Appendix B – Community Highway Schemes – Rejected Dec 2016

Area Highway Est. Location Details Manager CLC Local Member cost Comments 1 have commissioned and completed a Traffic Study (with Chris Owen) which consists of appx £10mil of various works over 20 Pete Bradbury Haywards individual schemes. Whole Central Stephen Hillier Heath Traffic package via LEP? What is Richard Mid Sujan Scale and cost of this scheme is outside Study process? Speller Wickremaratchi 10 mil the scope of this process. 2 Community Scheme has been reviewed and it did not meet criteria threshold for progression under this process. Unfortunately, there are limitations on available highway space and buildability across a culvert that would need to be Amberley, Chris Chancton addressed before WSCC could consider Turnpike Road Footway Stark bury Philip Circus 80k this further . 3

Community Scheme has been reviewed and it did not meet criteria threshold for progression under this process. We believe that this scheme would struggle , to deliver the desired outcome and the High Street jw Widen footway to deter Chris Chancton obstruction on the highway will still Church Street parking Stark bury Lionel Barnard 35k occur. 4 Community Scheme has been reviewed and it did not meet criteria threshold for progression under this process. We do not consider that it will offer any wider community benefit and could in fact Congestion in High Street create safety issues that currently do not , Mini roundabout at North Chris Chancton exist. The scheme is unlikely to improve North Street Street Stark bury Philp Circus 75k traffic flow. 5 The scale of this scheme would not deliver value for money and should be considered as part of an overall strategy via the Strateigic Transport Infrastructure Cowfold, Plan. The Area Highway Manager will A272 Narrow footway Widen Chris Chancton discuss with the parish Council to look Road footway and realign A272 Stark bury Lionel Barnard 600k into a way forward for this if achievable. 6 RTPI and low floor bus on This is not applicable to this process. This route 17 Provision of RTPI is already covered under S106 and bus shelters at bus Chris Chancton coordination and would be delivered as stops Stark bury Lionel Barnard 120k part of that mechanism. 7 The scale of this scheme is not suitable for this process. This would not deliver value for money and could only be considered as part of an overall strategy via the Strateigic Transport Infrastructure , Narrow footway Provision Plan. The Area Highway Manager to A29 of new footbridge alongside Chris Chancton advise on how this could be taken Footbridge west side of A29. Stark bury 800k forward. 8 Community Scheme has been reviewed , and it did not meet criteria threshold for Jane Murray Richard Mid Andrew progression due to insufficient evidence Way Pedestrian crossing facility Speller Sussex Barrett-Miles 20k of wider community support 9 A Task & Finish Group is currently evaluating the pilot Parking Review that was undertaken in , this group will consider how and if further parking Richard Mid reviews are carried out across the parking Parking review Speller Sussex Andy Petch 20k County. 10 A Task & Finish Group is currently evaluating the pilot Parking Review that was undertaken in Chichester, this group Haywards will consider how and if further parking Heath, Richard Mid reviews are carried out across the Lucasters Park Parking review Speller Sussex P Bradbury 20k County. 11 This scheme has been rejected as it would have no significant benefit due to the surrounding infrastructure and does not have a wider community benefit. The Burgess Hill, Area Highway Manager can discuss Woodpecker Richard Mid Andrew whether there are any alternative Crescent New speed cushion Speller Sussex Barrett-Miles 14k options. 12 Proposals are currently being worked on by a local Working Group. Once plans are formalised the working group should to submit this through the WSCC Cycle Hassocks Richard Mid Route Process. Area Highway Manager Cycle route Cycle route Speller Sussex A Petch 14k can advise. 13 Footway and kerbing Improvements where North Scheme removed from this process as , erosion/dilapidation has Chicheste already being implemented by Area Bepton Road occurred Chris Dye r Gordon McAra 18k Highways Team. 14 Community Scheme has been reviewed and it did not meet criteria threshold for New footway to link progression under this process. However, existing footway to the Area Team will work with the with , roadside across a grass Chris North applicants to see if this could be provided Granary Way verge. Stark Horsham David Sheldon 5k by alternative means. 15 Community Scheme has been reviewed and it did not meet criteria threshold for progression under this process. Horsham, Unfortunately, there are limitations on Richmond available highway space and therefore Road jw any footway would be a substandard Wimblehurst Extend footway and create Chris North width which prevent WSCC considering Road dropped crossing. Stark Horsham Nigel Dennis 10k this further. 16 A Task & Finish Group is currently evaluating the pilot Parking Review that was undertaken in Chichester, this group Road Space Audit and will consider how and if further parking , parking study, resulting in Chris North reviews are carried out across the High Street a scheme. Stark Horsham Amanda Jupp 15k County. 17 Request for footway from to Forest Row. ESCC and Mid Sussex As there are issues regarding land are implementing footway ownership this cannot be progressed as it off highway and leaves a stands. The Parish Council with the Area Ashurst Wood, short section for WSCC to Richard North Mid Highway Manager should re-evaluate the Wall Hill Road consider. Speller Sussex John O'Brien 8k land ownership issues. 18 Currently cannot be progressed. Recommend alternative options are Request for scheme to considered which may achieve the same prevent rat running outcome.This scheme requires more vehicles and improve development in conjunction with the East pedestrian access/safety. School Travel Plan and Area Highways Grinstead, Options appraisal/feasibility Richard North Mid manager to develop a more cohesive and Lowdells Lane assessment required. Speller Sussex Liz Bennett 40k data lead proposal 18 Community have various aspirations around The scheme is not comprehensive as it Copthorne to try and calm stands. The TRO and SRTS aspects of and manage traffic cutting these proposals can be progressed via through the village to get alternate mechanisms. The request for to the A23. Feasibility traffic calming should be resubmitted study needed on area to with data and evidence supporting the see if any of these are application. Recommended action is for viable and offer other Richard North Mid Area Team to liaise with Applicants to see Copthorne TC options. Speller Sussex Bill Acraman 70k how this can be taken forward. 20 Parking issues at QVH (300 spaces for 900 staff). TRO required for surrounding area for part time restrictions to stop Hospital visitors and Staff blocking residential parking. QVA is in parallel designing access East into the rear fields for staff. Grinstead, NOTE this would need to be QVA has a plan in place to increase staff Queen installed in conjection with parking capacity and this would need to Victoria QVA works which may not Richard North Mid be implemented and its affects known Hospital be ready yet! Speller Sussex Liz Bennett 10k before considering other restrictions. 21 Worth has been 'absorbed' by Pound Hill (inside A23). Until a recognised signing strategy for Worth Residents this boundary change has been Association would like introduced by CBC , this scheme cannot signage to indicate that be considered. Area Highway Manager to they have entered Worth as support in liaisons with CBC although it is signage outside still leads anticipated that any budget to address to Worth as a place. Needs this problem would not be suitable for a signing assessment for progression for community scheme as Worth both village and Richard North Mid the benefits to the wider highway Worth signs parish. Speller Sussex Bill Acraman 1k network would be limited. 22 Simon Oakley Louise Identified improvements to Goldsmith Chichester Chichester City Centre South Margaret City Centre based on plans drawn up Chicheste Evans Scale and cost of this scheme is outside Improvements by CDC consultants. Chris Dye r Jeremy Hunt 700k the scope of this process. 23 Parking issues in Village. Realign verge and convert to grasscrete to formalise parking, gain capacity and protect the Community Scheme has been reviewed verge. Likely to be South and it did not meet criteria threshold for Fulking, contributions from the Richard Mid progression due to insufficient evidence Parking Parish and local Publican. Speller Sussex Peter Griffiths 20k of wider community support 24 Footway scheme across the front of new development as current footpath diverts into new development and does not cater for those walking around it. Community Scheme has been reviewed Pedestrians walk here as it South and it did not meet criteria threshold for , Chalker's links to public countryside Richard Mid progression due to insufficient evidence Lane walks. Speller Sussex Peter Griffiths 24k of wider community support 25 Temporary red/white barrier installed along bridge as railtraack are concerned with wheeltracking with no exit strategy. Need permission from Railtrack to remove, but can't be removed until a permanent solution has been put in place. Neither Railtrack nor WSCC believe it to be their responsibility. RS has ideas for a bolt down bollard type Burgess Hill, replacement but funding This scheme is already programmed for Station Road required. Would need South delivery by WSCC Highways Structure Railway structural knowledge and Richard Mid Team. Area Team to advise applicant of Bridge railtrack input. Speller Sussex Anne Jones 50k progress of structures scheme. 26 Shared cycle path to connect Hassocks Station and Way. Expensive and tricky, South Hassocks, would need feasibility, Richard Mid Scale and cost of this scheme is outside Jack & Jill prelim and detailed. Speller Sussex Andy Petch 500 k the scope of this process. Forward. 27 Old ADS x 3 signs still in place on Road (old A23). Parish request to Would not demonstrate good value for replace the ADS with South money and will be picked up as part of a Albourne, smaller more appropriate Richard Mid maintenance regime should budget "A" road signs signs. Speller Sussex Peter Griffiths 3k allow. 28 Feasibility assessment and options appraisal to lessen Scheme is rejected. It is considerd that traffic accessing Station the risk of displacement of traffic and Car Park at end of Gordon adverse traffic movements would Haywards Road. Note: believed 500k South significantly outweigh any benefits that Heath, of S106 money associated Richard Mid work to mitigate traffic in Gordon Road Gordon Road with St Wilfred Bridge? Speller Sussex Anne Jones 20k would have. 29 Concept rejected, footway provision is , already available away from the verge in Thirlmere Extension of footway to Brian West question and by including footway in this Road, existing bus stop Lambarth Crawley Chris Oxlade 7k verge will have no added benefit. 30 Community Scheme has been reviewed Declassify Ham Road south and it did not meet criteria threshold for of the traffic lights at progression. As there is no restrictions Brougham Road. The on the vehicles that would still be able to majority of signs currently use this road, it is difficult to quantify support the reroute, how much relief to the issue the proposal however Sat Nav and GPS will bring, particularly as many HGV , take Ham road as the Mike drivers rely on Sat Navs rather than Ham Road shortest route. Thomas Worthing Roger Oakley 2k following road signs.