FS- RHOMBOS Installation manual General Information

General information Guidelines Building expansion joints and tolerances customary in building construction must This assembly manual addresses all metal These installation instructions have been taken into account accordingly. ceilings manufactured by durlum. dif- structured in accordance with the require- ferent sections describe the corresponding ment of 13964:2007. They describe durlum metal ceilings are, as a matter of products. proper installation. principle, to be assembled by professional dry construction companies who are ca- durlum is a leading German manufacturer The description does not exempt the user pable of assessing the overall conditions of metal ceilings and cladding elements, from examining the structural conditions, of the building, the metal ceiling and clad- mainly made of galvanised sheet steel, implementing the building code regula- ding, and can take the necessary precau- aluminium and expanded metal. tions and observing the information given tions for correct, safe static mounting. in the building permit prior to starting as- sembly. They have priority, but could not If parts from different manufacturers are

be included here. used to assemble the ceiling, the relevant mounting company must provide the cer- It is advisable always to draw up assembly tificates required by EN 13964:2007 and CERTIFICATE diagrams/drawings, to establish the loca- must obtain suitable certificates of conform-

The Certification Body tion where assembly is to begin and to - ity itself. of TÜV SÜD Management Service GmbH certifies that tablish the required suspension points for

the relevant ceiling system prior to starting Liability for proper selection of the products

durlum GmbH assembly. and system conformity can only be as- An der Wiese 5 79650 Schopfheim sumed for the systems delivered by durlum. Germany

has established and applies an Energy, Quality and Environmental Management System for the following scope of application: Structural preconditions To prevent the parts from becoming dirty,

Planning, development, manufacturing and sales of gloves must be worn during assembly. If the metal ceilings, functional ceilings, luminaries, lighting and daylight systems. Metal ceilings may usually be installed as ceiling products are delivered wrapped in Performance of audits (Report No. 70014435) has furnished proof that the requirements under: soon as the building is swept clean and at a protective film, they must be protected ISO 50001:2011 the latest after all wet work in the interior from exposure to UV radiation [sunlight], ISO 9001:2015 ISO 14001:2015 has been completed and the building has the film must likewise have been removed are fulfilled. The certificate is valid from 2017-04-06 until 2020-04-05. been closed. from the goods no later than 4 weeks after Certificate Registration No.: 12 340/100/104 25601 TMS. delivery. The storage temperature must not

Prior to starting assembly, the suspension exceed 30° C, since otherwise the adhe-

Product Compliance Management Munich, 2017-04-06 points must be checked for their usabil- sive on the panel may become hardened,

ity, and load introduction into the building and the protective film can no longer be

must be guaranteed. removed.

When using wall mounting points, such as The relevant products are described in the brackets or wall anchors, the load-carrying Storage marketing and sales documents. They are capacity of the wall in question must be both acoustically effective, and can also checked. durlum metal ceilings are usually delivered be used as design elements only. on pallets. It is advisable to leave the metal If ceiling elements rest on brackets, pos- panels on the pallets as long as possible. If Specifically, these products are: sible wall movements must be taken into the pallets have to be opened, the durlum • Acoustic ceilings account. metal panel should always be positioned • Chilled ceilings on the long side, it can then be placed • Character products Only dowels for which a general building carefully against the wall, do not store flat. supervisory approval is available may be durlum differentiates between a wide used, and their minimum extraction force Storage must be carried out such that range of ceiling systems, for example S1. must be greater than 100 kg. The dowels damage is excluded. During storage, "S" stands for the system, "1" for clamping. must be mounted as specified by the rele- durlum ceiling panels have to be protect- In this system, there are different nomen- vant dowel manufacturer. recommend ed from all weather influences. They have clatures that allow a further subdivision of performing regular tensile stress tests, to to be stored at a constant temperature be- the systems. verify that dowels have been set correctly. tween 10°C and 40°C.

All durlum systems are systems of modu- durlum metal ceilings are dimensioned The assembly of the ceiling panels must lar design. This applies not only to the such that they carry their own weight of not start until all dust-producing work has substructure but also to the ceiling parts the system construction plus a surface load been completed [swept clean]. that are suspended, locked into place or amounting to 40 N/m². Higher loads must durlum products are certified according placed on the substructure. be taken into account or suspended sepa- to ISO 9001 for development, production, rately in the construction, and the measures sales and also for service. Nonetheless, it durlum metal ceilings comply with the must be adapted to the situation at hand. is recommended as a matter of principle standard EN 13964:2007 and are CE-cer- Usually, built-in components and loads must to inspect the delivered metal ceilings im- tified. be suspended separately. mediately and to report complaints imme- For ceiling systems that do not allow any diately [as a rule immediately after delivery For special systems marketed by us and for tolerance compensation within a module, or within 3 days]. which no general approvals are available, suitable material expansions must be tak- there are suitable static certificates avail- en into account. able, and suitable designs compliant with EN 13964 have been constructed.

© durlum GmbH | durlum.com | Subject to changes of dimensions and design. Errors reserved. All rights reserved. | Issued: 31.01.2019 2 General Information

Standards and regulations 6. Follow the same procedure when mounting the perimeter trim, mounting The relevant regulations applicable at the interval approx. 400-625 mm, check installation site must be determined by the transmission of force into wall. assembly company in question. The ceilings marketed by durlum comply with EN 13964. 7. As a rule, arrangement of the panels This standard also regulates the classifica- should be from the centre of the cor- tion of fire protection. ridor to compensate and halve the tolerances of the corridor/panels. The precise arrangement must always be Application done on the basis of the ceiling lay- out plan. The application of durlum metal ceilings is restricted, unless agreed upon otherwise, 8. The metal ceiling panels are often to interiors, so that, pursuant to EN 13964, provided with a joint tape [9 x 3 mm], class of use 1, corrosion protection class A, to make for easier tolerance compen- has been defined here as standard. sation.

Should it become necessary to adjust the Should a joint tape be used, the joints metal ceiling panels to the building by cut- must also be re-aligned from time to ting them, we recommend protecting the cut- time, since the joint tape also has tol- ting edges from corrosion by means of paint erances. in order to maintain the corrosion protection class A. However, owing to the high production precision, it is also possible to connect the panels without a joint tape by us- Quality standard ing butt joints or provide them with rub- ber spacer naps. For material properties, dimensions, toler- ances, colour deviations, the TAIM Direc- Always ensure that the joints are tives [Technischer Arbeitskreis Industrieller aligned. Metalldeckenhersteller .V.] (Technical As- sociation of Industrial Metal Ceiling Manu- 9. Attachments or other loads are to be facturers) applies. mounted separately. For logical rea- sons these parts are integrated during the mounting process. Mounting sequence 10. After completion and pre-acceptance 1. Create a ceiling layout plan or use the of the ceiling, the sequence of joints one from the architect. should be re-aligned. Soiled ceiling panels should be cleaned to give a 2. Cross-check the ceiling layout plan perfect result for assembly. against the on-site situation.

3. Prepare a bill of materials, including a suitable work plan and retrieval/order of the materials required.

4. Determine the required suspension points in accordance with the classes of use of EN 13964. The correspond- ing suspension distances for the dif- ferent systems can be taken from the detailed descriptions of the individual ceiling systems.

5. Define which generally approved dow- is suitable.

Check the raw ceiling and the walls.

Mark the dowel mounting holes and drill them.

Mount the dowels as specified by the dowel manufacturer and carry out ex- traction tests using the device recom- mended by the dowel manufacturer, if necessary.

© durlum GmbH | durlum.com | Subject to changes of dimensions and design. Errors reserved. All rights reserved. | Issued: 31.01.2019 3 FS-OMEGA RHOMBOS Installation manual

OM76-Z011 OM76-Z010

OM100-6000F03

OM100-Z08-F03

OM76-WS-4000 OM100840-30E4-21 etc.

Threaded rod M6 OM100 Console 15-OM100-Z001 ~133 ~7 3 5 H

Panel length *20 100 F F 100 *20

© durlum GmbH | durlum.com | Subject to changes of dimensions and design. Errors reserved. All rights reserved. | Issued: 31.01.2019 4 FS-OMEGA RHOMBOS Installation manual

ABBREVIATIONS OMEGA channel. 3. Mount the connector 15-OM76-Z021 to AH: General distance for mounting: the OMEGA channel. Panel length 2 500 mm = 800 mm 4. Fasten the OMEGA channel on the wall Panel length >2 500 mm = 400 mm bracket OM76-Z010 with the screw con- nections M6. Secure the screw con- This regular distance is less, depending on nection against loosening. additional loads, the type of wall and spe- 5. The screwing distance must be select- cial requirements. ed analogous to the dowel fastening distance.

PLEASE NOTE

• Use only officially approved dowels. • The fastening base must be suitable in ~133

terms of statics. It must be able to reliably ~7 3

absorb the forces introduced into the 5 H construction.

Panel length Y/X 100 F F 100 *20 Maximum tolerance compen- sation Mounting the hook-on carrier • Wall connection with 1042: U1005 A shifting range 10 - 40 mm • Wall connection with U 1032: 1. Determine and outline the wall dis- shifting range 10 - 30 mm tance of the hook-on carrier U 1005 A. 2. Fasten the hook-on carrier U 1005 A to the wall bracket U 1042 or perimeter Assembly of the long side wall trim U 1032 with screw connection M6. bracket Secure the screw connection against loosening. 1. Level and outline the given ceiling 3. The screwing distance must be select- height. ed analogous to the dowel fastening 2. Outline the upper edge of the wall distance. anchor OM76-Z010 or U1042 or wall bracket U1032. 3. Mark the drill hole. Assembly of the ceiling panels 4. Screw wall bracket OM76-Z010 or U1042 or perimeter trim U1032 to the dowel. 1. Wear clean cotton gloves. 5. Secure the screw connection against 2. Remove the protective film from the loosening. ceiling panel, if available. 3. Insert the two short sides of the ceiling panel into the OMEGA channel or lift Determining the wall distance the ceiling panel diagonally over the [y] of the Omega channel or hook-on carrier U 1005 A, lower it and the hook-on carrier hang the short side(s) into the suspen- sion brackets of the hook-on carrier. 1. Measure the corridor width at several 4. Check the perpendicularity of the joint points and centre the shadow gap [di- and its even width. mension X]. 2. Use the ordered panel length to check whether the shifting range is sufficient. Disassembly of the ceiling pan- els

1. Wear clean cotton gloves. 2. Lift the ceiling panel to be disassem- Y bled and remove it from the OMEGA channel or the hook-on carrier U 1005 A and lower it past the hook-on carrier. X 3. Put the ceiling panel down and store it protected against damage.

Installation of the OMEGA channel

1. Determine and outline the wall dis- tance of the OMEGA channel. 2. Slide the nut M5 into the slot of the

© durlum GmbH | durlum.com | Subject to changes of dimensions and design. Errors reserved. All rights reserved. | Issued: 31.01.2019 5 CEIL ING LIGHTING AMBIENCE

durlum GmbH | An der Wiese 5 | D-79650 Schopfheim

T +49 (0) 76 22 | 39 05-0 F +49 (0) 76 22 | 39 05-42 E [email protected] durlum.com