Expression of Interest

Architectural Design Competition , New Building for the Faculty of , Building and Planning Via Online Upload May 1, 2009

It is with great pleasure and excitement that Studio Daniel Libeskind respond to your Call for Expressions of Interest for the University of Melbourne Architectural Design Competition for the New building for the Faculty of Architecture, Building, and Planning. We consider it an honor to have the opportunity to work on such a meaningful project. Our Studio is involved in an exciting array of architectural projects across the world, that have formed the basis of our practice and we’re enthusiastic about the potential for the University of Melbourne and its surrounding area.

Daniel Libeskind believes that architecture today is the most important symbol for a city and its academic, cultural and public life. SDL is capable of designing and delivering a project of this type as shown by the following criteria exhibited in this Expression of Interest. We have included projects ranging from concept to completion as our concrete examples of said capabilities. We emphasize our design philosophy and architectural approach within these examples.

Our interest is to design a unique building in an economically responsible manner. The project will provide a new learning environment that will demonstrate the best that each of the professions represented by the faculty has to offer. It will be an outstanding work of architecture, in both appearance and performance; it will be an outstanding work of urban design, activating and connecting to the campus and its community; it will use advanced construction, structural and servicing techniques, it will demonstrate integrated design between the natural and built landscape in and around the building. The building will also communicate ongoing work in each of these professions by enabling completed and in-process work of staff and students to be highly visible, as well as being enlivened by regular discussions, exhibitions and displays of contemporary and historical work.

We sincerely hope that we will be given the opportunity to personally convey our commitment, passion and enthusiasm for this project.

Sincerely Yours, Lynn Krogh Director of Public Relations

Studio Background

Daniel Libeskind established his architectural studio in Berlin, in 1989. Upon winning the World Trade Center design competition in February 2003, Studio Daniel Libeskind (SDL) moved its headquarters to . The office is now headquartered two blocks south of the original World Trade Center site.

Since 1990, the office has been fortunate to be involved in a diverse array of urban, architectural, and cultural projects. The office has won commissions for major cultural buildings and significant urban projects in Germany, , , Dubai, the , the , , , , the , Japan, , Israel, Mexico, Korea, and . Daniel Libeskind’s architecture continues to reflect his profound interest and involvement in philosophy, art, music, literature, theater and film, and a continuing commitment to expanding the horizons of architecture and urbanism.

It is fundamental to Daniel Libeskind’s thinking and motivation that buildings and urban projects are crafted with perceptible human energy and that they speak to the larger cultural community in which they are built.

The New York office has an average permanent staffing of 70 persons. SDL has European partner offices based in Zürich, Switzerland and Milan, Italy. In addition, the Studio has established site and partner offices with personnel around the world, including San Francisco, , Bern, and , bringing the total number of worldwide employees to roughly 140 persons.

The office has extensive resources and experience in computer aided design, with Macintosh and PC computer workstations used to produce 2D and 3D presentation materials, working drawings, and construction documents. The office uses email and FTP sites to furnish design documents to consultants all over the world and maintains a video conferencing facility. Complementing this, traditional drawing and model-making techniques are extensively employed at all stages of the design process to visualize and develop important aspects of the designs. In particular, a comprehensively equipped workshop, with facilities for the production of high-quality presentation models and mock-ups, functions as a key resource in the development and realization of the Studio’s designs.

Design Team Studio Daniel Libeskind DANIEL LIBESKIND, B.ARCH. M.A. BDA AIA is an international figure in architectural practice and urban design. He is well known for introducing a new critical discourse into architecture and for his multidis- ciplinary approach. His practice extends from building major cultural and commercial institutions - including museums and concert halls - to convention centers, universities, housing, hotels, shopping centers and residential work. He also designs opera sets and maintains an object design studio.

Born in postwar Poland in 1946, Mr. Libeskind became an American citizen in 1965. He studied music in Israel (on the America-Israel Cultural Foundation Scholarship) and in New York, becoming a virtuoso performer. He left music to study architecture, receiving his professional architectural degree in 1970 from the Cooper Union for the Advancement of Science and Art in New York City. He received a postgraduate degree in History and Theory of Architecture at the School of Comparative Studies at University (England) in 1972.

In 1989, Mr. Libeskind won the competition for the Jewish Museum Berlin, which opened to the public in September 2001 to wide public acclaim. The city museum of Osnabrück, Germany, The Felix Nussbaum Haus, opened in July 1998. In July 2002, the North in , England opened to the public. Atelier Weil, a private atelier/gallery, opened in Mallorca, Spain in September 2003. The Graduate Student Centre at the Metropolitan University opened in March 2004, and the Danish Jewish Museum opened in in June 2004. Tangent, an office tower for the Hyundai Development Corporation, opened in Seoul, Korea in February 2005, Memoria e Luce, a 9/11 memorial in Padua, Italy opened on September 11, 2005 and the Wohl Centre, Bar Ilan University, Tel Aviv, Israel; opened in October, 2005. The Frederic C. Hamilton building, Extension to the Denver Art Museum, alongside the Denver Museum Residences, in Colorado, opened in October 2006, The Extension to the Royal Ontario Museum, Canada, opened in June of 2007, and the Glass Courtyard, an extension to the Jewish Museum Berlin, which covers the original Courtyard, was completed in the Fall 2007. Most recently, the Ascent at Roebling’s Bridge, a residential high-rise in Covington, Kentucky opened in March 2008. The Contemporary Jewish Museum in San Francisco, California opened in June 2008 and Westside, the largest shopping and wellness center in Europe opened in October 2008, in Bern, Switzerland.

Several of Mr. Libeskind’s projects are currently under construction, including: the Military History Museum in , Germany; Haeundae Udong Hyundai l’Park in Busan; the L Tower and Sony Centre for the Performing Arts in Toronto, Canada; the Grand Canal Performing Arts Centre and Commercial Development in , Ireland; CityCenter, a retail complex, on the Las Vegas Strip in Nevada; the redevelopment of the historic Fiera Milano Fairgrounds in Milan; Zlota 44; a residential high rise in Warsaw, Poland, and a grand piano design for Schimmel Piano is currently in production. Upon winning the World Trade Center design competition in February 2003, Daniel Libeskind was appointed as master plan architect for the site in New York City. Memory Foundations is now under construction.

Mr. Libeskind has many other projects in design and planning, such as The New Center for Arts and Culture in , Massachusetts; New Songdo City, in Incheon, ; a waterfront, residential development, Reflections, in Keppel Bay, Singapore; Editoriale Bresciana Tower in Brescia; and Orestad Downtown Master Site Plan, in Copenhagen, Denmark, which is a 5km development zone; a redevelopment site in Belgrade, Yugoslavia; a building at Leuphana University in Luneburg, and two residential towers in Tel Aviv and Jerusalem.

Mr. Libeskind has taught and lectured at many universities worldwide. He has held such positions as the Frank O. Gehry Chair at the University of Toronto, Professor at the Hochschule für Gestaltung, Karlsruhe, Germany, and the Cret Chair at the University of Pennsylvania, and the Louis Kahn Chair at Yale University. He has received numerous awards, including the 2001 Hiroshima Art Prize - an award given to an artist whose work promotes international understanding and peace, never before given to an architect. He was awarded the 1999 Deutsche Architekturpreis (German Architecture Prize) for the Jewish Museum Berlin; also the 2000 Goethe Medallion for cultural contribution; in 1996 the American Academy of Arts and Letters Award for Architecture and in the same year the Berlin Cultural Prize; in 1990 a membership in the European Academy of Arts and Letters; in 1997 an Honorary Doctorate from Humboldt Universität, Berlin; also in 1999 an Honorary Doctorate from the College of Arts and Humanities, Essex University, England; in 2002 an Honorary Doctorate from the University of and an Honorary Doctorate from DePaul University, Chicago, and n 2004, an Honorary Doctorate from the University of Toronto. Two of Mr. Libeskind’s buildings won RIBA Awards in 2004, the London Metropolitan University Graduate Centre and the Imperial War Museum North, the latter of which was also nominated for the . Also in 2004, Mr. Libeskind was appointed the first Cultural Ambassador for Architecture by the U.S. Department of State, as part of the CultureConnect Program. In 2005 Daniel Libeskind was awarded the Building of the Year Award for the London Metropolitan University by the Royal Fine Arts Commission, as well as the American Architect Award for the Danish Jewish Museum, and the Giants of Design Awards from the Hearst Corporation and House Beautiful. In 2006, the Wohl Centre was awarded the Riba International Award. In 2007, Daniel was awarded the Trebbia European Award, the Gold-Medal for the Architecture at the National Arts Club, the Silver Award for “Large Visitor Attraction of the Year” honoring the Imperial War Museum North, the Second Penn State IAH Medal for Distinguished Contribu- tions to the Public Advancement of Arts and Humanities, the Award of Merit for innovative steel design for the Royal Onterial Museum, and the Commander’s cross of the Order of Merit at the Residence of the Consul General of Germany. Most Recently in 2008, Daniel Libeskind has been awarded the Annual Project of the Year Award for the Ascent at Roebling’s Bridge by the Midland Engineering Compnay, the CNBC Europe and Africa Property Awards in categories of Architecture, Redevelopment, High-Rise Architecture, and High-Rise Development to ORCO Property Group, the Doctor Scientiarum Honoris Causa awarded by the Technion Honorary Doctoral Ceremony, the CNBC Americas Property Awards for the Ascent at Roebling’s Bridge, and the AIA New York and the Center for Architecture Foundation presented Studio Daniel Libeskind with the 2008 President’s Award. Daniel Libeskind’s work has been exhibited extensively in major museums and galleries around the world and has also been the subject of numerous international publications in many languages.

CARLA SWICKERATH is Chief Executive Officer and a Principle Architect for Studio Daniel Libeskind. Prior to studying architecture, she received a BA in English and a BA in the History of Art from the University of Florida. She gained her MArch from the University of Michigan in 1999, and has worked for Studio Daniel Libeskind for 7 years. She has been involved in all aspects of the office and has led many competition teams, including the competition for the redevelopment of the World Trade Center Site in New York City, The Royal Ontario Museum in Toronto, the Extension to the Denver Art Museum, among others. Ms. Swickerath acts as a project manager with a particular focus on liaising with clients and client representatives and managing project schedules and contractual issues. Ms. Swickerath is leading the complicated WTC development process. Currently Ms. Swickerath is the project manager for a retail complex under construction in Las Vegas, Nevada and the Contemporary Jewish Museum in San Francisco, California, which opened in June 2008.

STEFAN BLACH is a Principal and an Architect for Studio Daniel Libeskind with over 20 years of experience. He received his Diploma in Architecture from the Technische Universität Berlin in 1991. From 1984 to 1992, he gained professional experience working with various architectural offices including Tim Heide’s office in Berlin and Salvador Perez Arroyo’s office in . He also worked independently as an architect from 1988 to 1996. Since 1992, he has worked at Studio Daniel Libeskind, and has played key roles in many of the major projects. Mr. Blach worked on the Jewish Museum Berlin, which opened in 1999, as one of the lead architects of the project team. He also acted as Project Architect for the Extension to the Victoria and Albert Museum in London and the Contemporary Jewish Museum San Francisco. Mr. Blach became an Associate of the Studio in 1999. He is responsible for the coordination of the design team and the management of project schedules and contractual issues, and also acts as a liaison for client representatives for the WTC redevelopment and Westside project in Brunnen, Switzerland.

ARUP Introduction Arup in the Americas is an integral part of the Ltd, one of the world’s largest independent engineering firms. Established in 1946, Arup has grown into an international group of multi-disciplinary practices with over 10,000 staff in 92 offices in 37 countries. The firm was established in the US in 1985 to provide the multi-disciplinary service that embodies the Arup philosophy and design approach.

Arup in For more than 40 years, Arup has worked in partnership with its clients as a key contributor in the development of Australia. Arup came to Australia in 1963 to undertake the structural design of the Opera House. We have been in Singapore since 1968, and have developed a diverse practice through a wide range of projects for public and private clients. Today, Arup in Australia is a multidisciplinary practice offering services across Australia, New Zealand, South East Asia and the Pacific. We have more than 1,300 staff comprising engineers, planners, project managers and a diverse range of consulting specialists. Arup’s breadth of experience equips us to draw together key players from around the globe to bring the best possible team to any given project. Globally, as a part of the Arup Group, we are more than 10,000 strong, operating out of 92 offices in 37 countries.

Total Design Engineering disciplines are integrated to provide clients and architects with a coordinated service from a project’s inception through to completion. The objectives are to contribute fully at the conceptual stage of a project, to ensure that the relevant engineering considerations and options are properly exposed to the owner and architect, and to ensure that the design is developed in a well-coordinated manner Total Design is undertaken by multi-disciplinary project teams, led by a principal-in-charge and a project manager, and including senior and supporting staff in each discipline required. The key project staff form an effective unit accustomed to working together as a team. Each team is responsible for handling its projects from inception to completion, thus ensuring full continuity.

Higher Education Arup understands the special needs of the campus. Arup brings a depth of experience in delivering the spectrum of project types found on the education campus, including academic, dormitory, performance spaces, laboratory, galleries, libraries, sport, transportation facilities and central plants. Arup also delivers services across the total life of these projects from needs assessment, capital planning, master planning, design, construction, commissioning, and post occupancy support. Arup recognizes that the fundamental purpose of the education campus is to teach. With this recognition comes a deep seated belief that through good design, Arup can contribute to the creation of better learning environments.

Arup has been involved in the design of educational facilities for 40 years. Projects undertaken range in scope from renovation of private institutions to the design of new world class facilities requiring fully integrated multidisciplinary teams. We have also worked with artists and exhibit designers on individual pieces and exhibits.

Designing and executing projects around the world with the invaluable input of our clients has given us a wealth of experience. Today Arup offers a broad spectrum of consulting services allowing us to provide almost all the technical design services required to successfully complete projects. We carefully identify the client’s criteria for success, design the means for achieving it and provide skills and management expertise for effective project implementation.

The Academic Environment As demonstrated by the projects we include in this EOI, this new building will provide an inspiring work environment for all staff, and in particular, will facilitate high quality research outcomes from academic staff and Research Higher Degree (RHD) students. The academic work environment will provide a range of opportunities from quiet, individual research to collaborative work with other academics and with RHD students. The building will play an essential part in the Faculty’s goal of attracting and retaining the best staff and allowing flexibility and choice in work styles.

The new building will provide an outstanding teaching and learning environment for all staff and students. It will provide a range of formal and informal teaching and learning spaces, encouraging interac- tion between students from all year levels, while still providing acoustic and visual privacy to enable work to proceed without interruption where necessary. Teaching and learning spaces will be based on advanced theories of studio and classroom design, addressing the role of technology, staff-student interaction and work styles in their layout, furnishings, and equipment. Studio is seen as the focus of student learning, the place of immersion in professional culture driven by experiential learning and global engagement in relevant social issues.

The building will demonstrate outstanding performance in the design and on-going operation of its environmental systems. It will use the best available techniques and technologies for sustainable design, and for the use of materials, energy, air and water. The building will also act as a laboratory, providing opportunities for staff and students to control, adjust and monitor environmental systems such as sun-shading or natural ventilation. The building will take advantage of local climate conditions to resourcefully provide high levels of occupant comfort, which will be evident through changes in the internal environment or to the external fabric. Internal spaces will be adaptable and flexible, but still have access to high quality natural light, ventilation and acoustics.

Capability and Process As aforementioned, SDL and ARUP have completed projects of this size, scale, and type. Schedule is a huge factor in all the projects and a highly prescriptive time schedule will be an inherent part of the brief for realization. Once such a schedule is fixed from the outset and agreement is secured with the whole Design Team and Construction Manager or Main Contractor, it is broadly matter of each associ- ated company staging the job in a manner to achieve their respective deliverables on time. With any given project, SDL expects varying sources of time management demands, for example: Client brief/ spending pattern requirements, Client’s Project Manager’s schedule, Construction Manager schedule and varying site conditions during construction, taking account of differing construction forms.

Another important factor for all projects is cost. Studio Daniel Libeskind expects to work with a cost control strategy that builds and develops throughout the project work stages. Within the Pre-Schematic and Schematic Design phases, the value is in having a clear and strong elemental cost plan. This allows the following for both the principal material decisions to be made in conjunction with the emergent form and confirmation of where funds are needed relative to Client financing packages and project cash flow predictions.

Process for Each Segment of the Project Pre-Schematic Design: Construction Documents: • Research and context specific gathering of information on site • On the basis of Client Design Development approval • Collaborative workshops with the Clients to understand and advise the program requirements and architectural aspirations • All Construction Documents produced by team at Joint Venture office close to • Intensive period of design and model building in our Studio ensure that they are produced in close connection with • Formal reporting of drawings, renderings, models, and outline cost estimate the local city laws, technical requirements while working with the contractor Schematic Design: • Production in close coordination with Construction Manager • On the basis of Client Pre-Schematic Design approval Construction Administration: • Development of outline design, again in close collaboration with all Clients • Contract Administration undertaken • Studio Daniel Libeskind’s Project Manager ensures liaison with local governing bodies and secure permissions in liaison • SDL ensure complimentary and constant design supervision with Clients • Deliveries to Client include comprehensive plans, sections, elevations, renderings, models outline specification and cost report Design Development: • On the basis of Client Schematic Design approval • Large scale study models enable architectural development and engineering/environmental modeling for use in working with Construction Managers and Sub-contractors • Formal reporting to include running costs to Client • Close working relationship with Client body to ensure detail of scheme provides optimal functioning of program • Deliverables to include more detailed specifications and finishes, large scale layout plans, typical details and cost report Studio Daniel Libeskind Relevant Projects

London Metropolitian University Graduate Centre London, England

Sketch

Elevation from Northeast The Graduate Student Centre for the London The Metropolitan University is a small building dedicated to the growing graduate population and is placed as a major gateway to the University on Holloway Road.

The building, which opened in March of 2004, promotes postgraduate identity through the provision of facilities to enhance the staff and student experience of graduate educations. It also encourages and facilitates cross-university collaboration at postgraduate level.

Even though it is a small project with a modest budget, the new development is vital to the University and greatly enhances student life as well as the local surroundings.

The University argues that top quality design can greatly improve the educational experience for the students as they feel valued and enjoy learning in high-quality surroundings.

Elevation from the Southwest Project Data:

Principal Architect: Daniel Libeskind Project Architects: Wendy James, Jean-Lucien Gay Services Provided: Complete Architectural (RIBA) Building Area: 10,000 sq.ft. Construction Budget: $5.1 Million Final Construction Cost: $5.6 Million Owner Scope Change: $350,000 Time of Award: 2001 Starting Date: 2002 Completion Date: December 2003 Awards: RIBA Award 2004, The Royal Fine Arts Commission Trust, Building of the Year Client: London Metropolitan University Contact: Brian Roper, Vice Chancellor Tel. +44 207 133 2001 Contractor: Costain Contact: Mark Hyam Tel. +44 123 583 8648 Principal: Wendy James Design Team: Jean-Lucien Gay, Chad Machen, Robert Hirschfield, Anne Markey Project Management, Planning Supervision: Robinson Low Francis Structural Engineer: Cadogan Tietz Mechanical/Electrical/Plumbing Engineer: WSP Group Cost Estimation: Gleeds View from Halloway Rd. Contractor: Costain

Ground Floor Plan

GRADUATE CENTRE 0m 2m 4m 10m LONDON METROPOLITAN UNIVERSITY GROUND FLOOR PLAN The Wohl Centre Bar-Ilan University, Ramat-Gan, Israel

Sketch

Aerial View of the Centre

Voices and its Echoes stands for the focal point which brings together the two essential components of the Bar-Ilan university: the secular and the sacred. Apparent in the form of the building is the interrelation between the dynamics of knowledge and the unifying role of faith.

The exciting form of the auditorium, lobbies, seminar rooms and public spaces are penetrated by the “labyrinth of letters” in which an ancient constellation of hierarchies is made visible. The functional volumes of program and the subtle enigma of light are carefully adjusted to create a space full active and meditative atmosphere.

The entire building functions as a dynamic ensemble which through its flexibility of usage can function equally intensively during the day or the night. The building’s exterior is homogeneous in form, built in stone and metal, penetrated by the projections of the labyrinth of letters which defines and organizes the glazing and indirect light.

The building stands on a critical crossroad in the campus and opens a dialogue between the university and its neighbors. As such, Voices and its Echoes is a gateway and beacon for the students, faculty, guests and public of the 21st Century. Auditorium

Project Data:

Principal Architect: Daniel Libeskind Project Architects: Michael Brown, Gerhard Brun Services Provided: Complete Architectural Building Area: 38,000 sq.ft. Auditorium Seating: 910 Seats Construction Budget: $6.5 Million Final Construction Cost: $6.5 Million Owner Scope Change: N/A Starting Date: October 1999 Awards: RIBA International Award 2006 Completion Date: October 2005 Client: Bar-Ilan University Contact: Moshe Kaveh, President Tel. +972.3.931.4145 Contractor: Ortam-Sahar Ltd. Contact: Hanan Horowitz Tel. +972.3.613.0073 Principal: Stefan Blach Design Team: Gerhard Brun, Michael Brown, Marian Chabrera, Robert Hirschfield, Thomas Willemeit Architect of Record: TheHeder Architecture Project Management: Vinko Yeeffet Structural Engineer: Josef Kahan & Partners Mechanical/Sanitary Engineer: Ben-Zvi Consulting Engineers Electrical Engineer: Shalom Ozer View of West Elevation Acoustical Engineer: Abraham Melzer and Uzi Livni Safety and Fire Protection Consultant: Shmuel Netanel Eng. Consultants Lighting Consultant: Dinnebier Licht Theater Consultant: Braslavi Architects CATERING DELIVERY

SITE LIMIT LINE WALL TOP 49.90

6 NO. 158x300MM slope Waterproofing Consultant: Michael Morton Eng. 78% WALL TOP 49.50

WALL TOP 50.40 RAMP 2, slope 1:18 6 NO. 6 NO. 158x300MM WALL TOP 49.30 CAFE 158x300MM ENTRANCE WALL TOP 50.60

BUILDING LINE HALL I EXIT 6 NO. M WALL TOP 49.30 167x300M Air Conditioning and Sanitary Engineer: WALL TOP 48.78 48.00 ST. FIRE EXIT Moshe Ben Zvi Consulting Eng. GARDEN WALL TOP 49.30 SITE LIMIT LINE ENTRANCE

CATERING ENTRANCE

WALL TOP 49.50

CAFE GARDEN slope 33% Cost Estimation: Eli Golding WALL TOP 49.00

WALL TOP 51.35 BUILDING LINE

SITE LIMIT LINE 6 NO. 6 NO. 167x300MM 167x300MM

4 NO. WALL TOP 51.65 HALL 175x250MMII EXIT

slope 33%

RAMP 1, slope 1:55

MAIN ENTRANCE 3 NO. 167x400MM WALL TOP 53.00

ENTRANCEMAIN

LIMIT OF FACADE

WALL TOP 53.50 ALTERNATIVE ENTR.

WALL TOP 53.15

WALL TOP 53.25 STAGE ENTR.

WALL TOP 53.00

WALL TOP 53.15

SITE LIMIT LINE

0m 2m 10m 20m SITE PLAN M 1:200

π THE WOHL CENTRE DANIEL LIBESKIND ARCHITECTURAL STUDIO SiteBAR-ILAN PlanUNIVERSITY Αα λΛ WINDSCHEIDSTR. 18 D-10627 BERLIN RAMAT-GAN 52900 TEL. 0049(0)30-327 782-0 ISRAEL

p THE HEDER PARTNERSHIP 11 GOTTLIEB STREET TEL AVIV 66069 DANIEL LIBESKIND TEL. 00972 3 5222402 THE WOHL CENTRE, BAR-ILAN UNIVERSITY Creative Media Centre City University of Hong Kong

Sketch

Front View The Creative Media Centre for the City University of Hong Kong provides facilities which will enable the University to become the first in Asia to offer the highest level of education and training in the Creative Media fields. In addition to the School of Creative Media, the Centre will also house the Centre for Media Technology and the Department of Computer Engineering and Information Technology.

The distinctive crystalline design will serve as an architectural icon for the departments housed within, and will contain an extraordinary range of spaces rich in form, light, and material that, together, will create an inspiring environment for research and creativity. Internal spaces have been designed specifically to encourage collaboration through an openness and connectivity of activity area. It will also provide an exciting place for visitors, who will be welcomed to enjoy the facilities as part of an extended public outreach program of courses and events. Secluded landscaped gardens to the north of the building will be available for students and public alike.

Accommodations include a multi-purpose theatre, sound stages, laboratories, classrooms, exhibition spaces, and a café and restaurant. Section

Project Data

Principal Architect: Daniel Libeskind Project Architects: Wendy James, Eric Sutherland, Joy Cardillo, Laphan Fan Services Provided: Complete Architectural Building Area: 327,500 sq.ft. Total Budget: $100 Million Construction Cost: $70.5 Million Time of Award: 2002 Scheduled Completion: 2009 Client: City University of Hong Kong Contact: Sam McBride Tel. +852 3 442 6870 Principal: Eric Sutherland, Wendy James Competition Team: Martin Ostermann, Simon Dittmann, Philipp Utermoehl, Gerhard Brun, Michael Brown, Bahadir Parali Design Team: Joy Cardillo, Ka Wing Lo, Sean Ellis, Laphan Fan, Susanne Milne, Tomoro Aida, Taek Kim, Donald Shillingburg, Sarah Nichols, Jennifer Russell Joint Venture Partner: Leigh & Orange Structural Engineer: ARUP (London/Hong Kong) Mechanical/Electrical/Plumbing Engineer: ARUP Geotechnical/Civil Engineer: ARUP Landscape Architect: ADI Limited Lobby and University Stairs Facade Consultant: ARUP Fire Protection Consultant: ARUP Lighting Designer: ARUP IT and Communications,Audiovisual,Acoustics: ARUP Site Formation: Kaden Construction Co. Town Planning: EDAW Cost Estimation: Levett and Bailey Contractor: China Resources Construction

Longitudinal Section Awards 2008 • Award of Merit by the AIA New York Building Type Awards for the Museum Residences • AIA New York and the Center for Architecture Foundation present Studio Daniel Libeskind with 2008 President’s Award • CNBC Americas Property Awards 2008 in categories of Best Development to the Museum Residences and Best High-Rise Develop- ment to the Ascent at Roebling’s Bridge • CNBC Europe & Africa Property Awards 2008 in categories of Architecture, Redevelopment, High-Rise Architecture and High-Rise Development for Zlota 44 2007 • The Commander ‘s cross of the Order of Merit at the Residence of the Consul General of Germany • Gold medal for Architecture at the National Arts Club • Award of Merit for innovative steel design for the Royal Ontario Museum,Canada • Merit Award for Multifamily for “The Museum Residences”, Denver, Colorado, USA 2006 • RIBA International Award, for the Wohl Centre at Bar-Ilan University, Israel 2005 • Royal Fine Arts Commission Trust, Building of the Year Award, Jeu D’ Esprit, for London Metropolitan University • American Architect Award, for the Danish Jewish Museum • Giants of Design Award, The Hearst Corporation and House Beautiful 2004 • Honorary member of the Royal Academy of Arts, London, England • RIBA (Royal Institute of British Architects) Award, 2004, for Imperial War Museum North • RIBA Award, 2004, for London Metropolitan University Graduate Centre • The First Cultural Ambassador to the US for Architecture by the U.S. Department of State, as part of the Culture Connect program • Man of the Year Award from the Tel Aviv Museum of Art, Israel • The Cooper Union, Urban Visionary Award for Architecture, New York City ARUP Experience C olumbia University Northwest Science Lab Structural, mechanical, electrical and plumbing Queensland Brain Institute, St Lucia, Queensland, Australia CNeolwum Yobiark, U Nenivewrs Yoity rNk orthwest Science Lab Structural,engineering, mechanical, lighting and electrical information and plumbing technology for the Client: University of Queensland NClient:ew Y oColumbiark, New YUniversityork engineering,new 180,000 lighting sq ft andlab building.information One technology of the primary for the Architect: John Wardle Architects & Wilson Architects Client:Design ColumbiaArchitect: UniversityRafael Moneo / Moneo newchallenges 180,000 of thesq ftproject lab building. was to developOne of thean architecturallyprimary Completed 2007 DesignBrock Studio Architect: Rafael Moneo / Moneo challengesexposed structural of the project system was to spanto develop the Dodge an architecturally Hall Environmental assessment report, management plan and sustainability design advice for the BrockExecutive Studio Architect: Davis Brody Bond exposedgymnasium. structural The systemproject toalso span included the Dodge an analysis Hall of design and construction of a new university research building at Queensland University. CExecutiveReference:olumbia Architect:U niversity DavisNorth Brodywest S Bondcienc e Lab gymnasium.Structural,subway vibrations mechanical, The project for their electrical also impact included and on plumbing thean laboratoriesanalysis of and NeReference:Irwinw Lefkowitz,York, New University York Architect subwayengineering,the review vibrations of lighting existing for andtheir adjacent informationimpact buildings on the technology laboratories to support for new theand John Wardle Architects & Wilson Client:IrwinColumbia Lefkowitz, Columbia University University University Architect thenewcooling review 180,000 towers. of existing sq ft lab adjacent building. buildings One ofto thesupport primary new Architects ColumbiaT: 212 854 University 2484 cooling towers. Design Architect: Rafael Moneo / Moneo challenges of the project was to develop an architecturally University Of Western Sydney Medical School, Campbelltown, New South T: 212 854 2484 Columbia University Northwest Science Lab BrockStructural, Studio mechanical, electrical and plumbing exposed structural system to span the Dodge Hall , Australia Princeton University Structural, mechanical, electrical and plumbing engineering CoNelumwb iaYo Urk,ni veNerswity Yo Nork rthwest Science Lab Executiveengineering,Structural, Architect:mechanical, lighting andDavis electrical information Brody and Bond technology plumbing for the gymnasium. The project also included an analysis of Client & Architect: Lyons Architects NeClient:w Yor k,Columbia New Yo Universityrk Reference:newengineering,PNerinu c180,000reotoscni eU nnc lightingieve sq Lar sftbity lab and building. information One technologyof the primary for the Structural,subwayfor the new vibrations mechanical, 225,000 for their electricalsq ft impact lab building.and on plumbingthe laboratories A key engineering goal and of this Completed 2007 Client:Design Columbia Architect: University Rafael Moneo / Moneo IrwinchallengesnewNePrinuc r180,000eLefkowitz,otoscnie, ofnNec thee wsqLa University projectJ beft r slabey building.was Architect to develop One ofan the architecturally primary fortheproject thereview new is to of225,000 design existing a adjacentsqbuilding ft lab building.thatbuildings supports toA support keyinterdisciplinary goal new of this Structural, civilDesign andBrock facadeArchitect: Studio engineering Rafael Moneo for three, / Moneo 3 storey buildings housing teaching, ColumbiaexposedchallengesPClient:rinceto Princeton nstructural, UniversityofNe thew J projectsystemeUniversityrs ey towas span to thedevelop Dodge an Hall architecturally projectcoolingcollaboration is towers. to design while a maintaining building that separate supports identities interdisciplinary for the administrationBrock andExecutive Studioresearch Architect: facilities Davis arranged Brody aroundBond a central 'hub' space with a floating T:gymnasium.exposedClient:Architect: 212 Princeton854 structural David The2484 project BrodyUniversitysystem alsoBond to span included the Dodgean analysis Hall of collaboration two departments. while Primarymaintaining technical separate challenges identities include for the the Reference: subway vibrations for their impact on the laboratories and Lyons Architects steel grillageExecutive roof. Architect: Davis Brody Bond gymnasium.Architect:Reference: David The projectBrody Bondalso included an analysis of twoneed departments. to establish aPrimary wide varietytechnical of challengesinternal environmental include the Irwin Lefkowitz, University Architect the review of existing adjacent buildings to support new Reference: subwayPReference:Georgerinceto nvibrations Olexa, U niver sFacilityi tyfor their Manager impact on the laboratories and needStructural,conditions to establish mechanical, with energy a wide electricalefficient variety ofbuilding and internal plumbing systems environmental engineering as well as Bio 21, Melbourne,Columbia Victoria, University Australia cooling towers. Client: UniversityIrwin ofLefkowitz, Melbourne University Architect theNeGeorgePrinceton ureviewrosc iOlexa,e Universitynofc eexisting La Facilityb adjacent Manager buildings to support new conditionsforthe the design new with of225,000 low energy vibration sqefficient ft labspaces buildingbuilding. systems A key as goal well of as this T: 212 854 2484 Architect: DesignIncColumbia Melbourne University Pty Ltd coolingPPrincetonT:ri n609ceto towers.n258, UniversityNe 6336w Jers ey theproject design is to of design low vibration a building spaces that supports interdisciplinary C olumbia University Northwest Science Lab Structural, mechanical, electrical and plumbing Award: RAIAT: Victorian 212 854 Architecture 2484 Awards - Marion Mahony Award for Interior Architecture Client:T: 609 Princeton 258 6336 University collaboration while maintaining separate identities for the NePriwnc Yoetornk, U Nenivewr sYoity rk engineering,Structural, mechanical, lighting and electrical information and plumbingtechnology engineering for the 2005 Princeton University Chemistry Lab Structural, mechanical, electrical and plumbing Client:Neuro Columbiascience La Universityb newforArchitect: the 180,000 new David 225,000 sq Brodyft lab sq building. Bondft lab building. One of Athe key primary goal of this two departments. Primary technical challenges include the Princeton University Structural,Princetoton ,mechanical,U Nnievewr sJietyrs eCy helectrical emistry La andb plumbing engineering Structural,engineering, mechanical, acoustics, electrical lighting, and facades, plumbing and sustainability Capital Cost: Design AUS$108Prince toArchitect:n, Ne000w 000JRafaelerse y Moneo / Moneo challengesprojectReference: is to of design the project a building was tothat develop supports an interdisciplinary architecturally need to establish a wide variety of internal environmental Neuroscience Lab forPri nthece tonewn, Ne225,000w Jerse ysq ft lab building. A key goal of this engineering, acoustics, lighting, facades, and sustainability Completed 2004BrockClient: Studio Princeton University exposedcollaborationGeorgeClient: Princeton structuralOlexa, while Facility systemUniversity maintaining toManager span separate the Dodge identities Hall for the conditionsservices for with this energynew 300,000 efficient buildingsq ft lab systemsbuilding. as Technical well as Princeton, New Jersey projectClient: isPrinceton to design University a building that supports interdisciplinary services for this new 300,000 sq ft lab building. Technical Trevor Mein Building physics,ExecutiveArchitect: structural, Architect: David facade Brody Davis and Bond civilBrody engineering Bond for a cutting edge biotechnology gymnasium.twoPrincetonArchitect: departments. UniversityHopkins The project Primary Architects also technical included challenges an analysis include of the thechallenges design of of low this vibrationproject include spaces the design of low Client: Princeton University collaborationArchitect: Hopkins while maintainingArchitects separate identities for the challenges of this project include the design of low discovery centre,Reference:Reference: including energy efficient solar shading and design measures to protect subwayneedT:Reference: 609 to establishvibrations258 6336 a for wide their variety impact of oninternal the laboratories environmental and vibration floors as well as the integration of façade and Architect:George David Olexa, Brody Facility Bond Manager conditionstwoReference: departments. with energy Primary efficient technical building challenges systems as include well as the vibration floors as well as the integration of façade and sensitive laboratoryIrwin Lefkowitz,equipment. University The building Architect is characterised by multiple rooms that appear the George review Olexa, of existing Facility adjacent Manager buildings to support new structural systems. Reference:Princeton University theneedGeorge design to establish Olexa, of low vibrationFacilitya wide Managervariety spaces of internal environmental structural systems. to float on the Columbiafacade of Universitythe building, and Arup achieved this very unusual form by coolingPPrincetonrinceto towers.n UUniversitynive rsity Chemistry Lab Structural, mechanical, electrical and plumbing GeorgeT: 609 Olexa, 258 6336 Facility Manager conditions with energy efficient building systems as well as designing the mainT: 212 support 854 2484of each room to be suspended from the roof, meaning there are PPrincetonT:ri n609ceto n258, UniversityNe 6336w Jers ey engineering, acoustics, lighting, facades, and sustainability Princeton University the design of low vibration spaces no floor support columns. Client:T: 609 Princeton 258 6336 University services for this new 300,000 sq ft lab building. Technical T: 609Princ e258ton U 6336nivers ity Chemistry Lab Structural, mechanical, electrical and plumbing Princeton University Structural, Forestry & mechanical, Environme nelectricaltal Studi eands S cplumbinghool engineering Arup is providing structural, mechanical, electrical and Deakin University Prin c-e Schoolton, Ne wOf Je Contemporaryrsey Arts Building, Burwood Campus, engineering,Architect: Hopkins acoustics, Architects lighting, facades, and sustainability challenges of this project include the design of low Neuroscience Lab forFoYa rthelees trU newyn i&ve En225,000rsivityr onme sqnta ftl Slabtud building.ies Scho o lA key goal of this Arupplumbing is providing engineering, structural, lighting mechanical, and acoustics electrical services and for the Burwood, Victoria,PrinClient:ceton Australia UPrincetonniversity UniversityChemistr y Lab servicesStructural,Reference: for mechanical, this new 300,000 electrical sq andft lab plumbing building. Technical vibration floors as well as the integration of façade and Princeton, New Jersey projectYale U isni veto rdesignsity a building that supports interdisciplinary plumbing engineering, lighting and acoustics services for the PrinArchitect:ceton, Ne Hopkinsw Jerse yArchitects challengesengineering,GeorgeNew Ha Olexa,ve ofn acoustics,this, C oFacilityprojectnnec tilighting, cincludeManagerut thefacades, design and of low sustainability structuralForestry &systems. Environmental Studies School at Yale, also known Client: Deakin Client:University Princeton University collaboration while maintaining separate identities for the NeClient:w Ha Yaleven ,University Connecti cut Forestryas the Kroon& Environmental Building. It Studieswill house School general at Yale, teaching also knownspace, Architect: WoodsClient:Reference: Bagot Princeton Pty Ltd University vibrationservicesPrinceton forfloors University this as new well 300,000 as the integration sq ft lab ofbuilding. façade Technicaland Architect: David Brody Bond twoClient: departments. Yale University Primary technical challenges include the as the Kroon Building. It will house general teaching space, Architect:George Hopkins Olexa, FacilityArchitects Manager structuralchallengesT:Architect: 609 258systems. Hopkinsof 6336this project Architects include Ltd. the design of low computer rooms, an auditorium, a library, academic offices Completed 2004Reference: need to establish a wide variety of internal environmental Reference:Princeton University vibrationArchitect:Reference: floors Hopkins as well Architects as the integration Ltd. of façade and computerand support rooms, spaces. an auditorium, The large opena library, space academic of the top offices floor George Olexa, Facility Manager conditions with energy efficient building systems as well as Acoustics design for the School of Contemporary Arts Building at Deakin University's Reference: and support spaces. The large open space of the top floor GeorgeT: 609 Olexa, 258 6336 Facility Manager structuralFJerryores tWarrenry &systems. Env iro nmental Studies School Arupwill include is providing an "environmental structural, mechanical, center" which electrical will and Burwood Campus.Princeton The buildingUniversity incorporates general and specialist teaching facilities the design of low vibration spaces Princeton University JerryAssociate Warren Vice President Construction and willaccommodate include an "environmentalexhibitions and center" events. which The projectwill has a including performanceT: 609 258 spaces, 6336 dance, video, film and sound studios. It also includes sound Yale University plumbing engineering, lighting and acoustics services for the T: 609Fores tr258y & En6336viron mental Studies School ArupAssociateRenovation is providing Vice President structural, Constructionmechanical, electricaland and accommodatestrong sustainability exhibitions agenda and and events. is reflected The project in some has ofa its editing spaces and collaborative spaces. This was a particularly important role as many of New Haven, Connecticut Forestry & Environmental Studies School at Yale, also known Yale University plumbingRenovation engineering, lighting and acoustics services for the strong sustainability agenda and is reflected in some of its the spaces areP acousticallyrinceton Uni vesensitiversity C handemi sprovidingtry Lab the right acoustic environment was Structural,Client:Yale University Yale mechanical, University electrical and plumbing asfeatures: the Kroon photovoltaics Building. Iton will the house roof, generalsolar hot teaching water heating, space, New Haven, Connecticut ForestryYale University & Environmental Studies School at Yale, also known features: photovoltaics on the roof, solar hot water heating, FoPrreinsctreyto &n ,En Nevirwon Jmeresnetay l Studies School engineering,ArupArchitect:T: 203 is providing 432 Hopkins acoustics, 8407 structural, Architects lighting, mechanical, Ltd. facades, electricaland sustainability and computerground source rooms, heat an pumpsauditorium, and storma library, water academic harvesting offices for critical to ensuringClient: the successfulYale University use of the space. as the Kroon Building. It will house general teaching space, YaClient:le Uni vePrincetonrsity University servicesplumbingT: 203 for432 engineering, this 8407 new 300,000 lighting sq and ft labacoustics building. services Technical for the groundtoilet use. source The heatproject pumps is approx and storm 58,000sf water andharvesting the for Architect: Ltd. computerReference: rooms, an auditorium, a library, academic offices and support spaces. The large open space of the top floor School of Botany,NeArchitect:w Ha Universityve nHopkins, Con nof eArchitectsc tiMelbourne,cut Victoria, Australia. challengesForestry & Environmentalof this project includeStudies theSchool design at Yale,of low also known toiletconstruction use. The budget project is is $24m. approx There 58,000sf is also and an the"adjoining Reference: andJerry support Warren spaces. The large open space of the top floor will include an "environmental center" which will Client: UniversityClient:Reference: of YaleMelbourne University vibrationas the Kroon floors Building. as well asIt will the houseintegration general of façade teaching and space, construction budget is $24m. There is also an "adjoining Jerry Warren willAssociate include Vicean "environmental President Construction center" which and will accommodateprojects" project exhibitions which comprises and events. an undergroundThe project has service a Architect: LyonsArchitect:George Architects Olexa,Hopkins Facility Architects Manager Ltd. structuralcomputer systems. rooms, an auditorium, a library, academic offices projects" project which comprises an underground service Associate Vice President Construction and accommodateRenovation exhibitions and events. The project has a strongnode tosustainability serve the Kroon agenda Building and isand reflected two existing in some buildings, of its Completed 2003Reference:Princeton University and support spaces. The large open space of the top floor node to serve the Kroon Building and two existing buildings, Renovation strongYale University sustainability agenda and is reflected in some of its features:various link photovoltaics passageways on theand roof, landscaping. solar hot water heating, JerryT: 609 Warren 258 6336 will include an "environmental center" which will various link passageways and landscaping. Building services,Yale acoustics University and fire engineering design for a new School of Botany features:T: 203 432photovoltaics 8407 on the roof, solar hot water heating, ground source heat pumps and storm water harvesting for building. ServicesAssociate included Vice designPresident of theConstruction lighting system and to provide a creative, cost efficient accommodate exhibitions and events. The project has a T: 203 432 8407 ground West Csourceampu heats Ho pumpsusing and storm water harvesting for toiletArup use.is providing The project structural, is approx mechanical, 58,000sf electrical and the and and ecologicallyRenovationFor esustainablestry & Envi rlightingonmenta design.l Studie Workings School closely with the architect, Arup ArupstrongWes ist Csustainabilityprovidingampus Ho structural, uagendasing mechanical, and is reflected electrical in some and of its Arup is providing structural, mechanical, electrical and toiletCorn use.ell U Thenive projectrsity is approx 58,000sf and the constructionplumbing engineering budget is $24m.as well Thereas communications is also an "adjoining and developed anYaleYa innovativele University Unive randsity holistic lighting scheme that utilised various colour treatments to plumbingfeatures: photovoltaicsengineering, lightingon the roof,and acousticssolar hot waterservices heating, for the constructionCIthoarcnae,ll NeUn iwbudgetve rYosityrk is $24m. There is also an "adjoining plumbingacoustic designengineering and masterplanningas well as communications for the renovations and and T:Ne 203w Ha432ve n8407, Con necticut Forestryground source& Environmental heat pumps Studies and stormSchool water at Yale, harvesting also known for projects" project which comprises an underground service make a visual impact on a limited project budget. The treatment of colour within the school projects"Ithaca, Neprojectw Yo whichrk comprises an underground service acoustic design and masterplanning for the renovations and Client: Yale University astoiletClient: the use. Kroon Cornell The Building. project University isIt willapprox house 58,000sf general andteaching the space, nodenew constructionto serve the ofKroon five Buildingdining halls and and two five existing dormitories buildings, was handled subtly. The ranges of colour temperature within the various spaces are not nodeClient: to Cornellserve the University Kroon Building and two existing buildings, new construction of five dining halls and five dormitories Architect: Hopkins Architects Ltd. computerconstructionArchitect: rooms, Kieran budget an Timberlake isauditorium, $24m. ThereAssociates a library, is also academic an "adjoining offices varioustotaling link1700 passageways beds for Cornell’s and landscaping. campus. immediately apparent when viewed internally, but are clearly evident when the building is variousArchitect: link Kieranpassageways Timberlake and landscaping.Associates totaling 1700 beds for Cornell’s campus. Reference: andprojects"Reference: support project spaces. which The comprises large open an space underground of the top service floor viewed from outside. Reference: Jerry Warren willnodeWeDavid includes t toC Newman aservem panu sthe"environmental Ho Kroonusing Building center" and which two existing will buildings, Arup is providing structural, mechanical, electrical and Arup West Campus Housing ArupDavid is Newmanproviding structural, mechanical, electrical and AssociateCornell U Vicenive rPresidentsity Construction and accommodateplumbingvariousCCornellornell link UUniversity engineeringn ipassagewaysve rexhibitionssity as well andand as events.landscaping. communications The project and has a plumbing engineering as well as communications and Martin Saunders Photography Cornell University RenovationIthaca, Ne w York strongacoustic IthT: a607ca ,sustainability Nedesign255w 6633Yo andrk agendamasterplanning and is reflected for the renovations in some of andits acoustic design and masterplanning for the renovations and T: 607 255 6633 University ofWe YaleTechnologyClient:st CUniversitya mCornellpus Sydney,Ho Universityusing Ultimo, NSW, Australia features:newArupClient: constructionis Cornellproviding photovoltaics University of structural, five on dining the mechanical, roof, halls solarand fivehot electrical waterdormitories heating,and new construction of five dining halls and five dormitories

Client: UniversityCT:oArchitect:r n203 eofll TechnologyU 432nive Kieranr s8407ity TimberlakeSydney Associates groundtotalingplumbingArchitect: source1700 engineeringKieran bedsheat Timberlake pumpsfor asCornell’s well and Associatesas storm campus. communications water harvesting and for totaling 1700 beds for Cornell’s campus. toilet use. The project is approx 58,000sf and the Architect: BlighItha Reference:Vollerca, Ne Nieldw Yo rk acousticReference: design and masterplanning for the renovations and construction budget is $24m. There is also an "adjoining Capital Cost:Client: A$100David Cornell Newman 000 University000 newDavid construction Newman of five dining halls and five dormitories Completed 2002Architect:Cornell KieranUniversity Timberlake Associates projects"totaling 1700 project beds which for comprises Cornell’s campus.an underground service Cornell University node to serve the Kroon Building and two existing buildings, Electrical, communications,Reference:T: 607 255 hydraulic6633 and fire engineering services for the fit out of all floors variousT: 607 link 255 passageways 6633 and landscaping. as part of theDavid redevelopment Newman of a historic building to house the faculty of IT, faculty of

education andCornell administration University department for the University of Technology. Specialist input West Campus Housing Arup is providing structural, mechanical, electrical and was providedT: on607 fire 255 engineering, 6633 vertical transportation and environmental design for the Cornell University plumbing engineering as well as communications and atrium. Ithaca, New York acoustic design and masterplanning for the renovations and Client: Cornell University new construction of five dining halls and five dormitories Architect: Kieran Timberlake Associates totaling 1700 beds for Cornell’s campus. Reference: David Newman Sidney MyerCornell Asia Centre, University University of Melbourne, Victoria, Australia T: 607 255 6633 Client: University of Melbourne

Architect: Nation Fender Katsilidis Completed 2001 Acoustic, civil and structural engineering for a purpose built facility to house the Melbourne Tony Miller Institute of Asian Languages & Societies and the Asialink Centre. It comprises a 500 seat basement lecture theatre and 5 storeys of state-of-the-art teaching and learning, research and academic office space. University Of Canterbury Maths & Computer Sciences Building, Christchurch, New Zealand Client: University of Canterbury Architect: Architectus/Cook Hitchcock & Sargisson Completed 1998 Structural, mechanical and electrical engineering design of three, 7-storey academic towers for staff and postgraduate research, and a 4-storey teaching wing for undergraduate studies. These two elements are brought together around a top-lit atrium, contained at the ends by vertical circulation/service cores. The academic offices within the towers are arranged in north facing clusters of ten around vertically stacked double height spaces. The offices are naturally ventilated with manually operated mechanisms controlling both sun & ventilation. Across the atrium the teaching block & computer laboratories face south, enjoying natural light without the problems of glare & solar gain. University of Canterbury

Arup