<<

TRANS-CASPIAN INTERNATIONAL TRANSPORT ROTE (MIDDLE CORRIDOR): ROLE AND CURRENT CONDITION

Mr. Vahid Aliyev, Deputy General Director

CJSC « INTERNATIONAL SEA TRADE PORT»

Katowice (Poland), May 2018 TRANS-CASPIAN INTERNATIONAL TRANSPORT ROUTE

Results of coordinated work of all Members of Coordination Committee and IA “TITR”

Infrastructure Large Permanent Growing Container and its constant geography of improvement of competitiveness service modernization presence the of the route "Nomad effectiveness Express" TRANS-CASPIAN INTERNATIONAL TRANSPORT ROUTE

DEEP-SEA ROUTE

Lianyungang (China) – Suez (Egypt) – () 16 000 km 30 days

TRANS-CASPIAN ROUTE

Lianyungang (China) – Aktau/Kuryk (Kazakhstan) – – Istanbul (Turkey) 9 400 km 13-14 days

Indicative rate Route per 40-feet container Duisburg (block train) ASTANA Lianyungang – Istanbul $ 6 300 Wuhan – Istanbul $ 5 900 Budapest Dostyk Chengdu - Istanbul $ 5 800 Constanta Ilichevsk Aktau Mointy * Not including provision of containers and expenses in departure and arrival SEZ Khorgos – Shymkent Eastern Gate Khorgos points Kuryk Sofia Poti Altynkol Urumqi Istanbul Kars Baku Tashkent Xian Lianyungang Zhengzhou

China – Caucasus –Turkey Launch of "Nomad Express" test trains: Lanzhou (thousand TEU) 28.07.2015 Shihezi (China) - Kishly (Azerbaijan) Chengdu Wuhan Hefei 300 29.11.2015 Lianyungang (China) - Istanbul (Turkey) Chongqing 180 Ningbo 15.01.2016 Ilyichevsk (Ukraine) - Dostyk Yiwu 15 Guanzhou 0,2 (Kazakhstan) 0,1 Kunming Shenzhen Putian 2016 2017 2018 2019 2020 08.06.2017 Lianyungang (China) - Istanbul (Turkey) Hong Kong PROACTIVE WORK WITH CHINA

Сooperation with 17 provinces in China LOGISTIC INFRASTRUCTURE ON THE TRANSCASPIAN ROUTE

DRY PORT ON THE TERRITORY OF THE SPECIAL ECONOMIC LIANYUNGANG LOGISTIC TERMINAL ZONE «KHORGOS – EASTERN GATES» TOTAL AREA 129,8 HA TOTAL AREA 21,6 HA 2 warehouses with area of 5 thousand m², including 2 freezing - Container yard – 13 ha rooms with area 700 m² KAZAKHSTAN Capacity: 540 000 TEU/year, 1 500 TEU/day - Open space warehouses for dry cargo – 6 ha Simultaneous storage: 18 000 TEU - Indoor storage - 1,2 ha (12 thousand sq. m2)

CHINA Dry Port on KAZ-CN border

(24,5%) (51%) (24,5%) (51%) (49%)

Container handling volume (thousand TEUs)

540

87 185 2016 2017 2020

Creation of logistics and trading platforms in the port of Lianyungang and SEZ «Khorgos – Eastern Gates» will contribute to the development of transportation towards Kazakhstan, Central Asia, the Persian Gulf countries, Turkey and Europe. LOGISTIC INFRASTRUCTURE ON THE ROUTE – CASPIAN SEA

Area: 40 hectares By 2020, the AKTAU International Sea Port The annual capacity 4,1 mln. Tons capacity of Kazakhstan's Deadline for completion - 2017 marine infrastructure in the Caspian sea Kuryk will be Ferry Sea Port increased Area: 66 hectares to 25,6 million

The annual capacity 20 mln. tons tons per year

Poland Izov Katovice Ukraine KAZAKHSTAN Khorgos Gateway Almaty Urumqi Ahalkalaki Istanbul

Izmir Ayat TURKEY Kars Lianyungang

CHINA

EXPANDING KAZAKHSTANI DRY CARGO FLEET

20 12 16 4 4

2016 2017 2019 2020 2022 LOGISTIC INFRASTRUCTURE ON THE ROUTE – CASPIAN SEA6

Fleet and Operations ACSC’s fleet and operational structure

OFFSHORE SUPPORT MERCHANT FLEET SHIP REPAIR EDUCATION FLEET

52 vessels 210 vessels 2 ship repair yards Marine Academy and Training Center LOGISTIC INFRASTRUCTURE ON THE ROUTE – CASPIAN SEA Fleet renewal Purchased and built vessels (2014-2016) AHTSV: General cargo vessels:  “Lankaran” (2014)  “Uzeyir Hajibayli” (2014)  “Mardakan” (2017)  “Natavan” (2014)  “Shuvalan” (2017)  “Rasul Rza” (2016)  “Shair Sabir” (2016) Tanker:  “Shair Vaqif” (2016)  “Nasimi” (2014)  “Huseyn Javid” (2016)  “Ganja” (2016)  “General Aslanov” (2016)  “Gafur Mammadov” (2016) Port tug boat:  “SOCAR-1” (2014) PSV: Passenger vessel:  “Sumgayit” (2014)  “Ufug” (2016)  “Gubadli” (2017)  “Zafar” (2016)  “Turan” (2016)

AHTSV «Lankaran» «Nasimi» tanker «Uzeyir Hajibayli» type general cargo vessels

PSV «Sumgayit» «SOCAR-1» port tugboat «Ufug» type passenger vessels LOGISTIC INFRASTRUCTURE ON THE ROUTE – CASPIAN SEA Fleet renewal Recently ordered vessels 2 new generation unique Ro-Pax/Ferry vessels

These vessels will be ready for exploitation in the of 2019.

Capacity:

• 56 tank wagons (12.0 m) • 46 semi-wagons (13.9 m) • 44 cargo wagons (14.7 m) • 50 trucks (TIR) • 100 passengers

2 new generation tankers

These vessels will be ready for exploitation in the end of 2019.

Loading capacity:

• 8,000 tons of liquid cargo LOGISTIC INFRASTRUCTURE ON THE ROUTE – CASPIAN SEA Infrastructure Projects RAILWAY INFRASTRUCTURE PROJECTS OF

• World Bank / Azerbaijan Railways CJSC - 806.7 mln USD • Rail Trade and Transport Facilitation Project for improvement of East-West transport corridor of Azerbaijan which includes projection, supply and installation of energy system and relevant communication system, IFRS financial management system, preparation of business plan etc. • Bank syndicates of Czech Republic (HSBC plc Praha, Societe General, Czech Commerce and Export Bank) - 600 mln USD • Capial repair of 600 km railways from Baku to Boyuk Kesik and supply of technical and material base. • Societe General, BNP Paribas and HSBC France - 276.8 mln USD • purchased 50 locomotive operating with alternating current • French Development Agency (Agence Française de Développement, AFD) – 120 mln USD • Construction of depo for locomotive park. • Construction of Baku-Tbilisi-Kars regional railway link connecting Turkey, Georgia and Azerbaijan – total length 820 km. • Improve direct railways transiting though Azerbaijan to Turkey and Europe • Increase transit potential of Azerbaijan Railways by attracting import, export and transit cargo volumes of Turkey with Central Asia and China • New transport product linking Mediterranean Sea regions to Railways of Azerbaijan, Central Asia and China via Mersin port LOGISTIC INFRASTRUCTURE ON THE TRANSCASPIAN ROUTE

Ongoing and completed Projects

track modernization project Construction carried out by China Railway 23RD construction Bureau 46% completed Completion year: 2019 Increasing capacity from 27.5M tons to 100M tons Speed increase from 60 to 80km/h for freight

• Deep Sea Port project Anaklia

Completion Year 2021 Throughput capacity: 100M tons Berth can accommodate Panamax sized container ships

• Baku-Tbilisi-Kars (BTK)

BTK railway length: 826 km Freight capacity: 6.5M tons Passengers capacity: 1M LOGISTIC INFRASTRUCTURE ON THE TRANSCASPIAN ROUTE

o Oil -15 mln tons/year Terminals & o Dry cargo - 2 mln tons/year capacity o Container – 100 thsd. TEU o Passenger and Ferry o Oil - 85 hectares o Dry cargo - 197,852 м2 Territory o Container – developed territory 33 410 m², with the possibility to increase up to 70 000 m² Number of berths o 11 + CBM

Total outloading o Up to 18 mln.tons/year capacity

Statistics of cargo turnover in Container terminal 2010-2017 Containers (TEU) 76 025 80 000 72 126 72 123 70 000 61 980 60 000 54 695 55 731 50 000 45 442 40 000 30 000 20 000 16 318 10 000 0 2010 2011 2012 2013 2014 2015 2016 2017 BAKU-TBILISI-KARS NEW RAILWAY LINE

Goods delivered to Turkey using the Baku-Tbilisi-Kars new railway line in 13-14 days NETWORK OF PARTNERS AND CLIENTS