Annual Listing of Obligated Projects In the Louisville/Jefferson County, KY-IN MPA

Fiscal Year 2018 (October 1, 2017 – September 30, 2018)

December 2018

Fiscal Year 2018 List of Obligated Federally Funded Projects

The Fixing America's Surface Transportation (FAST) Act directs Metropolitan Planning Organizations (MPOs), such as the Kentuckiana Regional Planning and Development Agency (KIPDA), to publish a list of federally funded projects that were obligated in the preceding fiscal year. An obligated project is one in which the federal government has made a commitment to pay the federal share of the project cost. KIPDA, cooperatively with the Indiana Department of Transportation (INDOT), the Transportation Cabinet (KYTC) and the Transit Authority of River City (TARC), has developed a list of projects that were obligated in Fiscal Year 2018 for the Louisville/Jefferson County, KY‐IN Metropolitan Planning Area. This list of obligated federally funded projects can be found in the following tables and includes maintenance projects, roadway improvements, transit projects, pedestrian walkways, bicycle facilities and many others. The Indiana projects were obligated in state Fiscal Year 2018, from July 1, 2017 through June 30, 2018. The Kentucky projects, as well as the TARC projects, were obligated in federal Fiscal Year 2018, from October 1, 2017 through September 30, 2018.

The projects are shown by state and county, and listed alphabetically by Project Sponsor. The transit projects follow the Indiana and Kentucky projects. The information that is shown includes the federal funding source, project descriptions (when applicable), the federal funds that were obligated, and other funding details. Information concerning the federal obligations was provided by the Indiana Department of Transportation, the Kentucky Transportation Cabinet, and the Transit Authority of River City. Indiana Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area State Fiscal Year 2018 (July 1, 2017 - June 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated Clark County

Indiana Department of Intersection improvement on IN 60 at St. Joe Road (East Jct.), Preliminary Congestion Mitigation and Air Quality 1104 0100712 IN 60 $ 196,360 $ 22,920 $ 173,440 Transportation including adding turn lanes. Engineering (CMAQ) - State

National Highway Performance Indiana Department of New bridge construction on IN 265, IN 265 bridge over Ohio River 1166 0201296 I-265 Construction $ 129,600,000 $ 62,408,752 $ 67,191,248 Program (NHPP) Transportation (joint project with KY).

National Highway Performance Indiana Department of New bridge, other construction on I-65, approach work for new 1241 0300798 I-65 Right of Way $ 2,400,000 $ 2,835 $ 2,397,165 Program (NHPP) Transportation bridge over Ohio River.

Indiana Department of New bridge, other construction on I-65, approach work for new Preliminary National Highway Performance 1241 0300798 I-65 $ 1,600,000 $ 263,392 $ 1,336,608 Transportation bridge over Ohio River. Engineering Program (NHPP)

Indiana Department of New bridge, other construction on I-65, approach work for new Preliminary 1241 0300798 I-65 $ 1,354,082 $ 85,648 $ 1,268,434 Interstate Maintenance (IM) Transportation bridge over Ohio River. Engineering

Indiana Department of Preliminary National Highway Performance 1882 0300799 I-65 Ohio River Bridge GEC for I-65 and SR265. $ 1,800,000 $ 733,817 $ 1,066,183 Transportation Engineering Program (NHPP)

Widen existing lanes (no new travel lanes) on Bethany Road, Surface Transportation Block Grant 965 0710003 Clark County Bethany Road provide turning lanes at 4 intersections and realign Utilities $ - $ 972,800 $ - (STBG) - State vertical/horizontal curves from IN 62 to CR 403.

Widen existing lanes (no new travel lanes) on Bethany Road, Surface Transportation Block Grant 965 710003 Clark County Bethany Road provide turning lanes at 4 intersections and realign Utilities $ - $ 574,744 $ - (STBG) - State vertical/horizontal curves from IN 62 to CR 403.

Big Four Bicycle & Construction of a ramp at the north end of the Big Four Bridge Transportation Alternatives Program 1564 0710993 Jeffersonville Construction $ 7,400,000 $ 5,517,482 $ 1,882,518 Pedestrian Bridge providing access to the bicycle and pedestrian bridge. (TAP) - State

Big Four Bicycle & Construction of a ramp at the north end of the Big Four Bridge Construction Transportation Alternatives Program 1564 0710993 Jeffersonville $ 1,882,518 $ 437,021 $ 1,445,498 Pedestrian Bridge providing access to the bicycle and pedestrian bridge. Engineering (TAP) - State

Indiana Department of Intersection improvement at Perry Crossing Road including the Preliminary 1565 0711017 IN 60 $ 63,000 $ 41,100 $ 21,900 Highway Infrastructure Transportation addition of turn lanes. Engineering

1 12/20/2018 Indiana Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area State Fiscal Year 2018 (July 1, 2017 - June 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated

Surface Transportation Block Grant Indiana Department of Bridge replacement on IN 403 over Silver Creek, 0.98 miles east of Preliminary 1585 0800072 IN 403 $ 160,000 $ 15,091 $ 144,909 (STBG) - State Transportation US 31 (no additional travel lanes). Engineering

Surface Transportation Block Grant Indiana Department of Bridge replacement on IN 403 over Silver Creek, 0.98 miles east of Construction 1585 0800072 IN 403 $ 1,980,000 $ 165,878 $ 1,814,122 (STBG) - State Transportation US 31 (no additional travel lanes). Engineering

Indiana Department of Patch and rehab pavement on I-65 from IN 311 to 0.5 miles north Construction 1896 1006431 I-65 $ 9,000,000 $ 205,507 $ 8,794,493 Interstate Maintenance (IM) Transportation of IN 160. Engineering

Indiana Department of Patch and rehab pavement on I-65 from IN 311 to 0.5 miles north 1896 1006431 I-65 Construction $ 8,794,493 $ 1,942,627 $ 6,851,865 Interstate Maintenance (IM) Transportation of IN 160.

Indiana Department of Advanced Traffic Management System (ATMS) / Dynamic Message Congestion Mitigation and Air Quality 1968 1173577 I-65 & I-64 Construction $ - $ 684,699 $ - Transportation Sign (DMS) installation in Southern Indiana. (CMAQ) - State

Indiana Department of Construction National Highway Performance 2099 1296970 I-65 Pavement resurfacing on I-65 from Stansifer Avenue to IN 311. $ 2,880,000 $ 87,836 $ 2,792,164 Transportation Engineering Program (NHPP)

Indiana Department of National Highway Performance 2099 1296970 I-65 Pavement resurfacing on I-65 from Stansifer Avenue to IN 311. Construction $ 2,792,164 $ 2,259,710 $ 532,454 Transportation Program (NHPP)

Indiana Department of Ohio River Bridges National Highway Performance N/A 1298648 East end ORB - Harrod's Creek FD emergency response for tunnel Construction $ - $ 3,275,520 $ - Transportation Project Program (NHPP)

Pavement rehabilitation and widening (no additional lanes) of Old Surface Transportation Block Grant Indiana Department of Preliminary 2080 1382057 Old Salem Road Salem Road from the southern terminus of the Ohio River Bridges $ 36,440 $ 17,442 $ 18,998 (STBG) - State Transportation Engineering Project to Utica Pike (4th Street) in Utica.

Pavement rehabilitation and widening (no additional lanes) of Old Surface Transportation Block Grant Indiana Department of Construction 2080 1382057 Old Salem Road Salem Road from the southern terminus of the Ohio River Bridges $ 720,000 $ 595,245 $ 124,756 (STBG) - State Transportation Engineering Project to Utica Pike (4th Street) in Utica.

Pavement rehabilitation and widening (no additional lanes) of Old Surface Transportation Block Grant Indiana Department of 2080 1382057 Old Salem Road Salem Road from the southern terminus of the Ohio River Bridges Right of Way $ 511,200 $ 516,942 $ - (STBG) - State Transportation Project to Utica Pike (4th Street) in Utica.

2 12/20/2018 Indiana Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area State Fiscal Year 2018 (July 1, 2017 - June 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated

Pavement rehabilitation and widening (no additional lanes) of Old Surface Transportation Block Grant Indiana Department of 2080 1382057 Old Salem Road Salem Road from the southern terminus of the Ohio River Bridges Utilities $ 652,800 $ 117,824 $ 534,976 (STBG) - State Transportation Project to Utica Pike (4th Street) in Utica.

Pavement rehabilitation and widening (no additional lanes) of Old Surface Transportation Block Grant Indiana Department of 2080 1382057 Old Salem Road Salem Road from the southern terminus of the Ohio River Bridges Construction $ 2,000,000 $ 3,016,300 $ - (STBG) - State Transportation Project to Utica Pike (4th Street) in Utica.

Indiana Department of Ohio River Bridges Preliminary N/A 1382529 Project Wide ORB - Tolling Oversight $ - $ 217,508 $ - Interstate Maintenance (IM) Transportation Project Engineering

Indiana Department of Ohio River Bridges Preliminary National Highway Performance N/A 1382529 Project Wide ORB - Tolling Oversight $ - $ 2,092,915 $ - Transportation Project Engineering Program (NHPP) - State

Indiana Department of Ohio River Bridges Preliminary N/A 1382529 Project Wide ORB - Tolling Oversight $ - $ 1,287,309 $ - High Priority Projects Transportation Project Engineering

Added travel lane from 1.02 miles north of IN 60 to 2.80 miles Indiana Department of National Highway Performance 2144 1400597 I-65 south of IN 160 (0.75 miles north of Memphis Road) in Clark Construction $ 23,350,000 $ 3,915,283 $ 19,434,717 Transportation Program (NHPP) - State County.

Added travel lane from 1.02 miles north of IN 60 to 2.80 miles Indiana Department of Construction National Highway Performance 2144 1400597 I-65 south of IN 160 (0.75 miles north of Memphis Road) in Clark $ 19,434,717 $ 30,000 $ 19,404,717 Transportation Engineering Program (NHPP) - State County.

Added travel lane from 1.02 miles north of IN 60 to 2.80 miles Indiana Department of National Highway Performance 2144 1400597 I-65 south of IN 160 (0.75 miles north of Memphis Road) in Clark Utilities $ - $ 75,800 $ - Transportation Program (NHPP) - State County.

Indiana Department of Ohio River Bridges Surface Transportation Block Grant N/A 1401239 Toll Systems Provider Construction $ - $ 1,979,012 $ - Transportation Project (STBG) - State

Reconstruction and improvement of approximately 580 feet of Blackiston Mill Road, just north of Lewis & Clark Parkway, including Blackiston Mill Road Highway Safety Improvement Program 2187 1401350 Clarksville the installation of turn lanes into and out of Kroger Drive, the Right of Way $ 879,412 $ 879,412 $ - Phase 1 (HSIP) - Urban addition of a raised center curb, improvement of sight lines, and drainage improvements.

Surface Transportation Block Grant Clark County Bridge Countywide Bridge Inspection and Inventory Program for Cycle Preliminary 2148 1500201 Clark County $ 127,502 $ 161,805 $ - (STBG) - State Inspection Years 2018-2021 Engineering

3 12/20/2018 Indiana Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area State Fiscal Year 2018 (July 1, 2017 - June 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated

National Highway Performance Indiana Department of 2241 1592229 I-65 Pavement restoration on I-65 from Stansifer Avenue to Old IN 311. Construction $ 2,610,000 $ 1,251,966 $ 1,358,034 Program (NHPP) Transportation

Indiana Department of Construction 2241 1592229 I-65 Pavement restoration on I-65 from Stansifer Avenue to Old IN 311. $ 1,358,004 $ 75,980 $ 1,282,024 Interstate Maintenance (IM) Transportation Engineering

National Highway Performance Indiana Department of Construction 2241 1592229 I-65 Pavement restoration on I-65 from Stansifer Avenue to Old IN 311. $ 1,282,024 $ 36,400 $ 1,245,624 Program (NHPP) Transportation Engineering

National Highway Performance Indiana Department of Construction 2241 1592229 I-65 Pavement restoration on I-65 from Stansifer Avenue to Old IN 311. $ 1,245,624 $ 31,299 $ 1,214,324 Program (NHPP) Transportation Engineering

National Highway Performance Indiana Department of Preliminary 2497 1592995 IN 62 Road resurface on IN 62 from IN 265 to 0.15 miles north of IN 3. $ 156,000 $ 31,500 $ 124,500 Program (NHPP) Transportation Engineering

Construct an HMA overlay, preventive maintenance on US 31 from Surface Transportation Block Grant Indiana Department of Preliminary 2325 1593014 US 31 1.91 miles north of IN 60 (old IN 311) to 2.67 miles north of IN $ 8,000 $ 25,627 $ - (STBG) - State Transportation Engineering 60.(old IN 403).

National Highway Performance Indiana Department of Concrete pavement restoration (CPR) on IN 265 from I-65 to 0.69 Preliminary 2323 1600308 IN 265 $ 16,000 $ 17,600 $ - Program (NHPP) Transportation miles west of IN 62 (ORB O&M limits). Engineering

Surface Transportation Block Grant Indiana Department of Preliminary 2406 1600675 IN 60 Small structure pipe lining on IN 60, 0.47 miles east of IN 111. $ 16,000 $ 3,375 $ 12,625 (STBG) - State Transportation Engineering

Indiana Department of Preliminary 2397 1600716 I-65 Small structure pipe lining on I-65, 0.15 miles south of IN 311. $ 18,000 $ 3,555 $ 14,445 Interstate Maintenance (IM) Transportation Engineering

Indiana Department of I- 65 Environmental Preliminary National Highway Performance 2338 1600757 Environmental mitigation on the Murphy property for I-65. $ 220,400 $ 164,745 $ 55,655 Transportation Mitigation Engineering Program (NHPP)

Signage installatlon and repair in the Ohio River Bridges area on I- Indiana Department of Construction 2334 1601872 I-65 65 from Exit 5 Veteran's Parkway to Exit 9 Sellersburg/New Albany $ 450,000 $ 9,691 $ 440,309 Interstate Maintenance (IM) Transportation Engineering exit.

4 12/20/2018 Indiana Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area State Fiscal Year 2018 (July 1, 2017 - June 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated

Signage installatlon and repair in the Ohio River Bridges area on I- Indiana Department of 2334 1601872 I-65 65 from Exit 5 Veteran's Parkway to Exit 9 Sellersburg/New Albany Construction $ 440,309 $ 484,537 $ - Interstate Maintenance (IM) Transportation exit.

Surface Transportation Block Grant Indiana Department of Pavement replacement on US 31, 1.53 miles north of IN 60 (Foothill Preliminary 2487 1700111 US 31 $ 384,000 $ 85,064 $ 298,937 (STBG) - State Transportation Road) to 3.28 miles north of IN 60. Engineering

Surface Transportation Block Grant Indiana Department of Pavement replacement on US 31, 1.53 miles north of IN 60 (Foothill Preliminary 2487 1700111 US 31 $ 298,937 $ 55,800 $ 243,137 (STBG) - State Transportation Road) to 3.28 miles north of IN 60. Engineering

Indiana Department of Bridge deck replacement on I-265, 02.50 miles east of IN 311 EB Preliminary National Highway Performance 2500 1701094 I-265 $ 157,500 $ 73,629 $ 83,871 Transportation ramp/65 NB and I-65. Engineering Program (NHPP)

Floyd County

Surface Transportation Block Grant Reconstruct McDonald Lane as a 2 lane road (no additional lanes) 95 0300779 New Albany McDonald Lane Construction $ 428,536 $ 370,936 $ 57,600 (STBG) - State from Grantline Road to Charlestown Road.

Surface Transportation Block Grant Reconstruct McDonald Lane as a 2 lane road (no additional lanes) Construction 95 0300779 New Albany McDonald Lane $ 57,600 $ 33,370 $ 24,230 (STBG) - State from Grantline Road to Charlestown Road. Engineering

Widen I-64 from 5 to 6 lanes from I-265 to IN 111. Additional east Indiana Department of Construction National Highway Performance 1003 0500307 I-64 bound lane between southbound I-265 and IN 111. Approximately $ 6,752,000 $ 8,955 $ 6,743,045 Transportation Engineering Program (NHPP) 1.2 miles.

Surface Transportation Block Grant Reconstruct Mount Tabor Road as a 2 lane road (no additional 309 0710808 New Albany Mount Tabor Road Right of Way $ 543,589 $ 331,577 $ 212,012 (STBG) - Urban lanes) from Grantline Road to Charlestown Road.

Surface Transportation Block Grant Reconstruct Mount Tabor Road as a 2 lane road (no additional 309 0710808 New Albany Mount Tabor Road Right of Way $ 212,012 $ 3,405 $ 208,607 (STBG) - Urban lanes) from Grantline Road to Charlestown Road.

Surface Transportation Block Grant Reconstruct Mount Tabor Road as a 2 lane road (no additional Preliminary 309 0710808 New Albany Mount Tabor Road $ 190,240 $ 190,240 $ - (STBG) - Urban lanes) from Grantline Road to Charlestown Road. Engineering

Surface Transportation Block Grant Reconstruct Mount Tabor Road as a 2 lane road (no additional 309 0710808 New Albany Mount Tabor Road Right of Way $ 208,607 $ 40,048 $ 168,559 (STBG) - Urban lanes) from Grantline Road to Charlestown Road.

5 12/20/2018 Indiana Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area State Fiscal Year 2018 (July 1, 2017 - June 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated

Surface Transportation Block Grant Reconstruct Mount Tabor Road as a 2 lane road (no additional 309 0710808 New Albany Mount Tabor Road Right of Way $ 918,559 $ 918,559 $ - (STBG) - Urban lanes) from Grantline Road to Charlestown Road.

State Street Corridor Upgrade signalizations at 14 intersections along State Street from Construction Congestion Mitigation and Air Quality 1588 0800745 New Albany $ 1,132,128 $ 16,533 $ 1,115,595 Improvements Main Street to I-265. Engineering (CMAQ) - Urban

State Street Corridor Upgrade signalizations at 14 intersections along State Street from Construction Congestion Mitigation and Air Quality 1588 0800745 New Albany $ 1,115,595 $ 14,372 $ 1,101,223 Improvements Main Street to I-265. Engineering (CMAQ) - Urban

State Street Corridor Upgrade signalizations at 14 intersections along State Street from Construction Congestion Mitigation and Air Quality 1588 0800745 New Albany $ 1,101,223 $ 91,415 $ 1,009,808 Improvements Main Street to I-265. Engineering (CMAQ) - Urban

State Street Corridor Upgrade signalizations at 14 intersections along State Street from Congestion Mitigation and Air Quality 1588 0800745 New Albany Construction $ 1,009,808 $ 1,009,808 $ - Improvements Main Street to I-265. (CMAQ) - Urban

Paoli Pike Intersection Intersection improvements to the intersections of Paoli Pike and Construction Surface Transportation Block Grant 1587 0800746 Floyd County $ 225,000 $ 6,600 $ 218,400 Improvements Scottsville Road, and Paoli Pike and Buffalo Trail, adding turn lanes. Engineering (STBG) - Urban

Upgrade and designate Market Street and Spring Street as two-way streets from Vincennes Street (formetly IN 111) to State Street; also Market Street/Spring includes the two-way conversion of Elm Street, Pearl Street, and 1556 0901275 New Albany Construction $ 1,800,000 $ 1,385,639 $ 414,361 Transportation Alternatives - Urban Street Bank Street, as well as the installation of landscaped medians, bicycle lanes, and railroad crossing improvement as well as traffic calming devices and sidewalks Upgrade and designate Market Street and Spring Street as two-way streets from Vincennes Street (formetly IN 111) to State Street; also Market Street/Spring includes the two-way conversion of Elm Street, Pearl Street, and 1556 0901275 New Albany Railroad $ 414,361 $ 146,392 $ 267,969 Transportation Alternatives - Urban Street Bank Street, as well as the installation of landscaped medians, bicycle lanes, and railroad crossing improvement as well as traffic calming devices and sidewalks Upgrade and designate Market Street and Spring Street as two-way streets from Vincennes Street (formetly IN 111) to State Street; also Market Street/Spring includes the two-way conversion of Elm Street, Pearl Street, and Construction 1556 0901275 New Albany $ 267,969 $ 214,251 $ 53,717 Transportation Alternatives - Urban Street Bank Street, as well as the installation of landscaped medians, Engineering bicycle lanes, and railroad crossing improvement as well as traffic calming devices and sidewalks

Indiana Department of Intersection improvement with new signals on US 150 at Cross Construction 1911 0902207 US 150 $ 549,600 $ 59,708 $ 489,892 Section 164 Penalty for HSIP Transportation Street. Engineering

Surface Transportation Block Grant Indiana Department of Intersection improvement with new signals on US 150 at Cross 1911 0902207 US 150 Right of Way $ 229,503 $ 27,968 $ 201,535 (STBG) - State Transportation Street.

6 12/20/2018 Indiana Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area State Fiscal Year 2018 (July 1, 2017 - June 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated

Indiana Department of Intersection improvement with new signals on US 150 at Cross 1911 0902207 US 150 Construction $ 489,892 $ 695,013 $ - Section 164 Penalty for HSIP Transportation Street.

Construct a pedestrian/bicycle path along Water Street and the New Albany Ohio River Construction Congestion Mitigation and Air Quality 1779 0902325 New Albany floodwall from East 8th Street to East 18th Street. Project length is $ 1,957,054 $ 37,680 $ 1,919,374 Greenway Engineering (CMAQ) - Urban 1.7 miles.

Construct a pedestrian/bicycle path along Water Street and the New Albany Ohio River Congestion Mitigation and Air Quality 1779 0902325 New Albany floodwall from East 8th Street to East 18th Street. Project length is Construction $ 1,919,374 $ 1,989,544 $ - Greenway (CMAQ) - Urban 1.7 miles.

Construct a pedestrian/bicycle path along Water Street and the New Albany Ohio River Construction Congestion Mitigation and Air Quality 1779 0902325 New Albany floodwall from East 8th Street to East 18th Street. Project length is $ 239,248 $ 245,839 $ - Greenway Engineering (CMAQ) - Urban 1.7 miles.

Indiana Department of Pavement maintenance including HMA overlay on IN 111 from Construction Surface Transportation Block Grant 2011 1173847 IN 111 $ 416,000 $ 6,451 $ 409,549 Transportation Corydon Pike to State Street. Engineering (STBG) - State

Indiana Department of Pavement maintenance including HMA overlay on IN 111 from 2011 1173847 IN 111 Construction $ 409,549 $ 609,008 $ - TIFIA Redistribution Transportation Corydon Pike to State Street.

Indiana Department of Bridge Deck Overlay on I-64 02.55 miles W of IN 64 (Baylor- National Highway Performance 1973 1173860 I-64 Construction $ 359,100 $ 60,373 $ 298,727 Transportation Wissman Rd) WB. Program (NHPP)

Indiana Department of Pavement resurfacing on I-64 from IN 62/IN 64 to Kentucky State National Highway Performance 2096 1296184 I-64 Construction $ 6,368,210 $ 7,354,623 $ - Transportation Line. Program (NHPP)

Indiana Department of Pavement resurfacing on I-64 from IN 62/IN 64 to Kentucky State Construction National Highway Performance 2096 1296184 I-64 $ - $ 142,161 $ - Transportation Line. Engineering Program (NHPP)

Floyd County Bridge Countywide Bridge Inspection and Inventory Program for Cycle Preliminary Surface Transportation Block Grant 2002 1382109 Floyd County $ 13,433 $ 13,433 $ 0 Inspection Years 2014-2017 Engineering (STBG) - State

Indiana Department of Construction 2139 1400473 I-265 Bridge Deck Overlay 0.25 mile East of I-64 over I-64 Ramp C. $ 65,700 $ 13,200 $ 52,500 Interstate Maintenance (IM) Transportation Engineering

7 12/20/2018 Indiana Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area State Fiscal Year 2018 (July 1, 2017 - June 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated

Indiana Department of Construction 2139 1400473 I-265 Bridge Deck Overlay 0.25 mile East of I-64 over I-64 Ramp C. $ 52,500 $ 4,086 $ 48,414 Interstate Maintenance (IM) Transportation Engineering

Indiana Department of 2139 1400473 I-265 Bridge Deck Overlay 0.25 mile East of I-64 over I-64 Ramp C. Construction $ 48,414 $ 42,756 $ 5,659 Interstate Maintenance (IM) Transportation

Indiana Department of Small Structure replacement, 1.97 miles west of I-65 under Payne- National Highway Performance 2181 1401178 I-265 Construction $ 202,500 $ 40,391 $ 162,109 Transportation Koehler Road. Program (NHPP)

Indiana Department of Small Structure replacement, 1.97 miles west of I-65 under Payne- Construction National Highway Performance 2181 1401178 I-265 $ 162,109 $ 10,335 $ 151,774 Transportation Koehler Road. Engineering Program (NHPP)

Indiana Department of Bridge deck overlay on I-64, 0.29 mile east of I-265 over Capt. Frank Surface Transportation Block Grant 2219 1500554 I-64 Construction $ 911,421 $ 517,089 $ 394,332 Transportation Road WBL. (STBG) - State

Indiana Department of Bridge deck overlay on I-64, 0.29 mile east of I-265 over Capt. Frank Construction Surface Transportation Block Grant 2219 1500554 I-64 $ 394,332 $ 22,982 $ 371,350 Transportation Road WBL. Engineering (STBG) - State

Indiana Department of Bridge deck overlay on I-64, 0.29 mile east of I-265 over Capt. Frank Construction National Highway Performance 2219 1500554 I-64 $ 371,350 $ 89,581 $ 281,769 Transportation Road WBL. Engineering Program (NHPP)

Indiana Department of Bridge deck overlay on I-64, 0.29 mile east of I-265 over Capt. Frank National Highway Performance 2220 1500557 I-64 Construction $ 751,406 $ 589,811 $ 161,595 Transportation Road EBL. Program (NHPP)

Indiana Department of Bridge deck overlay on I-64, 0.29 mile east of I-265 over Capt. Frank Construction National Highway Performance 2220 1500557 I-64 $ 161,595 $ 19,660 $ 141,934 Transportation Road EBL. Engineering Program (NHPP)

Indiana Department of Bridge deck overlay on I-64, 0.73 mile east of US 150 at Quarry Construction National Highway Performance 2221 1500559 I-64 $ 936,845 $ 20,309 $ 916,536 Transportation Road WBL. Engineering Program (NHPP)

Indiana Department of Bridge deck overlay on I-64, 0.73 mile east of US 150 at Quarry National Highway Performance 2221 1500559 I-64 Construction $ 916,536 $ 609,259 $ 307,277 Transportation Road WBL. Program (NHPP)

8 12/20/2018 Indiana Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area State Fiscal Year 2018 (July 1, 2017 - June 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated

Indiana Department of Preliminary National Highway Performance 2279 1592187 I-64 Bridge painting of the Sherman Minton Bridge over the Ohio River. $ 450,000 $ 200,000 $ 250,000 Transportation Engineering Program (NHPP)

Indiana Department of Preliminary National Highway Performance N/A 1592476 Budd Road 6.6 miles S of Budd Road $ - $ 3,191 $ - Transportation Engineering Program (NHPP)

Indiana Department of Preliminary National Highway Performance N/A 1592476 Budd Road 6.6 miles S of Budd Road $ - $ 74,745 $ - Transportation Engineering Program (NHPP)

Indiana Department of Bridge painting on I-265, 0.25 miles east of I-64 Ramp B over Ramp Surface Transportation Block Grant 2403 1592689 I-265 Construction $ 186,300 $ 208,811 $ - Transportation C. (STBG) - State

Indiana Department of Bridge painting on I-265, 0.25 miles east of I-64 Ramp B over Ramp Construction Surface Transportation Block Grant 2403 1592689 I-265 $ - $ 31,741 $ - Transportation C. Engineering (STBG) - State

Indiana Department of Bridge painting on I-265, 0.25 miles east of I-64 Ramp B over Ramp Construction National Highway Performance 2403 1592689 I-265 $ - $ 40,893 $ - Transportation C. Engineering Program (NHPP)

Indiana Department of Surface Transportation Block Grant 2321 1592698 I-265 Bridge painting on I-265 EBL 0.33 miles west of IN 111 over CSX RR. Railroad $ 336,600 $ 18,326 $ 318,274 Transportation (STBG) - State

Indiana Department of Surface Transportation Block Grant 2321 1592698 I-265 Bridge painting on I-265 EBL 0.33 miles west of IN 111 over CSX RR. Construction $ 318,274 $ 65,772 $ 252,502 Transportation (STBG) - State

Indiana Department of Construction Surface Transportation Block Grant 2321 1592698 I-265 Bridge painting on I-265 EBL 0.33 miles west of IN 111 over CSX RR. $ 252,502 $ 6,285 $ 246,218 Transportation Engineering (STBG) - State

Indiana Department of Bridge painting on I-265 WBL 0.33 miles west of IN 111 over CSX National Highway Performance 2322 1592699 I-265 Railroad $ 324,000 $ 25,076 $ 298,924 Transportation RR. Program (NHPP)

Indiana Department of Small structure maintenance and repair on I-64 at Valley View Preliminary National Highway Performance 2278 1600310 I-64 $ 225,000 $ 144,932 $ 80,069 Transportation Creek, 0.59 miles west of the Indiana/Kentucky state line. Engineering Program (NHPP)

9 12/20/2018 Indiana Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area State Fiscal Year 2018 (July 1, 2017 - June 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated

Indiana Department of IN 335 at 0.26 Miles Preliminary Surface Transportation Block Grant 2486 1700126 Small structure replacement on IN 335, 0.26 miles north of US 150. $ 120,560 $ 67,815 $ 52,745 Transportation North of US 150 Engineering (STBG) - State

Indiana Department of Bridge deck replacement on I-265, 00.89 miles west of I-65 at Preliminary 2498 1701091 I-265 $ 252,000 $ 42,458 $ 209,543 Interstate Maintenance (IM) Transportation Admore Lane, Silver Creek EB. Engineering

Indiana Department of Bridge deck replacement on I-265, 00.89 miles west of I-65 at Preliminary National Highway Performance 2501 1701093 I-265 $ 252,000 $ 42,458 $ 209,543 Transportation Admore Lane, Silver Creek WB. Engineering Program (NHPP)

Indiana Department of Single location bridge inspection for the Sherman Minton Bridge on Preliminary 2341 1601210 I-64 $ 562,500 $ 444,047 $ 118,454 Interstate Maintenance (IM) Program Transportation I-64 over the Ohio River between New Albany and Louisville. Engineering

Various Counties

KIPDA (Floyd & Clark Counties), MPO UPWP PL, STP & CMAQ FY Metropolitan Planning Program - FAST N/A 1600642 KIPDA Staff Activites Planning $ 242,048 $ 242,048 $ - 2017, FY 18

KIPDA (Floyd & Clark Counties), MPO UPWP PL, STP & CMAQ FY Metropolitan Planning Program - FAST N/A 1600642 KIPDA Staff Activites Planning $ 109,393 $ 109,393 $ - 2017, FY 18

Kentuckiana Air Kentuckiana Air Education (KAIRE): Air pollution prevention and Congestion Mitigation and Air Quality 370 1600642 APCD Planning $ 200,000 $ 200,000 $ - Education awareness program. (CMAQ) - Urban

The KIPDA Ticket to Ride program provides ride-matching services, employer-based and regional ridesharing, vanpool subscription Surface Transportation Block Grant 56 1600642 KIPDA Ticket to Ride services, promotional activities to support ride-sharing, which Planning $ 254,000 $ 254,000 $ - (STBG) - Urban includes carpooling, vanpooling, and bikepooling. This also includes program evaluation and administration.

10 12/20/2018 Kentucky Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area Federal Fiscal Year 2018 (October 1, 2017 - September 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated Bullitt County

Kentucky Transportation Widen travel lanes (no additional travel lanes) and relocate a Surface Transportation Block Grant 1493 05-00293.00 KY 1494 Utilities $20,000.00 $18,100.00 $1,900.00 Cabinet section of KY 1494 from KY 61 to Cundiff Lane. (STBG) - Urban

Perform low cost safety improvements on KY 480 from west Kentucky Transportation Highway Safety Improvement Program 2358 05-09007.00 KY 480 junction with KY 1442 (MP 3.292) extending east to the Nelson Construction $1,660,000.00 $1,747,180.00 $0.00 Cabinet (HSIP) County line (MP 11.723) in Bullitt County.

Jefferson County

Widen River Road from 2 to 4 lanes from east of Beargrass Creek Surface Transportation Block Grant 163 05-00091.01 Louisville Metro Government River Road near Pope Avenue to Zorn Avenue. To include bike lanes and Design $350,000.00 $350,000.00 $0.00 (STBG) - Urban shared use path. Project length is 1.3 miles.

Kentucky Transportation Clean and paint the US 31 (George Rogers Clark) Bridge over the Surface Transportation Block Grant 581 05-00110.00 US 31 Construction $25,000,000.00 $3,743,300.00 $21,256,700.00 Cabinet Ohio River between Louisville and Jeffersonville. (STBG) - Urban

Rehab on the George Rogers Clark Memorial Bridge carrying US 31 Kentucky Transportation National Highway Performance 2331 05-00110.10 US 31 over the Ohio River between Louisville, Kentucky, and Construction $2,187,700.00 $420,000.00 $1,767,700.00 Cabinet Program (NHPP) Jeffersonville, Indiana.

Widen ramp from westbound I-64 to westbound I-264 (Henry Kentucky Transportation National Highway Performance 397 05-00159.00 I-264 / I- 64 Watterson Expressway) from 1 to 2 lanes and other needed Right of Way $9,430,000.00 $550,000.00 $8,880,000.00 Cabinet Program (NHPP) improvements to address the weave issues at merge on I-264.

Widen ramp from westbound I-64 to westbound I-264 (Henry Kentucky Transportation National Highway Performance 397 05-00159.00 I-264 / I- 64 Watterson Expressway) from 1 to 2 lanes and other needed Construction $9,680,000.00 $9,811,890.00 $0.00 Cabinet Program (NHPP) improvements to address the weave issues at merge on I-264.

Kentucky Transportation Reconstruct intersection of KY 22 at Springcrest Drive. MP 1.389 to Surface Transportation Block Grant 2238 05-00372.12 KY 22 Right of Way $0.00 $150,000.00 $0.00 Cabinet MP 1.789 (STBG) - State

Phase 1: Reconstruct Cooper Chapel Road from 2 to 3 lanes (3rd Cooper Chapel Road Surface Transportation Block Grant 222 05-00403.00 Louisville Metro Government lane will be a center turn lane) from KY 61 to Smyrna Parkway. Utilities $0.00 $296,185.64 $0.00 Phase 1 (STBG) - Urban Project length is 1.8 miles.

Phase 1: Reconstruct Cooper Chapel Road from 2 to 3 lanes (3rd Cooper Chapel Road Surface Transportation Block Grant 222 05-00403.00 Louisville Metro Government lane will be a center turn lane) from KY 61 to Smyrna Parkway. Construction $0.00 $303,814.36 $0.00 Phase 1 (STBG) - Urban Project length is 1.8 miles.

1 12/20/2018 Kentucky Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area Federal Fiscal Year 2018 (October 1, 2017 - September 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated

Align intersection of Broadway and 18th Street by moving the Surface Transportation Block Grant 1192 05-00413.00 Louisville Metro Government Broadway & 18th Street Construction $1,000,000.00 $1,000,000.00 $0.00 south leg of 18th Street to the east. (STBG) - Urban

Watterson Trail Bicycle Construction of separated multi-use trail running parallel to 1579 05-00452.00 Jeffersontown & Pedestrian Corridor Watterson Trail between Stonybrook Drive and Ruckriegel Parkway Construction $274,159.00 $274,159.00 $0.00 Recreational Trails P1 in Jeffersontown.

Watterson Trail Bicycle Construction of separated multi-use trail running parallel to Congestion Mitigation and Air Quality 1579 05-00452.00 Jeffersontown & Pedestrian Corridor Watterson Trail between Stonybrook Drive and Ruckriegel Parkway Construction $9,245.00 $9,245.00 $0.00 (CMAQ) P1 in Jeffersontown.

Construct a shared-use path along US 60 (Shelbyville Road) from Northeast Louisville Congestion Mitigation and Air Quality 1794 05-00469.00 Louisville Metro Government Old Shelbyville Road to North English Station Road and from Construction $300,000.00 $681,514.00 $0.00 Loop Multi-Use Path (CMAQ) English Station Way to North Beckley Station Road.

Reduce congestion and improve safety at the KY 3084 (Old Henry Kentucky Transportation National Highway Performance 2066 05-00474.00 I-265 Road) Interchange. Add a left turn lane to NB exit ramp. Milepoints Construction $706,720.00 $286,420.00 $420,300.00 Cabinet Program (NHPP) from 28.28 to 29.1.

Intelligent Transportation System (ITS)/Signal System and Technology Upgrades to connect to the city's existing traffic operations center for active traffic management operations. Complete Streets and Safety/Access Management Improvements to include construction of pedestrian pathways and improved multi-modal (especially pedestrian and transit) Surface Transportation Block Grant 2232 05-00478.70 Louisville Metro Government Dixie TIGER Project connectivity. Project will include raised medians, consolidation of Construction $4,000,000.00 $3,584,118.00 $415,882.00 (STBG) - Urban access points, modification from TWLTL to dedicated turn lanes, signage and striping upgrades. Bus Rapid Transit to include upgraded transit facilities along corridor with approximately 36 new, highly visible and easily accessible BRT stations, newly branded vehicles unique to the Dixie Corridor, appropriately located queue-jump lanes and bus turnouts.

Widen Hubbards Lane from 2 to 3 lanes (3rd lane will be a center turn lane) from US 60 (Shelbyville Road) to KY 1447 (Westport Surface Transportation Block Grant 384 05-00479.00 Louisville Metro Government Hubbards Lane Right of Way $336,160.00 $336,160.00 $0.00 Road). Add bike lanes to Hubbards Lane from Kresge Way to KY (STBG) - Urban 1447. Project length is 1.4 mi.

Northeast Louisville Design and construct a shared-use path system from Eastwood Cut Surface Transportation Block Grant 2116 05-00525.00 Louisville Metro Government Right of Way $323,268.00 $323,268.00 $0.00 Loop - Section II Off Road to Eastwood Recreation Center (16300 Eastwood Cut Off). (STBG) - Urban

2 12/20/2018 Kentucky Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area Federal Fiscal Year 2018 (October 1, 2017 - September 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated

Installation of sidewalks to fix gaps in pedestrian network on US 60 (Shelbyville Road) , KY 1747 (Westport Road), and KY 22 (Brownsboro Road). Includes: westbound US 60 from end of U of L trail to Eden Avenue MP 7.717 to MP7.734, westbound US 60 from Sidewalk Connections Daventry Lane to Wildwood Lane MP 7.966 to MP 8.051, Kentucky Transportation Surface Transportation Block Grant 2216 05-00535.00 on US 60, KY 1747 & KY eastbound US 60 from Wildwood Lane to Cambridge Station Right of Way $63,458.00 $10,000.00 $53,458.00 Cabinet (STBG) - Urban 22 Frontage Road MP 8.062 to MP 8.241, eastbound US 60 from Dorsey Lane to Country Squire Florist entrance MP 8.535 to MP 8.641, southbound KY 1747 from Hurstbourne Trace to Eden Avenue MP 13.635 to MP 13.869, and eastbound KY 22 from Paul's Fruit Market to Herr Lane MP 0.370 to MP 0.432.

Widen I-265 (Gene Snyder Freeway) from 4 to 6 lanes from Kentucky Transportation National Highway Performance 958 05-00537.00 I-265 Taylorsville Road to I-71. Approximately 11.3 miles. From MP Design $5,800,000.00 $2,500,000.00 $3,300,000.00 Cabinet Program (NHPP) 23.409 to MP 34.727.

Kentucky Transportation Provide collector-distributor lane on southbound I-71 to facilitate National Highway Performance 2382 05-00539.00 I- 71 Design $600,000.00 $600,000.00 $0.00 Cabinet ramp movements to and from I-265. From MP 8.6 to MP 9.5. Program (NHPP)

Reconstruction of the I-265/I-64 interchange (2016BOP) from MP Kentucky Transportation 24.6 to MP 26.4. Project will evaluate a Spill Thru Flyover 179 05-00549.00 I-265 Design $1,460,000.00 $1,460,000.00 $0.00 Interstate Maintenance (IM) Cabinet Interchange configuration as a potential solution to eliminate all four weaving segments of the existing interchange.

Planning study to examine the need for bicycle, pedestrian, and vehicular access improvements to the proposed Dixie BRT in the Dixie BRT Access following corridors: KY 907 from US 31 W to Stonestreet Road, KY Surface Transportation Block Grant 2387 05-00563.00 Louisville Metro Government Planning $352,000.00 $352,000.00 $0.00 Improvement Study 2051 Rockford Lane from KY 1934 Cane Run Road to US 31W, Gagel (STBG) - Urban Avenue from Dixie Highway to Manslick Road, and KY 2049 Crums Lane from I-264 to KY 1931 Manslick Road.

Kentucky Transportation Ohio River Bridges LOUISVILLE BRIDGES; OVERALL PROJECT MITIGATION Surface Transportation Block Grant 185 05-00700.02 Non-Highway $0.00 $1,500,000.00 $0.00 Cabinet Project REQUIREMENTS. (STBG) - State

Kentucky Transportation Ohio River Bridges LOUISVILLE BRIDGES; SECTION ONE - KENNEDY INTERCHANGE National Highway Performance N/A 05-00701.00 Design $0.00 $305,375.93 $0.00 Cabinet Project DESIGN (GEC). (2008BOPC)(08CCR)(10CCR) Program (NHPP)

Kentucky Transportation Ohio River Bridges LOUISVILLE BRIDGES; SECTION ONE - KENNEDY INTERCHANGE National Highway Performance N/A 05-00711.20 Design $0.00 $405,390.60 $0.00 Cabinet Project DESIGN. Program (NHPP)

Kentucky Transportation Ohio River Bridges LOUISVILLE BRIDGES; SECTION ONE - KENNEDY INTERCHANGE National Highway Performance N/A 05-00712.11 Right of Way $0.00 $1,185,796.15 $0.00 Cabinet Project RIGHT OF WAY. Program (NHPP)

3 12/20/2018 Kentucky Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area Federal Fiscal Year 2018 (October 1, 2017 - September 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated

Kentucky Transportation Ohio River Bridges LOUISVILLE BRIDGES; SECTION ONE - KENNEDY INTERCHANGE National Highway Performance N/A 05-00712.40 Construction $0.00 $500,000.00 $0.00 Cabinet Project RIGHT OF WAY. Program (NHPP)

Kentucky Transportation Ohio River Bridges LOUISVILLE BRIDGES; SECTION ONE - KENNEDY INTERCHANGE National Highway Performance N/A 05-00713.00 Utilities $0.00 $3,505.02 $0.00 Cabinet Project UTILITIES.(10CCR) Program (NHPP)

Kentucky Transportation Ohio River Bridges LOUISVILLE BRIDGES; SECTION ONE - KENNEDY INTERCHANGE National Highway Performance N/A 05-00713.10 Construction $0.00 $29,861,175.00 $0.00 Cabinet Project UTILITIES.(10CCR) Program (NHPP)

Kentucky Transportation Ohio River Bridges LOUISVILLE BRIDGES; SECTION ONE - KENNEDY INTERCHANGE Surface Transportation Block Grant N/A 05-00713.10 Construction $0.00 $272,516.24 $0.00 Cabinet Project UTILITIES.(10CCR) (STBG) - State

Kentucky Transportation Ohio River Bridges LOUISVILLE BRIDGES; SECTION FOUR - EAST END BRIDGE National Highway Performance N/A 05-00731.20 Design $0.00 $88,063.91 $0.00 Cabinet Project APPROACH DESIGN. Program (NHPP)

Kentucky Transportation Ohio River Bridges LOUISVILLE BRIDGES; SECTION FOUR - EAST END BRIDGE National Highway Performance N/A 05-00732.20 Right of Way $0.00 $1,612,314.73 $0.00 Cabinet Project APPROACH RIGHT OF WAY. Program (NHPP)

Kentucky Transportation Ohio River Bridges LOUISVILLE BRIDGES; SECTION FOUR - EAST END BRIDGE National Highway Performance N/A 05-00732.20 Design $0.00 $382,705.68 $0.00 Cabinet Project APPROACH RIGHT OF WAY. Program (NHPP)

Intersection rebuild at Main Street/Story Avenue/Baxter Avenue including transitions between Wentzel Street to the west and Johnson Street to the east, taking an unsignalized intersection that Main Street/Story Surface Transportation Block Grant 2388 05-00578.00 Louisville Metro Government accommodates three one-way segments and transforming it into a Design $176,000.00 $176,000.00 $0.00 Avenue Intersection (STBG) - Urban more traditional four-legged intersection; including a new traffic signal, lane markings, crosswalks, and related lane-assignment signage .

KY 146 Sidewalks in Kentucky Transportation Improve pedestrian connectivity along KY 146 from Saddlecreek Surface Transportation Block Grant 2508 05-00759.00 Eastern Jefferson Design $200,000.00 $200,000.00 $0.00 Cabinet Drive to the existing sidewalk near the Oldham County line. (STBG) - Urban County

Kentucky Transportation Replace bridge on CR-1038L over Bee Lick Creek. Bridge Surface Transportation Block Grant 2036 05-01061.00 Old New Cut Road Construction $330,000.00 $506,520.00 $0.00 Cabinet #056C00104N. From MP 0.000 To MP 0.060 (STBG) - State

4 12/20/2018 Kentucky Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area Federal Fiscal Year 2018 (October 1, 2017 - September 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated

Replace bridge on Eastern Parkway (US 60A) over South Fork Kentucky Transportation Surface Transportation Block Grant 2038 05-01064.00 US 60A Beargrass Creek 0.2 Mile NE of Poplar Level Rd (KY864)(SR43.6). Construction $1,923,800.00 $450,000.00 $1,473,800.00 Cabinet (STBG) - State From MP 5.698 to MP 5.738.

Address deficiencies of bridge on East Broadway (US 150) over Kentucky Transportation Surface Transportation Block Grant 2043 05-01067.00 US 150 south fork Beargrass Creek at intersection with Brent Street (CS Right of Way $60,000.00 $60,000.00 $0.00 Cabinet (STBG) - State 1312G)056B00348N (SD). From MP 3.6 to MP 3.64.

Replace bridge on Fairmount Road (CR 1004N) over Cedar Creek Kentucky Transportation Surface Transportation Block Grant 2040 05-01068.00 Fairmount Road 0.2 mile west of Farmers Way (SR 16.8). From MP 0.737 to MP Construction $500,000.00 $293,460.00 $206,540.00 Cabinet (STBG) - State 0.777. Bridge #056C00054N.

Kentucky Transportation Replace expansion joints on various bridges along I-65 between National Highway Performance 2356 05-01085.00 I- 65 Construction $800,000.00 $1,844,830.00 $0.00 Cabinet MPs 132-135 in Jefferson County. Program (NHPP)

Kentucky Transportation I- 64 Bridge Repair pier cap on the I-64 westbound ramp to I-264 eastbound National Highway Performance 2481 05-01086.00 Construction $250,000.00 $632,980.00 $0.00 Cabinet Rehabilitation over I-64 eastbound. Program (NHPP)

JPC repair and diamond grind on I-64 from 0.129 MI east of KY Kentucky Transportation 2369 05-02086.00 I- 64 1932 (Breckenridge Lane) (MP 11.574) to 0.412 MI west of Oxmoor Construction $892,000.00 $337,000.00 $555,000.00 Interstate Maintenance (IM) Cabinet Avenue (MP 13.160) in Jefferson County.

I- 64 East of KY 1932 to JPC repair and diamond grind on I-64 from 0.129 miles east of KY Kentucky Transportation 2544 05-02086.01 West of Oxmoor 1932 (Breckenridge Lane) (MP 11.574) to 0.412 miles west of Construction $892,000.00 $1,320,860.00 $0.00 Interstate Maintenance (IM) Cabinet Avenue Oxmoor Avenue (MP 13.160) in Jefferson County (2016BOP).

Repair and grind concrete pavement on I-265 from I-65 (MP Kentucky Transportation National Highway Performance 2472 05-02087.00 I-265 10.250), extending and ending 0.476 miles east of KY 864 Construction $8,200,000.00 $7,637,300.00 $562,700.00 Cabinet Program (NHPP) Underpass (MP 15.660) in Jefferson County (2016BOP).

Northeast Louisville Construct a shared-use path along US 60 (Shelbyville Road) from Surface Transportation Block Grant 2269 05-03030.20 Louisville Metro Government Right of Way $400,000.00 $396,000.00 $4,000.00 Loop MET Section 2 Beckley Station to Bircham Road, 0.7 miles. (STBG) - Urban

Environmental documentation, design development, landscape I- 64 Corridor construction documents, and implementation of the landscape Vegetation management plan for the I-64 corridor between Cannons Lane and 2105 05-03033.00 Louisville Metro Government Management and Design $0.00 $3,400.00 $0.00 Transportation Enhancements (TE) Grinstead Drive interchanges. The scope of the work will extend on Landscape all 4 sides of each interchange. The approximate length is 2.5 Beautification miles. The size of the area is approximately 122 acres.

5 12/20/2018 Kentucky Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area Federal Fiscal Year 2018 (October 1, 2017 - September 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated

The Louisville Loop Ohio River Valley Northeast Bicycle/Pedestrian Improvements project will identify alternative shared-use path River Road Bicycle & alignments in the area generally between the Ohio River and Congestion Mitigation and Air Quality 1423 05-03036.00 Louisville Metro Government Pedestrian Design $0.00 $25,402.40 $0.00 approximately Brownsboro Road from the Big 4 Bridge at the Mile (CMAQ) Improvements 0 trailhead of the Louisville Loop to the City of Prospect at US 42. Approximately 8.5 miles.

4th Street Sidewalk Sidewalk and pedestrian improvements on 4th Street from Transportation Alternatives Program 2222 05-03208.00 Louisville Metro Government Design $219,455.00 $155,075.00 $64,380.00 Reconstruction Chestnut Street to Broadway. (TAP) - State

5th Street Sidewalk Sidewalk and pedestrian improvements on 4th Street from Transportation Alternatives Program 2223 05-03208.01 Louisville Metro Government Construction $1,376,345.00 $1,386,345.00 $0.00 Reconstruction Chestnut Street to Broadway. (TAP) - State

Construction of sidewalks on Farnsley Road, Mary Catherine Drive, Transportation Alternatives Program 2226 05-03209.00 Shively Shively Sidewalks Utilities $16,000.00 $18,000.00 $0.00 and Garrs Lane. (TAP) - Urban

Construction of sidewalks on Farnsley Road, Mary Catherine Drive, Transportation Alternatives Program 2226 05-03209.00 Shively Shively Sidewalks Construction $1,103,531.00 $1,113,531.00 $0.00 and Garrs Lane. (TAP) - Urban

Re-allocation of the northern most lane traveling in the west bound direction and relocation of the existing barrier wall to expand the River Road Multi-Modal existing separated multi-use path of sub-standard width. In Transportation Alternatives Program 2540 05-03217.00 Louisville Metro Government Improvements - 3rd Design $135,000.00 $135,000.00 $0.00 addition, street lighting would be updated and placed into the (TAP) - Urban Street to 7th Street relocated barrier wall to reduce maintenance costs and better illuminate the path beneath the shadow the the interstate.

Pedestrian and bicycle improvements around the Portland Elementary School campus including the following locations: (1) Portland Elementary 1795 05-03502.00 Louisville Metro Government Northwestern Pkwy at the intersection of 33rd, 34th, and 35th Construction $0.00 $197,358.68 $0.00 Safe Routes to School (SRTS) Safe Routes to School Streets. (2) 35th Street between Northwestern Pkwy and Pflanz Ave. (3) Intersection of Northwestern Pkwy and Portland Ave

Construct a multi-use path system connecting Algonquin, Southwestern, Southern and Eastern Parkways with existing trails to create a continuous 30 miles of connected paths for pedestrians Olmsted Parkways Multi- and bicyclists. Change from 4 lanes to 3 lanes (3rd lane will be a Congestion Mitigation and Air Quality 1273 05-03709.00 Louisville Metro Government Non-Highway $0.00 $1,489,765.00 $0.00 Use Path System center turn lane) on Southwestern Parkway from Shawnee Park to I- (CMAQ) 264, Algonquin Parkway from I-264 to Winkler, Southern Parkway from New Cut Road to South 3rd Street, and Eastern Parkway from I-65 to Cherokee Park.

CONSTRUCTION OF 3 NEW CNG FUELING STATIONS IN JEFFERSON Congestion Mitigation and Air Quality 2199 05-03710.00 Louisville Metro Government CNG Fueling Stations Construction $227,109.00 $227,109.00 $0.00 COUNTY. (2014BOP) (CMAQ)

6 12/20/2018 Kentucky Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area Federal Fiscal Year 2018 (October 1, 2017 - September 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated

Construction of 1 new CNG fueling station in Jefferson County at Congestion Mitigation and Air Quality 2292 05-03716.00 Louisville Metro Government CNG Fueling Station Construction $4,823,960.00 $4,823,960.00 $0.00 8100 Air Commerce Drive (CMAQ)

Kentucky Transportation Safety improvements at the intersection of KY 155 (Taylorsville Highway Safety Improvement Program 2477 05-09008.00 KY 155 Construction $857,000.00 $1,336,140.00 $0.00 Cabinet Road) and KY 1747 (Hurstbourne Parkway) in Jefferson County. (HSIP)

Reconstruct radius for right turn from Grade Lane to SB KY 61, Kentucky Transportation reconstruct sidewalk ramps, rebuild traffic signal, and update Highway Safety Improvement Program 2509 05-09010.10 KY 61 & Grade Lane Right of Way $40,000.00 $40,000.00 $0.00 Cabinet signing, striping, and pavement markings at intersection of KY 61 (HSIP) and Grade Lane.

Reconstruct radius for right turn from Grade Lane to SB KY 61, Kentucky Transportation reconstruct sidewalk ramps, rebuild traffic signal, and update Highway Safety Improvement Program 2509 05-09010.10 KY 61 & Grade Lane Utilities $25,000.00 $25,000.00 $0.00 Cabinet signing, striping, and pavement markings at intersection of KY 61 (HSIP) and Grade Lane.

Construct right turn lanes along KY 1065, reconstruct sidewalk Kentucky Transportation Highway Safety Improvement Program 2510 05-09010.30 KY 1065 & KY 1865 ramps, install pedestrian signals, and update signing, striping, and Right of Way $16,000.00 $16,000.00 $0.00 Cabinet (HSIP) pavement markings at the intersection of KY 1065 and KY 1865.

Construct right turn lanes along KY 1065, reconstruct sidewalk Kentucky Transportation Highway Safety Improvement Program 2510 05-09010.30 KY 1065 & KY 1865 ramps, install pedestrian signals, and update signing, striping, and Utilities $150,000.00 $150,000.00 $0.00 Cabinet (HSIP) pavement markings at the intersection of KY 1065 and KY 1865.

Construct sidewalks and sidewalk ramps, and update signing, Kentucky Transportation US 31W & Pendleton Highway Safety Improvement Program 2511 05-09010.50 striping, and pavement markings at intersection of US 31W and Right of Way $15,000.00 $15,000.00 $0.00 Cabinet Road (HSIP) Pendleton Road.

Kentucky Transportation Cabinet-Louisvlle Metro Roadway Safety Kentucky Transportation HSIP Roadway Safety Highway Safety Improvement Program 2586 05-09015.00 Study Plan for all public roads in the Louisville Metro Area in Planning $500,000.00 $500,000.00 $0.00 Cabinet Study (HSIP) Jefferson County.

Kentucky Transportation Widen KY 864 to create a northbound left turn lane between mile Highway Safety Improvement Program 2593 05-09016.00 KY 864 Design $125,000.00 $125,000.00 $0.00 Cabinet points 5.950 and 6.200. (HSIP)

Mill and place a thin asphalt overlay on I-65 (NB & SB) from the I-65 Repavement from Kentucky Transportation south limits of the Fern Valley Road interchange at milepoint National Highway Performance 2554 05-20012.00 Fern Valley Road to Construction $3,400,000.00 $4,173,950.00 $0.00 Cabinet 127.58 north to Phillips Lane at milepoint 131.24 in Jefferson Program (NHPP) Phillips Lane County.

Kentucky Transportation Wathen Lane Railroad ADD GATES TO EXISTING FLASHING LIGHTS AND BELL SYSTEM AT N/A 99-00352.00 Construction $0.00 $24,000.00 $0.00 Rail-Highway Crossings Cabinet Crossing PAL RR CROSSING ON WATHEN LANE IN SHIVELY. (DOT #296788A)

7 12/20/2018 Kentucky Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area Federal Fiscal Year 2018 (October 1, 2017 - September 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated

ADD GATES TO EXISTING FLASHING LIGHTS AND BELL SYSTEM AT Kentucky Transportation Pendleton Road N/A 99-00352.00 PAL RR CROSSING ON PENDLETON ROAD NEAR US 31W IN Construction $0.00 $24,000.00 $0.00 Rail-Highway Crossings Cabinet Railroad Crossing SOUTHWESTERN JEFFERSON COUNTY. (DOT #296840C)

Kentucky Transportation Add gates to existing flashing lights and bell system on Kendall 2368 99-00352.12 CS 1136 Construction $15,000.00 $224,434.80 $0.00 Rail-Highway Crossings Cabinet Road at PAL RR crossing in Valley Station.

Repair, rehabilitate including resurfacing of Bluegrass Parkway from KY 1747 to KY 1819, and Plantside Drive from Bunsen Bluegrass Commerce Parkway to Bluegrass Parkway, and to make key safety Surface Transportation Block Grant 2055 N/A Jeffersontown Park Strategic Design $0.00 $17,835.00 $0.00 improvements at various intersections to increase pedestrian (STBG) - Urban Infrastructure Project movement including sidewalks, curbs as well as enhancements to signage, wayfinding, streetscape and landscaping.

Oldham County

Kentucky Transportation KY 393 RECONSTRUCT FROM KY-22 TO KY-393 NORTH OF I-71 Surface Transportation Block Grant 367 05-00230.00 KY 393 Design $0.00 $220,000.00 $0.00 Cabinet NEAR WENDELL MOORE PARK (STBG) - State

Kentucky Transportation Surface Transportation Block Grant 1508 05-00449.00 KY 22 / KY 329 Intersection improvement at KY 22 and KY 329 in Crestwood. Construction $170,715.00 $170,715.00 $0.00 Cabinet (STBG) - Urban

Construction of a park and ride facility including a parking lot, The Park and Ride at shelter, playground, bike lockers, walkways, and a 1000' access Congestion Mitigation and Air Quality 1826 05-00468.00 Oldham County Design $0.00 $927.00 $0.00 Apple Patch road located on Apple Patch Way off of KY-329 near I-71 Exit 14 in (CMAQ) Crestwood.

Construction of a park and ride facility including a parking lot, The Park and Ride at shelter, playground, bike lockers, walkways, and a 1000' access Surface Transportation Block Grant 1826 05-00468.00 Oldham County Construction $1,174,800.00 $1,174,800.00 $0.00 Apple Patch road located on Apple Patch Way off of KY-329 near I-71 Exit 14 in (STBG) - Urban Crestwood.

Construction of a park and ride facility including a parking lot, The Park and Ride at shelter, playground, bike lockers, walkways, and a 1000' access Congestion Mitigation and Air Quality 1826 05-00468.00 Oldham County Construction $0.00 $745,119.00 $0.00 Apple Patch road located on Apple Patch Way off of KY-329 near I-71 Exit 14 in (CMAQ) Crestwood.

Intersection realignment/reconstruction at KY 329 and KY 329 Surface Transportation Block Grant 1877 05-00542.00 Oldham County KY 329 Design $120,000.00 $120,000.00 $0.00 Bypass. (STBG) - Urban

Construct new connection from Old LaGrange Road to KY 393 Surface Transportation Block Grant 1808 05-00754.00 Oldham County Buckner Connector Right of Way $680,944.00 $672,144.00 $8,800.00 Project length is 0.8 miles. (STBG) - Urban

8 12/20/2018 Kentucky Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area Federal Fiscal Year 2018 (October 1, 2017 - September 30, 2018)

Federal Funds Federal Funds KIPDA ID State ID Project Sponsor Project Name Project Description Phase Remaining Funds Funding Category Programmed Obligated Construct sidewalks along both sides of Spring Hill Trace within existing right-of-way from KY 329 to the existing bridge between Spring Hill Trace Surface Transportation Block Grant 2236 05-00757.00 Oldham County Spring Hill subdivision and Brentwood subdivision (approximately Right of Way $186,193.00 $186,193.00 $0.00 Sidewalk (STBG) - Urban 240’ beyond the intersection of Spring Hill Trace and Spring Hill Court).

KY 1793 & Various Construct sidewalks on KY 1793 from Ridgeview Drive to Settlers Surface Transportation Block Grant 1623 05-00440.10 Oldham County Construction $100,000.00 $100,000.00 $0.00 Sidewalks Point Trail. (STBG) - Urban

Various Counties

Kentucky Transportation Study new connection between I-65 in Bullitt County to I-64 in Surface Transportation Block Grant 2609 05-00564.00 Regional Connector Planning $2,000,000.00 $2,000,000.00 $0.00 Cabinet Shelby County to I-71 in Oldham County. (STBG) - State

Widen I-64 from 4 to 6 lanes from I-265 (Gene Snyder Freeway) to Kentucky Transportation National Highway Performance 350 05-00065.20 I- 64 the KY 53 interchange in Shelby County. (Project cost reflects Construction $0.00 $4,424,662.65 $0.00 Cabinet Program (NHPP) Jefferson County portion only.)

Kentuckiana Planning and N/A N/A FY 2018 Staff Activities Louisville MPO Unified Planning Work Program (UPWP) Program $1,181,600.00 $1,181,600.00 $0.00 Metropolitan Planning Funds Development Agency (KIPDA)

Kentuckiana Planning and Ticket To Ride regional Transportation Demand Management Surface Transportation Block Grant 162 05-00384.00 Ticket to Ride Program $1,060,500.00 $1,060,500.00 $0.00 Development Agency (KIPDA) (TDM) program. (STBG) - Urban

Bicycle & Pedestrian Development of educational and awareness programs concerning Education, bicycle and pedestrian issues. Provide education and training for Surface Transportation Block Grant 337 05-00965.15 Louisville Metro Government Encouragement, Program $120,000.00 $120,000.00 $0.00 cyclists, motorists, and city officials about laws governing cyclists' (STBG) - Urban Enforcement & rights and responsibilities Evaluation

Design and complete various low safety improvements along KY 53 Kentucky Transportation KY 53 Safety Highway Safety Improvement Program 2484 05-09012.00 from mile point 10.040 and extending to mile point 2.650 in Design $0.00 $35,000.00 $0.00 Cabinet Improvements (HSIP) Oldham County.

9 12/20/2018 Transit Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area Federal Fiscal Year 2018 (October 1, 2017 - September 30, 2018)

Activity Line Item Federal Funds Federal Funds Federal Funds Grant Name Grant Number Project Sponsor Project Description KIPDA ID (ALI) Number Programmed Obligated Remaining

Procarent Buy Replacement Van 11.12.15 2527 $ 64,000 $ 32,000 $ 32,000

Procarent Buy Expansion Van 11.13.15 2527 $ 32,000 $ 32,000 $ -

New Hope Services Buy Replacement Van 11.12.15 2526 $ 210,916 $ 210,916 $ -

LifeSpan Buy Replacement Van 11.12.15 2534 $ 85,940 $ 35,540 $ 50,400 Fiscal Year 2016 and 2017 Enhanced Mobility for Seniors and KY-2018-008 LifeSpan Buy Expansion Van 11.13.15 2534 $ 50,400 $ 50,400 $ - Individuals with Disabilities Program Harbor House Buy Expansion Van 11.13.15 2524 $ 36,586 $ 36,586 $ -

Elderserve Rehabilitate / Renovate ADA Access 11.94.09 2523 $ 19,056 $ 19,056 $ -

Jewish Family & Career Up to 50% Operating 30.09.01 2525 $ 32,000 $ 32,000 $ - Services Transit Authority of River City Job Access - Paratransit Work Trips 30.09.05 2528 $ 192,407 $ 192,407 $ - (TARC) Fiscal Year 2017 5339 Bus & Bus Transit Authority of River City KY-2018-014 Rehabilitate / Renovate Admin Facilities 11.44.01 2461 $ 1,438,252 $ 1,476,685 $ - Facilities Program (TARC)

Purchase Replacement Spare Parts 11.12.40 2448 $ 140,000 $ 140,000 $ -

Architectural and Engineering Services 11.41.03 2432 $ 160,000 $ 160,000 $ -

MIS Equipment / Hardware 11.42.07 2440 $ 160,000 $ 160,000 $ -

MIS Equipment / Software 11.42.08 2444 $ 140,000 $ 140,000 $ -

Security Enhancements 11.42.09 2436 $ 145,280 $ 145,280 $ - Fiscal Year 2018 Section 5307 Transit Authority of River City KY-2018-013 Capital Program (TARC) Capital Maintenance 11.7A.00 2428 $ 9,692,964 $ 9,692,964 $ -

Non-Fixed Rte ADA Paratransit Svc 11.7C.00 2424 $ 4,050,012 $ 4,050,012 $ -

Capital Cost of Contracting-Fixed Route 11.71.12 2420 $ 31,584 $ 31,584 $ -

Operating Assistance (LaGrange) 30.09.01 2359 $ 34,285 $ 36,026 $ -

Capital Assistance (LaGrange) 11.42.08 NA $ - $ 12,009 $ -

1 12/20/2018 Transit Projects with Funds Obligated In the Louisville/Jefferson County, KY-IN Metropolitan Planning Area Federal Fiscal Year 2018 (October 1, 2017 - September 30, 2018)

Activity Line Item Federal Funds Federal Funds Federal Funds Grant Name Grant Number Project Sponsor Project Description KIPDA ID (ALI) Number Programmed Obligated Remaining Fiscal Year 2016 Capital for FY KY-2016-007-01 Transit Authority of River City Preventive Maintenance 11.7A.00 2303 $ 10,025,360 $ 140,054 $ - 2016 Program of Projects (amendment) (TARC)

Purchase Replacement Spare Parts 11.12.40 2365 $ 68,050 $ 138,307 $ -

Architectural and Engineering Services 11.41.03 2360 $ 77,577 $ 210,000 $ -

MIS Equipment / Hardware 11.42.07 2363 $ 68,050 $ 80,000 $ -

MIS Equipment / Software 11.42.08 2362 $ 68,050 $ 80,000 $ -

KY-2017-008-01 Transit Authority of River City FY 2017 Section 5307 Capital Security Enhancements 11.42.09 2366 $ 136,100 $ 80,609 $ - (amendment) (TARC)

Capital Maintenance 11.7A.00 2364 $ 9,799,173 $ 4,406,536 $ -

Non-Fixed Rte ADA Paratransit Svc 11.7C.00 2361 $ 3,392,964 $ 1,379,909 $ -

Capital Cost of Contracting-Fixed Route 11.71.12 NA $ - $ 8,000 $ -

Operating Assistance (LaGrange) 30.09.01 2359 $ 34,285 $ 35,420 $ -

Eng/Design Bus Shelters 11.91.02 2227 $ 8,553 $ 8,552 $ 1

STP 5307 FY 2014 TAP - TARC Solar Transit Authority of River City KY-2018-012 Purchase Bus Shelters 11.92.02 2227 $ 70,133 $ 30,400 $ 39,733 Bus Shelters (TARC)

Construct Bus Shelters 11.93.02 2227 $ 39,733 $ 39,732 $ 1

FY 2018 STP 5307 Funding for Transit Authority of River City KY-2018-022 Construct Pedestrian Access / Walkways 11.93.05 1500 $ 250,000 $ 250,000 $ - Pedestrian Access (TARC) FY17 5339 - Purchase 10 Transit Authority of River City KY-2018-025 Buy Replacement 40 ft Bus 11.12.01 NA $ - $ 3,600,000 $ - Replacement Buses (TARC)

Buy Replacement 40 ft Bus 11.12.01 2459 $ 1,339,271 $ 492,322 $ 846,949

Architectural and Engineering Services 11.41.03 2460 $ 160,000 $ 160,000 $ - Transit Authority of River City FY 2018 5339 Bus & Bus Facilities KY-2018-027 (TARC) MIS Equipment / Hardware 11.42.07 NA $ - $ 60,000 $ -

Rehabilitate / Renovate Admin Facilities 11.44.01 NA $ - $ 1,281,600 $ -

2 12/20/2018