Infrastructure Master Plan for Public Transport in the Metropolitan Area of ​​Barcelona 2011-2020

Total Page:16

File Type:pdf, Size:1020Kb

Infrastructure Master Plan for Public Transport in the Metropolitan Area of ​​Barcelona 2011-2020 Infrastructure Master Plan for public transport in the metropolitan area of ​​Barcelona 2011-2020 Executive summary of the action programmes July, 2016 2 Index Index Background and Procedural Status Balance IMP 2001-2010 Objectives and Methodology IMP Presentation and Proposal 2011 - 2020 Priorities Budget and Finance 4 Actions: projects and works 31 Background Laws of the MTA (Metropolitan Transportation Authority). Article 4.1 entrusts “public transport infrastructure planning” to the ATM IMP 2001-2010, finally approved in April 2002. “The IMP is conceived as a flexible, progressive plan to be develop in five-year programmes” (p.11 of the initial IMP 2001-2010 report). April 2006: five-year update of the IMP 2001-2010. July 2008: drafting a new IMP 2009-2018. April 2010: Public consultation on the ESR of the IMP 2009-2018 based on the preview of the plan. April 2011: Agreement to start drafting a new IMP 2011 to 2020 and to terminate the agreements of July 2008 and April 2010 regarding the progress of the IMP 2009-2018 and its preliminary ISA. June 2011: Preliminary public consultation on the ESR of the IMP 2011-2020 based on the preliminary environmental study of the plan. 14 Procedures SCHEDULE Reference Environmental Document: December, 2011. Initial approval of IMP: June 2012. Public information: until October 2012. Approval of the allegations report by the Board of Directors of the ATM and introduction of any amendments to the IMP deriving from it: April 2013. Request for mandatory reports (CCM, CADS, CCTSV, CTESC, etc.) and processing of the environmental report by the DGPA: May 2013. Incorporation of suggestions: July, 2013. Approval of the IMP 2011-2020 by the Board of ATM: July 2013: July 2013. Final adoption: November 2013. 15 Procedures INFORMATION ON ALLEGATIONS The allegations period ended in October 2012. 70 allegations were submitted, of which 44 relate to public administrations (29 correspond to municipalities). Its content refers to the activities programme, layout improvements, financing and environmental issues. The remaining 26 allegations are from private organizations. The content is very varied: proposals for new railway lines, management issues, environmental impacts, etc. On 15 May 2013, the ATM Board of Directors approved the document “Report on the allegations submitted to the IMP 2011-2020”. 16 Procedures ADVISORY COUNCILS During the months of May, June and July, the IMP 2011-2020 was the subject of four global Advisory Council reports, in accordance with Article 4.3 of Decree 466/2004 of 28 September: - Advisory Council for Sustainable Development. - Catalan Commission for Traffic and Road Safety. - Employment, Economic and Social Council. - Mobility Council. Moreover, the Environmental Report was submitted to the Directorate General of Environmental Policies for evaluation. 71 Balance IMP 2001-2010 (1) Major actions AX04 L2. Pep Ventura - Badalona Pompeu Fabra AX05 L3. Canyelles - Trinitat Nova AX07 L5. Horta - Vall d'Hebron AX08 L9. Aeroport – Zona Universitària AX11 L9. Can Zam - La Sagrera AX11 L10. Gorg - La Sagrera AX14 FGC. Terrassa Rambla – Nacions Unides AX18 L11. Trinitat Nova - Can Cuiàs AX12a Tramvia Diagonal - Baix Llobregat AX12b Tramvia Diagonal - Besòs IN03 Sagrera Meridiana MM01 Conversió L4 a L2 MM04 Adaptation of stations to PRMs MM09 Cutting in Pallejà MM10 Doubling at Palau - Martorell MM11 Doubling at Martorell - Olesa MM13 FGC. Adaptation to PRM's. Gràcia station Works AX09 L10. Zona Franca – Zona Universitària AX15 FGC. Sabadell Estació - Ca n'Oriac 81 Balance IMP 2001-2010 (2) Generalitat actions (Network Expansion, Modernization and Improvement, and hubs) • Of the 52 actions planned 23 actions have been completed to an amount of 4,015 M €. (Including 10 from the AX programme) 17 actions have been awarded to an amount of 6,523 M €. 11 actions have not been started, amounting to 2,942 M €. IMP compliance by the Generalitat of Catalonia is around 80%. 91 Balance IMP 2001-2010 (3) The State Railway Network programme consists of 19 actions. Action 'XE01. Reconversion to passenger traffic of the Papiol - Mollet’ line and ‘XE07. New Stations at Terrassa Est’ These actions have begun: ‘XE17. Modernization and improvement of Safety installations’. ‘XE19. New commuter material’. The remaining 15 actions have not begun. The degree of compliance with IMP XFE programme is 10% 101 General criteria for drawing up the new IMP 2011 - 2020 The IMP defines the objectives of long-term infrastructure planning, a comprehensive system (regardless of who may be the operator in each case) These are criteria of the la new demand capture and network meshing plan (closing rings) Given the economic situation, the actions have been classified as: - Works to be complete before 2020. - Works to be started before 2020. - Works to be drafted before 2020. - Feasibility studies to be carried out. The IMP investments were selected using a cost-benefit methodology to ensure a suitable internal rate of return (IRR) in terms of socio-economic and environmental profitability: • Evaluation of demand and operating profit • Environmental benefits 11 Mobility and Increased public Modal share of mechanized means 65,7% transport 70% 63,0% environmental 60% 50% 37,0% objectives: Increase in public 34,3% transport modal share 40% 2020 30% 20% 10% 2010 2020 0% Reduction of consumption and emissions Value in 2020 Variation 2010-2020 Energy 1077 ktoe / year - consumption 12.2% associated with transport Use of oil-based 989 ktoe / year - fuels 15.0% GHG emissions associated 3,164 ktoe / year -12.2% with mobility NOx emissions 11,049 ktoe / year -13.6% PM 10 emissions 805 tons / year -14.7% 12 News. Cost-Benefit Analysis At the time, the activities included in the IMP 2001-2010 were evaluated by means of a cost - benefit analysis that mainly used as inputs, investment, operating costs, time savings associated to rail system users and less congestion on the roads, fewer accidents and less pollution. For planning purposes, IMP 2011-2020 applied a new improved CBA from a reworking made by TES and ATM, which incorporates new elements: - Internal benefit: reduced cost of running private vehicles - External costs: noise, vibration, climate change, prior-post effects, etc. - Environmental costs were extended (border effect, damage to nature and use of the space) - The environmental impact of building systems was evaluated in order to improve the selection of alternatives. To implement the Plan, the DTES, ATM and the Professional Association of CCP signed an agreement to develop a new methodology for cost-benefit assessment that will enable a better assessment of the social, environmental and economic investment returns. Actions that do not meet these criteria will not be undertaken. 13 News. Other considerations The IMP 2011-2020 includes a new public transport road infrastructure programme, which includes: - New bus stations in large hubs. - Reserved bus platforms. - Bus-HOV lanes. - Diagonal Oest Hub. - Other actions. The IMP 2011-2020 proposes a mechanism for automatic review in 2015 in the event of economic change. 14 Presentation of the IMP 2011-2020 proposal The IMP is divided into a set of 59 measures grouped into 4 IMP programmes new infrastructure programmes and one AX Network Expansion modernization and improvement programme. XE State railway network A very important part of the IN Hubs AX programme consists of completing the works that TPC Public transport by road are currently in progress. MM Modernization and improvement The XE programme includes the investments in the Commuter Rail Plan 2008- 2015. 151 16 17 18 19 20 Priorities (1) WORKS TO BE COMPLETED NETWORK EXTENSION IMP 2011-2020 can be divided into four sections: AX06 Metro. L4 La Pau - La Sagrera AX07 Metro. L9/L10 Aeroport/Zona Franca - Parc Logístic - Works to be complete before Zona Universitària 2020. AX08 Metro. L9/L10 Zona Universitària - La Sagrera Works to be started before 2020. AX10 FGC. Terrassa Rambla - Terrassa Nacions Unides Works to be drafted before 2020. AX11 FGC. Sabadell Estació - Ca n'Oriac Feasibility studies to be carried out. STATE RAILWAY NETWORK XE09 Remodelling of Hospitalet de Llobregat station 21 Priorities (2) WORKS TO BE STARTED BEFORE 2020 NETWORK EXTENSION STATE RAILWAY NETWORK AX04 Metro. L3 Zona Universitària - Esplugues XE01 Doubling Arenys de Mar - Blanes R1 AX05 Metro. L3 Trinitat Nova -Trinitat Vella XE02 New Airport access AX09 FGC. L8 Plaça Espanya - Gràcia XE04 Doubling Montcada - Vic XT01 Joining of tram networks in Barcelona XE05 Moncada Tunnel XT02 T3 Passage through Laurea Miró XE06 New line layout R2 Montcada i Reixac XE07 New line Castelldefels - Cornellà - Zona Universitària XE08 New layout L'Hospitalet de Llobregat XE08 New layout Sant Feliu de Llobregat XE11 Other actions 22 Priorities (3) WORKS TO BE STARTED BEFORE 2020 HUBS The other programmes (Hubs, Road Transport Infrastructure and Modernization and Improvement) PUBLIC TRANSPORT BY ROAD are planned to begin in 2020. MODERNIZATION AND IMPROVEMENT 23 Priorities (4) PROJECTS AND STUDIES PROJECTS TO BE DRAFTED FEASIBILITY STUDIES AX01 Metro. L1 Hospital de Bellvitge - El Prat Quadrupling of lanes Castelldefels-Sants AX02 Metro. L1 Fondo - Estació de Badalona Third line R4 Sabadell and Cerdanyola AX03 Metro. L2 Sant Antoni - Parc Logístic Improvements to the layout of R4 Coll de Cardús AX12 FGC. L6 Reina Elisenda - Finestrelles Rail integration Vilanova and Sitges AX13 FGC. Vallès Extension New Congost station at Manresa XT03 T3 Sant Feliu de Llobregat - Quatre Camins New Segle XX station at Terrassa (FGC) XT04 T4 Sant Adrià - Port Badalona New stations (proposed at Via Vallès) XT05 New line UAB Cerdanyola - Montcada Extension of tram to centre of Moncada XE03 New orbital line Extension of Tramvallès IN04 New FGC station Rubí New C-31 bus lane 24 Budget and Finance (1) NEW INFRASTRUCTURE BUDGET Budget excluding VAT, excluding financial expenses AX Network Expansion 2,764.3 A significant part of this investment corresponds to works XE State railway network 4,564.5 in progress, with spending already committed.
Recommended publications
  • 21-467-Planol Plegable Caraa Agost 2021
    Sant Genís Cementiri de Collserola Cementiri de Collserola Montcada i Reixac Ciutat Meridiana Ciutat Meridiana C Pl. Parc de Ciutat Meridiana Funicular t 112 Barris Zona 97 r 112 Velòdrom Horta Torre Baró a Sant 185 102 de Vallvidrera . 112 Montbau la Vall 185 Nord d Genís Mpal. d’Horta 183 62 96 e 19 76 Ctra. Horta 182 Vallbona S 112 d’Hebron 18 Peu del Funicular t. a Cerdanyola 3 u C 97 0 e 183 l u a 8 l 19 r g 76 Sant Genís 1 a r e a r a t Transports d 183 C i v Pl. 76 V21 l Lliçà n l 76 Bellprat 0 a Meguidó s 8 a Parc de a de le te Av. Escolapi CàncerTorre Baró Torre Baró 83 1 V t e 1 C Mundet l s u Metropolitans Hospital Universitari 135 A Roq Vallbona e La Font 102 Ronda de Dalt C tra. d Sinaí 76 de la Vall d’Hebron Arquitecte Moragas e r del Racó M19 Can Marcet D50 104 d Rda. Guineueta Vella o j Sarrià Vall d’Hebron 135 Pl. Valldaura a 60 de Barcelona Pg. Sta. Eulàlia C Montbau Pg. Valldaura Metro Roquetes Parc del Llerona 96 35 M o 9 1 Botticelli Roquetes 97 . llse M1 V23 Canyelles / 47 V7 v rola Vall d’Hebron 135 185 Pla de Fornells A 119 Vall d’Hebron V27 Canyelles ya 27 R 180 104 o 196 Funicular M19 n Pl. 127 o 62 ibidab 60 lu C drig . T del Tibidabo 102 ta Porrera de Karl 185 Canyelles 47 a o B v a Canyelles ro alenyà 130 A C Marx sania Can Caralleu Eduard Toda Roquetes A rte Sant Just Desvern 35 G e 1 d r Campoamor a r t Barri de la Mercè Parc del n e u V3 Pl.
    [Show full text]
  • Objetivo Tren 2024
    @transportpublic PromocioTransportPublic @transportpublic www.transportpublic.org [email protected] 93 244 49 70 OBJETIVO TREN 2024 Propuesta ferroviaria para reducir a casi cero las emisiones de CO2 del transporte público en Catalunya / 1a edición: Junio 2020 Autores: Pau Noy Serrano, ingeniero industrial. Ricard Riol Jurado, ingeniero técnico de obras públicas. Colaboradores: Albert Parés i Soldevila, Daniel Pi Noya, Georgina Montesinos Zaragoza, José Luis Rodrigo Jiménez, Josep Maria Olivé i Garcia, Marc Iglesias Pérez, Xavier Lujan Calvo, Javier Paricio Sosa. 2 / 114 ÍNDICE 1. Prólogo ................................................................................................................................ 4 2. ¿Por qué el nuevo Objetivo Tren 2024? ......................................................................... 6 3. ¿Por qué potenciar el ferrocarril? ................................................................................. 14 4. Principios del esquema básico de servicio deseado ................................................... 17 5. Actuaciones prioritarias de infraestructura ................................................................. 21 6. Actuaciones prioritarias no infraestructurales ............................................................ 42 7. Proyectos ferroviarios a estudiar a medio y largo ..................................................... 48 8. Nivel de servicio propuesto para cercanías ................................................................. 53 Conexión ferroviaria del
    [Show full text]
  • Sanchez-Piulachs Arquitectes S
    IMPROVEMENTS TO METRO STATIONS - Project in progress: restoration of the interchange in Urquinaona station of line 1 and line 4 of the underground in Barcelona. Collaboration with Infraes, S.A i Ingenium Civil SLP engineerings. Implementation project of actions on improvement of the evacuation and the accessibility. Promoter: Generalitat de Catalunya / Direcció General de Transports (Gisa). - Project in progress: restoration of the interchange of Catalunya station in line 1 and line 3 of the underground of Barcelona. Implementation project of architecture and facilities. Promoter: Transports Metropolitans de Barcelona (TMB). - Restoration plan for acoustic improvements of Muntaner and Plaça Espanya stations. Implementation project of architecture and facilities. Barcelona 2009. C.P.: 2.178.000€ / 2.963.692US$. Promoter: Ferrocarrils de la Generalitat de Catalunya. - Restoration of Gràcia station of Barcelona FGC (metro). Implementation project of architecture and facilities. Barcelona 2009. C.P.: 24.924.000€ / 33.915.084US$. Promoter: Generalitat de Catalunya / Direcció General de Transports (Gisa). - Restoration of Sarrià station of Barcelona FGC (metro). Implementation project of architecture and facilities. Barcelona 2008. C.P.: 31.272.000€ / 42.553.061US$. Collaboration with Auding Engineering. Promoter: Generalitat de Catalunya / Direcció General de Transports (Gisa). - New access to Torre Baró-Vallbona station on Line 11 of the Barcelona metro. Implementation project of architecture and facilities. Barcelona 2007. C.P.: 3.100.000€ / 4.218.294US$. Promoter: Bagur,SA. - Sagrera Meridiana interchange of the Barcelona metro. Implementation project for the hall of C/ Garcialso, C/ Felip II, main hall and Line 1 and 5 platforms. Barcelona 2006. C.P.: 88.100.000€ / 118.881.194US$.
    [Show full text]
  • LACCEI Paper
    Fourth LACCEI International Latin American and Caribbean Conference for Engineering and Technology (LACCET’2006) “Breaking Frontiers and Barriers in Engineering: Education, Research and Practice” 21-23 June 2006, Mayagüez, Puerto Rico. Innovative Techniques in Planning and Finance of Public Transportation Projects: Lessons Learned and its Applications Ildefonso Burgos-Gil, PE, MCE General Manager for Mass Transit Development, Puerto Rico Highway and Transportation Authority, San Juan, PR, USA, [email protected] Abstract The International Transit Studies Program (ITSP) conducts two study missions each year to provide transit managers from across the United States the opportunity to examine public transportation practices in other countries and regions, with the goal of encouraging innovation domestically. The program is sponsored by the Transit Cooperative Research Program (TCRP), funded by the Federal Transit Administration, and managed by the Eno Transportation Foundation. The subject for the 2005 Fall Study Mission was Innovative Techniques in Planning and Finance of Public Transportation Projects. The mission studied systems in Barcelona, Spain; Copenhagen, Denmark; Shanghai, China; and Osaka, Japan. As a participant, the author had the opportunity to meet with the managers for the different systems and learn and document the experience. This paper presents a more detailed insight on the author’s assigned studied systems in Barcelona, the way it has been integrated to become an effective transit system, its financial model, the lessons learned and its possible applications in Puerto Rico and elsewhere. Keywords integration, transit, planning, finance, public private partnership 1. Introduction The International Transit Studies Program (ITSP) conducts two study missions each year to provide transit managers from across the United States the opportunity to examine public transportation practices in other countries and regions, with the goal of encouraging innovation domestically.
    [Show full text]
  • Pensioner's Card
    Pensioner’s card de Ferrocarrils de la Generalitat de Catalunya Renewing it Cards issued before 31st December 2013 To find out more, visit the website www.fgc.cat or call 012 Criteria for renewing the FGC pensioner’s card: Pensioner’s card A - People aged 65 or over with pension income less than or equal to the minimum wage or who do not receive any pension. - People aged under 65 with 33% or higher degree of disability and benefit income less than or equal to the minimum wage or who do not receive any benefit. Pensioner’s card B - People aged 65 or over with with pension income more than the minimum wage. - People aged under 65 with 33% or higher degree of disability and benefit income more than the minimum wage. 1. Administrative process RENEWING THE CARD HANDING IN THE APPLICATION - Pick up an application form at any FGC station on the Hand in the application form, duly completed with Barcelona-Vallès or Llobregat-Anoia lines. personal details and all documentary evidence: - You also need to pick up a prepaid envelope. - By post, using the prepaid envelope. - At the pensioner’s card office at Carrer Avenir 6, Barcelona. 2. Documentation required - Application form completed with personal details - Photocopy of notification of benefit rise or plus bank details if choosing to pay by direct debit. certificate of monthly benefitfrom the National Social Security Institute (INSS) for the current year (for - Photocopy of Spanish ID card or foreigner ID renewals of pensioner’s card A only)*. - For under-65s, photocopy of the certificate - If no benefit is received, photocopy of the negative accrediting disability issued by the Department of benefit certificate from the National Social Security Employment, Social Affairs and Families or card Institute (INSS) for the current year (for renewals of accrediting disability, showing a degree of 33% or pensioner’s card A only)*.
    [Show full text]
  • BARCELONA TRAM SERVICE (SPAIN) PPP for CITIES Specialist Centre on PPP in Smart and Sustainable Cities
    WITH THE SUPPORT OF: PPP for CITIES Specialist Centre on PPP in Smart and Sustainable Cities PPP FOR CITIES CASE STUDIES BARCELONA TRAM SERVICE (SPAIN) PPP for CITIES Specialist Centre on PPP in Smart and Sustainable Cities Josep Navarro, Joan Enric Ricart, Francesc Trillas, Miquel Rodríguez Planas & Jordi Salvador With the collaboration of Barcelona's Autoritat del Transport Metropolità (ATM) September 2017 PPP FOR CITIES CASE STUDIES BARCELONA TRAM SERVICE (SPAIN) Josep Navarro, Joan Enric Ricart, Francesc Trillas, Miquel Rodríguez Planas & Jordi Salvador With the collaboration of Barcelona's Autoritat del Transport Metropolità (ATM) PPP FOR CITIES The Specialist Centre on PPPs in Smart and Sustainable Cities (PPP for Cities) is a research, innovation and advisory center that aims to provide public administrations throughout the world with support in the organization, management and development of projects involving collaboration between the public and private sectors in the smart cities arena. It is also a partnership platform between companies and administrations from all over the world where they can further explore the dynamics of public-private partnerships, create guides to good practices and standards and design solutions to the issues facing cities. The center is led by IESE Business School and is part of the United Nations’ International Centre of Excellence on PPPs program. It has the support and sponsorship of Barcelona City Hall and other public administrations and private companies. This document was prepared by the Public-Private-Sector Research Center as a document of interest for the study of public private partnerships rather than to illustrate either effective or ineffective handling of an administrative situation.
    [Show full text]
  • SOLETANCHE BACHY Key Figures Main Contractor Specialised in Geotechnical and Civil Engineering
    GEOTECHNICAL AND CIVIL ENGINEERING CONTRACTORS Edition 2008 BUILD ON US SOLETANCHE BACHY key figures Main contractor specialised in geotechnical and civil engineering > We serve a wide range of clients in the public and private sectors: central and local government, industrial, general building and civil engineering contractors, property developers, project promoters,... > We offer a complete range of geotechnical processes, special foundations, underground works, ground improvement and pollution treatment and control. > We are therefore able to: · resolve geotechnical problems for our clients, and · construct their foundation and underground civil works projects. What are our competitive strengths? > Our versatility, since we combine the skills of both main contractor and specialist: · We are able to coordinate all of the required trades and offer turnkey solutions for major Sales of 1.4 billion euros complicated infrastructure projects involving underground works. · We are careful to maintain our original core expertise: ground technology, generally acknowledged as the most complex aspect of a construction project. > Our operational reliability: · We have a track record of success, having completed more than 50,000 contracts in more than 100 countries over the last 60 years. · With our powerful logistics capacity, we can rapidly deploy human resources and equipment of quality, quantity and unrivalled international diversity to provide a reliable service in all circumstances. > Our technical creativity: 8,000 permanent staff of over 60 nationalities · Our design engineers are able to provide innovative and safe alternative solutions. A worldwide network of 1,200 engineers and managers · We have won a record number of industry awards, recognising our research and development Projects completed in over 100 countries achievements in creating and introducing some of the most important innovations within our Business activity has doubled over the last 4 years profession.
    [Show full text]
  • Olympic Transportation Planning: the Legacies of Barcelona and Beijing
    OLYMPIC TRANSPORTATION PLANNING: THE LEGACIES OF BARCELONA AND BEIJING Doneliza Joaquin Submitted in partial fulfillment for the requirement for the degree Master of Science in Urban Planning Graduate School of Architecture, Planning and Preservation Columbia University May 2012 INTRODUCTION Being selected as a host city for sport mega-events, such as the Olympics and the World Cup, is both a gift and a burden. Host cities are thrust into the international spotlight and must provide the stadiums, housing, transportation infrastructure and management, and crowd management needed for the games. To adequately supply transportation for the movement of millions of athletes, spectators, media, officials, workers, and volunteers; between venues, housing, and the airport; mega-events require the host city to implement a strategic transportation plan with a strict deadline. The transportation infrastructure built and policies implemented for these mega-events are an integral part of the games that can alter a city’s transportation network and leave a lasting legacy. Potential host cities are only required by the International Olympic Committee (IOC) to demonstrate their ability to provide a transportation plan that can efficiently support movement during the Olympic Games. Nowhere in a city’s Olympic bid must it explain how transportation built or policies implemented will be used after the Olympics has ended. In competition with other cities to win a bid, potential host cities may drastically propose to alter their transportation networks to attract the IOC. Mega-events provide an opportunity for a host city to make major investments in infrastructure development. These opportunities can by catalytic, compressing what was already planned on being built from taking decades to implementing it in a few years, or divergent, developing infrastructure specifically designed for purposes of the mega-event that would not have otherwise been built (Kassens 2009).
    [Show full text]
  • Automated Metro, Safer and More Efficient
    Automated Metro, safer and more efficient State-of-the-art technology at your service Transports Metropolitans de Barcelona Barcelona, on the road to automation The Barcelona Metro is on the road to automation. The medium- or long-term perspective is for 43% of the TMB network (70 to 160 kilometres) to be automated. The new lines, such as the L9/L10, have been conceived as automated lines and some of the existing ones will be progressively converted. Following L9/10, which was put into operation as an automated line from the outset, L2 will have to be technologically converted and adopt automated operation, as was recently done with L11. This is because, when it is extended to the airport through the Parc Logístic fork, L2 will share part of the infrastructure with L9. The two lines will require compatible trains and systems to operate jointly on the same infrastructure. The benefits of automation TMB’s commitment to automation is consistent 2) More passengers in less time with its desire to provide the best possible service. Automation enables more passengers to The introduction of automated metro systems not be transported in less time using the same only provides more safety, reliability and flexibility infrastructure. Thanks to their sophisticated control while adapting the supply to the demand, it also and monitoring systems, trains can run during peak enables more efficient management of the system times at shorter intervals, under two minutes, with and an increase in the capacity of the networks. An safety totally guaranteed. automated metro system can run with high journey frequencies, complete safety and optimum regularity.
    [Show full text]
  • TCRP Research Results Digest 77
    May 2006 TRANSIT COOPERATIVE RESEARCH PROGRAM Sponsored by the Federal Transit Administration Subject Areas: IA Planning and Administration, VI Public Transit, VII Rail Responsible Senior Program Officer: Gwen Chisholm-Smith Research Results Digest 77 International Transit Studies Program Report on the Fall 2005 Mission INNOVATIVE TECHNIQUES IN THE PLANNING AND FINANCING OF PUBLIC TRANSPORTATION PROJECTS This TCRP digest summarizes the mission performed October 20– November 5, 2005, under TCRP Project J-3, “International Transit Studies Program.” This digest includes transportation information on the cities and facilities visited. This digest was prepared by staff of the Eno Transportation Foundation and is based on reports filed by the mission participants. INTERNATIONAL TRANSIT participants to learn from foreign experience STUDIES PROGRAM while expanding their network of domestic and international contacts for addressing The International Transit Studies Prog- public transport problems and issues. ram (ITSP) is part of the Transit Cooperative The program arranges for teams of pub- Research Program (TCRP). ITSP is managed lic transportation professionals to visit ex- by the Eno Transportation Foundation under emplary transit operations in other countries. contract to the National Academies. TCRP Each study mission focuses on a theme that was authorized by the Intermodal Surface encompasses issues of concern in public Transportation Efficiency Act of 1991 and re- transportation. Cities and transit systems to authorized in 2005 by the Safe, Accountable, be visited are selected on the basis of their Flexible, Efficient Transportation Equity ability to demonstrate new ideas or unique Act: A Legacy for Users. It is governed by approaches to handling public transportation a memorandum of agreement signed by the CONTENTS challenges reflected in the study mission’s National Academies, acting through its theme.
    [Show full text]
  • Report2007.Pdf
    2007 IN THE MTA Ten years after the creation of the MTA, this 2007 Report contains many elements of enormous importance and individuality that indicate the order of priorities of the Government of the Gene- ralitat and all associated administrative bodies. In the first place, a review of the 2001-2010 Infrastructure Management Plan (IMP), showed the urgent need for the already begun revision and update. The key financial data is that in 2007, there has been a considerable excess, in absolute terms, of the amount of money allo- cated for the whole period of duration of the IMP. More money, but nevertheless, not yet all the improvement work, and some of this pending work still under discussion or modification. This is the case of Metro line 12. The agreement has been to replace it by extensions to some lines and the construction of a new Cornellà-Castelldefels railway line. It is therefore urgent to have a revised IMP that adapts to this new reality. JOAQuim NADAL I FarrEraS The physical translation of the work included in the IMP is now more than evident in the Councillor for Territorial Policy follow-up map. The map is very spectacular and shows the immensity of the process of mo- and Public Works and President of the MTA dernisation, change and adaptation of accesses of the whole public transport network of the metropolitan region. The fact that this enormous volume of work still has few obvious repercus- sions is a problem that must be resolved. This means making the progress of the work and the inconveniences corresponding to its materialisation compatible with the successive enjoyment of the improvements as they are completed and put into practice.
    [Show full text]
  • “Priorització D'actuacions En Infraestructures I Serveis De
    PRIORITZACIÓ D’ACTUACIONS EN INFRAESTRUCTURES I SERVEIS DE MOBILITAT DEL CORREDOR DE LA B-30 Març de 2014 Àmbit B30 PRIORITZACIÓ D’ACTUACIONS EN INFRAESTRUCTURES I SERVEIS DE MOBILITAT DEL CORREDOR DE LA Aquest treball s’ha fet en el marc del Grup de Treball de Territori (GTT) de l’Associació Àmbit B30, creat al 2011 amb l’objectiu de recollir, debatre i coordinar iniciatives que permetin potenciar l’activitat industrial en el territori de la B-30 per incrementar‐hi l’activitat econòmica. Es tracta del primer estudi realitzat pel GTT, que amb el suport de la Diputació de Barcelona i des d’una perspectiva global i de treball col·laboratiu amb els 23 municipis, té com a objectiu la definició d’una agenda de priorització de les actuacions del sistema de mobilitat públic i privat en el territori de la B30. Març de 2014 Grup de Treball de Territori: Ajuntament de Martorell, coordinació del grup, Ajuntament de Barberà del Vallès, Ajuntament de Granollers, Ajuntament de Parets del Vallès i Ajuntament de Sabadell. Organitzacions Àmbit B30 participants a les sessions de treball: Ajuntament de Badia del Vallès, Ajuntament de Barberà del Vallès, Ajuntament de Castellar del Vallès, Ajuntament de Castellbisbal, Ajuntament de Cerdanyola del Vallès, Ajuntament de Granollers, Ajuntament de la Roca del Vallès, Ajuntament de Martorell, Ajuntament de Mollet del Vallès, Ajuntament de Montmeló, Ajuntament de Montornès del Vallès, Ajuntament de Palau-solità i Plegamans, Ajuntament del Papiol, Ajuntament de Parets del Vallès, Ajuntament de Polinyà, Ajuntament de Ripo- llet, Ajuntament de Rubí, Ajuntament de Sabadell, Ajuntament de Sant Cugat del Va- llès, Ajuntament de Sant Quirze del Vallès, Ajuntament de Santa Perpètua de Mogo- da, Ajuntament de Terrassa, Ajuntament de Vilanova del Vallès, Associació d’Amics de la UAB, Cambra de Comerç de Sabadell, Cambra de Comerç de Terrassa, CCOO, CECOT, CIESC, Gremi de Constructors d’Obres de Sabadell i Comarca, Parc de l’Alba, Parc de Recerca de la UAB, PIMEC, Sant Cugat Empresarial, UAB, UPC, Via Vallès.
    [Show full text]