Accelerated Rural Electrification Project (RRP MYA 53223)

Initial Environmental Examination (Draft) – Appendixes 1-3

Document Stage: Draft: 1 September 2020

Republic of the Union of : Accelerated Rural Electrification Project

Prepared by the Ministry of Electricity and Energy, Government of The Republic of the Union of Myanmar for the Asian Development Bank.

This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Accelerated Rural Electrification Project (RRP MYA 53223)

Initial Environmental Examination (Draft) – Appendix 1

Document Stage: Draft: 1 September 2020

Republic of the Union of Myanmar: Accelerated Rural Electrification Project

Prepared by the Ministry of Electricity and Energy, Government of The Republic of the Union of Myanmar for the Asian Development Bank.

Electricity Supply Enterprise Proposed Project Lists for ADB New Loan-2020 (USD 140 Millions) Numbers calculated by Damian 1395 MMK/USD

Extension 66kV S/S Lines (Miles) 33kV S/S Estimated Cost Eöectrification Project bays s S No. State/Region 66/33kV 66/11kV 66kV 33kV 33/11kV 66kV 33kV MillionsMillions Towns Villages Household Doubl Doubl No. No. MVA No. MVA Single Single No. MVA No. No. MMK USD No. No. No. e e 1 Ayeyarwady 18 0 0.0 15 195.0 19.5 103.5 2.5 20.0 3 25.0 6 1 48682.4 ← 34.9 4 1962 224395

2 Magway 12 1 10.0 11 55.0 0.8 185.5 0.0 10.0 1 5.0 10 1 40597.3 ← 29.1 2 599 97688

3 Kayin 6 1 10.0 5 45.0 3.0 119.5 0.0 25.0 1 5.0 3 1 25350.1 ← 18.2 4 259 25239

4 BagoEast 11 0 0.0 5 45.0 123.7 9.0 3.0 0.0 3 15.0 10 0 59549.5 ← 42.7 1 135 20505

Total 47 2 20.0 36 340.0 147.0 417.5 5.5 55.0 8 50.0 29 3 174179.3 124.9 11 2955 367827 No. Name of project DROP Overhead line Substation Switch bays in new S/S Transformer Extension switch bay in exsisting S/S 1 Name Type Line length Voltage Circuits 66kV 33kV Tower type Name Location Land area 66/33 66/11 33/11 Type incomming outgoing Transformer 66/33 66/11 33/11 Name of S/S 66 33 tee-off/line miles kV 1 ckt 2 ckt 1 ckt 2 ckt Village/Town District Township acres ha kV kV kV 66kV 33kV 66kV 33kV 66kV 33kV MVA MVA MVA kV kV

1 66kV tee-off from 66kV line - tee-off 10.00 66 2 10.0 Concrete poles 66/11kV 10MVA Kwin Kauk (Ingapu) Kwin Kauk Hinthada Ingapu 2.00 0.81 1 Air 1 1 1 0 10

2 66kV tee-off from 66kV line Athoke - (old line) tee-off 0.15 66 2 0.2 Concrete poles 66/11kV 10MVA Hle Seik (Kyaunggon) Hle Seik Pathein Kyaunggon 2.00 0.81 1 Hybrid 1 1 1 0 10

3 33kV tee-off from Ahpyauk tee-off 8.00 33 1 8.0 Concrete poles 33/11kV 10MVA Za Kar Gyi (Danubyu) Za Kar Gyi Maubin Danubyu 0.70 0.28 1 Air 1 0 1 10

4 66kV line Kyaiklat Primary - Kyaiklat (Kyaiklat) line 0.50 66 1 0.5 Concrete poles 66/11kV 20MVA Kyaiklat (Kyaiklat) Kyaiklat Kyaiklat 1.50 0.61 1 Hybrid 1 1 0 20 66kV S/S Kyaiklat Primary 1

5 66kV line Kyaunggon - Tha Yet Kone (Einme) line 30.00 66 1 30.0 Concrete poles 66/11kV 10MVA Tha Yet Kone (Einme) Tha Yet Kone Einme 2.20 0.89 1 Air 1 1 0 10 66kV S/S Kyaunggon 1

6 Hinthada 66kV tee-off from 66kV line Ahthoke - Hinthada tee-off 0.25 66 2 0.3 Concrete poles 66/11kV 10MVA Shan Su (Hinthada) Shan Su Hinthada Hinthada 2.17 0.88 1 Air 1 1 1 0 10

7 Myaungmya 66kV tee-off from 66kV line Myaungmya - tee-off 1.00 66 2 1.0 Concrete poles 66/11kV 5MVA Thein Lar Gat Su (Myaungmya) Thein Lar Gat Su Myaungmya Myaungmya 2.00 0.81 1 Air 1 1 1 0 5

9 66kV tee-off from 66kV line Oke Shit Pin - Myanaung tee-off 1.50 66 2 1.5 Concrete poles 66/11kV 20MVA Bat Ye / Ka Loet Kwin (Kyangin) Bat Ye / Ka Loet Kwin Hinthada Kyangin 3.00 1.21 1 Hybrid 1 1 1 0 20

14 Einme 33kV line Einme - Ywar Thit / Ma Nyaung Chaung (Einme) line 12.00 33 1 12.0 Concrete poles 33/11kV 10MVA Ywar Thit / Ma Nyaung Chaung (Einme)Ywar Thit / Ma Nyaung ChaungMyaungmya Einme 2.40 0.97 1 Air 1 0 1 10 33kV S/S Einme 1

15 Ngathaing Chaung 66kV tee-off from 66kV line Yae Kyi - Gwa tee-off 1.40 66 2 1.4 Concrete poles 66/11kV 20MVA Tha Kwin, Kone Pyin (Yegyi) Tha Pyay Kwin, Kone Pyin Pathein Yegyi 2.50 1.01 1 Air 1 1 1 0 20

16 Pathein 66kV tee-off from 66kV line Pathein - Nga Yoke Kaung Taung tee-off 0.20 66 2 0.2 Concrete poles 66/11kV 10MVA Tha Lat Khwar (Pathein) Tha Lat Khwar Pathein Pathein 2.00 0.81 1 Air 1 2 1 0 10

17 Mawlamyainggyun 66kV line - Kyaung Htauk (Mawlamyainggyun) line 17.00 66 1 17.0 Concrete poles 66/11kV 10MVA Kyaung Htauk (Mawlamyainggyun) Kyaung Htauk Labutta Mawlamyainggyun 2.00 0.81 1 Hybrid 1 1 0 10 0

18 Kangyidaut 66kV line Kan Kone Primary - Kyaik Lat () line 8.00 66 1 8.0 Concrete poles 66/11kV 20MVA Kyaik Lat (Kangyidaunt) Kyaik Lat Pathein Kangyidaunt 2.00 0.81 1 Air 1 1 1 0 20 66kV S/S Kan Kone Primary 1

19 Myaungmya 66kV line Kyaiklat Primary - Kyon War (Myaungmya) line 20.00 66 1 20.0 Concrete poles 66/11kV 10MVA Kyon War (Myaungmya) Kyon War Myaungmya Myaungmya 2.00 0.81 1 Air 1 1 0 10 66kV S/S Kyaiklat Primary 1

20 Pathein 66kV line 66kV line Tha Lup Khwar - Shawpya - Shaw Pyar (Patheline 12.00 66 1 12.0 Concrete poles 66/11kV 10MVA Shaw Pyar (Pathein) Shaw Pyar Pathein Pathein 3.70 1.50 1 Air 1 1 0 10 66kV S/S 66kV line Tha Lup K 1

21 Labutta 66kV tee-off from 66kV line Myaungmya - Labutta tee-off 5.00 66 2 5.0 Concrete poles 66/11kV 20MVA Le Pyauk (Labutta) Le Pyauk Labutta Labutta 2.00 0.81 1 Air 1 1 1 0 20

22 Myaungmya 66kV line Myaungmya - Pyin / Da Yei (Myaungmya) line 16.00 66 1 16.0 Concrete poles 66/11kV 10MVA Pyin / Da Yei Pauk (Myaungmya) Pyin / Da Yei Pauk Myaungmya Myaungmya 2.00 0.81 1 Air 1 1 0 10 66kV S/S Myaungmya 1

23 33kV tee-off from 33kV line Hlaingtharya - Nyaungdon tee-off 2.50 33 2 2.5 Concrete poles 33/11kV 5MVA Ka Nyin Kauk Gyi (Nyaungdon) Ka Nyin Kauk Gyi Maubin Nyaungdon 0.92 0.37 1 Air 1 1 0 1 5 No. Name of project Description DROP Overhead line Substation Switch bays in new S/S Transformer Extension switch bay in exsisting S/S 2 Name Type Tap-off Location Connecting to Line length Voltage Circuits 66kV 33kV Tower type Name Location Land area 66/33 66/11 33/11 Type incomming outgoing Transformer 66/33 66/11 33/11 Name of S/S 66 33 tee-off/line Village/Town (Township)existing line or substation miles kV 1 ckt 2 ckt 1 ckt 2 ckt Village/Town District Township acres ha kV kV kV 66kV 33kV 66kV 33kV 66kV 33kV MVA MVA MVA kV kV New Construction of 66 kV Line 12 miles from , Saw Substation to Long She Village, 66/33kV, 10 MVA at 1 Saw 66kV line Saw - Laung Shay (Saw) line Saw Saw 12.00 66 1 12.0 Concrete poles 66/33kV 10MVA Laung Shay (Saw) Laung Shay Saw 2.00 0.81 1 1 Air 1 2 0 10 5 66kV S/S Saw 1 Long She Village with 66/11kV, 5MVA and 66kV Switching Bay 1 Set at Saw Substation

New Construction of 66kV Line 15 miles from 66kV 2 Aunglan Kyaukpadaung Substation to Shwe Pan Taw Village and 66kV line Kyaunkpadaung - Shwe Pan Taw Gyi (Aunglan) line Aunglan Kyaunkpadaung 15.00 66 1 15.0 Concrete poles 66/11kV 5MVA Shwe Pan Taw Gyi (Aunglan) Shwe Pan Taw Gyi Aunglan 2.00 0.81 1 Air 1 1 0 5 66kV S/S Kyaunkpadaung 2 66/11kV 5MVA Substation at Shwe Pan Taw Village New Construction of 66kV Line 37 miles from 132kV Ta Nyaug Substation to Nyaung Ni Chaung and 66kV Switch Bay 3 66kV line Ta Nyaung Primary - Nyaung Ni Chaung (Seikphyu) line Ta Nyaung (Seikphyu) Ta Nyaung Primary 37.00 66 1 37.0 Concrete poles 66/11kV 5MVA Nyaung Ni Chaung (Seikphyu) Nyaung Ni Chaung Seikphyu 2.00 0.81 1 Air 1 1 0 5 66kV S/S Ta Nyaung Primary 1 1set at Ta Nyaug Substation and 66/11kV, 5MVA Substation at Nyaung Ni Chaung New Construction of 66kV Line 18 miles from City, 66kV Kan Gyi Substation to near Tha Mone Kone Gyi Village , 4 Natmauk 66kV line Kann Gyi (Natmauk) - Tha Mone Kone Gyi (Natmauk)line Natmauk Kann Gyi (Natmauk) 18.00 66 1 18.0 Concrete poles 66/11kV 5MVA Tha Mone Kone Gyi (Natmauk)Tha Mone Kone Gyi Magway Natmauk 2.00 0.81 1 Air 1 1 0 5 66kV S/S Kann Gyi (Natmauk) 1 66kV Switch Bay 1 Set at Kan Gyi Substation and 66/11kV, 5MVA Substation at near Tha Mone Kone Gyi Village

New Construction of 66kV Lines 22 miles from 66V Koe Bin Substation to Da None Myaung Village , 66kV Switch Bay 1 6 Sinbaungwe 66kV line Koe Bin - Da None Myaung (Sinbaungwe) line Sinbaungwe Koe Bin 22.00 66 1 22.0 Concrete poles 66/11kV 5MVA Da None Myaung (Sinbaungwe)Da None Myaung Thayet Sinbaungwe 2.00 0.81 1 Air 1 1 1 0 5 66kV S/S Koe Bin 1 Set at Koe Bin Substation and 66kV Outgoing Switch Bay 1 Set, 66/11kV 5MVA Substation at Da None Myaung Village

New Construction of 66kV Line 15 miles from 66kV Sinbaungwe Substation to Sinbaungwe City , 66kV Switch 9 Sinbaungwe 66kV line Singbaungwe - Sinbaungwe (Sinbaungwe) line Koe Pin (Sinbaungwe) Singbaungwe 15.00 66 1 15.0 Concrete poles 66/11kV 5MVA Sinbaungwe (Sinbaungwe) Sinbaungwe Thayet Sinbaungwe 2.00 0.81 1 Hybrid 1 1 0 5 66kV S/S Singbaungwe 1 Bay 1 Set at Koe Pin Village Substation and 66/11kV, 5MVA Substation at Sinbaungwe Township New Construction of 66kV line 13.5 miles from Thayet Substation to Yae Bwet Village, 66kV switch bay 1 set at 10 Thayet 66kV line Thayet - Yae Bwet (Thayet) line Thayet Thayet 13.50 66 1 13.5 Concrete poles 66/11kV 5MVA Yae Bwet (Thayet) Yae Bwet Thayet Thayet 2.00 0.81 1 Air 1 1 0 5 66kV S/S Thayet 1 Thayet Substation and 66/11kV, 5MVA Substation at Yae Bwet Village New Construction of 66kV Line 15 miles from , Pa Dan Substation to Kan Toke Village , 66kV 11 Minhla 66kV line Pa Dan (Ngape) - Kan Toke (Minhla) line Min Hla Pa Dan (Ngape) 15.00 66 1 15.0 Concrete poles 66/11kV 5MVA Kan Toke (Minhla) Kan Toke Thayet Minhla 2.00 0.81 1 Air 1 1 0 5 66kV S/S Pa Dan (Ngape) 1 Switch Bay 1 Set at Pa Dan Substation and 66/11kV, 5MVA Substation at Kan Toke Village New Construction of 66kV line 18 miles from Ngape Township, Padein Substation to Goke Gyi Village, 66kV 12 Ngape 66kV line Padein (Ngape) - Goke Gyi (Ngape) line Pa Dan (Ngape) Padein (Ngape) 18.00 66 1 18.0 Concrete poles 66/11kV 5MVA Goke Gyi (Ngape) Goke Gyi Ngape 2.00 0.81 1 Air 1 1 0 5 66kV S/S Padein (Ngape) 1 switch bay 1 set at Padein Substation and 66/11kV, 5MVA Substation at Goke Gyi Village New Construction of 33kV Line 10 miles from , Kanbya Substation to Nyaung Kan Village, 33kV 13 Magway 33kV line Kanbya (Magway) - Nyaung Kan (Magway) line Magway Kanbya (Magway) 10.00 33 1 10.0 Concrete poles 33/11kV 5MVA Nyaung Kan (Magway) Nyaung Kan Magway Magway 2.00 0.81 1 Hybrid 1 0 1 5 33kV S/S Kanbya (Magway) 1 Switch Bay 1 Set at Kanbya Substation and 33/11kV, 5MVA Substation at near Nyaung Kan Village

New Construction of 66kV Line 20 miles from Aunglan 14 , Da None Myaung Substation to Hlan Tin Village 66kV line Da None Myaung - Hlan Tin (Aunglan) line Aunglan Da None Myaung 20.00 66 1 20.0 Concrete poles 66/11kV 5MVA Hlan Tin (Aunglan) Hlan Tin Thayet Aunglan 2.00 0.81 1 Air 1 1 0 5 0 and 66/11kV, 5 MVA Substation at near Hlan Tin Village

New Construction of 66kV In/Out Double circuit line 0.76 15 Minbu miles from 66kV Man- Padein Line and 66/11kV, 5MVA 66kV tee-off from 66kV line Man - Pa Dan (Ngape) tee-off line next to it 66kV line Man - Pa Dan (Ngape) 0.76 66 2 0.8 Concrete poles 66/11kV 5MVA Lay Pin, Min Hla Kyin (Minbu) Lay Pin, Min Hla Kyin Minbu Minbu 2.00 0.81 1 Air 1 1 1 0 5 Substation at , Lay Pin Village No. Name of project Description DROP Overhead line Substation Switch bays in new S/S Transformer Extension switch bay in exsisting S/S 3 Name Type Tap-off Location Connecting to Line length Voltage Circuits 66kV 33kV Tower type Name Location Land area 66/33 66/11 33/11 Type incomming outgoing Transformer 66/33 66/11 33/11 Name of S/S 66 33 tee-off/line Village/Town (Township) existing line or substation miles kV 1 ckt 2 ckt 1 ckt 2 ckt Village/Town District Township acres ha kV kV kV 66kV 33kV 66kV 33kV 66kV 33kV MVA MVA MVA kV kV New Construction of 66kV Line 39 miles from 66kV Kyainseikgyi Substation to Ko Du Kwe with 66kV 1 Kyainseikgyi 66kV line Kyainseikgyi - Ko Du Kwe (Kyainseikgyi) line Kyainseikgyi Kyainseikgyi 39.00 66 1 39.0 Concrete poles 66/11kV 10MVA Ko Du Kwe (Kyainseikgyi) Ko Du Kwe Kawkareik Kyainseikgyi 2.00 0.81 1 Air 1 1 1 0 10 66kV S/S Kyainseikgyi 1 Incoming/Outgoing Switch Bay 1 Set and 66/11kV , 10 MVA Substation at Ko Du Kwe Village New Construction of 66kV Line 26 Miles from 66kV Ko Du Kwe Substation to Hpayarthonesu Line and 2 Hpayarthonesu 66kV line Ko Du Kwe - Hpayarthonesu (Kyainseikgyi) line Kyainseikgyi Township, Ko Du Kwe VillageKo Du Kwe 26.00 66 1 26.0 Concrete poles 66/11kV 10MVA Hpayarthonesu (Kyainseikgyi) Hpayarthonesu Kawkareik Kyainseikgyi 2.00 0.81 1 Air 1 1 0 10 66/11kV, 10MVA Substation at Hpayarthonesu Township New Construction of 66kV(In/Out Double circuit line 3 3 Kawkareik miles from 66kV Koetie-Kyainseikgyi Line, 66/11kV, 66kV tee-off from 66kV line Myawaddy - Kyainseikgyitee-off line near village 66kV line Myawaddy - Kyainseikgyi 3.00 66 2 3.0 Concrete poles 66/11kV 5MVA Winka (Kawkareik) Winka Kawkareik Kawkareik 2.00 0.81 1 Air 1 1 1 0 5 5MVA Substation at Winka Village

New Construction of 66kV line 10.5 miles from 66kV 4 Kyon Doe Koetai to Kyon Doe and 66/11kV, 10MVA Substation 66kV line Koetai - Kyon Doe (Kawkareik) line Kawkareik Township, Koetai Village Koetai 10.50 66 1 10.5 Concrete poles 66/11kV 10MVA Kyon Doe (Kawkareik) Kyon Doe Kawkareik Kawkareik 1.00 0.40 1 Air 1 1 0 10 66kV S/S Koetai 1 at Kyon Doe Township

New Construction of 66kV line 44 miles from 66kV 5 Kyainseikgyi Koetai to Kyaikdon, 66/33kV, 10MVA and 66/11kV, 66kV line Koetai - Kyaikdon (Kyainseikgyi) line Kawkareik Township, Koetai Village Koetai 44.00 66 1 44.0 Concrete poles 66/33kV 10MVA Kyaikdon (Kyainseikgyi) Kyaikdon Kawkareik Kyainseikgyi 2.00 0.81 1 1 Air 1 2 0 10 10 66kV S/S Koetai 1 10MVA Substation at Kyaikdon Township New Construction of 33kV line 25 miles from 33kV Taung Dee to Ah Nan Kwin, Outgoing Switch Bay 1 Set 6 Kyainseikgyi at 33kV Taungdee Substation, Incoming Switch Bay 1 33kV line Taung Dee - Ah Nan Kwin (Kyainseikgyi) line Kyainseikgyi Township, Taung Dee VillageTaung Dee 25.00 33 1 25.0 Concrete poles 33/11kV 5MVA Ah Nan Kwin (Kyainseikgyi) Ah Nan Kwin Kawkareik Kyainseikgyi 2.00 0.81 1 Air 1 0 1 5 33kV S/S Taung Dee 1 Set and 33/11kV, 5MVA Substation at Ah Nan Kwin Village

New Construction of 33kV line 27 miles from 33kV Hlaingbwe to Shan Ywa Thit, 33kV Outgoing Switch 7 Hlaingbwe Bay 1 Set at Hlaingbwe Substation , Incoming Switch DROP 33kV line Hlainbwe - Shan Ywa Thit (Hlaingbwe) line Hlaingbwe Township, Chan Thar Village Hlainbwe 27.00 33 1 27.0 Concrete poles 33/11kV 5MVA Shan Ywa Thit (Hlaingbwe) Shan Ywa Thit Hpa-An Hlaingbwe 0.636 0.26 1 Air 1 0 1 5 33kV S/S Hlainbwe 1 Bay 1 Set and 33/11kV, 5MVA Substation at Shan Ywa Thit Township No. Name of project Description DROP Overhead line Substation Switch bays in new S/S Transformer Extension switch bay in exsisting S/S 4 Name Type Tap-off Location Connecting to Line length Voltage Circuits 66kV 33kV Tower type Name Location Land area 66/33 66/11 33/11 Type incomming outgoing Transformer 66/33 66/11 33/11 Name of S/S 66 33 tee-off/line Village/Town (Township) existing line or substation miles kV 1 ckt 2 ckt 1 ckt 2 ckt Village/Town District Township acres ha kV kV kV 66kV 33kV 66kV 33kV 66kV 33kV MVA MVA MVA kV kV New Construction of 66kV Outgoing Switch Bay 2 Sets at 230kV Ka Mar Net Substation and 66kV Double circuit line 22.7 miles from 230kV Ka Mar Net Primary 1 Daik-U 66kV line Ka Mar Net - Kyaik Sa Kaw (Daik-U) line Kyaik Sa Kaw Ka Mar Net 22.70 66 2 22.7 Lattice tower 66/11kV 10MVA Kyaik Sa Kaw (Daik-U) Kyaik Sa Kaw Bago Daik-U 2.00 0.81 1 Air 2 2 1 0 10 66kV S/S Ka Mar Net 2 Substation to Kyaik Sa Kaw Village, 66kV Line Switch Bay 4 Sets, 66kV Tr Bay 1 Set, 66/11kV 10MVA Substation at Kyaik Sa Kaw Village (Lattice Tower Type)

New Construction of 66kV Outgoing Switch Bay 2 Sets at 230kV Baing Dar (Wea Wun Shan Su) Substation and 2 Nyaung Lay Pin 66kV (Double Circuit) Line 18 miles from Baing Dar (Wea 66kV line Baing Dar (Wea Wun Shan Su) Primary - Kyaik Sa Kaw (Daik-U) line Kyaik Sa Kaw Baing Dar (Wea Wun Shan Su) Primary 18.00 66 2 18.0 Lattice tower kV MVA Kyaik Sa Kaw (Daik-U) Kyaik Sa Kaw Bago Daik-U 66kV S/S Baing Dar (Wea Wun Shan Su) Primary 2 Wun Shan Su) Substation to Kyaik Sa Kaw (Lattice Tower Type) New Construction of 66kV Outgoing Switch Bay 2 Sets at 230kV Baing Dar (Wea Wun Shan Su) Substation and 66kV (Double Circuit) Line 10 miles from 230kV Baing Dar 3 Nyaung Lay Pin (Wea Wun Shan Su) Primary Substation to Nyaung Lay 66kV line Baing Dar (Wea Wun Shan Su) Primary - (Nyaunglebin)line Baing Dar Baing Dar (Wea Wun Shan Su) Primary 10.00 66 2 10.0 Lattice tower 66/11kV 10MVA Nyaunglebin (Nyaunglebin) Nyaunglebin Bago Nyaunglebin 0.69 0.28 1 Air 4 1 0 10 66kV S/S Baing Dar (Wea Wun Shan Su) Primary 2 Pin , 66kV Line Switch Bay 4 Sets, 66kV Tr Bay 1 Set, 66/11kV 10MVA Substation at Nyaung Lay Pin (Lattice Tower Type)

New Construction of 66kV Outgoing Switch Bay 2 Sets at 230kV Thar Yar Kone Substation and 66kV Double circuit 4 Kyauktaga 66kV line Thar Yar Kone - Nyaunglebin (Nyaunglebin) line Nyaung Lay Pin Thar Yar Kone 14.00 66 2 14.0 Lattice tower kV MVA Nyaunglebin (Nyaunglebin) Nyaunglebin Bago Nyaunglebin 66kV S/S Thar Yar Kone 2 line 14 miles from Thar Yar Kone Substation to Nyaung Lay Pin (Lattice Tower Type)

New Construction of 66kV Outgoing Switch Bay 2 Sets at 230kV Thar Yar Kone Substation and 66kV Double circuit line 24 miles from 230kV Thar Yar Kone Primary 5 Phyu 66kV line Thar Yar Kone - Nyaung Pin Thar (Phyu) line Thar Yar Kone Thar Yar Kone 24.00 66 2 24.0 Lattice tower 66/11kV 10MVA Nyaung Pin Thar (Phyu) Nyaung Pin Thar Phyu 1.50 0.61 1 Air 2 2 1 0 10 Substation to Nyaung Pin Thar , 66kV Line Switch Bay 4 Sets, 66kV Tr Bay 1 Set, 66/11kV 10MVA Substation at Nyaung Pin Thar (Lattice Tower Type)

New Construction of 66kV Double circuit line 15 miles 6 Phyu from 66kV Nyaung Pin Thar Substation to Nyaung Chay 66kV line Nyaung Pin Thar - Nyaung Chay Htauk () line Nyaung Chay Htauk Nyaung Pin Thar 15.00 66 2 15.0 Lattice tower kV MVA Nyaung Chay Htauk (Oktwin) Nyaung Chay Htauk Taungoo Oktwin Htauk (Lattice Tower Type)

New Construction of 66kV Outgoing Switch Bay 2 Sets at 230kV Taungoo Substation and 66kV Double circuit line 20 miles from 230kV Taungoo Primary Substation to 7 Phyu 66kV line Taungoo Primary - Nyaung Chay Htauk (Oktwin) line Taungoo(Hin Ngote Pin) Taungoo Primary 20.00 66 2 20.0 Lattice tower 66/11kV 10MVA Nyaung Chay Htauk (Oktwin) Nyaung Chay Htauk Taungoo Oktwin 2.20 0.89 1 Air 2 2 1 0 10 66kV S/S Taungoo Primary 2 Nyaung Chay Htauk , 66kV Line Switch Bay 4 Sets, 66kV Tr Bay 1 Set, 66/11kV 10MVA Substation at Nyaung Chay Htauk (Lattice Tower Type)

New Construction of 66kV Line 9 miles from 230kV Baing 8 Daik-U Dar Primary to Pauk Taw Thi Village and 66/11kV, 5MVA 66kV line Baing Dar (Wea Wun Shan Su) Primary - Pauk Ta Pin (Daik-U) line Baing Dar Baing Dar (Wea Wun Shan Su) Primary 9.00 66 1 9.0 Concrete poles 66/11kV 5MVA Pauk Ta Pin (Daik-U) Pauk Ta Pin Bago Daik-U 1.26 0.51 1 Air 1 1 0 5 0 substation at Pauk Taw Thi Village

New Construction of 33kV Double circuit line 1 mile from 9 Kyaukkyi 33kV Penwegon-Kyaukkyi Line to Nat Than Kwin and 33kV tee-off from 33kV line Penwegon - Kyaukkyi tee-off line nearby 33kV line Penwegon - Kyaukkyi 1.00 33 2 1.0 Concrete poles 33/11kV 5MVA Nat Than Kwin (Kyaukkyi) Nat Than Kwin Taungoo Kyaukkyi 1.26 0.51 1 Air 1 1 0 1 5 33/11kV, 5 MVA Substation at Nat Than Kwin Village

New Construction of 33kV Double circuit line 1 mile from 33kV Waw-Tha Pyay Kan Line to Nyaung Khar Shey 10 Waw 33kV tee-off from 33kV line Waw - Tha Pyay Kan tee-off line nearby 33kV line Waw - Tha Pyay Kan 1.00 33 2 1.0 Concrete poles 33/11kV 5MVA Nyaung Khar Shey (Waw) Nyaung Khar Shey Bago Waw 1.00 0.41 1 Air 1 1 0 1 5 Village and 33/11kV, 5 MVA Substation at Nyaung Khar Shey Village

New Construction of 33kV Double circuit line 1 mile from 11 Taungoo Taungoo-Leik Tho Line to Pa Tee Factory and 33/11kV, 5 33kV tee-off from 33kV line Taungoo - Leik Tho tee-off line nearby 33kV line Taungoo - Leik Tho 1.00 33 2 1.0 Concrete poles 33/11kV 5MVA Pa Tee Factory at Ngwe Taung Lay (Taungoo)Pa Tee Factory at Ngwe Taung LayTaungoo Taungoo 1.00 0.40 1 Air 1 1 0 1 5 MVA Substation at Pa Tee Factory Area No. Name of project Description DROP Overhead line Substation Switch bays in new S/S Transformer Extension switch bay in exsisting S/S Name Type Tap-off Location Connecting to Line length Voltage Circuits 66kV 33kV Tower type Name Location Land area 66/33 66/11 33/11 Type incomming outgoing Transformer 66/33 66/11 33/11 Name of S/S 66 33 tee-off/line Village/Town (Township) existing line or substation miles kV 1 ckt 2 ckt 1 ckt 2 ckt Village/Town Township acres ha kV kV kV 66kV 33kV 66kV 33kV 66kV 33kV MVA MVA MVA kV kV 1 Ayeyarwady 0 15 3 New Construction of 66kV Double circuit line 10 mile 1 Ingapu 66kV tee-off from 66kV line Myanaung - Hinthada tee-off line further away 66kV line Myanaung - Hinthada 10.00 66 2 10.0 Concrete poles 66/11kV 10MVA Kwin Kauk (Ingapu) Kwin Kauk Ingapu 2.00 0.81 1 Air1 1 10 10 Newfrom Construction66kV Myanaung-Hinthada of 66kV Double Line circuit to Kwin line Kauk0.15 andmiles 2 Kyaunggon 66kV tee-off from 66kV line Athoke - Pathein (old line) tee-off line next to it 66kV line Athoke - Pathein (old line) 0.15 66 2 0.2 Concrete poles 66/11kV 10MVA Hle Seik (Kyaunggon) Hle Seik Kyaunggon 2.00 0.81 1 HGIS1 1 1 0 10 Newfrom Construction66kV Ah Thoke-Kan of 33kV Kone(Pathein-1) Line 8 miles of Ahpyauk-Line to Kan Ka 3 Danubyu 33kV tee-off from Ahpyauk tee-off line further away Ahpyauk 8.00 33 1 8.0 Concrete poles 33/11kV 10MVA Za Kar Gyi (Danubyu) Za Kar Gyi Danubyu 0.700.28 1Air 1 01 10 NewZaKaGyi Construction and 33/11kV of 66kV 10MVA Switch new Bay(1) Substation Set at at 230kV 4 KyaikLat 66kV line Kyaiklat Primary - Kyaiklat (Kyaiklat) line Kyaiklat Kyaiklat Primary 0.50 66 1 0.5 Concrete poles 66/11kV 20MVA Kyaiklat (Kyaiklat) Kyaiklat Kyaiklat 1.50 0.61 1 HGIS 1 1 0 20 66kV S/S Kyaiklat Primary 1 NewKyaiklat Construction Substation, of 66kV 66kV Line Switch 0.5 Bay(1)miles from Set at Kyaik 66kVLat 5 Einme 66kV line Kyaunggon - Tha Yet Kone (Einme) line Kyaunggon Kyaunggon 30.00 66 1 30.0 Concrete poles 66/11kV 10MVA Tha Yet Kone (Einme) Tha Yet Kone Einme 2.20 0.89 1 Air 1 1 0 10 66kV S/S Kyaunggon 1 NewKyaunggon Construction Substation of 66kV , 66kV Double Line 30circuit miles line at 0.25 Miles 6 Hinthada 66kV tee-off from 66kV line Ahthoke - Hinthada tee-off line next to it 66kV line Ahthoke - Hinthada 0.25 66 2 0.3 Concrete poles 66/11kV 10MVA Shan Su (Hinthada) Shan Su Hinthada 2.17 0.88 1 Air1 1 10 10 Newfrom Construction66kV Hinthada-Yegyi of 66kV Double-Ah Thoke circuit Line line and 1 66/11mile kV 7 Myaungmya 66kV tee-off from 66kV line Myaungmya - Labutta tee-off line near village 66kV line Myaungmya - Labutta 1.00 66 2 1.0 Concrete poles 66/11kV 5MVA Thein Lar Gat Su (Myaungmya) Thein Lar Gat Su Myaungmya 2.00 0.81 1 Air 1 1 1 0 5 Newfrom Construction66kV Myaungmya-Labutta of 66kV Double Line circuit and line66/11kV 1.5 mi les 9 Kyangin 66kV tee-off from 66kV line Oke Shit Pin - Myanaung tee-off line near village 66kV line Oke Shit Pin - Myanaung 1.50 66 2 1.5 Concrete poles 66/11kV 20MVA Bat Ye / Ka Loet Kwin (Kyangin) Bat Ye / Ka Loet Kwin Kyangin 3.00 1.21 1 HGIS 1 1 1 0 20 Newfrom Construction66kV Oke Shit of Pin-Myanaung 33kV Switch Bay Line 12 and Set 66/11kV at Einme 14 Einme 33kV line Einme - Ywar Thit / Ma Nyaung Chaung (Einme)line Einme Einme 12.00 33 1 12.0 Concrete poles 33/11kV 10MVA Ywar Thit / Ma Nyaung Chaung (EinmYwar Thit / Ma Nyaung ChaungEinme 2.40 0.97 1 Air 1 0 1 1033kV S/S Einme 1 NewSubstation, Construction 33kV Line of 66kV 12 miles Double at Einme circuit -Ywathit line 1.4mil anesd 15 Ngathaing Chaung 66kV tee-off from 66kV line Yae Kyi - Gwa tee-off line near village 66kV line Yae Kyi - Gwa 1.40 66 2 1.4 Concrete poles 66/11kV 20MVA Tha Pyay Kwin, Kone Pyin (Yegyi) Tha Pyay Kwin, Kone Pyin Yegyi 2.50 1.01 1 Air 1 1 1 0 20 Newfrom Construction66kV Line Gwa of to66kV Thidakonepyin Double circuit Junction line 0.2 mile 16 Pathein 66kV tee-off from 66kV line Pathein - Nga Yoke Kaung Taungtee-off line next to it 66kV line Pathein - Nga Yoke Kaung Taun 0.20 66 2 0.2 Concrete poles 66/11kV 10MVA Tha Lat Khwar (Pathein) Tha Lat Khwar Pathein 2.00 0.81 1 Air 1 2 1 0 10 Newfrom Construction66kV Pathein-Nga of 66kV Yoke Line Kaung 17 miles Taung from and 66kV 66/11kV, 17 Mawlamyainggyun 66kV line Bogale - Kyaung Htauk (Mawlamyainggyun) line Bogale Bogale 17.00 66 1 17.0 Concrete poles 66/11kV 10MVA Kyaung Htauk (Mawlamyainggyun) Kyaung Htauk Mawlamyainggyun 2.000.81 1 HGIS1 1 0 10 0 NewBogale Construction Substation ofto 66kVMawlamyainggyun, Line 8 miles from 66kV 230kV Switch Ka n 18 Kangyidaut 66kV line Kan Kone Primary - Kyaik Lat (Kangyidaunt) line Pathein(Kan Kone) Kan Kone Primary 8.00 66 1 8.0 Concrete poles 66/11kV 20MVA Kyaik Lat (Kangyidaunt) Kyaik Lat Kangyidaunt 2.00 0.81 1 Air 1 1 1 0 20 66kV S/S Kan Kone Primary 1 NewKone ConstructionPrimary Substation of 66kV to Switch Kyaiklat Bay and 1 Set66/11kV, at 19 Myaungmya 66kV line Kyaiklat Primary - Kyon War (Myaungmya) line Kyaik Lat (Kangyidaunt) Kyaiklat Primary 20.00 66 1 20.0 Concrete poles 66/11kV 10MVA Kyon War (Myaungmya) Kyon War Myaungmya 2.00 0.81 1 Air 1 1 0 10 66kV S/S Kyaiklat Primary 1 NewKangyidaunt Construction Township, of 66kV Kyaiklat Switch Substation Bay 1 Set atand 66kV 66kV Tha 20 Pathein 66kV line 66kV line Tha Lup Khwar - Shawpya - Shaw Pyar (Paline Tha Lup Khwar (Pathein) 66kV line Tha Lup Khwar - Shawpya 12.00 66 1 12.0 Concrete poles 66/11kV 10MVA Shaw Pyar (Pathein) Shaw Pyar Pathein 3.701.50 1 Air1 10 10 66kV S/S 66kV line Tha Lup 1 NewLup Khwar Construction Substation, of 66kV 66kV Double Line 12 circuit miles line from 5 mileTha sL up 21 Labutta 66kV tee-off from 66kV line Myaungmya - Labutta tee-off line near village 66kV line Myaungmya - Labutta 5.00 66 2 5.0 Concrete poles 66/11kV 20MVA Le Pyauk (Labutta) Le Pyauk Labutta 2.00 0.81 1 Air1 1 10 20 Newfrom ConstructionMyaungmya-Labutta of 66kV OutgoingLine and 66/11kV, Switch 1 20MVASet at 22 Myaungmya 66kV line Myaungmya - Pyin / Da Yei Pauk (Myaungmya) line Myaungmya Myaungmya 16.00 66 1 16.0 Concrete poles 66/11kV 10MVA Pyin / Da Yei Pauk (Myaungmya) Pyin / Da Yei Pauk Myaungmya 2.00 0.81 1 Air 1 1 0 10 66kV S/S Myaungmya 1 New66kV ConstructionMyaungmya ofSubstation, 33kV Line 66kV 2.5 miles Line 16from miles from 23 Nyaungdon 33kV tee-off from 33kV line Hlaingtharya - Nyaungdon tee-off line near village 33kV line Hlaingtharya - Nyaungdon 2.50 33 2 2.5 Concrete poles 33/11kV 5MVA Ka Nyin Kauk Gyi (Nyaungdon) Ka Nyin Kauk Gyi Nyaungdon 0.92 0.37 1 Air 1 1 0 1 5 Hlaingtharya-Nyaungdon and 33/11kV, 5MVA No. Name of project Substation MATRIX Switch bays Transformer Name Location Land area 66/3366/1133/11TransformerIn OutBays in new S/S Extension in existing S/S 66/3366/1133/11 Village/Town Township acres ha kV kV kV 66kV33kV66kV33kV66kV 33kV Type In Out Name of S/S 66kV 33kV MVA MVA MVA 1 Ayeyarwady 1.1 Ingapu 66/11kV 10MVA Kwin Kauk (Ingapu) Kwin Kauk Ingapu 2.000.81 1 1 0 1 1 Air 1 1 10 1.2 Kyaunggon 66/11kV 10MVA Hle Seik (Kyaunggon) Hle Seik Kyaunggon 2.000.81 1 1 0 1 1 HGIS1 1 10 1.3 Danubyu 33/11kV 10MVA Za Kar Gyi (Danubyu) Za Kar Gyi Danubyu 0.700.28 1 0 1 1 Air1 0 10 1.4 KyaikLat 66/11kV 20MVA Kyaiklat (Kyaiklat) Kyaiklat Kyaiklat 1.500.61 1 1 0 1 HGIS 1 0 66kV S/S Kyaiklat Primary 1 20 1.5 Einme 66/11kV 10MVA Tha Yet Kone (Einme) Tha Yet Kone Einme 2.200.89 1 1 0 1 Air 1 066kV S/S Kyaunggon 1 10 1.6 Hinthada 66/11kV 10MVA Shan Su (Hinthada) Shan Su Hinthada 2.170.88 1 1 0 1 1 Air 1 1 10 1.7 Myaungmya 66/11kV 5MVA Thein Lar Gat Su (Myaungmya) Thein Lar Gat Su Myaungmya 2.000.81 1 1 0 1 1 Air 1 1 5 1.9 Kyangin 66/11kV 20MVA Bat Ye / Ka Loet Kwin (Kyangin) Bat Ye / Ka Loet Kwin Kyangin 3.00 1.21 1 1 0 1 1 HGIS 1 1 20 1.14 Einme 33/11kV 10MVA Ywar Thit / Ma Nyaung Chaung (EinYwar Thit / Ma Nyaung ChaungEinme 2.400.97 1 0 1 1 Air 1 033kV S/S Einme 1 10 1.15 Ngathaing Chaung66/11kV 20MVA Tha Pyay Kwin, Kone Pyin (Yegyi) Tha Pyay Kwin, Kone Pyin Yegyi 2.501.01 1 1 0 1 1 Air 1 1 20 1.16 Pathein 66/11kV 10MVA Tha Lat Khwar (Pathein) Tha Lat Khwar Pathein 2.000.81 1 1 0 1 2 Air 1 2 10 1.17 Mawlamyainggyun66/11kV 10MVA Kyaung Htauk (Mawlamyainggyun)Kyaung Htauk Mawlamyainggyu2.000.81 1 1 0 1 HGIS1 0 0 10 1.18 Kangyidaut 66/11kV 20MVA Kyaik Lat (Kangyidaunt) Kyaik Lat Kangyidaunt 2.000.81 1 1 0 1 1 Air 1 1 66kV S/S Kan Kone Primary 1 20 1.19 Myaungmya 66/11kV 10MVA Kyon War (Myaungmya) Kyon War Myaungmya 2.00 0.81 1 1 0 1 Air 1 0 66kV S/S Kyaiklat Primary 1 10 1.20 Pathein 66/11kV 10MVA Shaw Pyar (Pathein) Shaw Pyar Pathein 3.701.50 1 1 0 1 Air1 0 66kV S/S 66kV line Tha Lup Khwar - Sha 1 10 1.21 Labutta 66/11kV 20MVA Le Pyauk (Labutta) Le Pyauk Labutta 2.000.81 1 1 0 1 1 Air1 1 20 1.22 Myaungmya 66/11kV 10MVA Pyin / Da Yei Pauk (Myaungmya)Pyin / Da Yei Pauk Myaungmya 2.000.81 1 1 0 1 Air 1 0 66kV S/S Myaungmya 1 10 1.23 Nyaungdon 33/11kV 5MVA Ka Nyin Kauk Gyi (Nyaungdon) Ka Nyin Kauk Gyi Nyaungdon 0.920.37 1 0 1 1 1 Air 1 1 5 No. Name of project Overhead line Name Type Line length Voltage Circuits 66kV 66kV 33kV 33kV Tower type tee-off/line miles kV 1/2 1 ckt 2 ckt 1 ckt 2 ckt 1 Ayeyarwady 1.1 Ingapu 66kV tee-off from 66kV line Myanaung - Hinthada tee-off 10.00 66 2 10.0 Concrete poles 1.2 Kyaunggon 66kV tee-off from 66kV line Athoke - Pathein (old line) tee-off 0.15 66 2 0.2 Concrete poles 1.3 Danubyu 33kV tee-off from Ahpyauk tee-off 8.00 33 1 8.0 Concrete poles 1.4 KyaikLat 66kV line Kyaiklat Primary - Kyaiklat (Kyaiklat) line 0.50 66 1 0.5 Cables 1.5 Einme 66kV line Kyaunggon - Tha Yet Kone (Einme) line 30.00 66 1 30.0 Concrete poles 1.6 Hinthada 66kV tee-off from 66kV line Ahthoke - Hinthada tee-off 0.25 66 2 0.3 Concrete poles 1.7 Myaungmya 66kV tee-off from 66kV line Myaungmya - Labutta tee-off 1.00 66 2 1.0 Concrete poles 1.9 Kyangin 66kV tee-off from 66kV line Oke Shit Pin - Myanaung tee-off 1.50 66 2 1.5 Concrete poles 1.14 Einme 33kV line Einme - Ywar Thit / Ma Nyaung Chaung (Einme) line 12.00 33 1 12.0 Concrete poles 1.15 Ngathaing Chaung 66kV tee-off from 66kV line Yae Kyi - Gwa tee-off 1.40 66 2 1.4 Concrete poles 1.16 Pathein 66kV tee-off from 66kV line Pathein - Nga Yoke Kaung Taung tee-off 0.20 66 2 0.2 Concrete poles 1.17 Mawlamyainggyun 66kV line Bogale - Kyaung Htauk (Mawlamyainggyun) line 17.00 66 1 17.0 Concrete poles 1.18 Kangyidaut 66kV line Kan Kone Primary - Kyaik Lat (Kangyidaunt) line 8.00 66 1 8.0 Concrete poles 1.19 Myaungmya 66kV line Kyaiklat Primary - Kyon War (Myaungmya) line 20.00 66 1 20.0 Concrete poles 1.20 Pathein 66kV line 66kV line Tha Lup Khwar - Shawpya - Shaw Pyar (Patheline 12.00 66 1 12.0 Concrete poles 1.21 Labutta 66kV tee-off from 66kV line Myaungmya - Labutta tee-off 5.00 66 2 5.0 Concrete poles 1.22 Myaungmya 66kV line Myaungmya - Pyin / Da Yei Pauk (Myaungmya) line 16.00 66 1 16.0 Concrete poles 1.23 Nyaungdon 33kV tee-off from 33kV line Hlaingtharya - Nyaungdon tee-off 2.50 33 2 2.5 Concrete poles 1 Ayeyarwady 1.1 Ingapu 1.2 Kyaunggon 1.3 Danubyu 1.4 KyaikLat 1.5 Einme 1.6 Hinthada 1.7 Myaungmya 1.9 Kyangin 1.14 Einme 1.15 Ngathaing Chaung 1.16 Pathein 1.17 Mawlamyainggyun 1.18 Kangyidaut 1.19 Myaungmya 1.20 Pathein 1.21 Labutta 1.22 Myaungmya 1.23 Nyaungdon 2 Magway 2.1 Saw 2.2 Aunglan 2.3 Seikphyu 2.4 Natmauk 2.6 Sinbaungwe 2.9 Sinbaungwe 2.10 Thayet 2.11 Minhla 2.12 Ngape 2.13 Magway 2.14 Aunglan 2.15 Minbu 3 Kayin 3.1 Kyainseikgyi 3.2 Hpayarthonesu 3.3 Kawkareik 3.4 Kyon Doe 3.5 Kyainseikgyi 3.6 Kyainseikgyi 4 Bago East 4.1 Daik-U 4.2 Nyaung Lay Pin 4.3 Nyaung Lay Pin 4.4 Kyauktaga 4.5 Phyu 4.6 Phyu 4.7 Phyu 4.8 Daik-U 4.9 Kyaukkyi 4.10 Waw 4.11 Taungoo No. Name of project Description DROP 1 Ayeyarwady 1.1 Ingapu New Construction of 66kV Double circuit line 10 mile from 66kV Myanaung-Hinthada Line to Kwin Kauk and 66/11kV, 10MVA new Subatation at Kwin Kauk 1.2 Kyaunggon New Construction of 66kV Double circuit line 0.15 miles from 66kV Ah Thoke-Kan Kone(Pathein-1) Line to Kan Ka Lay Village and 66/11kV 10MVA new Substation at , Kan Ka Lay Village 1.3 Danubyu New Construction of 33kV Line 8 miles of Ahpyauk- ZaKaGyi and 33/11kV 10MVA new Substation at ZaKaGyi 1.4 KyaikLat New Construction of 66kV Switch Bay(1) Set at 230kV Kyaiklat Substation, 66kV Line 0.5 miles from KyaikLat Substation to and 66/11kV 20MVA new Substation at Kyaiklat Township (Lattice Tower Type) 1.5 Einme New Construction of 66kV Switch Bay(1) Set at 66kV Kyaunggon Substation , 66kV Line 30 miles at Kyaunggon-Thayet and 66/11kV 10MVA new Substation at Einme Township, Thayet Kone Village 1.6 Hinthada New Construction of 66kV Double circuit line 0.25 Miles from 66kV Hinthada-Yegyi -Ah Thoke Line and 66/11 kV 10MVA new Substation at , Shansu Village 1.7 Myaungmya New Construction of 66kV Double circuit line 1 mile from 66kV Myaungmya-Labutta Line and 66/11kV ,5MVA new Substation at , Thein Lar Village (Lattice Tower Type) 1.9 Kyangin New Construction of 66kV Double circuit line 1.5 miles from 66kV Oke Shit Pin-Myanaung Line and 66/11kV 20MVA new Substation at Kyangin Township, Bet Ye Village 1.14 Einme New Construction of 33kV Switch Bay 12 Set at Einme Substation, 33kV Line 12 miles at Einme -Ywathit and 33/11kV 10MVA at Einme Township, Ywathit Village 1.15 Ngathaing Chaung New Construction of 66kV Double circuit line 1.4miles from 66kV Line Gwa to Thidakonepyin Junction ( Township) and 66/11kV, 20MVA Substation at Thidakonepyin Junction 1.16 Pathein New Construction of 66kV Double circuit line 0.2 mile from 66kV Pathein-Nga Yoke Kaung Taung and 66/11kV, 10MVA Substation at , Tha Lup Khwar Village 1.17 Mawlamyainggyun New Construction of 66kV Line 17 miles from 66kV Bogale Substation to Mawlamyainggyun, 66kV Switch Bay 1 Set at Bogale Substation and 66/11kV, 10MVA Substation at Mawlamyainggyun 1.18 Kangyidaut New Construction of 66kV Line 8 miles from 230kV Kan Kone Primary Substation to Kyaiklat and 66/11kV, 20MVA new Substation at Kyaiklat Township 1.19 Myaungmya New Construction of 66kV Switch Bay 1 Set at Kangyidaunt Township, Kyaiklat Substation and 66kV Line 20 Miles from Kyaiklat Substation to Kyon War Village (5 Mile Junction) and 66/11kV, 10MVA new Substation at Myaungmya Township, Kyon War Village 1.20 Pathein New Construction of 66kV Switch Bay 1 Set at 66kV Tha Lup Khwar Substation, 66kV Line 12 miles from Tha Lup Khwar- Shawpya Line and 66/11kV 10MVA new Substation at Pathein Township, Shawpya Village 1.21 Labutta New Construction of 66kV Double circuit line 5 miles from Myaungmya-Labutta Line and 66/11kV, 20MVA new Substation at , Le Pyauk Village 1.22 Myaungmya New Construction of 66kV Outgoing Switch 1 Set at 66kV Myaungmya Substation, 66kV Line 16 miles from Myaungmya Substation to Pyin Ywa Village and 66/11kV, 10 MVA Substation at Pyin Ywa Village 1.23 Nyaungdon New Construction of 33kV Line 2.5 miles from Hlaingtharya-Nyaungdon and 33/11kV, 5MVA Substation at , Yoe Gyi Village State/Region Indicator Indicator TypePopulation Ayeyarwady Ayeyarwady Area Total 35963.5 Ayeyarwady Population density Total 172.0 Ayeyarwady Population size Total 6184.8 Ayeyarwady Population size Urban 872.6 Ayeyarwady Population size Rural 5312.2 Ayeyarwady Number of households Total 1488983 Ayeyarwady Average household size Total 4.1 Ayeyarwady Average annual population growth rate 2017-18 Total 0.03 Ayeyarwady Average annual population growth rate 2014-15 Total 0.11 Ayeyarwady Proportion of households with access to electricityTotal 29.7% Ayeyarwady Proportion of households with access to electricityUrban 80.1% Ayeyarwady Proportion of households with access to electricityRural 19.8% Ayeyarwady Internet users Total 0.19% Ayeyarwady Mobile Phone Total 68.0% Ayeyarwady Number of households which have Television Total 588361

Magway Magway Area Total 45024.8 Magway Population density Total 20.4 Magway Population size Total 919.8 Magway Population size Urban 131.3 Magway Population size Rural 788.5 Magway Number of households Total 788526 Magway Average household size Total 4.7 Magway Average annual population growth rate 2017-18 Total -0.07 Magway Average annual population growth rate 2014-15 Total -0.04 Magway Proportion of households with access to electricityTotal 26.9% Magway Proportion of households with access to electricityUrban 72.2% Magway Proportion of households with access to electricityRural 14.2% Magway Internet users Total 0.15% Magway Mobile Phone Total 98.0% Magway Number of households which have Television Total 348256

Kayin Kayin Area Total 30327.0 Kayin Population density Total 49.6 Kayin Population size Total 1504.3 Kayin Population size Urban 329.2 Kayin Population size Rural 1175.2 Kayin Number of households Total 308041 Kayin Average household size Total 4.7 Kayin Average annual population growth rate estimatedTotal 1.39 Kayin Population size 2018 Total 1590.0 Kayin Proportion of households with access to electricityTotal 26.9% Kayin Proportion of households with access to electricityUrban 72.2% Kayin Proportion of households with access to electricityRural 14.2% Kayin Internet users Total 0.17% Kayin Mobile Phone Total 68.0% Kayin Number of households which have Television Total 145072

Bago (East) Bago (East) Area Total 23947.0 Bago (East) Population density Total 119.2 Bago (East) Population size Total 2854.4 Bago (East) Population size Urban 490.2 Bago (East) Population size Rural 2364.2 Bago (East) Number of households Total 679619 Bago Average household size Total 4.2 Bago Average annual population growth rate 2017-18 Total 0.21 Bago Average annual population growth rate 2014-15 Total 0.24 Bago (East) Proportion of households with access to electricityTotal 37.0% Bago (East) Proportion of households with access to electricityUrban 80.1% Bago (East) Proportion of households with access to electricityRural 29.1% Bago Internet users Total 0.27% Bago Mobile Phone Total 72.0% Bago Number of households which have Television Total 518186 Bago Number of households Total 1142974 Bago Population size Total 4867.4 Bago Population size Urban 3795.0 Bago Population size Rural 1072.3 Source

MMR_MOH/DHP, Township Health Profile Calculated MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by average growth rate until today MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by average growth rate until today MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by average growth rate until today MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by average growth rate until today MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015 MMR_CSO, Statistical Yearbook MMR_CSO, Statistical Yearbook MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census

MMR_MOH/DHP, Township Health Profile, 2011_2011 Calculated MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by average growth rate until today MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by average growth rate until today MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by average growth rate until today MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by average growth rate until today MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015 MMR_CSO, Statistical Yearbook MMR_CSO, Statistical Yearbook MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015 MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015 MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015 MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census

MMR_MOH/DHP, Township Health Profile, 2011_2011 Calculated MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by calculated growth rate until today MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by calculated growth rate until today MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by calculated growth rate until today MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by calculated growth rate until today MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census Calculated MMR_CSO, Statistical Yearbook MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015 MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015 MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015 MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census

Vulnerability Study Calculated MMR_MOH/DHP, Township Health Profile, 2009_2009, , increased by average growth rate until today MMR_MOH/DHP, Township Health Profile, 2009_2009, , increased by average growth rate until today MMR_MOH/DHP, Township Health Profile, 2009_2009, , increased by average growth rate until today Calculated MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015 MMR_CSO, Statistical Yearbook MMR_CSO, Statistical Yearbook MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile,2009-2010_2011 MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile,2009-2010_2011 MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile,2009-2010_2011 MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census MMR_MOH/DHP, Township Health Profile, 2009_2009, , increased by average growth rate until today MMR_MOH/DHP, Township Health Profile, 2009_2009, , increased by average growth rate until today MMR_MOH/DHP, Township Health Profile, 2009_2009, , increased by average growth rate until today Area Square kilometer 35,964 Population density 172.0 MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by average growth rate until today Population People (1000's) 876.3 5,334.6 6,210.9 MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by average growth rate until today Percent 14.1% 85.9% MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by average growth rate until today Average growth rate 0.07% MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by average growth rate until today Households Number (1000's) 1,495 Average Size 4.1 Access to Electricity 80.1% 19.8% 29.7% with Television 39.3% People Internet users 0.19% Mobile Phone 68.0%

Area Square kilometer 45,025 Population density 20.4 MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by average growth rate until today Population People (1000's) 130.8 785.9 916.7 MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by average growth rate until today Percent 14.3% 85.7% 100% MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by average growth rate until today Average growth rate -0.06% MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by average growth rate until today Households Number (1000's) 786 Average Size 4.7 Access to Electricity 72.2% 14.2% 26.9% with Television 44.3% People Internet users 0.15% Mobile Phone 98.0%

Area Square kilometer 30,327 Population density 49.6 MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by calculated growth rate until today Population People (1000's) 357.7 1,277.0 1,634.6 MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by calculated growth rate until today Percent 21.9% 78.1% 100% MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by calculated growth rate until today Average growth rate 1.39% MMR_MOIP/DOP, The 2014 Myanmar Population and Housing Census_2015, increased by calculated growth rate until today Households Number (1000's) 335 Average Size 4.7 Access to Electricity 72.2% 14.2% 26.9% with Television 43.3% People Internet users 0.17% Mobile Phone 68.0%

Area square kilometer 23,947 Population density 119.2 Population People (1000's) 501.3 2,418.0 2,919.3 Percent 17.2% 82.8% Average growth rate 0.23% Households Number (1000's) 695 Average Size 4.2 Access to Electricity 80.1% 29.1% 37.0% with Television 45.3% MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile,2009-2010_2011People Internet users 0.27% MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile,2009-2010_2011 Mobile Phone 72.0% MMR_MNPED/SIDA/UNDP/UNICEF,Integrated Household Living Conditions Survey in Myanmar, Poverty Profile,2009-2010_2011

Population People (1000's) 3,881.3 1,096.7 4,978.0 Percent 78.0% 22.0% Average growth rate 0.23% No. Description Substation Material (Foreign Costs)

Switchgear Additional Transformer Low voltage Total 66 kV 33 kV 11 kV Bays 1 Ayeyarwady 3,746 9,842 1,129 2,293 586 1,462 19,058 2 Magway 2,478 5,342 295 1,591 388 2,304 12,398 3 Kayin 1,362 2,620 318 811 195 831 6,137 4 Bago East 1,271 4,657 1,478 1,062 265 2,105 10,837 Total 8,857 22,461 3,220 5,757 1,434 6,703 48,430

Sr. No 1 2 3 4 5 6 No. Description

Foreign Costs

1 Ayeyarwady 19,058 2 Magway 12,398 3 Kayin 6,137 4 Bago East 10,837 Total 48,430

S/S [No.] Lines [km] New assets Air insulated Hybrid GIS Single circuit Double circuit 66/33 kV Substation 2 0 66/11 kV Substation 31 5 33/11 kV Substation 7 1 66 kV Line Concrete poles 417.5 23.3 33 kV Line Concrete poles 55.0 5.5 66 kV Line Lattice tower 0.0 123.7 Substations Lines Local Costs No. Description Foreign Costs Total Installation Civil Works Concrete poles Conductors Hardware 1,502 2,692 23,252 1 Ayeyarwady 2,729 1,727 5,723 939 1,665 15,002 2 Magway 2,766 2,119 7,158 479 941 7,557 3 Kayin 2,063 1,611 5,133 783 1,200 12,820 4 Bago East 258 2,679 16,815 3,703 6,499 58,631 Total 7,816 8,137 34,829 Local Costs Total Installation No. Description Substations Lines Total 1,693 11,872 1 Ayeyarwady 23,252.2 11,872.2 35,124.4 2,035 14,078 2 Magway 15,002.0 14,078.1 29,080.1 1,529 10,336 3 Kayin 7,557.4 10,335.9 17,893.3 10,190 29,942 4 Bago East 12,819.8 29,942.0 42,761.9 15,446 66,228 Total 58,631.4 66,228.2 124,859.7 Number of Elecrified Villages Villages Electrified Villages (Grid + Off Grid) Government Private State/ Non- No Electrifie Region electrifie Hydr Hydr Biog Othe d Grid Solar Diesel Total DieselSolar Total d o o as r

1 Ayeyarwaddy 6768 5096 1327 202 1529 13 509 4005 704 8 5239 2 Magway 2975 1813 1179 1179 39 18 1243 496 0 1796 3 Kayin 1161 936 520 165 97 782 55 1 36 287 0 379 4 Bago(East) 1307 1571 1019 4 1023 0 0 0 284 0 284 Total 12211 9416 4045 367 0 101 4513 107 528 5284 1771 8 7698 No Region/ State 01/2017 02/2017 03/2017 04/2017 05/2017 06/2017 07/2017 08/2017 09/2017 10/2017 1 Ayeyarwady 44,652,808 ######## ######## ######## ######## ######## ######## ######## ######## ######## 2 Magway 51,250,971 ######## ######## ######## ######## ######## ######## ######## ######## ######## 3 Kayin 17,276,129 ######## ######## ######## ######## ######## ######## ######## ######## ######## 4 Bago (East) 55,600,960 ######## ######## ######## ######## ######## ######## ######## ######## ######## Total ######### ######## ######## ######## ######## ######## ######## ######## ######## ######## 11/2017 12/2017 01/2018 02/2018 03/2018 04/2018 05/2018 06/2018 07/2018 08/2018 09/2018 10/2018 ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## Energy [MWh]Energy Comsumption 11/2018 12/2018 01/2019 02/2019 03/2019 04/2019 05/2019 06/2019 07/2019 08/2019 09/2019 10/2019 ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ######## ########

Monthly Sold Unit 2017-2020 (without Departmental Con 80,000,000

70,000,000 y = 43954e0.00

60,000,000

50,000,000 y = 745.45e0.000 40,000,000

30,000,000

20,000,000 Energy [MWh]Energy Comsumption 10,000,000

0 Ayeyarw 01/2017 02/2017 03/2017 04/2017 05/2017 06/2017 07/2017 08/2017 09/2017 10/2017 11/2017 12/2017 01/2018 02/2018 03/2018 04/2018 05/2018 06/2018 07/2018 08/2018 09/2018 10/2018 11/2018 12/2018 01/2019 02/2019 11/2019 12/2019 01/2020 02/2020 03/2020 04/2020 ######## ######## ######## ######## ######## 31,006,733 Region/ State #### #### #### #### #### ######## ######## ######## ######## ######## 40,449,569 1 Ayeyarwady 51 50 51 55 50 ######## ######## ######## ######## ######## 12,241,413 2 Magway 60 65 65 67 64 ######## ######## ######## ######## ######## 54,384,222 3 Kayin 20 23 22 23 21 ######## ######## ######## ######## ######## ######### 4 Bago (East) 65 67 63 62 58 Total 196 204 202 207 193

al Consumption)

0.0002x y = 6581x - 2E+08

0.0003x

y = 8.4158e0.0003x

yarwady Magway 02/2019 03/2019 04/2019 05/2019 06/2019 07/2019 08/2019 09/2019 10/2019 11/2019 12/2019 01/2020 02/2020 03/2020 Region Total Energy Consumption Consumption per household PopulationConsumption Household Consumption #### #### #### #### #### #### #### #### 1000's) GWh/year kWh/Person Nos. people kWh/year 52 53 59 56 55 55 55 51 Ayeyarwady 6,211 693.5 112 4.1 458 63 61 64 57 54 55 55 61 Magway 917 792.3 864 4.7 4062 17 18 17 20 23 24 27 28 Kayin 1,635 284.7 174 4.7 819 59 59 68 67 64 64 62 70 Bago East 2,919 826.6 283 4.2 1189 191 192 208 200 197 198 198 210 11,682 2597.1 222 4.26 946 Consumption per household Consumption kWh/day 1.3 11.1 2.2 3.3 2.6 No. 66 kV Lines Conductor Miles Towers Ayeyarwady 1 66 kV Yegyi - Athoke 336.4 MCM 13.76 107 2 66 kVPathein - Myaungmya 266.8 MCM 16.62 100 3 66 kV Pathein - Hmanset 70/40 sqmm 3.01 62 4 66 kV Myanaung - Hinthata 336.4 MCM 63 373 5 66 kV Hinthata - 336.4 MCM 40 228 6 66 kVOakshinpin - Myanaung 336.4 MCM 40.8 246 7 66 kVAthoke - Pathein 336.4 MCM 29.51 194 8 66 kVPathein (Kan Kone) – Pathein (Myatto) 336.4 MCM 6.5 39 9 66 kVMyaungmya - Latpottar 397.5 MCM 36.34 639 10 66 kVAthoke - Tharpaung 605 MCM 39.2 233 11 66 kVAthoke – Kangyidaung (Fertilizer) 397.5 MCM 34.08 209 12 66 kVPathein (Kan Kone)- Ngayokekaung taung 300/15 sqmm 53 906 13 66 kVNgayokekaungtaung - Ngapyayma 300/15 sqmm 23.47 367 14 66 kV Kyangin-Seikthar (Methnol) 70 sqmm 9 146 15 66 kV Myanaung - Kyangin 266.8 MCM 8 115 Magway 1 66 kV –Nyaungoo 266.8 MCM 28.1 316 2 66 kV Kyunchaung – Kyunchaung (Fertilizer) 266.8 MCM 1.3 15 3 66 kV Kyunchaung - Warsi 266.8 MCM 19.2 175 4 66 kV Kyunchaung - Pakokku 185 sqmm 24.8 313 5 66 kV Pyi – Thayet (Yonesate) 266.8 MCM 34 525 6 66 kV Aunglan – Thayet 266.8 MCM 8 156 7 66 kV Pyi – Kyawswar 336.4 MCM 16.43 93 8 66 kV Chauk–Pakhannge 266.8 MCM 14.53 208 9 66 kV Chauk - Kyaukpadaung 185 sqmm 21.4 328 10 66 kV Pakokku – Pakhangyi 120 sqmm 15.38 205 11 66 kV Kyunchaung - Salay(Fertilizer) 185 sqmm 31.31 400 12 66 kV Pakokku-Pakokku(Textile Industry) 150 sqmm 3 52 13 66 kV Kyaukpadaung - Posolan 150 sqmm 15 240 14 66 kV Koepin – Kapasa (8) 397.5 MCM 6 98 15 66 kV Chaunggu – Kyaw (1 + 2) 605 MCM 42.07 216 16 66 kV Chaunggu – Pauk (1) 605 MCM 3.75 70 17 66 kV Chaunggu – Pauk (2) 605 MCM 3.75 68 18 66 kV Kyaw – Gangaw 605 MCM 30.1 436 19 66 kV Aunglan – Meekhanoat Factory 397.5 MCM 7.5 117 20 66 kV Oakshinpin - Kanma - Mintone 397.5MCM 54.83 894 21 66 kV Gangaw–Myitthar 605 MCM 14.84 262 22 66 kV Taungtwingyi - Aunglan 397.5 MCM 60 838 23 66 kV Aunglan - Shwepantaw (Kapasa-15) 397.5 MCM 21.4 344 24 66 kV Minbu – Ngephal (Kapasa-14) 795 MCM 33 510 25 66 kV Minbu–Malon (Kapasa-10) 795 MCM 22 270 26 66 kV Aunglan – Kapasa (12) 397.5 MCM 17.5 211 27 66 kV – Swunhsae(Kapasa-17) 397.5 MCM 24.5 343 28 66 kV Tanyaung-Kansonma(Kapasa-21) 795 MCM 29.49 474 29 66 kV Tanyaung-Pauk(Kapasa-22) 795 MCM 35 569 30 66 kV Kyunchaug - (1) (Thapana) 397.5 MCM 51.25 802 31 66 kV Kyunchaug - Myaing (2) 120 sqmm 30.7 495 32 66 kV - (Kapasa-20) 397.5 MCM 2.8 46 33 66 kV Taungdwingyi-kalama(Kapasa-18) 397.5 MCM 21 326 34 66 kV Chaunggu – Pauk (Thayarttaw) 397.5 MCM 3.59 51 35 66 kV Pauk – Mintap 397.5 MCM 34.82 490 36 66 kV - Saw 397.5 MCM 22.14 319 37 66 kV Kyaukhtu – Tilin 397.5 MCM 22.82 355 Kayin 1 66 kV Thaton - Baphan 397.5 MCM 22 353 2 66 kV Mawlamyine – Kayone - Baphan 397.5 MCM 35.21 504 3 66 kV Thaton - Ton (4000) - Ton (900) 397.5 MCM 17.5 322 Bago Division 1 66 kV Shwetaung - Pyi 336.4 MCM 9.64 55 2 66 kV Shwetaung-Textile industry 100 sqmm 1 12 3 66 kV Shwetaung- Nuthmaw 266.8 MCM 4 46 4 66 kV Zaungtoo - Kamarnat 185 sqmm 45.25 646 5 66 kV Shwetaung – Hsintae 397.5 MCM 11.5 133 6 66 kV Hsintae – Nyaungchayhtauk 397.5 MCM 20 259 7 66 kV Oakshinpin-(Kapasa-6) 336.4MCM 4.4 32 8 66 kV Hsintae - Oakshinpin 397.5 MCM 17.3 282 9 66 kV Oakshinpin - Mathone 397.5 MCM 12.2 188 10 66 kV Kasala (5) - Kwinhla 266.8 MCM 0.94 13 11 66 kV Kamyaing – kapasa (5) 336.4 MCM 2.5 33 12 66 kV Shwetaung-Kyaukswyalkyoe 397.5 MCM 32 448 13 66 kV Shwetaung-Paukkhaung 795 MCM 44 677 14 33 kV Yenwe - Tharyargone 397.5MCM 17 336 15 33 kV Khapaung – Taungoo (1) 95sqmm 15.57 300 16 33 kV Khapaung – Taungoo (2) 400/35sqmm 15.57 286

No Substation Voltage Ayeyarwady 1 Athoke 230/66/11 2a Pathein 230/66/11 2b Pathein 230/66/11 Magway 1 Chaunggu 230/66/11 2a Taungdwingyi 230/132/11 2b Taungdwingyi 230/132/11 1 Chauk 132/66/11 2 Sidoktaya 132/66/11 3 Tanyaung 132/66/11 4 Buddhagone 132/66/11 5a Magway 132/33/11 5b Magway 132/33 Kayin Bago Division 1a Kamarnat 230/33/11 1b Kamarnat 230/33/11 2 Taungoo 230/33/11 3 Tharyargone 230/33/11 4 Thaephyu 230/33/11 5 Oakshinpin 230/66/11 6 Minhla 230/33/11

MVA Location

100 , Yegyi Township, Athoke 50 Patheain District, Kan-gyi-daunt Township 50 Patheain District, Kan-gyi-daunt Township

100 , Chaunggu Village 80 Taungdwingyi Township 60 Taungdwingyi Township 40 , 45 Sidoktaya Township 60 , 60 , Magway Division 60 Magway Township 15 Magway Township

100 Kamarnat village,Bago 60 Kamarnat village,Bago 60 Oaktwin Township 30 Kyauktagar township, Tharyargone village 100 Yaetarshae township, Myohla, Thaephyu village 100 Pyi district, Pantaung township, Oakshinpin 100 Tharyarwady district, Minhla Township Oakshinpin Current Demand and Demand Forecast for Each Project Region (FY 2017 to 2022)

Region/State Consuming maximum electricity in year (MW) No. 2016 2017 2018 2019 2020 2021 2022 ### 2024 2025 2026 2027 1 Ayeyarwardy 89.45 103.80 124.56 140.75 157.64 174.98 194.23 2 Magway 81.45 97.70 116.26 130.21 143.24 157.56 173.32 3 Kayin 39.90 42.00 48.30 54.10 59.51 66.05 73.32 4 Bago East 177.30 207.53 224.13 237.58 249.46 264.43 280.29

Source: ESE

Region/State Increase in consumption per year (%) No. 2016 2017 2018 1 Ayeyarwardy 16% 20% 13% 2 Magway 20% 19% 12% 3 Kayin 5% 15% 12% 4 Bago East 17% 8% 6%

2028 2029 2030 406.00 293.00 165.00 646.00

Increase in consumption per year (%) 2019 2020 2021 2020-2030 12% 11% 11% 158% 10% 10% 10% 105% 10% 11% 11% 177% 5% 6% 6% 159%

300

2016 2017 2018 2019 2020 2021 2022 250

200

150 (MW) 100 g maximum electricity in in year electricitymaximum g 50 Consuming ma Consuming 0 Ayeyarwardy Magway Kayin

700

2016 2017 2018 2019 2020 20

600

500

400 406

300 293

200 194 175 173 158 158 141 143 130 100 125 116 104 98 89 81

0 Ayeyarwardy Magway

Ayeyarwardy Mag 700

600

500

400

300

200 100

0 2016 2017 2018 2019 2020 2021 2022 yin Bago East

2021 2022 2030 646

280 264 249 238 224 208 177 165

73 60 66 40 42 48 54

Kayin Bago East

Magway Kayin Bago East 2023 2024 2025 2026 2027 2028 2029 2030

Existing Diesel-Generators List in Ayeyarwaddy Region average runtime 3 hours/day Information provided by ESE total runtime per year 1096 hours cosphi 0.8 As per list of diesel generators Diesel consumption 0.4 L/kVA https://energyeducation.ca/encyclopedia/Diesel_generator Price for diesel 0.63 USD/L 870 MMK per end of Feb 2020 CO2 1.27 kgCO2/kWh Paper 'Estimation of Carbon Footprints from Diesel Generator Emissions' NOx 60 g/L at 20% load https://www.homerenergy.com/products/pro/docs/latest/generator_nitrogen_oxides_emissions_factor.html

Location Diesel Generator Effective Diesel Emissions Powe Age S Pnom Work Usage Cost CO2 r y KVA KW kW MWh L USD ton 1 Ayeyarwady 10.3 5,343 4,274 2,277 2,495 ####### 780,816 3,169 2 Magway 27.1 3,360 2,688 1,584 1,736 867,834 543,177 2,204 3 Kayin 11.6 5,904 4,728 4,002 4,385 ####### ####### 5,569 4 Bago East 12 2,536 1,988 459 503 251,475 157,398 639 15 ##### ##### 8,322 9,119 ####### ####### 11,581 Information provided by ESE

As per list of diesel generators https://energyeducation.ca/encyclopedia/Diesel_generator 870 MMK per end of Feb 2020 Paper 'Estimation of Carbon Footprints from Diesel Generator Emissions' https://www.homerenergy.com/products/pro/docs/latest/generator_nitrogen_oxides_emissions_factor.html

Emissions NOx ton 75 52 132 15 274 https://www.homerenergy.com/products/pro/docs/latest/generator_nitrogen_oxides_emissions_factor.html Ministry of Electricity and Energy, Electricity Supply Enterprise List of Unit Losses Mio. kWh from fiscal year 2010/11 to 2016/17 Production Consumption Losses Fiscal Small year Diesel Received Total Selling Own use Total Effective Relative Hydro 1 2 3 6=1+2+3 4 5 7=4+5 8=6-7 2010/11 42.0 31.8 3,922.7 3,996.6 3,411.6 7.6 3,419.1 577.4 14.4% 2011/12 48.9 38.2 4,978.7 5,065.8 4,181.0 11.1 4,192.1 873.7 17.2% 2012/13 44.1 50.6 5,325.8 5,420.5 4,492.1 10.6 4,502.7 917.8 16.9% 2013/14 45.1 60.6 6,088.6 6,194.3 5,357.0 9.2 5,366.1 828.2 13.4% 2014/15 40.6 63.4 7,342.3 7,446.3 6,324.1 9.2 6,333.3 1,113.0 14.9% 2015/16 35.7 52.0 6,227.8 6,315.6 5,345.5 6.5 5,352.0 963.6 15.3% 2016/17 34.4 59.5 6,267.0 6,360.9 5,491.3 3.2 5,494.4 866.5 13.6%

8,000 Production Consumption Losses Linear

7,000

6,000

5,000

4,000

Mio. kWhMio. 3,000

2,000

1,000

- 2010/11 2011/12 2012/13 2013/14 2014/15 20.0% 19.0% 18.0% Effective Trend 17.0% 16.0% 15.0% 14.0% 13.0% 12.0% 11.0% 10.0% 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 201

20.0% inear (Losses) 18.0% y = -0.003x + 0.1632 16.0%

14.0%

12.0%

10.0%

8.0%

6.0%

4.0%

2.0%

0.0% 2015/16 2016/17 2016/17 Trips [Nos.] No. Substation Consumers 2017 2018 2019 1 Ayeyarwady 208498 39 154 169 Comparison of Shortage Electricity Line due to Line Fault in Main Substations at Ayeyarwaddy Region Shortage Electricity Area No. Distribution Line Affected Township Trip Consumer SAIFI Total Hours Hours Minutes Seconds Hours SAIDI 1 66kV Tharpaung(1) Tharpaung Paper-Mill 7 1 0.0000 ####### 10.00 14 0 10.23 1.46 0.000 2 66kV Tharpaung(2) Tharpaung Paper-Mill 7 1 0.0000 ####### 10.00 45 0 10.75 1.54 0.000 3 66kV Kangyidaung(1) Kangyidaung Fertilizer Plant 6 1 0.0000 ####### 5.00 57 0 5.95 0.99 0.000 4 66kV Kangyidaung(2) Kangyidaung Cement Factory 6 1 0.0000 ####### 6.00 12 0 6.20 1.03 0.000 Yeykyi, Ngathaichaung, , 5 66kV Yeykyi Danuphyu, , Aeinme, 7 34317 1.6479 ####### 9.00 49 0 9.82 1.40 2.311 Kyaungkone 6 66kV Pathein Pathein, Myaungmya, Lapwatar 7 64344 3.0898 ####### 3.00 15 0 3.25 0.46 1.435 Pathein, Ngaputaw, Kangyidaung, 7 66kV Mirror Factory 2 45085 0.6186 ####### 1.00 52 0 1.87 0.93 0.577 Tharpaung 8 66kV Ngayokekaung TaungHaigyi Kyun 4 2023 0.0555 ####### 1.00 23 0 1.38 0.35 0.019 Average 5.75 145773 5.41 6.18 1.02 4.34 SAIFI SAIDI

No. Distribution Line Affected Township Trip Consumer SAIFI Total Hours Hours Minutes Seconds Hours SAIDI 1 33kV Yeni-Yaetarshey Line Kywepwe, Zayawady, Phyu, Mone 67 15517 2.9305 ####### 4.00 15 0 4.25 0.06 0.1859 33kV Lewe Army 2 area+Water Pumping Lewe Army area +Water Pumping 66 1 0.0002 ####### 14.00 24 0 14.40 0.22 0.0000 Line 33kV No (2029) Air 3 Air Defence Battalion 29 1 0.0001 ####### 2.00 34 0 2.57 0.09 0.0000 Defence Battalion 4 33kV TharGaYa (1 ) Line Thargaya-1 5 1 0.0000 ####### 19.00 44 0 19.73 3.95 0.0001 5 33kV TharGaYa (2 ) Line Thargaya-1 9 1 0.0000 ####### 19.00 30 0 19.50 2.17 0.0001 33kV Paper-Chemical (1 ) Paper- 6 40 1 0.0001 ####### 14.00 30 0 14.50 0.36 0.0000 Line Chemical (1) 33kV Paper-Chemical (2 ) Paper- 7 1 0.0000 0.00 0 0.00 0.0000 Line Chemical (2) 33kV Industrial- ceramic 8 Industrial- ceramic 33 1 0.0001 ####### 20.00 26 0 20.43 0.62 0.0001 Line 9 33kV Max Myanmar Line Industrial- ceramic 9 1 0.0000 ####### 2.00 58 0 2.97 0.33 0.0000 10 33kV Brick Mill (Pantin) Line Brick Mill (Pantin) 19 1 0.0001 ####### 14.00 56 0 14.93 0.79 0.0000 11 33kV Sugar Mill Line Oketwin 69 4153 0.8077 ####### 16.00 2 0 16.03 0.23 0.1877 12 33kV Taungngu Line Taungngu 31 27644 2.4156 ####### 12.00 14 0 12.23 0.39 0.9532 13 33kV Zayawady Line Kywepwe, Zayawady, Phyu, Mone 81 23028 5.2578 ####### 1.00 42 0 1.70 0.02 0.1103 14 33kV Htantapin Line Hatantapin 27 8564 0.6518 ####### 17.00 31 0 17.52 0.65 0.4229 15 33kV TaPaKha Line Kaytumady 49 5261 0.7266 ####### 21.00 54 0 21.90 0.45 0.3248 16 33kV Khapaung -1 Line 12 0 0.0000 ####### 6.00 59 0 6.98 0.58 0.0000 17 33kV Khapaung -2 Line 6 0 0.0000 ####### 6.00 25 0 6.42 1.07 0.0000 18 33kV Bago -1 Line Bago 14 21329 0.8417 ####### 13.00 30 0 13.50 0.96 0.8116 19 33kV Bago -2 Line Bago 32 14524 1.3101 ####### 19.00 38 0 19.63 0.61 0.8038 Waw, 20 33kV Sittaung Line 50 10748 1.5148 ####### 6.00 30 0 6.50 0.13 0.1969 MyitKyo 33kV Industrial zone Kawa, 21 51 24526 3.5258 ####### 20.00 22 0 20.37 0.40 1.4080 ( Chinsu) Line Inntagaw 33kV Hpayargyi + , Hpayargyi, Hpayarlay, 22 50 18808 2.6508 ####### 4.00 0 0 4.00 0.08 0.2121 Ayethukha Line Ayethukha 33kV Inntagaw 23 Industrial Zone 13 1 0.0000 ####### 0.00 18 0 0.30 0.02 0.0000 ( Industrial zone) Line 33kV Myanma Economic Inntagaw 24 4 1 0.0000 ####### 8.00 24 0 8.40 2.10 0.0000 (U-Paing) Line ( Industrial zone) 25 33/66kV Zaungtu Line - 26 0 0.0000 ####### 23.00 49 0 23.82 0.92 0.0000 26 33kV NyaungInn -1 Line NyaungInn -1 (Industrial zone) 22 1 0.0001 ####### 2.00 6 0 2.10 0.10 0.0000 27 33kV NyaungInn -2 Line NyaungInn -2 (Industrial zone) 48 1 0.0001 ####### 3.00 6 0 3.10 0.06 0.0000 28 33kV Yenwe -1 Line - 13 0 0.0000 ####### 6.00 27 0 6.45 0.50 0.0000 29 33kV Yenwe -2 Line - 2 0 0.0000 ####### 0.00 25 0 0.42 0.21 0.0000 Kyauktaga, Penwegone, Kyaukkyi, 30 33kV Phyu Line 68 20569 3.9426 ####### 14.00 31 0 14.52 0.21 0.8417 Kanyutkwin, Tawkwelinn, Phyu Painzalot, Phado, Nyaunglaypin, 31 33kV Daik-U Line 71 32002 6.4046 ####### 6.00 15 0 6.25 0.09 0.5638 Pyuntazar, Daik U Accelerated Rural Electrification Project (RRP MYA 53223)

Appendix 2 to Initial Environmental Examination (IEE)

Site Visit Report

Project Number: 53223-002 Loan Number: XXXX August 2020

The Republic of the Union of Myanmar: Accelerated Rural Electrification Development Project

Prepared by the Ministry of Electricity and Energy, Government of The Republic of the Union of Myanmar for the Asian Development Bank. 2

SITE VISIT REPORT / EVALUATION MATRIX January 8 – 15, 2020

Site observations are for proposed new substations, existing substations that may be upgraded /undergo extension works as part of the project, and proposed new distribution lines. Photo documentation of the sites were undertaken; informal meetings and public consultations with villagers and potential beneficiaries, affected persons, village administrators and public officials were done on-site when possible. The following criteria for subproject selection was considered during environmental due diligence: o Exclusion of subprojects that are Category A for environment, including any potential impact on areas declared as forests, wildlife sanctuaries, protected areas, elephant corridors by the Government o New substation sites / new distribution line transects - Proximity to any sensitive natural and human receptors e.g. species or habitat of conservation value, significant number of trees of economic value (such as fruit bearing trees), water bodies (such as wetlands, mangroves, rivers, lakes or ponds), existing host communities / neighborhoods, schools and physical cultural resources (PCRs) o New substation site - status of ownership, land title; number of villages / intended project beneficiaries that will benefit from electrification No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region Site Visit: 8 January 2020,

1 Natmauk New New S/S  The total earmarked area The construction of Township, construction of site for the new S/S is 0.93 ha. substation is not Magway 66kV distribution  The land area is owned by expected to cause District line 28.9 km 66/11kV, ESE. significant adverse Mayway from Natmauk 5MVA environmental  The new S/S site (“site”) is Region Township, 66kV Thamhonek impacts Kankyi S/S (E/F) onegyi S/S, an open barren land and to near Thamhonek uneven. It will require Thamhonekoneg onegyi leveling and some backfill; yi Village, 66kV village the backfill will be Switch Bay 1 Set procured from within the

1 S/S = substation; E/F = existing facility; ha = hectare; m = metre; ESE = Electricity Supply Enterprise, Government of Myanmar; ERP = Emergency Response Plan; PPE = Personal Protective Equipment 3

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region at Kankyi S/S site; therefore, no Site of new Thamhonegonekyi and new additional borrow areas. S/S construction  The site is located near 66/11kV, 5MVA the main Natmauk road S/S at and further accessible by Thamhonekoneg an earth road sloping yi Village down towards the site that will cross over an existing natural stream.  The earth road will be modified into 6 to 7.5 m wide paved road.  A box culvert will be constructed over the natural stream and the environmental flow will be maintained; the S/S boundary will be designed to maintain a distance of at least 20-30 m from the natural stream  The incoming new 66kV distribution line from the E/F Kankyi S/S will connect to the southern side of new S/S. The outgoing distribution line from the new S/S will mainly follow the road easement (Natmauk road)

4

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region or across agricultural fields.  Few households are located at a distance of greater than 500 m from the site; the nearest village called ‘Kabyu’ is located at a distance of approximately 10 km.  Except for the existing natural stream, there are no sensitive natural or human receptors that may be impacted by the construction of the new S/S.  Civil works will result in adverse environmental impacts that will be temporary and localized such as generation of dust and noise, and increase in traffic due to movement of construction vehicles.  The ESE proposes to construct tube-wells at the site and extract water for construction and operation of the new S/S. 5

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region 2 Natmauk E/F site  The Kankyi S/S was The extension Township, 66kV commissioned in year works at the E/F Magway Kankyi S/S, 2018. site is not expected District Natmauk  The land area is to cause any Mayway Township approximately 0.8 ha with significant adverse Region impacts, all works a one level-control will be confined to building and switchyard; within the existing this will be upgraded with fenced perimeter / 66kV switch bay 1 set. boundary  Incoming lines from Switch yard of existing facility 66/11kV new S/S 66kV Kankyi S/S Thamhonekonegyi will connect to Kankyi S/S and outgoing lines will connect to a S/S in Taungtwingyi Township.  At the time of the site visit, there was no permanent staff onsite, only one temporary staff that is deputed on rotation basis. Control building of existing  ERP is not maintained on- facility 66kV Kankyi S/S site; However, as per the discussion with the Divisional Engineer at the time of the site visit, ERP is available at the main ESE regional office.  Safety signage and safety instruction labels were observed.

6

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region  Only 1 potable fire extinguisher was observed onsite; no sand pails were absent.  PPE was not observed on staff.  The S/S boundary was fenced and maintained.  There is no designated storage area for new / old equipment; drainage built around the S/S periphery seems to drain into the adjacent plot which is an open field. There are no oil pits.  Detailed EHS audit will be carried out for Kanyi S/S and S/S in Taungtwingyi Township. 7

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region 3 Natmauk New 66 kV  The proposed transect will Given the scale of Township, distribution mainly follow road subproject and Magway line transect easements and some existing land use, District portions may cross this distribution line Mayway length 28.9 agricultural fields and is not expected to Region km, other cultivated areas cause significant from E/F adverse such as Tragacanth (local 66kV Kanyi environmental S/S to new herb name) / gum impacts construction plantations. 66kV  Overall, the proposed Thamhonek transect will not disturb onegyi S/S, any sensitive natural Natmauk receptors or cross into Township human settlements; however, avoidance of plantations, dense tree Alignment of new 66kV coverage areas, distribution Line settlements and PCRs will be avoided as part of the finalization of the detailed design of distribution line alignment.  Placement of poles in water channels will be avoided  The ROW for 66kV line will be approximately 23 m.  Pruning of trees that fall within the ROW may take place as well as ground

8

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region clearance; no herbicides will be employed. For trees that may be felled within the ROW, due permission will be obtained from the local forest department prior to any subproject activity.

Site Visit: 9 January, 2020, Magway Region

4. Sinbaungwe New New S/S  The total earmarked area The construction of Township, construction of site of new S/S is substation is not Thatyet 66kV distribution approximately 0.8 ha and expected to cause District, line 35.4 km 66/11 kV, it is owned by ESE. significant adverse Magway from 66kV Koe 5MVA Da  The land has been environmental Region Pin S/S (E/F) to None impacts donated by the villagers Da None Myaung S/S Trees that will be to the Government. Myaung Village, Sinbaungwe cleared will be 66kV Switch Bay Township  The site is surrounded by replanted by ESE 1 Set at Koe Pin agricultural land in the after construction S/S and new east, Da None Myaung of the S/S as part construction of village (1.6 km from the of site rehabilitation 66/11kV 5MVA site) in the west, a village Site of new Da None Myaung and landscaping S/S at Da None (4.83 km from the Site) in S/S Myaung Village the south and Mankin village and Konebo village (3.22 km from site) in the north.  There are existing 10 mature trees line that the 9

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region new S/S site boundary; these may be retained at margins as long it does not cause interference in the functioning of the new S/S.  There are no sensitive natural or human receptors in the immediate vicinity that may be impacted by the construction of the new S/S.  Civil works will result in adverse environmental impacts that will be temporary and localized such as generation of dust and noise, and increase in traffic due to movement of construction vehicles.

5 Sinbaungwe E/F site  The existing S/S was The extension Township, commissioned in 2016. works at the E/F Thatyet 66kV Koe  The total area is 0.86 ha site is not expected District, Pin S/S and it is fenced. to cause any Magway Sinbaungwe significant adverse  It has a one-level control Region Township impacts, all works building and switchyard; will be confined to this will be upgraded with within the existing 66kV Switch Bay 1 set.

10

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region  There are 2 permanent Control building of E/F Koe Pin fenced perimeter / staffs and 6 daily S/S boundary workers.  The fire emergency training is provided twice a year in collaboration with Local Fire Department.  Safety equipment (e.g. 2 portable extinguishers, PPE, etc.) and safety instructions are provided Switchyard of E/F Koe pin S/S at the existing S/S. However, there is no manual instruction for ERP onsite. However, as per the divisional engineer at site, ERP is available at the main ESE regional office.  There is no dedicated storage area for new / old equipment on-site; Control office drainage built around the S/S periphery seems to drain into the adjacent plot which is an open field.  There are no oil pits.

11

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region

Portable fire extinguisher

Safety Equipment / PPE

12

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region

Safety instructions

Condition of toilet

13

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region

Waste disposal at S/S

6 Sinbaungwe New 66 kV  The proposed transect will The proposed line Township, distribution mainly follow Kyopin- alingment has Thatyet line transect Tharya road easement been re-routed to District, and will cross Sinpyuu avoid community Magway length 35.5 village area including forest plantation Region km creeks, small to medium and protected public forest. water channels. from E/F 66kV Koe  The proposed transect Pin S/S to seems to cross a community forest School new construction plantation and a protected Da None public forest called Tharsi; Myaung S/S avoidance of plantations, dense tree coverage areas, protected areas, settlements and PCRs will be avoided as part of the finalization of the detailed design of distribution line alignment. Pond

14

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region  Placement of poles in water channels will be avoided  The ROW for 66kV line will be approximately 23 m.  Pruning of trees that fall within the ROW may take place as well as ground clearance; no herbicides Community forest plantation will be employed. For

trees that may be felled within the ROW, due permission will be obtained from the local forest department prior to any subproject activity.

‘Tharsi’ Protected Public Forest

15

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region

Tharsi’ Protected Public Forest 7. Sinbaungwe New New S/S  The new S/S site is a The construction of Township, construction of vacant plot of land owned substation is not Thatyet 66kV Lines 8 66/11 kV, by the Government that is expected to cause District km from 5MVA, yet to be transferred to significant adverse Sinbaungwe S/S S/S at the ESE. environmental to Sinbaungwe Sinbaungwe impacts  The total earmarked area City, 66kV City Switch Bay 1 Set for the new S/S is 2 ha. at Koe Pin S/S  The new S/S site will require some leveling and and 66/11kV 5MVA S/S at it is free from any Site of new Sinbaungwe S/S Sinbaungwe City encumbrances.  The new S/S is located besides the existing Sinbaungwe main road; an existing approach road to the site will be further upgraded and paved.  The nearest villages (named ‘Laykyo village and Ywarthi village’) are

16

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region located within 1.6 km from the site  The nearest water source is a river (name not unknown) located within 1.6 km west of the site.  There are no sensitive natural or human receptors nearby that may be impacted by the construction of the new S/S.  Civil works will result in adverse environmental impacts that will be temporary and localized such as generation of dust and noise, and increase in traffic due to movement of construction vehicles. Site Visit Date: 10 January, 2020, Ayewarwady Region

17

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region 8. Kyangin New New S/S  The total area for the new The construction of Township, construction of site S/S site is 1.21 ha. substation is not Hinthada 66kV Double  The land is owned by expected to cause District Circuit line 2.4 66/11kV, ESE. significant adverse km from existing 20MVA environmental  Currently, the land use is 66kV Pat Ye S/S, impacts for cultivation of paddy Oakeshitpin- Pay Ye Myanaung line Village within the site and wider and 66/11kV area of influence. 20MVA new S/S  The new S/S site is Site of new Bet Ye S/S at Kyangin located beside the Pay

Township, Pat Ye-Kyangin-Myanaung- Ye Village Hinthata road; there is an existing approach road to site that will be further upgraded and paved.  There are no sensitive natural or human receptors in close proximity to the site.  Wildlife (elephants) has been observed in near Pauknwaysan village, located at a distance of 13 km from site.  The new S/S site will require some leveling.  Civil works will result in adverse environmental impacts that will be

18

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region temporary and localized such as generation of dust and noise, and increase in traffic due to movement of construction vehicles.

9. Inkapu New New S/S  The total area for the new The construction of Township, construction of site S/S site is 0.8 ha and it is substation is not Hinthada 66kV double currently owned by ESE. expected to cause District circuit line 16 km 66/11kV,  The current land use significant adverse from existing 10MVA within the site and in the environmental 66kV Myanaung- Kwin Kauk impacts wider area of influence is Hinthada line to S/S, Kwin Kauk and Kwin Kauk agricultural land, used for 66/11 kV,10MVA (North) green gum and lentil new S/S at Kwin plantations. Village Site of new Kwin Kauk S/S Kauk  The site is located near the main road (name unknown). There is an existing approach road that will cross over an existing irrigation channel.  A box culvert will be constructed for access and irrigation channel maintained.  Kwin Kauk village is located at a distance of 1.6 km from site in the west and Anyartan 19

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region Gwetauk village is located at a distance of 2 km from the site in the north; there are no sensitive natural or human receptors in close proximity to the site.  The nearest identified elephant corridor / reserve forest is located at a distance of at least 30 km from the site.  The new S/S site is required levelling. Civil works will result in adverse environmental impacts that will be temporary and localized such as generation of dust and noise, and increase in traffic due to movement of construction vehicles.

20

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region 10. Hinthada New New S/S  The total area for the new The construction of Township, construction of site S/S is 0.8 ha. substation is not Hinthada 66kV double  The land purchase is expected to cause District circuit line 0.4 66/11 kV currently under significant adverse km from existing 10MVA negotiation between ESE environmental 66kV Hinthada- Shansu S/S impacts and land owner. Yaekyi-Ahthot Shansu Persons that may line and 66/11 Village,  The new S/S site is be affected will be kV 10MVA new Hinthada located beside the main compensated S/S at Hinthada road connected from the Township Site of new Shansu S/S based on national Township, Hinthada Township to laws and ADB SPS Shansu Village Pathein Township. 2009. (tap off)  The approach road will be constructed to connect the site to the main road. The width of the approach road will be 10 m.  There are existing some mature trees that currently line the site boundary, these may be retained at margins as long it does not cause interference in the functioning of the new S/S.  The site is surrounded by paddy fields, Inntalu village in the east (1 to 2 km from the new S/S site) and Pyitawthar village in 21

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region the south (2 km from the new S/S site).  There are no sensitive natural or human receptors in close proximity that may be impacted by the construction of the new S/S.  The site will require some levelling. Civil works will result in adverse environmental impacts that will be temporary and localized such as generation of dust and noise, and increase in traffic due to movement of construction vehicles.

11. Ngathaing- New New S/S  The total area for the new The construction of chaung construction of site S/S will be approximately substation is not Township, 66kV double 0.8 ha. expected to cause Pathein circuit line 200m 66/11kV,  The land is a vacant plot significant adverse District from existing 20MVA environmental and owned by ESE. 66kV line Gwa to Thidakonep impacts Thidakonepyin yin S/S,  The site is located by the street Thidakonep Gwa-Ngathaingchaung (Ngathaing- yin village main road; an existing approach to the site will chaung City) and Site of new Thidakonepyin S/S 66/11kV, 20MVA be further upgraded and S/S at paved.

22

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region Thidakonepyin  The site is surrounded by (tap off) the paddy field. The nearest villages are Kwinkyankwin village in the east, Gwaytauk village in the west, Eaingyi village in the south and Kyaungkwin village in the north within 1.6 km from the site.

 There are no sensitive natural or human receptors that may be impacted by the construction of the new S/S.  The site will require some levelling. Civil works will result in adverse environmental impacts that will be temporary and localized such as generation of dust and noise, and increase in traffic due to movement of construction vehicles. Site Visit Date: 11 January, 2020, Ayewarwady Region

23

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region 12. Pathein New New S/S  The total area for the new The construction of Township, construction of site S/S is approximately 0.8 substation is not Pathein 66kV double ha. expected to cause District circuit line 0.32 66/11 kV  The site is an agricultural significant adverse km from existing 10MVA, land owned by the private environmental 66kV Pathein- Tha Lup impacts owner that the land owner Nga Yoke Kaung Khwar S/S, Persons that may Taung and Shaw Pya has agreed with ESE to be affected will be 66/11kV, 10MVA village sell his land. compensated S/S at Pathein  The new S/S site is Site of new Tha Lup Khwar based on national Township, Tha located beside the main S/S laws and ADB SPS Lup Khwar road connected from 2009. Village (tap off) Pathein Township to Township.  There is an existing approach to the site that will be paved.  The new S/S site is surrounded by agricultural land.  The nearest villages are Madawkon village in the north, Tha Lup Khwar village in the east and Alayywar village in south within 2 km from the site.  The nearest water source is from a creek called “Mayandaung” that is at a distane of approximately 150m west direction of the site.

24

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region  There are no sensitive natural or human receptors that may be impacted by the construction of the new S/S.

13. Kyaungkone New New S/S  The total area for the new The construction of Township, construction of site S/S is approximately 0.8 substation is not Pathein 66kV double ha. expected to cause District circuit line 0.24 66/11 kV,  The current land use is significant adverse km from 66kV 10MVA agriculture, used for environmental Ahthot - Kanlalay impacts green-gum plantation. Kankone S/S, Persons that may (Pathein-1) line Kankalay  The land is owned be affected will be and 66/11 kV village currently by a private compensated 10MVA new S/S owner but has agreed in based on national at Kyaungkone principle to sell the land Site of new Kankalay S/S laws and ADB SPS Township, to ESE. 2009. Kankalay Village  The site is located besides the Yangon- Pathein Highway and there is an existing approach road to the site that will be further upgraded and paved.  There is an existing pagoda in the north within Pagoda located within 15 m 15 m of the site from the new S/S site boundary; two houses and the “Apinnasay Creek” in the west within 25

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region 60 m from the site boundary.  The nearest village is called Thayarkwin village located in the south within 300 m from the site boundary.  ESE agreed to ensure that the site boundary will Apin nasay Creek located be designed such as to within 60 metres from the new maintain a distance of at S/S site least 60 m from the pagoda, creek and houses.  The nearby two houses nearby may be affected temporarily during the construction works.  The new S/S site will require levelling. Civil works will result in adverse environmental Houses located within 50 impacts that will be metres from the new S/S site temporary and localized such as generation of dust and noise, and increase in traffic due to movement of construction vehicles.

26

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region Site Visit Date: 13 January, 2020, Kayin State

14. Kawkareik New New S/S  The total area for the new The construction of Township, construction of site S/S is approximately 0.8 substation is not Kawkareik 66kV (In/Out ha. expected to cause District double circuit) 66/11kV,  The site is a rubber significant adverse line 4.83 km 5MVA plantation owned by the environmental from existing Winka S/S, impacts private owner that the 66kV Koetie- Winka Persons that may land owner has agreed Kyainseikgyi village be affected will be line, 66kV with ESE to sell his land. compensated Incoming Switch The surrounding area are Site of new Winka S/S based on national Bay 1 Set and also existing rubber laws and ADB SPS 66/11kV, 5MVA plantations. 2009. S/S at Winka  The site is located near Village Kawkareik-Mudon main road. There is a wide ditch / creek between the main road and the site. The approach road will be constructed from the main road to the proposed site. The size of Creek between the main road the approach road will be and the new S/S site 40m in length and 18m in width.  A box culvert will be constructed over the creek and the environmental flow will be maintained. 27

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region  The nearest village is Winka located in the south and Htizuki village in the north within 1.6 km from the new site.  The new S/S site will require levelling. There are no nearby sensitive natural or human receptors that may be impacted by the construction of the new S/S.  Civil works will result in adverse environmental impacts that will be temporary and localized such as generation of dust and noise, and increase in traffic due to movement of construction vehicles. Site Visit Date: 14 January, 2020,

28

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region 15. Daik-U New New S/S  The total area The construction of Township, construction of site requirement of new S/S is substation is 66kV Outgoing approximately 0.8 ha. situated in close Switch Bay 2 66/11kV  The land is currently proximity to Sets at E/F 10MVA owned by a private owner households. 230kV Ka Mar Kyaik Sa Therefore, this site but they have agreed in Net S/S and Kaw S/S, is not suitable. principle with ESE to sell 66kV double Mine Tone circuit line 36.5 village, land. km from 230kV Kyaik Sa  The nearest water source Site of new Kyaik Sa Kaw S/S Ka Mar Net S/S Kaw village is Nyaungdon Lay creek to Kyaik Sa Kaw tract located within 60 m from Village, 66kV the site. line Switch Bay  The site is surrounded by 4 Sets, 66kV Tr agricultural land in west Bay 1 Set, and south, and Minedon 66/11kV 10MVA village in east and north S/S at Kyaik Sa within 30m from the site. Kaw Village (Lattice Tower  The site is located near Type) KaLaYa (30) army road Minedon village road is and further accessible by accessible to the new Kyaik Sa an earth road that is 5m Kaw S/S. wide and 60 m in length that will cross through a Minedon village.  If the existing site is used for the S/S, the 5m wide approach road will require further widening. House boundaries will require to be shifted and land acquired. The households 29

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region will further be impacted Houses in Minedon Village by movement of heavy located within 30 metres from construction vehicles the New Kyaik Sa Kaw S/S. during the construction period and dust. Therefore, this site is not suitable.

16. Daik-U Alternative  The total area for the The construction of Township, Location for alternative site is substation is not Bago District New S/S approximately 0.8 ha. expected to cause  ESE is making significant adverse 66/11kV negotiation with land environmental 10MVA impacts owner to buy the land. Kyaik Sa Persons that may Kaw S/S,  The alternative site is be affected will be Kyaik Sa located beside the Daik-U compensated Factory road; therefore, Kaw village Alternative location for new based on national there is an existing Kyaik Sa Kaw S/S laws and ADB SPS approach road that will be 2009. further upgraded.  The alternative site is an agricultural land surrounded by agricultural lands and no nearby houses. The nearest villages are Kyaikataw village in the west, and Aye Thu Ka village and Chaungsauk creek in the south within

30

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region 1.6 kilometers from the site.  There are no sensitive natural or human receptors that may be impacted by the construction of the new S/S.  Civil works will result in adverse environmental impacts that will be temporary and localized such as generation of dust and noise, and increase in traffic due to movement of construction vehicles.

17. Nyaung Lay New New S/S  The total area for the S/S The plot is small, Pin construction of 66/11kV is 0.28 ha and it is therefore not Township, 66kV Outgoing 10MVA currently owned by the suitable Bago District Switch Bay 2 Nyaung Lay ESE. Since the site area Sets at E/F Pin S/S, is small; ESE may 230kV Baing Dar Nyaung Lay consider an alternative (Wea Wun) S/S Pin site. and 66kV double Township circuit line 16 km  The new S/S site is from 230kV located besides Yangon- Site of new Nyaung Lay Pin Baing Dar (Wea Mandalay high way road; S/S Wun) S/S to therefore, there is an

Nyaung Lay Pin existing access road to , 66kV Line the site. The approach 31

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region Switch Bay 4 road to the site will cross Sets, 66kV Tr over a creek. The Bay 1 Set, approach road will be 66/11kV 10MVA paved and a box culvert S/S at Nyaung will be constructed over Lay Pin (Lattice the creek and the Tower Type) environmental flow will be maintained.  The new S/S site is surrounded by Creek between the main road agricultural land with no and the New Nyaung Lay Pin S/S nearby houses in the immediate vicinity.  Within 1 km from the site, the nearest receptors are called Ngapyartaw village in the west, Kyaukkway village in the north, Alcohol Factory in the west and Kyu Creek in the east.  There are existing mature trees that line the boundary of the site which may be retained at margins as long it does not cause interference in the functioning of the new S/S.

32

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region 18. Nyaung Lay Alternative  The total area is The construction of Pin location for approximately 0.8 ha. substation is not Township, New S/S  ESE is making expected to cause Bago District site negotiation with land significant adverse

owner to buy the land. environmental 66/11kV impacts  The alternative site is 10MVA Persons that may Nyaung Lay located near the Yangon- be affected will be Pin S/S, Mandalay high way road. compensated The approach road will be Nyaung Lay Alternative location for New based on national constructed from the high Pin Nyaung Lay Pin S/S laws and ADB SPS Township way road to the proposed 2009. site. A box culvert will be constructed over the creek and the environmental flow will be maintained.  The alternative site is surrounded by agricultural lands with no nearby houses in the immediate vicinity.  The alternative site will require levelling.  There are no sensitive natural or human receptors that may be impacted by the construction of the new S/S.  Civil works will result in adverse environmental 33

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region impacts that will be temporary and localized such as generation of dust and noise, and increase in traffic due to movement of construction vehicles.

19. Daik-U New New S/S  The total area for the new The construction of Township, construction of site S/S site is 0.56 ha and substation is not Bago District 66kV line 14.5 currently owned by the expected to cause km from E/F 66/11kV, ESE. significant adverse 230kV Baing Dar 5MVA  Currently, the land is environmental S/S to Hpaung Hpaung impacts being used as a storage Taw Thi Village Taw Thi area by the ESE. and 66/11kV, S/S, New Hpaung Taw Thi S/S 5MVA S/S at Hpaung  The new S/S is located Hpaung Taw Thi Taw Thi beside the Yangon- Village village Mandalay high way road.  The nearest receptor is Agricultural Community Learning Center within 30 m from the new site. The nearest village is called Pauktapin village within 1 km from the site.  The closest water source is Paukkwin creek within 1km from the site.  There are existing 4 mature trees that line the boundary of the site

34

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region which may be retained at margins as long it does not cause interference in the functioning of the new S/S.  Except for the nearby Agricultural Community Learning Center, there are no other sensitive natural or human receptors that may be impacted by the construction of the new S/S.  Civil works will result in adverse environmental impacts that will be temporary and localized such as generation of dust and noise, and increase in traffic due to movement of construction vehicles. Site Visit: 15 January, 2020, Bago Region

35

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region 20. Phyu New New S/S  The total area is 0.6 ha. The construction of Township, construction of site  The current land use substation is not Taungoo 66kV Outgoing agriculture. The site is expected to cause District Switch Bay 2 66/11kV surrounded by significant adverse Sets at E/F 10MVA agricultural lands. There environmental 230kV Thar Yar Nyaung Pin impacts are three houses within Kone S/S and Thar S/S Persons that may 30m from the site. These 66kV double Nyaung Pin be affected will be circuit line 38.6 Thar Town three houses may be compensated km from 230kV affected temporarily Sit of new Nyaung Pin Thar based on national Thar Yar Kone during the construction S/S laws and SPS S/S to Nyaung works. 2009. Pin Thar , 66kV  The land owner has Trees that will be line Switch Bay agreed with ESE to sell cleared will be 4 Sets, 66kV Tr the land. replanted by ESE Bay 1 Set,  The new S/S site is after construction 66/11kV 10MVA located beside the of the S/S as part S/S at Nyaung Yangon-Mandalay high of site rehabilitation Pin Thar (Lattice and landscaping way. The existing Tower Type) approach road to site will be upgraded and a box culvert will be constructed Houses located within 30m of over a creek and the the new Nyaung Pin Thar S/S environmental flows will be maintained. There are 3 existing mature trees that line the boundary of the new site which may be retained at margins as long it does not cause interference in the

36

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region functioning of the new S/S.  Some portions of an existing 33kV distribution line cross the site and 1 or 2 poles are placed within the boundary of the site. Therefore, the placement of poles may be moved to outside of Creek between the new Nyaung Pin Thar S/S and the the boundary of the site main road causing temporary

disruption to services.  Except for the three nearby houses, there are no other sensitive natural or human receptors that may be impacted by the construction of the new S/S.

21. Oktwin New New S/S  The total area of new S/S The construction of Township, construction of site is 0.8 ha and it is vacant substation is not Taungoo 66kV Outgoing plot. expected to cause District Switch Bay 2 66/11kV  The new S/S site is significant adverse Sets at E/F 10MVA environmental located beside an existing 230kV Taungoo Nyaung impacts paved road connected S/S and 66kV Chay Htauk Persons that may double circuit S/S, from Nyaung Chay Htauk be affected will be line 32 km from Nyaung village to Mae Chaung compensated 230kV Taungoo village. based on national Chay Htauk Site of new S/S at Nyaung S/S to Nyaung Village Chay Htauk 37

No Township/ Scope of Work1 Location Description of Site/ Site Photographs Remarks District / Surrounding Region Chay Htauk ,  An approach road will be laws and ADB SPS 66kV line Switch constructed from the 2009. Bay 4 Sets, main paved road to the 66kV Tr Bay 1 site; the size of the Set, 66/11kV approach road will be 10MVA S/S at 58.8 m in length and 14 Nyaung Chay m in width. Htauk (Lattice Tower Type)  Current land use in the wider area is agriculture.  There are two temporary Cemetery within 200 m across huts within 20m from the the road from the New S/S site site that may be affected at Nyaung Chay Htauk temporarily due to construction works. There is a cemetery at the opposite site of the road from the site within 200 meters away. No impacts to the cemetery are anticipated. Except for the 2 nearby temporary huts, there are no other sensitive natural or human receptors that may be impacted by the construction of the new S/S.

1

Appendix 3 to Initial Environmental Examination (IEE)

Project Description Maps

Project Number: 53223-002 Loan Number: XXXX August 2020

Myanmar: Accelerated Rural Electrification Project

Prepared by the Ministry of Electricity and Energy, Government of The Republic of the Union of Myanmar for the Asian Development Bank.

2

Map 1. Proposed Subproject Proponents in Bago (East) Region from 2018-2019 to 2022-2023

Legend Legend

Hydroelectric Power Plant 33 kV Substation (Future) Projects under ADB Loan- 53223- AREP 230 KV Sub-station 230 kV Transmission Line

230 kV Substation (Future Plan) 66 kV Distribution Line

66 kV Sub-station 66 kV Distribution Line

66 kV Sub-station (Future) 33 kV Transmission Line

33 KV Sub-station 33kV Transmission Line (Future)

3

Map 2. Proposed Subproject Proponents in Magway Region from 2018-2019 to 2023-2024

Legend Natural Gas Power Plant LegendLegend 230 KV Sub-station 132 kV Substation ProjectsProjects under under ADB ADB Loan- Loan- 53223 53223-ARE-ARECP 66 kV Sub-station

66 kV Sub-station (Future)

33 KV Sub-station

Hydropower Plant

33 kV Substation (Future)

230 kV Transmission Line

66 kV Distribution Line

66 kV Distribution Line (Future)

33 kV Distribution Line

33 kV Distribution Line (Future)

132 kV Transmission Line

4

Map 3. Proposed Subproject Proponents in Magway Region from 2023-2024 to 2025-2026

Legend Natural Gas Power Plant

230 KV Sub-station Legend 132 kV Substation

66 kV Sub-station

Projects under ADB Loan- 53223-AREP 66 kV Sub-station (Future)

33 KV Sub-station

Hydropower Plant

33 kV Substation (Future)

230 kV Transmission Line

66 kV Distribution Line

66 kV Distribution Line (Future)

33 kV Distribution Line

33 kV Distribution Line (Future)

132 kV Transmission Line

5

Map 4. Proposed Subproject Proponents in Ayeyarwady Region from 2018-2019 to 2023- 2024

Legend

Projects under ADB Loan- 53223-AREP

Legend Natural Gas Power Plant 33 kV Substation (Future)

230 KV Sub-station 230 kV Transmission Line

230 kV Substation (Future Plan) 66 kV Distribution Line

66 kV Sub-station 66 kV Distribution Line (Future)

66 kV Sub-station (Future) 33 kV Distribution Line

33 KV Sub-station 33 kV Distribution Line (Future)

230 kV Transmission Line (Future)

6

Map 5. Proposed Subproject Proponents in Ayeyarwady Region from 2023-2024 to 2025- 2026

Legend

Projects under ADB Loan- 53223-AREP

Legend Natural Gas Power Plant 33 kV Substation (Future)

230 KV Sub-station 230 kV Transmission Line

230 kV Substation (Future Plan) 66 kV Distribution Line

66 kV Sub-station 66 kV Distribution Line (Future)

66 kV Sub-station (Future) 33 kV Distribution Line

33 KV Sub-station 33 kV Distribution Line (Future)

230 kV Transmission Line (Future)

7

Map 6. Proposed Subproject Proponents in Kayin State from 2018-2019 to 2023-2024

Legend

33 kV Sub-station

230 kV Substation (Construction 66 kV Distribution Line

66 kV Sub-station 66 kV Distribution Line (Future) Legend

66 kV Sub-station (Future) 33 kV Distribution Line Projects under ADB Loan- 53223-AREP 33 KV Sub-station (Future) 33 kV Distribution Line (Future)