Brighton Bypass Project
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
HOBART FOOD TRUCKS Program Guidelines and Permit Conditions NOVEMBER 2019 2 TABLE of CONTENTS
HOBART FOOD TRUCKS Program Guidelines and Permit Conditions NOVEMBER 2019 2 TABLE OF CONTENTS INTRODUCTION 4 MAPS Principles 6 Hobart Interim Planning Scheme 2015 boundary 18 Values 6 Hobart Interim Planning Scheme Aims 6 2015 and Sullivans Cove Planning Definition 7 Scheme boundary – inner city and TRADING LOCATIONS 8 waterfront detail 19 Sullivan Cove Planning Scheme Greater CBD No Go Zone 20 trading exceptions 8 North Hobart Shopping Events & festivals 10 Precinct No Go Zone 21 No go zones 10 Brooker Highway No Go Zone 22 TRADING 11 Sandy Bay Shopping Precinct No Go Zone 23 Trading times and duration 11 Southern Outlet No Go Zone 24 Trading on Council land vs trading on private land 11 kunanyi/Mount Wellington No Go Zone 25 PERMIT 12 Permit fee 13 Delegatiopn to approve Hobart food truck permits 13 Permit reissue 13 Permit cancellation 13 PERMIT CONDITIONS 14 Health & safety 14 Trading times, location & duration 14 Community access 15 Noise 16 Waste 16 General 17 COMMUNICATION & PROMOTIONS 17 INFORMATION 17 Hobart Food Trucks Program Guidelines 2019–20 3 INTRODUCTION The Hobart Food Trucks program provides a framework within which the City of Hobart, local business and the community can enjoy the economic, social and cultural benefits of mobile food vending. The City is committed to supporting existing food and beverage businesses and aims to ensure that the program complements the city’s existing food and beverage economy. As a result, the program has been developed after extensive community and business consultation and the implementation of 12-month trial that took place from July 2015 to July 2016. -
Do Oma Ain H High Hwa Ay P Plann Ning G
Tasmanian Government 2012 Submission to Nation Building 2 Program Domain Highway Planning (Part of Brooker Highway Upgrades submission to Infrastructure Australia) September 2012 Department of Infrastructure, Energy and Resources Priority assigned by jurisdiction for NB2 Priority three under Innovation funding consideration Details of full scope of project, including Information on project objectives, strategic objectives, service requirements, project context and options analysis is discussed in status and project phase(s) seeking the Stage 1-6 template. funding. Note: It is expected that this will be largely addressed through the main IA submission. However, the Department requires cost estimates to be provided using the Best Practice Cost Estimation Standard and at both P50 and P90. Also to use both 4% and 7% for BCRs. Alignment with objectives of NB2 The Domain Highway Planning project is Note: This should include how a project submitted under the Innovation theme of aligns with the overarching objective of Nation Building 2, and also aligns with NB2, as well as how it aligns with the Connecting People and Moving Freight objective of each relevant NB2 subprogram. themes. The Domain Highway is a key urban freight and passenger connection in Greater Hobart. The Highway has two major high-volume interchanges with the Brooker Highway and Tasman Highway. The Domain Highway Interchange with the Brooker Highway is one of two key capacity bottlenecks on the Highway. This project will develop detailed design options at the Domain Highway Interchange. -
Tasmanian Road Futures
TASMANIAN ROAD FUTURES FUNDING PRIORITIES 2019 & BEYOND Road Funding Commitments Funding Total Funding Total Funding Total from cost from cost from cost 2019 2019 2019 Greater Hobart Traffic Solution $72.1M $93.8M Includes: East Tamar Highway $6M $7M Northern Road Upgrades State and Federal $44.9M $54.2M State and Federal – Mowbray Connector Midland Highway 10 year plan Control of Macquarie and Davey streets Includes: West Tamar Highway $11.2M $12M Bass Highway – Deloraine to Latrobe Southern Outlet fifth lane Traffic Solution: Pedestrian crossing Campbell Town River Derwent ferry service Gravelly Beach Road to Rosevears Drive Tasman Highway at Myrtle Park Traffic incident response Atkinsons Road and Waldhorn Drive Dorset Roads Package and transport access points Overtaking opportunities between Exeter Bus priorities and active transport initiatives and Batman Highway junction Tomahawk to Gladstone Northern suburbs light rail Resealing and widening north of Batman Prossers Road Highway intersection to Lightwood Hills Road Underground bus transit centre Esk Main Road Left turn lane Motor Road/West Greater Hobart master plan Tamar Highway junction Airport to Evandale Road Improved Hadspen access Urban Congestion Fund State $24M State and Federal $84.7M $0.4m Federal $58.7M State $58M State Bridgewater Bridge $576M Midland Highway 10 year plan $325M Hobart Congestion Package (linked to Federal $236M Federal $111.4M projects in Greater Hobart Traffic Solution) Roads of Strategic Importance: Bass State $25.8M North West Road Upgrades State and Federal $35.7M $50.1M Tasman Highway Intelligent Transport Systems Highway (Wynyard to Marrawah), $606M Hobart to Sorell corridor, Birralee Federal $205M Bass Highway (West of Wynyard), including South East Traffic Solution State and Federal $25.9M $27M Main Road, Old Surry Road/Massey- Brittons Swamp, Wynyard to Smithton passing Greene Drive, Murchison Highway, lanes, access to Boat Harbour Primary School Tasman Highway near Tasmania Golf Club Lyell Highway. -
Economic Stimulus Plan 1.9
PARLIAMENT OF TASMANIA Budget Paper No 1 The Budget Presented by the Honourable Michael Aird MLC, Treasurer, for the information of Honourable Members, on the occasion of the Budget, 2009-10 Useful 2009-10 Budget and Government Web sites www.budget.tas.gov.au Contains the Budget Papers. www.treasury.tas.gov.au Provides other Budget and financial publications. www.media.tas.gov.au Contains the Government's Budget related media releases. www.tas.gov.au Provides links to the Web sites of a wide range of Tasmanian public and private sector organisations. www.service.tas.gov.au Provides a comprehensive entry point to Government services in Tasmania. www.tasmaniatogether.tas.gov.au Provides detailed information on Tasmania Together, including the current status of this important initiative. CONTENTS 1 The 2009-10 Budget 2 Tasmanian Economy 3 Interim Fiscal Strategy 4 Revenue and Expense Estimates 5 Taxation Revenue 6 Assets and Liabilities 7 Infrastructure Investment 8 Estimated Outcome, 2008-09 9 Commonwealth-State Financial Arrangements Appendix 1 Uniform Government Reporting i INDEX 1 The 2009-10 Budget 1.1 The 2009-10 Budget 1.2 Fiscal Outlook 1.3 Revenue Summary 1.4 Expenditure Summary 1.5 Budget Management Strategies 1.6 Infrastructure Investment 1.8 Nation Building – Economic Stimulus Plan 1.9 Economic Outlook 1.9 2 Tasmanian Economy 2.1 Introduction 2.2 Current Environment – Overview 2.2 Global Conditions 2.2 Australian Conditions 2.3 Economic Outlook 2.4 Summary of 2008-09 Estimates and 2009-10 Forecasts 2.5 Tasmania's Economic Outlook -
Infrastructure Fact Sheet
Tasmanian Budget 06-07 STRONG ECONOMY. STRONG COMMUNITIES. Infrastructure fact sheet Building better Delivering our commitments infrastructure The 2006-07 Budget delivers on the Labor Government’s commitment to continue to Infrastructure is vital to building strong improve Tasmania’s infrastructure for the long-term benefit of the Tasmanian community. communities. It forms the foundation on Initiative Benefit which government services are provided $332 million for the development and Continue to improve community safety and on which the economy can grow. maintenance of Tasmania’s vital roads and amenity while also providing the The Labor Government has always over the next 4 years including: basis for continued economic development recognised the importance of infrastructure • $10 million for the Brooker Highway • $14 million for the Lyell Highway and has developed and implemented long- • $10.2 million for Sisters Hill term strategic plans to ensure its optimal • $8.7 million for the South Arm Rd development. • $8.3 million for the East Tamar Highway and southern approaches to Launceston The Government’s plan for energy • $4.8 million to commence work on main infrastructure has resulted in a complete access routes to the Central Highlands restructuring of the state’s energy industry. • $2.5 million for Sorell traffic management • $3.1 million for the Illawarra Main Rd Over half a billion dollars has been spent • $2 million Blackspot funding and $1 million on Tasmania’s road and bridge network for line marking since 1998. $4.4 million for jetties including Improve facilities for boat users in Tasmania Major health, housing, education, sporting Opossum Bay, Swansea, Battery Point where we have one of the highest rates and St Helens of boat ownership per capita and communication infrastructure projects are currently under way. -
Proclamation Under the Roads and Jetties Act 1935
TASMANIA __________ PROCLAMATION UNDER THE ROADS AND JETTIES ACT 1935 STATUTORY RULES 2018, No. 91 __________ I, the Governor in and over the State of Tasmania and its Dependencies in the Commonwealth of Australia, acting with the advice of the Executive Council, by this my proclamation made under section 7 of the Roads and Jetties Act 1935 – (a) declare the portions of roads specified in Schedule 1 to this proclamation to be State highways for the purposes of Part II of that Act; and (b) declare the portions of roads specified in Schedule 2 to this proclamation to be a single subsidiary road, classified as a main road, for the purposes of Part II of that Act; and (c) amend the proclamation notified in the Gazette as Statutory Rules 1970, No.67 as follows: (i) by omitting from the First Schedule to that proclamation the item relating to the Brooker Highway and substituting the following item: Roads and Jetties Act 1935 – Proclamation Statutory Rules 2018, No. 91 Brooker Highway From the intersection with the 11.48 Tasman Highway to the Midland Highway at, and (18.48 including, the intersection with kilometres) the Lyell Highway, Granton (ii) by omitting from the First Schedule to that proclamation the item relating to the Southern Outlet Highway and substituting the following item: Southern Outlet From the intersection with the 5.95 Highway southern boundary of the Davey/Macquarie Couplet, (9.582 South Hobart to and including kilometres) the Kingston Interchange (iii) by omitting from the First Schedule to that proclamation the item relating to the Tasman Highway and substituting the following item: 2 Roads and Jetties Act 1935 – Proclamation Statutory Rules 2018, No. -
Bypass Means New Approach for Golfers
VOL 12 NO 5 AUGUST 2010 Volcanic Drive extended 300 metres for access Bypass means new approach for golfers Catnip Cattery owners Narelle and Lionel Brown are delighted with their state award in the Telstra Tasmanian GOLFERS at the Tea Tree business awards. Golf Club are taking a new approach to the clubhouse as Golf Club Road has been Purrfect awards closed to make way for the new bypass. Access to the golf club is now via Volcanic Drive outcome for which has been extended 300 Golfers can metres to become the new now access the Tea Tree permanent road to the golf Golf Club Catnip Cattery club. from the Brighton Bypass Project Volcanic (northern section) commu- OLD Beach business Cat- growth. Drive nity relations officer Karyn extension. nip Cattery was recently Other winners in the Kennedy said work was pro- named as one of six win- 2010 Telstra Tasmanian Busi- gressing well. ners in the 18th Testra Tas- ness Awards were: “With heavy machinery manian Business Awards • InSPArations Day Spa and trucks in the area, along and the owners couldn’t be of Spreyton – MYOB small with deep cuttings in the more delighted. business award. road, safety is incredibly Narelle and Lionel • Maintenance Systems important,” she said. Brown were recently named Solutions of Shearwater – “Parents and grandpar- winners in the business Panasonic Australia medium ents with young children are owner micro-business business award. asked to talk about these awards category. • Insight4 of Hobart – safety risks with their chil- Mr Brown said Catnip AMP innovation award. dren. enter the site.” traders are finding it a little struction continued. -
Brighton Bypass Project Will Provide Safer, More Efficient Movement of Freight and General Traffic Between Hobart and Tasmania’S Northern Cities and Ports
ANCIENT ARTEFACTS INSPIRE A BRAVE NEW FIRST The Brighton Bypass Project will provide safer, more efficient movement of freight and general traffic between Hobart and Tasmania’s northern cities and ports. MAIN CONSTRUCTION COMpany : VEC Thiess Joint Venture CLIENT : Tasmania Department of Infrastructure, Energy & Resources COMPLETION : November 2012 ProjeCT VALUE : $120 Million The VEC Thiess Joint Venture faced enormous challenges in Completing these works required an estimated 450,000 cubic metres VIC/SA/TAS/NZ Business Unit Engineering Manager Dougie Wight these factors, we can prepare for them and manage them accordingly to delivering the northern section of the Brighton Bypass, Tasmania’s of bulk earthworks, 10,000 cubic metres of concrete, 3,000 tonnes of says, “The VEC Thiess Joint Venture has worked very hard over many ensure everyone remains safe at all times.” John added. largest ever road infrastructure project. In the process of doing so, they reinforcing steel and 170 precast Super T beams. These were manufactured months on the planning, design, and preparation for these works. After not only set a new benchmark for Australian bridge construction, they also in a dedicated precast yard constructed by VEC near the project site, in so much effort it was very gratifying to see the launch go so smoothly Thiess’ Regional General Manager Rod Heale commended the team delivered their entire package of works three months ahead of schedule. order to save the time and costs associated with transporting the beams and entirely according to plan”. on its meticulous planning. from VEC’s nearest pre-existing precast yard 300kms away. -
Brighton Bypass
2009 (No. 10) 2009 _______________ PARLIAMENT OF TASMANIA _______________ PARLIAMENTARY STANDING COMMITTEE ON PUBLIC WORKS Brighton Bypass ______________ Presented to His Excellency the Governor pursuant to the provisions of the Public Works Committee Act 1914. ______________ MEMBERS OF THE COMMITTEE Legislative Council House of Assembly Mr Harriss (Chairman) Mr Best Mr Hall Mr Green Mrs Napier By Authority: Government Printer, Tasmania 00000 1 TABLE OF CONTENTS INTRODUCTION ..........................................................................................................................3 BACKGROUND..............................................................................................................................3 SCOPE OF WORKS....................................................................................................................... 7 ENVIRONMENTAL AND SOCIAL IMPLICATIONS ....................................................... 14 STAKEHOLDER CONSULTATION...................................................................................... 24 SOCIAL IMPLICATIONS ..........................................................................................................25 ECONOMIC DEVELOPMENT BENEFITS...........................................................................26 PROJECT COSTS .........................................................................................................................28 EVIDENCE .....................................................................................................................................28 -
04 March 2009
[295] VOL. CCCXII OVER THE COUNTER SALES $2·75 INCLUDING G.S.T. TASMANIAN GOV ERNMENT • U • B E AS RT LIT AS•ET•FIDE TASMANIA GAZETTE PUBLISHED BY AUTHORITY WEDNESDAY 4 MARCH 2009 No. 20 924 ISSN 0039-9795 CONTENTS Administration and Probate Notice Page Adjustment Factors ............................................ 304 ADMINISTRATION AND PROBATE ACT 1935 Notice of Intention to Apply for Letters of Administration Administration and Probate ............................... 295 NOTICE is given that after the expiration of fourteen days Associations Incorporation ................................ 299 from the publication of this notice application will be made Business Names ................................................. 300 to the Supreme Court of Tasmania in its Ecclesiastical Forest Practices .................................................. 302 Jurisdiction that Letters of Administration of the Estate of AL A ST A IR IA N BE A TON late of 2 Russell Street Evandale Freedom of Information ..................................... 297 in Tasmania financial consultant/single deceased may be Land Acquisition ................................................ 297 granted to Daphne Clare Mary Habibis of 2 Russell Street Evandale in Tasmania sociology lecturer/divorced the Marine Safety ..................................................... 301 partner of the said deceased. Mining ................................................................ 297 Dated this fourth day of March 2009. Nomenclature Board ......................................... -
Government's Management Plan Protects Aboriginal Heritage Values
VOL 12 NO 4 JULY 2010 Government’s management plan protects Aboriginal heritage values Bypass move welcomed BRIGHTON Council has Council and the municipal- ment also announced that a we are very proud of that duct the most extensive “It enables both the long- taken into account a number welcomed the Tasmanian ity. permit application had been cultural heritage and our archaeological investigation term protection of the levee of requirements, including Government’s announce- The State Government received from the Depart- strong cultural links. ever carried out in Tasmania. site and allows Tasmanians minimising combined social, ment of a management announced that the manage- ment of Infrastructure “At the same time the “These investigations to benefit from an important heritage and environmental plan to protect the Aborigi- ment plan would ensure that Energy and Resources community is keen to see the found that the 500-metre- transport infrastructure proj- impacts, transport needs and nal heritage values in and historical Aboriginal (DIER) to enable the con- Brighton bypass proceed as long levee area, which inter- ect. the provision of safe road around the proposed remains, discovered in a levee struction of a long-span it is a major piece of infra- sects the bypass, contained a “In what is understood to standards. Brighton bypass. during the construction of bridge at the Jordan River on structure that will ensure we stratified cultural deposit of be an Australian first, the “In fact, if the Brighton Brighton Mayor Tony the bypass, would be pre- the Brighton bypass. can meet the demands of our national significance dating construction methodology bypass had not followed this Foster said the decision to served. -
Brighton Structure Plan
Brighton Structure Plan June 2009 Ref: 38318-001 Document Control Document ID: P:\URBAN\CURRENT PROJECTS\38318 BRIGHTON STRUCTURE PLAN\REPORT\PDF JUNE 09\REPORT REV 6.DOC Rev No Date Revision Details Typist Author Verifier Approver 0 17.11.08 Partial Draft – Stage 1 SA SA RM RM 1 04.12.08 Partial Draft – Stage 1 – Revised SA SA RM RM 2 24.03.09 Provisional Draft Report (Revised scope) SA SA RM RM 3 06.04.09 Final Draft Report SA SA RH (client) RM 4 12.05.09 Final Report SA SA RH (client) RM 5 18.05.09 Final Report following Planning Committee comments SA SA RH (client) RM 6 03.06.09 Final Report following Council and DIER comments SA SA RH (client) RM A person using Connell Wagner documents or data accepts the risk of: a) Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard copy version. b) Using the documents or data for any purpose not agreed to in writing by Connell Wagner. Brighton Structure Plan Brighton Council Contents Section Page 1. Executive Summary 3 2. Introduction 4 2.1 Context 4 2.2 The Project 5 2.3 Structure Plan Process and Stages 5 3. Vision 7 4. Existing Conditions and Site Analysis 8 4.1 Location 8 4.2 Physical Form 8 4.3 Transport 8 4.4 Infrastructure 11 4.5 Natural Environment 11 4.6 Heritage and Cultural Significance 13 4.7 SWOT Analysis 14 5. Policy and Strategic Planning Context 16 5.1 Introduction 16 5.2 State 16 5.3 Regional 17 5.4 Local 22 6.