Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion MEADOW ST. BRIDGE OVER RIGHT FORK COAL ANDERSON Local Bridges 0A460 0.010 $425,000 CREEK ANDERSON State Bridges SR-61 STATE HWY. 61 BRIDGE OVER BRUSHY CREEK 0.010 $2,234,000 US-25W (SR- ANDERSON State Bridges US-HWY. 25W BRIDGE OVER BULL RUN CREEK 0.010 $4,802,000 9) ANDERSON Local Bridges 4365 BRIAR CLIFF AVE. BRIDGE OVER BRANCH 0.010 $254,000

ANDERSON Local Bridges 0A276 OLD STATE CIR. BRIDGE OVER BULL RUN CREEK 0.000 $2,419,000 FROM SR-9/US-25W (CLINTON HWY) TO SR-162 ANDERSON Rural Access SR-170 6.180 $88,320,000 (OAK RIDGE HIGHWAY) ITS INSTRUMENTATION AT SR-61 (ANDERSONVILLE ANDERSON Technology I-75 0.100 $500,000 HWY., EXIT 122) HORSE MOUNTAIN RD. BRIDGE OVER PANNELL BEDFORD Local Bridges 0A468 0.010 $490,000 CREEK ROWESVILLE CHURCH RD. BRIDGE OVER BEDFORD Local Bridges 0A233 0.010 $640,000 SHIPPMAN CREEK BEDFORD Local Bridges 0A170 KELLERTOWN RD. BRIDGE OVER STRAIGHT CREEK 0.010 $235,000 NORMANDY TO TULLAHOMA RD. BRIDGE OVER BEDFORD State Bridges SR-269 0.010 $121,000 CARR BRANCH US-41A (SR- BEDFORD State Bridges US-41A BRIDGE OVER HOOK CREEK 0.010 $2,287,000 16) WALKING HORSE PKWY. BRIDGE OVER SUGAR BEDFORD State Bridges SR-64 0.010 $3,176,000 CREEK ROY MOORE RD. BRIDGE OVER NORTH FORK BEDFORD Local Bridges 0A048 0.010 $280,000 CREEK BEDFORD Local Bridges 0A122 GREGORY MILL RD. BRIDGE OVER FALL CREEK 0.010 $1,372,000

BEDFORD Local Bridges 0A664 OLD HWY. 64 BRIDGE OVER STOKES BRANCH 0.010 $1,003,000

Data current as of 12/5/2016 1 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion FOSTERVILLE RD. BRIDGE OVER BELL BUCKLE BEDFORD Local Bridges 0A390 0.010 $175,000 CREEK (SHELBYVILLE BYPASS) FROM US-231 (SR-10) TO BEDFORD Rural Access SR-437 3.080 $78,400,000 US-41A (SR-16) US-41A (SR- (MADISON ST.) FROM SR-64 EAST OF SHELBYVILLE BEDFORD Rural Access 2.160 $24,700,000 16) TO JENKINS ROAD BENTON Local Bridges 0A197 FRAZIER ST. BRIDGE OVER CHARLIE CREEK 0.010 $239,000 SULPHUR CREEK RD. BRIDGE OVER SULPHUR BENTON Local Bridges 1753 0.010 $89,000 CREEK BENTON State Bridges SR-147 DANVILLE RD. BRIDGE OVER DRY CREEK 0.010 $218,000 LOWER SANDY RD. BRIDGE OVER RAMBLE CREEK, BENTON Local Bridges 911 0.000 $1,883,751 LM 15.72 BENTON Local Bridges 0A439 FERN AVE. BRIDGE OVER CANE CREEK 0.010 $479,000 MT. ZION CHURCH RD. BRIDGE OVER SULPHUR BENTON Local Bridges 0A156 0.010 $341,000 CREEK BENTON Rural Access US-70 (SR-1) FROM CAMDEN BYPASS TO RIVER 3.950 $37,360,086

BENTON Maintenance I-40 BENTON COUNTY REST AREA RENOVATION 0.100 $3,750,000 FROM DECATUR-BENTON COUNTY LINE TO SR-191 BENTON Interstate I-40 7.040 $91,650,000 (BIRDSONG RD.) BENTON, FERRY SERVICE ACROSS THE , Rural Access SR-147 0.510 $700,000 HOUSTON SR-69A TO SR-147 BLEDSOE Local Bridges 0A310 RAY HIXSON RD. BRIDGE OVER BRANCH 0.010 $455,000

BLEDSOE Local Bridges 2174 OLD HWY. 28 BRIDGE OVER SWAFFORD BRANCH 0.010 $172,000

BLEDSOE Local Bridges 0A068 ALVIN YORK HWY. BRIDGE OVER BRANCH 0.010 $220,000

Data current as of 12/5/2016 2 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion (RELOCATED ALCOA HIGHWAY) FROM SR-162 US-129 (SR- BLOUNT Trade (PELLISSIPPI PARKWAY) TO EXISTING SR-115 AT 1.730 $35,000,000 115) SINGLETON STATION ROAD US-129 (SR- (ALCOA HIGHWAY) FROM PELLISSIPPI PARKWAY BLOUNT Trade 1.800 $47,600,000 115) (SR-162) TO NORTH OF LITTLE RIVER (RELOCATED ALCOA HIGHWAY) FROM PROPOSED US-129 (SR- BLOUNT Trade INTERCHANGE AT TYSON BOULEVARD TO SR-162 2.500 $74,530,884 115) (PELLISSIPPI PARKWAY) (RE-BUDGETED-ROW) US-129 (SR- (US-129 BYPASS) FROM SR-73 ( BLOUNT Trade 3.800 $6,000,000 115) PKWY) TO SR-35 (RELOCATED ALCOA HIGHWAY) FROM HALL ROAD US-129 (SR- BLOUNT Trade (SR-35), SOUTH OF AIRPORT ROAD TO PROPOSED 0.520 $35,000,000 115) INTERCHANGE AT TYSON BOULEVARD (PELLISSIPPI PKWY) FROM SR-33 TO SR-73 (US- BLOUNT Urban Growth SR-162 4.410 $61,049,200 321) (RE-BUDGETED-ROW&STAGE CONST) (MONTVALE RD.) FROM MONTVALE STATION ROAD BLOUNT Urban Growth SR-336 0.580 $11,800,000 TO SR-73 (LAMAR ALEXANDER PKWY). US-129 (SR- ITS EXPANSION FROM I-140 IN BLOUNT COUNTY TO BLOUNT, KNOX Technology 7.380 $2,216,000 115) TRAILS IN KNOX COUNTY ITS EXPANSION FROM I-140 MM 2 TO SR-115 (US- BLOUNT, KNOX Technology I-140 19.250 $3,755,000 129, ALCOA HWY., EXIT 11) (MISSING LINK) FROM US-321 NEAR WALLAND TO FOOTHILLS BLOUNT, SEVIER Rural Access US-321 NEAR WEARS VALLEY (JOINT PROJECT 20.660 $15,000,000 PARKWAY WITH NATIONAL PARKS SERVICE) CHATATA VALLEY RD. BRIDGE OVER CHATATA BRADLEY Local Bridges 2265 0.010 $1,052,000 CREEK 20TH ST. N.E. BRIDGE OVER LITTLE CHATTA BRADLEY Local Bridges 4615 0.010 $625,000 CREEK BRADLEY Local Bridges 0D947 TUNNEL HILL RD. BRIDGE OVER BLACK FOX CREEK 0.010 $167,000 BRYMER CREEK RD. BRIDGE OVER BRYMER BRADLEY Local Bridges 0A062 0.010 $595,000 CREEK

Data current as of 12/5/2016 3 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion GEORGETOWN RD. N.W. BRIDGE OVER CANDIES BRADLEY State Bridges SR-60 0.010 $5,480,000 CREEK LEAD MINE VALLEY RD. BRIDGE OVER BLACK FOX BRADLEY Local Bridges 0A003 0.010 $470,000 CREEK PLEASANT GROVE PL. BRIDGE OVER CANDIES BRADLEY Local Bridges 0A234 0.010 $961,000 CREEK (N. LEE HWY.) FROM NEAR ANATOLE LANE TO SR- BRADLEY Urban Growth US-11 (SR-2) 4.370 $36,708,000 308 IN CHARLESTON (GEORGETOWN RD. NW) FROM 4-LANE NORTH OF BRADLEY Urban Growth SR-60 2.690 $14,699,042 I-75 (WESTLAKE DRIVE) TO SR-306 FROM CLEVELAND URBAN BOUNDARY TO BRADLEY Interstate I-75 2.050 $26,624,000 BRADLEY-MCMINN COUNTY LINE TRUCK CLIMBING LANE SOUTH BOUND AT WHITE BRADLEY Interstate I-75 1.020 $18,000,000 OAK MTN. BRADLEY, (GEORGETOWN RD. NW)FROM SR-306 TO SR-58 IN HAMILTON, Urban Growth SR-60 6.270 $20,000,000 HAMILTON COUNTY. MEIGS DOSSETT LANE, BRIDGE OVER CSX R/R AT LM 0.26 CAMPBELL Local Bridges 0B001 0.000 $2,800,000 IN LA FOLLETTE CAMPBELL Local Bridges 2425 OLD HWY. 63 BRIDGE OVER TITUS CREEK 0.010 $533,000 OLD STINKING CREEK RD. BRIDGE OVER STINKING CAMPBELL Local Bridges 0A080 0.010 $977,000 CREEK CAMPBELL Local Bridges 0A247 D. W. BAIRD LN. BRIDGE OVER STINKING CREEK 0.010 $803,000

CAMPBELL Local Bridges 1278 TOWE STRING RD. BRIDGE OVER PRIVATE ROAD 0.010 $725,000 DAVIS CREEK RD. BRIDGE OVER DAVIS BRANCH, CAMPBELL Local Bridges 1282 0.000 $565,360 LM 5.00 DAVIS CREEK RD. BRIDGE OVER DAVIS BRANCH, CAMPBELL Local Bridges 1282 0.000 $310,282 LM 5.27

Data current as of 12/5/2016 4 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion NORTH 11TH STREET, BRIDGE OVER CSX CAMPBELL Local Bridges 0A622 0.000 $554,386 RAILROAD IN LAFOLLETTE, LM 0.27 ITS EXPANSION AT SR-9/SR-116 (US-25W, EXIT 134) CAMPBELL Technology I-75 0.100 $500,000 INTERCHANGE (HOWARD BAKER HWY.) FROM SCOTT COUNTY CAMPBELL Rural Access SR-63 6.510 $4,600,000 LINE TO I-75 (***) (RE-BUDGETED-ROW) IMPLEMENT A FOG AND SEVERE WEATHER CAMPBELL Technology I-75 DETECTION SYSTEM ON I-75 OVER JELLICO 24.980 $8,890,000 MOUNTAIN (GENERAL CARL W. STINER HWY.) FROM LAFOLLETTE URBAN BOUNDARY TO FRONTIER CAMPBELL Rural Access SR-63 4.820 $22,680,000 ROAD/WOODSON LANE (RE-BUDGETED- ROW&CONST) (GENERAL CARL W. STINER HWY.) FROM CAMPBELL Rural Access SR-63 FRONTIER ROAD/WOODSON LANE TO CLAIBORNE 5.260 $18,767,800 COUNTY LINE (RE-BUDGETED-ROW&CONST) ITS EXPANSION ON I-75 AT SR-63 (HOWARD BAKER CAMPBELL Technology I-75 0.100 $500,000 RD., EXIT 141) INTERCHANGE FROM ANDERSON-CAMPBELL COUNTY LINE TO SR- CAMPBELL Interstate I-75 9 (APPALACHIAN HWY.) RT. AND 2425 ROYAL BLUE 4.800 $62,725,000 RD. LT. CURTIS GEORGE RD. BRIDGE OVER WILMORE CANNON Local Bridges 0A332 0.010 $430,000 CREEK MARSHALL CREEK RD. BRIDGE OVER MARSHALL CANNON Local Bridges 0A021 0.010 $835,000 CREEK CANNON Local Bridges 0A090 TATE RD. BRIDGE OVER CONNELL CREEK 0.010 $433,000 W. MAIN ST. BRIDGE OVER EAST FORK STONES CANNON State Bridges US-70S (SR-1) 0.010 $4,105,000 RIVER CANNON Local Bridges 1376 MURFREESBORO RD. BRIDGE OVER BRANCH 0.010 $448,000

Data current as of 12/5/2016 5 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion GILLEY HILL RD. BRIDGE OVER BRAWLEYS FORK CANNON Local Bridges 0A181 0.010 $458,000 CREEK CANNON Local Bridges 0A059 BLAIR BRANCH RD. BRIDGE OVER BLAIR CREEK 0.010 $341,000 MCALLISTER LN. BRIDGE OVER SANDERS FORK CANNON Local Bridges 0A014 0.010 $377,000 CREEK HOWARD YOUREE RD. BRIDGE OVER DUG CANNON Local Bridges 0A184 0.010 $137,000 BRANCH CANNON Local Bridges 0A141 BULLPEN RD. BRIDGE OVER BULLPEN CREEK 0.010 $452,000 POLLY CAMPBELL RD. BRIDGE OVER WILMORE CANNON Local Bridges 0A331 0.010 $416,000 CREEK CANNON Local Bridges 0A316 CASTLE PT. BRIDGE OVER LEACH CREEK 0.010 $460,000 FERRELL BRIDGE LN. BRIDGE OVER EAST FORK CANNON Local Bridges 0A354 0.010 $455,000 STONES RIVER JACK BARNES RD. BRIDGE OVER HURRICANE CANNON Local Bridges 0A293 0.010 $418,000 CREEK (W. MAIN ST.) FROM WEST OF WOODBURY TO NEW CANNON Rural Access US-70S (SR-1) 1.590 $13,200,000 SR-1 (US-70 S) EAST OF WOODBURY HOLLOW ROCK BRANCH RD. BRIDGE OVER CARROLL Local Bridges 0A393 0.010 $437,000 HOLLOW ROCK BRANCH CARROLL State Bridges SR-436 REEDY CREEK RD. BRIDGE OVER REEDY CREEK 0.010 $1,043,000 (BROAD ST. N.) FROM WEST OF CUTLIP LANE TO CARROLL Trade US-79 (SR-76) 5.120 $14,833,000 WEST OF SYDNOR/WINSTON RD (BROAD ST. S.) FROM EAST OF SR-77 TO WEST OF CARROLL Trade US-79 (SR-76) 4.830 $14,150,000 CUTLIP LANE CARTER Local Bridges 4833 SOUTHSIDE RD. BRIDGE OVER GAP CREEK 0.010 $608,000

CARTER Local Bridges 0A102 BIG SANDY RD. BRIDGE OVER STONEY CREEK 0.010 $410,000

Data current as of 12/5/2016 6 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion CARTER Local Bridges 0A250 REESER RD. BRIDGE OVER BUFFALO CREEK 0.010 $601,000

CARTER Local Bridges 0A656 SUGAR HOLLOW RD. BRIDGE OVER DOE RIVER 0.010 $242,000

CARTER Local Bridges 0B001 HONEYCUTT ST. BRIDGE OVER DOE RIVER 0.010 $584,000

CARTER Local Bridges 0A746 OLD SR-67 BRIDGE OVER LAUREL FORK CREEK 0.010 $2,402,000

CARTER Local Bridges 0A767 CROW RD. BRIDGE OVER LAUREL FORK CREEK 0.010 $256,000

CARTER Local Bridges 0A869 EARL WILLIAMS RD. BRIDGE OVER STONEY CREEK 0.010 $445,000

CARTER Local Bridges 0A972 ESTEP HOLLOW RD. BRIDGE OVER STONEY CREEK 0.010 $109,000

CARTER Local Bridges 2680 COVE CREEK RD. BRIDGE OVER DOE RIVER 0.010 $562,000 ENSOR GRAVEYARD RD. BRIDGE OVER STONEY CARTER Local Bridges 0A961 0.010 $538,000 CREEK CARTER Local Bridges 0C102 HOPSON RD. BRIDGE OVER LITTLE DOE CREEK 0.010 $452,000

CARTER Local Bridges 0A724 STEVENS RD. BRIDGE OVER LITTLE DOE RIVER 0.010 $728,000 GOV. ALFRED TAYLOR RD. BRIDGE OVER BUFFALO CARTER Local Bridges 2609 0.010 $619,000 CREEK CARTER Local Bridges 3938 W. G ST. BRIDGE OVER GAP CREEK 0.010 $806,000 RAILROAD GRADE RD. BRIDGE OVER BEAR GAGE CARTER Local Bridges 0A634 0.010 $1,268,000 RD / DOE RIVER CARTER State Bridges SR-362 GAP CREEK RD. BRIDGE OVER GAP CREEK 0.010 $655,000

CARTER Local Bridges 1385 SMALLING RD. BRIDGE OVER WATAUGA RIVER 0.010 $2,767,000 STOUT HOLLOW RD. BRIDGE OVER LAUREL FORK CARTER Local Bridges 0A752 0.010 $587,000 CREEK

Data current as of 12/5/2016 7 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion DENNIS COVE RD BRIDGE OVER LAUREL FORK CARTER Local Bridges 0A765 0.010 $554,000 CREEK CARTER Local Bridges 0A618 PAUL BLEVINS RD. BRIDGE OVER TIGER CREEK 0.010 $404,000

CARTER Local Bridges 0A373 HILLSIDE DR. BRIDGE OVER DOE RIVER 0.010 $805,000 BLEVINS HOLLOW RD. BRIDGE OVER STONEY CARTER Local Bridges 0A967 0.010 $698,000 CREEK CARTER Local Bridges 0A642 CRABTREE RD. BRIDGE OVER GEORGE CREEK 0.010 $479,000

CARTER Local Bridges 0B085 POWELL RD. BRIDGE OVER HAMPTON CREEK 0.010 $365,000 DANNER SUBDIVISION RD. BRIDGE OVER STONEY CARTER Local Bridges 0A906 0.010 $466,000 CREEK CARTER Local Bridges 0A974 ESTEP LOOP BRIDGE OVER STONY CREEK 0.010 $698,000 US-321 (SR- (W. ELK AVE.) FROM SR-67 (US-321) TO SR-37 (US- CARTER Rural Access 4.060 $22,156,500 91) 19E) (RE-BUDGETED-ROW) CHEATHAM Local Bridges 0A226 DRY FORK RD. BRIDGE OVER DRY FORK CREEK 0.010 $242,000

CHEATHAM Local Bridges 0A372 S. HARPETH RD. BRIDGE OVER BRUSH CREEK 0.010 $565,000

CHEATHAM State Bridges SR-249 SAMS CREEK RD. BRIDGE OVER DRY CREEK 0.010 $844,000

CHEATHAM State Bridges I-40 I-40 BRIDGE OVER HARPETH RIVER (WB) 0.010 $5,935,000

CHEATHAM State Bridges I-40 I-40 BRIDGE OVER HARPETH RIVER (EB) 0.010 $5,935,000 JACKSON FELTS RD. BRIDGE OVER NEW HOPE RD. CHEATHAM State Bridges SR-249 0.010 $2,599,000 / I-24 LITTLE MARROWBONE RD. BRIDGE OVER CHEATHAM Local Bridges 0A235 0.010 $767,000 MARROWBONE CREEK LOST HOLLOW LN. BRIDGE OVER SOUTH HARPETH CHEATHAM Local Bridges 0A506 0.010 $719,000 RIVER

Data current as of 12/5/2016 8 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion CHEATHAM Interstate I-24 I-24 EXIT 31 RAMP IMPROVEMENTS 1.200 $3,500,000

CHEATHAM Interstate I-24 I-24 TRUCK CLIMBING LANE LM 0.05 - 0.57 1.080 $6,500,000 FROM SR-12 TO I-24 (SPOT IMPROVEMENTS - TPR CHEATHAM Rural Access SR-49 6.150 $30,200,000 OPTION 4) FROM SR-249 LUYBEN HILLS RD. TO CHEATHAM- CHEATHAM Interstate I-40 3.500 $45,240,000 DAVIDSON COUNTY LINE. TALLEY STORE RD. BRIDGE OVER JACKS CHESTER Local Bridges 1679 0.000 $3,510,595 CREEK,LM 2.51, LM 2.59 & OVERFLOW LM 2.64 CHESTER State Bridges SR-100 SR-100 BRIDGE OVER DRY BRANCH 0.010 $2,147,000

CHESTER State Bridges SR-100 SR-100 BRIDGE OVER S. FK. FORKED DEER RIVER 0.010 $3,488,000 OLD JACKS CREEK RD. BRIDGE OVER JACKS CHESTER Local Bridges 0A253 0.010 $137,000 CREEK CHESTER Local Bridges 0A035 SANFORD RD. BRIDGE OVER TURKEY CREEK 0.010 $815,000 (W. MAIN ST.) FROM SR-5 TO CHURCH STREET CHESTER Rural Access SR-100 0.290 $1,620,000 (OLD US-5) IN HENDERSON CHESTER, FROM SR-69 IN MILLEDGEVILLE TO SR-100 IN HENDERSON, Safety SR-22 8.550 $1,860,000 CHESTER (SAFETY IMPROVEMENTS) MCNAIRY STATE HWY. 33 BRIDGE OVER SOUTH FORK CLAIBORNE State Bridges SR-33 0.010 $752,000 SYCAMORE CREEK CLAIBORNE Local Bridges 0A497 ACADEMY RD. BRIDGE OVER DAVIS CREEK 0.010 $517,000 BUCKLICK LN. BRIDGE OVER BIG SYCAMORE CLAIBORNE Local Bridges 0A250 0.010 $674,000 CREEK CLAIBORNE Local Bridges 0A051 Y HOLLOW RD. BRIDGE OVER CLEAR FORK 0.010 $533,000

CLAIBORNE Local Bridges 2503 HOOP CREEK RD. BRIDGE OVER HOOP CREEK 0.010 $437,000

Data current as of 12/5/2016 9 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion US-25E (SR- CLAIBORNE Safety (DIXIE HWY) INTERCHANGE AT SR-345 0.170 $6,250,000 32) FROM WEST OF OLD TOWN CREEK TO SR-32 (US- CLAIBORNE Rural Access SR-63 6.600 $12,700,000 25E) (***) FROM CAMPBELL COUNTY LINE TO HALL LANE (RE- CLAIBORNE Rural Access SR-63 5.210 $19,380,000 BUDGETED-ROW&CONST) CLAY Local Bridges 0A210 WET MILL CREEK RD. BRIDGE OVER MILL CREEK 0.010 $173,000 JOHN BUTLER RD. BRIDGE OVER PROCTOR CLAY Local Bridges 0A053 0.000 $974,869 BRANCH, LM 0.16 COCKE State Bridges SR-160 HWY. 160 BRIDGE OVER NOLICHUCKY RIVER 0.010 $1,054,000 US-25/70 (SR- COCKE State Bridges E. BROADWAY BRIDGE OVER PIGEON RIVER 0.010 $4,847,000 9) STERLING RD. BRIDGE OVER TRAIL FORK BIG COCKE Local Bridges 0A277 0.010 $613,000 CREEK COCKE Local Bridges 1326 MORRELL SPRINGS RD. BRIDGE OVER I40 0.010 $3,064,000 STOKLEY CEMETERY RD. BRIDGE OVER TRAIL COCKE Local Bridges 0A276 0.010 $473,000 FORK BIG CREEK COCKE Local Bridges 0A238 OLD LONG CREEK RD. BRIDGE OVER LONG CREEK 0.010 $458,000

COCKE Local Bridges 0A445 MIDDLE CREEK RD. BRIDGE OVER COSBY CREEK 0.010 $1,097,000

COCKE Local Bridges 0A495 OLD SR-35 BRIDGE OVER CLEAR CREEK 0.010 $569,000 BRIARTHICKET RD. BRIDGE OVER NOLICHUKY COCKE Local Bridges 0A909 0.010 $2,887,000 RIVER COCKE Local Bridges 0A447 BALL PARK RD. BRIDGE OVER COSBY CREEK 0.010 $230,000

COCKE State Bridges I-40 I-40 BRIDGE OVER GREEN CORNER RD (1321) 0.010 $1,934,000

COCKE Local Bridges 0A055 CHEMWOOD DR. BRIDGE OVER SINKING CREEK 0.010 $1,018,000

Data current as of 12/5/2016 10 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion TOMS CREEK RD. BRIDGE OVER TRAIL FORK BIG COCKE Local Bridges 0A261 0.010 $511,000 CREEK COCKE Local Bridges 0A407 CANEY CREEK RD. BRIDGE OVER COSBY CREEK 0.010 $122,000

COCKE Local Bridges 2513 BRIARTHICKET RD. BRIDGE OVER KNOB CREEK 0.010 $488,000

COCKE Local Bridges 0A408 LIBERTY RD. BRIDGE OVER COSBY CREEK 0.010 $43,000

COCKE Local Bridges 2570 OLD STATE HWY. 32 BRIDGE OVER COSBY CREEK 0.010 $1,492,000 ST. TIDE HOLLOW RD. BRIDGE OVER CLEAR COCKE Local Bridges 0A136 0.010 $262,000 CREEK SPICEWOOD FLATS RD. BRIDGE OVER TRAIL FORK COCKE Local Bridges 0A264 0.010 $431,000 BIG CREEK COCKE State Bridges I-40 I-40 BRIDGE OVER SR-9 0.010 $4,472,000 US-321 (SR- (COSBY HWY.) FROM SR-73 AT COSBY TO WILTON COCKE Rural Access 6.860 $64,500,000 32) SPRINGS RD. (***) (RE-BUDGETED-ROW) US-321 (SR- (NEWPORT BYPASS) FROM US-70 (SR-9) TO SAINT COCKE Rural Access 6.190 $43,000,000 35) TIDE HOLLOW ROAD COCKE Interstate I-40 INTERCHANGE AT O'NEIL ROAD 0.170 $14,500,000

COCKE Technology I-40 ITS RURAL DEPLOYMENT ON I-40 TO STATE LINE 21.930 $2,000,000

COCKE Maintenance I-40 "HARTFORD" WELCOME CENTER RENOVATION 0.390 $3,000,000

COFFEE Local Bridges 0A440 DUNCAN RD. BRIDGE OVER PERRY CREEK 0.010 $386,000

COFFEE State Bridges US-41 (SR-2) HILLSBORO RD. BRIDGE OVER CFW RAILROAD 0.010 $2,558,000 NORTON BRANCH RD. BRIDGE OVER NORTON COFFEE Local Bridges 0A409 0.010 $416,000 BRANCH WINCHESTER HWY. BRIDGE OVER BRADLEY COFFEE State Bridges SR-127 0.010 $3,886,000 CREEK

Data current as of 12/5/2016 11 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion WATTENDORF MEMORIAL HWY. BRIDGE OVER COFFEE Local Bridges 918 0.010 $3,733,000 A.E.D.C. RD. / I-24 CAMP GROUND LN. BRIDGE OVER DUCK RIVER COFFEE Local Bridges 0B188 0.010 $2,480,000 (OSFSP) W. GRUNDY ST. BRIDGE OVER NORTH FORK ROCK COFFEE Local Bridges 0A049 0.010 $941,000 CREEK COFFEE Local Bridges 1111 CAT CREEK RD. BRIDGE OVER CRUMPTON CREEK 0.010 $1,058,000 (HILLSBORO HWY.) FROM JOE HICKERSON RD TO COFFEE Rural Access US-41 (SR-2) 2.130 $20,000,000 ARNOLD CENTER ROAD (WILSON AVE.) FROM FIRST AVE. IN TULLAHOMA COFFEE Rural Access SR-55 0.640 $7,900,000 TO SR-16 (US-41A) N. OF JACKSON ST. WARREN RD. BRIDGE OVER BRANCH OF CYPRESS CROCKETT Local Bridges 0A191 0.010 $455,000 CREEK CROCKETT Local Bridges 0A081 BEAVER RD. BRIDGE OVER BRANCH 0.010 $352,000

CROCKETT Local Bridges 0A119 WALTER TAYLOR RD. BRIDGE OVER RICE CREEK 0.010 $451,000

CROCKETT Local Bridges 0A170 KENNER RD. BRIDGE OVER BRANCH, LM 0.84 0.000 $433,634

CROCKETT Local Bridges 0A078 REYNOLDS RD. BRIDGE OVER POND CREEK 0.010 $673,000

CROCKETT Local Bridges 0A308 COUNTY LINE RD. BRIDGE OVER BRANCH, LM 0.27 0.000 $399,510 US-70N (SR- CUMBERLAND State Bridges WEST AVE. BRIDGE OVER OBED RIVER 0.010 $2,299,000 24) BROWNTOWN RD. BRIDGE OVER POKEPATCH CUMBERLAND Local Bridges 2202 0.010 $283,000 CREEK CUMBERLAND Local Bridges 2289 WIGHTMAN RD. BRIDGE OVER DUNCAN CREEK 0.010 $556,000

CUMBERLAND State Bridges US-70 (SR-1) SPARTA HWY. BRIDGE OVER OBED RIVER 0.010 $2,821,000 (NORTHWEST CONNECTOR) FROM US-70N (SR-24) CUMBERLAND Rural Access SR-462 1.040 $10,000,000 TO US-127 (SR-28) IN CROSSVILLE

Data current as of 12/5/2016 12 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion US-127 (SR- FROM NORTH OF I-40 TO NEAR POTATO FARM CUMBERLAND Trade 4.810 $29,200,000 28) ROAD CUMBERLAND Maintenance I-40 CUMBERLAND COUNTY REST AREA RENOVATION 0.100 $3,750,000 US-127 (SR- FROM NEAR POTATO FARM ROAD TO NEAR CUMBERLAND Trade 3.450 $32,200,000 28) HOLLOW LANE (***) US-127 (SR- FROM NEAR HOLLOW LANE TO NEAR LOWE ROAD CUMBERLAND Trade 3.040 $21,600,000 28) (***) (NORTHWEST CONNECTOR) FROM US-127 (SR-28) CUMBERLAND Rural Access SR-462 1.550 $13,100,000 TO SR-298 (S. YORK HWY.) FROM NEAR LOWE ROAD IN CUMBERLAND, US-127 (SR- Trade CUMBERLAND COUNTY TO NEAR LITTLE ROAD 3.210 $46,600,000 FENTRESS 28) CLARKRANGE CUMBERLAND, Technology I-40 ITS EXPANSION AT ROCKWOOD MOUNTAIN 48.220 $2,800,000 PUTNAM DAVIDSON State Bridges I-40 I-40 BRIDGE OVER I-40 STR 80 / I-40 RAMP 0.010 $2,020,000

DAVIDSON State Bridges I-40 I-40 BRIDGE OVER MILL CREEK 0.010 $8,167,000

DAVIDSON State Bridges US-31E (SR-6) GALLATIN PK. BRIDGE OVER MANSKER CREEK 0.010 $3,125,000

DAVIDSON State Bridges I-24 I-24 BRIDGE OVER I-24 LL / OLD HICKORY BLV 0.010 $2,468,000

DAVIDSON State Bridges I-24 I-24 BRIDGE OVER I-24 / NORTH FIRST ST 0.010 $10,559,000 US-31A/41A DAVIDSON State Bridges NOLENSVILLE PK. BRIDGE OVER CSX RAILROAD 0.010 $2,449,000 (SR-11) DAVIDSON State Bridges US-31E (SR-6) ELLINGTON PKWY. BRIDGE OVER CSX R/R 0.010 $2,609,000

DAVIDSON State Bridges I-40 I-40 BRIDGE OVER NASVILLE & EASTERN RR 0.010 $2,818,000

DAVIDSON State Bridges I-40 I-40 BRIDGE OVER I-40 STR 13/I-65 & I-65 RMP 0.010 $7,016,000

Data current as of 12/5/2016 13 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion DAVIDSON State Bridges I-24 I-24 BRIDGE OVER I-24 RL / CUMBERLAND RIVER 0.010 $8,009,000

DAVIDSON State Bridges I-24 I-24 BRIDGE OVER I-24 RL / OLD HICKORY BLV 0.010 $2,468,000

DAVIDSON State Bridges I-40 I-40 BRIDGE OVER I-40/SR-11, SR-1, & 2ND AVE S 0.010 $24,538,000

DAVIDSON State Bridges I-40 I-40 BRIDGE OVER I-40 STR 79 / I-65 RAMP 0.010 $2,215,000

DAVIDSON State Bridges I-65 I-65 BRIDGE OVER CUMBERLAND RV & COWAN ST 0.010 $58,447,000

DAVIDSON State Bridges I-40 I-40 BRIDGE OVER BROWNS CREEK 0.010 $4,408,000

DAVIDSON State Bridges I-24 I-24 BRIDGE OVER MILL CREEK 0.010 $3,767,000

DAVIDSON State Bridges I-40 I-40 BRIDGE OVER I-40 STR 5B / I-24 0.010 $1,586,000 US-41A (SR- DAVIDSON State Bridges CLARKSVILLE PK. BRIDGE OVER WHITE CREEK 0.010 $2,017,000 112) DAVIDSON State Bridges I-65 I-65 BRIDGE OVER I-65 / ABD. RR. 0.010 $8,492,000

DAVIDSON State Bridges I-24 I-24 BRIDGE OVER SEVEN MILE CREEK 0.010 $3,599,000 US- BROADWAY BRIDGE OVER BRDWY /11TH AVE S & DAVIDSON State Bridges 431/70/70S 0.010 $5,015,000 CSX RR (SR-1) DAVIDSON State Bridges I-24 I-24 BRIDGE OVER I-24 LL / CUMBERLAND RIVER 0.010 $8,009,000

DAVIDSON Urban Growth US-70 (SR-24) (CHARLOTTE PIKE) FROM AMERICAN ROAD TO I-40 1.800 $49,000,000 (DICKERSON PIKE) FROM FANNIN DRIVE TO OLD US-31W (SR- DAVIDSON Safety STONE BRIDGE ROAD TO INCLUDE THE CSX 0.220 $8,000,000 11) RAILROAD OVERPASS STRUCTURE US-41A (SR- (CLARKSVILLE HWY.) FROM SR-12 (ASHLAND CITY DAVIDSON Urban Growth 2.100 $19,600,000 112) HWY.) TO SR-155 (BRILEY PARKWAY)

Data current as of 12/5/2016 14 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion INTERCHANGE MODIFICATION AT HICKORY DAVIDSON Interstate I-24 1.030 $25,700,000 HOLLOW PARKWAY (CHARLOTTE PIKE) FROM I-40 TO OLD HICKORY DAVIDSON Urban Growth US-70 (SR-24) 1.690 $25,000,000 BLVD. FROM MCCRORY LANE (EXIT 192) TO JUST WEST DAVIDSON Interstate I-40 3.760 $41,652,543 OF SR-1/US-70S (EXIT 196) SR-255 (DONELSON PIKE) RELOCATION FROM DAVIDSON Interstate I-40 TAXIWAY BRIDGES OVER EXISTING DONELSON 0.790 $57,500,000 PIKE TO I-40 I-24 RAMP IMPROVEMENTS EXITS 35, 40, 57, 59, DAVIDSON Interstate I-24 5.560 $25,300,000 AND 60 I-440 PAVEMENT REPLACEMENT AND SAFETY DAVIDSON Interstate I-440 7.640 $50,000,000 IMPROVEMENTS I-24 AT HARDING PLACE INTERCHANGE RE- DAVIDSON Interstate I-24 0.710 $13,200,000 CONFIGURATION FROM I-65 TO OLD HICKORY BLVD. (SR-45), EXIT 40 DAVIDSON Interstate I-24 4.330 $72,346,176 - EXIT 44 US-31A/41A (NOLENSVILLE PIKE) FROM NORTH OF MILL CREEK DAVIDSON Urban Growth 2.400 $32,300,000 (SR-11) TO NEAR SR-254 (OLD HICKORY BOULEVARD) (DOWNTOWN LOOP) I-24, INCLUDING SOUTH OF DAVIDSON Interstate I-24 0.740 $15,200,000 FERN TO TRINITY LANE (CHARLOTTE PIKE) FROM WHITE BRIDGE ROAD TO DAVIDSON Urban Growth US-70 (SR-24) 0.940 $20,100,000 AMERICAN ROAD DAVIDSON, DICKSON, ITS EXPANSION FROM US-70S (EXIT 196) TO I-840, CHEATHAM, Technology I-40 AND FROM SR-255 (DONELSON PIKE, EXIT 216) TO 46.410 $4,000,000 WILLIAMSON, US-70 (EXIT 239). WILSON I-24 CONGESTION REDUCTION FROM I-40 IN DAVIDSON, Interstate I-24 DAVIDSON COUNTY TO I-840 IN RUTHERFORD 23.230 $400,000,000 RUTHERFORD COUNTY

Data current as of 12/5/2016 15 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion DAVIDSON, SUMNER, Interstate I-65 FROM NASHVILLE TO KY STATE LINE 51.540 $397,400,000 ROBERTSON DOE CREEK RD. BRIDGE OVER EAST PRONG DOE DECATUR Local Bridges 0A327 0.010 $341,000 CREEK DEKALB Local Bridges 0A330 OLD DRY CREEK RD. BRIDGE OVER DRY CREEK 0.010 $1,052,000

DEKALB Local Bridges 0A095 HOLMES CREEK RD. BRIDGE OVER FALL CREEK 0.010 $719,000 (NASHVILLE HWY.) FROM WEST OF WILSON DEKALB, WILSON Rural Access US-70 (SR-26) COUNTY LINE TO NEAR SR-96 IN DEKALB COUNTY 6.250 $15,200,000 (***) DICKSON Local Bridges 0A177 OLD HWY. 47 BRIDGE OVER TOWN BRANCH 0.010 $370,000 E. PINEY RD. BRIDGE OVER EAST FORK PINEY DICKSON Local Bridges 1854 0.010 $727,000 RIVER YELLOW CREEK RD. BRIDGE OVER BRANCH LM DICKSON State Bridges SR-46 0.010 $808,000 15.74 YELLOW CREEK RD. BRIDGE OVER BRANCH LM DICKSON State Bridges SR-46 0.010 $820,000 15.59 DICKSON Maintenance I-40 DICKSON REST AREA RENOVATION 0.520 $3,750,000

DICKSON Rural Access I-840 FROM I-40 TO SR-96 1.520 $30,000,000

DYER Local Bridges 0A282 PACE RD. BRIDGE OVER MULHERIN CREEK 0.010 $463,000

DYER Local Bridges 1502 DR. HALL RD. BRIDGE OVER BRANCH 0.010 $98,000

DYER Local Bridges 0A264 HARTSFIELD RD. BRIDGE OVER BRANCH 0.010 $740,000 BLANKENSHIP RD. BRIDGE OVER MULHERIN DYER Local Bridges 0A333 0.010 $245,000 CREEK DYER Local Bridges 0A616 LOVEJOY RD. BRIDGE OVER DRAINAGE DITCH 0.010 $482,000

Data current as of 12/5/2016 16 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion DYER Local Bridges 0A498 MEADOW RD. BRIDGE OVER BRANCH 0.010 $391,000

DYER Local Bridges 0A230 MCGEE RD. BRIDGE OVER SLOUGH 0.010 $554,000

DYER Local Bridges 0A208 SPENCE SPUR RD. BRIDGE OVER DRAINAGE DITCH 0.010 $766,000

DYER Local Bridges 1495 UNIONVILLE RD. BRIDGE OVER OVERFLOW 0.010 $1,450,000

DYER State Bridges SR-211 S. MAIN AVE. BRIDGE OVER OVERFLOW 0.010 $2,854,000 S. MAIN AVE. BRIDGE OVER N. FORK FORKED DYER State Bridges SR-211 0.010 $4,555,000 DEER RIVER DYER Local Bridges 0A493 EARL CARTER RD. BRIDGE OVER MCBRIDE CREEK 0.010 $406,000

DYER Maintenance I-155 "DYERSBURG" WELCOME CENTER RENOVATION 0.560 $3,000,000 (W. MAIN ST.) FROM US-412 IN DYERSBURG TO SR- DYER Rural Access SR-211 6.330 $21,220,000 77 IN NEWBERN FROM US-412 (SR-20) IN DYERSBURG TO EAST OF DYER Rural Access SR-104 3.810 $6,900,000 DON HURLEY ROAD FROM EAST OF DON HURLEY ROAD TO OLD SR-104 DYER Rural Access SR-104 4.480 $8,500,000 NEAR THE GIBSON COUNTY LINE BUFORD ELLINGTON RD. BRIDGE OVER NORTH FAYETTE Local Bridges 0A149 0.010 $1,537,000 FORK CREEK FAYETTE Local Bridges 0A208 CHAPEL RD. BRIDGE OVER OVERFLOW 0.010 $211,000

FAYETTE Local Bridges 1553 OLD JACKSON RD. BRIDGE OVER BEAR CREEK 0.010 $1,300,000

FAYETTE Local Bridges 0A232 JOHNSON DR. BRIDGE OVER HURRICANE CREEK 0.010 $139,000

FAYETTE State Bridges SR-193 MACON RD. BRIDGE OVER BRANCH 0.010 $565,000 RALEIGH-LA GRANGE RD. EAS BRIDGE OVER FAYETTE Local Bridges 1454 0.010 $877,000 BRANCH

Data current as of 12/5/2016 17 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion FAYETTE Local Bridges 1540 YAGER DR. BRIDGE OVER BRANCH 0.010 $1,541,000 LA GRANGE RD. BRIDGE OVER WOLF RIVER FAYETTE Local Bridges 1442 0.010 $740,000 OVERFLOW FAYETTE Local Bridges 0A070 TOMLIN RD. BRIDGE OVER TREADVILLE CREEK 0.010 $577,000

FAYETTE Local Bridges 0A257 MEBANE RD. BRIDGE OVER DRAINAGE DITCH 0.010 $245,000

FAYETTE Local Bridges 1442 LA GRANGE RD. BRIDGE OVER BRANCH 0.010 $1,106,000

FAYETTE Local Bridges 1474 THORPE DR. BRIDGE OVER BRANCH 0.010 $124,000 BAILEY MORRISON DR. BRIDGE OVER GREGG FAYETTE Local Bridges 0A119 0.010 $781,000 CREEK FAYETTE Local Bridges 0A091 OLD JACKSON RD. BRIDGE OVER LITTLE CREEK 0.010 $356,000 NEWCASTLE DR. BRIDGE OVER BRANCH OF FAYETTE Local Bridges 0A136 0.010 $251,000 MORROW CREEK FAYETTE Local Bridges 0A235 KNOX RD. BRIDGE OVER BRANCH 0.010 $544,000

FAYETTE Local Bridges 0A127 FINNIE DR. BRIDGE OVER BRANCH 0.010 $809,000 OLD JACKSON RD. BRIDGE OVER BIG MUDDY FAYETTE Local Bridges 840 0.010 $412,000 CREEK FAYETTE Local Bridges 0A043 OLD FIFTY NINE DR. BRIDGE OVER BRANCH 0.010 $217,000

FAYETTE Local Bridges 0A094 CALDWELL DR. BRIDGE OVER LONDON CREEK 0.010 $490,000 SARDIS DR. BRIDGE OVER BRANCH N. FK. WOLF FAYETTE Local Bridges 0A129 0.010 $1,180,000 RIVER FAYETTE Local Bridges 2706 MCKINSTRY RD. BRIDGE OVER OVERFLOW 0.010 $242,000

FAYETTE Local Bridges 0A204 HAYES RD. BRIDGE OVER SANDY CREEK 0.010 $118,000

Data current as of 12/5/2016 18 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion (SOMERVILLE BELTWAY) FROM US-64 (SR-15) FAYETTE Rural Access SR-460 WEST OF SOMERVILLE TO US-64 (SR-15) EAST OF 4.970 $55,600,000 SOMERVILLE ROTTEN FORK ROAD, BRIDGE OVER ROTTEN FENTRESS Local Bridges 0A073 0.000 $389,130 FORK WOLF RIVER, LM 0.14 WOLF RIVER LOOP BRIDGE OVER ROTTEN FORK FENTRESS Local Bridges 0A063 0.010 $728,000 WOLF RIVER GLEN OBEY RD. BRIDGE OVER ROCK CASTLE FENTRESS Local Bridges 0A196 0.010 $209,000 CREEK LITTLE CRAB RD. BRIDGE OVER LITTLE CRAB FENTRESS Local Bridges 2316 0.010 $587,000 CREEK VINES RIDGE ROAD, BRIDGE OVER BIG LAUREL FENTRESS Local Bridges 0A302 0.000 $600,729 CREEK, LM 1.06 GWINN BRANCH RD. BRIDGE OVER ROCK CASTLE FENTRESS Local Bridges 0A198 0.010 $443,000 CREEK WILDER RD. BRIDGE OVER EAST FORK OBEY FENTRESS State Bridges SR-85 0.010 $3,025,000 RIVER US-127 (SR- (S. YORK HWY.) FROM LITTLE ROAD IN FENTRESS Trade 3.110 $19,800,000 28) CLARKRANGE TO NEAR KILBY ROAD FENTRESS, US-127 (SR- (S. YORK HWY.) FROM NORTH OF JAMESTOWN TO Safety 19.210 $10,000,000 PICKETT 28) SR-111 (SPOT IMPROVEMENTS) FRANKLIN Local Bridges 0A406 OLD DECHERD RD. BRIDGE OVER WAGNER CREEK 0.010 $1,291,000

GIBSON Local Bridges 1585 SALEM CHURCH RD. BRIDGE OVER OVERFLOW 0.010 $544,000 BOHAM RD. BRIDGE OVER BR RUTHERFORD FORK GIBSON Local Bridges 0A161 0.010 $245,000 OBION GIBSON Local Bridges 0A364 POWELL RD. BRIDGE OVER DITCH 0.010 $362,000

GIBSON Local Bridges 0A215 SHANKLIN RD. BRIDGE OVER CAMP CREEK 0.010 $560,000

Data current as of 12/5/2016 19 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion SALEM STREET, BRIDGE OVER ROE CREEK LM 0.68 GIBSON Local Bridges 0B112 0.000 $1,388,000 IN MILAN ESQUIRE HUNT RD. BRIDGE OVER BRANCH OF GIBSON Local Bridges 0A738 0.010 $448,000 BARNETT BRANCH GIBSON Local Bridges 0A978 GUMWOODS RD. BRIDGE OVER BRANCH 0.010 $437,000

GIBSON Local Bridges 860 CONCORD-CADES RD. BRIDGE OVER MAYS CREEK 0.010 $562,000 OLD TRENTON-EATON RD. BRIDGE OVER BRANCH GIBSON Local Bridges 1592 0.010 $544,000 BUCK CREEK GIBSON Local Bridges 0A982 GUMWOODS RD. BRIDGE OVER BRANCH 0.010 $479,000

GIBSON Local Bridges 1401 KEELEY MILL RD. BRIDGE OVER OVERFLOW 0.010 $391,000 PAUL PRICE RD. BRIDGE OVER WALLSMITH GIBSON Local Bridges 0A715 0.010 $382,000 BRANCH CONOVER NEEDHAM RD. BRIDGE OVER GIBSON Local Bridges 0A076 0.010 $163,000 EDMUNDSON CREEK OLD DYERSBURG RD. BRIDGE OVER DRAINAGE GIBSON Local Bridges 1594 0.010 $551,000 DITCH GIBSON Local Bridges 0A725 CASEY RD. BRIDGE OVER PARKER BRANCH 0.010 $245,000 SKIFF BARTON RD. BRIDGE OVER BRANCH OF GIBSON Local Bridges 0A224 0.010 $404,000 CAMP CREEK GIBSON Local Bridges 0A745 MAG DUFFY RD. BRIDGE OVER DUFFY BRANCH 0.010 $428,000

GIBSON Local Bridges 0A211 NEE RD. BRIDGE OVER COW CREEK 0.010 $167,000

GIBSON Local Bridges 0A982 GUMWOODS RD. BRIDGE OVER BRANCH 0.010 $544,000

GIBSON Local Bridges 0B011 NORTHERNS CHAPEL RD. BRIDGE OVER BRANCH 0.010 $245,000

GIBSON Local Bridges 0A029 HAPPY HOLLOW RD. BRIDGE OVER YORK BRANCH 0.010 $461,000

Data current as of 12/5/2016 20 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion HICKS ST. EXT. BRIDGE OVER BR RUTHERFORD FK GIBSON Local Bridges 0B009 0.010 $548,000 OBION R GIBSON Local Bridges 1596 NEW BETHLEHEM RD. BRIDGE OVER BRANCH 0.010 $1,013,000 WILDCAT LANE RD. BRIDGE OVER LOCUST GROVE GIBSON Local Bridges 0A254 0.010 $445,000 CREEK ESQUIRE GREEN RD. BRIDGE OVER DRAINAGE GIBSON Local Bridges 0A044 0.010 $92,000 DITCH - COW CR. THETFORD RD. BRIDGE OVER BRANCH OF GIBSON Local Bridges 0A349 0.010 $347,000 RUTHERFORD FK. E. AIRPORT RD. BRIDGE OVER BR N FORK FORKED GIBSON Local Bridges 0A380 0.010 $245,000 DEER IDLEWILD-HOLLY LEAF RD. BRIDGE OVER BR OF GIBSON Local Bridges 0A323 0.010 $700,000 THOMPSON CREEK ROBERT R. THORNTON RD. BRIDGE OVER OWEN GIBSON Local Bridges 0A159 0.010 $245,000 BRANCH GIBSON Local Bridges 0A925 DAISY DONALDSON RD. BRIDGE OVER BRANCH 0.010 $365,000 QUINCY BUTLER RD. BRIDGE OVER BR MID FK GIBSON Local Bridges 0A960 0.010 $341,000 FORKED DEER OLD RUTHERFORD-KENTON RD. BRIDGE OVER BR GIBSON Local Bridges 0B010 0.010 $44,000 RUTHERFORD FORK OBION GIBSON Local Bridges 0A077 SAW MILL LN. BRIDGE OVER EDMUNDSON CREEK 0.010 $370,000

GIBSON Local Bridges 0A376 OLD SR-104 BRIDGE OVER OVERFLOW 0.010 $526,000

GIBSON Local Bridges 0A994 BLUFF RD. BRIDGE OVER BRANCH 0.010 $476,000 OLD DYER-YORKVILLE RD. BRIDGE OVER SAND GIBSON Local Bridges 0A199 0.010 $740,000 CREEK GIBSON Local Bridges 0A262 PEAVINE RD. BRIDGE OVER OVERFLOW 0.010 $499,000

Data current as of 12/5/2016 21 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion GIBSON, (E. MAIN ST.) FROM WEST OF CADES-ATWOOD Trade US-79 (SR-76) 3.840 $15,000,000 CARROLL ROAD TO EAST OF SR-77 (DYERSBURG HWY.) FROM OLD SR-104 TO WEST GIBSON, DYER Rural Access SR-104 4.930 $12,700,000 OF SR-188 (***) GILES State Bridges US-31 (SR-7) COLUMBIA HWY. BRIDGE OVER CSX RAILROAD 0.010 $2,410,000

GILES Local Bridges 0A068 WATERS SMITH RD. BRIDGE OVER BIG CREEK 0.010 $275,000

GILES State Bridges SR-166 WALES RD. BRIDGE OVER RICHLAND CREEK 0.010 $5,908,000

GILES Local Bridges 0A296 TUNNEL RD. BRIDGE OVER CSX R/R 0.010 $823,000 FRANKEWING RD. BRIDGE OVER BRADSHAW GILES Local Bridges 0A501 0.010 $1,696,000 CREEK GILES State Bridges US-31 (SR-7) COLUMBIA HWY. BRIDGE OVER RICHLAND CREEK 0.010 $2,410,000

GILES Local Bridges 0A382 BOOTH CHAPEL RD. BRIDGE OVER HUSLEY CREEK 0.010 $242,000 TARPLEY SHOP RD. BRIDGE OVER BUNKER HILL GILES Local Bridges 1900 0.010 $2,140,000 RD / I-65 GILES Local Bridges 0A177 NEWMAN RD. BRIDGE OVER INDIAN CREEK 0.010 $311,000 US-31A (SR- LEWISBURG HWY. BRIDGE OVER PIGEON ROOST GILES State Bridges 0.010 $1,558,000 11) CREEK (MAIN ST.), FROM UNION HILL RD. TO MORROW RD. GILES Safety SR-7 0.900 $1,500,000 IN ARDMORE GRAINGER Local Bridges 0A365 BLUFF RD. BRIDGE OVER RICHLAND CREEK 0.010 $445,000

GRAINGER State Bridges SR-131 STATE HWY. 131 BRIDGE OVER WILLIAMS CREEK 0.010 $553,000

GRAINGER Local Bridges 0A026 HOGSKIN RD. BRIDGE OVER HOGSKIN CREEK 0.010 $584,000

GRAINGER Local Bridges 0A408 MILLIGAN LN. BRIDGE OVER RICHLAND CREEK 0.010 $703,000

Data current as of 12/5/2016 22 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion LITTLE VALLEY RD. BRIDGE OVER RICHLAND GRAINGER Local Bridges 2534 0.010 $824,000 CREEK GRAINGER Local Bridges 2540 CHERRY ST. BRIDGE OVER BRANCH 0.010 $265,000 US-11W (SR- GRAINGER State Bridges US-11W BRIDGE OVER SHIELDS CREEK 0.010 $3,131,000 1) LIBERTY HILL RD. BRIDGE OVER WILLIAMS GRAINGER Local Bridges 2544 0.010 $518,000 BRANCH US-11W (SR- FROM WEST OF HELTON ROAD TO BEAN STATION GRAINGER Rural Access 4.810 $27,300,000 1) (***) US-25E (SR- (DIXIE HWY.) OFF-SETTING INTERSECTION AT SR- GRAINGER Safety 0.100 $2,500,000 32) 131 US-11W (SR- GRAINGER Rural Access FROM RUTLEDGE TO WEST OF HELTON ROAD (***) 5.600 $25,500,000 1) US-321 (SR- NEWPORT HWY. BRIDGE OVER NOLICHUCKY GREENE Local Bridges 0.010 $9,731,000 35) RIVER PAINT MOUNTAIN RD. BRIDGE OVER LOWER PAINT GREENE Local Bridges 0A682 0.010 $169,000 CREEK GREENE Local Bridges 1346 BLUE SPRINGS PKWY. BRIDGE OVER LICK CREEK 0.010 $2,857,000

GREENE Local Bridges 0A759 LINKS MILL RD. BRIDGE OVER RICHLAND CREEK 0.010 $589,000

GREENE Local Bridges 3863 E. CHURCH ST. BRIDGE OVER BRANCH 0.010 $758,000

GREENE Maintenance I-81 GREENE COUNTY REST AREA RENOVATION 0.470 $3,750,000 (NEWPORT HWY.) FROM SR-349 (WARRENSBURG US-321 (SR- GREENE Rural Access RD.) NEAR PATES LANE TO SR-34 (US-11E) (***) (RE- 3.650 $32,000,000 35) BUDGETED-ROW) (GREENEVILLE BYPASS) FROM US-11E, WEST OF US-11E (SR- GREENE Rural Access GREENEVILLE TO US-11E, EAST OF GREENEVILLE 10.480 $166,200,000 34) (***)

Data current as of 12/5/2016 23 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion (NEWPORT HWY.) FROM NORTH OF COCKE US-321 (SR- GREENE Rural Access COUNTY LINE TO NORTH OF NOLICHUCKY RIVER 3.830 $23,500,000 35) (BRIGHT HOPE ROAD) (***) (NEWPORT HWY.) FROM NORTH OF NOLICHUCKY US-321 (SR- RIVER NEAR BRIGHT HOPE RD. TO SOUTH OF SR- GREENE Rural Access 4.760 $34,800,000 35) 349 (WARRENSBURG RD.) NEAR PATE LANE (***) (RE-BUDGETED-ROW) STELLA SCRUGGS RD. BRIDGE OVER PEPPER GRUNDY Local Bridges 0A430 0.010 $451,000 HOLLOW BRANCH (PELHAM RD.) FROM MM 8.0 ,7.5 MILES EAST OF I- GRUNDY Rural Access SR-50 3.070 $2,250,000 24 (EXIT 127), TO MM 11.0 HAMBLEN Local Bridges 0A251 BRITT LN. RD. BRIDGE OVER SPRING BRANCH 0.010 $146,000

HAMBLEN State Bridges SR-160 ENKA HWY. BRIDGE OVER OVERFLOW 0.010 $4,315,000

HAMBLEN Local Bridges 0A314 BRIGHTS PK. BRIDGE OVER SPRING CREEK 0.010 $446,000 US-11E (SR- (E. ANDREW JOHNSON HWY.) FROM US-25E (SR-32) HAMBLEN Urban Growth 3.770 $25,800,000 34) IN MORRISTOWN TO NEAR E. MORRIS BLVD (E. ANDREW JOHNSON HWY.) FROM WEST OF OLD US-11E (SR- HAMBLEN Urban Growth STAGECOACH ROAD IN RUSSELLVILLE TO 3.490 $14,800,000 34) STEADMAN ROAD (***) (E. ANDREW JOHNSON HWY.) FROM NEAR E. US-11E (SR- HAMBLEN Rural Access MORRIS BLVD. TO WEST OF OLD STAGECOACH 1.560 $11,100,000 34) ROAD IN RUSSELLVILLE (***) HAMBLEN, US-11E (SR- (ANDREW JOHNSON HWY.) FROM STEADMAN RD Rural Access 5.680 $33,120,000 HAWKINS 34) TO I-81 HAMILTON State Bridges I-24 I-24 BRIDGE OVER I-24/I-24RP TO CENTRAL AVE 0.010 $4,660,000

HAMILTON State Bridges I-24 I-24 BRIDGE OVER SOU RWY (ABANDONED) 0.010 $2,987,000

HAMILTON State Bridges I-24 I-24 BRIDGE OVER SR-27 (ROSSVILLE BLVD.) 0.010 $6,277,000

Data current as of 12/5/2016 24 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion HAMILTON State Bridges I-24 I-24 BRIDGE OVER I-24 EB / SR-2 BROAD ST 0.010 $4,213,000 BONNY OAKS DR. BRIDGE OVER CHICKAMAUGA HAMILTON State Bridges SR-17 0.010 $5,125,000 CREEK HAMILTON State Bridges I-24 I-24 BRIDGE OVER GERMANTOWN RD (FAU 3577) 0.010 $3,247,000

HAMILTON State Bridges SR-320 E. BRAINERD RD. BRIDGE OVER CSX R/R 0.010 $2,228,000

HAMILTON State Bridges I-24 I-24 BRIDGE OVER I-24 EB & WB / A643 WILLIAMS 0.010 $3,005,000

HAMILTON Interstate I-24 FROM I-59 TO US-27 10.030 $171,557,785 FROM SR-321(OOLTEWAH-RINGGOLD ROAD) TO HAMILTON Trade SR-317 3.040 $18,900,000 NEAR LAYTON LANE FROM EAST OF BEL-AIR ROAD TO SR-321 HAMILTON Urban Growth SR-320 1.520 $19,278,000 (OOLTEWAH-RINGGOLD ROAD). (BONNY OAKS DRIVE), FROM SR-17 TO INDUSTRY HAMILTON Trade SR-317 0.570 $6,700,000 DRIVE HAMILTON Interstate I-75 INTERCHANGE MODIFICATION AT I-24 0.400 $65,000,000 FROM SR-317 (APISON PIKE) TO SR-320 (EAST HAMILTON Urban Growth SR-321 4.470 $56,700,000 BRAINERD ROAD) FROM SR-27 SUCK CREEK RD TO NORTH OF HAMILTON Trade US-127 (SR-8) 3.060 $5,500,000 PALISADES DRIVE (MOUNTAIN ROAD) INTERCHANGE MODIFICATION AT HAMILTON HAMILTON Interstate I-75 0.420 $40,000,000 PLACE MALL INTERCHANGE MODIFICATION OF I-24 AND SR-2 HAMILTON Interstate I-24 0.870 $37,000,000 (BROAD ST.) / SR-58 (MARKET ST.) (BONNY OAKS DRIVE), FROM ADAMSON CIRCLE TO HAMILTON Trade SR-317 1.160 $20,700,000 WEST OF BONNYSHIRE DRIVE FROM NEAR LAYTON LANE TO EAST BRAINERD HAMILTON Trade SR-317 1.050 $9,200,000 ROAD IN CHATTANOOGA

Data current as of 12/5/2016 25 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion (BONNY OAKS DRIVE) FROM INDUSTRY DRIVE TO HAMILTON Trade SR-317 0.790 $8,300,000 ADAMSON CIRCLE (BONNY OAKS DRIVE), FROM BONNYSHIRE DRIVE HAMILTON Trade SR-317 1.870 $21,200,000 TO I-75 HAMILTON, Interstate I-75 FROM NORTH OF US 64 TO US-74 8.840 $95,065,854 BRADLEY HANCOCK State Bridges SR-33 MAIN ST. BRIDGE OVER GREASY ROCK CREEK 0.010 $601,000

HARDEMAN Local Bridges 865 SAIN RD. BRIDGE OVER SPRING CREEK 0.010 $6,538,000

HARDEMAN Local Bridges 0A191 NEWSTEAD DR. BRIDGE OVER BRANCH 0.010 $475,000

HARDEMAN Local Bridges 0A338 HOWELL RD. BRIDGE OVER WADE CREEK 0.010 $245,000

HARDEMAN State Bridges SR-100 HWY. 100 BRIDGE OVER BRANCH 0.010 $313,000

HARDEMAN Local Bridges 0A230 KENNEDY RD. BRIDGE OVER BRANCH, LM 2.59 0.000 $661,079

HARDEMAN Local Bridges 2320 OLD HWY. 64 BRIDGE OVER BRANCH 0.010 $205,000

HARDEMAN State Bridges SR-125 SILERTON RD. BRIDGE OVER BRANCH 0.010 $281,000

HARDEMAN State Bridges US-64 (SR-15) US-64 BRIDGE OVER OVERFLOW 0.010 $4,696,000 POWELL CHAPEL RD. BRIDGE OVER HATCHIE HARDEMAN Local Bridges 869 0.000 $4,823,963 RIVER, LM 7.92 HARDEMAN State Bridges US-64 (SR-15) US-64 BRIDGE OVER SPRING CREEK 0.010 $5,300,000 (BOLIVAR BYPASS) FROM EAST OF SR-18 TO WEST HARDEMAN Rural Access SR-458 2.960 $21,300,000 OF OLD MIDDLETON ROAD (***) (BOLIVAR BYPASS) FROM US-64 (SR-15) WEST OF HARDEMAN Rural Access SR-458 2.240 $21,300,000 BOLIVAR TO EAST OF SR-18 (***) HARDEMAN, FROM SR-100 IN HARDEMAN COUNTY TO NORTH Trade SR-18 7.820 $77,160,000 MADISON OF MEDON/MALESUS ROAD

Data current as of 12/5/2016 26 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion BURNT CHURCH RD. BRIDGE OVER LITTLE TURKEY HARDIN Local Bridges 1723 0.010 $308,000 CREEK HARDIN Local Bridges 0A048 MARSHALL DR. BRIDGE OVER CHALK CREEK 0.010 $428,000

HARDIN Local Bridges 0A098 LEBANON LOOP BRIDGE OVER FLATS CREEK 0.010 $281,000 HWY. 128 BRIDGE OVER TENN. RIVER (PICKWICK HARDIN State Bridges SR-128 0.010 $12,000,000 DAM) FELLOWSHIP RD. BRIDGE OVER MIDDLETON HARDIN Local Bridges 1754 0.010 $191,000 CREEK CAMPBELL OLD MILL RD. BRIDGE OVER HARDIN Local Bridges 5561 0.010 $740,000 CHAMBERS CREEK HARDIN Local Bridges 0A081 HURRICANE DR. BRIDGE OVER DRAINAGE DITCH 0.010 $565,000

HARDIN Local Bridges 0A308 NICHOLS DR. BRIDGE OVER HORSE CREEK 0.010 $596,000

HARDIN Local Bridges 2702 BIG IVY RD. BRIDGE OVER WHITES CREEK 0.010 $307,000

HARDIN Local Bridges 0A286 HATLEY LOOP BRIDGE OVER HATLEY CREEK 0.010 $373,000

HARDIN Local Bridges 0A232 IRVIN RD. BRIDGE OVER CHOATE CREEK 0.010 $530,000

HARDIN Local Bridges 0A292 FIRST PITTSBURG DR. BRIDGE OVER MUD CREEK 0.010 $356,000 FROM SR-226 (AIRPORT ROAD) TO SOUTH OF ONE HARDIN Rural Access SR-128 2.160 $11,107,000 STOP DRIVE (***) HARDIN Rural Access SR-128 FROM PYBURN RD. TO SR-226 (AIRPORT RD.) (***) 3.430 $3,500,000

HAWKINS Local Bridges 0A682 BROWN RD. BRIDGE OVER BEECH CREEK 0.010 $452,000 US-11W (SR- W. STONE DR. BRIDGE OVER NORTH FORK HAWKINS State Bridges 0.010 $2,947,000 1) HOLSTON RIVER LM 41.30 (LL) HAWKINS State Bridges SR-70 HWY. 70 BRIDGE OVER SOUTHERN RAILWAY 0.010 $1,082,000

Data current as of 12/5/2016 27 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion HAWKINS State Bridges SR-70 HWY. 70 BRIDGE OVER CANEY CREEK 0.010 $598,000

HAWKINS Local Bridges 0A352 AFG RD. BRIDGE OVER SOUTHERN RAILWAY 0.010 $2,170,000

HAWKINS Local Bridges 0A005 OLD HWY. 11 W. BRIDGE OVER CLOUD CREEK 0.010 $272,000 US-11W (SR- W. STONE DR. BRIDGE OVER NORTH FORK HAWKINS State Bridges 0.010 $1,745,000 1) HOLSTON RIVER LM 41.30 (RL) HAWKINS State Bridges SR-31 SR-31 BRIDGE OVER POOR VALLEY CREEK 0.010 $2,243,000 S. ARMSTRONG RD. BRIDGE OVER CROCKETT HAWKINS Local Bridges 0A922 0.010 $134,000 CREEK HAWKINS State Bridges SR-346 E. MAIN ST. BRIDGE OVER SURGOINSVILLE CREEK 0.010 $353,000 WALKERS CHURCH RD. BRIDGE OVER HAWKINS Local Bridges 0A765 0.010 $424,000 ROBERTSON CREEK (FLAT GAP RD.) FROM MOORESBURG TO ADAMS HAWKINS Rural Access SR-31 4.510 $7,200,000 LANE (***) (RE-BUDGETED-ROW) FROM SR-34 IN BULLS GAP TO SOUTH OF HAWKINS Rural Access SR-66 5.620 $32,400,000 SPEEDWELL ROAD./OLD HIGHWAY 66 HAYWOOD Local Bridges 0A152 ESTANAULA RD. BRIDGE OVER BRANCH 0.010 $541,000

HAYWOOD Local Bridges 0A096 STURDIVANT RD. BRIDGE OVER BRANCH 0.010 $487,000

HAYWOOD Local Bridges 0A040 GARRETT RD. BRIDGE OVER LOST CREEK 0.010 $514,000

HAYWOOD State Bridges US-70 (SR-1) HWY. 70 E. BRIDGE OVER MUDDY CREEK 0.010 $946,000 STANTON KOKO RD. BRIDGE OVER PRAIRIE HAYWOOD Local Bridges 1443 0.000 $1,129,176 CREEK, LM 2.54 HAYWOOD Local Bridges 1482 NUNN RD. BRIDGE OVER DISTRICT BRANCH 0.010 $481,000 MT. PLEASANT RD. BRIDGE OVER RICHLAND HAYWOOD Local Bridges 857 0.010 $700,000 CREEK

Data current as of 12/5/2016 28 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion HAYWOOD State Bridges US-70 (SR-1) HWY. 70 E. BRIDGE OVER BRANCH 0.010 $751,000

HAYWOOD Local Bridges 0A035 TOULON RD. BRIDGE OVER BRANCH 0.010 $485,000

HAYWOOD Local Bridges 0A076 GILLISPIE RD. BRIDGE OVER BRANCH 0.010 $455,000 FROM EAST OF BINFORD ROAD TO EAST OF HAYWOOD Rural Access SR-19 3.900 $8,300,000 BOBBY MANN ROAD (***) (BROWNSVILLE BYPASS), FROM EAST OF SR-87 TO HAYWOOD Rural Access SR-19 3.200 $19,400,000 WEST OF WINDROW ROAD FROM LAUDERDALE COUNTY LINE TO EAST OF HAYWOOD Rural Access SR-19 4.000 $8,200,000 BINFORD ROAD (***) FROM EAST OF BOBBY MANN ROAD TO EAST OF HAYWOOD Rural Access SR-19 3.210 $8,400,000 SR-87(***) WAKE FOREST RD. BRIDGE OVER BIG HURRICANE HENDERSON Local Bridges 0A238 0.010 $379,000 DRAINAGE HENDERSON Local Bridges 0A264 BELTON ROBISON RD. BRIDGE OVER BEECH RIVER 0.010 $808,000

HENDERSON Local Bridges 0A266 ROCK HILL RD. BRIDGE OVER HALEY CREEK 0.010 $509,000 DYER RD. BRIDGE OVER MIDDLE PRONG DOE HENDERSON Local Bridges 0A327 0.010 $251,000 CREEK (LEXINGTON BYPASS), FROM SR-22, SOUTH OF HENDERSON Rural Access SR-459 LEXINGTON TO US-412 (SR-20), EAST OF 3.150 $17,600,000 LEXINGTON (***) (LEXINGTON BYPASS), FROM US-412 (SR-20), WEST HENDERSON Rural Access SR-459 OF LEXINGTON TO SR-22, SOUTH OF LEXINGTON 4.380 $29,700,000 (***) SHADY GROVE RD. BRIDGE OVER THOMPSON HENRY Local Bridges 1715 0.010 $607,000 CREEK HENRY Local Bridges 0A210 RED TOP HILL RD. BRIDGE OVER BLOOD RIVER 0.010 $739,000

HENRY Local Bridges 0A113 TERRAPIN CREEK RD. BRIDGE OVER BRANCH 0.010 $262,000

Data current as of 12/5/2016 29 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion SHADY GROVE RD. BRIDGE OVER HOLLEY FORK HENRY Local Bridges 1715 0.010 $173,000 CREEK GOLDSTON SPRINGS RD. BRIDGE OVER CLEAR HENRY Local Bridges 0A072 0.010 $403,000 CREEK TERRAPIN CREEK RD. BRIDGE OVER SUGAR HENRY Local Bridges 0A113 0.010 $974,000 CREEK HAGLER RIDGE RD. BRIDGE OVER CLENDON HENRY Local Bridges 0A434 0.010 $434,000 CREEK GUM SPRINGS RD. BRIDGE OVER MIDDLE FORK HENRY Local Bridges 0A572 0.010 $535,000 OBION RIVER HENRY Local Bridges 0A058 BIRDS CREEK RD. BRIDGE OVER BIRDS CREEK 0.010 $410,000

HENRY Local Bridges 0A118 KUYKENDALL RD. BRIDGE OVER SANDY BRANCH 0.010 $667,000 US-641 (SR- FROM NEAR SMITH ROAD TO KENTUCKY STATE HENRY Rural Access 10.920 $24,363,300 54) LINE HICKMAN Local Bridges 942 CANE CREEK RD. BRIDGE OVER CANE CREEK 0.010 $2,332,000

HICKMAN Local Bridges 0A104 TOM PATTON RD. BRIDGE OVER JONES CREEK 0.010 $125,000 W. BEAVERDAM RD. BRIDGE OVER BEAVER DAM HICKMAN Local Bridges 0A325 0.010 $1,108,000 CREEK E. PLUNDERS CREEK RD. BRIDGE OVER PINEY HICKMAN Local Bridges 0A366 0.010 $410,000 RIVER HICKMAN Local Bridges 1848 GRAYS BEND RD. BRIDGE OVER HALEY CREEK 0.010 $586,000

HICKMAN Local Bridges 0A542 BRIAR POND RD. BRIDGE OVER BLOWING SPRINGS 0.010 $424,000

HICKMAN State Bridges SR-50 HWY. 50 BRIDGE OVER DUCK RIVER 0.010 $9,119,000

HICKMAN Local Bridges 1846 TOTTYS BEND RD. BRIDGE OVER ARNOLD BRANCH 0.010 $226,000

HICKMAN Local Bridges 0A128 FRIENDSHIP LN. BRIDGE OVER MILL CREEK 0.010 $466,000

Data current as of 12/5/2016 30 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion UGLY CREEK RD. BRIDGE OVER BLUE BUCK HICKMAN Local Bridges 0A270 0.010 $590,000 CREEK MINNIE PEARL MEMORIAL HWY BRIDGE OVER HICKMAN State Bridges SR-50 0.010 $5,510,000 DUCK RIVER HICKMAN Local Bridges 0A100 S. TATUM CREEK RD. BRIDGE OVER TATUM CREEK 0.010 $227,000

HICKMAN Local Bridges 961 GOODRICH RD. BRIDGE OVER BRANCH 0.010 $275,000

HICKMAN Local Bridges 1846 TOTTYS BEND RD. BRIDGE OVER DUCK RIVER 0.010 $2,540,000

HICKMAN Local Bridges 0A170 WASHER RD. BRIDGE OVER MILL CREEK 0.010 $1,094,000

HICKMAN Local Bridges 0A756 BARNHILL LN. BRIDGE OVER HALEY CREEK 0.010 $520,000

HICKMAN Local Bridges 961 GOODRICH RD. BRIDGE OVER BIRD CREEK 0.010 $928,000 BAKER HOLLOW RD. BRIDGE OVER LITTLE SPRING HICKMAN Local Bridges 0A176 0.010 $238,000 CREEK W. BEAVERDAM RD. BRIDGE OVER WADES HICKMAN Local Bridges 0A325 0.010 $557,000 BRANCH HICKMAN Local Bridges 0A330 SPRING RD. BRIDGE OVER INDIAN CREEK 0.010 $335,000

HICKMAN Local Bridges 0A802 YATES LN. BRIDGE OVER GARNER CREEK 0.010 $574,000

HICKMAN Safety SR-100 SR-100 AND SR-48 INTERSECTION IMPROVEMENTS 0.100 $2,000,000 HICKMAN, SR-46 FROM I-40 TO THE INTERSECTION OF SR-100 Rural Access SR-46 6.520 $85,224,000 DICKSON AND SR-7 HOUSTON State Bridges SR-49 E. MAIN ST. BRIDGE OVER WELLS CREEK 0.010 $162,900 CARL NORFLEET LN. BRIDGE OVER POLLARD HOUSTON Local Bridges 0A410 0.010 $442,000 BRANCH HOUSTON Local Bridges 1783 TANK HILL RD. BRIDGE OVER ERIN BRANCH 0.010 $68,000

Data current as of 12/5/2016 31 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion HURRICANE LANDING RD. BRIDGE OVER HOUSTON Local Bridges 0A018 0.010 $154,000 HURRICANE CREEK HOUSTON Safety SR-49 FROM SR-13 TO SR-46 (SAFETY IMPROVEMENTS) 9.150 $2,567,000

HUMPHREYS Local Bridges 0A279 WEED LN. BRIDGE OVER BLUE CREEK 0.010 $986,000

HUMPHREYS Local Bridges 0A223 LEE LN. BRIDGE OVER INDIAN CREEK 0.010 $428,000 TUMBLING CREEK RD. BRIDGE OVER TUMBLING HUMPHREYS Local Bridges 0A239 0.010 $719,000 CREEK CUBA LANDING RD. BRIDGE OVER NORTH FORK HUMPHREYS Local Bridges 1794 0.010 $1,186,000 BLUE CREEK HUMPHREYS Local Bridges 0A144 DRY HOLLOW RD. BRIDGE OVER BRANCH 0.010 $428,000

HUMPHREYS State Bridges SR-13 STATE HWY. 13 BRIDGE OVER BLACK BRANCH 0.010 $232,000

HUMPHREYS State Bridges I-40 I-40 BRIDGE OVER BUFFALO RIVER 0.010 $18,724,000

HUMPHREYS State Bridges I-40 I-40 BRIDGE OVER BUFFALO RIVER 0.010 $4,058,000

HUMPHREYS State Bridges SR-13 N. CHURCH ST. BRIDGE OVER SR-13 / TRACE CR 0.010 $3,443,000 SMITH BRANCH RD. BRIDGE OVER WHITE OAK HUMPHREYS Local Bridges 0A171 0.010 $497,000 CREEK HUMPHREYS Local Bridges 0A276 TATEM LN. BRIDGE OVER BLUE CREEK 0.010 $1,061,000 INDIAN CREEK RD. BRIDGE OVER HURRICANE HUMPHREYS Local Bridges 1779 0.010 $64,000 CREEK CEDAR GROVE RD. BRIDGE OVER HURRICANE HUMPHREYS Local Bridges 0A341 0.010 $2,422,000 CREEK HEMBY CEMETERY LN. BRIDGE OVER HEMBY HUMPHREYS Local Bridges 0A058 0.010 $371,000 BRANCH HUMPHREYS Local Bridges 0A124 PATRICK RD. BRIDGE OVER WHITE OAK CREEK 0.010 $115,000

Data current as of 12/5/2016 32 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion TUMBLING CREEK RD. BRIDGE OVER TUMBLING HUMPHREYS Local Bridges 0A239 0.010 $721,000 CREEK CROCKETT MURPHREE LN. BRIDGE OVER NFA HUMPHREYS Local Bridges 0A281 0.010 $2,042,000 A281 / I40 BAKERVILLE RD. BRIDGE OVER DUCK RIVER, LM HUMPHREYS Local Bridges 910 0.000 $9,689,569 15.71 HUMPHREYS Rural Access SR-13 FROM THE PERRY COUNTY LINE TO I-40 3.410 $8,500,000 COX HOLLOW RD. BRIDGE OVER WARTRACE JACKSON Local Bridges 0A021 0.010 $376,000 CREEK (MARTIN CREEK RD.) FROM SR-53 TO US-70N (SR- JACKSON, Safety SR-96 24), (SPOT IMPROVMENTS, SAFETY 8.670 $10,000,000 PUTNAM IMPROVEMENTS) JEFFERSON State Bridges I-81 I-81 BRIDGE OVER RAMP TO I-40 RT LN ONLY 0.010 $2,659,000

JEFFERSON Local Bridges 0A082 DAY RD. BRIDGE OVER LOST CREEK 0.010 $487,000 HEBRON CHURCH RD. BRIDGE OVER DUMPLIN JEFFERSON Local Bridges 0A482 0.010 $451,000 CREEK US-25W (SR- JEFFERSON State Bridges US-25W BRIDGE OVER KOONTZ CREEK 0.010 $2,027,000 9) JEFFERSON Local Bridges 2516 BELL RD. BRIDGE OVER CARTER CREEK 0.010 $442,000

JEFFERSON Local Bridges 0A897 SEAHORN RD. BRIDGE OVER LOST CREEK 0.010 $175,000

JEFFERSON Local Bridges 2453 LOST CREEK RD. BRIDGE OVER LEWIS CREEK 0.010 $397,000

JEFFERSON State Bridges I-40 BRIDGE OVER FRENCH BROAD RIVER, LM 14.70 0.000 $59,722,993

JEFFERSON Local Bridges 2510 MINE RD. BRIDGE OVER LOST CREEK 0.010 $97,000 US-25W (SR- JEFFERSON State Bridges E. MEETING ST. BRIDGE OVER RIMMER CREEK 0.010 $2,008,000 9)

Data current as of 12/5/2016 33 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion JEFFERSON Local Bridges 2510 MINE RD. BRIDGE OVER LOST CREEK 0.010 $445,000

JEFFERSON Local Bridges 2457 WITT RD. BRIDGE OVER LONG CREEK 0.010 $841,000

JEFFERSON Local Bridges 2500 ZIRKLE RD. BRIDGE OVER KOONTZ CREEK 0.010 $520,000

JEFFERSON Local Bridges 0A579 CARMICHAEL RD. BRIDGE OVER LONG CREEK 0.010 $202,000

JEFFERSON Local Bridges 1430 SPRING CREEK RD. BRIDGE OVER LONG CREEK 0.010 $170,000

JEFFERSON Interstate I-81 I-40 TO SR-341 ROY MESSER HWY. 3.810 $49,569,000

JOHNSON Local Bridges 0A064 STAGE COACH LOOP BRIDGE OVER DOE CREEK 0.010 $199,000

JOHNSON Local Bridges 0A296 FORGE CREEK CIR. BRIDGE OVER FORGE CREEK 0.010 $349,000

JOHNSON Local Bridges 0A409 LITTLE DRY RUN RD. BRIDGE OVER ROAN CREEK 0.010 $986,000

JOHNSON Local Bridges 0A375 SLIMP BRANCH RD. BRIDGE OVER ROAN CREEK 0.010 $943,000 FROM NEAR COLD SPRINGS ROAD TO THE JOHNSON Rural Access SR-91 7.810 $90,000,000 VIRGINIA STATE LINE JACKSON AVE., BRS OV RAMP TO GAY ST/GROUND KNOX Local Bridges 0C899 0.000 $5,107,383 AT LM 0.24 AND LM 0.26 IN KNOXVILLE KNOX State Bridges I-275 I-275 BRIDGE OVER I-275 / ELM STREET 0.010 $3,686,000

KNOX State Bridges I-40 I-40 BRIDGE OVER I-40-LL / 17TH. STREET 0.010 $2,903,000 S. NORTHSHORE DR. BRIDGE OVER SINKING KNOX State Bridges SR-332 0.010 $2,711,000 CREEK KNOX State Bridges I-40 I-40 BRIDGE OVER I-40 / WESLEY RD. 0.010 $2,483,000 FROM EMORY ROAD (SR-131) TO RACCOON KNOX Interstate I-75 4.850 $95,480,561 VALLEY ROAD (SR-170)

Data current as of 12/5/2016 34 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion KNOX Interstate I-75 INTERCHANGE AT I-640/275 (SHARPS GAP) 0.860 $75,000,000 US-129 (SR- (ALCOA HWY.) FROM NORTH OF LITTLE RIVER TO KNOX Trade 2.490 $39,000,000 115) NORTH OF MALONEY ROAD US-129 (SR- (ALCOA HWY.) FROM WOODSON DRIVE TO KNOX Trade 1.140 $25,600,000 115) CHEROKEE TRAIL INTERCHANGE KNOX Urban Growth SR-131 (E. EMORY RD.) FROM SR-331 TO SR-33 4.840 $62,244,000 ITS EXPANSION FROM MM 109.6 TO JUST BEFORE KNOX Technology I-75 13.030 $2,000,000 SR-61 (EXIT 122) (KINGSTON PK.) INTERSECTION WITH SR-332 KNOX Safety SR-1/SR-332 0.190 $12,000,000 (NORTHSHORE DR.) INTERCHANGE WITH I-275 (I-40 WESTBOUND KNOX Interstate I-40 0.330 $50,000,000 APPROACH) (OAK RIDGE HWY.) FROM SCHAAD ROAD TO SR- KNOX Urban Growth SR-62 4.220 $69,300,000 131 (PELLISSIPPI PKWY) INTERCHANGE WITH SR-62 KNOX Safety SR-162 0.450 $13,300,000 (OAK RIDGE HWY) IN SOLWAY (CHAPMAN HWY) BLOUNT AVE TO SR-338 (BOYDS KNOX, BLOUNT, US-441 (SR- Safety CREEK HWY) IN SEYMOUR, OPERATIONS & 10.280 $45,268,000 SEVIER 71) SAFETY IMPROVEMENTS (MULTIPLE LOCATIONS) ITS EXPANSION FROM STRAWBERRY PLAINS PIKE KNOX, SEVIER Technology I-40 (EXIT 398) INTERCHANGE TO SR-66 (SEVIERVILLE, 9.170 $2,915,000 EXIT 407) INTERCHANGE FREE BRIDGE RD. BRIDGE OVER RUNNING LAKE Local Bridges 2155 0.010 $985,000 REELFOOT BAYOU LAKE, OBION Rural Access SR-21 FROM SR-78 RO SR-22 5.600 $14,000,000

LAUDERDALE Local Bridges 0A121 DEE WEBB RD. BRIDGE OVER KNOB CREEK 0.010 $569,000

LAUDERDALE Local Bridges 0A257 COON DANCE RD. BRIDGE OVER BRANCH 0.010 $395,000

Data current as of 12/5/2016 35 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion KELLAR AVENUE, BRIDGE OVER HYDE CREEK IN LAUDERDALE Local Bridges 0A164 0.000 $1,139,020 RIPLEY, LM 1.07 UNIONVILLE RD. BRIDGE OVER CHAMBERS LAUDERDALE Local Bridges 4495 0.000 $758,088 BRANCH, LM 2.28 LAUDERDALE Local Bridges 0A110 TURKEY HILL RD. BRIDGE OVER BRANCH 0.010 $757,000

LAUDERDALE Local Bridges 0A140 OLDS RD. BRIDGE OVER BRANCH 0.010 $662,000

LAUDERDALE Local Bridges 0A257 COON DANCE RD. BRIDGE OVER BRANCH 0.010 $448,000

LAUDERDALE Local Bridges 0A291 PARCHMAN RD. BRIDGE OVER BRANCH 0.010 $169,000

LAUDERDALE Local Bridges 821 TWIN RIVERS RD. BRIDGE OVER OVERFLOW 0.010 $1,280,000

LAUDERDALE Local Bridges 0A523 OLD BROWNSVILLE RD. BRIDGE OVER BRANCH 0.010 $508,000

LAUDERDALE Local Bridges 0A316 JOHN MOORER RD. BRIDGE OVER OVERFLOW 0.010 $424,000

LAUDERDALE State Bridges SR-87 SR-87 BRIDGE OVER OVERFLOW 0.010 $508,000

LAUDERDALE Local Bridges 0A099 DR. LEWIS RD. BRIDGE OVER BRANCH 0.010 $223,000

LAUDERDALE Local Bridges 821 TWIN RIVERS RD. BRIDGE OVER OVERFLOW 0.010 $757,000

LAUDERDALE Local Bridges 0A316 JOHN MOORER RD. BRIDGE OVER BRANCH 0.010 $200,000

LAUDERDALE Local Bridges 823 LAWRENCE RD. BRIDGE OVER SUMROW CREEK 0.010 $1,199,000

LAUDERDALE Local Bridges 0A142 KEY CORNER RD. BRIDGE OVER BRANCH 0.010 $362,000 CHISHOLM LAKE ROAD OVER COLD CREEK, LM LAUDERDALE Local Bridges 0A081 0.000 $1,610,870 4.63 FAYE BARFIELD RD. BRIDGE OVER BRANCH OF LAUDERDALE Local Bridges 0A064 0.010 $509,000 HATCHIE RIVER

Data current as of 12/5/2016 36 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion LAUDERDALE Local Bridges 0A291 PARCHMAN RD. BRIDGE OVER BRANCH 0.010 $383,000

LAUDERDALE Local Bridges 0A094 SUTTON RD. BRIDGE OVER BRANCH 0.010 $430,000 FROM SOUTH OF SR-19 TO SOUTH OF COFFEE LAUDERDALE Trade I-69 4.140 $50,449,720 SHOP ROAD FROM SOUTH OF DRY HILL ROAD TO NORTH OF LAUDERDALE Trade I-69 5.640 $65,726,300 SR-88 FROM EAST OF EASTLAND AVE. TO HAYWOOD LAUDERDALE Rural Access SR-19 3.940 $11,800,000 COUNTY LINE (***) LAUDERDALE Trade I-69 FROM SOUTH OF SR-87 TO SOUTH OF SR-19 5.440 $78,580,000 FROM SOUTH OF COFFEE SHOP ROAD TO SOUTH LAUDERDALE Trade I-69 5.150 $74,000,000 OF DRY HILL ROAD LAUDERDALE, Trade I-69 FROM LEIGH'S CHAPEL ROAD TO SOUTH OF SR-87 3.320 $47,900,000 TIPTON LAWRENCE Local Bridges 1426 BUSBY RD. BRIDGE OVER SHOAL CREEK 0.010 $1,687,000 PLEASANT VALLEY RD. BRIDGE OVER DRY LAWRENCE Local Bridges 0A197 0.010 $184,000 WEAKLEY CREEK LEWIS Local Bridges 0A098 SICKLER RD. BRIDGE OVER BUFFALO RIVER 0.010 $940,000

LINCOLN Local Bridges 0A165 PROVIDENCE RD. BRIDGE OVER BRANCH 0.010 $352,000

LINCOLN Local Bridges 0A405 KIDD LN. BRIDGE OVER ELK RIVER 0.010 $3,862,000 STEELMAN RD. BRIDGE OVER EAST FORK LINCOLN Local Bridges 0A001 0.010 $686,000 MULBERRY CREEK WELLS LEE RD. BRIDGE OVER BIG HUCKLEBERRY LINCOLN Local Bridges 1967 0.010 $830,000 CREEK PROVIDENCE RD. BRIDGE OVER MULBERRY LINCOLN Local Bridges 0A187 0.010 $751,000 CREEK

Data current as of 12/5/2016 37 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion US-231/431 (HUNTSVILLE HWY.) FROM SOUTH OF ELK RIVER LINCOLN Rural Access 1.410 $17,766,000 (SR-10) TO THE INTERSECTION OF SR-110 LOUDON State Bridges I-40 I-40 BRIDGE OVER I-75 NBL 0.010 $5,105,000

LOUDON Local Bridges 1251 SUGAR LIMB RD. BRIDGE OVER I-75 0.010 $3,667,000

LOUDON Local Bridges 0A808 ELM ST. BRIDGE OVER BACON CREEK 0.010 $89,000 FROM POND CREEK ROAD (SR-323) TO THE I-40/I- LOUDON Interstate I-75 16.030 $200,182,597 75 JUNCTION MACON Local Bridges 02087 SYCAMORE VALLEY RD. BRIDGE OVER BRANCH 0.010 $251,000

MACON Safety SR-56 VARIOUS SAFETY PROJECTS 20.110 $150,000

MADISON State Bridges SR-223 SHADY GROVE RD. BRIDGE OVER BRANCH 0.010 $440,000

MADISON Local Bridges 3043 AIRWAYS BLVD. BRIDGE OVER BRANCH 0.010 $1,196,000

MADISON Local Bridges 3058 JACKSON ST. BRIDGE OVER WEST TENNESSEE RR 0.010 $1,660,000 GEORGE ANDERSON RD. BRIDGE OVER MADISON Local Bridges 0A166 0.010 $515,000 OVERFLOW MADISON Local Bridges 0A364 AGINS RD. BRIDGE OVER OVERFLOW 0.010 $476,000

MADISON Local Bridges 0A386 VINSON RD. BRIDGE OVER OVERFLOW 0.010 $175,000

MADISON Local Bridges 868 MIFFLIN RD. BRIDGE OVER BRANCH 0.010 $509,000

MADISON Local Bridges 0A980 WESTOVER RD. BRIDGE OVER OVERFLOW 0.010 $1,858,000

MADISON Local Bridges 0A538 HICKS AVE. BRIDGE OVER BOND CREEK 0.010 $409,000

MADISON Local Bridges 0A310 JOHN BROWN RD. BRIDGE OVER BRANCH 0.010 $712,000

MADISON State Bridges SR-152 LAW RD. BRIDGE OVER I-40 0.010 $2,009,000

Data current as of 12/5/2016 38 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion WESTOVER RD. BRIDGE OVER ANDERSON MADISON Local Bridges 0A980 0.010 $355,000 BRANCH MADISON Local Bridges 0A980 WESTOVER RD. BRIDGE OVER OVERFLOW 0.010 $1,643,000

MADISON Local Bridges 0A092 TURNER LOOP BRIDGE OVER BRANCH 0.010 $713,000 WALTER HELMS CUT-OFF RD. BRIDGE OVER MADISON Local Bridges 0A224 0.010 $352,000 BRANCH MADISON Local Bridges 0A980 WESTOVER RD. BRIDGE OVER OVERFLOW 0.010 $1,267,000

MADISON Local Bridges 870 COLLINS RD. BRIDGE OVER COBB CREEK 0.010 $196,000

MADISON Local Bridges 0A603 1ST ST. BRIDGE OVER ANDERSON BRANCH 0.010 $281,000 FROM EAST OF SR-5 (US-45) TO SR-1 (US-70) IN MADISON Interstate I-40 4.620 $46,800,000 JACKSON (BOLIVAR HWY.) FROM NORTH OF MEDON- MADISON Trade SR-18 6.760 $17,400,000 MALESUS ROAD TO US-45 (SR-5) IN JACKSON (***) US-45 BP (SR- (SOUTHERN BYPASS) SR-186 FROM SR-1 (AIRWAYS MADISON Urban Growth 5.300 $162,948,000 186) BLVD.) TO SR-5 (SO HIGHLAND AVE.) IN JACKSON MADISON Technology I-40 ITS EXPANSION ALONG I-40 IN THE JACKSON AREA 10.460 $1,600,000 FROM WEST OF US-412 (SR-20, HOLLYWOOD MADISON Interstate I-40 1.620 $19,500,000 DRIVE) TO WEST OF US-45 BYPASS (SR-186) MARION Local Bridges 2153 ORME RD. BRIDGE OVER DRY CREEK 0.010 $418,000 APPROX 1 MILE WEST OF CEDAR AVE IN SOUTH MARION Rural Access SR-156 0.700 $8,000,000 PITTSBURG TO APPROXIMATELY 1.7 MILES WEST US-64/72 (SR- MARION Rural Access FROM KIMBALL TO JASPER 3.190 $27,984,000 2) MARSHALL Local Bridges 0A273 E. HILL AVE. BRIDGE OVER CSX R/R 0.010 $859,000 US-31A (SR- MARSHALL State Bridges NASHVILLE HWY. BRIDGE OVER ROCK CREEK 0.010 $3,542,000 11)

Data current as of 12/5/2016 39 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion HATCHETT ROAD, BRIDGE OVER HATCHETT RIVER MARSHALL Local Bridges 0A261 0.000 $547,963 IN CORNERSVILLE, LM 0.12 MARSHALL State Bridges SR-130 HIGH ST. BRIDGE OVER CANE CREEK 0.010 $2,024,000

MAURY Local Bridges 0A064 ROBERTS BEND RD. BRIDGE OVER DUCK RIVER 0.010 $709,000

MAURY Local Bridges 0A408 ASHWOOD RD. BRIDGE OVER BIG BIGBY CREEK 0.010 $607,000

MAURY State Bridges SR-247 SNOW CREEK RD. BRIDGE OVER LEIPERS CREEK 0.010 $337,000

MAURY Local Bridges 04624 MT. OLIVET RD. BRIDGE OVER BEAR CREEK 0.010 $373,000 MARTIN HOLLOW RD. BRIDGE OVER S. FK. MAURY Local Bridges 0A326 0.010 $785,000 FOUNTAIN CREEK VESTAL HOLLOW RD. BRIDGE OVER LEIPERS MAURY Local Bridges 0A048 0.010 $601,000 CREEK MAURY Local Bridges 1897 HOWARD BRIDGE RD. BRIDGE OVER DUCK RIVER 0.010 $2,453,000

MAURY Local Bridges 0A068 ALGIE SEWELL RD. BRIDGE OVER LEIPERS CREEK 0.010 $629,000

MAURY Local Bridges 0A358 OLD HWY. 43 BRIDGE OVER BIG BIGBY BRANCH 0.010 $1,480,000

MAURY Local Bridges 0A381 ARROW MINES RD. BRIDGE OVER SUGAR CREEK 0.010 $383,000

MAURY Local Bridges 0A161 CRANFORD HOLLOW RD. BRIDGE OVER BRANCH 0.010 $139,000

MAURY State Bridges SR-243 N. MAIN ST. BRIDGE OVER SUGAR CREEK 0.010 $2,129,000 N. JAMES M. CAMPBELL BLVD BRIDGE OVER MAURY Local Bridges 03194 0.010 $220,000 TENNESSEE SOUTHERN R/R MAURY Local Bridges 0A570 OLD SOWELL MILL PK. BRIDGE OVER DUCK RIVER 0.010 $3,190,000

MAURY Local Bridges 0A163 MARTIN DR. BRIDGE OVER LYTLE CREEK 0.010 $268,000

Data current as of 12/5/2016 40 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion CARPENTER BRIDGE RD. BRIDGE OVER PUMPKIN MAURY Local Bridges 0A177 0.010 $394,000 CREEK MARTIN HOLLOW RD. BRIDGE OVER CAMPBELL MAURY Local Bridges 0A326 0.010 $499,000 STATION BRANCH CURRY BRANCH RD. BRIDGE OVER BAPTIST MAURY Local Bridges 0A424 0.010 $679,000 CREEK MAURY Local Bridges 0B021 CRAIG BRIDGE RD. BRIDGE OVER DUCK RIVER 0.010 $3,304,000 OLD SOWELL MILL PK. BRIDGE OVER CEDAR MAURY Local Bridges 0B310 0.010 $428,000 CREEK MAURY Local Bridges 01924 SEAVY HIGHT RD. BRIDGE OVER FOUNTAIN CREEK 0.010 $1,784,000 LAWRENCEBURG HWY. BRIDGE OVER MAURY Local Bridges 02733 0.010 $931,000 RATTLESNAKE FALLS BRANCH MAURY Local Bridges 0A064 ROBERTS BEND LN. BRIDGE OVER KNOB CREEK 0.010 $544,000

MAURY Local Bridges 0B561 JOHN LUNN RD. BRIDGE OVER AENON CREEK 0.010 $662,000

MAURY Local Bridges 0A051 MARTIN ERVIN RD. BRIDGE OVER LEIPERS CREEK 0.010 $433,000

MAURY Local Bridges 0A412 ROY THOMPSON RD. BRIDGE OVER DOG BRANCH 0.010 $106,000 BIGBYVILLE RD. BRIDGE OVER LITTLE BIGBY MAURY Local Bridges 01916 0.010 $185,000 CREEK LAWRENCEBURG HWY. BRIDGE OVER TENNESSEE MAURY Local Bridges 02733 0.010 $1,355,000 SOUTHERN RR MAURY Local Bridges 0A189 DAIMWOOD RD. BRIDGE OVER CEDAR CREEK 0.010 $224,000

MAURY Local Bridges 0B625 JONES VALLEY RD. BRIDGE OVER BRANCH 0.010 $235,000

MAURY Interstate I-65 US-412 (SR-99), INTERCHANGE MODIFICATION 0.800 $5,600,000 FROM WEST OF US-43 (SR-6) TO US-412 (SR-99) @ MAURY, LEWIS Rural Access SR-166 6.230 $60,500,000 LEWIS COUNTY LINE

Data current as of 12/5/2016 41 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion COLUMBIA PIKE WIDENING OF US-31 (COLUMBIA MAURY, Urban Growth US-31 PIKE) DUPLEX RD. IN SPRING HILL TO I-840 IN 3.280 $60,000,000 WILLIAMSON THOMPSON'S STATION MCMINN State Bridges SR-39 SR-39 BRIDGE OVER MIDDLE CREEK 0.010 $2,482,000

MCMINN State Bridges SR-163 ETOWAH RD. BRIDGE OVER CONASAUGA CREEK 0.010 $2,216,000 INTERCHANGE IMPROVEMENTS AT SR-30 AND SR- MCMINN Interstate I-75 0.920 $2,035,000 305 (RAMP TERMINALS AND SIGNALS) MCNAIRY Local Bridges 01657 BUTLER CHAPEL RD. BRIDGE OVER INDIAN CREEK 0.010 $811,000

MCNAIRY State Bridges SR-57 SR-57 BRIDGE OVER BRANCH 0.010 $2,266,000

MCNAIRY State Bridges SR-57 SR-57 BRIDGE OVER OVERFLOW 0.010 $2,540,000

MCNAIRY Local Bridges 0A658 MT. VINSON RD. BRIDGE OVER CLEAR CREEK 0.010 $154,000

MCNAIRY State Bridges US-64 (SR-15) COURT AVE. BRIDGE OVER CYPRESS CREEK 0.010 $4,108,000

MEIGS Local Bridges 0A022 BIG SEWEE RD. BRIDGE OVER SEWEE CREEK 0.010 $1,156,000 W. MEMORIAL DR. BRIDGE OVER DECATUR MEIGS Local Bridges 0A733 0.010 $526,000 BRANCH MONROE State Bridges US-11 (SR-2) S. MAIN ST. BRIDGE OVER SWEETWATER CREEK 0.010 $2,000,000 MT. PLEASANT RD. BRIDGE OVER MULBERRY MONROE Local Bridges 01139 0.010 $196,000 CREEK POVO RD. BRIDGE OVER NORTH FORK NOTCHY MONROE Local Bridges 02344 0.010 $214,000 CREEK POVO RD. BRIDGE OVER NORTH FORK NOTCHY MONROE Local Bridges 02344 0.010 $190,000 CREEK (SWEETWATER VONORE RD.) FROM SHEPPARD MONROE Rural Access SR-322 2.000 $8,500,000 ROAD TO SR-72 (***)

Data current as of 12/5/2016 42 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion (SWEEETWATER VONORE RD.) FROM MONROE Rural Access SR-322 SWEETWATER-VONORE ROAD TO SHEPPARD 5.140 $24,000,000 ROAD (***) DOTSONVILLE RD. BRIDGE OVER CUMMINGS MONTGOMERY Local Bridges 00975 0.010 $760,000 CREEK MONTGOMERY Local Bridges 01863 COOPER CREEK RD. BRIDGE OVER BRANCH 0.010 $241,000

MONTGOMERY Local Bridges 03148 DUNBAR CAVE RD. BRIDGE OVER BRANCH 0.010 $277,000 SULPHUR SPRINGS RD. BRIDGE OVER SULPHUR MONTGOMERY Local Bridges 0A009 0.010 $461,000 BRANCH MONTGOMERY Local Bridges 01861 BUDDS CREEK RD. BRIDGE OVER BUDDS CREEK 0.010 $799,000

MONTGOMERY Local Bridges 0A089 RINGGOLD RD. BRIDGE OVER IC R/R (REMOVED) 0.010 $1,432,000

MONTGOMERY Local Bridges 0A394 AKIN RD. BRIDGE OVER LOUISE CREEK 0.010 $580,000

MONTGOMERY Local Bridges 01888 SHADY GROVE RD. BRIDGE OVER MCADOO CREEK 0.010 $383,000

MONTGOMERY State Bridges SR-13 KRAFT ST. BRIDGE OVER IC R/R (REMOVED) 0.010 $2,701,000

MONTGOMERY Interstate I-24 FROM TN STATE LINE TO SR-76 (EXIT 11) 10.630 $150,105,000

MONTGOMERY Urban Growth SR-48 (TRENTON ROAD), FROM SR-374 TO I- 24 3.720 $36,700,000 FROM DOTSONVILLE ROAD TO US-79 (SR-76) (RE- MONTGOMERY Trade SR-374 2.970 $16,600,000 BUDGETED-ROW&STAGE CONST) SR-374; FROM DOTSONVILLE ROAD TO SR-149, SR- MONTGOMERY Trade SR-149/374 149 FROM SR-374 TO RIVER ROAD (RE-BUDGETED- 5.440 $51,400,000 ROW) MONTGOMERY Maintenance I-24 "CLARKSVILLE" WELCOME CENTER RENOVATION 0.100 $3,000,000 TURKEY CREEK LOOP BRIDGE OVER TURKEY MOORE Local Bridges 0A083 0.010 $290,000 CREEK

Data current as of 12/5/2016 43 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion SR-55 AT THE INTERSECTION OF GOODBRANCH MOORE Safety SR-55 0.200 $1,680,000 ROAD TO MOORE COUNTY HIGH SCHOOL (LYNCHBURG HWY.) SR-55 PASSING LANE FROM THE INTERSECTION AT RIDDLE ROAD TO THE 5 MOORE Safety SR-55 1.820 $5,040,000 POINTS ROAD INTERSECTION (SAFETY IMPROVEMENTS) FROZEN HEAD STATE PARK RD BRIDGE OVER MORGAN Local Bridges 0A413 0.010 $754,000 FLAT FORK CREEK MORGAN State Bridges SR-298 GENESIS RD. BRIDGE OVER CLEAR CREEK 0.010 $2,312,000

MORGAN Local Bridges 0A409 WMA RD. BRIDGE OVER ISLAND CREEK 0.010 $874,000 PETROS HWY. BRIDGE OVER STOCKSTILL CREEK MORGAN State Bridges SR-116 0.010 $478,000 LM2.60 MORGAN Local Bridges 2378 CAMP AUSTIN RD. BRIDGE OVER HALL BRANCH 0.010 $479,000 PETROS HWY. BRIDGE OVER STOCKSTILL CREEK MORGAN State Bridges SR-116 0.010 $479,000 LM 2.26 MORGAN Local Bridges 0A153 HEBBERTBURG RD. BRIDGE OVER ISLAND CREEK 0.010 $418,000

MORGAN Local Bridges 0A253 MACEDONIA RD. BRIDGE OVER EMORY RIVER 0.010 $550,000 MORGAN COUNTY HWY. BRIDGE OVER MORGAN State Bridges US-27 (SR-29) 0.010 $263,000 MASSINGALE CREEK MORGAN Local Bridges 0A019 SEXTON LOOP BRIDGE OVER WHITEOAK CREEK 0.010 $158,000 FROM NORTH OF RAY CROSS RD / MOSSY RD. MORGAN Rural Access US-27 (SR-29) (FORMERLY WESTMINSTER RD.) TO SR-62 IN 4.910 $39,600,000 WARTBURG (KNOXVILLE HWY.) FROM OLIVER SPRINGS TO MORGAN Rural Access SR-62 10.550 $88,368,000 NEAR PETIT LANE FROM NORTH OF SR-328 TO NORTH OF RAY MORGAN Rural Access US-27 (SR-29) CROSS RD/MOSSY GROVE RD(FORMERLY 2.700 $63,700,000 WESTMINSTER RD)

Data current as of 12/5/2016 44 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion OBION State Bridges US-51 (SR-3) N. US-HWY. 51 BRIDGE OVER BRANCH 0.010 $410,000

OBION Local Bridges 0A283 TOWN AND COUNTRY RD. BRIDGE OVER BRANCH 0.010 $445,000 OLD TURNPIKE RD. BRIDGE OVER OLD OBION OBION Local Bridges 2122 0.010 $799,000 RIVER BED OBION Local Bridges 0A578 W. MIDDLE TRIMBLE RD. BRIDGE OVER BRANCH 0.010 $235,000

OBION Local Bridges 0A815 COLLEGE ST. BRIDGE OVER HARRIS FORK CREEK 0.010 $823,000

OBION Local Bridges 0A057 CHERRY RD. BRIDGE OVER BRANCH 0.010 $341,000

OBION Local Bridges 01433 S. BLUFF RD. BRIDGE OVER BROWNS CREEK 0.010 $976,000

OBION Local Bridges 01525 SIMMONS RD. BRIDGE OVER OVERFLOW 0.010 $1,232,000

OBION Local Bridges 01528 PHESBUS RD. BRIDGE OVER DAVIDSON CREEK 0.010 $815,000

OBION Local Bridges 1524 W. BLACK LN. RD. BRIDGE OVER MILL CREEK 0.010 $1,064,000

OBION Local Bridges 0A047 PATE RD. BRIDGE OVER DAVIDSON CREEK 0.010 $460,000 US-45W (SR- FROM TROY STATION ROAD TO ALLIE CAMPBELL OBION Rural Access 6.160 $15,491,600 5) ROAD (***) OBION Trade I-69 FROM SOUTH OF SR-3 TO SOUTH OF SR-5 0.370 $9,000,000 FROM SOUTH OF SR-21 (TROY-RIVES ROAD) TO OBION Trade I-69 4.620 $48,200,000 SOUTH OF US-51 FROM WEST OF SR-21 TO US-51 NEAR MAYBERRY OBION Trade I-69 4.840 $62,762,588 ROAD I-69 FROM ROGERS RD IN KENTUCKY TO SR-3 (US- OBION Trade I-69 1.440 $50,400,000 45W & US-51) IN OBION COUNTY OBION Trade I-69 FROM SOUTH OF SR-5 TO WEST OF SR-21 3.990 $12,000,000

Data current as of 12/5/2016 45 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion FROM 1.2 MILES SOUTH OF SR-183 TO SOUTH OF OBION Trade I-69 3.810 $54,400,000 SR-21 (TROY-RIVES ROAD) US-45W (SR- FROM ALLIE CAMPBELL ROAD TO US-51 (SR-3) IN OBION Rural Access 2.290 $13,633,000 5) UNION CITY (***) OLD SR-42/RICKMAN RD. BRIDGE OVER CARR OVERTON Local Bridges 01506 0.000 $3,293,424 CREEK, LM 9.06 BIG LAUREL CREEK RD. BRIDGE OVER BIG LAUREL OVERTON Local Bridges 0A255 0.010 $544,000 CREEK WINDLE COMMUNITY RD. BRIDGE OVER R0ARING OVERTON Local Bridges 01205 0.010 $1,228,000 RIVER (JAMESTOWN HWY.) FROM SR-52/85, WEST OF OVERTON Safety SR-52 6.240 $600,000 ALPINE TO WEST OF PICKETT COUNTY LINE (***) MOUSETAIL LANDING RD. BRIDGE OVER SPRING PERRY Local Bridges 0A008 0.010 $206,000 CREEK PERRY Local Bridges 0921 S. MILL ST. BRIDGE OVER BUFFALO RIVER 0.010 $5,131,000

PERRY Local Bridges 0A202 CULPS BEND RD. BRIDGE OVER WHITEOAK CREEK 0.010 $1,034,000 3 SPOT IMPROVEMENTS AT (E,H,K), FROM SR-20 PERRY Rural Access SR-13 1.290 $5,300,000 TO SOUTH OF THE HUMPHREYS COUNTY LINE 4 SPOT IMPROVEMENTS AT LOCATIONS B, C, D & F PERRY Rural Access SR-13 FROM SR-20 TO SOUTH OF THE HUMPHREYS 1.740 $4,200,000 COUNTY LINE US-64/74 (SR- POLK State Bridges US-HWY. 64 BRIDGE OVER NORTH POTATO CREEK 0.010 $2,999,000 40) POLK State Bridges SR-68 SR-68 BRIDGE OVER SR-40 0.010 $2,012,000 BOANERGES CHURCH RD. BRIDGE OVER OLD POLK Local Bridges 0A207 0.000 $330,825 FORT CREEK, LM 3.29 POLK Local Bridges 0A317 COLUMBUS RD. BRIDGE OVER CSX R/R, LM 1.13 0.000 $1,022,904

POLK State Bridges SR-68 OCOEE ST. BRIDGE OVER DAVIS MILL CREEK 0.010 $2,411,000

Data current as of 12/5/2016 46 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion EASLEY FORD RD, BRIDGE OVER CONASAUGA POLK Local Bridges 02268 0.000 $1,004,550 RIVER, LM 1.53 REYNOLDS BRIDGE RD. BRIDGE OVER OCOEE POLK Local Bridges 02309 0.010 $886,000 RIVER US-64/74 (SR- POLK State Bridges US-HWY. 64 BRIDGE OVER OCOEE RIVER 0.010 $6,968,000 40) US-64/74 (SR- (OCOEE RIVER GORGE BYPASS) APPALACHIA POLK Trade 2.160 $200,000,000 40) CORRIDOR "K" (PHASE 3, RE-BUDGETED CONSTR) US-64/74 (SR- (OCOEE RIVER GORGE BYPASS) APPALACHIA POLK Trade 23.060 $300,000,000 40) CORRIDOR "K" (PHASE 1) (N. WILLOW AVE.) FROM WEST BROAD STREET TO PUTNAM Safety SR-135 0.990 $35,800,000 WEST 12TH STREET PUTNAM Rural Access SR-136 (S. JEFFERSON AVE.) FROM I-40 TO SR-111 2.230 $20,070,000

RHEA Local Bridges 0A024 HARRISON AVE. BRIDGE OVER ROARING CREEK 0.010 $1,490,000 (OLD WASHINGTON HWY.) FROM US-27 (SR-29) TO RHEA Rural Access SR-30 8.060 $44,100,000 WEST OF THE TENNESSEE RIVER BRIDGE ROANE Local Bridges 0B076 MAIN ST. BRIDGE OVER INDIAN CREEK 0.010 $502,000

ROANE Local Bridges 0A448 SCENIC DR. BRIDGE OVER I-40 0.010 $1,709,000

ROANE State Bridges I-40 I-40 BRIDGE OVER & NFA A774 0.010 $2,893,000

ROANE Local Bridges 01425 CANEY CREEK ROAD OVER CANEY CREEK, LM 3.94 0.000 $1,192,000

ROANE State Bridges US-27 (SR-29) US-HWY. 27 BRIDGE OVER SR-29 / SR-61 0.010 $2,564,000

ROANE Local Bridges 01226 PANSY HILL DR. BRIDGE OVER EMORY RIVER 0.010 $1,418,000

ROANE State Bridges US-27 (SR-29) S. ROANE ST. BRIDGE OVER EMORY RIVER 0.010 $21,772,000

ROANE Local Bridges 02374 POPLAR CREEK RD. BRIDGE OVER POPLAR CREEK 0.010 $1,735,000

Data current as of 12/5/2016 47 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion ROANE Rural Access US-70 (SR-1) FROM SR-382 TO MIDTOWN (SR-29) 3.530 $26,500,000 EXPERIMENT STATION RD. BRIDGE OVER ROBERTSON Local Bridges 05353 0.010 $686,000 WARTRACE CREEK CROSS PLAINS RD. BRIDGE OVER EMPSON ROBERTSON Local Bridges 01021 0.010 $62,000 BRANCH KINNEYS SCHOOL RD. BRIDGE OVER SULPHUR ROBERTSON Local Bridges 0A480 0.010 $1,093,000 FORK CREEK ROBERTSON State Bridges SR-49 SR-49 BRIDGE OVER CALEBS CREEK 0.010 $820,000

ROBERTSON State Bridges SR-76 SR-76 BRIDGE OVER SULPHUR FORK CREEK 0.010 $4,751,000

ROBERTSON Interstate I-24 RAMP IMPROVEMENTS EXIT 19 AND 24 3.140 $8,800,000

ROBERTSON Maintenance I-65 WEIGH STATION 0.040 $14,500,000

ROBERTSON Rural Access SR-76 FROM CHARLES DRIVE TO NEW HALL ROAD 2.070 $2,620,800 US-231 (SR- RUTHERFORD State Bridges S. CHURCH ST. BRIDGE OVER CSX R/R 0.010 $13,255,000 10) US-41A (SR- RUTHERFORD State Bridges S. MAIN ST. BRIDGE OVER KELLY CREEK 0.010 $1,042,000 16) RUTHERFORD State Bridges SR-96 FRANKLIN RD. BRIDGE OVER BRANCH 0.010 $695,000

RUTHERFORD State Bridges SR-99 BRADYVILLE PK. BRIDGE OVER MURRAY CREEK 0.010 $449,000 (N. THOMPSON LN.) FROM US-41/70S (SR-1) TO SR- RUTHERFORD Urban Growth SR-268 4.310 $25,600,000 10 (NEW SALEM HIGHWAY), FROM CASON LANE TO I- RUTHERFORD Urban Growth SR-99 2.130 $30,800,000 24 IN MURFREESBORO (W. JEFFERSON PIKE) FROM SR-102 TO EAST OF I- RUTHERFORD Urban Growth SR-266 3.800 $26,530,578 840 I-24 RAMP IMPROVEMENTS EXITS 66, 70, 81, 84 RUTHERFORD Interstate I-24 15.710 $22,200,000 AND 89

Data current as of 12/5/2016 48 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion (BRADYVILLE PIKE), FROM US-41 (SR-2, SE BROAD RUTHERFORD Urban Growth SR-99 STREET) TO RUTHERFORD BOULEVARD IN 2.150 $10,600,000 MURFREESBORO (NEW SALEM HIGHWAY), FROM I-24 TO SR-96 (OLD RUTHERFORD Urban Growth SR-99 1.320 $7,020,000 FORT PARKWAY) IN MURFREESBORO I-24 INTERCHANGE IMPROVEMENTS, 3 LOCATIONS RUTHERFORD Interstate I-24 6.140 $45,600,000 EXIT 74, 78, AND 80 (NEW SALEM HIGHWAY), FROM SW LOOP ROAD TO RUTHERFORD Urban Growth SR-99 1.970 $26,900,000 CASON LANE SCOTT Local Bridges 0A209 BLACK CREEK RD. BRIDGE OVER BRANCH 0.010 $194,000 NIGGS CREEK RD. BRIDGE OVER SOUTHERN SCOTT Local Bridges 02400 0.010 $463,000 RAILWAY SCOTT Local Bridges 0A040 O AND W RD. BRIDGE OVER PINE CREEK 0.010 $998,000

SCOTT Local Bridges 0A137 ANGEL VALLEY RD. BRIDGE OVER JELLICO CREEK 0.010 $638,000 GRAVE HILL RIDGE RD. BRIDGE OVER SCOTT Local Bridges 0A008 0.010 $178,000 PUNCHEONCAMP CREEK STANLEY CREEK RD. BRIDGE OVER STANLEY SCOTT Local Bridges 0A450 0.010 $551,000 CREEK (ONEIDA BYPASS) FROM 5-LN SECTION NORTH OF SCOTT Rural Access US-27 (SR-29) 5.030 $3,500,000 ONEIDA TO 5-LN SECTION SOUTH OF ONEIDA (LON FOUST HWY.) FROM NORTH OF WOLF CREEK SCOTT Rural Access US-27 (SR-29) ROAD TO OLD US-27 AT ROBBINS (***) (RE- 3.790 $29,100,000 BUDGETED-ROW) (RUGBY HWY.) FROM MORGAN COUNTY LINE TO SCOTT Rural Access SR-52 5.030 $1,000,000 SR-29 (US-27) (***) SEQUATCHIE, Rural Access SR-28 FROM DUNLAP TO PIKEVILLE 17.330 $2,000,000 BLEDSOE SEVIER Local Bridges 0A852 SPRUCE LN. BRIDGE OVER ROARING FORK CREEK 0.010 $446,000

Data current as of 12/5/2016 49 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion US-321/421 PARKWAY BRIDGE OVER W.FK.LITTLE PIGEON SEVIER State Bridges 0.010 $4,115,000 (SR-71) RIVER US-321 (SR- (EAST PKWY.) FROM BUCKHORN ROAD TO SR-416 SEVIER Rural Access 0.980 $35,900,000 73) (PHASE 2) (***) (JAKE THOMAS CONNECTOR) FROM SR-449 TO SR- SEVIER Rural Access SR-XXX 2.010 $28,000,000 73 (US-321/441) (VETERANS BLVD.) FROM SR-35 TO ROBERT SEVIER Rural Access SR-449 EXT 0.390 $17,000,000 HENDERSON ROAD (NEWPORT HWY.) FROM SIMS ROAD IN SEVIER SEVIER, US-411 (SR- Trade COUNTY TO SR-92 (DICKEY ROAD) IN JEFFERSON 4.440 $35,300,000 JEFFERSON 35) COUNTY SHELBY State Bridges SR-14 JACKSON AVE. BRIDGE OVER HARRISON CREEK 0.010 $3,208,000

SHELBY State Bridges US-51 (SR-3) THOMAS ST. BRIDGE OVER OVERFLOW 0.010 $6,668,000

SHELBY State Bridges US-51 (SR-3) THOMAS ST. BRIDGE OVER CNIC R/R 0.010 $3,574,000 US-70/79 (SR- SHELBY State Bridges US-HWY. 70 / 79 BRIDGE OVER CLEAR CREEK 0.010 $2,780,000 1) SHELBY State Bridges US-72 (SR-57) POPLAR AVE. BRIDGE OVER CYPRESS CREEK 0.010 $2,149,000 LAMAR AVE. BRIDGE OVER RAMPS FROM I-240 & SHELBY State Bridges US-78 (SR-4) 0.010 $3,355,000 SR-4 (LAMAR AVE.) FROM RAINES ROAD/PERKINS ROAD SHELBY Trade US-78 (SR-4) 1.580 $81,400,000 INTERCHANGE TO GETWELL ROAD (SR-176) (AUSTIN PEAY HWY.) FROM EAST OF KERRVILLE- SHELBY Urban Growth SR-14 4.240 $20,000,000 ROSEMARK ROAD TO TIPTON COUNTY LINE (LAMAR AVE.) FROM MISSISSIPPI STATE LINE TO SHELBY Trade US-78 (SR-4) 1.510 $42,000,000 SOUTH OF SHELBY DRIVE (AUSTIN PEAY HWY.) FROM SR-385 (PAUL BARRETT SHELBY Urban Growth SR-14 4.780 $20,000,000 PKWY) TO EAST OF KERRVILLE-ROSEMARK ROAD

Data current as of 12/5/2016 50 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion FROM SR-177 (GERMANTOWN ROAD) TO 1.0 MILE SHELBY Interstate I-40 3.810 $47,000,000 EAST OF CANADA ROAD FROM 1.0 MILE EAST OF CANADA ROAD TO SR-205 SHELBY Interstate I-40 3.880 $40,000,000 (COLLIERVILLE-ARLINGTON ROAD) (LAMAR AVE.) FROM SOUTH OF SHELBY DRIVE TO SHELBY Trade US-78 (SR-4) 2.000 $125,300,000 RAINES/PERKINS ROAD INTERCHANGE FROM I-55 TO I-40 NEAR MIDTOWN (RE-BUDGETED- SHELBY Interstate I-240 5.920 $51,000,000 ROW) (ELVIS PRESLEY BLVD.) FROM CRAFT ROAD TO SHELBY Urban Growth US-51 (SR-3) 1.600 $15,500,000 SHELBY DRIVE (SUMMER AVENUE) FROM 0.1 MILE NORTH OF US-64/70/79 SHELBY Urban Growth SYCAMORE VIEW ROAD TO 0.1 MILE NORTH OF 1.670 $35,400,000 (SR-1) ELMORE ROAD SHELBY Interstate I-240 INTERCHANGE AT AIRWAYS BLVD 0.480 $42,000,000 US-64/70/79 (SUMMER AVENUE) FROM I-40 TO 0.1 MILE NORTH SHELBY Urban Growth 1.720 $28,300,000 (SR-1) OF SYCAMORE VIEW ROAD SHELBY, Technology SR-385 ITS EXPANSION FROM MM 7 TO MM 15 9.480 $4,000,000 FAYETTE SHELBY, ITS EXPANSION ON SR-385/I-269 FROM I-40 Technology I-269 19.220 $9,000,000 FAYETTE SOUTHWARD TO THE MISSISSIPPI STATE LINE SMITH State Bridges I-40 I-40 BRIDGE OVER HICKMAN CREEK & NFA A156 0.010 $2,953,000

SMITH Local Bridges 1068 BRUSH CREEK RD BRIDGE OVER BRUSH CREEK 0.010 $725,000

SMITH State Bridges SR-141 GRANT HWY. BRIDGE OVER SR-141 / I-40 0.010 $2,585,000 OLD KEMP HOLLOW LN. BRIDGE OVER PEYTON SMITH Local Bridges 0A028 0.010 $1,103,000 CREEK SMITH State Bridges I-40 I-40 BRIDGE OVER CANEY FORK RIVER 0.010 $803,000 FRIENDSHIP HOLLOW LN. S. BRIDGE OVER SMITH Local Bridges 0A039 0.010 $86,000 LANKFORD BRANCH

Data current as of 12/5/2016 51 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion FRIENDSHIP HOLLOW LN. S. BRIDGE OVER SMITH Local Bridges 0A039 0.010 $493,000 LANKFORD BRANCH SMITH Local Bridges 02076 WEBSTER RD. BRIDGE OVER LITTLE INDIAN CREEK 0.010 $853,000 FRIENDSHIP HOLLOW LN. S. BRIDGE OVER SMITH Local Bridges 0A039 0.010 $743,000 LANKFORD BRANCH SMITH Local Bridges 02084 GLADICE RD. BRIDGE OVER BRANCH 0.010 $485,000 "CANEY FORK RIVER" WELCOME CENTER SMITH Maintenance I-40 0.400 $4,250,000 RENOVATION US-70N (SR- ROCK FALL MITIGATION (NEAR CORDELL HULL SMITH Safety 0.670 $6,000,000 24) BRIDGE) COX HOLLOW RD. BRIDGE OVER STANDING ROCK STEWART Local Bridges 0A467 0.010 $1,078,000 CREEK BUMPUS MILLS RD. BRIDGE OVER MORGAN STEWART Local Bridges 00945 0.010 $70,000 BRANCH E. FORK LEATHERWOOD RD. BRIDGE OVER STEWART Local Bridges 0A335 0.010 $145,000 HARRIS BRANCH STEWART Local Bridges 01797 PLEASANT HILL RD BRIDGE OVER BLUE CREEK 0.010 $169,000 UPPER STANDING ROCK RD. BRIDGE OVER STEWART Local Bridges 0A380 0.010 $16,000 TERRAPIN RUN BRANCH DEVAULT BRIDGE RD. BRIDGE OVER MUDDY SULLIVAN Local Bridges 02599 0.010 $2,689,000 CREEK SULLIVAN State Bridges SR-93 JOHN B. DENNIS HWY. BRIDGE OVER CSX R/R 0.010 $2,081,000

SULLIVAN Local Bridges 3930 STATE ST. BRIDGE OVER BEAVER CREEK 0.010 $1,789,000

SULLIVAN State Bridges SR-355 INDUSTRY DR. BRIDGE OVER REEDY CREEK 0.010 $2,831,000

SULLIVAN Local Bridges 01375 MUDDY CREEK RD. BRIDGE OVER BOOHER CREEK 0.010 $199,000

Data current as of 12/5/2016 52 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion WYATT HOLLOW RD. BRIDGE OVER HARPERS SULLIVAN Local Bridges 0A839 0.010 $139,000 CREEK OLD BLAIR GAP RD. BRIDGE OVER WALKER FORT SULLIVAN Local Bridges 0B419 0.010 $496,000 CREEK MEADOW BROOKE LN. BRIDGE OVER REEDY SULLIVAN Local Bridges 0C534 0.010 $851,000 CREEK SULLIVAN Local Bridges 0C473 REEDY CREEK LN. BRIDGE OVER REEDY CREEK 0.010 $232,000

SULLIVAN Local Bridges 0C835 HENRY RD. BRIDGE OVER MUDDY CREEK 0.010 $473,000 OLD CARDEN HOLLOW RD. BRIDGE OVER BACK SULLIVAN Local Bridges 0A353 0.010 $142,000 CREEK SULLIVAN Local Bridges 01392 OLD SR-37 BRIDGE OVER INDIAN CREEK 0.010 $1,243,000

SULLIVAN State Bridges SR-44 DRY BRANCH RD. BRIDGE OVER BRANCH 0.010 $169,000

SULLIVAN Local Bridges 0A456 8TH ST. BRIDGE OVER BEAVER CREEK 0.010 $518,000 FT. HENRY DR. BRIDGE OVER SOUTH HOLSTON SULLIVAN State Bridges SR-36 0.010 $9,250,000 RIVER, LM 5.02 (RL) SULLIVAN Local Bridges 02640 FORDTOWN RD. BRIDGE OVER CSX R/R 0.010 $1,505,000 FORT ROBINSON DR, BRIDGE OVER DRY BRANCH, SULLIVAN Local Bridges 03899 0.010 $3,541,000 LM 0.39 IN KINGSPORT FT. HENRY DR. BRIDGE OVER SOUTH HOLSTON SULLIVAN State Bridges SR-36 0.010 $12,829,000 RIVER, LM 5.03 (LL) (SULLIVAN GARDENS PARKWAY) FROM SOUTH OF SULLIVAN Rural Access SR-93 HORSE CREEK TO NORTH OF DERBY DRIVE (TPR 0.780 $11,700,000 OPTION 5, SPOT IMPROVEMENTS 4&5) FROM US-11E (SR-34) NEAR BRISTOL MOTOR SULLIVAN Urban Growth SR-XXX SPEEDWAY TO US-11W (SR-1) NEAR PINNACLE 4.750 $85,000,000 PARKWAY

Data current as of 12/5/2016 53 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion (MEMORIAL BLVD.) FROM EAST OF COOKS VALLEY SULLIVAN Urban Growth SR-126 4.370 $50,100,000 ROAD TO I-81 IN KINGSPORT (MEMORIAL BLVD.) FROM EAST CENTER STREET IN SULLIVAN Urban Growth SR-126 4.100 $42,600,000 KINGSPORT TO EAST OF COOKS VALLEY ROAD ITS EXPANSION ALONG I-81 BETWEEN I-26 (EXIT SULLIVAN Technology I-81 18.780 $1,780,000 57) INTERCHANGE AND VIRGINIA STATE LINE (SULLIVAN GARDENS PARKWAY) FROM MORGAN SULLIVAN, LANE IN WASHINGTON COUNTY TO SOUTH OF Rural Access SR-93 0.720 $2,934,668 WASHINGTON BAILEYTON ROAD IN SULLIVAN COUNTY (TPR OPTION 5, SPOT IMPROVEMENT) NASHVILLE PK. BRIDGE OVER W. FK STATION SUMNER State Bridges US-31E (SR-6) 0.010 $4,222,000 CAMP CREEK OLD US-31 E. BRIDGE OVER LITTLE TRAMMEL SUMNER State Bridges SR-174 0.010 $1,432,000 CREEK NASHVILLE PK. BRIDGE OVER E. FK STATION CAMP SUMNER State Bridges US-31E (SR-6) 0.010 $3,775,000 CREEK INTERCHANGE ON SR-386 AT FOREST RETREAT SUMNER Urban Growth SR-386 0.070 $11,200,000 ROAD (BROADWAY) FROM EAST BROADWAY TO DOBBINS SUMNER Urban Growth US-31E (SR-6) 0.750 $4,400,000 PIKE (SR-174) (PROPOSED SR-109 PORTLAND BYPASS) FROM SR- SUMNER Trade SR-109 52, WEST OF PORTLAND, TO EXISTING SR-109, 4.220 $34,100,000 NORTH OF PORTLAND (PROPOSED SR-109 PORTLAND BYPASS) FROM SUMNER Trade SR-109 EXISTING SR-109, SOUTH OF PORTLAND, TO SR-52, 1.310 $34,100,000 WEST OF PORTLAND (VIETNAM VETERANS PARKWAY) TRANSIT SUMNER Urban Growth SR-386 MANAGED LANES & WIDENING FROM I-65 TO US- 9.340 $199,200,000 31E (PHASE 1) SUMNER, OLD SHILOH RD, BRIDGE OVER MANSKER CREEK, Local Bridges 0B375 0.000 $264,000 DAVIDSON LM 0.01

Data current as of 12/5/2016 54 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion TIPTON Local Bridges 1473 OLD MEMPHIS RD. BRIDGE OVER BRANCH 0.010 $562,000 ANTIOCH-COTTON LAKE RD. BRIDGE OVER TIPTON Local Bridges 0A090 0.010 $200,000 RICHLAND CREEK TIPTON Local Bridges 0A169 S. TERRY LANE RD. BRIDGE OVER HALL CREEK 0.010 $488,000

TIPTON Local Bridges 808 BRIDE RD. BRIDGE OVER ROCKY BRANCH 0.010 $953,000

TIPTON Local Bridges 0A188 MCLENNAN RD. BRIDGE OVER KELLY BRANCH 0.010 $100,000

TIPTON Local Bridges 05447 MAPLE RD. BRIDGE OVER BIG BRANCH CREEK 0.010 $1,499,000

TIPTON Local Bridges 1459 DUNLAP ORPHANAGE RD. BRIDGE OVER BRANCH 0.010 $223,000

TIPTON Local Bridges 808 BRIDE RD. BRIDGE OVER MATHIS CREEK 0.010 $955,000

TIPTON Local Bridges 0A118 SALEM RD. BRIDGE OVER BRANCH CREEK, LM 1.05 0.000 $263,250 HOLLY GROVE RD. BRIDGE OVER ADKINSON TIPTON Local Bridges 0C001 0.010 $1,456,393 CREEK LM 4.74 TIPTON Rural Access SR-14 FROM NORTH OF SR-384 TO SR-59 4.390 $24,804,000 FROM HARTSVILLE PK CEDAR BLUFF TROUSDALE Rural Access SR-141 4.200 $23,200,000 INTERSECTION TO N OF SR-10 TROUSDALE, (HARTSVILLE RD.) SAFETY IMPROVEMENTS FROM Safety SR-10 10.760 $2,000,000 MACON LAFAYETTE TO HARTSVILLE UNICOI Local Bridges 0A048 HENSLEY RD. BRIDGE OVER S INDIAN CREEK 0.010 $524,000

UNICOI State Bridges SR-107 UNICOI DR. BRIDGE OVER INDIAN CREEK 0.010 $2,849,000

UNICOI Local Bridges 0A481 CARVER RD. BRIDGE OVER DRY CREEK 0.010 $347,000

UNICOI Local Bridges 0A601 LOCUST LN. BRIDGE OVER SOUTH INDIAN CREEK 0.010 $476,000

Data current as of 12/5/2016 55 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion TUMBLING CREEK RD. BRIDGE OVER SPIVEY UNICOI Local Bridges 0A051 0.010 $443,000 CREEK BOWER HOLLOW RD. BRIDGE OVER BULL RUN UNION Local Bridges 0A122 0.010 $439,000 CREEK EDWARDS HOLLOW RD. BRIDGE OVER LITTLE UNION Local Bridges 1345 0.010 $221,000 BARREN CREEK LITTLE TATER VALLEY RD. BRIDGE OVER BULL UNION Local Bridges 0A128 0.010 $160,000 RUN CREEK BEARD VALLEY RD. BRIDGE OVER RACCOON UNION Local Bridges 0A156 0.010 $184,000 CREEK JOHNSON RD. BRIDGE OVER N FORK BULL RUN UNION Local Bridges 0A156 0.010 $200,000 CREEK FROM MAYNARDVILLE TO LUTTRELL NORTH CITY UNION Rural Access SR-61 2.520 $5,900,000 LIMITS (***) FROM KNOX COUNTY LINE TO SOUTH OF SR-144 UNION Rural Access SR-33 5.470 $38,465,587 (LEFT) PARK ROAD OVER FALL CREEK FALLS DAM VAN BUREN Local Bridges A090 0.200 $1,000,000 OVERFLOW L.M. 2.72 WARREN Local Bridges 1100 SHELBYVILLE RD. BRIDGE OVER SMALL BRANCH 0.010 $617,000 TELFORD-NEW VICTORY RD. BRIDGE OVER LITTLE WASHINGTON Local Bridges 2575 0.010 $497,000 LIMESTONE CREEK US-11E/321 WASHINGTON State Bridges W. MARKET ST. BRIDGE OVER CSX R/R 0.010 $2,236,000 (SR-34) OLD SR-34 BRIDGE OVER LITTLE LIMESTONE WASHINGTON State Bridges SR-353 0.010 $586,000 CREEK WASHINGTON Local Bridges 0A674 NEW ST. BRIDGE OVER BRUSH CREEK 0.010 $656,000

WASHINGTON Local Bridges 3960 MILLIGAN HWY. BRIDGE OVER CSX R/R 0.010 $5,915,000

WASHINGTON Local Bridges 0A873 GARLAND RD. BRIDGE OVER LIMESTONE CREEK 0.010 $482,000

Data current as of 12/5/2016 56 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion TOMMY CAMPBELL RD. BRIDGE OVER LITTLE WASHINGTON Local Bridges 0B181 0.010 $533,000 CHEROKEE CREEK WASHINGTON Local Bridges 0B435 MAGNOLIA EXT. BRIDGE OVER CSX R/R 0.010 $1,727,000

WASHINGTON Local Bridges 1352 BOWMANTOWN RD. BRIDGE OVER CARSON CREEK 0.010 $671,000

WASHINGTON Local Bridges 0A918 JARRETT RD. BRIDGE OVER BRANCH 0.010 $425,000

WASHINGTON Local Bridges 2644 GRAY STATION RD. BRIDGE OVER FORD CREEK 0.010 $425,000

WASHINGTON Local Bridges 1335 GLENDALE RD. BRIDGE OVER BRANCH 0.010 $608,000

WASHINGTON Local Bridges 0A970 MILL ST. BRIDGE OVER LITTLE LIMESTONE CREEK 0.010 $611,000 LITTLE CASSI CREEK RD. BRIDGE OVER CASSI WASHINGTON Local Bridges 0B099 0.010 $575,000 CREEK AUSTIN SPRINGS RD. BRIDGE OVER WATAUGA WASHINGTON Local Bridges 0C900 0.010 $893,000 RIVER WASHINGTON Interstate I-26 INTERCHANGE AT SR-354 (EXIT 17) 0.750 $12,300,000 (SULLIVAN GARDENS PARKWAY) FROM NORTH OF WASHINGTON Rural Access SR-93 DAVIS ROAD TO NORTH OF FIRE HALL ROAD (TPR 0.590 $3,846,008 OPTION 5, SPOT IMPROVEMENT) (KNOB CREEK RD.) FROM SR-354 (BOONES CREEK WASHINGTON Rural Access SR-XXX 1.980 $39,500,000 RD.) TO MIZPAH HILLS DR. WASHINGTON, Rural Access SR-36 (FORT HENRY DR.) FROM SR-75 TO I-81 3.530 $44,100,000 SULLIVAN SIMMONS BRANCH RD. BRIDGE OVER SIMMONS WAYNE Local Bridges 0A141 0.010 $194,000 BRANCH WRIGHT RIDGE RD. BRIDGE OVER CYPRESS WAYNE Local Bridges 0A312 0.010 $652,000 CREEK WAYNE Local Bridges 0A387 CROMWELL RIDGE RD. BRIDGE OVER BEAR CREEK 0.010 $137,000

Data current as of 12/5/2016 57 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion HURRICANE CREEK RD. BRIDGE OVER HURRICANE WAYNE Local Bridges 01767 0.010 $379,000 CREEK WAYNE Local Bridges 0A280 HILL PKWY. BRIDGE OVER BUTLER CREEK 0.010 $727,000

WAYNE Local Bridges 0A303 ROCKY FORD RD. BRIDGE OVER HOLLY BRANCH 0.010 $406,000 RALSTON RD. BRIDGE OVER NORTH FORK OBION WEAKLEY Local Bridges 815 0.010 $2,818,000 RIVER WEAKLEY Local Bridges 859 EVERGREEN ST. BRIDGE OVER OVERFLOW 0.010 $1,057,000 LOWER SHARON RD. BRIDGE OVER TERRELL WEAKLEY Local Bridges 1610 0.010 $463,000 BRANCH WEAKLEY Local Bridges 0A666 RYAN RD. BRIDGE OVER CYPRESS CREEK 0.010 $476,000

WEAKLEY Local Bridges 1616 OLIVER RD. BRIDGE OVER CANE CREEK 0.010 $400,000

WEAKLEY State Bridges SR-54 SR-54 BRIDGE OVER BRANCH 0.010 $475,000 THOMPSON CREEK RD. BRIDGE OVER THOMPSON WEAKLEY Local Bridges 0A235 0.000 $262,566 CREEK, LM 0.23 OLD SR-22 BRIDGE OVER MIDDLE FORK OBION WEAKLEY Local Bridges 859 0.010 $838,950 RIVER, LM 10.31 CHESTNUT GLADE RD. BRIDGE OVER RICHLAND WEAKLEY Local Bridges 0A060 0.010 $457,000 CREEK WEAKLEY Local Bridges 859 EVERGREEN ST. BRIDGE OVER OVERFLOW 0.010 $755,000 ROBERTS-MATTHEWS HWY. BRIDGE OVER POST WHITE Local Bridges 0A966 0.010 $2,378,000 OAK CREEK OLD SR-42, BRIDGE OVER FALLING WATER RIVER, WHITE Local Bridges 0A966 0.000 $1,383,750 LM 6.74 (SPENCER HWY.) GRADE SEPARATION AT TAFT WHITE Rural Access SR-111 0.040 $7,200,000 CHURCH ROAD IN SPARTA

Data current as of 12/5/2016 58 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion US-31A/41A WILLIAMSON State Bridges HORTON HWY. BRIDGE OVER HARPETH RIVER 0.010 $2,725,000 (SR-11) US-31A/41A WILLIAMSON State Bridges NOLENSVILLE RD. BRIDGE OVER BRANCH 0.010 $1,036,000 (SR-11) COLUMBIA PK. BRIDGE OVER WEST HARPETH WILLIAMSON State Bridges US-31 (SR-6) 0.010 $2,041,000 RIVER US-31A/41A WILLIAMSON State Bridges HORTON HWY. BRIDGE OVER BRANCH 0.010 $241,000 (SR-11) US-31A/41A NOLENSVILLE RD. BRIDGE OVER MC CANLESS WILLIAMSON State Bridges 0.010 $2,482,000 (SR-11) BRANCH MURFREESBORO RD. BRIDGE OVER MAYES WILLIAMSON State Bridges SR-96 0.010 $1,462,000 CREEK WILLIAMSON State Bridges US-31 (SR-6) E. MAIN ST. BRIDGE OVER HARPETH RIVER 0.010 $4,532,000 US-31A/41A WILLIAMSON State Bridges NOLENSVILLE RD. BRIDGE OVER MILL CREEK 0.010 $1,445,000 (SR-11) WILLIAMSON State Bridges SR-96 3RD AVE. S BRIDGE OVER HARPETH RIVER 0.010 $3,250,000

WILLIAMSON State Bridges US-31 (SR-6) COLUMBIA PK. BRIDGE OVER CSX R/R 0.010 $2,809,000

WILLIAMSON Urban Growth SR-100 (FAIRVIEW BLVD.) FROM BOWIE LAKE RD. TO I-840 4.430 $51,786,000 (MACK C. HATCHER MEMORIAL BLVD.) FROM WILLIAMSON Urban Growth SR-397 SOUTH OF SR-96 TO US-431 (SR-106) (NORTHWEST 3.260 $43,300,000 QUADRANT) (COLUMBIA PIKE) FROM I-840 IN THOMPSON'S WILLIAMSON Urban Growth US-31 (SR-6) STATION TO MACK HATCHER PARKWAY IN 4.970 $50,000,000 FRANKLIN (MACK C. HATCHER MEMORIAL PKWY.) FROM SR- 96 EAST OF FRANKLIN TO US-31 (SR-6, COLUMBIA WILLIAMSON Urban Growth SR-397 3.190 $35,000,000 PIKE) SOUTH OF FRANKLIN (SOUTHEAST QUADRANT)

Data current as of 12/5/2016 59 of 60 Report generated on 1/12/2017 Projects Report

Est. Cost to County Program Route Project Description Length (mi.) Completion (FRANKLIN RD.) FROM EAST OF SR-252 (WILSON WILLIAMSON Urban Growth SR-96 5.620 $27,600,000 PIKE) TO I-840 (***) (FRANKLIN RD.) FROM EAST OF ARNO ROAD TO WILLIAMSON Urban Growth SR-96 5.800 $37,500,000 EAST OF SR-252 (WILSON PIKE) (***) INTERCHANGE AT SR-441 (MOORES LANE), WILLIAMSON Interstate I-65 0.700 $20,000,000 RECONSTRUCTION (COLUMBIA PIKE) FROM FOWLKES STREET TO SR- WILLIAMSON Urban Growth US-31 (SR-6) 1.870 $23,562,000 397 (MACK HATCHER PARKWAY) WILLIAMSON, US-31A/41A (NOLENSVILLE PIKE) FROM SOUTH OF BURKITT Urban Growth 1.770 $50,400,000 DAVIDSON (SR-11) ROAD TO NORTH OF MILL CREEK WILLIAMSON, FROM I-840 IN WILLIAMSON COUNTY TO VETERANS Urban Growth SR-96 6.910 $45,420,000 RUTHERFORD PARKWAY (HARTSVILLE PIKE) FROM SOUTH OF SPRING WILSON Urban Growth SR-141 1.570 $6,500,000 CREEK TO NORTH OF LOVERS LANE FROM NORTH OF US-70 (SR-24) TO SOUTH OF DRY WILSON Trade SR-109 7.500 $18,500,000 FORK CREEK WILSON Interstate I-40 FROM SR-109 TO I-840 2.970 $32,527,530 (MT. JULIET RD.) FROM CENTRAL PIKE (SR-265) TO WILSON Urban Growth SR-171 1.000 $25,418,571 PROVIDENCE WAY I-40 AT CENTRAL PIKE (SR-265) NEW WILSON Interstate I-40 0.320 $14,200,000 INTERCHANGE (LEBANON ROAD) FROM PARK GLEN DRIVE TO WILSON Urban Growth US-70 (SR-24) 0.670 $8,568,000 BENDER'S FERRY ROAD WILSON Interstate I-40 FROM I-840 TO US -70 (SR-26) 4.720 $61,635,382 (HARTSVILLE PIKE) FROM NORTH OF LOVERS WILSON Urban Growth SR-141 1.820 $14,700,000 LANE TO US-70 (SR-26) WILSON, (CENTRAL PIKE, SR-265) FROM OLD HICKORY Urban Growth SR-265 5.420 $68,292,000 DAVIDSON BOULEVARD (SR-45) TO MT. JULIET ROAD (SR-171) Total Est. 962 Projects $10,507,484,522

Data current as of 12/5/2016 60 of 60