All Regional Projects Report
Total Page:16
File Type:pdf, Size:1020Kb
North Region Scores SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100 Jefferson5 5‐555 KY 1747 CONGESTION $4,260,000 REDUCE CONGESTION AND IMPROVE SAFETY 89.0 MITIGTN ALONG KY‐1747 (HURSTBOURNE PARKWAY) 10.5 ‐ 11.995 FROM STONY BROOK DRIVE TO I‐64. Fayette7 7‐438 KY 4 MAJOR WIDENING $22,300,000 REDUCE CONGESTION ON KY‐4 (NEW CIRCLE RD) FROM TRADE CENTER DR TO WOODHILL DR. 88.0 13.195 ‐ 14.508 Jessamine7 7‐430 US 27 SAFETY $54,290,000 ACCESS MANAGEMENT ON NICHOLASVILLE ROAD BETWEEN NICHOLASVILLE AND MAN‐O‐ 86.5 10.87 ‐ 15.278 WAR BLVD. (14CCR) Fayette7 IP20000036 US 60 MINOR WIDENING $18,305,000 MODERNIZE ROADWAY, IMPROVE MULTI‐ MOBILITY, AND INCLUDE SAFETY AND CAPACITY 85.2 5 ‐ 7.53 IMPROVEMENTS AT INTERSECTIONS ON US 60 (VERSAILLES ROAD) FROM VILEY ROAD TO WEST END OF NORFOLK SOUTHERN RAILROAD BRIDGE. Jefferson5 5‐80001 US 60 MAJOR WIDENING $4,280,000 WIDEN US‐60 TO 6 LANES FROM OLD SHELBYVILLE RD. TO NORTH ENGLISH STATION 84.9 11.093 ‐ 11.684 RD.(18CCN) Fayette7 IP20080429 KY 4 MAJOR WIDENING $28,084,000 NEW CIRCLE RD. (KY 4): FROM BOARDWALK TO NORTH LIMESTONE STREET ‐ IMPROVE SAFETY 84.2 10.015 ‐ 10.9 AND ACCESS MANAGEMENT MEASURES. Boone6 IP20190064 KY 18 CONGESTION $58,688,000 PAIRED GRADE‐SEPARATED INTERSECTIONS 81.9 MANAGEMENT ALONG KY 18 AT KY 842 AND MALL ROAD. 14.5 ‐ 15.1 Note: Projects may extend beyond county shown. Wednesday, September 18, 2019 Page 1 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100 Fayette7 7‐8902 KY 1927 MAJOR WIDENING $21,890,000 IMPROVE LIBERTY ROAD FROM GRAFTONS MILL LANE TO NEW CIRCLE ROAD AND IMPROVE 81.9 0 ‐ 1.175 INTERSECTION WITH NEW CIRCLE ROAD. (16CCN)(18CCR) Woodford7 7‐117 US 60 MAJOR WIDENING $15,330,000 IMPROVE US 60 (VERSAILLES ROAD) FROM THE BLUEGRASS PARKWAY/HUNTERTOWN PIKE TO 80.6 11.238 ‐ 12.612 PISGAH PIKE. (18CCR) Boone6 6‐446 PF 9999 NEW ROUTE $22,680,000 PROVIDE EAST‐WEST CONNECTIVITY AND IMPROVED MOBILITY FROM KY‐237 (PLEASANT 80.0 ‐ VALLEY ROAD) THRU KY‐842 (HOPEFUL CHURCH ROAD) TO MALL ROAD/I‐75 INTERCHANGE. (18CCR) Kenton6 6‐450 KY 1303 CONGESTION $28,780,000 IMPROVE SAFETY AND REDUCE CONGESTION 79.0 MITIGTN ALONG KY‐1303 (TURKEYFOOT RD) FROM 5.01 ‐ 6.248 DUDLEY RD TO US‐25 (DIXIE HWY). (18CCR) Woodford7 7‐8905 US 60 CONGESTION $4,030,000 ACCESS MANAGEMENT IMPROVEMENTS ON US 77.7 MITIGTN 60 FROM LEXINGTON ROAD AT WOODFORD 9.38 ‐ 9.7 FEED TO MARSAILLES DRIVE (MP 9.38 TO MP 9.70).(16CCN)(18CCN) Jefferson5 5‐8953 KY 1747 SAFETY $4,490,000 IMPROVE THE HURSTBOURNE PARKWAY (KY 1747) AT SHELBYVILLE ROAD (US 60) 77.3 13.4 ‐ 13.6 INTERSECTION TO INCREASE CAPACITY, REDUCE DELAYS, AND IMPROVE SAFETY.(SEE 5‐344.02) (16CCN) Fayette7 7‐8901 PF 9999 NEW ROUTE $10,600,000 EXTEND CITATION BLVD. (16CCN) 76.3 ‐ Jefferson5 5‐80002 PF 9999 NEW $60,650,000 NEW INTERCHANGE ON I‐64E EAST OF THE GENE 74.5 INTERCHANGE SNYDER FREEWAY(18CCN) ‐ Wednesday, September 18, 2019 Page 2 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100 Shelby5 5‐8958 KY 55 X RECONSTRUCTION $13,110,000 WIDEN KY 55X FROM TWO TO FIVE LANES FROM US 60 (MP 0.0) NORTH TO KY 43 (MP 74.3 0 ‐ 1.354 1.354).(16CCN) Boone6 6‐80003 US 42 RECONSTRUCTION $8,550,000 INCREASE CAPACITY AND REDUCE CONGESTION ON US 42 AT I 71/75(18CCN) 73.9 13.812 ‐ 14.252 Kenton6 6‐449 KY 17 CONGESTION $4,370,000 IMPROVE SAFETY AND REDUCE CONGESTION ON 73.8 MITIGTN KY‐17 AT THE I‐275 INTERCHANGE. (18CCR) 18.15 ‐ 18.65 Bullitt5 IP20190078 I 65 RECONSTRUCTION $8,448,000 IMPROVE SAFETY AND REDUCE CONGESTION AT THE I‐65/ KY‐1526 (BROOKS HILL ROAD ‐ JOHN 73.7 121.2 ‐ 122 HARPER HIGHWAY) INTERCHANGE INCLUDING IMPROVEMENTS TO KY‐1526 FROM KY‐1020 (CORAL RIDGE ROAD) TO KY‐1450 (BLUE LICK ROAD). I‐65 MP 121.20 TO MP 122.00 .DESIGN MAY CONSIDER Jefferson5 5‐122 KY 1065 SAFETY $6,700,000 MAJOR REVISION OF THE INTERSECTION LOCATED AT THE OUTER LOOP, FEGENBUSH 73.7 9.944 ‐ 10.009 LANE, AND BEULAH CHURCH ROAD. TURN LANE TO BE COMPLETED BY TRANSPORTATION CABINET PER AGREEMENT. (04CCN)(08CCR)(10CCR)(12CCR) Fayette7 7‐412 US 27 RECONSTRUCTION $16,900,000 REPLACE L&N RAILROAD BRIDGE OVERPASS (MP 8.378), IMPROVE DRAINAGE AND TYPICAL 73.6 8.565 ‐ 8.691 SECTION ON US 27 (NORTH BROADWAY)(12CCR)(14CCR)(16CCR)(18CCN) Oldham5 5‐234 KY 393 MAJOR WIDENING $12,470,000 KY‐393 RECONSTRUCT FROM 140FEET SOUTH OF RAILROAD CROSSING (CSX) EXTENDING 72.8 5.13 ‐ 5.177 NORTHWEST TOWARDS KY 146 ENDING AT STATION 12+00 (DESIGN UNDER 5‐230.00). (CONSTRUCTION SEQ.#2) Wednesday, September 18, 2019 Page 3 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100 Boone6 IP20190066 I 75 RECONSTRUCTION $25,180,000 RECONSTRUCT I‐75 INTERCHANGE AT KY 1017 (TURFWAY ROAD). 72.7 182.2 ‐ 183.312 Bullitt5 5‐150.50 KY 44 RECONSTRUCTION $4,690,000 SECTION 5 ‐ FROM US‐31EX TO US‐31E BYPASS. (2008BOPC). 72.5 22.8 ‐ 23.25 Jessamine7 7‐87.30 PF 9999 NEW ROUTE $52,010,000 EAST NICHOLASVILLE BYPASS SECTION IB FROM 125 FEET NORTH OF KY 169 TO END OF PROJECT 71.8 ‐ AT TIE‐IN TO WEST BYPASS. THIS INCLUDES THE INTERCHANGE AT US 27 NORTH OF NICHOLASVILLE. (14CCR) Jessamine7 7‐414 / 7‐ KY 1980 SAFETY $27,180,000 IMPROVE ROADWAY GEOMETRICS, TYPICAL 414.10 SECTION, AND ROADWAY HAZARDS ON KY 1980 71.6 0 ‐ 3.205 (BRANNON RD) FROM US 68 (HARRODSBURG RD) TO US 27 (NICHOLASVILLE RD)(12CCR)(18CCN) Campbell6 6‐8105.06 PF 9999 NEW ROUTE $17,070,000 TRANSPORTATION IMPROVMENTS TO AA‐I‐275; CONSTRUCT A NEW CONNECTOR RD FROM THE 71.2 ‐ AA HWY (KY 9) TO THE END OF NEW CONSTRUCTION JUST SOUTH OF JOHN'S HILL RD (KY 2345). (SECTION 2) (2005HPP‐KY166) (SEE 6‐ 8105.00 FOR "KYD" COMPONENT) Jefferson5 5‐367.20 PF 9999 NEW ROUTE $20,890,000 EXTENSION OF OLD HENRY ROAD EAST TO ASH AVENUE (KY362). (12CCR)(18CCN) 70.8 ‐ Jefferson5 5‐344.01 KY 1747 RECONSTRUCTION $5,910,000 WIDEN SOUTHBOUND HURSTBOURNE LANE TO 3 LANES FROM LINN STATION RD (CS‐1004H) TO 70.3 12.289 ‐ 13.632 EDEN AVE (CS‐1660H). (06CCR)(03KYD)(2006BOPP)(SEE 5‐344.02 FOR KYD C PHASE)(14CCR)(XCHNG UNDER 5‐8953) Wednesday, September 18, 2019 Page 4 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100 Bullitt5 5‐8509 KY 245 MINOR WIDENING $13,140,000 WIDEN KY‐245 FROM BERNHEIM FOREST TO THE COMMUNITY COLLEGE. 69.8 4.425 ‐ 6.415 (08CCN)(10CCR)(14CCR)(16CCR) Scott7 IP20080477 KY 2906 RECONSTRUCTION $11,892,000 IMPROVE CAPACITY AND ACCESS ON KY 2906 (CONNECTOR ROAD) FROM US 460 (PARIS PIKE) 69.6 0 ‐ 1.118 TO US 62 (CHERRY BLOSSOM WAY). Boone6 6‐444 KY 236 MAJOR WIDENING $26,500,000 IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY‐236 (DONALDSON ROAD) FROM KY‐ 69.4 0 ‐ 1.594 842 (HOUSTON ROAD) TO KY‐3076 (MINEOLA PIKE). (18CCR)(DESIGN INCLUDES ITEM # 6‐445) Boone6 IP20190063 I 75 RECONSTRUCTION $40,516,000 RECONSTRUCT I‐75 INTERCHANGE AT KY 18. 69.2 180.6 ‐ 181.85 Jefferson5 5‐8203 KY 1819 RECONSTRUCTION $3,280,000 RECONSTRUCT BILLTOWN ROAD FROM NORTH OF COLONNADES PLACE TO SOUTH OF EASUM 68.4 6.9 ‐ 8.1 ROAD. (04CCN)(06CCN)(08CCR)(10CCR)(12CCR) Jefferson5 IP20080208 KY 907 CONGESTION $10,690,000 IMPROVE SAFETY AND REDUCE CONGESTION ON 68.1 MANAGEMENT KY 907 (SOUTHSIDE DRIVE) FROM KY 1865 (NEW 6.31 ‐ 7.036 CUT ROAD) TO KY 1020 (NATIONAL TURNPIKE). THE DESIGN WILL EVALUATE 3‐LANE WIDENING OR OTHER LOWER IMPACT SOLUTIONS AND INCLUDE CONSIDERATION OF BICYCLE & PEDESTRIAN FACILI Jefferson5 5‐8908 KY 155 MINOR WIDENING $19,850,000 WIDEN TAYLORSVILLE ROAD TO 3 LANES FROM I‐ 265 TO KY‐148. (18CCN) 68.0 4.4 ‐ 5.75 Fayette7 7‐593.03 / 7‐ PF 9999 NEW ROUTE $34,480,000 NEWTOWN PIKE EXTENSION FROM WEST MAIN 593.30 ST. TO SOUTH LIMESTONE ST. IN LEXINGTON. 67.9 ‐ (ADDITIONAL FUNDING FOR DESIGN FOR CLT)(05KYD‐KY095) Wednesday, September 18, 2019 Page 5 of 49 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100 Jessamine7 7‐87.20 PF 9999 NEW ROUTE $18,280,000 EAST NICHOLASVILLE BYPASS SECTION IA: IMPROVE CONNECTIVITY AND MOBILITY EAST 67.3 ‐ AROUND NICHOLASVILLE FROM SOUTH OF KY‐39 TO NORTH OF KY‐169. Kenton6 6‐162.40 KY 536 RECONSTRUCTION $39,530,000 IMPROVE SAFETY AND REDUCE CONGESTION ON KY‐536 FROM WILLIAMSWOOD ROAD/CALVARY 66.8 2.542 ‐ 4.062 DRIVE TO KY‐17 (PRIORITY SECTION 3). DESIGN PHASE UNDER PARENT NO. 6‐162.01. (2012BOP)(18CCR) Fayette7 7‐122.10 US 25 MAJOR WIDENING $45,140,000 RECONSTRUCT/WIDEN US‐25 FROM SPURR ROAD SOUTH OF I‐75 TO 1400 FEET SOUTH OF 66.6 18.264 ‐ 21.415 IRONWORKS ROAD. (06CCN)(08CCR)(10CCR)(12CCR)(16CCR) Jefferson5 5‐808 KY 155 DESIGN $5,860,000 SAFETY PROJECT FOR RECONSTRUCTION OF 66.4 ENGINEERING TAYLORSVILLE ROAD AND SOUTH POPE LICK 4.4 ‐ 5 ROAD INTERSECTION AND BRIDGE OVER POPE LICK CREEK.