AN ACT Relating to Road Projects. Be It Resolved by the General Assembly
UNOFFICIAL COPY AS OF 04/16/16 16 REG. SESS. 16 RS HJR 160/EN AN ACT relating to road projects. Be it resolved by the General Assembly of the Commonwealth of Kentucky: Section 1. This Joint Resolution in conjunction with 2016 Regular Session HB 129 shall constitute the Six-Year Road Plan. The last four years of the Six-Year Road Plan are as follows: Page 1 of 1 HJR016020.100 - 2000 - 8564 Engrossed 2018-2022 HIGHWAY CONSTRUCTION PLAN County Item No. Route Description Phase Fund FY 2019 FY 2020 FY 2021 FY 2022 ADAIR 1068 KY-704 REPLACE BRIDGE ON KY 704 (11.909) OVER PL UNNAMED STREAM (SR=53.5) (001B00078N) DN BRX 250,000 RW BRX 150,000 UT BRX 50,000 CN BRX 500,000 Project Cost: 0 250,000 200,000 500,000 Total for ADAIR county PL DN 250,000 RW 150,000 UT 50,000 CN 500,000 Total Amounts: 0 250,000 200,000 500,000 ALLEN 1088 CR-1328 REPLACE BRIDGE OVER BAYS FORK ON PL MITCHELL WEAVER ROAD (CR 1328) 2.1 MI W DN BRZ 400,000 OF KY 1332 (002C00063N)(SR=31.5) RW BRZ 150,000 UT BRZ 75,000 CN BRZ 1,655,000 Project Cost: 0 400,000 1,880,000 0 ALLEN 8802 KY-100 WIDENING OF KY 100 (FRANKLIN ROAD) TO 3 PL LANES WITH URBAN SECTION FROM OLIVER DN STREET TO US 31E TO INCREASE RW CAPACITY/SAFETY. MP 11.800-12.700 (14CCN) UT SP 670,000 CN SP 3,800,000 Project Cost: 670,000 3,800,000 0 0 ALLEN 8902 KY-98 RECONSTRUCT 1.0 MILE EAST OF BRIDGE OVER PL BARREN RIVER LAKE TO CORRECT VERTICAL DN AND HORIZONTAL DEFICIENCIES.
[Show full text]