471 Terry Fox Drive OTTAWA (KANATA),ON GROUND FLOOR PLAN 525 [1.7Ft.] WALL ASSEMBLY SCHEDULE: GENERAL NOTES 525 [1.7Ft.] 1

Total Page:16

File Type:pdf, Size:1020Kb

471 Terry Fox Drive OTTAWA (KANATA),ON GROUND FLOOR PLAN 525 [1.7Ft.] WALL ASSEMBLY SCHEDULE: GENERAL NOTES 525 [1.7Ft.] 1 471 Terry FoxOTTAWA Drive(KANATA),ON NOW PRE LEASING AVAILABLE SUMMER 2021 PHILIP ZUNDER. BROKER OF RECORD0 [email protected] 613 725 71700 www.decathloncommercial.com 471 Terry FoxOTTAWA (KANATA),ONDrive PROPERTY DETAILS Terry Fox Drive is a major arterial road stretching from Kanata North over Highway 417 to Kanata South. The site is located between Kanata Avenue and Tillsonburg Street. The site is very near to Minto’s fast-growing community of Arcadia. Nearby is the Kanata Centrum Shopping Centre, the Tanger Outlet Mall, Canadian Tire Centre, Kanata Lakes Golf and Country Club, and Kanata North Business Park. PRIME RETAIL FOR LEASE, ANCHORED BY A NATIONAL RETAIL FUEL AND GAS OFFERING TYPE BAR, CARWASH AND CONVENIENCE FOOD ASKING PRICE $37.00 PER SQ. FT. ( STARTING ) OPERATING COSTS & $15.00 PER SQ. FT. ESTIMATED PLUS UTILITIES REALTY TAXES SITE AREA 126,759 SQ. FT. OR 2.91 ACRES TOTAL PLAZA: APPROX. 22,140 SQ. FT. PROPOSED RETAIL AREA TOTAL REMAINING: 16,980 SQ. FT. SPACES STARTING AT 1,080 SQ. FT. AND UP ZONED LC7(411) - LOCAL COMMERCIAL ZONE PHILIP ZUNDER. BROKER OF RECORD0 [email protected] 613 725 71700 www.decathloncommercial.com 471 Terry Fox Drive OTTAWA (KANATA),ON GROUND FLOOR PLAN 525 [1.7ft.] WALL ASSEMBLY SCHEDULE: GENERAL NOTES 525 [1.7ft.] 1. DO NOT SCALE DRAWINGS; ONLY FIGURED DIMENSIONS 1. EXTERIOR WALLS TO BE W2 ASSEMBLY UNLESS NOTED ARE TO BE USED. WHERE DOUBT EXISTS; FILE REQUEST OTHERWISE. FOR INTERPRETATION AND REQUEST CLARITY. 2. IT IS THE RESPONSIBILITY OF THE GENERAL 525 [1.7ft.] TYPICAL FOUNDATION WALL CONTRACTOR TO VERIFY DIMENSIONS ON SITE; REPORT W1 · POURED CONCRETE FOUNDATION WALL, REFER TO DISCREPANCIES TO THE ARCHITECT PROMPTLY. 1 STRUCTURAL 3. GENERAL CONTRACTOR TO TAKE INTO ACCOUNT 525 [1.7ft.] CONSTRUCTION TOLERANCE; GENERAL CONTRACTOR TYPICAL EXTERIOR WALL R26 TO COORDINATE THE WORK OF DIFFERENT TRADES TO W2 COMPLY WITH DESIGN INTENT. · EXTERIOR FINISH: - 4. ALL WORK DESCRIBED IN THESE DRAWINGS AND A400 (a) METAL PANEL CLADDING w/ Z-BAR SUB-GIRTS -OR- (b) 90mm MASONRY VENEER w/ 25mm AIR SPACE -OR- SPECIFICATIONS ARE TO COMPLY WITH THE CURRENT (c) PRE-FINISHED STEEL SIDING w/ Z-BAR SUB-GIRTS, EDITION OF THE ONTARIO BUILDING CODE (2012) OR REFER TO ELEVATIONS + LEGEND NATIONAL BUILDING CODE (2010) INCLUDING MOST 4300 [14.1ft.] RECENT AMENDMENTS. · CONTINUOUS INSULATION (MIN. R13) D101 · VAPOUR PERMEABLE AIR BARRIER MEMBRANE 5. DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY AND ARE TO BE READ TOGETHER. · 16mm EXTERIOR GRADE GYPSUM BOARD SHEATHING · 152mm STEEL STUDS c/w FULL DEPTH BATT COPYRIGHT 2 SOUTH FLOOR PLAN INSULATION (MIN. R13) · 6mil POLYETHYLENE VAPOUR BARRIER THIS DRAWING IS AN INSTRUMENT OF SERVICE AND IS · 13mm GYPSUM BOARD PROTECTED BY COPYRIGHT AND IS THE SOLE PROPERTY OF · PAINT FINISH (ONE COAT, WHITE) DREESSEN CARDINAL ARCHITECTS INC. COPIES, INCLUDING ELECTRONIC COPIES MAY ONLY BE USED FOR THE PURPOSE TYPICAL EXTERIOR WALL (FIRE RATED) 1HR. FRR, R26 INTENDED, FOR THE SINGLE PROJECT FOR WHICH THEY ARE W2+ · EXTERIOR FINISH: ISSUED AND MAY NOT BE OFFERED FOR SALE OR TRANSFER (a) METAL PANEL CLADDING w/ Z-BAR SUB-GIRTS -OR- WITHOUT THE EXPRESS WRITTEN PERMISSION OF THE (b) 90mm MASONRY VENEER w/ 25mm AIR SPACE -OR- ARCHITECT. 4600 [15.1ft.] (c) PRE-FINISHED STEEL SIDING w/ Z-BAR SUB-GIRTS, REFER TO ELEVATIONS + LEGEND D102 · CONTINUOUS INSULATION (MIN. R13) · VAPOUR PERMEABLE AIR BARRIER MEMBRANE 3 · 16mm EXTERIOR GRADE GYPSUM BOARD SHEATHING ACTUAL NORTH · 152mm STEEL STUDS c/w FULL DEPTH BATT D103 INSULATION (MIN. R13) · 6mil POLYETHYLENE VAPOUR BARRIER RETAIL · 16mm TYPE 'X' GYPSUM BOARD UNIT · PAINT FINISH (ONE COAT, WHITE) A FRR ACHIEVED W/ ULC DESIGN NO. W453 4,280 ft2 GROSS LEASABLE project north 4600 [15.1ft.] 1 HOUR INTERIOR DEMISING WALL 1HR. FRR AREA W3 (Ottawa Zoning By-law · PAINT FINISH (ONE COAT, WHITE) 2008-250 Definition) · 16mm TYPE 'X' GYPSUM BOARD ISSUE RECORD: · 152mm STEEL STUDS c/w FULL DEPTH MINERAL FIBRE D104 D105 D106 D107 D108 D109 INSULATION (ROCK, SLAG OR GLASS) NO. DESCRIPTION DATE 4 20ft CLEAR HEIGHT TO ROOF STRUCTURE · 16mm TYPE 'X' GYPSUM BOARD · PAINT FINISH (ONE COAT, WHITE) 01 FOR CIRCULATION 2019/01/11 FRR ACHIEVED W/ ULC DESIGN NO. W453 02 FOR SITE PLAN APPLICATION 2019/02/01 2 HOUR INTERIOR DEMISING WALL 2HR. FRR 03 FOR OWNER REVIEW / COORDINATION 2019/03/26 W4 · PAINT FINISH (ONE COAT, WHITE) - · 2x LAYER 16mm TYPE 'X' GYPSUM BOARD 04 FOR SITE PLAN APPLICATION / COORD. 2019/04/05 4350 [14.3ft.] A500 · 152mm STEEL STUDS c/w FULL DEPTH MINERAL FIBRE INSULATION (ROCK, SLAG OR GLASS) 05 FOR LEASING COORDINATION 2019/04/09 · 2x LAYER 16mm TYPE 'X' GYPSUM BOARD · PAINT FINISH (ONE COAT, WHITE) 5 FRR ACHIEVED W/ ULC DESIGN NO. W453 D137 RETAIL RETAIL RETAIL RETAIL RETAIL RETAIL RETAIL RETAIL RETAIL UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT B C D E F G H I J 4475 [14.7ft.] 2,720 ft2 GROSS LEASABLE 1,100 ft2 GROSS LEASABLE 1,120 ft2 GROSS LEASABLE 1,120 ft2 GROSS LEASABLE 1,120 ft2 GROSS LEASABLE 1,120 ft2 GROSS LEASABLE 1,120 ft2 GROSS LEASABLE AREA AREA AREA AREA AREA AREA AREA (Ottawa Zoning By-law (Ottawa Zoning By-law (Ottawa Zoning By-law (Ottawa Zoning By-law (Ottawa Zoning By-law (Ottawa Zoning By-law (Ottawa Zoning By-law 2008-250 Definition) 2008-250 Definition) 2008-250 Definition) 2008-250 Definition) 2008-250 Definition) 2008-250 Definition) 2008-250 Definition) 6 20ft CLEAR HEIGHT TO 20ft CLEAR HEIGHT TO 14ft CLEAR HEIGHT TO 14ft CLEAR HEIGHT TO 14ft CLEAR HEIGHT TO 14ft CLEAR HEIGHT TO 14ft CLEAR HEIGHT TO ROOF STRUCTURE ROOF STRUCTURE ROOF STRUCTURE ROOF STRUCTURE ROOF STRUCTURE ROOF STRUCTURE ROOF STRUCTURE 4475 [14.7ft.] 7 D136 525 [1.7ft.] - 4350 [14.3ft.] A400 8 D135 D134 D133 D132 D131 D130 D129 D128 D127 CLIENT 525 [1.7ft.] 525 [1.7ft.] 7873794 CANADA INC 525 [1.7ft.] 4200 [13.8ft.] 6000 [19.7ft.] 6000 [19.7ft.] 7500 [24.6ft.] 1700 [5.6ft.] 4300 [14.1ft.] 6000 [19.7ft.] 6000 [19.7ft.] 6000 [19.7ft.] 6000 [19.7ft.] 6000 [19.7ft.] 43 AURIGA DRIVE, 2ND FLOOR NEPEAN, ONTARIO, K2E 7Y8 DENNIS LAURIN A B C D E F G H J K L M N TEL: 613-656-0672 CONSULTANTS 1 GROUND FLOOR PLAN: WEST NOVATECH ENGINEERING A201 SCALE: 1 : 100 CONSULTANTS LTD. CIVIL ENGINEERS & LANDSCAPE ARCHITECTS 240 MICHAEL COWPLAND DRIVE, SUITE 200 OTTAWA, ONTARIO, K2M 1P6 TEL: 613-254-9643 525 [1.7ft.] CLEALAND JARDINE ENGINEERING LTD. 525 [1.7ft.] STRUCTURAL ENGINEERS 200-580 TERRY FOX DRIVE D116 D110 D111 D112 D113 D114 D115 D117 4 KANATA, ONTARIO, K2L 4B9 TEL: 613-591-1533 EVEREST ENGINEERING LTD. MECHANICAL & ELECTRICAL ENGINEERS PRELIMINARY 6861 FALLOWFIELD ROAD, OTTAWA, ONTARIO, K2S 1B8 TEL: 613-831-5454 - - A500 A500 4350 [14.3ft.] ANNIS, O'SULLIVAN, 5 VOLLEBECK LTD. SURVEYOR 14 CONCOURSE GATE, SUITE 500 OTTAWA, ONTARIO, K2E 7S6 TEL: 613-727-0850 RETAIL RETAIL RETAIL RETAIL RETAIL RETAIL RETAIL RETAIL RETAIL UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT G H I J K L M N O 4475 [14.7ft.] 1,080 ft2 GROSS LEASABLE 1,080 ft2 GROSS LEASABLE 1,120 ft2 GROSS LEASABLE 1,120 ft2 GROSS LEASABLE 1,120 ft2 GROSS LEASABLE 1,120 ft2 GROSS LEASABLE 1,800 ft2 GROSS LEASABLE AREA AREA AREA AREA AREA AREA AREA (Ottawa Zoning By-law (Ottawa Zoning By-law (Ottawa Zoning By-law (Ottawa Zoning By-law (Ottawa Zoning By-law (Ottawa Zoning By-law (Ottawa Zoning By-law 2008-250 Definition) 2008-250 Definition) 2008-250 Definition) 2008-250 Definition) 2008-250 Definition) 2008-250 Definition) 2008-250 Definition) 6 14ft CLEAR HEIGHT TO 14ft CLEAR HEIGHT TO 14ft CLEAR HEIGHT TO 14ft CLEAR HEIGHT TO 14ft CLEAR HEIGHT TO 14ft CLEAR HEIGHT TO 14ft CLEAR HEIGHT TO ROOF STRUCTURE ROOF STRUCTURE ROOF STRUCTURE ROOF STRUCTURE ROOF STRUCTURE ROOF STRUCTURE ROOF STRUCTURE LEASED LEASED LEASED - 4475 [14.7ft.] A400 1 1350 WELLINGTON ST. WEST OTTAWA ON K1Y 3C1 A600 to Dental Office 7 WWW.ARCHITECTSDCA.COM 613.725.2294 to Sandwich Shop to Sandwich D118 to Nail Salon SPRINKLER ELECTRICAL UNIVERSAL 4350 [14.3ft.] ROOM ROOM WASHROOM RM 102 RM 101 RM 100 PROJECT TITLE 8 HERITAGE HILLS RETAIL D121 D120 D119 471 TERRY FOX DRIVE D128 D127 D126 D125 D124 D123 D122 OTTAWA, ONTARIO DRAWING TITLE 525 [1.7ft.] GROUND FLOOR PLAN 6000 [19.7ft.] 6000 [19.7ft.] 6000 [19.7ft.] 6000 [19.7ft.] 6000 [19.7ft.] 6000 [19.7ft.] 4500 [14.8ft.] 6000 [19.7ft.] 525 [1.7ft.] IMPERIAL DIM. - PRELIMINARY DATE DRAWN JOB NO. DRAWING NO. L M N P Q R S T U V 01 | 2019 DR | EB - SCALE REVIEWED 3082 A299 A400 1 : 100 TD 2 GROUND FLOOR PLAN: EAST A201 SCALE: 1 : 100 ARCHITECTURAL D07-12-19-0017 PLAN #17868 PHILIP ZUNDER. BROKER OF RECORD0 [email protected] 613 725 71700 www.decathloncommercial.com 471 Terry Fox Drive OTTAWA (KANATA),ON SITE PLAN PHILIP ZUNDER. BROKER OF RECORD0 [email protected] 613 725 71700 www.decathloncommercial.com 471 Terry FoxOTTAWA Drive(KANATA),ON ELEVATION PLAN • THE BUILDING WILL CONSIST OF OF APPROX 22,140 SQ.FT. • 471 TERRY FOX IS ANCHORED BY A NATIONAL VEHICLE FUEL GAS BAR AND CAR WASH • 95 PARKING SPACES AVAILABLE ON SITE PHILIP ZUNDER. BROKER OF RECORD0 [email protected] 613 725 71700 www.decathloncommercial.com Elementary School Catholic Saint-Remi Eagleson St. Gabriel School All Saints Catholic High School Terry Fox Drive 471 Terry Fox Drive Kanata Avenue Terry Fox Drive Campeau Queensway Terry Fox Drive Katimavik Queensway Palladium PHILIP ZUNDER. BROKER OF RECORD0 [email protected] 613 725 71700 www.decathloncommercial.com 471 Terry FoxOTTAWA Drive (KANATA),ON DEMOGRAPHICS POPULATION WITHIN 5KM RADIUS CONSUMER SPENDING TOTALS 2016 AVG HOUSEHOLD INCOME: PHILIP ZUNDER.
Recommended publications
  • Minto Commercial Properties Inc. Illustrative Purposes
    Morgan’s Grant (Kanata) | Retail Plaza (73,000 sq. ft.) OTTAWA OVERVIEW MAP LOCATION MAP AERIAL MAP SITE MAP DUNROBIN ROAD FERRY ROAD 2001 Population and Households TORBOLTON RIDGE ROAD Zone Population Households GALETTA SIDE ROAD FITZROY PTA 6,909 2,165 HARBOUR CONSTANCE BAY STA1 14,544 5,015 QUEBEC STA2 12,790 4,470 CARP ROAD STA Total 27,334 9,485 WOODKILTON ROAD TA Total 34,243 11,650 VANCE SIDE ROAD 5 LINE ROAD Source: Statistics Canada 2001 Census Population Projections (TA Total) Year Population LOGGERS WAY JOHN SHAW ROAD DUNROBIN TORWOOD DRIVE 2005 41,200 MOHR ROAD 2010 50,500 DUNROBIN ROAD STA 2 2 LINE ROAD KERWIN ROAD KERWIN 2015 58,200 KINBURN SIDEROAD DIAMONDVIEW ROAD KINBURN PTA RIDDELL DRIVE MARCH VALLEY RD. DONALD B. MUNRO DRIVE 17 MARCHURST ROAD THOMAS A. DOLAN PARKWAY FARMVIEW ROAD MARCH ROAD OTTAWA RIVER 2 LINE ROAD UPPER DWYER HILL ROAD KLONDIKE ROAD CARP MARCH ROAD LEGGET DRIVESANDHILL ROAD THOMAS ARGUE ROAD TERRY FOX DRIVE SUBJECT SITE GOULBOURNFORCEDRD. SHANNA ROAD HINES ROAD CARLING AVENUEOTTAWA DIAMONDVIEW ROAD OLD CARPKANATA ROAD TERON ROAD CARP ROAD MARSHWOOD ROAD 417 417 HUNTMARSTA DRIVE 1 CONCESSION ROAD 12 OLD CREEK DRIVE TIMM ROAD CAMPEAU DRIVE ROBERTSON ROAD PANMURE ROAD MARCH ROAD PALLADIUM DRIVE HAZELDEAN ROAD RICHARDSON SIDE ROAD MAPLE GROVE ROAD 7 STITTSVILLE For discussion and/or Minto Commercial Properties Inc. illustrative purposes. Subject to change without notice 613-786-3000 minto.com Morgan’s Grant (Kanata) | Retail Plaza (73,000 sq. ft.) OTTAWA OVERVIEW MAP LOCATION MAP AERIAL MAP SITE MAP Future Residential Existing Future Residential Residential MARCH ROAD KLONDIKE ROAD FLAMBOROUGH WAY MERSEY DRIVE MORGAN’S GRANT For discussion and/or Minto Commercial Properties Inc.
    [Show full text]
  • Project Synopsis
    Final Draft Road Network Development Report Submitted to the City of Ottawa by IBI Group September 2013 Table of Contents 1. Introduction .......................................................................................... 1 1.1 Objectives ............................................................................................................ 1 1.2 Approach ............................................................................................................. 1 1.3 Report Structure .................................................................................................. 3 2. Background Information ...................................................................... 4 2.1 The TRANS Screenline System ......................................................................... 4 2.2 The TRANS Forecasting Model ......................................................................... 4 2.3 The 2008 Transportation Master Plan ............................................................... 7 2.4 Progress Since 2008 ........................................................................................... 9 Community Design Plans and Other Studies ................................................................. 9 Environmental Assessments ........................................................................................ 10 Approvals and Construction .......................................................................................... 10 3. Needs and Opportunities ..................................................................
    [Show full text]
  • 2021 Forecast Capital Construction - AAC (Short List) the List Below Shows the 2020/2021 Projects on Which Your Feedback Is Requested
    2020-2021 Forecast Capital Construction - AAC (Short List) The list below shows the 2020/2021 projects on which your feedback is requested. For these projects, the City of Ottawa Accessibility Design Standards will be applied to the greatest extent possible. Many of these projects contain exterior paths of travel for which the potention provision and placement of a rest area will be decided in the upcoming design phase of the project based on numerous factors, such as the results of the consultation, available space, property requirements, location of transit stops, and volume of pedestrian traffic. If a rest area is to be provided on an individual project, its design would follow the Accessibility Design Standards. Many of the projects listed have existing on-street parking areas which are available to Accessible Parking Permit holders. Any adjustments to those areas would be determined during the upcoming design phase of the project. May 07, 2020 Location Description From Street To Street Type of Work Ward Description Item Year Construction Construction 1 2020 OLD GREENBANK ROAD AND KILBIRNIE DRIVE NOT AVAILABLE NOT AVAILABLE Intersection Modifications Jan Harder - 3 2 2020 VARLEY DRIVE BEAVERBROOK LANE CARR CRESECENT New Sidewalks Jenna Sudds - 4 3 2020 MARCH ROAD AND STREET C AND E NOT AVAILABLE NOT AVAILABLE Intersection Modifications Eli El-Chantiry - 5 4 2020 FERNBANK ROAD AND COPE DRIVE NOT AVAILABLE NOT AVAILABLE Intersection Modifications Glen Gower - 6, Scott Moffatt - 21 5 2020 CEDARVIEW ROAD RICHMOND ROAD BRUIN ROAD Cycling
    [Show full text]
  • Pathway Network for Canada's Capital Region 2006 Strategic Plan PLANI
    Pathway Network for Canada’s Capital Region 2006 Strategic Plan PLANI-CITÉ i June 2006 Pathway Network for Canada’s Capital Region 2006 Strategic Plan THE VISION The National Capital Commission (NCC) and its partners propose the following as a framework for the planning and development of the Capital Pathway network for the next 10 years: Multi-purpose use The Capital Pathway network covers Canada’s Capital Region in its entirety. It is a multi-purpose recreational and tourist network, which also supports non-motorized commuting vocations. Accessibility and safety The network extends to and links natural and built areas. Through its layout and design standards, the network encourages a quality user experience and accessibility, emphasizing the recognition of the “Green Capital”, and highlighting symbolic points of interest within the Capital. The network provides access to waterways, green spaces, cultural and heritage features while supporting the protection of natural areas and offering a wide range of easily accessible services. User education and awareness programs targeting pathway sharing in a respectful and tolerant manner result in a safe and pleasant experience. Connectivity The network, through its linkage with local cycling routes and regional/national trails, is connected to other non-motorized transportation networks within the region to encourage sustainable transportation and forms a key component of Canada’s Capital recreational and cycling experience. Recognition The network, as a result of its multi use vocation, its extensive and far reaching system of pathways and connection with regional, provincial and national trails and pathways within and outside Canada’s Capital Region as well as the quality of the experience is regarded as one of North America’s best.
    [Show full text]
  • Welcome to Kanata North Message from Councillor Wilkinson
    WELCOME TO KANATA NORTH MESSAGE FROM COUNCILLOR WILKINSON anata North is the most fantastic ward in the City of Ottawa. As well as the Kanata North Business K Park, the largest employment area outside the City core, it contains natural environment lands, a provincially significant wetland, distinctive residential areas, the town centre that serves both Kanata North and Kanata South, schools, churches and retail areas. Just across Highway 417 is Canadian Tire Place, the home of the Ottawa Senators, and under construction is an outlet mall and Bass Pro Shop. I’ve had the great opportunity of representing this area on municipal councils for 25 years, with 9 of those years as Head of Council and 7 of those years as Mayor of Kanata, when Kanata was a separate municipality. My job is to serve all aspects of the community, from individual con- cerns to dealing with large developments and the services they need. Welcome to Kanata North. Feel free to contact me via phone 613-580-2474 or email Marianne.Wilkinson@ ottawa.ca if you have any concerns or suggestions to make Kanata North an even better place. MESSAGE FROM KANATA NORTH BIA anata North is a fantastic place to live, work and play. We have over 500 businesses doing incredible work K – and yet we have access to green space and many, many trails, right outside our door. Truthfully, we think there is no better place! The Kanata North BIA works hard every day to support our local businesses, and to promote the area as a center of expertise in technology and innovation.
    [Show full text]
  • Phase One Environmental Site Assessment 950 Terry Fox Drive Ottawa, Ontario
    Phase One Environmental Site Assessment 950 Terry Fox Drive Ottawa, Ontario Houle Chevrier Engineering Ltd. • 180 Wescar Lane • Ottawa, Ontario • K0A 1L0 • www.hceng.ca Submitted to: SPB Developments Inc. 114 Arbourbrook Blvd. Ottawa, Ontario K0A 1L0 Phase One Environmental Site Assessment 950 Terry Fox Drive Ottawa, Ontario September 11, 2014 Project: 14-346 Houle Chevrier Engineering Ltd. • 180 Wescar Lane • Ottawa, Ontario • K0A 1L0 • www.hceng.ca EXECUTIVE SUMMARY Houle Chevrier Engineering Ltd. (HCEL) was retained by SPB Developments Inc. to carry out a Phase One Environmental Site Assessment (ESA) for the properties located at 950 Terry Fox Drive and the southeast portion of the adjacent property located at 820 Terry Fox Drive in Ottawa, Ontario (hereafter collectively referred to as “the subject property”). The primary objective of this Phase One ESA was to identify any former or current potentially contaminating activities at the subject property and its vicinity to determine if they create any areas of potential environmental concern on the subject property. This Phase One ESA was carried out in accordance with Ontario Regulation 153/04 made under the Environmental Protection Act and meets the requirements of Part VII (Sections 23 to 31) and Schedule D of the regulation. Section 1.0 of this report provides a brief description of the site and Section 2.0 of this report provides the scope of investigation. Section 3.0 presents the findings of the records review. Section 4.0 presents the results of the interviews conducted. Section 5.0 presents the findings of the site reconnaissance. Section 6.0 provides a review and evaluation of information gathered.
    [Show full text]
  • REAL STRATEGY Realstrategy.Com
    Real Strategy Market Outlook: Q2 2019 RealStrategy.com R E A L S T R A T E G Y Real Strategy Market Outlook: Q2 2019 Ottawa’s office market continued to experience significant demand for office space across all sectors. Overall office availability fell to 8.5% from 8.9% the previous quarter. This represents six straight quarters of falling availability, a clear sign that the market is moving to favour landlords over tenants. Real Strategy is predicting availability to continue falling for the balance of the year until such time as the results of the Federal election are known. DOWNTOWN SUBMARKET ANALYSIS Available space in Class B and Class C buildings continued to increase sharply as the Federal Government continued its exodus from older properties in favour of National Defence’s new headquarters in Bells Corners and new product downtown. Class A availability remains stable indicating that demand may have levelled off for top tier properties. Real Strategy is predicting significant price reduction in older Class B and Class C buildings over the course of the remainder of 2019, while Class A rents should remain stable. Downtown Available Rate by Class Greater Ottawa Availability 30 14% 25 25 12% 20 10% 20 15 8% 15 6% 10 10 4% 5 5 2% 0 0 0% Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 2014 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019 20142014201520152015201520162016201620162017201720172017201820182018201820192019 Class A (%) Class B (%) Class C (%) Buildings with Available Area greater than 50,000 sq.
    [Show full text]
  • New Fernbank Elementary School Opening Grade Structure, Program and Attendance Boundary Study
    New Fernbank Elementary School Opening Grade Structure, Program and Attendance Boundary Study Public Consultation Meeting Thursday May 23rd, 2019 7:00 PM – 9:00 PM Gymnasium John Young Elementary School 5 Morton Drive Ottawa Table of Contents Page 1. Introduction and Background 1 2. Planning Considerations 1-2 3. Working Group Meetings 2-3 4. Proposed New Fernbank ES Attendance Boundary, Program, 3-4 and Opening Grade Structure 5. Proposed Revisions to Middle French Immersion Program 4 Attendance Boundaries 6. Next Steps 5 7. Study Timeline 6 8. General Location Map 7 9. Proposed Attendance Boundary and Five Year Enrolment Projections 8-15 10. Impact Summary by School 16-18 11. Other Attendance Boundary Options Considered 19-23 12. Question and Answer Section 24-26 13. Supplementary Information 27 • Core Study Schools Attendance Boundaries 28-32 • 31 October 2018 Status Quo Enrolments 33 • 2019-2025 Enrolment Projections – Status Quo 34-40 14. Comment Sheet 41-42 Introduction and Background This study has been initiated in order to set the attendance boundary, opening grade structure, and program offering for a future new Ottawa-Carleton District School Board (OCDSB) elementary school to be opened in the Fernbank development area of Stittsville. The need for a new elementary school was first identified in 2008 as part of the City of Ottawa’s Fernbank Community Design Plan (CDP). In total the CDP process resulted in the identification of a requirement for four future elementary school sites and one secondary school site. In May 2018 the Board approved a list of updated capital priorities which included the opening of a new elementary school in the Fernbank development area as the highest ranked project.
    [Show full text]
  • 668 Bus Time Schedule & Line Route
    668 bus time schedule & line map 668 Bridlewood View In Website Mode The 668 bus line (Bridlewood) has 2 routes. For regular weekdays, their operation hours are: (1) Bridlewood: 2:15 PM - 2:25 PM (2) Holy Trinity H.S: 7:12 AM - 7:17 AM Use the Moovit App to ƒnd the closest 668 bus station near you and ƒnd out when is the next 668 bus arriving. Direction: Bridlewood 668 bus Time Schedule 48 stops Bridlewood Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday Not Operational Holy Trinity H.S 17 Liston Cres, Ottawa Tuesday 2:15 PM - 2:25 PM Katimavik / Mcgibbon Wednesday 2:15 PM - 2:25 PM 13 Liston Cres, Ottawa Thursday Not Operational Katimavik / Mcgibbon Friday Not Operational 5 Robarts Cres, Ottawa Saturday Not Operational Katimavik / Davis 28 Dorey Crt, Ottawa Katimavik / Ad. 200 118 Rowe Dr, Ottawa 668 bus Info Direction: Bridlewood Katimavik / Terry Fox Stops: 48 90 Rowe Dr, Ottawa Trip Duration: 35 min Line Summary: Holy Trinity H.S, Katimavik / Terry Fox / Palladium Mcgibbon, Katimavik / Mcgibbon, Katimavik / Davis, Terry Fox Drive, Ottawa Katimavik / Ad. 200, Katimavik / Terry Fox, Terry Fox / Palladium, Terry Fox / Maple Grove, Terry Fox / Terry Fox / Maple Grove Edgewater, Hazeldean / Terry Fox, Hazeldean / 8 Gesner Crt, Ottawa Young, Hazeldean / Castlefrank, Hazeldean / Castlefrank, 436 Hazeldean, Hazeldean / Carbrooke, Terry Fox / Edgewater Hazeldean / Carbrook, Eagleson / Hazeldean, 651 Terry Fox Drive, Ottawa Eagleson / Abbeyhill, Eagleson / Palomino, Eagleson / Rothesay, Eagleson / Ad. 500, Eagleson Ad. 630,
    [Show full text]
  • KANATA Thesenovember 26, 2020 [email protected] 613-45-VOICE [email protected] Vol
    CommunityWRAP Voice - November 26, 2020 1 Your CommunityVoice KANATA TheseNovember 26, 2020 [email protected] 613-45-VOICE www.ottawavoice.ca [email protected] Vol. 3 No. 23 UNTIL DECEMBER 4TH Blackwork. People Friday tell us that our starts now! Blundstone CSA work boot is the lightest work boot they’ve ever offALL WINTER worn. Pretty incredible when BOOTS you consider that these rugged $ boots are more durable than most heavy clunkers. All-day comfort even on concrete. Pull-on, kick-off 20 laceless convenience. These work overtime. #164 CSA Greenpatch Crazy Horse Brown $219.95 BLUNDSTONE.CA Excludes Blundstones. Discounts cannot be combined with other offers. Only applicable to in stock merchandise. Some restrictions. See in store for details. KANATA - 499 Terry Fox Drive - (613) 799-6101 BARRHAVEN - 3777 Strandherd Drive - (613) 825-6100 KEMPTVILLE - 2727 County Road 43 - (613) 258- 6100 BARRHAVEN -Follow 3777 Strandherd us on Instagram Drive - (613) 825 -www.tandashoes.com 6100 Like us on Facebook KEMPTVILLE - 2727 County Road 43 - (613) 258 - 6100 2 November 26, 2020 - Community Voice 2 November 26, 2020 - WRAP Black Friday startsUNTIL DECEMBER now! 4TH % 50ALL EARTH BOOTSoff & SHOES Community Voice - November 26, 2020 1 Free consultations. No fees until we settle. Disability insurance denials, car crashes, wrongful dismissal, slip and fall accidents and medical malpractice. Call today 613-599-3535 or www.gironeslawyers.com You have nothing to lose and so much to gain. Your CommunityVoice KANATA November 26, 2020 [email protected] 613-45-VOICE www.ottawavoice.ca [email protected] Vol. 3 No. 23 City planners reject ClubLink development proposal BY PATRICK UGUCCIONI The so-called 40-per- is not expected until cent Agreement is cur- January 2022 because of a City planning staff op- rently the subject of a backlog due to COVID-19.
    [Show full text]
  • 1 Report to Rapport Au: Planning Committee Comité De L
    1 Report to Rapport au: Planning Committee Comité de l'urbanisme and Council et au Conseil June 23, 2014 23 juin 2014 Submitted by Soumis par: Nancy Schepers, Deputy City Manager / Directrice municipale adjointe, Planning and Infrastructure / Urbanisme et Infrastructure Contact Person Personne ressource: Lee Ann Snedden, Manager / Gestionnaire, Policy Development and Urban Design / Élaboration de la politique et conception urbaine, Planning and Growth Management / Urbanisme et Gestion de la croissance (613) 580-2424, 25779, [email protected] Ward: KANATA NORTH (4) / KANATA File Number: ACS2014-PAI-PGM-0142 NORD (4) and KANTA SOUTH (23) / KANATA-SUD (23) SUBJECT: City-initiated Official Plan and Zoning By-law amendment regarding building heights in Kanata OBJET: Modification du Plan officiel et du Règlement de zonage demandé par la Ville relative à la hauteur des bâtiments à Kanata 2 REPORT RECOMMENDATIONS That Planning Committee recommend Council approve an amendment to: 1. Zoning By-law 2008-250 for multiple properties throughout Kanata North and Kanata South, as shown in Document 1 and detailed in Document 2; and 2. The Official Plan, Volume 2b, Former City of Kanata, 5.7 Town Centre, as detailed in Document 3. RECOMMANDATIONS DU RAPPORT Que le Comité de l’urbanisme recommande au Conseil d’approuver une modification au : 1. Règlement de zonage 2008-250 pour plusieurs propriétés à Kanata Nord et à Kanata Sud, comme le montre le document 1 et l’explique en détail le document 2; 2. Plan officiel, volume 2B, ancienne Ville de Kanata, 5.7 Centre de ville, comme l’explique en détail le document 3.
    [Show full text]
  • 2011 Q4 Retail
    MA RKET BEAT RETAIL SNAPSHOT OTTAWA , ON Q4 201 1 A Cushman & Wakefield Alliance Research Publication ECONOMIC OVERVIEW In contrast to the national employment loss of almost anywhere else in Canada; spending an average of $16,000 a 18,600, the Ottawa-Gatineau region added year on commercial goods and services. This translates into 1,900 jobs in November. However, due to a approximately $472 for every square foot of retail in the city. Most larger labour force, the local unemployment other Canadian cities come in between $250 and $350 per square rate rose 0.4 percentage points to 6.3%. This foot (psf) of retail space annually. This spending, combined with the marks the highest unemployment rate since this past April. This rate average Ottawa income being in the top three in the country, makes still compares favourably to the national unemployment rate, which the city an attractive place for retailers to establish a presence. increased to 7.4%. Improving local sectors included professional, ECONOMIC INDICATORS scientific, technical, and educational services, while job losses NATIONAL 2010 2011 2012F occurred within the public administration and construction sectors. GDP Growth 2.8 % 1.4 % 1.8 % Sales of existing homes in the Ottawa area set an all-time record in November with sales of 1,020 properties, an increase of 8.5% from CPI Growth 2.5 % 3.1 % 2.0 % one year ago. The number of properties on the market is higher Retail Sales Growth 5.4 % 3.6 % 3.7 % compared to last year, indicating current homeowners are confident that it is a good time to sell, and when, combined with the strong REGION 2010 2011 2012F sales numbers, this demonstrates that buyers feel this is the time to Household Income $43,235 $43, 811 $44, 490 buy.
    [Show full text]