North Region Scores

SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Jefferson5 5‐555 KY 1747 CONGESTION $4,260,000 REDUCE CONGESTION AND IMPROVE SAFETY 89.0 MITIGTN ALONG KY‐1747 (HURSTBOURNE PARKWAY) 10.5 ‐ 11.995 FROM STONY BROOK DRIVE TO I‐64.

Fayette7 7‐438 KY 4 MAJOR WIDENING $22,300,000 REDUCE CONGESTION ON KY‐4 (NEW CIRCLE RD) FROM TRADE CENTER DR TO WOODHILL DR. 88.0 13.195 ‐ 14.508

Jessamine7 7‐430 US 27 SAFETY $54,290,000 ACCESS MANAGEMENT ON NICHOLASVILLE ROAD BETWEEN NICHOLASVILLE AND MAN‐O‐ 86.5 10.87 ‐ 15.278 WAR BLVD. (14CCR)

Fayette7 IP20000036 US 60 MINOR WIDENING $18,305,000 MODERNIZE ROADWAY, IMPROVE MULTI‐ MOBILITY, AND INCLUDE SAFETY AND CAPACITY 85.2 5 ‐ 7.53 IMPROVEMENTS AT INTERSECTIONS ON US 60 (VERSAILLES ROAD) FROM VILEY ROAD TO WEST END OF NORFOLK SOUTHERN RAILROAD BRIDGE.

Jefferson5 5‐80001 US 60 MAJOR WIDENING $4,280,000 WIDEN US‐60 TO 6 LANES FROM OLD SHELBYVILLE RD. TO NORTH ENGLISH STATION 84.9 11.093 ‐ 11.684 RD.(18CCN)

Fayette7 IP20080429 KY 4 MAJOR WIDENING $28,084,000 NEW CIRCLE RD. (KY 4): FROM BOARDWALK TO NORTH LIMESTONE STREET ‐ IMPROVE SAFETY 84.2 10.015 ‐ 10.9 AND ACCESS MANAGEMENT MEASURES. Boone6 IP20190064 KY 18 CONGESTION $58,688,000 PAIRED GRADE‐SEPARATED INTERSECTIONS 81.9 MANAGEMENT ALONG KY 18 AT KY 842 AND MALL ROAD. 14.5 ‐ 15.1

Note: Projects may extend beyond county shown. Wednesday, September 18, 2019 Page 1 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Fayette7 7‐8902 KY 1927 MAJOR WIDENING $21,890,000 IMPROVE LIBERTY ROAD FROM GRAFTONS MILL LANE TO AND IMPROVE 81.9 0 ‐ 1.175 INTERSECTION WITH NEW CIRCLE ROAD. (16CCN)(18CCR)

Woodford7 7‐117 US 60 MAJOR WIDENING $15,330,000 IMPROVE US 60 (VERSAILLES ROAD) FROM THE BLUEGRASS PARKWAY/HUNTERTOWN PIKE TO 80.6 11.238 ‐ 12.612 PISGAH PIKE. (18CCR)

Boone6 6‐446 PF 9999 NEW ROUTE $22,680,000 PROVIDE EAST‐WEST CONNECTIVITY AND IMPROVED MOBILITY FROM KY‐237 (PLEASANT 80.0 ‐ VALLEY ROAD) THRU KY‐842 (HOPEFUL CHURCH ROAD) TO MALL ROAD/I‐75 INTERCHANGE. (18CCR) Kenton6 6‐450 KY 1303 CONGESTION $28,780,000 IMPROVE SAFETY AND REDUCE CONGESTION 79.0 MITIGTN ALONG KY‐1303 (TURKEYFOOT RD) FROM 5.01 ‐ 6.248 DUDLEY RD TO US‐25 (DIXIE HWY). (18CCR) Woodford7 7‐8905 US 60 CONGESTION $4,030,000 ACCESS MANAGEMENT IMPROVEMENTS ON US 77.7 MITIGTN 60 FROM LEXINGTON ROAD AT WOODFORD 9.38 ‐ 9.7 FEED TO MARSAILLES DRIVE (MP 9.38 TO MP 9.70).(16CCN)(18CCN)

Jefferson5 5‐8953 KY 1747 SAFETY $4,490,000 IMPROVE THE HURSTBOURNE PARKWAY (KY 1747) AT SHELBYVILLE ROAD (US 60) 77.3 13.4 ‐ 13.6 INTERSECTION TO INCREASE CAPACITY, REDUCE DELAYS, AND IMPROVE SAFETY.(SEE 5‐344.02) (16CCN) Fayette7 7‐8901 PF 9999 NEW ROUTE $10,600,000 EXTEND CITATION BLVD. (16CCN) 76.3 ‐ Jefferson5 5‐80002 PF 9999 NEW $60,650,000 NEW INTERCHANGE ON I‐64E EAST OF THE GENE 74.5 INTERCHANGE SNYDER FREEWAY(18CCN) ‐

Wednesday, September 18, 2019 Page 2 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Shelby5 5‐8958 KY 55 X RECONSTRUCTION $13,110,000 WIDEN KY 55X FROM TWO TO FIVE LANES FROM US 60 (MP 0.0) NORTH TO KY 43 (MP 74.3 0 ‐ 1.354 1.354).(16CCN)

Boone6 6‐80003 US 42 RECONSTRUCTION $8,550,000 INCREASE CAPACITY AND REDUCE CONGESTION ON US 42 AT I 71/75(18CCN) 73.9 13.812 ‐ 14.252 Kenton6 6‐449 KY 17 CONGESTION $4,370,000 IMPROVE SAFETY AND REDUCE CONGESTION ON 73.8 MITIGTN KY‐17 AT THE I‐275 INTERCHANGE. (18CCR) 18.15 ‐ 18.65

Bullitt5 IP20190078 I 65 RECONSTRUCTION $8,448,000 IMPROVE SAFETY AND REDUCE CONGESTION AT THE I‐65/ KY‐1526 (BROOKS HILL ROAD ‐ JOHN 73.7 121.2 ‐ 122 HARPER HIGHWAY) INTERCHANGE INCLUDING IMPROVEMENTS TO KY‐1526 FROM KY‐1020 (CORAL RIDGE ROAD) TO KY‐1450 (BLUE LICK ROAD). I‐65 MP 121.20 TO MP 122.00 .DESIGN MAY CONSIDER

Jefferson5 5‐122 KY 1065 SAFETY $6,700,000 MAJOR REVISION OF THE INTERSECTION LOCATED AT THE OUTER LOOP, FEGENBUSH 73.7 9.944 ‐ 10.009 LANE, AND BEULAH CHURCH ROAD. TURN LANE TO BE COMPLETED BY TRANSPORTATION CABINET PER AGREEMENT. (04CCN)(08CCR)(10CCR)(12CCR)

Fayette7 7‐412 US 27 RECONSTRUCTION $16,900,000 REPLACE L&N RAILROAD BRIDGE OVERPASS (MP 8.378), IMPROVE DRAINAGE AND TYPICAL 73.6 8.565 ‐ 8.691 SECTION ON US 27 (NORTH BROADWAY)(12CCR)(14CCR)(16CCR)(18CCN)

Oldham5 5‐234 KY 393 MAJOR WIDENING $12,470,000 KY‐393 RECONSTRUCT FROM 140FEET SOUTH OF RAILROAD CROSSING (CSX) EXTENDING 72.8 5.13 ‐ 5.177 NORTHWEST TOWARDS KY 146 ENDING AT STATION 12+00 (DESIGN UNDER 5‐230.00). (CONSTRUCTION SEQ.#2)

Wednesday, September 18, 2019 Page 3 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Boone6 IP20190066 I 75 RECONSTRUCTION $25,180,000 RECONSTRUCT I‐75 INTERCHANGE AT KY 1017 (TURFWAY ROAD). 72.7 182.2 ‐ 183.312

Bullitt5 5‐150.50 KY 44 RECONSTRUCTION $4,690,000 SECTION 5 ‐ FROM US‐31EX TO US‐31E BYPASS. (2008BOPC). 72.5 22.8 ‐ 23.25

Jessamine7 7‐87.30 PF 9999 NEW ROUTE $52,010,000 EAST NICHOLASVILLE BYPASS SECTION IB FROM 125 FEET NORTH OF KY 169 TO END OF PROJECT 71.8 ‐ AT TIE‐IN TO WEST BYPASS. THIS INCLUDES THE INTERCHANGE AT US 27 NORTH OF NICHOLASVILLE. (14CCR)

Jessamine7 7‐414 / 7‐ KY 1980 SAFETY $27,180,000 IMPROVE ROADWAY GEOMETRICS, TYPICAL 414.10 SECTION, AND ROADWAY HAZARDS ON KY 1980 71.6 0 ‐ 3.205 (BRANNON RD) FROM US 68 (HARRODSBURG RD) TO US 27 (NICHOLASVILLE RD)(12CCR)(18CCN)

Campbell6 6‐8105.06 PF 9999 NEW ROUTE $17,070,000 TRANSPORTATION IMPROVMENTS TO AA‐I‐275; CONSTRUCT A NEW CONNECTOR RD FROM THE 71.2 ‐ AA HWY (KY 9) TO THE END OF NEW CONSTRUCTION JUST SOUTH OF JOHN'S HILL RD (KY 2345). (SECTION 2) (2005HPP‐KY166) (SEE 6‐ 8105.00 FOR "KYD" COMPONENT)

Jefferson5 5‐367.20 PF 9999 NEW ROUTE $20,890,000 EXTENSION OF OLD HENRY ROAD EAST TO ASH AVENUE (KY362). (12CCR)(18CCN) 70.8 ‐

Jefferson5 5‐344.01 KY 1747 RECONSTRUCTION $5,910,000 WIDEN SOUTHBOUND HURSTBOURNE LANE TO 3 LANES FROM LINN STATION RD (CS‐1004H) TO 70.3 12.289 ‐ 13.632 EDEN AVE (CS‐1660H). (06CCR)(03KYD)(2006BOPP)(SEE 5‐344.02 FOR KYD C PHASE)(14CCR)(XCHNG UNDER 5‐8953)

Wednesday, September 18, 2019 Page 4 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Bullitt5 5‐8509 KY 245 MINOR WIDENING $13,140,000 WIDEN KY‐245 FROM BERNHEIM FOREST TO THE COMMUNITY COLLEGE. 69.8 4.425 ‐ 6.415 (08CCN)(10CCR)(14CCR)(16CCR)

Scott7 IP20080477 KY 2906 RECONSTRUCTION $11,892,000 IMPROVE CAPACITY AND ACCESS ON KY 2906 (CONNECTOR ROAD) FROM US 460 () 69.6 0 ‐ 1.118 TO US 62 (CHERRY BLOSSOM WAY).

Boone6 6‐444 KY 236 MAJOR WIDENING $26,500,000 IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY‐236 (DONALDSON ROAD) FROM KY‐ 69.4 0 ‐ 1.594 842 (HOUSTON ROAD) TO KY‐3076 (MINEOLA PIKE). (18CCR)(DESIGN INCLUDES ITEM # 6‐445) Boone6 IP20190063 I 75 RECONSTRUCTION $40,516,000 RECONSTRUCT I‐75 INTERCHANGE AT KY 18. 69.2 180.6 ‐ 181.85

Jefferson5 5‐8203 KY 1819 RECONSTRUCTION $3,280,000 RECONSTRUCT BILLTOWN ROAD FROM NORTH OF COLONNADES PLACE TO SOUTH OF EASUM 68.4 6.9 ‐ 8.1 ROAD. (04CCN)(06CCN)(08CCR)(10CCR)(12CCR) Jefferson5 IP20080208 KY 907 CONGESTION $10,690,000 IMPROVE SAFETY AND REDUCE CONGESTION ON 68.1 MANAGEMENT KY 907 (SOUTHSIDE DRIVE) FROM KY 1865 (NEW 6.31 ‐ 7.036 CUT ROAD) TO KY 1020 (NATIONAL TURNPIKE). THE DESIGN WILL EVALUATE 3‐LANE WIDENING OR OTHER LOWER IMPACT SOLUTIONS AND INCLUDE CONSIDERATION OF BICYCLE & PEDESTRIAN FACILI

Jefferson5 5‐8908 KY 155 MINOR WIDENING $19,850,000 WIDEN TAYLORSVILLE ROAD TO 3 LANES FROM I‐ 265 TO KY‐148. (18CCN) 68.0 4.4 ‐ 5.75

Fayette7 7‐593.03 / 7‐ PF 9999 NEW ROUTE $34,480,000 NEWTOWN PIKE EXTENSION FROM WEST MAIN 593.30 ST. TO SOUTH LIMESTONE ST. IN LEXINGTON. 67.9 ‐ (ADDITIONAL FUNDING FOR DESIGN FOR CLT)(05KYD‐KY095)

Wednesday, September 18, 2019 Page 5 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Jessamine7 7‐87.20 PF 9999 NEW ROUTE $18,280,000 EAST NICHOLASVILLE BYPASS SECTION IA: IMPROVE CONNECTIVITY AND MOBILITY EAST 67.3 ‐ AROUND NICHOLASVILLE FROM SOUTH OF KY‐39 TO NORTH OF KY‐169.

Kenton6 6‐162.40 KY 536 RECONSTRUCTION $39,530,000 IMPROVE SAFETY AND REDUCE CONGESTION ON KY‐536 FROM WILLIAMSWOOD ROAD/CALVARY 66.8 2.542 ‐ 4.062 DRIVE TO KY‐17 (PRIORITY SECTION 3). DESIGN PHASE UNDER PARENT NO. 6‐162.01. (2012BOP)(18CCR)

Fayette7 7‐122.10 US 25 MAJOR WIDENING $45,140,000 RECONSTRUCT/WIDEN US‐25 FROM SPURR ROAD SOUTH OF I‐75 TO 1400 FEET SOUTH OF 66.6 18.264 ‐ 21.415 IRONWORKS ROAD. (06CCN)(08CCR)(10CCR)(12CCR)(16CCR) Jefferson5 5‐808 KY 155 DESIGN $5,860,000 SAFETY PROJECT FOR RECONSTRUCTION OF 66.4 ENGINEERING TAYLORSVILLE ROAD AND SOUTH POPE LICK 4.4 ‐ 5 ROAD INTERSECTION AND BRIDGE OVER POPE LICK CREEK. (2016BOP)

Clark7 7‐8639 PF 9999 NEW ROUTE $1,780,000 EXTEND FULTON ROAD. (BY COUNTY)(10CCN)(18CCN) 66.2 ‐ Campbell6 6‐448 KY 9 CONGESTION $105,610,000 IMPROVE SAFETY AND REDUCE CONGESTION AT 66.0 MITIGTN THE I‐275 INTERCHANGE WITH KY‐9 (AA HWY.) 17.525 ‐ 17.978 Grant6 IP20080332 KY 22 SPOT $40,213,000 IMPROVE SAFETY AND MOBILITY AND ADDRESS 66.0 IMPROVEMENT GEOMETRIC DEFICIENCIES ALONG KY 22 FROM 6.671 ‐ 10.748 BATON ROUGE ROAD TO KY 467 (WARSAW ROAD). (SECTION A4 MAY 2004 PROGRAMMING STUDY)

Wednesday, September 18, 2019 Page 6 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Mercer7 IP20080741 PF 9999 NEW ROUTE $3,068,000 CONSTRUCT NEW ROUTE FROM KY 1989 (CORNISHVILLE RD) TO KY 152. 65.9 ‐

Madison7 7‐251.40 US 25 MAJOR WIDENING $13,390,000 PRIORITY SECTION II & III: WIDEN US‐25 FROM US‐421 TO PUMPKIN RUN.(SEE 7‐251.10 FOR SEC 65.8 11.903 ‐ 14.883 III UTIL & CONST) (2006BOPC)(08CCR)(10CCR)(12CCR)(14CCR)

Jefferson5 5‐8952 US 60 MINOR WIDENING $2,200,000 WIDEN US‐60 TO THREE LANES FROM EASTWOOD CUTOFF (MP 14.7) TO ROCKCREST 65.7 14.718 ‐ 15.114 WAY (MP 15.1). (LOCALS WILL DO DESIGN FOR $330,000). (16CCN)(18CCR) Shelby5 IP20150477 KY 55 SPOT $1,498,000 THE PURPOSE OF THIS PROJECT IS TO ADDRESS 65.6 IMPROVEMENT SAFETY AND IMPROVE TRAFFIC FLOW FOR 6.6 ‐ 6.7 OPERATIONS IMPROVEMENTS ON KY 55 AT OLD BRUNERSTOWN ROAD. THIS PROJECT IS TO INCLUDE A RIGHT TURN LANE ON KY 55 THAT MAY INCLUDE A TRAFFIC SIGNALIZATION. Grant6 IP20080331 KY 22 SPOT $59,040,000 IMPROVE SAFETY AND MOBILITY AND ADDRESS 65.3 IMPROVEMENT GEOMETRIC DEFICIENCIES ALONG KY 22 FROM 0.63 ‐ 6.671 KY 1993 (LAWRENCEVILLE ROAD) TO BATON ROUGE ROAD. (SECTION A3 MAY 2004 PROGRAMMING STUDY)

Bourbon7 7‐8705 US 460 RECONSTRUCTION $18,160,000 IMPROVE US‐460 FROM RUSSELL CAVE ROAD TO US‐27 BYPASS IN PARIS.(12CCN)(14CCR)(16CCR) 64.8 1.394 ‐ 7.696

Kenton6 6‐162.10 KY 1303 RECONSTRUCTION $19,330,000 IMPROVE SAFETY AND REDUCE CONGESTION ON KY‐1303 FROM KY‐536 TO BEECHGROVE 64.4 0 ‐ 1.1 ELEMENTARY (PRIORITY SECTION 4). DESIGN PHASE UNDER PARENT NO. 6‐162.01. (2012BOP)(16CCR)(18CCR)

Wednesday, September 18, 2019 Page 7 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Jefferson5 IP20120002 PF 9999 NEW ROUTE $82,363,000 EXTEND URTON LANE FROM NORTH OF I‐64 TO SEATONVILLE ROAD. INCLUDES CONSIDERATION 64.4 ‐ OF FACILITIES FOR ALL MODES (PEDESTRIAN, BICYCLE, SOV, AND TRANSIT).

Bullitt5 5‐391.30 I 65 RECONSTRUCTION $9,490,000 IMPROVE OPERATIONAL PERFORMANCE OF THE I‐65/KY‐480 INTERCHANGE INCLUDING RAMP 64.2 115.147 ‐ IMPROVEMENTS AND TURNING LANES. 115.938 (12CCR)(14CCR)(2014BOP)(16CCR)

Henry5 5‐8820 KY 55 MINOR WIDENING $5,750,000 REHABILITATION‐OVERLAY AND WIDENING EXISTING KY‐55 FROM KY‐22 TO CURVE AT MP 64.1 1.408 ‐ 2.21 2.210 NORTH OF EMINENCE. INCLUDES REPLACING EXISTING CURB AND GUTTER AND SIDEWALKS, AND RELOCATION OF IMPACT UTILITIES. (MP 1.408 TO 2.210)(14CCN)

Bourbon7 7‐916 US 27 SAFETY $1,570,000 ADDRESS SAFETY AND CONGESTION AT THE INTERSECTION OF US 27 AND KY 1939 IN PARIS 63.9 6.573 ‐ 6.673

Scott7 IP20170036 US 25 RECONSTRUCTION $41,780,000 RECONSTRUCT US25 FROM CHERRY BLOSSOM WAY (KY 620) TO DOUBLE CULVERT RD (KY 620) 63.8 8.827 ‐ 14.975 TO IMPROVE HIGHWAY SAFETY AND MOBILITY.

Bullitt5 5‐150.40 KY 44 RECONSTRUCTION $36,870,000 SECTION 4 ‐ FROM ARMSTRONG LANE TO US 31EX. (2008BOPC) 63.7 21 ‐ 22.8

Anderson7 5‐806 KY 151 RECONSTRUCTION $31,750,000 RECONSTRUCT KY 151 FROM US 127 AT LAWRENCEBURG TO I‐64 IN FRANKLIN COUNTY. 63.4 0 ‐ 4.587

Garrard7 7‐196.30 US 27 RELOCATION $38,550,000 IMPROVE US‐27 FROM WEST LANCASTER BYPASS TO KY‐34. (2006BOPC) (16CCN)(18CCR) 63.0 5.199 ‐ 10.331

Wednesday, September 18, 2019 Page 8 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Montgomer 7 7‐240 / 7‐ KY 1991 MAJOR WIDENING $8,850,000 WIDEN KY‐1991 FROM MAYSVILLE ROAD TO y 240.01 / 7‐ MIDLAND TRAIL INDUSTRIAL PARK, 62.9 0 ‐ 1.768 8501 MONTGOMERY COUNTY. (SEE 7‐240.01 FOR HPP FUNDS AND SEE 7‐8501.00 FOR "SPB" FUNDS) (2005HPP‐KY129)

Bullitt5 5‐150.02 KY 44 RECONSTRUCTION $38,940,000 SECTION ‐1 FROM I‐65 TO CHIMNEY ROCK DRIVE.(06CCN) 62.9 13.1 ‐ 15.1

Carroll6 IP20080301 KY 36 RECONSTRUCTION $117,916,000 RECONSTRUCTION FROM MILTON TO US 42 AT CARROLLTON TO INCREASE SAFETY, EASE TRAVEL 62.3 0 ‐ 8.132 AND REDUCE TRAVEL TIMES ON KY‐36 INDUSTRY USES THIS KY‐36. IT RUNS ALONG THE OHIO RIVER. IT CONNECTS I‐71 TO MARKLAND DAM AND IS A MAJOR THOROUGHFARE TO GET TO CASINOS Jefferson5 5‐41.10 I 265 I‐CHANGE $64,410,000 SNYDER FREEWAY; RECONSTRUCT I‐265/US‐60 62.0 RECONST INTERCHANGE AS A SINGLE POINT URBAN 26.5 ‐ 27.1 INTERCHANGE AND CONSTRUCT NEEDED IMPROVEMENTS TO CONNECT WITH THE I‐265/I‐ 64 INTERCHANGE. (2006BOPC)

Franklin5 IP20190167 US 60 MINOR WIDENING $1,992,000 INTERIM IMPROVEMENTS TO ADDRESS CAPACITY AND SAFETY AT THE I‐64/US‐60 INTERCHANGE. 61.8 13.2 ‐ 13.45 PROJECT WILL EVALUATE ADDITIONAL LEFT TURN LANE STORAGE IN BOTH DIRECTIONS FOR VEHICLES ENTERING I‐64 FROM US‐60.

Boone6 6‐447 US 25 MAJOR WIDENING $63,430,000 IMPROVE MOBILITY AND REDUCE CONGESTION ON US‐25 FROM WINNING COLORS DRIVE TO 61.3 5.085 ‐ 9.2 THE NORFOLK SOUTHERN RAILROAD CROSSING SOUTH OF KY‐1829 (INDUSTRIAL ROAD); EXCLUDES GRADE SEPARATION AT KY‐536.

Wednesday, September 18, 2019 Page 9 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Clark7 7‐8401 PF 9999 NEW ROUTE $36,080,000 EXTEND THE WINCHESTER EAST BYPASS (KY 1958) FROM IRVINE ROAD (KY 89) TO KY 627 61.2 ‐ SOUTH OF WINCHESTER. (08CCN)(10CCR)(18CCN) Anderson7 7‐80001 US 62 SPOT $23,330,000 IMPROVE US‐62 (VERSAILLES RD.) FROM HILLTOP 60.5 IMPROVEMENTS DR. TO WEST END OF BRIDGE OVER 20.54 ‐ 22.813 RIVER AT TYRONE(18CCN)

Oldham5 5‐80005 KY 329 SAFETY $4,260,000 IMPROVE THE INTERCHANGE OF I 71 AND KY 329. (18CCN) 60.3 6.65 ‐ 7.07

Jefferson5 IP20080209 KY 907 MINOR WIDENING $91,207,000 IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY 907 (VALLEY STATION ROAD/3RD 60.0 0 ‐ 6.31 STREET ROAD) FROM US 31W () TO KY 1865 (NEW CUT ROAD). PROJECT WILL EVALUATE 3‐LANE WIDENING AND CONSIDER BICYCLE AND PEDESTRIAN FACILITIES. Carroll6 IP20040017 US 42 SPOT $25,820,000 IMPROVE SAFETY AND MOBILITY AND ADDRESS 59.9 IMPROVEMENT GEOMETRIC DEFICIENCIES ALONG US 42 FROM 13.2 ‐ 16.5 THE WESTERN CITY LIMIT OF GHENT TO THE GALLATIN COUNTY LINE. Boone6 IP20190058 KY 18 CONGESTION $22,566,000 USE INNOVATIVE CORRIDOR STRATEGIES TO 59.8 MANAGEMENT IMPROVE SAFETY, RELIABILITY, AND CAPACITY 12.138 ‐ 14.026 FROM KY 18 FROM MCGRATH TO BOONE AIRE ROAD.

Kenton6 6‐80002 KY 236 RECONSTRUCTION $10,580,000 RECONSTRUCT KY 236 (STEVENSON ROAD) FROM ALICE STREET TO JACQUELINE 59.8 0 ‐ 1.436

Harrison6 IP20080348 US 62 RECONSTRUCTION $9,258,000 IMPROVE SAFETY AND CONGESTION ALONG US 62 (ODDVILLE AVE) FROM PINE STREET TO KY 59.7 9.449 ‐ 10.259 392 (REPUBLICAN PIKE) IN CYNTHIANA.

Wednesday, September 18, 2019 Page 10 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Boone6 6‐80001 KY 237 CONGESTION $10,790,000 EXPANSION OF ROUNDABOUTS ALONG KY‐237 59.6 MITIGTN AT CARDINAL COVE AND GRAVES RD(18CCN) 11.2 ‐ 12.259 Jefferson5 IP20080210 KY 1065 SPOT $2,412,000 IMPROVE SAFETY AND REDUCE CONGESTION AT 59.5 IMPROVEMENT THE KY 1065 AND KY 61 INTERSECTION. PROJECT 6.055 ‐ 6.155 WILL CONSIDER ADDING A RIGHT TURN LANE ON WESTBOUND KY 1065 (OUTER LOOP) AT KY 61 (PRESTON HIGHWAY).

Madison7 7‐192.20 PF 9999 NEW ROUTE $23,720,000 CONSTRUCT 4‐LANE BEREA BYPASS SECTION 2; FROM 150' EAST OF US‐25, SE TO KY‐21. PHASE 59.4 ‐ 1 ‐ BEREA BYPASS FROM US‐25 TO KY‐ 1016.(2004BOPC)(08CCR)(12CCR)(18CCN)

Garrard7 7‐196.20 / 7‐ PF 9999 RELOCATION $35,980,000 CONSTRUCT WEST LANCASTER BYPASS. 196.1 (2006BOPC) 58.2 ‐

Jefferson5 5‐373 KY 1819 RECONSTRUCTION $19,190,000 RECONSTRUCT AND WIDEN WATTERSON TRAIL FROM PLANTSIDE DRIVE TO BLANKENBAKER 58.1 10.795 ‐ 12.811 ROAD. (98CCR)

Gallatin6 IP20080316 US 42 MINOR WIDENING $24,999,000 UPGRADE US‐42 FROM KY 35, THROUGH WARSAW, TO MIDDLETON ROAD 58.0 6.832 ‐ 8.888

Boyle7 IP20040019 KY 52 MINOR WIDENING $16,734,000 RECONSTRUCT KY 52 FROM KY 1805 (GOGGIN LN) TO KY 590. 56.8 1.586 ‐ 3.773

Fayette7 IP20000037 US 68 RECONSTRUCTION $9,928,000 SOUTH BROADWAY (US 68): FROM RED MILE ROAD TO MASON HEADLEY RD. IN LEXINGTON ‐ 56.7 5.095 ‐ 5.639 ACCESS MANAGEMENT; OPERATIONAL IMPROVEMENTS, AND MULTIMODAL IMPROVEMENTS.

Wednesday, September 18, 2019 Page 11 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Kenton6 6‐162.30 KY 536 AIR QUALITY $21,680,000 IMPROVE SAFETY AND REDUCE CONGESTION ON KY‐536 FROM KY 1303 TO WILLIAMSWOOD 56.1 1.061 ‐ 2.542 ROAD/CALVARY DRIVE (PRIORITY SECTION 2). DESIGN PHASE UNDER PARENT NO. 6‐162.01. (2012BOP)(18CCN)

Jefferson5 5‐8810 KY 1931 MINOR WIDENING $12,390,000 THREE LANE WIDENING ALONG KY‐1931 FROM THE DOSS HIGH SCHOOL ENTRANCE TO PALATKA 55.5 4.65 ‐ 5.52 ROAD, INCLUDING INTERSECTION IMPROVEMENTS WITH PALATKA ROAD AND TURN LANES. (14CCN)

Jefferson5 5‐371.10 KY 22 SAFETY $2,020,000 RECONSTRUCT KY‐22 AT SPRINGCREST DRIVE. (06CCN) (2004BOPC)(14CCR)(EMERGENCY 55.4 1.432 ‐ 1.789 CULVERT REPLACEMENT AWARDED UNDER 5‐ 371.12)

Jefferson5 IP20080240 CR 1001 G RECONSTRUCTION $20,573,000 IMPROVE SAFETY AND REDUCE CONGESTION ON GRADE LANE FROM KY 1065 (OUTER LOOP) TO 55.2 2.106 ‐ 4.058 KY 1631 (FERN VALLEY ROAD). PROJECT DESIGN WILL EVALUATE 3‐LANE WIDENING WITH TWO‐ WAY CENTER TURN LANE AND CONSIDER BICYCLE AND PEDESTRIAN FACILITIES.

Jefferson5 IP20080201 KY 155 MAJOR WIDENING $30,079,000 IMPROVE SAFETY AND REDUCE CONGESTION ON KY 155 FROM WATTERSON TRAIL TO I‐265. 55.1 6.3 ‐ 9.35 PROJECT DESIGN WILL EVALUATE 3‐LANE WIDENING WITH TWO‐WAY CENTER TURN LANE AND CONSIDER BICYCLE AND PEDESTRIAN FACILITIES.

Bourbon7 7‐8705.10 US 460 RECONSTRUCTION $32,360,000 IMPROVE US‐460 FROM I‐75 IN GEORGETOWN TO KY 353 (RUSSELL CAVE RD) IN BOURBON 55.0 0 ‐ 1.394 COUNTY. (2018BOP)

Wednesday, September 18, 2019 Page 12 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Montgomer 7 7‐8810 US 60 MAJOR WIDENING $16,090,000 WIDEN EXISTING PAVEMENT & IMPROVE y VERTICAL & HORIZONTAL CURVES FROM 54.9 2.007 ‐ 4.311 EXISTING MT STERLING BYPASS (KY 686) TO 500' W OF BENTBROOK SUBDIVISION. ADD FULL WIDTH SHOULDERS & A CENTER TURNING LANE IN CONGESTION AREAS FROM MP 2.2 TO 4.311.(14CCN)(16CCR)(18CCN)

Jefferson5 IP20080203 KY 155 MAJOR WIDENING $19,149,000 IMPROVE SAFETY AND REDUCE CONGESTION ON KY 155 FROM HIKES LANE/BROWNS LANE TO KY 54.9 11.395 ‐ 13.314 1747 (HURSTBOURNE PARKWAY). TO INCLUDE BICYCLE AND PEDESTRIAN FACILITIES .

Shelby5 5‐8511 KY 53 RECONSTRUCTION $12,000,000 WIDEN KY‐53 TO FOUR LANES FROM I‐64 TO US‐ 60.(08CCN)(10CCN) 54.9 6.064 ‐ 8.006 (12CCR)(14CCR)(16CCR)(18CCR)

Kenton6 IP20170085 KY 8 RECONSTRUCTION $34,552,000 IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY 8 (4TH ST) FROM US 25 (MAIN ST) TO 54.0 6.667 ‐ 6.85 KY 3090 (PHILADELPHIA ST); INCLUDES MULTI‐ MODAL NEEDS OF PEDS, BIKES AND TRANSIT.

Jefferson5 IP20080217 KY 1747 MAJOR WIDENING $31,047,000 IMPROVE SAFETY AND REDUCE CONGESTION ON KY 1747 (HURSTBOURNE PARKWAY) FROM US 53.8 7.4 ‐ 11.1 31E (BARDSTOWN ROAD) TO KY 155 (TAYLORSVILLE ROAD). PROJECT WILL EVALUATE THE ADDITION OF ONE ADDITIONAL TRAVEL LANE IN EACH DIRECTION AND OTHER LOWER IMPACT ALTERNATIVES. PROJ Bullitt5 IP20130129 KY 44 CONGESTION $14,504,000 IMPROVE SAFETY AND REDUCE CONGESTION ON 53.8 MANAGEMENT KY 44 BETWEEN THE I‐65 INTERCHANGE AND 12.215 ‐ 12.94 THE KY 61 INTERSECTION. CONSIDER ACCESS MANAGEMENT, PEDESTRIAN FACILITIES AND GRADE SEPARATED RAIL CROSSING.

Wednesday, September 18, 2019 Page 13 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Fayette7 IP20110148 KY 4 MAJOR WIDENING $28,315,000 CAPACITY IMPROVEMENTS ON KY 4 (NEW CIRCLE RD) FROM N LIMESTONE TO EASTLAND DR. 53.8 10.9 ‐ 12.515

Owen6 6‐8702 KY 22 MAJOR WIDENING $4,610,000 WIDEN KY 22 FROM INTERSECTION WITH KY 845 TO THE OWEN/GRANT COUNTY 53.6 16.057 ‐ 18.56 LINE.(12CCN)(14CCR)(16CCR)

Boyle7 IP20170094 PF 9999 NEW ROUTE $31,599,000 NEW CONNECTOR ROUTE BETWEEN BUSINESS US 150/KY 52 TO KY 34 AROUND THE EAST SIDE 53.6 ‐ OF DANVILLE. Pendleton6 IP20130083 US 27 SPOT $3,707,000 IMPROVE SAFETY AND MOBILITY ON US 27 AT 53.3 IMPROVEMENT THE KY 17 INTERSECTION. 11.6 ‐ 12

Jefferson5 IP20080197 US 60 MAJOR WIDENING $51,793,000 IMPROVE SAFETY AND REDUCE CONGESTION ON US 60 FROM KY 1747 TO OLD SHELBYVILLE ROAD 52.9 7.857 ‐ 11.1 (CS 3596). PROJECT WILL EVALUATE THE ADDITION OF ONE TRAVEL LANE IN EACH DIRECTION AND WILL CONSIDER ACCOMMODATIONS FOR BICYCLISTS, PEDESTRIANS, AND TRANSIT USERS.

Grant6 IP20170020 US 25 MAJOR WIDENING $5,061,000 IMPROVE SAFETY AND TRAFFIC MOBILITY AT THE INTERSECTION OF US 25 AND KY 491 52.4 22.114 ‐ 22.418 (GARDNERSVILLE ROAD) AND THE RAILROAD AT‐ GRADE CROSSING.

Bracken6 6‐8309 KY 10 RECONSTRUCTION $36,070,000 SPOT IMPROVEMENTS FROM THE CITY OF BROOKSVILLE SOUTH TO POWERSVILLE. (06CCN) 52.4 10.38 ‐ 13.959 (10CCR) (16CCR)

Fayette7 IP20000052 CS 4524 MAJOR WIDENING $18,506,000 MAN O WAR BLVD ‐ ADDRESS CONGESTION AND IMPROVE SAFETY FROM RICHMOND RD (US 25) 52.3 11.823 ‐ 12.786 TO ALUMNI DR (CS 316).

Wednesday, September 18, 2019 Page 14 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Bullitt5 IP20150374 KY 44 MAJOR WIDENING $167,990,000 RECONSTRUCT KY‐44 FROM I‐65 TO MT. WASHINGTON. (06CCN) 52.2 13.1 ‐ 23.25

Jefferson5 5‐80053 / 5‐ US 31 E RECONSTRUCTION $10,010,000 RECONSTRUCT EAST MARKET (US‐31E) FROM 80053.10 FIRST ST TO JOHNSON ST TO IMPROVE 52.1 16.635 ‐ 17.669 PEDESTRIAN SAFETY AND ENHANCE ECONOMIC DEVELOPMENT.(18CCN)

Fayette7 IP20000034 US 60 MAJOR WIDENING $3,343,000 OPERATIONAL & MULTIMODAL IMPROVEMENTS ON US 60 (WINCHESTER RD) FROM MIDLAND TO 51.8 8.551 ‐ 9.934 NEW CIRCLE RD.

Fayette7 IP20130099 US 27 RECONSTRUCTION $26,026,000 ACCESS MANAGEMENT IMPROVEMENTS ON US 27 (NICHOLASVILLE RD) AT KY 4 (NEW CIRCLE RD) 51.7 2.1 ‐ 2.6 INTERCHANGE. Spencer5 IP20150054 KY 155 SPOT $1,727,000 IMPROVE SAFETY AT THE INTERSECTION OF KY 51.1 IMPROVEMENT 155 AND KY 3192/HOCHSTRASSER ROAD. 2.4 ‐ 2.6

Boone6 IP20080271 US 42 MAJOR WIDENING $46,498,000 IMPROVE SAFETY AND REDUCE CONGESTION ALONG US 42 FROM KY 237 TO KY 842 50.8 12.602 ‐ 13

Fayette7 IP20190164 CS 4524 MAJOR WIDENING $23,821,000 ADDRESS CONGESTION, IMPROVE SAFETY, AND IMPROVE MOBILITY ON MAN O WAR FROM 50.7 12.786 ‐ 14.255 RICHMOND ROAD TO LIBERTY ROAD

Bullitt5 5‐347.51 KY 44 RECONSTRUCTION $1,910,000 NEW TURN LANES IN FRONT OF BULLITT EAST HIGH SCHOOL. (BREAKOUT FROM 347.50) 50.7 23.6 ‐ 23.7 (18CCN)

Fayette7 IP20000053 CS 4524 MAJOR WIDENING $30,830,000 IMPROVE CAPACITY AND MULTI‐MOBILITY OF MAN O WAR BOULEVARD FROM KY 1974 (TATES 50.5 6.55 ‐ 8.561 CREEK RD.) TO US 27 (NICHOLASVILLE RD.) IN LEXINGTON.

Wednesday, September 18, 2019 Page 15 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Jefferson5 IP20080211 KY 1065 MAJOR WIDENING $47,146,000 IMPROVE SAFETY AND REDUCE CONGESTION ON KY 1065 (OUTER LOOP) FROM I‐65 TO KY 2052 50.3 4.93 ‐ 7.655 (SHEPHERDSVILLE ROAD). PROJECT WILL EVALUATE THE ADDITION OF ONE TRAVEL LANE IN EACH DIRECTION AND CONSIDER ACCOMMODATIONS FOR BICYCLISTS AND PEDESTRIANS. Jefferson5 IP20170070 KY 1932 SPOT $4,151,000 ADDRESS CONGESTION AND SAFETY ISSUES IN 50.0 IMPROVEMENT THE VICINITY OF THE BRECKENRIDGE LANE (KY 3.6 ‐ 3.9 1932) AND DUTCHMANS LANE INTERSECTION. PROJECT WILL CONSIDER LANE ADDITIONS TO BRECKENRIDGE LANE SOUTH OF DUTCHMANS LANE; DUTCHMANS PARKWAY LANE WEST OF BRECKENRIDGE LANE; D

Scott7 IP20080466 US 460 RECONSTRUCTION $11,155,000 IMPROVE ROADWAY CAPACITY & TYPICAL SECTION ON US 460 FROM E MAIN ST TO 300FT 49.9 10.185 ‐ 10.763 W OF CHERRY BLOSSOM WAY.

Fayette7 IP20000050 CS 3016 MAJOR WIDENING $20,211,000 ALUMNI DRIVE: ADDRESS CONGESTION FROM EDGEWATER DR TO MOW BLVD. 49.5 2.904 ‐ 3.876

Fayette7 IP20190163 CS 4524 MAJOR WIDENING $17,262,000 IMPROVE CONGESTION, SAFETY AND MOBILITY ON MAN O WAR FROM LIBERTY ROAD (KY 1927) 49.4 14.255 ‐ 15.241 TO I‐75

Spencer5 5‐8954 KY 155 RECONSTRUCTION $21,640,000 CONSTRUCT A 2+1 ROAD ON KY 55/155 (TAYLORSVILLE ROAD) IN SPENCER COUNTY AND 49.3 0 ‐ 4.247 KY 155 (TAYLORSVILLE LAKE ROAD) IN JEFFERSON COUNTY BY ADDING A CONTINUOUS THIRD LANE THAT SERVES AS AN ALTERNATING PASSING LANE.(16CCN)(18CCN)

Wednesday, September 18, 2019 Page 16 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Fayette7 IP20190160 PF 9999 NEW ROUTE $5,622,000 ADDRESS CONGESTION AND IMPROVE SAFETY ON US 60 (WINCHESTER RD) AND MAN O' WAR 48.9 ‐ BLVD (KY 1425 & CS 4524) CREATING AN ALTERNATIVE ROUTE BETWEEN SIR BARTON WAY (CS 2636) AND POLO CLUB BLVD (CS 2548) Jefferson5 5‐8102.30 I 65 I‐CHANGE $2,360,000 RECONSTRUCT RAMP FROM CRITTENDEN DRIVE 48.8 RECONST TO NB I‐65. (2004BOPC) 132.2 ‐ 132.7

Oldham5 IP20080250 KY 53 MAJOR WIDENING $25,154,000 IMPROVE SAFETY AND REDUCE CONGESTION ON KY 53 FROM I‐71 TO ZHALE SMITH ROAD. 48.5 5.685 ‐ 6.268 INCLUDES CONSIDERATION OF A FIVE LANE WIDENING AND BIKE/PED ACCOMMODATIONS.

Trimble5 5‐905 US 421 SAFETY $2,310,000 ADDRESS SAFETY ISSUES AND ACCESS AT THE INTERSECTION OF US‐421/KY‐1226 AT MP 11.5. 48.4 11.278 ‐ 11.678 (12CCR)

Kenton6 IP20070209 KY 1072 MAJOR WIDENING $36,998,000 ADDRESS SAFETY AND MOBILITY ALONG KY 1072 (HIGHLAND PIKE/KYLES LANE) FROM KY 17 48.0 0.731 ‐ 2.58 (MADISON PIKE) TO INTERSTATE 71/75 NORTHBOUND ON AND OFF RAMPS.

Jefferson5 IP20080212 KY 1065 MINOR WIDENING $12,882,000 IMPROVE SAFETY, ACCESS, AND MOBILITY FOR ALL MODES ALONG KY 1065 (OUTER LOOP) 47.8 0 ‐ 1.069 FROM KY 907 (3RD STREET ROAD) TO KY 1865 (NEW CUT ROAD). PROJECT WILL CONSIDER 3‐ LANE WIDENING AND ACCOMMODATIONS FOR BICYCLISTS AND PEDESTRIANS.

Bullitt5 5‐391.20 KY 480 RECONSTRUCTION $7,900,000 WIDEN CEDAR GROVE ROAD (KY‐480) FROM CEDAR GROVE ELEMENTARY SCHOOL TO VALLEY 47.6 1.698 ‐ 2.84 VIEW DRIVE. (12CCR)(14CCR) (SEE 5‐391.3 FOR INTERCHANGE IMPROVEMENTS)

Wednesday, September 18, 2019 Page 17 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Jefferson5 IP20080192 PF 9999 NEW $71,161,000 PROVIDE CONNECTIVITY AND IMPROVED 47.5 INTERCHANGE MOBILITY ON I‐265 AT REHL ROAD. THE REHL ‐ ROAD PORTION WOULD INCLUDE CONSIDERATION FOR ENHANCED SAFETY FOR BICYCLISTS AND PEDESTRIANS.

Bullitt5 5‐8710 PF 9999 NEW ROUTE $16,530,000 NEW ROUTE NORTHWEST OF MT. WASHINGTON FROM US 31E TO KY 2706.(12CCN)(14CCN) 46.9 ‐ Jefferson5 IP20080222 KY 1932 CONGESTION $17,373,000 TRANSPORTATION SYSTEM MANAGEMENT 46.4 MANAGEMENT IMPROVEMENTS ON KY 1932 (BRECKENRIDGE 4.25 ‐ 5.555 LANE) FROM KY 1447 (WESTPORT ROAD) TO KRESGE WAY. Grant6 6‐112.10 PF 9999 NEW $51,060,000 CONSTRUCT AN INTERCHANGE ON I‐75 AT 45.6 INTERCHANGE SHERMAN. (06CCN)(08CCN)(10CCN) ‐

Jefferson5 IP20080194 US 42 MAJOR WIDENING $12,911,000 IMPROVE SAFETY AND REDUCE CONGESTION ON US 42 (BROWNSBORO ROAD) FROM I‐264 45.4 5.779 ‐ 6.795 (HENRY WATTERSON EXPRESSWAY) TO SEMINARY DRIVE. PROJECT WILL EVALUATE ONE ADDITIONAL TRAVEL LANE IN EACH DIRECTION AND CONSIDER ACCOMMODATIONS FOR BICYCLISTS AND PEDESTRIANS.

Fayette7 IP20000035 US 60 MAJOR WIDENING $6,304,000 PROVIDE ADDITIONAL CAPACITY AND IMPROVE PEDESTRIAN ACCESS ON US 60 (WINCHESTER 45.1 10.511 ‐ 11.801 ROAD) FROM FORTUNE DRIVE TO I‐75.

Oldham5 IP20130128 KY 53 RECONSTRUCTION $12,562,000 IMPROVE SAFETY AND REDUCE CONGESTION AT THE I‐71/KY 53 (NORTH/SOUTH FIRST AVENUE) 45.0 6.2 ‐ 6.5 INTERCHANGE. INCLUDES CONSIDERATION OF AN ADDITIONAL TWO‐WAY LEFT TURN LANE AND BIKE/PED ACCOMMODATIONS.

Wednesday, September 18, 2019 Page 18 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Fayette7 IP20190156 PF 9999 NEW ROUTE $40,549,000 EXTEND ROUTE FROM KY 1980 (ASHGROVE RD) AT TATES CREEK INTERSECTION IN JESSAMINE 44.8 ‐ COUNTY TO US 25/JACKS CREEK PIKE (KY 1975) INTERSECTION IN FAYETTE COUNTY.

Bullitt5 IP20130146 KY 44 SAFETY‐HAZ‐ELM $2,510,000 IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ALONG KY 44 NEAR OLD PITTS 44.6 10 ‐ 10.25 POINT ROAD (IN AND WEST OF SHEPHERDSVILLE).(ID#015B00020N)

Fayette7 IP20170077 CS 2418 RECONSTRUCTION $8,270,000 RECONSTRUCT LIBERTY ROAD FROM APPLETREE LANE TO NEW CIRCLE ROAD TO IMPROVE SAFETY 44.4 0.56 ‐ 1.297 AND MULTI‐MOBILITY.

Madison7 IP20080444 KY 52 MAJOR WIDENING $24,129,000 IMPROVE SAFETY ON KY 52 FROM KY 374 (CHARLIE NORRIS RD) TO DROWNING CREEK 44.2 16.334 ‐ 22.707 BRIDGE #033B00017N AT ESTILL CL.

Jefferson5 IP20110082 I 64 RECONSTRUCTION $54,744,000 RECONSTRUCT THE I‐64/(HURSTBOURNE PARKWAY) INTERCHANGE. 43.8 0 ‐ 0.56 Jefferson5 5‐531 KY 1932 MATCHED FED $3,930,000 IMPROVE THE SAFETY AND CONGESTION OF KY 43.3 FUNDS 1932 (CHENOWETH LANE) FROM US 60 5.523 ‐ 6.59 (SHELBYVILLE ROAD) TO US 42 (BROWNSBORO ROAD) APPROXIMATELY 1.07 MILES (2014BOP). Jefferson5 5‐8102.50 I 65 I‐CHANGE $28,060,000 RECONSTRUCT RAMP FROM PRESTON ST TO NB I‐ 43.3 RECONST 65, CONSTRUCT ACCESS TO S JACKSON ST 133.7 ‐ 134.1 AND/OR S PRESTON ST, REMOVE RAMP FROM NB I‐65 TO WOODBINE ST AND EVALUATE THE IMPACTS OF CLOSING THE MAGNOLIA ST RAMP TO SB I‐65. (2004BOPC)

Wednesday, September 18, 2019 Page 19 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Fayette7 IP20000047 CS 1376 MINOR WIDENING $8,070,000 E. LOUDON AVE ‐ IMPROVE CAPACITY, SAFETY, AND MULTI‐MOBILITY BEGINNING AT EAST 42.7 0 ‐ 0.558 LOUDON AVE. (MP 0.00) TO N. LIMESTONE STREET IN LEXINGTON Jefferson5 IP20110078 CS 1003 F CONGESTION $8,072,000 TRANSPORTATION SYSTEM 42.6 MANAGEMENT MANAGEMENT/TRANSPORTATION DEMAND 0.2 ‐ 0.8 MANAGEMENT, AESTHETIC IMPROVEMENTS AT MEDICAL CENTER ON SOUTH FLOYD STREET (CS‐ 1003F) FROM EAST BROADWAY (US‐150) TO JEFFERSON STREET (CS‐1014B).

Shelby5 5‐8713 US 60 RECONSTRUCTION $2,170,000 CONSTRUCT A THIRD LANE ON US‐60 FROM THE MASONIC HOME TO ROCKET LANE. 42.5 11.5 ‐ 12.878 (12CCN)(14CCR)

Fayette7 IP20000041 KY 1425 MAJOR WIDENING $11,526,000 PROVIDE ADDITIONAL CAPACITY AND IMPROVE MULTI‐MODAL ACCESS ON KY 1425 (MAN O' 42.5 0 ‐ 1.429 WAR BLVD) FROM I‐75 TO US 60 (WINCHESTER ROAD).

Shelby5 5‐80004 KY 55 X SAFETY $730,000 FOUR RIGHT TURNING LANES AT THE INTERSECTION OF KY 55X AND KY 43 AND TWO 42.5 1.097 ‐ 1.419 LEFT TURNING LANES FROM KY 55X ONTO KY 43.(18CCN)

Jefferson5 5‐8102.10 PF 9999 NEW ROUTE $28,160,000 CONSTRUCT RAMPS CONNECTING NB AND SB I‐ 65 TO THE CENTRAL AVENUE/CRITTENDEN DRIVE 42.3 ‐ INTERSECTION. (2004BOPC)

Grant6 IP20000023 US 25 MINOR WIDENING $65,835,000 IMPROVE SAFETY ALONG US 25 (DIXIE HWY) FROM KY 2363 (GRANT COUNTY) TO PRECISION 42.2 23.225 ‐ 23.866 DRIVE (BOONE COUNTY).

Boone6 IP20130022 PF 9999 NEW ROUTE $25,009,000 PROVIDE FREIGHT CONNECTIVITY AND IMPROVE MOBILITY BETWEEN AERO PARKWAY (KY 1017) 41.9 ‐ AND LIMABURG ROAD.

Wednesday, September 18, 2019 Page 20 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Pendleton6 IP20150015 US 27 MAJOR WIDENING $7,518,000 IMPROVE SAFETY AND MOBILITY ON NORTHBOUND US 27 FROM MP 13.5 (MENZIE 41.7 13.5 ‐ 14.2 BOTTOMS ROAD) TO MP 14.2. Boone6 IP20190018 KY 14 SPOT $33,368,000 RECONSTRUCTION OF KY 14 FROM STEPHENSON 41.6 IMPROVEMENT MILL RD TO I‐75. 5.35 ‐ 8.114

Trimble5 IP20080268 KY 36 RECONSTRUCTION $4,516,000 IMPROVE SAFETY, TRUCK MOBILITY, AND ADDRESS GEOMETRIC DEFICIENCIES ALONG KY 41.6 0 ‐ 0.25 36 FROM US 421 TO 250 FEET EAST OF SCHOOL HOLLOW ROAD IN MILTON. Shelby5 IP20150478 KY 55 SPOT $1,381,000 ADDRESS SAFETY AND IMPROVE TRAFFIC FLOW 40.7 IMPROVEMENT WITH CONSIDERATION FOR ADDING A RIGHT 7.8 ‐ 8 TURN LANE SOUTHBOUND ON KY 55 AND US 60 INTERSECTION IN SHELBYVILLE.

Henry5 IP20110218 KY 55 MINOR WIDENING $2,607,000 IMPROVE SAFETY AND ACCESS ALONG KY 55 FROM KY 1899 (MULBERRY PIKE) TO KY 22 IN 40.2 0.737 ‐ 1.4 EMINENCE.

Jefferson5 IP20080221 KY 1931 MINOR WIDENING $34,940,000 IMPROVE SAFETY AND REDUCE CONGESTION ON KY 1931 (MANSLICK ROAD) FROM KY 1931 (ST. 40.1 5.477 ‐ 7.702 ANDREWS CHURCH ROAD) TO I‐264 (HENRY WATTERSON EXPRESSWAY). PROJECT WILL EVALUATE 3‐LANE WIDENING AND CONSIDER ACCOMMODATIONS FOR BICYCLISTS AND PEDESTRIANS.

Boyle7 IP20080412 KY 34 MINOR WIDENING $7,582,000 REDUCE CONGESTION AND REDUCE CRASHES ON KY 34 (LEXINGTON ROAD) FROM MAIN ST. TO KY 39.6 13.629 ‐ 13.891 2324 IN DANVILLE

Wednesday, September 18, 2019 Page 21 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Jefferson5 IP20080241 CR 1005 B MINOR WIDENING $4,794,000 WIDEN HUBBARDS LANE FROM 2 TO 3 LANES (3RD LANE WILL BE A CENTER TURN LANE) 39.6 0 ‐ 0.614 FROM US 60 (SHELBYVILLE ROAD) TO KY 1447 (WESTPORT ROAD). ADD BIKE LANES TO HUBBARDS LANE FROM KRESGE WAY TO KY 1447. PROJECT LENGTH IS 0.6 MI.(BOPC2010)

Jefferson5 5‐247.10 KY 1450 MAJOR WIDENING $10,490,000 WIDEN BLUE LICK ROAD FROM SNYDER FREEWAY NORTH TO KY‐61 (LOU T.I.P.) (SECTION 39.6 1.873 ‐ 3.542 2) (RU‐04DEOB)(08CCR)(12CCR)(16CCR)

Boone6 IP20150030 CR 1001 MAJOR WIDENING $36,427,000 IMPROVE SAFETY & MOBILITY, REDUCE CONGESTION AND ADDRESS GEOMETRIC 39.6 0 ‐ 2.169 DEFICIENCIES ALONG CAMP ERNST ROAD (CR 1001) FROM LONG BRANCH RD. TO KY 237 (PLEASANT VALLEY RD.)

Oldham5 IP20080252 KY 146 RECONSTRUCTION $19,626,000 REDUCE CONGESTION, IMPROVE ACCESS, AND PROVIDE BETTER MOBILITY FOR ALL MODES 39.5 0 ‐ 2.021 ALONG KY 146 FROM THE OLDHAM/JEFFERSON COUNTY LINE TO PRYOR AVENUE IN CRESTWOOD. PROJECT DESIGN WILL CONSIDER RECONSTRUCTING KY 146 AS A 2 LANE ROAD (NO ADDITIONAL LANES) FROM

Fayette7 IP20000033 US 60 MAJOR WIDENING $38,743,000 IMPROVE MOBILITY OF US 60 FROM PISGAH PIKE IN WOODFORD COUNTY TO OLD CLUBHOUSE 39.5 0 ‐ 2.607 LANE IN FAYETTE COUNTY (MP 2.606)

Jefferson5 IP20080205 KY 864 MINOR WIDENING $20,492,000 IMPROVE SAFETY AND REDUCE CONGESTION ON KY 864 (FEGENBUSH LANE) FROM KY 864 39.4 4.25 ‐ 6.596 (BEULAH CHURCH ROAD) TO KY 1747 (FERN VALLEY ROAD/SOUTH HURSTBOURNE PKWY). PROJECT DESIGN WILL EVALUATE 3‐LANE WIDENING WITH TWO‐WAY CENTER TURN LANE AND CONSIDER ACCOMMODATIONS F

Wednesday, September 18, 2019 Page 22 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Jefferson5 5‐323.01 KY 1931 MAJOR WIDENING $14,680,000 WIDEN GREENWOOD ROAD FROM GREENBELT HWY TO DIXIE HWY (US‐31W) (3‐LANE 39.2 0.54 ‐ 3.148 IMPROVEMENT) FROM MP 0.54 TO MP 3.148. (98CCR)(R‐ 04DEOB)(04CCR)(BOP2006P)(10CCR)(12CCR)

Jefferson5 IP20140033 KY 2050 MINOR WIDENING $6,444,000 REDUCE CONGESTION AND IMPROVE SAFETY ALONG KY 2050 (HERR LANE) FROM KY 1447 39.2 1.03 ‐ 2.18 (WESTPORT ROAD) TO KY 22 (BROWNSBORO ROAD). PROJECT WILL EVALUATE 3‐LANE WIDENING AND CONSIDER ACCOMMODATIONS FOR BICYCLISTS AND PEDESTRIANS.

Boone6 IP20190019 US 25 MAJOR WIDENING $61,304,000 IMPROVE SAFETY & MOBILITY, AND ADDRESS GEOMETRIC DEFICIENCIES ALONG US 25 (DIXIE 38.9 2.264 ‐ 4.859 HWY.) BETWEEN KY 16 (MARY GRUBBS HIGHWAY) AND KY 338 (RICHWOOD RD.)

Boone6 IP20150193 US 25 MAJOR WIDENING $38,386,000 IMPROVE MOBILITY AND REDUCE CONGESTION ALONG US 25 (DRY RIDGE ‐ FLORENCE ROAD) 38.9 7.431 ‐ 7.81 FROM BEESOM DRIVE TO ARISTOCRAT DRIVE. (2006BOPC) (10CCR)(14CCN) FORMERLY 6‐351.3.

Jefferson5 IP20080213 KY 1065 MINOR WIDENING $21,308,000 IMPROVE SAFETY AND REDUCE CONGESTION ON KY 1065 (BEULAH CHURCH ROAD) FROM KY 864 38.6 10.009 ‐ 11.858 (FEGENBUSH LANE) TO US 31E (BARDSTOWN ROAD). PROJECT WILL EVALUATE 3‐LANE WIDENING OR OTHER LOWER IMPACT SOLUTIONS AND CONSIDER ACCOMMODATIONS FOR BICYCLISTS AND PEDESTRIANS.

Wednesday, September 18, 2019 Page 23 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Henry5 5‐8300.10 KY 146 RECONSTRUCTION $13,940,000 MAJOR RECONSTRUCTION OF KY‐146 BETWEEN NEW CASTLE AT US‐421 AND PENDLETON AT KY‐ 38.5 6.8 ‐ 9.8 153. SEGMENT 2:LOST CREEK (1/2 MILE EAST OF SAFETY KLEEN ENTRANCE) TO MAIN STREET (US 421/KY 55). MILE POINT 6.8 TO MILE POINT 9.8.(12CCN)(14CCR)

Shelby5 IP20130007 PF 9999 NEW ROUTE $23,879,000 IMPROVE CONNECTIVITY FROM KY53 AT THE OLD SEVEN MILE PIKE INTERSECTION TO 38.5 ‐ US60/ROCKET LANE INTERSECTION.

Woodford7 IP20080484 US 62 RECONSTRUCTION $15,964,000 IMPROVE SAFETY, REDUCE CONGESTION, ACCESS MANAGEMENT, AND MULTI‐MOBILITY ON US 62 38.5 5.4 ‐ 7.046 FROM SOUTH MAIN STREET TO WOODFORD COUNTY PARK IN VERSAILLES. Fayette7 IP20070214 US 27 CONGESTION $6,304,000 INTERSECTION IMPROVEMENTS AT S BROADWAY 38.4 MANAGEMENT AND VIRGINIA AVE. 5.653 ‐ 5.714 Jefferson5 IP20080189 I 65 SPOT $124,805,000 IMPROVEMENTS TO I‐65 FROM CRITTENDEN 38.0 IMPROVEMENT DRIVE TO ARTHUR STREET. (02CCN) 132.6 ‐ 133.6

Clark7 IP20080419 US 60 RECONSTRUCTION $4,932,000 ACCESS MANAGEMENT IMPROVEMENTS ON US 60 (W LEXINGTON AVE) AT CAROL RD 38.0 4.67 ‐ 4.892 INTERSECTION.

Montgomer 7 IP20150064 PF 9999 NEW ROUTE $9,220,000 CONSTRUCT NEW PARALLEL ROUTE NORTH OF I y 64 CONNECTING KY 11 NEAR US 460 (PARIS PIKE) 37.9 ‐ EXTENDING ~2.0MI EAST TO HINKSTON PIKE.

Wednesday, September 18, 2019 Page 24 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Jefferson5 IP20080219 KY 1819 MINOR WIDENING $35,014,000 IMPROVE SAFETY, MOBILITY FOR ALL MODES, AND ADDRESS GEOMETRIC DEFICIENCIES ALONG 37.9 5.3 ‐ 8.9 KY 1819 (BILLTOWN ROAD) FROM I‐265 (GENE SNYDER FREEWAY) TO RUCKRIEGEL PARKWAY/BILLTOWN ROAD (IN AND NEAR JEFFERSONTOWN). PROJECT WILL EVALUATE 3‐ LANE WIDENING AND CONSIDER

Kenton6 IP20000024 KY 16 MAJOR WIDENING $72,194,000 IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY 16 (TAYLOR MILL RD) FROM KY 2047 37.8 5.315 ‐ 9.269 (SENOUR RD) TO KY 536 (HARRIS PIKE); INCLUDE MULTI‐MODAL NEEDS.

Jefferson5 IP20170067 PF 9999 NEW ROUTE $12,539,000 EXTEND 12TH STREET FROM HILL STREET TO INDUSTRY ROAD 37.6 ‐ Spencer5 IP20190093 KY 155 SPOT $2,283,000 IMPROVE SAFETY AT THE INTERSECTION OF KY 37.6 IMPROVEMENT 155 AND GOEBEL ROAD/HOCHSTRASSER ROAD. 0.65 ‐ 0.85 MP 0.65 TO MP 0.85.

Kenton6 IP20190065 I 75 RECONSTRUCTION $28,196,000 RECONSTRUCT I‐75 INTERCHANGE AT KY 236 (DONALDSON HIGHWAY). 37.2 183.317 ‐ 184.1

Woodford7 7‐440 KY 169 RECONSTRUCTION $16,430,000 IMPROVE KY‐169 FROM NORTH OF CLEAR CREEK RD IN JESSAMINE COUNTY TO NORTH OF KY‐ 37.1 0 ‐ 3 1967 IN WOODFORD COUNTY.

Jessamine7 7‐8906 KY 169 RECONSTRUCTION $37,430,000 RECONSTRUCT KY 169 FROM US 68 TO 0.54 MILES NORTH OF CLEAR CREEK RD (MP 14.448 37.0 14.448 ‐ 19 TO MP 19.00). (16CCN) Jefferson5 IP20170071 CS 1011 F SPOT $4,129,000 RECONSTRUCT THE INTERSECTION OF HILL 36.8 IMPROVEMENT STREET AND 7TH STREET TO PROVIDE LEFT TURN 0.558 ‐ 0.758 LANES.

Wednesday, September 18, 2019 Page 25 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Jefferson5 IP20080231 CS 1024 G RECONSTRUCTION $14,513,000 IMPROVE SAFETY AND REDUCE CONGESTION ON PHILLIPS LANE FROM KY 61 (PRESTON HIGHWAY) 36.7 0 ‐ 1.277 TO KY 1631 (CRITTENDEN DRIVE). INCLUDES CONSIDERATION OF BICYCLE AND PEDESTRIAN FACILITIES.

Clark7 IP20110183 US 60 MAJOR WIDENING $62,371,000 MODERNIZE ROADWAY & IMPROVE CAPACITY ON US 60 (LEXINGTON RD) FROM KY 859 (HALEY 36.3 0 ‐ 4.678 RD) TO KY 1958 (VETERANS MEMORIAL PKWY). INCLUDES 2.8MI IN FAYETTE.

Franklin5 5‐8902 US 421 RECONSTRUCTION $2,100,000 IMPROVE DRAINAGE ALONG SLICKWAY BRANCH BY EXPANDING WATER SHED BASIN AT JIM 36.2 1.778 ‐ 2.349 BEAM DISTRIBUTION CENTER ON US 421S TO IMPROVE DRAINAGE ISSUES ON COUNTRY LANE.

Fayette7 IP20000043 KY 1968 MAJOR WIDENING $12,592,000 PARKERS MILL RD ‐ MODERNIZE ROADWAY FOR SAFETY FROM VERSAILLES RD TO MAN‐O‐WAR 36.2 3.873 ‐ 6.019 BLVD IN LEXINGTON

Jessamine7 IP20130101 KY 169 RECONSTRUCTION $15,792,000 RECONSTRUCT KY 169 (RICHMOND AVE) FROM PROPOSED EAST NICHOLASVILLE BYP TO US 27X 36.1 8.45 ‐ 10.458 (NORTH MAIN ST).

Jefferson5 IP20080226 CR 1013 L RECONSTRUCTION $12,181,000 RECONSTRUCT EAST PAGES LANE AS A 2 LANE (NO ADDITIONAL LANES) ROAD WITH SEVERAL 36.0 0 ‐ 1.299 IMPROVEMENTS TO INTERSECTIONS FROM US 31W (DIXIE HIGHWAY) TO KY 907 (3RD STREET ROAD). INCLUDES CONSIDERATION OF BICYCLE AND PEDESTRIAN FACILITIES.

Oldham5 IP20190082 KY 22 RECONSTRUCTION $20,247,000 RECONSTRUCT KY 22/KY 146 FROM PRYOR AVENUE TO KY 329B ‐ 3 LANE SECTION WITH 35.6 3.543 ‐ 3.929 CENTER TURN LANE. FROM MP 3.500 TO MP 3.929.

Wednesday, September 18, 2019 Page 26 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Fayette7 IP20070216 KY 1978 MAJOR WIDENING $7,607,000 RECONSTRUCT KY 1978 (GREENDALE RD) FROM US 421 (LEESTOWN RD) TO CITATION BLVD. 35.4 0 ‐ 1.326

Jessamine7 IP20000057 KY 169 RECONSTRUCTION $18,417,000 IMPROVE SAFETY AND MOBILITY ON NORTH 3RD STREET/KEENE ROAD FROM OAK ST TO US 27 35.1 10.63 ‐ 11.978 (NICHOLASVILLE BYPASS) IN NICHOLASVILLE

Campbell6 IP20170019 KY 8 X RECONSTRUCTION $4,165,000 REDUCE CONGESTION AT THE INTERSECTION OF KY 8 AT RIVIERA DRIVE. 34.6 0.715 ‐ 0.914

Jefferson5 IP20080214 KY 1447 MINOR WIDENING $7,046,000 IMPROVE SAFETY AND REDUCE CONGESTION ON KY 1447 (WESTPORT ROAD) FROM MURPHY 34.6 7.5 ‐ 9.242 LANE TO KY 146. PROJECT DESIGN WILL EVALUATE 3‐LANE WIDENING WITH TWO‐WAY CENTER TURN LANE AND CONSIDER BICYCLE AND PEDESTRIAN FACILITIES.

Anderson7 7‐8100.10 US 62 SAFETY $6,360,000 WIDENING WITH ACCESS IMPROVEMENTS TO ANDERSON CROSSING ON US62, FROM 0.2MI W 34.1 17.842 ‐ 18.276 OF CORPORATE DR TO US127B (LAWRENCEBURG BYPASS). PRIORITY SECTION (2016BOP)

Clark7 IP20080427 KY 1927 MINOR WIDENING $40,927,000 RECONSTRUCT KY 1927 FROM 1000FT W OF KY 1923 TO WINCHESTER BYP. 33.9 0.371 ‐ 6.826

Jefferson5 IP20080228 CR 1011 H RECONSTRUCTION $10,257,000 RECONSTRUCT FAIRGROUND ROAD FROM US 31E TO KY 1819. PROJECT DESIGN WILL 33.5 0 ‐ 1.953 EVALUATE A 2 LANE ROAD (NO ADDED LANES), LEFT‐TURN LANES AT US 31E, BILLTOWN ROAD, POSSIBLY OTHER INTERSECTIONS, AND RADIUS IMPROVEMENTS AT THREE 90‐DEGREE CURVES AND CONSIDER BIKE AN

Wednesday, September 18, 2019 Page 27 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Boone6 IP20080275 KY 3060 MAJOR WIDENING $46,693,000 IMPROVE SAFETY & MOBILITY, AND ADDRESS GEOMETRIC DEFICIENCIES ALONG KY 3060 33.5 0 ‐ 2.726 (FROGTOWN RD.) FROM US 42 TO US 25 (DIXIE HWY); INCLUDE MULTI‐MODES.

Fayette7 IP20000051 CS 3037 MINOR WIDENING $24,673,000 IMPROVE SAFETY, AND MOBILITY OF ARMSTRONG MILL ROAD FROM KY 1974 (TATES 33.4 0 ‐ 1.407 CREEK PIKE) TO MAN O WAR BLVD IN LEXINGTON

Woodford7 7‐8904 KY 33 RECONSTRUCTION $51,380,000 RECONSTRUCT KY 33 FROM 100 FEET NORTH OF KY 1267 TO 100 FEET NORTH OF KY 169. (MP 33.1 3.04 ‐ 10.65 3.04 TO MP 10.65) (16CCN) Jefferson5 5‐8102.20 I 65 I‐CHANGE $21,850,000 RECONSTRUCT RAMP FROM SB I‐65 TO ARTHUR 33.0 RECONST ST, RECONSTRUCT ARTHUR ST AND RAMP TO SB 133.541 ‐ I‐65 FROM ARTHUR ST AND REMOVE EXISTING 133.752 RAMPS TO SB I‐65 & OFF‐RAMPS FROM SB I‐65. (2004BOPC) Madison7 IP20080441 KY 21 RELOCATION $27,892,000 RECONSTRUCT KY 21 FROM KY 1617 TO US 421. 32.9 11.511 ‐ 14.641

Garrard7 IP20080431 KY 52 MAJOR WIDENING $15,251,000 IMPROVE SAFETY ON KY 52 FROM BOONE CREEK ROAD TO KY 1150 IN GARRARD COUNTY. 32.9 2.422 ‐ 4.231

Campbell6 IP20080294 KY 8 X RECONSTRUCTION $10,766,000 IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY 8 FROM RIVIERA DRIVE BELLEVUE TO 32.3 0.814 ‐ 1.603 WALNUT STREET IN DAYTON; INCLUDE MULTI‐ MODES. Bourbon7 IP20110191 US 68 X DRAINAGE $6,238,000 PAVEMENT REHAB WITH DRAINAGE 32.2 IMPROVEMENT IMPROVEMENTS FROM SOUTHERN BYPASS 0 ‐ 2.772 INTERSECTION AT US 27 TO NORTHERN BYPASS INTERSECTION AT US 68, INCLUDING MAIN ST & HIGH ST (1‐WAY SEGMENTS).

Wednesday, September 18, 2019 Page 28 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Fayette7 IP20190154 US 60 MAJOR WIDENING $19,192,000 MODERNIZE ROADWAY & IMPROVE CAPACITY ON US60 FROM END OF FOUR‐LANE SECTION 31.9 12.5 ‐ 16.4 NEAR POLO CLUB BLVD TO KY 859 (HALEY RD).

Boone6 IP20000018 KY 20 MAJOR WIDENING $51,985,000 IMPROVE SAFETY AND MOBILITY ALONG KY 20 (PETERSBURG ROAD) FROM GRAVES ROAD TO KY 31.9 14.525 ‐ 16.62 237 (NORTH BEND ROAD).

Henry5 5‐8300 KY 146 RECONSTRUCTION $14,800,000 MAJOR RECONSTRUCTION OF KY‐146 BETWEEN NEW CASTLE AT US‐421 AND PENDLETON AT KY‐ 31.8 2.169 ‐ 6.8 153. SEGMENT 1: PENDLETON ROAD (KY 153) TO LOST CREEK (1/2 MILE EAST OF SAFETY KLEEN ENTRANCE). MILE POINT 2.1 TO MILE POINT 6.8. (06CCN)(08CCR)(10CCR)(12CCR)(14CCR)(18CCR)

Fayette7 IP20000040 KY 1966 RECONSTRUCTION $24,937,000 RECONSTRUCT KY 1267/1966 (MILITARY PK) FROM KY 1967 IN WOODFORD COUNTY TO US 68 31.7 0 ‐ 3.865 IN FAYETTE COUNTY.

Fayette7 IP20000049 CS 3016 MAJOR WIDENING $10,083,000 IMPROVE SAFETY, CAPACITY, AND MULTI‐ MODAL MOBILITY OF ALUMNI ROAD (CS 3016) 31.5 1.223 ‐ 1.919 FROM TATES CREEK TO CHINOE RD IN LEXINGTON.

Fayette7 IP20000046 CS 2690 RECONSTRUCTION $27,034,000 RECONSTRUCT OLD TODDS RD FROM CODELL DR TO LIBERTY RD. 31.5 0.237 ‐ 1.793 Jefferson5 5‐8102.40 I 65 I‐CHANGE $16,320,000 RECONSTRUCT RAMP FROM NB I‐65 TO 31.2 RECONST WARNOCK ST, FROM WARNOCK ST TO I‐65 NB 132.7 ‐ 133.2 AND REMOVE RAMPS FROM NB I‐65 TO EASTERN PARKWAY. (2004BOPC)

Campbell6 6‐407 KY 9 SAFETY $2,270,000 KY 9 EXTENSION, CAMPBELL COUNTY. (2006KYD). (KYD FUNDING MOVED FROM 6‐ 30.7 21.734 ‐ 22.005 8101.02)

Wednesday, September 18, 2019 Page 29 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Montgomer 7 7‐8818 KY 686 MAJOR WIDENING $9,200,000 WIDEN EXISTING BYPASS FROM 2 LANES TO 4 y LANES FROM US 460 TO US 60. IMPROVE 30.7 3.506 ‐ 6.333 CAPACITY AND SAFETY IMPROVEMENTS ALONG KY‐713 INTERSECTION. ADD TURNING LANES WHERE APPROPRIATE. INCLUDE MULTI‐USE TRAILWAY ALONG ROUTE. (14CCN)

Campbell6 IP20080296 KY 547 RECONSTRUCTION $25,040,000 IMPROVE MOBILITY ALONG KY 547 FROM KY 9 (AA HIGHWAY) TO KY 10; INCLUDE MULTI‐ 30.6 0 ‐ 1.75 MODES.

Campbell6 IP20170044 US 27 RECONSTRUCTION $1,434,000 IMPROVE MOBILITY AND SAFETY AT THE INTERSECTIONS OF US 27 AND PAT FANNING 30.6 11.866 ‐ 11.981 WAY/KY 709.

Clark7 7‐8952 US 60 AIR QUALITY $24,080,000 RECONSTRUCT US 60 FOR SAFETY IMPROVEMENTS FROM I‐64 IN CLARK COUNTY 30.6 14.21 ‐ 17.032 (MP 14.210)) TO 500 FEET WEST OF SEWELL SHOP ROAD (MP 17.032) .(16CCN)(18CCN)

Scott7 IP20080468 US 460 MAJOR WIDENING $11,234,000 RECONSTRUCT US 460 FROM SOARDS ROAD TO BELVEDERE DR. 30.5 4.008 ‐ 6.072

Shelby5 IP20080256 KY 55 X MAJOR WIDENING $24,950,000 ADDRESS ACCESS MANAGEMENT AND SAFETY ISSUES ALONG KY 55X FROM KY 43 TO THE 30.4 1.354 ‐ 2.076 ENTRANCE OF THE SHELBYVILLE BYPASS (KY 55).

Garrard7 IP20120031 KY 52 MAJOR WIDENING $34,400,000 IMPROVE SAFETY ON KY 52 FROM KY 590 IN BOYLE COUNTY TO MARTIN LANE IN GARRARD 30.3 0 ‐ 1.53 COUNTY.

Boone6 IP20110123 KY 338 MAJOR WIDENING $10,727,000 IMPROVE SAFETY & MOBILITY, AND ADDRESS GEOMETRIC DEFICIENCIES ALONG KY 338 30.2 0.756 ‐ 1.35 (RICHWOOD RD. ) FROM HICKS PIKE TO TRIPLE CROWN BOULEVARD.

Wednesday, September 18, 2019 Page 30 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Scott7 IP20080475 KY 1962 RECONSTRUCTION $7,374,000 ADDRESS SAFETY ISSUES ON KY 1962 (LEMON'S MILL ROAD) FROM MILITARY STREET IN 30.1 0.518 ‐ 2.118 GEORGETOWN TO LISLE ROAD AT I‐75.

Mercer7 7‐416 US 68 SAFETY $4,180,000 IMPROVE SAFETY ON US 68 AT KY 127 INTERSECTION IN HARRODSBURG. 29.9 6.752 ‐ 6.852 (12CCR)(14CCR)(16CCR)

Montgomer 7 IP20130102 US 60 MAJOR WIDENING $21,436,000 IMPROVE SAFETY AND WIDEN US 60 AND I‐64 y INTERCHANGE (EXIT 113). 29.9 8.4 ‐ 8.95

Montgomer 7 IP20060246 US 460 RECONSTRUCTION $18,686,000 IMPROVE CONGESTION & SAFETY, ON US 460 y FROM CARDINAL LN TO US 60 IN MOUNT 29.9 8.528 ‐ 9.549 STERLING.

Montgomer 7 7‐8817 KY 213 MAJOR WIDENING $22,440,000 WIDEN EXISTING PAVEMENT AND IMPROVE y VERTICAL AND HORIZONTAL CURVES FROM 29.9 0 ‐ 2.894 BOTTOM OF HILL TO US 460 IN JEFFERSONVILLE. ADD FULL‐WIDTH SHOULDERS TO IMPROVE SAFETY. (14CCN)

Spencer5 IP20080263 KY 1169 MINOR WIDENING $13,195,000 IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ALONG KY 1169 FROM KY 55 TO 29.7 4.96 ‐ 7.14 MEADOWLAKE DRIVE.

Kenton6 IP20080360 KY 536 MAJOR WIDENING $80,329,000 IMPROVE SAFETY AND PROVIDE CONNECTIVITY ALONG KY 536 FROM KY 16 (TAYLOR MILL RD) TO 29.6 6.092 ‐ 10.249 KY 177 (DECOURSEY PIKE); INCLUDING MULTI‐ MODES.

Fayette7 7‐439 KY 4 MINOR WIDENING $50,110,000 NEW CIRCLE RD: IMPROVE SAFETY AND REDUCE CONGESTION FROM US‐68 (HARRODSBURG RD) 29.4 2.224 ‐ 4.335 TO US‐60 (VERSAILLES RD). SEE SEGMENTS 2A & 2B IN AUGUST, 1998 ADVANCE PLANNING STUDY.

Wednesday, September 18, 2019 Page 31 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Montgomer 7 7‐250.01 US 460 RECONSTRUCTION $67,830,000 RECONSTRUCTION OF US 460 FROM KY 599 AT y JEFFERSONVILLE TO KY 713 AT MEANS. 29.3 19.6 ‐ 22.067 (00CCR)(2004BOPC)

Montgomer 7 IP20150057 KY 11 SAFETY‐HAZ‐ELM $71,308,000 ADDRESS SAFETY ISSUES AND HIGH TRAFFIC y VOLUMES FROM THE MOUNT STERLING BYPASS 29.3 0 ‐ 9.246 (KY 686) TO THE POWELL COUNTY LINE.

Madison7 7‐8404 PF 9999 NEW ROUTE $146,930,000 CONSTRUCT A NEW 4 LANE CONNECTOR BETWEEN US‐27 AND I‐75. 29.2 ‐ (08CCN)(12CCR)(16CCR)

Oldham5 IP20080248 KY 22 MINOR WIDENING $15,675,000 IMPROVE SAFETY AND REDUCE CONGESTION ON KY 22 FROM HAUNZ LANE TO KY 329. INCLUDES 29.2 0.021 ‐ 3.262 CONSIDERATION OF A THREE LANE WIDENING AND BIKE/PED ACCOMMODATIONS.

Scott7 IP20080472 KY 32 RECONSTRUCTION $62,776,000 ADDRESS SAFETY ISSUES ON KY 32 IN SCOTT COUNTY FROM SALEM ROAD TO THE HARRISON 29.1 20.71 ‐ 23.003 COUNTY LINE.

Shelby5 5‐8959 PF 9999 NEW ROUTE $4,120,000 NEW NORTH‐SOUTH ROUTE BETWEEN US 60 AND BENSON PIKE WEST OF AND PARALLEL TO 29.1 ‐ ROCKET LANE (KY 1871).(16CCN)

Boone6 6‐8851 KY 842 SAFETY $10,660,000 INCREASE SAFETY & OPERATIONS AT THE INTERSECTION OF KY 842 (RICHARDSON RD.) 29.0 0 ‐ 0.34 AND US 25 (DIXIE HIGHWAY) FROM JUST W OF US 25 TO BOONE CO. LINE AND INCLUDES MULTI‐ MODES; (14CCN) Mercer7 IP20120033 US 127 SPOT $335,000 IMPROVE SAFETY & ACCESS WITH TURN LANES 28.9 IMPROVEMENT ONTO ADAMS LN FROM US127 (2 LEFT & 1 SB 1.23 ‐ 1.457 RIGHT).

Wednesday, September 18, 2019 Page 32 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Boone6 IP20130018 I 275 RECONSTRUCTION $22,427,000 IMPROVE MOBILITY AND REDUCE CONGESTION AT THE INTERCHANGE OF I‐275 AND KY 3076 28.8 1.7 ‐ 2.4 (MINEOLA PIKE).

Bourbon7 IP20080408 KY 1939 MAJOR WIDENING $16,102,000 MODERNIZE ROADWAY, IMPROVING CONGESTION, SAFETY & PEDESTRIAN ACCESS, 28.7 5.812 ‐ 7.712 FROM US 27 ALONG KY 1939 FOR 1.90 MILES.

Woodford7 IP20080488 KY 1681 SAFETY‐HAZ‐ELM $1,668,000 CURVE REVISION ON KY 1681 (OLD FRANKFORT PIKE) FROM CR 1010 (BROWNS MILL RD) TO 28.5 11.9 ‐ 12.325 WOODFORD/FAYETTE CL.

Kenton6 IP20150034 KY 842 MINOR WIDENING $8,268,000 IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY 842 (RICHARDSON RD) FROM BOONE 28.4 0 ‐ 0.713 COUNTY LINE TO KY 1303 (TURKEYFOOT RD) Harrison6 IP20110111 US 62 SPOT $17,808,000 IMPROVE SAFETY AND MOBILITY AND ADDRESS 28.3 IMPROVEMENT GEOMETRIC DEFICIENCIES ALONG US 62 10.259 ‐ 11.7 (ODDVILLE PIKE) FROM KY 392 (REPUBLICAN PIKE) TO SALEM PIKE.

Boyle7 IP20080411 KY 33 MAJOR WIDENING $39,544,000 IMPROVE SAFETY, LEVEL OF SERVICE ON KY 33 FROM LEXINGTON AVE. TO KY 2168 (DANVILLE 28.2 0.22 ‐ 2.29 BYPASS).

Oldham5 IP20080251 KY 146 MINOR WIDENING $26,562,000 IMPROVE SAFETY AND REDUCE CONGESTION ON KY 146 (LAGRANGE ROAD) FROM KY 329B (KY 28.1 2.642 ‐ 7.673 329 BYPASS) TO KY 393. INCLUDES CONSIDERATION OF A FOUR LANE WIDENING AND BIKE/PED ACCOMMODATIONS.

Boone6 6‐80000 KY 237 RECONSTRUCTION $37,510,000 RECONSTRUCT GUNPOWDER RD. FROM US‐42 TO KY‐536. (18CCN) 28.1 0 ‐ 1.588

Wednesday, September 18, 2019 Page 33 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Jefferson5 5‐80006 PF 9999 SPOT $14,070,000 CONSTRUCT NEW INTERCHANGE ON KY‐841 AT 27.9 IMPROVEMENTS THE RENAISSANCE SOUTH BUSINESS ‐ PARK(18CCN)

Bullitt5 IP20130131 KY 1450 SAFETY‐HAZ‐ELM $8,246,000 IMPROVE SAFETY AND REDUCE CONGESTION AT THE INTERSECTION OF KY 1450 AND KY 1526 27.9 1.795 ‐ 1.995 EAST OF THE I‐65/KY 1526 INTERCHANGE. Campbell6 IP20000021 KY 915 SPOT $12,199,000 IMPROVE SAFETY & MOBILITY, AND ADDRESS 27.8 IMPROVEMENT GEOMETRIC DEFICIENCIES ALONG KY 915 FROM 5.9 ‐ 9.286 KY 9 (AA HWY.) TO KY 2924.

Clark7 7‐8302 KY 89 MAJOR WIDENING $10,760,000 WIDEN KY‐89 WINCHESTER‐IRVINE ROAD: SECTION EIGHT FROM MILEPOST 12.45 TO 27.6 12.45 ‐ 14.32 MILEPOST 14.32. (06CCN)(12CCR)(16CCR)

Kenton6 IP20080359 KY 536 MAJOR WIDENING $26,004,000 PROVIDE CONNECTIVITY, IMPROVE MOBILITY, AND REDUCE CONGESTION ALONG KY 536 FROM 27.6 4.602 ‐ 6.092 KY 17 TO KY 16; INCLUDE MULTI‐MODES.

Kenton6 IP20130010 PF 9999 NEW ROUTE $65,899,000 PROVIDE CONNECTIVITY AND IMPROVE MOBILITY BETWEEN KY 177 (DECOURSEY PIKE) 27.4 ‐ AND KY 9 SO AS TO ACCESS I‐275.

Jefferson5 5‐371.13 KY 22 SAFETY $870,000 RECONSTRUCT KY‐22 AT GOOSE CREEK ROAD. (06CCN) (2004BOPC)(14CCR)(18CCR) 27.4 2.537 ‐ 2.937

Jefferson5 IP20080224 KY 2845 MINOR WIDENING $21,374,000 RECONSTRUCT KY 2845 (MANSLICK ROAD) FROM KY 61 TO KY 864 (BEULAH CHURCH ROAD). 27.4 0 ‐ 3.776 PROJECT WILL EVALUATE 3‐LANE WIDENING WITH TWO‐WAY CENTER TURN LANE AND CONSIDER ACCOMMODATIONS FOR BICYCLISTS AND PEDESTRIANS.

Wednesday, September 18, 2019 Page 34 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Spencer5 IP20080261 KY 55 MINOR WIDENING $18,858,000 IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ALONG KY 55 FROM KY 155/KY 27.4 11.27 ‐ 13.566 1633 TO THE SPENCER/SHELBY COUNTY LINE. Fayette7 IP20160130 CS 1375 CONGESTION $7,742,000 FOURTH STREET CORRIDOR IMPROVEMENTS 27.3 MANAGEMENT BETWEEN JEFFERSON AND UPPER STREET AT 0.071 ‐ 0.503 TRANSYLVANIA UNIVERSITY IN LEXINGTON (2014BOP)

Grant6 IP20110140 PF 9999 NEW ROUTE $35,626,000 IMPROVE SAFETY, RELIABILITY, AND MOBILITY BY PROVIDING GRADE SEPARATED ACCESS OVER 27.3 ‐ NORFOLK SOUTHERN RAILROAD TO ACCESS US 25 IN THE VICINITY OF NEEDHAM LANE TO HYDE ROAD.

Fayette7 IP20110184 KY 57 RECONSTRUCTION $31,931,000 TYPICAL SECTION & PAVEMENT IMPROVEMENTS ALONG BRIAR HILL RD FROM BRYAN STATION (KY 27.2 3.05 ‐ 6.755 57) TO N CLEVELAND RD (KY 1973).

Kenton6 IP20130009 KY 1072 MINOR WIDENING $3,680,000 IMPROVE MOBILITY ALONG KY 1072 (KYLES LANE) FROM INTERSTATE 75 TO HENRY CLAY AVE. 27.1 2.489 ‐ 2.7

Bourbon7 IP20080405 KY 353 SAFETY‐HAZ‐ELM $1,069,000 ROADWAY SAFETY IMPROVEMENTS ON RUSSELL CAVE ROAD (KY 353) IN BOURBON COUNTY. 26.5 3.835 ‐ 4.005

Jefferson5 IP20110072 KY 22 MINOR WIDENING $6,898,000 IMPROVE SAFETY AND REDUCE CONGESTION ON KY 22 FROM JUST EAST OF MURPHY LANE TO 26.4 6.05 ‐ 6.725 HAUNZ LANE. PROJECT DESIGN WILL EVALUATE 3‐LANE WIDENING WITH TWO‐WAY CENTER TURN LANE AND CONSIDER BICYCLE AND PEDESTRIAN FACILITIES.

Wednesday, September 18, 2019 Page 35 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Campbell6 6‐352 PF 9999 NEW ROUTE $58,610,000 EXTEND PROPOSED POND CREEK ROAD FROM US‐27 TO AA HIGHWAY VIA PORTION OF KY 26.4 ‐ 10/KY 1997 CORRIDOR (NEW KY‐ 536)(04CCN)(12CCR)(14CCR)

Bracken6 IP20070207 KY 9 MAJOR WIDENING $110,732,000 REDUCE CONGESTION ON KY 9 FROM KY 1109 IN BRACKEN COUNTY TO KY 159 IN PENDLETON 26.4 13.59 ‐ 19.857 COUNTY

Madison7 IP20080437 US 25 MAJOR WIDENING $49,475,000 RECONSTRUCT US 25 FROM KY 1156 (JACKS CREEK RD) TO I‐75. 26.4 21.02 ‐ 28.161

Madison7 IP20150123 KY 1156 SAFETY‐HAZ‐ELM $34,070,000 IMPROVE SAFETY ON JACKS CREEK RD (KY 1156) FROM US 25 TO CLAY LANE. 26.2 0 ‐ 4.651

Bourbon7 IP20050009 KY 1678 MAJOR WIDENING $24,099,000 RECONSTRUCT KY 1678 (CLINTONVILLE RD) FROM THE NEW PROVIDENCE CHURCH TO 26.1 5.4 ‐ 8.251 CASTLE BLVD.

Fayette7 IP20150466 KY 57 RECONSTRUCTION $7,625,000 RECONSTRUCT KY 57 (BRYAN STATION RD) FROM HERMITAGE DR TO PREAKNESS DR. 26.1 0.912 ‐ 1.292

Gallatin6 IP20130029 US 42 MINOR WIDENING $38,340,000 IMPROVE SAFETY AND MOBILITY ON US 42 FROM THE CARROLL COUNTY LINE TO KY 1039. 25.9 0 ‐ 3.325

Bourbon7 IP20080406 KY 627 RECONSTRUCTION $78,817,000 IMPROVE SAFETY ON KY 627 (WINCHESTER RD) FROM CLARK/BOURBON CL TO US 68X (HIGH ST). 25.9 0 ‐ 9.276

Woodford7 IP20080483 US 62 RECONSTRUCTION $4,874,000 RECONSTRUCT INTERSECTION AT US 62 (ROSE HILL AVE & TYRONE PK) AND KY 1964 (CLIFTON 25.6 6.496 ‐ 6.7 RD) IN VERSAILLES.

Wednesday, September 18, 2019 Page 36 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Boone6 6‐445 KY 3076 MAJOR WIDENING $22,250,000 IMPROVE FREIGHT MOBILITY AND REDUCE CONGESTION ON KY‐3076 (MINEOLA PIKE) FROM 25.5 0 ‐ 1.05 KY‐236 TO I‐275. (18CCR)(DESIGN CONDUCTED UNDER ITEM 3 6‐444)

Clark7 IP20080424 KY 974 RECONSTRUCTION $3,914,000 RECONSTRUCT APPROACHES AND BRIDGE ON KY 974 FROM ELIZABETH ST TO 0.237MI E OF 25.5 0.363 ‐ 0.6 ELIZABETH ST. Jefferson5 IP20000014 PF 9999 NEW $296,082,000 NEW INTERCHANGE AND CONNECTOR ROAD 25.4 INTERCHANGE FROM KY 1447 TO US 42 WITH INTERCHANGE ON ‐ I‐71 NEAR JEFFERSON/OLDHAM COUNTY BORDER. THE CONNECTOR ROAD WOULD ACCOMODATE ALL MODES, INCLUDING BICYCLISTS AND PEDESTRIANS.

Oldham5 IP20080246 US 42 MINOR WIDENING $13,506,000 IMPROVE TRAFFIC FLOW, MINIMIZE CONGESTION, AND ADDRESS SAFETY ISSUES ON 25.4 0.942 ‐ 6.034 US 42 BETWEEN RIDGEMOOR DRIVE AND KY 1694 (GUM STREET). INCLUDES CONSIDERATION OF A THREE LANE WIDENING AND BIKE/PED ACCOMMODATIONS.

Pendleton6 IP20080378 US 27 RECONSTRUCTION $104,650,000 ADDRESS SAFETY AND LEVEL OF SERVICE ON US 27 FROM HARRISON COUNTY LINE TO KY 22. 25.4 0 ‐ 6.9

Jefferson5 IP20110081 CS 1005 F RELOCATION $959,000 REALIGN KENTUCKY STREET (CS 1005) TO CONNECT TO GARLAND AVENUE TO AVOID 25.2 2.541 ‐ 2.817 CROSSING THE P&L RAILROAD.

Campbell6 6‐8104 I 471 NEW ROUTE $32,660,000 CONSTRUCT NEW I‐471 SOUTHBOUND OFF‐ RAMP AT KY‐8 (SEE ALSO 6‐183.00). 25.1 0 ‐ 0.219 (02CCN)(06CCN)

Wednesday, September 18, 2019 Page 37 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Trimble5 IP20150050 KY 36 RECONSTRUCTION $9,122,000 ADDRESS SAFETY AND CORRIDOR IMPROVEMENTS ON KY 36 JUST EAST OF 25.0 0.25 ‐ 2.2 SCHOOL HOLLOW ROAD TO CARROLL COUNTY LINE.

Kenton6 6‐1086 KY 8 AM‐BRIDGE $41,250,000 ADDRESS DEFICIENCIES OF BRIDGE OVER LICKING RIVER ON WEST 4TH STREET (KY 8) IN 24.5 7.57 ‐ 7.662 COVINGTON/NEWPORT AT KENTON/CAMPBELL CO LN. (059B00037N) *CAMPBELL CO MPS ARE 0.0‐0.19

Bracken6 IP20140005 KY 8 RECONSTRUCTION $43,476,000 RECONSTRUCT KY 8 FROM WRANGLING RUN RD TO OLD KY 19. 24.3 9.666 ‐ 12.717

Kenton6 6‐8951 KY 371 RECONSTRUCTION $28,190,000 IMPROVE EXISTING ALIGNMENT WITH BUTTERMILK PIKE, ORPHANAGE ROAD, AND US 24.2 1.6 ‐ 1.817 25. FT. MITCHELL WILL PAY $50,000 TOWARD DESIGN. (16CCN)(18CCN)

Woodford7 IP20150126 US 62 MINOR WIDENING $6,222,000 IMPROVE SAFETY, ACCESS, AND LEVEL OF SERVICE ON US 62 (MIDWAY ROAD) FROM 24.1 7.38 ‐ 9.247 CHESTNUT LANE TO AIKEN ROAD IN WOODFORD COUNTY.

Spencer5 IP20080264 KY 1169 MINOR WIDENING $11,972,000 ADDRESS SAFETY ISSUES AND GEOMETRIC ISSUES ON KY 1169 FROM KY 1060 TO JUST WEST 24.0 0 ‐ 4.96 OF THE KY 1169/KY 55 INTERSECTION.

Clark7 7‐8953 US 60 RECONSTRUCTION $19,210,000 RECONSTRUCT US 60 FOR SAFETY IMPROVEMENTS FROM 500 FEET WEST OF 24.0 17.032 ‐ 17.166 SEWELL SHOP ROAD (MP 17.032) IN CLARK COUNTY TO 500 FEET WEST OF BENTBROOK (MP 2.007) IN MONTGOMERY COUNTY.(16CCN)

Wednesday, September 18, 2019 Page 38 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Bracken6 IP20080277 KY 9 MAJOR WIDENING $126,258,000 REDUCE CONGESTION ON KY 9 IN BRACKEN COUNTY FROM KY 19 TO KY 1109. 24.0 5.546 ‐ 13.59

Franklin5 IP20080179 KY 1665 RECONSTRUCTION $15,571,000 IMPROVE SAFETY AND LEVEL OF SERVICE ON EVERGREEN ROAD (KY 1665) FROM US 127 TO 23.9 0.127 ‐ 3.892 US 60 IN FRANKLIN COUNTY.

Scott7 IP20080476 KY 1963 RECONSTRUCTION $11,125,000 ADDRESS ROADWAY GEOMETRIC DEFICIENCIES ON LISLE RD FROM US 25 TO KY 1962 IN 23.8 0 ‐ 2.684 GEORGETOWN. Boone6 6‐80 I 75 CONGESTION $49,000,000 REDUCE CONGESTION AND IMPROVE TRAFFIC 23.7 MITIGTN MOBILITY AT THE INTERCHANGE OF I‐75 AND KY‐ 171 ‐ 171.8 14 IN WALTON.

Jefferson5 IP20080198 US 60 MINOR WIDENING $12,122,000 IMPROVE SAFETY AND REDUCE CONGESTION ON US 60 FROM ROCKCREST WAY (CS 3157) TO 23.5 15.114 ‐ 17.375 NOTTING HILL BLVD (CS 1224J) AT THE JEFFERSON/SHELBY COUNTY LINE. PROJECT DESIGN WILL EVALUATE 3‐LANE WIDENING WITH A CONTINUOUS TWO‐WAY CENTER TURN LANE AND OTHER LOWER IMPACT Spencer5 IP20150052 KY 44 SPOT $3,396,000 ADDRESS SAFETY AND GEOMETRIC ISSUES ON KY 22.8 IMPROVEMENT 44 AT JUNCTION KY 1251 TO CURVE AFTER 5.6 ‐ 6.2 HUNTER'S TRACE ROAD.

Trimble5 IP20080265 US 421 RECONSTRUCTION $64,060,000 IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ALONG US 421 FROM I‐71 IN 22.3 0 ‐ 6.704 HENRY COUNTY TO US 42 IN BEDFORD (TRIMBLE COUNTY).

Fayette7 IP20130091 US 421 MINOR WIDENING $7,016,000 ADDRESS NARROW UNDERPASS AND IMPROVE DRAINAGE ON US 421 UNDER RR OVERPASS 0.1 22.0 7.071 ‐ 7.221 MILES NW OF CR 1314 (DOLAN LANE).

Wednesday, September 18, 2019 Page 39 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Boone6 IP20170050 KY 1017 RECONSTRUCTION $1,037,000 IMPROVE SAFETY AND REDUCE CONGESTION AT THE INTERSECTION OF KY 1017 (TURFWAY 21.9 2.45 ‐ 2.549 ROAD) AND KY 717 (THOROUGHBRED BLVD).

Woodford7 7‐345 PF 9999 NEW ROUTE $35,650,000 NORTHWEST VERSAILLES MOBILITY CORRIDOR. (06CCR)(10CCN)(12CCN) 21.7 ‐

Fayette7 IP20000042 KY 1681 RECONSTRUCTION $5,769,000 RECONSTRUCT INTERSECTION OF KY 1681 AT FORBES RD. 21.6 6.55 ‐ 6.75

Robertson6 IP20170041 US 62 MINOR WIDENING $975,000 IMPROVE SAFETY AND ADDRESS BRIDGE DEFICIENCIES ON US 62 OVER N BRANCH CEDAR 21.5 4.85 ‐ 4.95 CREEK. (101B00006N)

Franklin5 IP20080175 US 421 MINOR WIDENING $67,841,000 IMPROVE SAFETY AND LEVEL OF SERVICE ON US 421 (BALD KNOB HILL) FROM THE END OF 21.5 5.39 ‐ 11.132 EXISTING IMPROVEMENTS APPROX. 0.9 MILES NORTH OF US 127 TO KY 12 IN FRANKLIN COUNTY.

Robertson6 6‐8713 US 62 SAFETY $17,160,000 IMPROVE SAFETY BEGINNING AT ORCHARD AVENUE TO THE INTERSECTION AT KY 616. 21.5 10.834 ‐ 12.102 (12CCN)(14CCN)(16CCR) Pendleton6 IP20130086 US 27 SPOT $3,707,000 IMPROVE SAFETY AND MOBILITY ON US 27 AT 21.3 IMPROVEMENT THE KY 22 INTERSECTION. 10 ‐ 10.4 Boyle7 IP20150117 KY 34 CONGESTION $6,180,000 IMPROVE INTERSECTION AT KY 34 AND US 150 21.1 MANAGEMENT AND ADDRESS SAFETY, CONGESTION, AND LEVEL 13.19 ‐ 13.629 OF SERVICE FROM COWAN STREET TO US 150.

Wednesday, September 18, 2019 Page 40 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Franklin5 5‐97.50 US 60 MAJOR WIDENING $13,450,000 WIDEN US 60 FROM JUST EAST OF THE EXISTING BRIDGE OVER SOUTH BENSON CREEK (B97) TO 21.0 2.78 ‐ 3.913 JUST WEST OF VICKY WAY, WEST OF FRANKFORT, KY.(04CCN)(10CCR)

Montgomer 7 7‐411 KY 1991 MINOR WIDENING $5,070,000 UPGRADE HINKSTON PIKE IN MT. STERLING y FROM NEW MIDLAND TRAIL TO THE NEW 21.0 1.768 ‐ 2.8 INDUSTRIAL PARK ENTRANCE (INCLUDES EXTENSION OF INDUSTRIAL ACCESS ROAD TO HINKSTON PIKE). (12CCR)(18CCN)

Kenton6 6‐8916 CS 3000 NEW ROUTE $4,840,000 EXTEND HOUSTON ROAD TO CINEMA PROPERTY. (16CCN)(18CCN) 20.9 0 ‐ 0.59

Trimble5 IP20100047 US 421 RECONSTRUCTION $15,011,000 IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ALONG US 421 FROM 400 FEET 20.9 1 ‐ 2.4 NORTH OF MARTINI LANE TO 0.8 MILES SOUTH OF KY 316.

Bourbon7 IP20160243 KY 537 RECONSTRUCTION $16,807,000 MODERNIZE EXISTING ROADWAY GEOMETRIC TO IMPROVE SAFETY ON KY 537 FROM US 460 TO 20.3 0 ‐ 3.58 APPROXIMATELY 4000' EAST OF STEELE ROAD. Pendleton6 6‐8508.10 KY 22 DESIGN $67,360,000 RELOCATE KY22 FROM THE INTERSECTION OF 20.2 ENGINEERING FRYER ROAD AND KY 330 TO US27 (ALIGNMENT 8.704 ‐ 10.365 H FROM 1988 STUDY)

Harrison6 6‐8708 US 27 RECONSTRUCTION $5,980,000 RECONSTRUCT US 27 FROM MP 11.9 TO MP 12.4.(12CCN)(14CCR)(18CCN) 20.1 12.9 ‐ 13.4 Carroll6 IP20080304 KY 47 RELOCATION $89,974,000 RECONSTRUCT KY 47 FROM KY 184 TO US 42 20.0 2.038 ‐ 9.539

Wednesday, September 18, 2019 Page 41 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Gallatin6 IP20080317 US 42 RECONSTRUCTION $44,644,000 IMPROVE SAFETY AND RELIABILITY ON US 42 FROM MIDDLETON ROAD TO US 127. 19.9 8.888 ‐ 11.878 (ALTERNATE 2B 1999 LOCATION STUDY REPORT)

Franklin5 IP20190143 US 421 MINOR WIDENING $23,203,000 IMPROVE SAFETY AND LEVEL OF SERVICE ON US 421 (BALD KNOB HILL) FROM THE END OF 19.7 5.39 ‐ 7.3 EXISTING IMPROVEMENTS APPROX. 0.9 MILES NORTH OF US 127 TO HARVIELAND ROAD IN FRANKLIN COUNTY. MP 5.39 TO MP 7.30 5‐ 374.00 BREAKOUT PROJECT

Scott7 7‐8306 KY 620 MAJOR WIDENING $4,700,000 WIDEN/IMPROVE SHOULDERS ON KY‐620. (06CCN) (08CCR) 19.7 11.26 ‐ 12.63 Mercer7 7‐417 CS 1237 SPOT $2,280,000 IMPROVE SYSTEM MOBILITY ALONG MOBERLY 19.6 IMPROVEMENTS ROAD FROM KY 390 TO KY 1989 IN NORTHWEST 0 ‐ 0.341 HARRODSBURG. (12CCR) Anderson7 IP20120025 US 127 SPOT $453,000 CONSTRUCT A LEFT TURN LANE ON US 127 TO 19.5 IMPROVEMENT HAWTHORNE LANE IN ANDERSON COUNTY. 1.028 ‐ 1.128

Boyle7 IP20160272 US 150 RECONSTRUCTION $5,484,000 CONSTRUCT ROUNDABOUT ON US 150 (STANFORD AVE) AT E WALNUT ST. 19.4 13.85 ‐ 13.95

Woodford7 7‐8908 PF 9999 NEW ROUTE $19,260,000 EXTEND FALLING SPRINGS BLVD FROM TYRONE PIKE (US‐62) TO CLIFTON ROAD (KY‐1964). 19.3 ‐ (16CCN)

Shelby5 IP20060243 KY 53 BIKE/PED FACILITY $3,557,000 IMPROVE SAFETY AND MOBILITY FOR BICYCLISTS AND PEDESTRIANS ALONG KY 53 FROM US 60 TO 19.3 8.006 ‐ 9.607 WARRIORS WAY IN SHELBYVILLE.

Wednesday, September 18, 2019 Page 42 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Kenton6 IP20170083 CS 7091 RELOCATION $6,188,000 REALIGN ROYAL DRIVE FROM KY 371 (BUTTERMILK PIKE) TO GRACE AVE. 19.2 0 ‐ 0.413

Grant6 IP20080343 KY 1994 MAJOR WIDENING $10,399,000 IMPROVE SAFETY AND MOBILITY AND ADDRESS GEOMETRIC DEFICIENCIES ALONG KY 1994 19.1 3.411 ‐ 3.934 (SHERMAN MT ZION RD) FROM I‐75 TO US 25 TO ACCOMODATE NEW I‐75 INTERCHANGE.(6‐ 112.10 IN HIGHWAY PLAN) Owen6 IP20080365 KY 35 SPOT $39,672,000 IMPROVE SAFETY AND MOBILITY ALONG KY 35 19.1 IMPROVEMENT FROM US 127 TO THE GALLATIN COUNTY LINE. 0 ‐ 4.132

Jefferson5 IP20080234 CR 1001 H RECONSTRUCTION $15,043,000 RECONSTRUCT TUCKER STATION ROAD FROM REHL ROAD TO ELLINGSWORTH LANE. PROJECT 19.1 1.079 ‐ 3.54 DESIGN WILL EVALUATE 2 LANE ROAD (NO ADDED LANES) AND CONSIDER INTERSECTION IMPROVEMENTS (S. POPE LICK, REHL ROAD & ELLINGSWORTH LANE) AND BICYCLE AND PEDESTRIAN FACILITIES.

Woodford7 IP20080487 KY 1681 SAFETY‐HAZ‐ELM $2,525,000 INTERSECTION IMPROVEMENTS ON KY 1681 (OLD FRANKFORT PK) AT KY 1967 (PISGAH PK) 19.0 11 ‐ 11.2 AND CR 1013 (PAYNES DEPOT RD). Montgomer 7 IP20130094 KY 646 SPOT $1,952,000 RECONSTRUCT KY 646 FROM APPROXIMATELY 19.0 y IMPROVEMENT 0.09 MILES NORTH OF MCDONALD RD (CR 1237) 9.6 ‐ 9.7 TO APPROXIMATELY 0.19 MILES NORTH OF MCDONALD RD (CR 1237). Franklin5 IP20080168 US 60 SPOT $1,774,000 IMPROVE SAFETY AND ADDRESS GEOMETRIC 18.8 IMPROVEMENT DEFICIENCIES AT THE INTERSECTION OF US 60 0.4 ‐ 0.6 AND KY 151.

Wednesday, September 18, 2019 Page 43 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Harrison6 IP20080349 KY 32 RECONSTRUCTION $3,468,000 IMPROVE SAFETY, FREIGHT MOBILITY. AND GEOMETRIC DEFICIENCIES ALONG KY 32 FROM 18.7 8.05 ‐ 8.303 SEA BISCUIT WAY TO US 27 (CYNTHIANA BYPASS).

Harrison6 6‐8300 PF 9999 BYPASS $23,800,000 CONSTRUCT WEST US‐27 CYNTHIANA BYPASS: SECTION THREE FROM US‐27 NORTH TO US 62 18.5 ‐ EAST. (06CCN)

Gallatin6 IP20130081 KY 467 SAFETY‐HAZ‐ELM $6,590,000 IMPROVE EXISTING GRADE SEPARATED RAILROAD CROSSING OVER KY 467 TO CORRECT 18.4 3.3 ‐ 3.7 GEOMETRIC DEFICIENCIES AND RAISE ROAD OUT OF FLOOD PLAIN.

Spencer5 5‐8955 KY 44 SAFETY $1,980,000 IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ALONG KY‐44 NEAR DUTCHMAN 18.3 0.28 ‐ 0.44 CREEK ROAD. (16CCN) Pendleton6 IP20080377 US 27 SPOT $7,518,000 IMPROVE SAFETY AND MOBILITY ALONG US 27 18.2 IMPROVEMENT NORTHBOUND FROM THE HARRISON COUNTY 0 ‐ 0.8 LINE TO NEAR KY 1053 (RANKIN MILL ROAD).

Jessamine7 IP20000056 KY 39 RECONSTRUCTION $6,756,000 RECONSTRUCT INTERSECTION AT MAPLELEAF AND MILES RD TO IMPROVE SIGHT DISTANCE 18.1 8.836 ‐ 8.906 AND TO REALIGN MAPLELEAF WITH MILES RD

Kenton6 IP20080363 KY 3187 SAFETY‐HAZ‐ELM $6,372,000 IMPROVE SAFETY, MOBILITY, AND GEOMETRIC DEFICIENCIES ON KY 3187 (KYLES LANE) AT THE 18.1 0.7 ‐ 0.828 INTERSECTIONS OF FARRELL DR. AND MOUNT VERNON; INCLUDING MULTI‐MODAL NEEDS.

Trimble5 5‐8712 US 421 SAFETY $1,510,000 CONSTRUCT TURN LANES INTO TRIMBLE COUNTY HIGH SCHOOL. (12CCN) 17.7 7.68 ‐ 7.78

Scott7 IP20150468 KY 32 RECONSTRUCTION $24,545,000 RECONSTRUCT KY 32/I‐75 INTERCHANGE EXIT 136 (LOVE'S TRUCK STOP), REALIGNING PORTER 17.3 22.466 ‐ 23.003 RD WITH SADIEVILLE RD AT US25.

Wednesday, September 18, 2019 Page 44 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Bracken6 6‐8901 KY 2228 SAFETY $770,000 IMPROVE SAFETY ALONG KY 2228 FROM KY 9 TO KY 8. (16CCN) 17.2 0 ‐ 0.287

Owen6 IP20080364 US 127 RECONSTRUCTION $67,164,000 RECONSTRUCT US 127 FROM KY 35 TO THE GALLATIN COUNTY LINE 16.8 22.979 ‐ 28.488 Anderson7 IP20120027 KY 44 SPOT $1,096,000 CONSTRUCT LEFT TURN LANES ON KY 44 TO 16.4 IMPROVEMENT SCENIC GARDENS DRIVE & NAUTICAL WAY IN 11.726 ‐ 12.372 LAWRENCEBURG. Owen6 IP20110143 KY 22 SPOT $26,023,000 IMPROVE SAFETY, MOBILITY, AND GEOMETRICS 16.3 IMPROVEMENT ALONG KY 22 (GRATZ ROAD) FROM HIDE AWAY 6.373 ‐ 8.526 DRIVE TO KY 1670 (DAVIS LAKE ROAD).

Campbell6 IP20080293 KY 6335 RECONSTRUCTION $66,036,000 IMPROVE SAFETY & MOBILITY, AND ADDRESS GEOMETRIC DEFICIENCIES, SLOPE STABILIZATION 16.2 1.767 ‐ 4.636 AND MULTI‐MODES ALONG KY 6335 FROM TOWER HILL RD TO KY 445 (RIVER RD.).

Gallatin6 IP20080318 US 42 RECONSTRUCTION $24,490,000 RECONSTRUCT US 42 FROM KNOX LILLARD ROAD TO 5TH STREET. 16.0 4.619 ‐ 6.6 Henry5 IP20150049 KY 574 SPOT $6,263,000 ADDRESS SAFETY AND GEOMETRIC ISSUES ON KY 16.0 IMPROVEMENT 574 JUST EAST OF US 421 IN CAMPBELLSBURG 0.5 ‐ 3.4 TO TURNER STATION

Robertson6 6‐8711 KY 616 RECONSTRUCTION $3,190,000 IMPROVE CURVE ON KY 616 AND IMPROVE ROADWAY FROM THE NEW ROBERTSON 15.9 6.3 ‐ 6.514 COUNTY SCHOOL TO MT OLIVET. (12CCN)(14CCR)(18CCN)

Gallatin6 IP20080324 KY 467 MINOR WIDENING $28,984,000 IMPROVE SAFETY AND MOBILITY AND ADDRESS GEOMETRIC DEFICIENCIES ON KY 467 FROM US 15.9 7.666 ‐ 9.994 127 TO THE GRANT COUNTY LINE.

Wednesday, September 18, 2019 Page 45 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Gallatin6 6‐8909 US 42 SAFETY $10,850,000 IMPROVE SAFETY, CONGESTION, AND PEDESTRIAN AND FREIGHT MOBILITY ON US 42 15.8 7.281 ‐ 8.066 IN WARSAW FROM DAVIS DRIVE TO 0.4 MILES EAST OF DORMAN DRIVE. MP 7.281‐7.8. (16CCN) Montgomer 7 IP20130095 KY 11 SPOT $1,072,000 IMPROVE SAFETY AND SIGHT DISTANCE AT THE 15.6 y IMPROVEMENT INTERSECTION ON KY 11 AT KY 646 (KIDDVILLE 6.95 ‐ 7.15 RD) 0.373MI S OF TONKIN RD. Trimble5 IP20080270 KY 1226 SPOT $1,411,000 ADDRESS SAFETY ISSUES, SIGHT DISTANCE, 15.4 IMPROVEMENT SUBSTANDARD CURVES TO UPGRADE THE 2.41 ‐ 2.61 SAFETY OF THE ROADWAY ON KY 1226.

Madison7 IP20040023 KY 876 RECONSTRUCTION $5,763,000 RECONSTRUCT KY 876 FROM KY 595 TO 1.05MI E OF KY 595 (LOCATION OF FORMER ACRES OF 15.1 0 ‐ 1.05 LAND WINERY).

Henry5 5‐8821 KY 241 BIKE/PED FACIL $1,150,000 IMPROVE DRAINAGE AND INSTALL SIDEWALK ALONG KY 241 IN PLEASUREVILLE. (14CCN) 14.7 0.094 ‐ 1.147

Pendleton6 IP20080384 KY 22 RELOCATION $83,982,000 IMPROVE SAFETY, MOBILITY, CONNECTIVITY, AND GEOMETRICS ALONG KY 22 FROM KY 1054 14.4 1.934 ‐ 8.704 TO TURNER RIDGE ROAD. Spencer5 IP20190092 KY 155 SPOT $1,061,000 IMPROVE SAFETY ON KY 155 NEAR THE 14.4 IMPROVEMENT ENTRANCE TO SPENCER CHRISTIAN CHURCH. MP 0.2 ‐ 0.4 0.20 TO MP 0.40.

Madison7 IP20190155 PF 9999 NEW ROUTE $15,319,000 IMPROVED ACCESS TO CENTRAL KENTUCKY REGIONAL AIRPORT FROM PROPOSED KY 52. 14.0 ‐

Grant6 IP20080344 KY 2363 RECONSTRUCTION $9,814,000 IMPROVE DRAINAGE, PEDESTRIAN SAFETY, AND MOBILITY ALONG KY 2363 (VIOLET RD) FROM KY 13.9 0 ‐ 0.564 491 (LEBANON RD) TO EADS RD.

Wednesday, September 18, 2019 Page 46 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Woodford7 IP20120044 US 62 SPOT $2,591,000 IMPROVE DRAINING IN VERTICAL CURVE ON US 13.9 IMPROVEMENT 62 AROUND THE RAILROAD OVERPASS NEAR 16.1 ‐ 16.2 MIDWAY. Trimble5 IP20080269 KY 754 SPOT $1,429,000 ADDRESS SAFETY ISSUES, SIGHT DISTANCE, A 13.3 IMPROVEMENT SUBSTANDARD CURVE TO UPGRADE THE 1.42 ‐ 1.62 ROADWAY OF KY 754. Fayette7 IP20160093 US 60 TRANSPORTATION $1,082,000 REGIONAL CORRIDOR FEASIBILITY STUDY TO 13.2 STUDY EVALUATE EAST‐WEST CONNECTIVITY BETWEEN 0 ‐ 4.5 US 127 AND I‐75. STUDY REGION INCLUDES THE FOLLOWING COUNTIES: ANDERSON, FAYETTE, FRANKLIN, JESSAMINE, MERCER, SCOTT & WOODFORD.

Carroll6 IP20110063 KY 36 SAFETY‐HAZ‐ELM $5,800,000 IMPROVE SAFETY AND MOBILITY AND ADDRESS GEOMETRIC DEFICIENCIES AT THE 13.0 9.479 ‐ 10.445 INTERSECTIONS OF KY 36 & COMMANCHE TRAIL AND KY 36 & BOONE ROAD. Campbell6 IP20190072 KY 9 SPOT $4,664,000 IMPROVE EGRESS SAFETY ALONG KY 9 IN THE 13.0 IMPROVEMENT VICINITY OF INTERSECTIONS OF SHADOW LAKE, 15.1 ‐ 16.1 GLENRIDGE, KY 915. Shelby5 IP20110224 KY 53 SPOT $4,092,000 IMPROVE SAFETY AND ACCESS AT THE KY53/KY 12.0 IMPROVEMENT 322 INTERSECTION. 16.178 ‐ 16.4

Oldham5 IP20150467 KY 524 LANDSLIDE REPAIR $6,903,000 LANDSLIDE REPAIR ON WESTPORT ROAD (KY‐ 524) FROM JCT. US‐42 WEST, NORTH 1.0 MILE. 11.9 0 ‐ 1 (2002BOPC)(NOT REQUIRED) Owen6 IP20110141 KY 22 SPOT $23,815,000 IMPROVE SAFETY, MOBILITY, GEOMETRICS 11.6 IMPROVEMENT ALONG KY 22 (GRATZ ROAD) FROM KY 355 0.31 ‐ 2.3 NORTH TO MILEPOINT 2.3.

Wednesday, September 18, 2019 Page 47 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Bracken6 IP20190067 KY 9 SPOT $270,000 STUDY KY 9 (THE AA) IN CAMPBELL, PENDLETON, 11.5 IMPROVEMENT BRACKEN, MASON, LEWIS, GREENUP AND 0 ‐ 19.857 CARTER COUNTIES TO IMPROVE SAFETY. Owen6 IP20150053 KY 22 SPOT $21,020,000 IMPROVE SAFETY, MOBILITY, AND GEOMETRICS 11.5 IMPROVEMENT ALONG KY 22 (GRATZ ROAD) FROM MILEPOINT 2.3 ‐ 3.978 2.3 TO MORGAN ROAD.

Madison7 IP20190157 PF 9999 NEW ROUTE $9,357,000 EXTEND FARRISTOWN INDUSTRIAL DRIVE AT MENELAUS RD (KY 1983) TO THE EAST TO 11.2 ‐ CONNECT TO US 25.

Gallatin6 6‐202 US 42 LANDSLIDE REPAIR $18,000,000 RECONSTRUCT US‐42 ALONG THE OHIO RIVER TO CORRECT LANDSLIDE PROBLEMS BETWEEN 11.0 3.325 ‐ 4.636 MARKLAND DAM AND CRAIGS CREEK.(U‐ 04DEOB)(10CCR)(14CCR)

Madison7 IP20150128 PF 9999 NEW ROUTE $5,416,000 NEW ROAD TO EXTEND FROM MENELAUS RD (KY 1983) AT EXISTING MILEPOINT 2.851 TO MAYDE 10.5 ‐ RD IN BEREA. Carroll6 IP20080309 KY 389 SPOT $1,843,000 IMPROVE SAFETY AND ADDRESS GEOMETRIC 10.0 IMPROVEMENT DEFICIENCIES AT THE INTERSECTION OF KY 389 4.75 ‐ 4.95 AND GREENS BOTTOM ROAD.

Spencer5 IP20130144 KY 44 RECONSTRUCTION $419,000 ADDRESS GEOMETRIC DEFICIENCIES ALONG KY 44 NEAR BREASHERS CREEK ROAD IN 9.9 10.217 ‐ 10.315 TAYLORSVILLE. Carroll6 IP20080310 KY 467 DRAINAGE $3,342,000 IMPROVE DRAINAGE AND PEDESTRIAN SAFETY 8.8 IMPROVEMENT AND MOBILITY ALONG KY 467 FROM OLD US 227 0.322 ‐ 0.702 SOUTH ROAD TO JACKSON RIDGE ROAD IN WORTHVILLE. Boone6 IP20190060 KY 237 RELOCATION $7,665,000 IMPROVE ACCESS TO KY 237 FOR LITTON LANE. 8.2 0.14 ‐ 0.26

Wednesday, September 18, 2019 Page 48 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Kenton6 IP20170084 KY 3716 RECONSTRUCTION $32,875,000 RECONSTRUCT WAYMAN BRANCH ROAD FROM KY 1501 (HANDS PIKE) TO KY 16 (PRIDE 7.1 0 ‐ 1.5 PARKWAY) TO IMPROVE SAFETY AND MOBILITY.

Henry5 5‐8822 KY 389 SCOPING STUDY $3,500,000 SCOPING/PLANNING STUDY FOR KY‐389 IN HENRY COUNTY FROM KY‐202 (DRENNON ROAD) 6.9 13.16 ‐ 21.791 NORTH TO HENRY COUNTY/CARROLL COUNTY LINE. (14CCN) Clark7 7‐8632 PF 9999 DESIGN $5,540,000 DESIGN ENGINEERING FOR 7TH STREET 4.8 ENGINEERING RELOCATION. (10CCN) ‐

Grant6 6‐8716 CR 1142 AM‐BRIDGE $15,310,000 ADDRESS DEFICIENCIES OF BRIDGE ON NORTH END OF DELANEY ROAD 0.1 MILE NORTH OF THE 4.2 0 ‐ 0.07 JUNCTION WITH US 25. 041C00016N (12CCN)

Wednesday, September 18, 2019 Page 49 of 49