet
    1. What are Main Roads and Highways in the Perth metropolitan area? Metropolitan In the Perth metropolitan area, the following highways and main roads (whole or part) are under the care and control of Main Roads Road Fact Sheet Western Australia: Albany Highway Albany Highway – starts at Welshpool Road and finishes at Metropolitan Boundary Armadale Road Starts at Albany Highway and finishes at Kwinana Freeway Brearley Avenue Starts at Great Eastern Highway and finishes at Airport boundary Brookton Starts at Albany Highway and finishes at Highway the Metropolitan Boundary Canning Highway Starts at Causeway and finishes at Stirling Highway Causeway Cockburn Road Starts at Hampton Road and finishes at Russell Road Garratt Road Bridge Great Eastern Starts at Causeway into Johnson Street Highway right at James Street into East Street and right at Great Eastern Highway to Roe Highway intersection and then through Greenmount, Mundaring and past the Lakes Turn-off to the Metropolitan Boundary west of Linley Valley Road Great Eastern Starts at Great Eastern Highway and Highway Bypass finishes at Roe Highway Great Southern Starts at Great Eastern Highway to Highway Metropolitan Boundary approx. 2.5 km Graham Farmer Starts at Tunnel and finishes at Freeway Chamberlain Road Great Northern Starts at Roe Highway to Metropolitan Highway Boundary near parking bay 300 metres south of Brand Highway Guildford Road Starts on south side of bridge over Graham Farmer Freeway on East Parade and finishes at Johnson Street, Guildford High Street Starts at Carrington Street
    [Show full text]
  • Supply and Erect Fencing, Busselton Bypass Area, Shire of Busselton
    1800 [ASSEMBLY] (o) Provision of Project and Contract Management Support Services. (p) Supply and erect fencing, Busselton Bypass area, Shire of Busselton. (q) Supply and erection of approximately 25kms of fencing on the Port Gregory to Kalbarri Road, Shire of Northampton. (r) Material investigation consultancy, Great Central Road from Laverton to the Western Australian / Northern Territory border. (s) Manufacture and supply of Tric Bloc concrete safety barriers. (t) Bridge construction and associated roadworks, Little Panton River and Spring Creek, Great Northern Highway. (u) Longitudinal road line marking, Gascoyne and Pilbara Regions. (v) Longitudinal road line marking in the Midwest, Wheatbelt North and Goldfields- Esperance Regions. (w) Longitudinal road line marking in Rural Regions: Wheatbelt South, Great Southern and South West Regions. (x) Supply and spray bitumen, supply sealing aggregate, supply and place asphalt, Shire of Tammin. (y) Bituminous sealing, bitumen supply and spray and aggregate spreading, Eyre Highway, 105 to 113 SLK, Shire of Dundas. (z) Sprayed bituminous surfacing pavement repairs, Great Northern Highway, Victoria Highway, Gibb River Road, Kimberley Region. (aa) Supply and lay bituminous microsurfacing to existing seals on Great Eastern Highway and Coolgardie- Esperance Highway. (bb) Provision of limited cadastral survey for casement definition, Sues Road, Brockman Highway, Stewart Road and Gibb River Road. (cc) Provision of limited cadastral survey for casement definition, Sues Road, Brockman Highway, Stewart Road and Gibb River Road. (5) (a) 6 May 1999. (b) 6 August 1999. (c) 9 July 1999. (d) 11 June 1999. (e) 16 July 1999. (f) 31 March 2000. (g)-(h) 7 July 1999. (i) 30 June 1999.
    [Show full text]
  • Metropolitan Roads
    METROPOLITAN ROADS 2015/16 (Approved Comments Budget) 5. State Black Spot Program - Metropolitan State Roads Metropolitan Region Tonkin Highway/ Gosnells Road West (City of Gosnells) $1,408,000 Install traffic signals at intersection. South Street/North Lake Road (City of Melville) $2,392,000 Stage 3. Stages 1 and 2 funded in 2013/14 and 2014/15. Upgrade traffic signals and right turn pockets, install mast arms and improve street lights. Marmion Avenue/Whitfords Avenue (City of Joondalup) Intersection improvements, extend turning pockets, convert existing single left turn into double left turn on signalised Whitfords $500,000 Staged project, Co-funded by State Capital Funds. (Total project cost $4,500,000). Avenue approaches. Marmion Avenue/Hepburn Avenue (City of Joondalup) $500,000 Staged project, Co-funded by State Capital Funds. (Total project cost $5,500,000). Intersection improvements, extend all turning pockets and double right turns on south approach and add auxiliary thru lane. Various $200,000 Post fatal crash safety treatments. Total - State Black Spot Program - Metropolitan State Roads $5,000,000 Page 1 of 1 REGIONAL ROADS 2015/16 (Approved Comments Budget) 2. State Black Spot Program - Regional State Roads Great Southern Region Albany Highway/Kooyong Avenue (City of Albany) $450,000 Install passing bulge on Albany Highway and widen large multi barrel culvert to suit. South Western Highway/McLeod Road Intersection (Shire of Denmark) $50,000 Stage 1. Stage 2 to be funded in future years. (Total cost to State $500,000). Install passing bulge on South Western Highway for west bound traffic. Total Great Southern Region $500,000 South West Region Brockman Highway SLK 55.90 - 57.70 (Shire of Augusta-Margaret River) $300,000 Stage 3.
    [Show full text]
  • Perth – Bunbury Highway Is Provided Within Section 2.2 of the PER Document
    Perth – Bunbury Highway (Peel Deviation) Main Roads Western Australia Report and recommendations of the Environmental Protection Authority Environmental Protection Authority Perth, Western Australia Bulletin 995 September 2000 ISBN. 0 7307 6618 7 ISSN. 1030 - 0120 Assessment No. 786 Summary and recommendations This report provides the Environmental Protection Authority’s (EPA’s) advice to the Minister for Environment on the proposal by Main Roads Western Australia (MRWA) to construct an inter-regional road, on the eastern side of the Peel-Harvey Estuary, to bypass Mandurah. The proposal extends from the southern most portion of the proposed Kwinana Freeway at Stock Road, Lakelands (near Mandurah) south to where it intersects Old Coast Road approximately 2.5 km north of Johnston Road. Section 44 of the Environmental Protection Act 1986 requires the EPA to report to the Minister for the Environment on the environmental factors relevant to the proposal and on the conditions and procedures to which the proposal should be subject, if implemented. In addition, the EPA may make recommendations as it considers necessary. Relevant environmental factors Although a number of environmental factors were considered by the EPA in the assessment, it is the EPA’s opinion that the following are the environmental factors relevant to the proposal, which require detailed evaluation in the report: • Vegetation Communities • Declared Rare and Priority Flora • Wetlands • Traffic Noise Conclusion The EPA has considered the proposal by MRWA to construct an inter-regional road on the eastern side of the Peel-Harvey Estuary to bypass Mandurah and the comments raised by government agencies and public submissions.
    [Show full text]
  • Brad Goode & Associates Pty Ltd Company Profile
    BRAD GOODE & ASSOCIATES PTY LTD COMPANY PROFILE A Tender Document prepared for the provision of ABORIGINAL HERITAGE SERVICES January 2015 79 Naturaliste Terrace, Dunsborough WA 6281 Phone: (08) 9755 3716 Mobile: 0432 267 443 Email: [email protected] CONTENTS IDENTITY OF RESPONDENT .................................................................................................. 3 COMPANY PROFILE ................................................................................................................ 4 PURPOSE AND AIM OF THE COMPANY .................................................................................. 4 PROFESSIONAL PERSONNEL & ASSOCIATES ..................................................................... 4 SERVICES OF THE COMPANY ................................................................................................... 5 REFEREES ................................................................................................................................ 6 CURRICULUM VITAE OF PERSONNEL ................................................................................. 7 MR BRAD GOODE .......................................................................................................................... 7 MRS JACQUELINE HARRIS ......................................................................................................... 8 MR PAUL GREENFELD ................................................................................................................. 9 MR TOM O’REILLY ......................................................................................................................
    [Show full text]
  • Estuary Bridge to Dawesville Bridge Road and Land Use Study Summary Report November 2006 2
    PERTH TO BUNBURY HIGHWAY: ESTUARY BRIDGE TO DAWESVILLE BRIDGE ROAD AND LAND USE STUDY SUMMARY REPORT NOVEMBER 2006 CONTENTS 1. INTRODUCTION 4 1.1 Summary 4 1.2 Council Adoption of Study 5 2. STUDY AREA AND PLANNING CONTEXT 6 2.1 Study Area 6 2.1.1 Road Hierarchy 7 2.1.2 Traffic Volumes 7 2.2 Network Changes 8 2.2.1 New Perth Bunbury Highway 8 2.2.2 Mandurah Estuary Bridge 8 2.2.3 Southern Suburbs Railway 8 2.3 Planning Context 10 2.3.1 Peel Region Scheme 10 2.3.2 Inner Peel Region Structure Plan 10 2.3.3 Town Planning Scheme No 3 12 2.3.4 Outline Development Plans 12 2.3.5 Local Commercial Strategy 12 3. CONTEXT ANALYSIS 16 3.1 Existing Development & Character 16 3.2 Future Development & Character 16 3.2.1 Port Mandurah 17 3.2.2 Bridgewater North 17 3.2.3 Bridgewater South 17 3.2.4 Seascapes 17 3.2.5 Eastport (Port Bouvard) 17 3.2.6 Northport (Port Bouvard) 17 3.2.7 Falcon Precinct 19 3.2.8 Pleasant Grove 19 3.2.9 Halls Head Precinct 19 4. KEY STRATEGIC IMPROVEMENTS 20 4.1 Level of Service 20 4.2 Hierarchical Strategy 21 5. RECOMMENDATIONS (PRE-CONSULTATION) 22 5.1 Projected Traffic Volumes 22 5.2 Road Recommendations 23 5.2.1 Old Coast Road 23 5.2.2 Local Road Improvements 24 6. CONSULTATION 28 6.1 Consultation Procedure 28 6.2 Summary of Submissions 29 6.3 Main Issues Rising from Submissions 36 6.3.1 General Comments 36 6.3.2 Specific Comments 37 7.
    [Show full text]