Red Line & Mattapan Trolley
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Conceptual Plan
About the Cover Photo The photo on the cover of this report was taken on December 17, 2010, around 8:00 AM. The view is from the Savin Hill Avenue overpass and looks almost directly south. This overpass is shown in Figure 3-3 of the report, and the field of view includes land shown in Figure 3-2. At the right is the recently completed headhouse of the Savin Hill Red Line station. Stopped at the station platform is an inbound Red Line train that started at Ashmont and will travel to Alewife. The station is fully ADA-compliant, and the plan presented in this report requires no modification to this station. Next to the Red Line train is an inbound train from one of the three Old Colony commuter rail branches. There is only one track at this location, as is the case throughout most of the Old Colony system. This train has a mixed consist of single-level and bi-level coaches, and is being pushed by a diesel locomotive, which is mostly hidden from view by the bi-level coaches. Between the two trains is an underpass beneath the Ashmont branch of the Red Line. This had been a freight spur serving an industrial area on the west side of the Ashmont branch tracks. Sections A-2.3 and A-2.4 of this report present an approach to staging railroad reconstruction that utilizes the abandoned freight spur and underpass. The two tracks to the left of the Old Colony tracks serve the Braintree Red Line branch. -
Union Station Conceptual Engineering Study
Portland Union Station Multimodal Conceptual Engineering Study Submitted to Portland Bureau of Transportation by IBI Group with LTK Engineering June 2009 This study is partially funded by the US Department of Transportation, Federal Transit Administration. IBI GROUP PORtlAND UNION STATION MultIMODAL CONceptuAL ENGINeeRING StuDY IBI Group is a multi-disciplinary consulting organization offering services in four areas of practice: Urban Land, Facilities, Transportation and Systems. We provide services from offices located strategically across the United States, Canada, Europe, the Middle East and Asia. JUNE 2009 www.ibigroup.com ii Table of Contents Executive Summary .................................................................................... ES-1 Chapter 1: Introduction .....................................................................................1 Introduction 1 Study Purpose 2 Previous Planning Efforts 2 Study Participants 2 Study Methodology 4 Chapter 2: Existing Conditions .........................................................................6 History and Character 6 Uses and Layout 7 Physical Conditions 9 Neighborhood 10 Transportation Conditions 14 Street Classification 24 Chapter 3: Future Transportation Conditions .................................................25 Introduction 25 Intercity Rail Requirements 26 Freight Railroad Requirements 28 Future Track Utilization at Portland Union Station 29 Terminal Capacity Requirements 31 Penetration of Local Transit into Union Station 37 Transit on Union Station Tracks -
Transportation Impact Study
The Harvest Club 255 Elm Street Somerville, Massachusetts Transportation Impact Study Prepared For: The Harvest Club Prepared by: Design Consultants, Inc. January 2021 255 ELM STREET TABLE OF CONTENTS 1. EXECUTIVE SUMMARY ......................................................................................................... 5 1.1 Introduction ................................................................................................................. 5 1.2 Study Area .................................................................................................................. 5 1.3 Safety Analysis ............................................................................................................ 5 1.4 Trip Generation ........................................................................................................... 5 1.5 Intersection Capacity Analysis .................................................................................... 6 1.6 Conclusion .................................................................................................................. 6 2. EXISTING CONDITIONS INVENTORY ................................................................................. 11 2.1 Study Area ................................................................................................................ 11 2.1.1 Study Roadways ................................................................................................. 11 2.1.2 Study Intersections ............................................................................................. -
CHAPTER 2 Progress Since the Last PMT
CHAPTER 2 Progress Since the Last PMT The 2003 PMT outlined the actions needed to bring the MBTA transit system into a state of good repair (SGR). It evaluated and prioritized a number of specific enhancement and expansion projects proposed to improve the system and better serve the regional mobility needs of Commonwealth residents. In the inter- vening years, the MBTA has funded and implemented many of the 2003 PMT priorities. The transit improvements highlighted in this chapter have been accomplished in spite of the unsus- tainable condition of the Authority’s present financial structure. A 2009 report issued by the MBTA Advisory Board1 effectively summarized the Authority’s financial dilemma: For the past several years the MBTA has only balanced its budgets by restructuring debt liquidat- ing cash reserves, selling land, and other one-time actions. Today, with credit markets frozen, cash reserves depleted and the real estate market at a stand still, the MBTA has used up these options. This recession has laid bare the fact that the MBTA is mired in a structural, on-going deficit that threatens its viability. In 2000 the MBTA was re-born with the passage of the Forward Funding legislation.This legislation dedicated 20% of all sales taxes collected state-wide to the MBTA. It also transferred over $3.3 billion in Commonwealth debt from the State’s books to the T’s books. In essence, the MBTA was born broke. Throughout the 1990’s the Massachusetts sales tax grew at an average of 6.5% per year. This decade the sales tax has barely averaged 1% annual growth. -
Massachusetts Bay Transportation Authority
y NOTE WONOERLAND 7 THERE HOLDERS Of PREPAID PASSES. ON DECEMBER , 1977 WERE 22,404 2903 THIS AMOUNTS TO AN ESTIMATED (44 ,608 ) PASSENGERS PER DAY, NOT INCLUDED IN TOTALS BELOW REVERE BEACH I OAK 8R0VC 1266 1316 MALOEN CENTER BEACHMONT 2549 1569 SUFFOLK DOWNS 1142 ORIENT< NTS 3450 WELLINGTON 5122 WOOO ISLANC PARK 1071 AIRPORT SULLIVAN SQUARE 1397 6668 I MAVERICK LCOMMUNITY college 5062 LECHMERE| 2049 5645 L.NORTH STATION 22,205 6690 HARVARD HAYMARKET 6925 BOWDOIN , AQUARIUM 5288 1896 I 123 KENDALL GOV CTR 1 8882 CENTRAL™ CHARLES^ STATE 12503 9170 4828 park 2 2 766 i WASHINGTON 24629 BOYLSTON SOUTH STATION UNDER 4 559 (ESSEX 8869 ARLINGTON 5034 10339 "COPLEY BOSTON COLLEGE KENMORE 12102 6102 12933 WATER TOWN BEACON ST. 9225' BROADWAY HIGHLAND AUDITORIUM [PRUDENTIAL BRANCH I5I3C 1868 (DOVER 4169 6063 2976 SYMPHONY NORTHEASTERN 1211 HUNTINGTON AVE. 13000 'NORTHAMPTON 3830 duole . 'STREET (ANDREW 6267 3809 MASSACHUSETTS BAY TRANSPORTATION AUTHORITY ricumt inoicati COLUMBIA APFKOIIUATC 4986 ONE WAY TRAFFIC 40KITT10 AT RAPID TRANSIT LINES STATIONS (EGLESTON SAVIN HILL 15 98 AMD AT 3610 SUBWAY ENTRANCES DECEMBER 7,1977 [GREEN 1657 FIELDS CORNER 4032 SHAWMUT 1448 FOREST HILLS ASHMONT NORTH OUINCY I I I 99 8948 3930 WOLLASTON 2761 7935 QUINCY CENTER M b 6433 It ANNUAL REPORT Digitized by the Internet Archive in 2014 https://archive.org/details/annualreportmass1978mass BOARD OF DIRECTORS 1978 ROBERT R. KILEY Chairman and Chief Executive Officer RICHARD D. BUCK GUIDO R. PERERA, JR. "V CLAIRE R. BARRETT THEODORE C. LANDSMARK NEW MEMBERS OF THE BOARD — 1979 ROBERT L. FOSTER PAUL E. MEANS Chairman and Chief Executive Officer March 20, 1979 - January 29. -
Berkshire Passenger Rail Station Location and Design Analysis, Draft for Public Comment—August 2014
BERKSHIRE PASSENGER RAIL STATION LOCATION AND DESIGN ANALYSIS, DRAFT FOR PUBLIC COMMENT—AUGUST 2014 BERKSHIRE PASSENGER RAIL STATION LOCATION AND DESIGN ANALYSIS, DRAFT FOR PUBLIC COMMENT—AUGUST 2014 ACKNOWLEDGEMENTS Staff, Elected Officials, and Residents of the Berkshire Line Communities Karen Christensen and the Bring Back the Trains Campaign Bill Palmer, MassDOT Dustin Rhue, MassDOT Gary Sheppard, Berkshire Regional Transit Authority Bob Malnati, Berkshire Regional Transit Authority John R. Hanlon Jr., Housatonic Railroad Company Colin Pease, Housatonic Railroad Company Deborah Menette,Housatonic Railroad Company Berkshire Regional Planning Commission Nathaniel Karns, AICP, Executive Director Thomas Matuszko, AICP, Assistant Director Clete Kus, AICP, Transportation Manager Mark Maloy, GIS, Data and IT Manager Brian Domina, Senior Planner Patricia Mullins, Senior Planner Gwen Miller, Planner Jaclyn Pacejo, Planner BERKSHIRE PASSENGER RAIL STATION LOCATION AND DESIGN ANALYSIS Page 1 ACKNOWLEDGEMENTS This page intentionally left blank. BERKSHIRE PASSENGER RAIL STATION LOCATION AND DESIGN ANALYSIS Page 2 EXECUTIVE SUMMARY Executive Summary rail service. In some instances, the nearly significant challenge in locating a passen- Map 1: Locus Map The Housatonic Railroad Company (HRRC) century old historic passenger rail stations ger rail station in a downtown area was has proposed re-establishing passenger rail may meet these needs and in other instances, finding sites with sufficient room for park- service between Danbury, Connecticut and new locations may better serve them. ing. Thus, for the recommended down- Pittsfield, Massachusetts on the former town passenger rail stations a smaller To address this issue, the Berkshire Regional Berkshire Line. The passenger rail service amount of parking, compared to a regional Planning Commission (BRPC) partnered between these two locations last operated passenger rail station, will likely be availa- with HRRC to conduct this passenger rail in 1971 shortly after the Penn Central ble. -
MBTA > Riding the T > Events
The MBTA has announced its service schedules for Christmas Eve (Thursday, December 24, 2015) and Christmas Day (Friday, December 25, 2015) as well as its service schedules for New Year's Eve (Thursday, December 31, 2015) and New Year's Day (Friday, January 1, 2016). Late-Night Service will not be available on Christmas Day or New Year's Day. Parking at the Wellington surface lot and the Alewife, Braintree, Quincy Adams, and Wonderland garages will be pay on entry and cash only on New Year's Eve, December 31, 2015. Credit cards and garage TAP cards will not be accepted. Subway Christmas Eve - Thursday, 12/24/15 • The Red Line will operate a regular weekday schedule. • The Orange Line will operate a regular weekday schedule. • The Blue Line will operate a regular weekday schedule. • The Green Line B-, C-, D-, and E-Branches will operate a regular weekday schedule. • The Silver Line will operate a regular weekday schedule. • The Mattapan Trolley will operate a regular weekday schedule. Christmas Day - Friday, 12/25/15 • The Red Line will operate a Sunday schedule. • The Orange Line will operate a Sunday schedule. • The Blue Line will operate a Sunday schedule. • The Green Line B-, C-, D-, and E-Branches will operate a Sunday schedule. • The Silver Line will operate a Sunday schedule. • The Mattapan Trolley will operate a Sunday schedule. Customers should also note that the CharlieCard Store located adjacent to the Red and Orange Lines at Downtown Crossing Station is closed on Christmas Day. New Year's Eve - Thursday, 12/31/15 • The Red Line will operate a modified weekday schedule with additional trains operating at rush-hour levels of service throughout the evening from 3 p.m. -
Board of Directors J U L Y 2 4 , 2 0
BOARD OF DIRECTORS JULY 24, 2015 SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY BOARD ROSTER SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY County Member Alternate Orange: Shawn Nelson (Chair) Jeffrey Lalloway* Supervisor, 4th District Mayor Pro Tem, City of Irvine 2 votes County of Orange, Chairman OCTA Board, Chair OCTA Board Gregory T. Winterbottom Todd Spitzer* Public Member Supervisor, 3rd District OCTA Board County of Orange OCTA Board Riverside: Daryl Busch (Vice-Chair) Andrew Kotyuk* Mayor Council Member 2 votes City of Perris City of San Jacinto RCTC Board, Chair RCTC Board Karen Spiegel Debbie Franklin* Council Member Mayor City of Corona City of Banning RCTC Board RCTC Board Ventura: Keith Millhouse (2nd Vice-Chair) Brian Humphrey Mayor Pro Tem Citizen Representative 1 vote City of Moorpark VCTC Board VCTC Board Los Angeles: Michael Antonovich Roxana Martinez Supervisor, 5th District Councilmember 4 votes County of Los Angeles, Mayor City of Palmdale Metro Board Metro Appointee Hilda Solis Joseph J. Gonzales Supervisor, 1st District Councilmember County of Los Angeles City of South El Monte Metro Board Metro Appointee Paul Krekorian Borja Leon Councilmember, 2nd District Metro Appointee Metro Board Ara Najarian [currently awaiting appointment] Council Member City of Glendale Metro Board One Gateway Plaza, 12th Floor, Los Angeles, CA 90012 SCRRA Board of Directors Roster Page 2 San Bernardino: Larry McCallon James Ramos* Mayor Supervisor, 3rd District 2 votes City of Highland County of San Bernardino, Chair SANBAG Board SANBAG Board -
MIT Kendall Square
Ridership and Service Statistics Thirteenth Edition 2010 Massachusetts Bay Transportation Authority MBTA Service and Infrastructure Profile July 2010 MBTA Service District Cities and Towns 175 Size in Square Miles 3,244 Population (2000 Census) 4,663,565 Typical Weekday Ridership (FY 2010) By Line Unlinked Red Line 241,603 Orange Line 184,961 Blue Line 57,273 Total Heavy Rail 483,837 Total Green Line (Light Rail & Trolley) 236,096 Bus (includes Silver Line) 361,676 Silver Line SL1 & SL2* 14,940 Silver Line SL4 & SL5** 15,086 Trackless Trolley 12,364 Total Bus and Trackless Trolley 374,040 TOTAL MBTA-Provided Urban Service 1,093,973 System Unlinked MBTA - Provided Urban Service 1,093,973 Commuter Rail Boardings (Inbound + Outbound) 132,720 Contracted Bus 2,603 Water Transportation 4,372 THE RIDE Paratransit Trips Delivered 6,773 TOTAL ALL MODES UNLINKED 1,240,441 Notes: Unlinked trips are the number of passengers who board public transportation vehicles. Passengers are counted each time they board vehicles no matter how many vehicles they use to travel from their origin to their destination. * Average weekday ridership taken from 2009 CTPS surveys for Silver Line SL1 & SL2. ** SL4 service began in October 2009. Ridership represents a partial year of operation. File: CH 01 p02-7 - MBTA Service and Infrastructure Profile Jul10 1 Annual Ridership (FY 2010) Unlinked Trips by Mode Heavy Rail - Red Line 74,445,042 Total Heavy Rail - Orange Line 54,596,634 Heavy Rail Heavy Rail - Blue Line 17,876,009 146,917,685 Light Rail (includes Mattapan-Ashmont Trolley) 75,916,005 Bus (includes Silver Line) 108,088,300 Total Rubber Tire Trackless Trolley 3,438,160 111,526,460 TOTAL Subway & Bus/Trackless Trolley 334,360,150 Commuter Rail 36,930,089 THE RIDE Paratransit 2,095,932 Ferry (ex. -
Concord Coach (NH) O Dartmouth Coach (NH) O Peter Pan Bus Lines (MA)
KFH GROUP, INC. 2012 Vermont Public Transit Policy Plan INTERCITY BUS NEEDS ASSESSMENT AND POLICY OPTIONS White Paper January, 2012 Prepared for the: State of Vermont Agency of Transportation 4920 Elm Street, Suite 350 —Bethesda, MD 20814 —(301) 951-8660—FAX (301) 951-0026 Table of Contents Page Chapter 1: Background and Policy Context......................................................................... 1-1 Policy Context...................................................................................................................... 1-1 Chapter 2: Inventory of Existing Intercity Passenger Services.......................................... 2-1 Intercity Bus......................................................................................................................... 2-1 Impacts of the Loss of Rural Intercity Bus Service......................................................... 2-8 Intercity Passenger Rail.................................................................................................... 2-11 Regional Transit Connections ......................................................................................... 2-11 Conclusions........................................................................................................................ 2-13 Chapter 3: Analysis of Intercity Bus Service Needs............................................................ 3-1 Demographic Analysis of Intercity Bus Needs............................................................... 3-1 Public Input on Transit Needs ....................................................................................... -
MBTA Red Line Repairs
Ana Torres November 3, 2011 Assignment 5: Basic queries MBTA Red Line Repairs Starting next Saturday (November 5, 2011) and until March 4, 2012, the MBTA will close the Red Line north of Harvard Square on weekends to complete $80 million in repairs designed to keep trains from derailing due to eroded tracks and power lines caused by leaks in the tunnel. The service will be replaced with shuttle buses. According to an article from the Boston Globe by Eric Moskowitz on October 22, 2011, about 21,200 riders on Saturday and 14,200 on Sunday board the Red Line at Porter, Davis and Alewife stations, meaning over 35,000 commuters will be affected weekly in the five-month shutdown period. The MBTA has come up with its next commuter nightmare. On weekends starting November 5, Red Line trains north of Harvard Square due to tunnel repairs. According to an article from the Boston Globe, the $80 million project will serve to keep trains from derailing These events are a perfect opportunity to reanalyze the profile of the users of the MBTA. Having a clearer idea of the sociodemographic profile and the patterns of use of transportation of the people that will be affected by this project will help to have a better assessment of the true cost of the project, that it, not only the monetary cost of the infrastructure but counting the social cost of the project as well. For this, a map that relates different characteristics of the population and their transportation information will result extremely useful. -
20-70 Old Colony Avenue, South Boston
5,000 25,000 SF South Boston, MA • Parking: Signicant o - street and on-street (± One Space per 1000 SF) • Water/Sewer: City of Boston • Gas: National Grid • Electric: NSTAR • Fiber Connectivity: Sprint and Level 3 • Access to public transportation • Equidistant to Andrew and Broadway Stations on the Red Line ( ± four minutes) • ± Eight minutes from South Station • ± Five minutes from Seaport Silver Line • Nearest MBTA bus stop is 0.1 miles away at West 7th Street and B Street • Corporate Neighbors: Gillette/P&G, Frank Webb’s Bath Center, Gold’s Gym • Area Retailers: Dunkin Donuts, CVS, Stop & Shop, Pizza Pie -er, D’Angelo, Starbucks, Stephi’s in Southie, and Lapels • Prominent signage available POPULATION 798,580 (FIVE MILE RADIUS) MEDIAN HOUSEHOLD $50,000 INCOME (FIVE MILE RADIUS) TRAFFIC COUN T 9,200 CARS DAILY JP Plunkett PRINCIPAL 617 341 8800 www.r-dome.com | 617.341.8800 [email protected] 5,000 25,000 SF Dorchester Avenue Financial District Rowes Wharf Downtown Crossing Flex/Industrial/Showroom South Station Atlantic Wharf 8,225 SF Unit * Liberty Wharf • ±18’ clear height • Shared loading dock (drive in) • 64 C Street mailing address Broadway Station 13,500 SF Unit * Boston Convention • ± 25’ clear height and Exhibition • Shared loading dock (drive in) Center • Partial basement for dead storage 25,000 SF 20-70 Old • Dedicated o street loading Colony Avenue (two grade level drive in, three tail board height) • ±18’ clear height Andrew Station • Signicant o street truck court * South Bay Center Office 25,000 SF • Divisible to 5,000