Synthesis Model for Experimental Simulation of Document Code Normal and Attack Conditions-IFSTTAR Version C Status Final

Total Page:16

File Type:pdf, Size:1020Kb

Synthesis Model for Experimental Simulation of Document Code Normal and Attack Conditions-IFSTTAR Version C Status Final SECRET SECurity of Railways against Electromagnetic aTtacks Grant Agreement number: 285136 Funding Scheme: Collaborative project Start date of the contract: 01/08/2012 Project website address: http://www.secret-project.eu Deliverable D 3.1 "Synthesis model" for experimental simulation of normal and attack conditions: methodology and results th Submission date: 24 July 2013 Deliverable on Railway electromagnetic environment analysis Date: 24/07/2013 Distribution: All partners Manager: IFSTTAR SECRET Project Grant Agreement number: 285136 Document details: "Synthesis model" for experimental simulation of normal and attack Title conditions: methodology and results Workpackage WP3 Date 28/06/2013 M. Heddebaut, J.P. Ghys, S. Ambellouis, D. Sodoyer, V. Deniau, S. Mili Author(s) V. Beauvois, H. Philippe Responsible Partner IFSTTAR SEC-D3.1-C-07 2013-Synthesis model for experimental simulation of Document Code normal and attack conditions-IFSTTAR Version C Status Final Dissemination level: Project co-funded by the European Commission within the Seventh Framework Programme PU Public X PP Restricted to other programme participants (including the Commission Services) Restricted to a group specified by the consortium (including the Commission) RE Services) Confidential, only for members of the consortium (including the Commission CO Services) Document history: Revision Date Authors Description Initial version 28/06/2013 M. Heddebaut, Draft v1.0 J.P. Ghys, S. Ambellouis, D. Sodoyer, V. Deniau, S. Mili, V. Beauvois, H. Philippe Minor 08/07/210 / v1.1 modifications Minor 11/07/210 / v1.2 modifications after reviewing SEC-D3.1-C-07 2013-"Synthesis model" for experimental simulation of normal and attack conditions- IFSTTAR 24/07/2013 2/42 SECRET Project Grant Agreement number: 285136 Table of content 1. Executive summary ___________________________________________________ 6 2. Introduction __________________________________________________________ 6 2.1. Purpose of the document ________________________________________________ 6 2.2. Definitions and acronyms ________________________________________________ 6 3. Considered railway critical systems ____________________________________ 8 3.1. Ground to train communication based on GSM-R __________________________ 9 3.2. Railway station operation based on TETRA _______________________________ 9 3.3. Train location and services based on GNSS/GPS _________________________ 10 3.4. Spot communication using EUROBALISE ________________________________ 11 3.5. Conclusion ____________________________________________________________ 12 4. Railway critical environments to be considered ________________________ 12 4.1. Lines __________________________________________________________________ 12 4.2. Stations _______________________________________________________________ 12 5. European selected railway sites and configurations ____________________ 14 5.1. LGV Est _______________________________________________________________ 14 5.2. Paris Gare de l’Est _____________________________________________________ 14 5.3. Liège Guillemins _______________________________________________________ 15 6. Normal environment measurement setup ______________________________ 16 7. Results of in situ measurement campaigns ____________________________ 17 7.1. Measurements along the LGV Est from France to Germany ________________ 17 7.2. Measurements in Paris Gare de l’Est ____________________________________ 20 7.2.1. Results obtained along the platform (Gare de l’Est - loc. A) ______________________ 22 7.2.2. Results in front of the control-command centre (Gare de l’Est - loc. B) ____________ 24 7.2.3. Junction between the railway and the subway stations (Gare de l’Est - loc. C) ______ 26 7.3. Measurements in Liège Guillemins ______________________________________ 27 8. Inputs for the definition of normal EM conditions _______________________ 30 8.1. TETRA 410-430 MHz ____________________________________________________ 30 8.2. GSM-R ________________________________________________________________ 30 8.2.1. Downlink frequency band 921-925 MHz _______________________________________ 30 8.2.2. Uplink frequency band 876-880 MHz __________________________________________ 30 8.3. GNSS - Civilian GPS ____________________________________________________ 32 8.4. EUROBALISE __________________________________________________________ 32 9. Anomaly detection techniques ________________________________________ 32 9.1. Introduction ___________________________________________________________ 32 9.2. Generalities ____________________________________________________________ 33 9.3. Description of the most common techniques _____________________________ 33 9.3.1. Discriminative methods ______________________________________________________ 33 SEC-D3.1-C-07 2013-"Synthesis model" for experimental simulation of normal and attack conditions- IFSTTAR 24/07/2013 3/42 SECRET Project Grant Agreement number: 285136 9.3.2. Generative methods ________________________________________________________ 34 9.4. Towards EM anomaly detection _________________________________________ 35 9.5. Bibliography of section 9 _______________________________________________ 35 10. Preliminary results using the experimental collected data _____________ 36 10.1. Analysis and model of the EM environment _____________________________ 36 10.1.1. Introduction and context ____________________________________________________ 36 10.1.2. Analysis and Characterization of the EM environment in normal conditions _______ 36 10.1.3. EM model : Intrinsic variations and variations in function of time ________________ 40 10.1.4. EM Spectrum model: Variations in function the location observation. ____________ 41 11. Conclusion ________________________________________________________ 41 12. Acknowledgements ________________________________________________ 41 SEC-D3.1-C-07 2013-"Synthesis model" for experimental simulation of normal and attack conditions- IFSTTAR 24/07/2013 4/42 SECRET Project Grant Agreement number: 285136 List of figures Figure 1: ERTMS/ETCS targets for EM threats ...................................................................................... 8 Figure 2: Eurobalise/BTM transmissions principle ................................................................................ 11 Table 1: Railway systems and associated electromagnetic parameters .............................................. 12 Figure 3: LGV Est line as seen from a measurement site ..................................................................... 14 Figure 4: Tracks and platforms of the Paris Gare de l’Est .................................................................... 15 Figure 5: Tracks and platforms of the Liège Gare des Guillemins ........................................................ 15 Figure 6a: Electric field measurement using the conical dipole (Paris, gare de l’Est) .......................... 16 Figure 6b: Magnetic field measurement using the active loop (Liège, Guillemins gare) ...................... 16 Figure 7a: Laboratory van and wideband conical dipole installed on top the van along LGV Est ........ 16 Figure 7b: Measuring equipment inside the laboratory van .................................................................. 16 Figure 8: 875-975 MHz GSM-R downlink LGV Est record .................................................................... 17 Figure 9: 918-928 MHz GSM-R downlink LGV Est ............................................................................... 18 Figure 10: 922 MHz BTS centered record – span = 120 kHz ............................................................... 18 Figure 11: 873-883 MHz GSM-R uplink LGV Est record ...................................................................... 19 Figure 12: GPS-L1 typical LGV Est record ............................................................................................ 19 Figure 13: Eurobalise 27 MHz band typical record ............................................................................... 20 Figure 14: Measurement locations on a platform (A), in front of the station control room (loc. A & B) . 21 Figure 15: Measurement at the junction between railway and subway stations (loc. C). ..................... 21 Figure 16: GSM-R downlink frequencies - span = 100 MHz (Gare de l’Est - loc. A). ........................... 22 Figure 17: GSM-R downlink frequencies - span = 10 MHz (Gare de l’Est - loc. A). ............................. 22 Figure 18: GSM-R uplink frequencies - span = 10 MHz (Gare de l’Est - loc. A). .................................. 23 Figure 19: GPS L1 civilian frequency - span = 2 MHz (Gare de l’Est - loc. A). ..................................... 23 Figure 20: Measurements at TETRA frequencies - span = 40 MHz (Gare de l’Est - loc. B). ................ 24 Figure 21: Measurements at TETRA frequencies - span = 20 kHz (Gare de l’Est - loc. B). ................. 24 Figure 22: GSM-R downlink frequencies - span = 100 MHz (Gare de l’Est - loc. B). ........................... 25 Figure 23: GSM-R downlink frequency band - span = 10 MHz (Gare de l’Est - loc. B). ....................... 25 Figure 24: GSM-R uplink frequencies - span = 10 MHz (Gare de l’Est - loc. B). .................................. 26 Figure 25: TETRA frequencies - span = 40 MHz (Gare de l’Est - loc. C). ............................................ 26 Figure 26: GSM-R downlink frequencies - span = 10 MHz (Gare de l’Est - loc. C). ............................. 27 Figure 27: GSM-R downlink frequencies - span = 100 MHz (Guillemins)............................................
Recommended publications
  • Lessen HSL Zuid Voor Hogesnelheidslijn Amsterdam
    > Retouradres Postbus 20901 2500 EX Den Haag De voorzitter van de Tweede Kamer Ministerie van Infrastructuur en der Staten-Generaal Waterstaat Binnenhof 4 Rijnstraat 8 2513 AA DEN HAAG 2515 XP Den Haag Postbus 20901 2500 EX Den Haag T 070-456 0000 F 070-456 1111 Ons kenmerk IENW/BSK-2018/160673 Bijlage(n) Datum 27 september 2018 - VGR 41 HSL-Zuid e Betreft Aanbieding 41 Voortgangsrapportage HSL-Zuid en - Langetermijnvisie HSL- Langetermijnvisie HSL van NS en ProRail Zuid van NS en ProRail Geachte voorzitter, Met deze brief bied ik uw Kamer de 41e Voortgangsrapportage (VGR) HSL-Zuid en de langetermijnvisie HSL-Zuid van NS en ProRail aan. Hieronder schets ik de belangrijkste ontwikkelingen rondom de HSL-Zuid en licht ik de VGR en langetermijnvisie nader toe. Ontwikkelingen vervoer Er is de afgelopen jaren door NS en ProRail hard gewerkt om de prestaties op de HSL-Zuid te verbeteren en dat leidt tot resultaat. In het kader van het gezamenlijke Verbeterprogramma HSL-Zuid is een reeks aan maatregelen uitgevoerd. De gemiddelde prestaties van dit jaar op de HSL-Zuid liggen tot nu toe op alle prestatiegebieden boven de in de concessie afgesproken bodemwaarden.1 Bovendien blijkt dat er een toenemende vraag is naar de diensten die worden aangeboden op de HSL-Zuid, zowel voor binnenlands als internationaal vervoer. De afgelopen jaren is de Intercity Den Haag-Eindhoven (2017) over de HSL-Zuid gaan rijden en per april 2018 zijn zowel de Intercity Brussel als Eurostar over de HSL-Zuid geïntroduceerd. Het aanbod van Thalys wordt geoptimaliseerd door vanaf april 2019 Marne la Vallée (Disneyland) en de Luchthaven Charles de Gaulle aan te doen.
    [Show full text]
  • Concept TEE 2.0 Will Interlink the Individual Optimized Systems to Form a Range of European Services Designed to Reduce International Journey Times
    International high-speed and overnight rail services to promote climate change mitigation Revised and enlarged Version – May 2021 Secretariat of the Federal Government Commissioner for Rail Transport www.bmvi.de | 27 November 2020 1 Contents 1. General introduction 2. Development of the Concept 3. Rolling Stock Considerations 4. Conclusion and next steps 5. Blueprint study – Detailed descriptions of the TEE 2.0 lines 2.0 www.bmvi.de | 12 May 2021 2 Contents 1. General introduction 2. Development of the Concept 3. Rolling Stock Considerations 4. Conclusion and next steps 5. Blueprint study – Detailed descriptions of the TEE 2.0 lines 2.0 www.bmvi.de | 12 May 2021 3 Societal change in travel behaviour – wider clientele Changes in travel choices due to effects such as • greater awareness of climate change (“flying shame”) • shorter journey times thanks to growing high-speed networks • direct links to and from smaller towns and cities located along the routes of the mainlines Opportunity for new message from railways – new TEE network High-speed trains over long distances (passing through 4, but at least 3 countries) The TransEuropExpress 2.0, or TEE 2.0 for short, is thus a symbol of cohesion and further European integration. Opportunity presented by the establishment of clock-face timetables TEE 2.0 and attractive overnight services can be integrated in the clock- face timetables and will not use any paths at the expense of freight trains. 2.0 www.bmvi.de | 12 May 2021 4 Clock-face timetabling such as the “Deutsch- Züge sind bereit zur Abfahrt (00) Abfahrt in den Umsteigebahnhöfen (05) landtakt” to form the basis of new TEE network Ankunft in den Umsteigebahnhöfen (55) Züge sind bereit zur Abfahrt (00) • “More frequent – faster – everywhere”: clock-face timetable will establish a new, transparent principle of infrastructure planning and capacity management.
    [Show full text]
  • A Resource Book on High Speed Rail Technology
    A resource book on High Speed Rail Technology A Resource Book On High Speed Rail Technology Important: The contents of this book are a work of compilation from various international journals, publications, books, data/information available on the e-world etc. No part of this book is an expression of the views of any individual, organisation etc. Neither the Government of India nor the Railway Board and Research Designs and Standards Organisation are responsible for the opinion or statements made therein. The book is meant as a resource material and a ready reckoner information on the work done so far and also the future strategies, by various railways world-over in the field of High Speed Railways. There is no copyright violation in preparation of this book. Published on: May, 2011 Compiled by: Gaurav Agarwal, Director(Efficiency &Research)/Mech Engg. Ministry of Railways, Govt. of India Government of India Ministry of Railways (Research, Design & Standards Organisation, Lucknow) FOREWORD High‐speed rail (HSR) brings clear and significant economic benefits to the communities they serve not only in terms of rise in GDP, but also in terms of its environmental impact. HSR uses much less energy per mile than auto or air travel. HSR transit is thus quickly gaining popularity as a key alternative in transportation policy planning. HSR also presents significant technological challenges as it requires synergy amongst a number of engineering disciplines. It is heartening to see the book “High Speed Rail Technology” by Mr. Gaurav Agarwal, Director(E&R)/ME, Railway Board which is a sincere effort towards collating all the relevant information relating to HSR at one place.
    [Show full text]
  • International System Summary: BELGIUM
    International System Summary: BELGIUM UIC Map of Belgium’s High-Speed Rail Lines Belgium is a relatively small country located in Western per capita of $37,600 ranks 30th in the world. Brussels is Europe, bordering France, Germany, Luxembourg, and the seat of both the European Union and NATO, largely a The Netherlands. Its population ranks 82nd in the world reflection of Belgium’s location as the crossroads of West- with over 10.4 million people, with 97 percent of that pop- ern Europe. Belgium currently has 130 miles of high-speed ulation listed as urban. The capital of Brussels is the major rail in operation, much of it connecting with neighboring population center with almost 1.9 million people and Ant- countries. Above is a map of the Belgian high-speed rail werp is second with over 961,000 residents. The country’s lines. GDP of $412 billion ranks 32nd in the world; and its GDP INTERNATIONAL HIGH-SPEED RAIL SYSTEM SUMMARY: BELGIUM | 1 The Thalys service between Paris and Brussels reduced the travel time from 2 hours to 90 minutes. Service levels in- clude 28 trains in each direction each day, or one every half hour on weekdays. The high-speed rail service reduced the travel time from 2 hours to 90 minutes. The 100 percent double-tracked high-speed rail network crosses several different terrains throughout the coun- try. The following table describes the variety in the types of structures on each line segment. Segments L1 and L2 both are almost all earthwork, which signifies generally flat, level terrain.
    [Show full text]
  • Operational Transitions in Railway Infrastructure
    Operational transitions in railway infrastructure I II Master thesis Operational transitions in railway infrastructure Maurits de Hek 4468384 MSc. Transport, Infrastructure & Logistics Keywords: Train operations, railway infrastructure, human factors, transitions, train service disruptions, automatic train protection, vertical track alignment, train dispatching, power supply system Hardinxveld-Giessendam 03-09-2020 Graduation committee: Prof. R.M.P. Goverde – TU Delft Dr. J.H. Baggen – TU Delft Dr. M.L.C. de Bruijne – TU Delft Ing. F. Bokhorst – ProRail III IV Preface Terwijl de kinderen in mijn straat hun ongewoon lange schoolvrije periode gebruikten om de sloot voor mijn huis uit te baggeren, wat de buurt vervulde met een enorme moeraslucht, en visten naar rivierkreeftjes, die daar niet horen te zitten, zat ik op mijn kamer te schrijven aan mijn afstudeerrapport. Dag in, dag uit herhaalde dit tafereel zich. Soms had ik de neiging om me bij hen te voegen, zeker als de zinnen met moeite uit mijn vingers kwamen. Het feit dat dit rapport af is en voor u ligt, is daarom niet te danken aan mijn eigen kracht, maar door de gemeenschappelijke inspanning van velen die mij de afgelopen maanden ondersteund hebben. Dit rapport is tot stand gekomen dankzij de onbezoldigde hulp van vele mensen. Mijn meest nabije begeleiders, John Baggen, Frank Bokhorst en Mark de Bruijne wil ik hartelijk bedanken voor hun grote inzet en betrokkenheid bij het afstuderen. Eveneens wil ik Rob Goverde bedanken voor de taak die hij op zich heeft genomen als voorzitter van de afstudeercommissie. Jullie aanbevelingen en aanmoedigingen hebben mij geholpen om dit rapport te brengen tot waar het nu is.
    [Show full text]
  • Renew and Expand
    December Cover_Layout 1 22/11/2018 12:08 Page 1 December 2018 | Volume 58 Issue 12 www.railjournal.com | @railjournal IRJInternational Railway Journal Renew and expand Incoming Brazilian president sets the agenda for rail freight development Houston, we have an answer Trailblazing Texas high-speed project taps into booming inter-city travel market Unlocking the Yucatan Can Mexico’s Maya Train take tourist dollars inland? IRJDECXX (UITP)_Layout 1 19/11/2018 12:08 Page 1 Register Now and Save 25%* *Applies to registrations before 27 January 2019 January 27 before registrations to *Applies THE DEFINING EVENT What Can You Expect? IN PUBLIC TRANSPORT 2,500 total delegates IS BACK ! from 80 countries international 13,000 visitors www.uitpsummit.org exhibitors 330 from 35 countries Local host December Contents_Layout 1 22/11/2018 12:49 Page 3 Contact us ContentsDecember 2018 Volume 58 issue 12 Editorial offices News 46 Killigrew Street Post 4 This month Falmouth Cornwall, TR11 3PP, UK 6 News headlines Tel +44 1326 313945 14 Transit Web www.railjournal.com 16 Financial Editor-in-Chief David Briginshaw [email protected] South and Central America Senior Editor 18 New government set to prioritise rail freight Keith Barrow 18 [email protected] Brazil’s president-elect to continue network development Managing Editor 22 São Paulo targets rail expansion Kevin Smith State pushes investment in urban rail [email protected] 28 Yucatan railway finally gets green light News & Features Writer Construction of the line is expected to start this month
    [Show full text]
  • De Integratie Van De HSL-Zuid in Het Hoofdrailnet Voor De Concessie
    14-12-2012 Versie 1.2 De integratie van de HSL-Zuid in het Hoofdrailnet voor de concessie 2015-2024 Op weg naar een geïntegreerd hogesnelheidsnet in Nederland Master Thesis Transport, Infrastructure and Logistics Student: Naam: Roel Zijdemans E-mailadres: [email protected] Studentnummer: 13407940 Universiteit: Technische Universiteit Delft, Faculteit Technologie, Bestuur en Management, sectie Transport en Logistiek, Faculteit Civiele Techniek en Geowetenschappen, sectie Transport en Planning. Afstudeercommissie: Prof. Dr. Ir. B. van Arem TUDelft, Faculteit Civiele Techniek en Geowetenschappen, sectie Transport en Planning Prof. Dr.-Ing. I.A. Hansen TUDelft, Faculteit Civiele Techniek en Geowetenschappen, sectie Transport en Planning Dr. Ir. J.H. Baggen TUDelft, Faculteit Technologie, Bestuur en Management, sectie Transport en Logistiek Dr. R.M.P. Goverde TUDelft, Faculteit Civiele Techniek en Geowetenschappen, sectie Transport en Planning Ir. M.J. Oldenziel NS Hispeed, afdeling Business Development, Alliantiemanager ii Voorwoord Dit afstudeeronderzoek heeft als onderwerp ‘de integratie van de HSL-Zuid in het Hoofdrailnet voor de concessie 2015-2024’. Dit is een zeer actueel onderwerp omdat in het regeerakkoord van het kabinet Rutte-Asscher is vastgelegd dat de HSL-Zuid zal worden toegevoegd aan het Hoofdrailnet en dat de gezamenlijke concessie 2015-2024 zal worden gegund aan NS. In dit onderzoek wordt onder andere gekeken naar de kansen die deze samenvoeging biedt op het gebied van netwerk- en productontwikkeling. Dit onderzoek is verricht als afstudeeropdracht voor de Masterstudie Transport, Infrastructure and Logistics van de TUDelft. De afstudeerprofessor is Prof. Dr. Ir. B. Van Arem van de sectie Transport en Planning, onderdeel van de faculteit Civiele Techniek en Geowetenschappen.
    [Show full text]
  • SPEEDLINES, HSIPR Committee, March 2019, Issue
    High-Speed Intercity Passenger SPEEDLINES MARCH 2019 ISSUE #25 AN AMAZING JOURNEY Amtrak ordered over 600 non- powered Amfleet cars, based on the Metroliner design and also manufactured by Budd, in the mid-1970s. STATE ROUNDUP Notable highlights for HSR in USA PAGE 13 EUROPE HSR Page 36 2 CONTENTS SPEEDLINES MAGAZINE 3 LETTER FROM OUR CHAIR SPRING GREETINGS FROM OUR CHAIR, AL ENGEL. 4 APTA’s High-Speed Rail Forum 10 Proposed Legislation 11 Celebrating Metroliners 13 State Round-up - USA » p.31 25 Spotlight On the front cover: All Metroliners, including this car, began revenue service with Penn Central markings. They were a 26 Midwest News - USA great success, tempting passengers out of cars and planes! 29 Middle East & Transcontinental Regions Designed by Budd, the Metroliner was a high-speed electric car that could reach speeds of up to 110 mph. 31 Asia Region In 1972, Amtrak offered 11 daily Metroliner Service trains between Penn Station and Boston and 14 daily trains between New York and Washington, D.C. 34 Washington Wire 36 Europe Region CHAIR: AL ENGEL VICE CHAIR: CHRIS BRADY SECRETARY: MELANIE K. JOHNSON OFFICER AT LARGE: MICHAEL MCLAUGHLIN IMMEDIATE PAST CHAIR: ANNA BARRY EDITOR: WENDY WENNER PUBLISHER: KENNETH SISLAK ASSOCIATE PUBLISHER: ERIC PETERSON ASSOCIATE PUBLISHER: DAVID WILCOCK PUBLISHER EMERITUS: AL ENGEL LAYOUT DESIGNER: WENDY WENNER © 2011-2019 APTA - ALL RIGHTS RESERVED SPEEDLINES is published in cooperation with: AMERICAN PUBLIC TRANSPORTATION ASSOCIATION 1300 I Street NW, Suite 1200 East Washington, DC 20005 SPEEDLINES | March 2019 3 SECTION NAME Your steering committee and subcommittee leadership have been very hard at work since we last assembled at the APTA Annual in Nashville, Tennessee September 23, 2018.
    [Show full text]
  • Geachte Leden Van De Staten En Gemeenteraden, Op 21 September
    Van: Frank Menger Onderwerp: BO-MIRT / AO Spoor spanningssluizen de ontwerpfout van de HSL-Zuid lessen voor de Lelylijn en HSL Amsterdam - Groningen - Hamburg Datum: dinsdag 22 september 2020 13:36:49 Bijlagen: ontwikkelingen-nationaal-en-internationaal-spoorvervoer-voor-reizigers.pdf bijlage-1-review-quickscan-spanningssluizen-hsl-zuid.pdf bijlage-2-quickscan-spanningssluizen-managementsamenvatting.pdf bijlage-3-quickscan-spanningssluizen-technische-rapportage.pdf bijlage-4-brief-coo-quickscan-spanningssluizen-hsl.pdf Geachte leden van de staten en gemeenteraden, Op 21 september 2020 stuurde de staatssecretaris de volgende brief naar de Tweede Kamer: https://www.rijksoverheid.nl/ministeries/ministerie-van- infrastructuur-en-waterstaat/documenten/kamerstukken/2020/09/21/ontwikkelingen- nationaal-en-internationaal-spoorvervoer-voor-reizigers Deze brief ging over nationaal en internationaal spoor. Waarbij extra aandacht voor de spanningssluizen is op de HSL Zuid. In de hele HSl- Zuid is dit de grootste ontwerpfout die er gemaakt is. Dit zal bij nieuwe hogesnelheidslijnen vanuit Nederland naar Duitsland. Waarbij ook snellere verbindingen via Noordoost Nederland hoognodig zijn tussen de Randstad en Duitsland. Waarbij de verbindingen via Arnhem volledig ontoereikend zijn. Het is dus raadzaam de technische bijlagen te lezen. Met vriendelijke groet, Frank Menger Groningen > Retouradres Postbus 20901 2500 EX Den Haag De voorzitter van de Tweede Kamer Ministerie van Infrastructuur en der Staten-Generaal Waterstaat Binnenhof 4 Rijnstraat 8 2513 AA DEN HAAG 2515 XP Den Haag Postbus 20901 2500 EX Den Haag T 070-456 0000 F 070-456 1111 Ons kenmerk IENW/BSK-2020/113992 Bijlagen Datum 21 september 2020 1. Review Quickscan Betreft Ontwikkelingen nationaal en internationaal spoorvervoer spanningssluizen HSL voor reizigers 2.
    [Show full text]
  • Night Trains 2.0 New Opportunities by HSR? Executive Summary Night Trains 2.0 – New Opportunities by HSR?
    UIC-Study Night Trains 2.0 New opportunities by HSR? Executive summary Night Trains 2.0 – New opportunities by HSR? UIC-Study DB International GmbH on behalf of the INTERNATIONAL UNION OF RAILWAYS (UIC) Berlin, 30 April 2013 Agenda First general results and recommendations Background and purpose of the study Analysis of the current situation Survey of infrastructure and operation conditions Identification of opportunities for Night Trains in 2025 Backup DB International | Night Trains 2.0 | 30/04/2013 2 Agenda First general results and recommendations Background and purpose of the study Analysis of the current situation Survey of infrastructure and operation conditions Identification of opportunities for Night Trains in 2025 Backup DB International | Night Trains 2.0 | 30/04/2013 3 Very Long Distance Night Trains (VLDNT) can compete traditional air routes in the near future if rail infrastructure costs fall significantly Recommendations Assets & challenges KEY FINDINGS RECOMMENDATIONS New HS infrastructure and rolling stock Continuing significantly extends overnight travel ranges and construction makes numerous long distance city connections possible PAX traffic volume Detail ASSETS on reviewed connections offers a substantial base for studies planning new Very Long Distance Night Train services High energy efficiency and environmental advantages Intensified will improve VLDNT competitiveness vs. air transport in communication view of rising oil prices and stronger regulations Infrastructure and operation limitations DAILY Detail require
    [Show full text]
  • HSL-Beveiligingssysteem ERTMS
    HSL-beveiligingssysteem ERTMS Eenonafhankelijk onderzoek naar nutennoodzaak van de aanpassing van hetHSL-beveiligingssysteem ERTMS inopdrachtvanhet Onderzoeks- enVerificatiebureau vande Tweede Kamer der StatenGeneraal 23 mei 2007 Onderzoeksteam Technische UniversiteitDelft J.A. Stoop, J.H. Baggen, J.M. Vleugel, J.L.de Kroes enJ.L.M. Vrancken Inhoudsopgave SAMENVATTING 5 SUMMARY 11 1 WERKWIJZE, OPZET EN VERANTWOORDING VAN HET ONDERZOEK 17 1.1 Aanleiding tot het onderzoek 17 1.2 Werkwijze en opzet 18 1.3 Het ERTMS-vraagstuk op de hogesnelheidslijn Schiphol-Antwerpen 20 1.4 Leeswijzer 21 2 DE HOGESNELHEIDSLIJN SCHIPHOL-ANTWERPEN 23 2.1 Inleiding 23 2.2 Een bijzonder project? 24 2.3 Een trendbreuk bij de spoorwegen 25 2.4 Betrokken partijen en hun onderlinge relatie 26 2.4.1 Belangrijkste actoren 26 2.4.2 Contracten en contractvormen 27 2.4.3 Planning 30 2.5 Conclusies 31 3 BEVEILIGINGSSYSTEMEN VOOR HOGESNELHEIDSSPOORLIJNEN OP DE CORRIDOR PARIJS-BRUSSEL-KEULEN-AMSTERDAM-LONDEN 33 3.1 Inleiding 33 3.2 De ontwikkeling van een Europese beveiligingssysteem ERTMS 34 3.2.1 Inleiding 34 3.2.2 Meerdere redenen om ERTMS in te voeren 35 3.2.3 ETCS Beveiligingsniveaus 37 3.2.4 Relaties tussen levels; fall-back en ontwikkelingsmogelijkheden 41 3.2.5 Interoperabiliteit 42 3.2.6 Technische ontwikkelingen industriepolitieke belangen 44 3.2.7 Tot slot 45 2 Technische Universiteit Delft 3.3 Spoorwegbeveiliging in Nederland 45 3.4 Spoorwegbeveiliging in België 47 3.5 Spoorwegbeveiliging in Frankrijk 50 3.6 Spoorwegbeveiliging in Duitsland 50 3.7 Spoorwegbeveiliging
    [Show full text]
  • Activity Report
    ACTIVITY REPORT 2018 SUMMARY FOREWORD 04 Brazil 51 Chile 57 EXECUTIVE COMMITTEE 09 Colombia 59 Ecuador 62 TPF IN THE WORLD 10 Paraguay 63 Peru 63 HIGHLIGHTS 12 ASIA 64 AFRICA 14 Afghanistan 66 Algeria 16 East Timor 67 Angola 20 Georgia 68 Cameroon 22 India 69 Egypt 24 Laos 72 Ivory Coast 25 Philippines 73 Kenya 26 Saudi Arabia 74 Mauritania 27 Sultanate of Oman 75 Morocco 28 Turkey 76 Mozambique 30 Vietnam 78 São Tomé and Príncipe 32 Senegal 33 EUROPE 80 Tunisia 34 Belgium 82 France 92 NORTH AMERICA 36 Grand Duchy of Luxembourg 98 Mexico 38 Greece 99 United States 39 Poland 100 Portugal 103 CENTRAL AMERICA 40 Romania 109 Costa Rica 42 Spain 112 Guatemala 43 Honduras 44 EXPERTISE CENTRES 118 Panama 45 Building 120 Transport Infrastructures 128 LATIN AMERICA 46 Water - Environment- Energy 134 Argentina 48 Bolivia 50 CONSOLIDATED ACCOUNTS 2018 140 04 Foreword ACTIVITY REPORT 05 4 000 collaborators Established in 47 countries Active in 58 countries The year 2018 was a great year for TPF. Indeed, we were able to maintain our turnover despite the end of our Contracting business. It was no longer part of our core business. Evolution of Sales and Services (in million euros) 254 254 244 242 234 150 132 114 106 2010 2011 2012 2013 2014 2015 2016 2017 2018 2018 06 TPF SA Belgium has subsidiaries and branches in 47 countries, with operations in 11 countries depending directly on the company. Spain and Portugal operate as sub-hold- ing companies and control operations in 36 countries.
    [Show full text]