<<

National Electric Power Regulatory Authority Islamic Republic of NEPRA Tower, Attaturk Avenue (East) G-5/1, Islamabad It .gas - Phone: 9206500, Fax: 2600026 REGISTRAR Website: www.nepra.org.pk, Email: infoneDra.org.Dk

No. NEPLAN-9245/ Februaiy 02, 2021

Prime rrolling Company Shaheen, Plot No. 10, 10/1, 10/2, 10/3, 10/4, 10/5 10/6 & Deh , Manghopir, . Contact No. 0300-2001128

Subject: Generation Licence No. DGL/924512020 Licence Application No. LAN-9245 Prime Tolling Company Shaheen, K-Electric Limited

Reference: KEL's letter No. KE/BPR/NEPRA/2021/036 dated 04.01.2021 ('received on 08.01.202 1).

Enclosed please find herewith Generation Licence No. DGL/9245/2020 granted by the National Electric Power Regulatory Authority to Prime Tolling Company Shaheen for 179.520 kW photo voltaic solar based distributed generation facility located at Plot No. 10, 10/1, 10/2, 10/3, 10/4, 10/5, 10/6 & Deh Manghopir, Manghopir, Karachi, pursuant to NEPRA (Alternative & Renewable Energy) Distributed Generation and Net Metering Regulations, 2015.

2. Please quote above mentioned Generation Licence No. for future correspondence.

Enclosure: Generation Licence (DGL19245/2020)

REGISTRAR G_ (Syed Safeer Hussain)

Copy to:

1. Chief Executive Office, Alternative Energy Development Board, 2 Floor, OPF Building, G-5/2, Islamabad.

2. Chief Executive Officer, K-Electric Limited, KE House, 39 B, Main Sunset Boulevard, DHA Phase-lI, Karachi.

3. Director General, Environment Protection Department, Government of , Complex Plot No. ST-2/l, Industrial Area, Karachi. National Electric Power Requlatory Authority (NEPRA) ____Islamabad—Pakistan I GENERATION LICENCE No. DGL1924512021

The Authority hereby grants Generation Licence to Prime Tolling Company Shaheen, for 179.52 KW photovoltaic solar based distributed generation facility, having consumer reference number BL 005306, located at Plot# 10, 10/1, 10/2, 10/3, 10/4, 10/5, 10/6 & Deh Manghopir, Manghopir under the National Electric Power Regulatory Authority (Alternative & Renewable Energy) Distributed Generation and Net Metering Regulations, 2015 (the "A&RE Regulations") for a period of seven (07) years. This Licence is valid up to'/ 'day of /4 2028.

2. The Licensee shall abide by the provisions under the A&RE Regulations during the currency of the Generation Licence. 3. The technical parameters of Net Metering arrangements are shown hereunder:- -

(i). Primary Energy Source: Solar (ii). Size of Distributed Generation Facility: 179.52 KW (iii). Generator/I nverter Information:

Manufacture: KACO NEW ENERGY

Model No. 50.0 TL3-Blueplanet

(iv). Vendor/Installer Greaves Pakistan (v). Generation Type: Inverter

4. This Licence may be renewed subject to the A&RE Regulations.

MA(7 This Licence is given under my hand onooL day of Two Thousand & Twenty One

Registrar ç45