A303 Amesbury to Berwick Down TR010025

2.16 Bored Tunnel Limits of Deviation Plan Volume 2 Volume

APFP Regulation 5(2)(o) & 6(2)

Planning Act 2008

Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009

October 2018 Seven Barrows NOTES:

PC 105.7m 1. ALL CHAINAGES, LEVELS AND COORDINATES ARE IN METRES UNLESS DEFINED OTHERWISE. Stone N Down MS The Avenue 2. FOR FURTHER DETAILS OF LEVEL INFORMATION EITHER SIDE OF THE BORED TUNNEL SECTION Heel PLEASE REFER TO SHEETS 7 AND 9 OF THE PLAN

Stonehenge Track AND PROFILE DRAWINGS (APPLICATION REF BYWAY AMES12 98.5m Amesbury CP Tumuli TR010025-2.7) Tumulus Tumulus ED Bdy Amesbury CP Stonehenge Down Tumulus 3. FOR ANY EXTENSION OF THE BORED TUNNEL OUTSIDE CHAINAGE 7400 TO 10400, THE UPPER STONEHENGE 110.6m LIMIT OF DEVIATION OF THE CROWN OF THE WESTERN PORTAL EASTERN PORTAL BORED TUNNEL WOULD BE A MINIMUM OF 6.75m BELOW EXISTING GROUND LEVEL AND THE UPPER LIMIT OF DEVIATION FOR THE FINISHED ROAD Tumulus LEVEL WOULD BE A MINIMUM OF 15m BELOW BRIDLEWAY AMES10

Tumuli EXISTING GROUND LEVEL. A 303 Tumuli Stonehenge Bottom MS sites of A 303 site of

108.8m Drain 97.9m A 303 Def Long Barrow

Tumulus

9000 9000 8500 LEGEND Custodian Cottages 8000 Tumulus

7500 9500 9500 INDICATIVE CUT/COVER TUNNEL

GP

10000 10000 OUTLINE

Track Tumulus INDICATIVE BORED TUNNEL site of

Drain 10400 OUTLINE 10500 Tumulus 1.83m TB Tumuli Drain

Lay-by Drain 1000 Drain 00 CHAINAGE (MEASURED DISTANCE A 303 Drain Drain ALONG THE SCHEME LENGTH)

ED Bdy Water Tank

Tumulus Normanton Gorse Track Tumulus CROWN OF BORED TUNNEL

ETL Tumulus

BYWAY AMES12

Earthwork Path (um

Tumulus Def Water Tank CUT Tumulus Track AND Water Tank 105.3m COVER

BYWAY AMES11 CUT AND COVER Track course of TUNNEL TUNNEL (WORK (WORK No.1E) PROPOSED BORED TUNNEL - (WORK No. 1F) No.1G) site of Track Long Barrow Bush Barrow

BYWAY WCLA2 Tumuli Amesbury CP FINISHED ROAD LEVEL

Luxenborough FOOTPATH AMES13 2 site of Tumuli 2

Water Tank

Def 99.4m Water Tank Long Barrow ED Bdy Water Tank Tumuli Tumuli Tumulus

BYWAY WCLA1 Normanton Down 3

Track Coneybury 3 Tumuli ETL Water Tank Tumulus 71.0m Merion

Pikes Cottage Sub Sta Tumulus 4 92.9m Dairy Tumulus Track TUNNEL BORE ILLUSTRATIVE Water Tank Normanton Down Spring CROSS SECTION Sandell's House TCB 0 100m 200m 400m Coneybury Hill

FB Half Acre Sluice

CF Coneybury House SCALE 1:5000 FB 65.9m Water Tank © Crown copyright and database rights 2018 Ordnance Survey 100030643.

Drain

PLAN VIEW CUT SCALE 1:5000 AND COVER CUT AND COVER TUNNEL TUNNEL (WORK NO. 1E) PROPOSED BORED TUNNEL - (WORK No. 1F) (WORK NO. 1G)

KEYPLAN N UPPER LIMIT OF DEVIATION FOR CROWN OF BORED TUNNEL UPPER LIMIT OF DEVIATION FOR FINISHED ROAD LEVEL PROPOSED FINISHED ROAD LEVEL EXISTING GROUND LEVEL (REFER TO ILLUSTRATIVE CROSS SECTION) (REFER TO ILLUSTRATIVE CROSS SECTION) (REFER TO ILLUSTRATIVE CROSS SECTION)

110 110

100 100

90 90

80 80 Level

70 70 SUBMITTED FOR DEVELOPMENT VM CONSENT ORDER APPLICATION OCT 2018 P02 TT 60 60 By Revision Details Date Suffix Check 50 50

40 40

DATUM = 30 30 30 EXISTING Purpose of Issue GROUND 93.491 95.861 93.899 97.145 98.357 88.356 80.300 88.616 92.416 93.974 94.580 97.422 LEVEL 99.770 104.391 109.631 107.991 101.794 107.150 109.947 109.047 105.342 103.977 101.954 104.353 106.360 107.596 107.343 104.648 103.177 102.047 102.473 DCO APPLICATION

PROPOSED Project Title FINISHED 68.384 65.885 63.385 60.885 55.886 53.428 51.718 51.008 51.298 52.588 54.836 57.337 59.837 62.337 64.837 67.338 69.838 81.690 83.100 84.816 85.617 77.625 75.748 73.384 70.884 58.385 72.338 74.838 77.338 79.753 ROAD LEVEL 84.015 A303

UPPER LIMIT OF Amesbury to Berwick Down DEVIATION FOR FINISHED 86.109 85.309 84.508 83.509 82.177 80.592 78.992 77.392 75.792 74.192 72.592 70.992 69.392 67.792 66.192 64.592 63.017 62.141 62.264 63.351 64.701 66.001 67.401 68.751 70.101 71.451 72.801 74.151 75.501 76.851 78.201 ROAD LEVEL Drawing Title UPPER LIMIT OF DEVIATION FOR BORED TUNNEL CROWN OF 94.650 93.850 93.049 92.050 90.718 89.133 87.533 85.933 84.333 82.733 81.133 79.533 78.473 76.333 74.733 73.133 71.558 70.682 70.805 71.892 73.242 74.542 75.942 77.292 78.642 79.992 81.342 82.692 84.042 85.392 86.742 LIMITS OF DEVIATION PLAN BORED TUNNEL REGULATION 5(2)(o) & 6(2) (WORK No. 1F) CHAINAGE 7400 7500 7600 7700 7800 7900 8000 8100 8200 8300 8400 8500 8600 8700 8800 8900 9000 9100 9200 9300 9400 9500 9600 9700 9800 9900 10000 10100 10200 10300 10400 Highways Project Office Temple Quay House 2 The Square, Temple Quay Bristol, BS1 6HA LONGITUDINAL SECTION Scale @ A1 0 100m 200m 400m AS SHOWN H=1:5000 SCALE Horiz.1:5000 Vert.1:1000 V=1:1000 Application Document Number Rev 20m 40m 80m TR010025 - 2.16 P02