TCRP Research Results Digest 77
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
2012 Annual Report Pursuing Our Unlimited Potential Annual Report 2012
For the year ended March 31, 2012 Pursuing Our Unlimited Potential Annual Report 2012 Annual Report 2012 EAST JAPAN RAILWAY COMPANY JR East’s Strengths 1 AN OVERWHELMINGLY SOLID AND ADVANTAGEOUS RAILWAY NETWORK The railway business of the JR East Being based in the Tokyo metro- Group covers the eastern half of politan area is a major source of our Honshu island, which includes the strength. Routes originating in the Tokyo metropolitan area. We provide Kanto area (JR East Tokyo Branch transportation services via our Office, Yokohama Branch Office, Shinkansen network, which connects Hachioji Branch Office, Omiya Tokyo with regional cities in five Branch Office, Takasaki Branch directions, Kanto area network, and Office, Mito Branch Office, and intercity and regional networks. Our Chiba Branch Office) account for JR EAST’S SERVICE AREA networks combine to cover 7,512.6 68% of transportation revenue. kilometers and serve 17 million Japan’s total population may be people daily. We are the largest declining, but the population of the railway company in Japan and one of Tokyo metropolitan area (Tokyo, TOKYO the largest in the world. Kanagawa Prefecture, Saitama Prefecture, and Chiba On a daily basis, about 17million passengers travel a network of 70 train lines stretching 7,512.6 operating kilometers An Overwhelmingly Solid and Advantageous Railway Network Annual Report 2012 SECTION 1 OVERALL GROWTH STRATEGY Prefecture) continues to rise, mean- OPERATING REVENUES OPERATING INCOME ing our railway networks are sup- For the year ended March 31, 2012 For the year ended March 31, 2012 ported by an extremely sturdy Others 7.9% Transportation Others 6.1% Transportation operating foundation. -
Report Report INTRODUCTION
Report Report INTRODUCTION The efforts the Catalan government is making to extend the public transport network to new points of the territory and improve the quality of the service have made a notable contribution to the increase in demand, especially in the second half of 2010. For example, in the sphere of the integrated fare system for the Barcelona area a total of 922.33 million journeys were recorded for 2010, 0.9% more than the previous year, thanks largely to the increase in the number of journeys by Metro, a 5.4% increase over 2009. Moreover, this upward tendency in the number of journeys made by public transport has been confirmed in the first quarter of 2011, and the forecasts for the close of the year LLUÍS RECODER I MirAllES already point to a record annual figure. Councillor for Territory and Sustainability and Chairman of the This recovery of demand is partly due to the set of measures taken to improve the infra- Metropolitan Transport Authority structure which the Catalan government is promoting in order to extend the public transport network and bring it to new centres of population, thus substantially broadening its area of coverage. It was in 2010 that new sections of the Metro came into operation, such as L9/L10 between Gorg and La Sagrera, L5 between Horta and Vall d’Hebron, and L2 between Pep Ventura and Badalona Pompeu Fabra. It was in the same year that Ferrocarrils de la Generalitat opened the station at Volpelleres near Sant Cugat del Vallès. In the field of road public transport various bus lines have been modified and extended to adapt their routes to the new needs for access to strategic facilities and other points where a large number of journeys are concentrated. -
21-467-Planol Plegable Caraa Agost 2021
Sant Genís Cementiri de Collserola Cementiri de Collserola Montcada i Reixac Ciutat Meridiana Ciutat Meridiana C Pl. Parc de Ciutat Meridiana Funicular t 112 Barris Zona 97 r 112 Velòdrom Horta Torre Baró a Sant 185 102 de Vallvidrera . 112 Montbau la Vall 185 Nord d Genís Mpal. d’Horta 183 62 96 e 19 76 Ctra. Horta 182 Vallbona S 112 d’Hebron 18 Peu del Funicular t. a Cerdanyola 3 u C 97 0 e 183 l u a 8 l 19 r g 76 Sant Genís 1 a r e a r a t Transports d 183 C i v Pl. 76 V21 l Lliçà n l 76 Bellprat 0 a Meguidó s 8 a Parc de a de le te Av. Escolapi CàncerTorre Baró Torre Baró 83 1 V t e 1 C Mundet l s u Metropolitans Hospital Universitari 135 A Roq Vallbona e La Font 102 Ronda de Dalt C tra. d Sinaí 76 de la Vall d’Hebron Arquitecte Moragas e r del Racó M19 Can Marcet D50 104 d Rda. Guineueta Vella o j Sarrià Vall d’Hebron 135 Pl. Valldaura a 60 de Barcelona Pg. Sta. Eulàlia C Montbau Pg. Valldaura Metro Roquetes Parc del Llerona 96 35 M o 9 1 Botticelli Roquetes 97 . llse M1 V23 Canyelles / 47 V7 v rola Vall d’Hebron 135 185 Pla de Fornells A 119 Vall d’Hebron V27 Canyelles ya 27 R 180 104 o 196 Funicular M19 n Pl. 127 o 62 ibidab 60 lu C drig . T del Tibidabo 102 ta Porrera de Karl 185 Canyelles 47 a o B v a Canyelles ro alenyà 130 A C Marx sania Can Caralleu Eduard Toda Roquetes A rte Sant Just Desvern 35 G e 1 d r Campoamor a r t Barri de la Mercè Parc del n e u V3 Pl. -
DSB S-Tog A/S Annual Report 2008
DSB S-tog a/s Annual report 2008 Annual report 2008· DSB S-tog a/s / 1 Publisher: DSB S-tog a/s Sølvgade 40 1349 København K Photo: Klaus Holsting Layout: DSB Kommerciel, Visual Kommunikation 6. marts 2009 Annual report 2008 · DSB S-tog a/s / 2 Contents Management Statement Annual Accounts & Auditors’ report 11 Accounting Policies 4 Management statement 15 Profit and loss account 5 Independent auditors’ report 16 Balance sheet 18 Equity statement Management’s report 19 Cash flow statement 6 Financial review 20 Notes to the annual accounts 7 Risks 9 Sustainability Other information 10 Expectations for the future 31 Company information 32 Company profile Annual report 2008· DSB S-tog a/s / 3 Management Statement & Auditors’ report Management statement The Board of Directors and the Executive Board have today It is also our view that the Management Report contains a dis¬cussed and adopted DSB S-tog’s Annual Report for well-founded assessment of the company’s activities and 2008. financial conditions, the annual result and the company’s financial position in general and a description of the most The Annual Report is presented in accordance with the Da- important risks and uncertainty factors to which the nish Financial Statements Act, Danish Accounting Standards company is subject. and the Act on the Independent Public Corporation DSB and on DSB S-tog A/S. We consider the accounting policies The Annual Report is presented for approval at the Annual applied to be appropriate. Accordingly, the Annual Report Meeting. gives a true and fair view of the company’s assets, liabi- lities and financial position at 31 December 2008 and the Copenhagen, 6 March 2009 results of the company’s activities and cash flows for the financial year January 1-December 31, 2008. -
Objetivo Tren 2024
@transportpublic PromocioTransportPublic @transportpublic www.transportpublic.org [email protected] 93 244 49 70 OBJETIVO TREN 2024 Propuesta ferroviaria para reducir a casi cero las emisiones de CO2 del transporte público en Catalunya / 1a edición: Junio 2020 Autores: Pau Noy Serrano, ingeniero industrial. Ricard Riol Jurado, ingeniero técnico de obras públicas. Colaboradores: Albert Parés i Soldevila, Daniel Pi Noya, Georgina Montesinos Zaragoza, José Luis Rodrigo Jiménez, Josep Maria Olivé i Garcia, Marc Iglesias Pérez, Xavier Lujan Calvo, Javier Paricio Sosa. 2 / 114 ÍNDICE 1. Prólogo ................................................................................................................................ 4 2. ¿Por qué el nuevo Objetivo Tren 2024? ......................................................................... 6 3. ¿Por qué potenciar el ferrocarril? ................................................................................. 14 4. Principios del esquema básico de servicio deseado ................................................... 17 5. Actuaciones prioritarias de infraestructura ................................................................. 21 6. Actuaciones prioritarias no infraestructurales ............................................................ 42 7. Proyectos ferroviarios a estudiar a medio y largo ..................................................... 48 8. Nivel de servicio propuesto para cercanías ................................................................. 53 Conexión ferroviaria del -
Ringbanen – En Ny, Tværgående Bybane
Ringbanen – en ny, tværgående bybane Ringbanen EN BANE PÅ TVÆRS MED NYE FORBINDELSER Ringbanen bliver en ny, tværgående linie på det storkøben- havnske S-banenet. Hér får passagererne mulighed for hurtigt og bekvemt at skifte til de andre S-togslinier, og der bliver gode omstigningsmuligheder til busser, regionaltog på Hellerup Station (Kystbanen) og Ny Ellebjerg Station (Øresundsbanen) samt Metroen på Flintholm Station. Ringbanen er på ca. 11,5 km. Den består dels af den hidtidige Ydre Bybane mellem Hellerup og Grøndal og dels af en nyan- lagt bane. Fra Hellerup til Grøndal Station har Banestyrelsen udskiftet den eksisterende bane totalt med nyt underlag, Mod Farum Mod Hillerød Mod Klampenborg Mod Helsingør Eksisterende Ringbane Ringbane under bygning Hellerup Mod Frederikssund Ryparken Bispebjerg Nørrebro Fuglebakken C. F. Richsvej Grøndal Flintholm Nørreport KB Hallen Ålholm Mod Høje Taastrup Mod Roskilde Danshøj Vigerslev Ny Ellebjerg Mod Køge Mod Kastrup skærver, skinner og køreledningsanlæg. Fra Grøndal over den nye Flintholm Station og frem til den nye Vigerslev Station lægger Banestyrelsen nye spor på den hidtidige godsbane. Fra Vigerslev Allé og frem til Ny Ellebjerg Station bygges et nyt dobbeltspor på nordsiden af Øresundsbanen på en ca. to km lang strækning. BANEN ÅBNER I FIRE ETAPER Ringbanen bliver taget i brug i takt med, at Banestyrelsen bliver færdig med at bygge bane og stationer. Strækningen fra Helle- rup til en midlertidig station ved C.F. Richsvej tæt på Grøndal Station er allerede i drift. Strækningen frem til Flintholm Station åbner i december 2003, hvor den midlertidige station lukker. Strækningen mellem Flintholm og Danshøj Station åbner i sommeren 2004. -
The Copenhagen Test and Treat Hepatitis C in a Mobile
Open access Protocol BMJ Open: first published as 10.1136/bmjopen-2020-039724 on 9 November 2020. Downloaded from The Copenhagen test and treat hepatitis C in a mobile clinic study: a protocol for an intervention study to enhance the HCV cascade of care for people who inject drugs (T’N’T HepC) Jeffrey Victor Lazarus ,1 Anne Øvrehus,2 Jonas Demant,3 Louise Krohn- Dehli,4 Nina Weis 4,5 To cite: Lazarus JV, ABSTRACT Strengths and limitations of this study Øvrehus A, Demant J, et al. Introduction Injecting drug use is the primary driver of The Copenhagen test and hepatitis C virus (HCV) infection in Europe. Despite the ► This protocol presents one of the first studies glob- treat hepatitis C in a mobile need for more engagement with care, people who inject clinic study: a protocol for an ally to employ a peer-led integrated model of care, drugs (PWID) are hard to reach with HCV testing and intervention study to enhance with the latest point-of- care technology, to target treatment. We initiated a study to evaluate the efficacy for the HCV cascade of care people who inject drugs for hepatitis C testing, treat- testing and linkage to care among PWID consulting peer- for people who inject drugs ment and care outside of addiction treatment. (T’N’T HepC). based testing at a mobile clinic in Copenhagen, Denmark. BMJ Open ► The study will use both antibody rapid detection Methods and analysis In this intervention study, we will 2020;10:e039724. doi:10.1136/ tests and RNA point- of-care testing in order to sim- bmjopen-2020-039724 recruit participants at a single community- based, peer- run plify and expedite hepatitis C diagnosis. -
Sanchez-Piulachs Arquitectes S
IMPROVEMENTS TO METRO STATIONS - Project in progress: restoration of the interchange in Urquinaona station of line 1 and line 4 of the underground in Barcelona. Collaboration with Infraes, S.A i Ingenium Civil SLP engineerings. Implementation project of actions on improvement of the evacuation and the accessibility. Promoter: Generalitat de Catalunya / Direcció General de Transports (Gisa). - Project in progress: restoration of the interchange of Catalunya station in line 1 and line 3 of the underground of Barcelona. Implementation project of architecture and facilities. Promoter: Transports Metropolitans de Barcelona (TMB). - Restoration plan for acoustic improvements of Muntaner and Plaça Espanya stations. Implementation project of architecture and facilities. Barcelona 2009. C.P.: 2.178.000€ / 2.963.692US$. Promoter: Ferrocarrils de la Generalitat de Catalunya. - Restoration of Gràcia station of Barcelona FGC (metro). Implementation project of architecture and facilities. Barcelona 2009. C.P.: 24.924.000€ / 33.915.084US$. Promoter: Generalitat de Catalunya / Direcció General de Transports (Gisa). - Restoration of Sarrià station of Barcelona FGC (metro). Implementation project of architecture and facilities. Barcelona 2008. C.P.: 31.272.000€ / 42.553.061US$. Collaboration with Auding Engineering. Promoter: Generalitat de Catalunya / Direcció General de Transports (Gisa). - New access to Torre Baró-Vallbona station on Line 11 of the Barcelona metro. Implementation project of architecture and facilities. Barcelona 2007. C.P.: 3.100.000€ / 4.218.294US$. Promoter: Bagur,SA. - Sagrera Meridiana interchange of the Barcelona metro. Implementation project for the hall of C/ Garcialso, C/ Felip II, main hall and Line 1 and 5 platforms. Barcelona 2006. C.P.: 88.100.000€ / 118.881.194US$. -
International Student's Guide
International Students’ Guide UNIVERSITY OF BARCELONA Faculty of Economics and Business 2021/2022 1 CONTENT 1. Official Welcome ……………………………………..3 2. Contact Details…………………………………………4 3. The University of Barcelona ………………….…5 4. Faculty of Economics and Business.………….7 5. Arrival check-in and course enrolment……..8 6. Spanish and Catalan courses…………………….11 7. Academic calendar…………………………………..17 8. Studying at the University of Barcelona……18 9. Testimonials.…………………………………………….23 10. Internships in Barcelona……………..………….24 11. Buddy Programme………………………..……….27 12. Travelling to Barcelona……………………………28 13. Formalities to be done during your stay in Barcelona.………………………………………….30 14. Going out in Barcelona.………………………….33 15. Travel around in Barcelona and Catalonia.……………………………………….38 16. Useful information………………………………… 40 2 OFFICIAL WELCOME INTERNATIONAL RELATIONS OFFICE Remember that in Catalonia we have our own language, FACULTY OF ECONOMICS AND BUSINESS which is Catalan. In the UB both Catalan and Spanish are official languages and everyone can communicate, write The International Relations Office would like to their tests or present their homework in both languages. welcome you to the Faculty of Economics and Business The University offers Catalan and Spanish courses that may of the University of Barcelona (UB). We are happy that help you to follow the classes better from the beginning. you have chosen our institution to spend your academic exchange abroad! Please carefully read this International Students’ Guide that has been designed especially for you to guide you step In our Faculty you’ll have the opportunity to relate with by step while you arrange your arrival to Barcelona and local students and to understand better the Catalan your stay at our faculty. -
LACCEI Paper
Fourth LACCEI International Latin American and Caribbean Conference for Engineering and Technology (LACCET’2006) “Breaking Frontiers and Barriers in Engineering: Education, Research and Practice” 21-23 June 2006, Mayagüez, Puerto Rico. Innovative Techniques in Planning and Finance of Public Transportation Projects: Lessons Learned and its Applications Ildefonso Burgos-Gil, PE, MCE General Manager for Mass Transit Development, Puerto Rico Highway and Transportation Authority, San Juan, PR, USA, [email protected] Abstract The International Transit Studies Program (ITSP) conducts two study missions each year to provide transit managers from across the United States the opportunity to examine public transportation practices in other countries and regions, with the goal of encouraging innovation domestically. The program is sponsored by the Transit Cooperative Research Program (TCRP), funded by the Federal Transit Administration, and managed by the Eno Transportation Foundation. The subject for the 2005 Fall Study Mission was Innovative Techniques in Planning and Finance of Public Transportation Projects. The mission studied systems in Barcelona, Spain; Copenhagen, Denmark; Shanghai, China; and Osaka, Japan. As a participant, the author had the opportunity to meet with the managers for the different systems and learn and document the experience. This paper presents a more detailed insight on the author’s assigned studied systems in Barcelona, the way it has been integrated to become an effective transit system, its financial model, the lessons learned and its possible applications in Puerto Rico and elsewhere. Keywords integration, transit, planning, finance, public private partnership 1. Introduction The International Transit Studies Program (ITSP) conducts two study missions each year to provide transit managers from across the United States the opportunity to examine public transportation practices in other countries and regions, with the goal of encouraging innovation domestically. -
Pensioner's Card
Pensioner’s card de Ferrocarrils de la Generalitat de Catalunya Renewing it Cards issued before 31st December 2013 To find out more, visit the website www.fgc.cat or call 012 Criteria for renewing the FGC pensioner’s card: Pensioner’s card A - People aged 65 or over with pension income less than or equal to the minimum wage or who do not receive any pension. - People aged under 65 with 33% or higher degree of disability and benefit income less than or equal to the minimum wage or who do not receive any benefit. Pensioner’s card B - People aged 65 or over with with pension income more than the minimum wage. - People aged under 65 with 33% or higher degree of disability and benefit income more than the minimum wage. 1. Administrative process RENEWING THE CARD HANDING IN THE APPLICATION - Pick up an application form at any FGC station on the Hand in the application form, duly completed with Barcelona-Vallès or Llobregat-Anoia lines. personal details and all documentary evidence: - You also need to pick up a prepaid envelope. - By post, using the prepaid envelope. - At the pensioner’s card office at Carrer Avenir 6, Barcelona. 2. Documentation required - Application form completed with personal details - Photocopy of notification of benefit rise or plus bank details if choosing to pay by direct debit. certificate of monthly benefitfrom the National Social Security Institute (INSS) for the current year (for - Photocopy of Spanish ID card or foreigner ID renewals of pensioner’s card A only)*. - For under-65s, photocopy of the certificate - If no benefit is received, photocopy of the negative accrediting disability issued by the Department of benefit certificate from the National Social Security Employment, Social Affairs and Families or card Institute (INSS) for the current year (for renewals of accrediting disability, showing a degree of 33% or pensioner’s card A only)*. -
Train Scheduling of Shinkansen and Relationship to Reliable Train Operation
Computers in Railways XII 133 Train scheduling of Shinkansen and relationship to reliable train operation S. Sone & Y. Zhongping Beijing Jiaotong University, China Abstract This paper explains why security is important, especially in Asia, as well as safety, and how we established reliable transportation in the Japanese Shinkansen, mainly in relation to train scheduling. The authors also describe several ideas actually taken by Shinkansen in order to realise reliable operation even in the case of possible disturbances. Out of many ideas, some examples of which are shown here, selective adoption according to the purpose of the railway or line is strongly recommended, together with given conditions taken into account. Keywords: disturbance, punctuality, reliable operation, spare time, train scheduling. 1 Introduction Features of east-Asian high-speed railways are very dense passenger flow together with frequent train operation with a big capacity. In order to realise reliable transportation in this circumstance, safe train operation in a narrow sense, which is guaranteed mainly by signalling system, is not enough; secure passenger flow must also be guaranteed even when some traffic disturbances take place. This is the reason why the authors present this paper, which mainly deals with security rather than safety, for the special invited session of "Traffic Control and Safety of High-speed Railways in Asia". Just after the inauguration of Tokaido Shinkansen in 1964, we had many disruptions to train operation due to rain and snowfall, breakdown of the power feeding system, deterioration of track conditions due to excess axleload, etc. In a narrow sense of safety, the Japanese Shinkansen carried more than nine billion passengers without any casualty by train accident, which is by far the safest WIT Transactions on The Built Environment, Vol 114, © 2010 WIT Press www.witpress.com, ISSN 1743-3509 (on-line) doi:10.2495/CR100131 134 Computers in Railways XII railway in the world.