Spaceport News John F

Total Page:16

File Type:pdf, Size:1020Kb

Spaceport News John F April 3, 2009 Vol. 49, No. 7 Spaceport News John F. Kennedy Space Center - America’s gateway to the universe www.nasa.gov/centers/kennedy/news/snews/spnews_toc.html INSIDE . Bird team clears path for Discovery Final Ares I-X By Linda Herridge segments arrive Spaceport News irds fly where they will and there’s no Bway to predict when one or more might strike the space shuttle during launch or landing. To re- Page 2 duce the chances, Kennedy Space Center makes use Shuttle’s MLP-1 of several bird-deterrent handed over methods. to Constellation As Discovery touched Program down at 3:13 p.m. EDT on March 28, and glided to a stop at Kennedy’s Shuttle Landing Facility, or SLF, the EG&G team felt a sense of accomplishment in creat- ing the safest environment Page 3 possible for its return. NASA/Kevin O’Connell According to Ron Feile, Space shuttle Discovery touches down on Runway 15 at Kennedy Space Center, completing the 13-day, 5.3-million mile Dream Job journey of the STS-119 mission to the International Space Station. Main gear touchdown was at 3:13:17 p.m. EDT. Nose gear EG&G air traffic controller, touchdown was at 3:13:40 p.m. and wheelstop was at 3:14:45 p.m. Experience NASA’s Space Shuttle Pro- winners visit KSC gram mandates that NASA on the ground. in the landing facility’s has a hazard management Smith fired shotguns Mate/Demate Device and plan. The SLF plan includes and pistols loaded with that it’s a popular hangout the use of pyrotechnics, blanks to scare large flocks for vultures. propane cannons and bird- of birds away from the “The bird threat can watch activities. runway. From time to time, come from any direction, About five hours before he would sound a special at any time, day or night,” Discovery’s first landing siren from his truck or use Asche said. He also said opportunity, several EG&G a remote control to set off shooting blanks at birds workers were stationed at NASA/ Troy Cryder cannons. requires timing. Page 6 the SLF’s Landing Aids EG&G’s Bob Smith fires a shotgun A series of 25 liquid “There are times not Control Building, the con- loaded with blanks in an attempt to propane cannons, placed in to shoot at them. You don’t Heritage: scare large flocks of birds away from strategic locations along the want a flock of birds flying trol tower and at the runway the runway at Kennedy Space Center’s Mission prep overrun area monitoring Shuttle Landing Facility. east and west sides of the around as the shuttle is land- ‘heats up’ in 1964 bird activity. SLF runway, are controlled ing,” Asche said. Air traffic controller Astronaut Brent Jett com- by air traffic controllers in Feile said the SLF team Vaden DeJarnette said that municated runway condi- the tower and remotely by also monitors bird activity large flocks of birds can be tions, including weather, bird-watchers in the field. when crews are at the center detected on radar as they fly wind and bird concerns These cannons, installed in for Shuttle Training Aircraft over or around the SLF. back to the Discovery crew. September 2007, are fired practice. “We mostly rely on Inside the control tower, randomly by zone, individu- “It gets more inter- communications from the EG&G air traffic controller ally or all at once. Each ro- esting during the winter bird-watcher and our own Donny Linton monitored the tates in a 360-degree pattern months with the addition visual confirmation,” DeJar- runway for birds and kept in for the greatest effect. of migratory birds from the nette said. touch with bird-watcher Bob Bird-watcher Kurt north,” Feile said. “It’s just Page 7 Flying in the Shuttle Smith, who was stationed in Asche said that Ospreys the nature of doing business Training Aircraft, Chief a specially-equipped truck have tried to build nests on a wildlife refuge.” Page 2 SPACEPORT NEWS April 3, 2009 Final Ares I-X segments arrive at Kennedy via train By Steven Siceloff stand higher than 320 feet Spaceport News when it is complete. The rocket will be or years, Grady Mc- rolled out to Kennedy’s Coy has supervised Launch Pad 39B for liftoff the NASA Railroad F from one of the launch plat- as space shuttle booster seg- forms that was used by the ments were hauled across shuttle program. the Indian River to Kennedy “I never would have Space Center. March 19, he envisioned that when I was watched over the first boost- flying shuttle,” said Charlie er segments destined for the Precourt, a former astronaut agency’s new rocket. who is now vice president of The four segments will Space Launch Systems for make up the first stage of ATK. the Ares I-X rocket, NASA’s Precourt has a history new design to take over for with some of the booster the space shuttle and carry segments that Ares I-X will astronauts to the Interna- use. The booster segments tional Space Station and into get reused, and some of the Earth orbit to begin moon NASA/Kim Shiflett pieces made up the boosters missions. Ares I-X is the The NASA Railroad train hauls cars carrying the Ares I-X motor segments and nozzle exit cone over a river bridge to that carried Precourt into first flight test of the new Kennedy Space Center. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage space. launcher. prime contractor Alliant Techsystems Inc., or ATK, departed Utah on March 12 for the seven-day, cross-country trip to Florida. “This hardware The rest of the Ares launched me into space three rails, will loft the rocket into rail cars and hauled by the the folks and they begin to I-X vehicle already is being times, three of the four times the skies over the Atlantic Florida East Coast Railway think this thing really could assembled inside Kennedy’s I flew,” Precourt said. Vehicle Assembly Building. Ocean to find out how the to Mims, Fla., where the happen. It becomes that If the Ares I-X flight test Most of the rocket is made design will work. NASA locomotive took over. much more real.” works as engineers expect it up of heavily instrumented “It’s pretty exciting Jon Cowart, Kennedy’s The booster segments to, the booster segments that weight simulators that will that the NASA Railroad is deputy mission manager for will go through the same lifted the shuttles will keep be stacked atop the booster getting into the next program Ares I-X, made part of the well-practiced preparations lifting astronauts into space. to give it the look and flight with Constellation,” McCoy trip with the booster seg- that shuttle boosters go “I have every faith this characteristics of the opera- said. ments. through. Then, the Ares I-X is a great design,” Cowart tional Ares I-X. The rocket segments “The team’s been work- segments will be stacked said. “Shuttle was fantastic During the test later this were fueled at the Alli- ing many years to get to this inside the Vehicle Assembly and great and does all kinds year, the first stage, made ant Techsystems, or ATK, point,” Cowart said. “When Building and the simulated of incredible things, but up of the four segments facility in Utah before you get the last of the hard- stages will be bolted onto we’ve got to move on to the McCoy watched traverse the being loaded aboard special ware here, it really energizes the top. The rocket will next thing.” Spaceport hosts much-anticipated Family Day on April 18 ennedy Space Center, guests at specific facilities and NASA Exchange stores will Cape Canaveral Air Force More online times. be open for souvenirs, T-shirts and KStation and contractor For more information on 2009 Cafeterias in the following complimentary Family Day collec- employees are invited to attend the Family Day, as well as specific areas will be open for employees tors’ coins. 2009 Family Day on April 18. areas of interest for children, visit: and guests from 10 a.m. to 3 p.m.: The Operations and Checkout Friends and family can partici- http://familyday.ksc.nasa.gov/ Multi-Function Facility in the Mission Briefing Room will host pate from 9 a.m. to 3 p.m., but gates Launch Complex 39 area; the Space educational exhibits displayed by will close at 2:30 p.m. Kennedy and Station Processing Facility and NASA and contractor organiza- CCAFS will allow self-guided tours Access to the complex includes Operations and Checkout Building tions. On the cape side, Hangar T of designated areas and badged em- IMAX movies, the Shuttle Launch in the Industrial Area. will host exhibits and activities for ployees can escort guests through- Experience and entrance into the The snack bar in the Launch children. out the day’s activities. Astronaut Hall of Fame. Control Center will be open from The Space Museum at CCAFS The Visitor Complex’s main Kennedy is anticipating special 9 a.m. to 3 p.m. There also will be will be open for guests to gain campus will be open throughout the guest appearances by active NASA three mobile refreshment trailers firsthand insight into the history day, free to employees who bring astronauts who will be available open from 10 a.m. to 3 p.m.
Recommended publications
  • 381 Part 117—Drawbridge Operation
    Coast Guard, DOT Pt. 117 c. Betterments llll $llll other than an order of apportionment, Expected savings in repair or maintenance nor relieve any bridge owner of any li- costs: ability or penalty under other provi- a. Repair llll $llll b. Maintenance llll $llll sions of that act. Costs attributable to requirements of rail- [CGD 91±063, 60 FR 20902, Apr. 28, 1995, as road and/or highway traffic llll amended by CGD 96±026, 61 FR 33663, June 28, $llll 1996; CGD 97±023, 62 FR 33363, June 19, 1997] Expenditure for increased carrying capacity llll $llll Expired service life of old bridge llll PART 117ÐDRAWBRIDGE $llll OPERATION REGULATIONS Subtotal llll $llll Share to be borne by the bridge owner Subpart AÐGeneral Requirements llll $llll Contingencies llll $llll Sec. Total llll $llll 117.1 Purpose. Share to be borne by the United States 117.3 Applicability. llll $llll 117.4 Definitions. Contingencies llll $llll 117.5 When the draw shall open. Total llll $llll 117.7 General duties of drawbridge owners and tenders. (d) The Order of Apportionment of 117.9 Delaying opening of a draw. Costs will include the guaranty of 117.11 Unnecessary opening of the draw. costs. 117.15 Signals. 117.17 Signalling for contiguous draw- § 116.55 Appeals. bridges. (a) Except for the decision to issue an 117.19 Signalling when two or more vessels are approaching a drawbridge. Order to Alter, if a complainant dis- 117.21 Signalling for an opened drawbridge. agrees with a recommendation regard- 117.23 Installation of radiotelephones. ing obstruction or eligibility made by a 117.24 Radiotelephone installation identi- District Commander, or the Chief, Of- fication.
    [Show full text]
  • AAPRCO & RPCA Members Meet to Develop Their Response to New Amtrak Regulations
    Volume 1 Issue 6 May 2018 AAPRCO & RPCA members meet to develop their response to new Amtrak regulations Members of the two associations met in New Orleans last week to further develop their response to new regulations being imposed by Amtrak on their members’ private railroad car businesses. Several of those vintage railroad cars were parked in New Orleans Union Station. “Most of our owners are small business people, and these new policies are forcing many of them to close or curtail their operations,” said AAPRCO President Bob Donnelley. “It is also negatively impacting their employees, suppliers and the hospitality industry that works with these private rail car trips,” added RPCA President Roger Fuehring. Currently about 200 private cars travel hundreds of thousands of miles behind regularly scheduled Amtrak trains each year. Along with special train excursions, they add nearly $10 million dollars in high margin revenue annually to the bottom line of the tax-payer subsidized passenger railroad. A 12% rate increase was imposed May 1 with just two weeks’ notice . This followed a longstanding pattern of increases taking effect annually on October 1. Cost data is being developed by economic expert Bruce Horowitz for presentation to Amtrak as are legal options. Members of both organizations are being asked to continue writing their Congress members and engaging the press. Social media is being activated and you are encouraged to follow AAPRCO on Facebook and twitter. Successes on the legislative front include this Congressional letter sent to Amtrak's president and the Board and inclusion of private car and charter train issues in recent hearings.
    [Show full text]
  • 2004 Freight Rail Component of the Florida Rail Plan
    final report 2004 Freight Rail Component of the Florida Rail Plan prepared for Florida Department of Transportation prepared by Cambridge Systematics, Inc. 4445 Willard Avenue, Suite 300 Chevy Chase, Maryland 20815 with Charles River Associates June 2005 final report 2004 Freight Rail Component of the Florida Rail Plan prepared for Florida Department of Transportation prepared by Cambridge Systematics, Inc. 4445 Willard Avenue, Suite 300 Chevy Chase, Maryland 20815 with Charles River Associates Inc. June 2005 2004 Freight Rail Component of the Florida Rail Plan Table of Contents Executive Summary .............................................................................................................. ES-1 Purpose........................................................................................................................... ES-1 Florida’s Rail System.................................................................................................... ES-2 Freight Rail and the Florida Economy ....................................................................... ES-7 Trends and Issues.......................................................................................................... ES-15 Future Rail Investment Needs .................................................................................... ES-17 Strategies and Funding Opportunities ...................................................................... ES-19 Recommendations........................................................................................................
    [Show full text]
  • I N V E S T I N G
    INVESTING IN Program Highlights | 2016 1 INVESTING IN The SIS n 2003, the Florida Legislature and Governor established the Strategic Intermodal System (SIS) to enhance Florida’s transportation mobility and Ieconomic competitiveness. The SIS is a statewide network of high-priority transportation facilities, including the State’s largest and most significant WHAT IS THE airports, spaceports, deep-water seaports, freight rail terminals, passenger rail and intercity bus terminals, rail corridors, waterways and highways. These facilities represent the state’s primary means for moving people and freight between Florida’s diverse regions, as well as between Florida and other states STRATEGIC and nations. SIS Facilities are designated through the use of objective criteria and thresholds based on quantitative measures of transportation and economic activity. These facilities meet high levels of people and goods movement and INTERMODAL generally support major flows of interregional, interstate, and international travel and commerce. Facilities that do not yet meet the established criteria and thresholds for SIS designation, but are expected to in the future are referred to as Emerging SIS. These facilities experience lower levels of people SYSTEM? and goods movement but demonstrate strong potential for future growth and development. The designated SIS and Emerging SIS includes 17 commercial service airports, two spaceports, 12 public seaports, over 2,300 miles of rail corridors, over 2,200 miles of waterways, 34 passenger terminals, seven rail freight terminals, and over 4,600 miles of highways. These hubs, corridors and connectors are the fundamental structure which satisfies the transportation needs of travelers and visitors, supports the movement of freight, and provides transportation links to external markets.
    [Show full text]
  • N a S a Facts
    National Aeronautics and Space Administration The NASA Railroad he NASA Railroad is a 38-mile industrial Wilson Yard, slightly west of the geographical loca- Tshort line on the Kennedy Space Center in tion of Wilson’s Corners. Central Florida. It connects to additional Air East of Wilson Yard, the line divides with a Force trackage on Cape Canaveral Air Force nine-mile branch going south to NASA’s Vehicle Station. The railroad system is government owned Assembly Building and the Kennedy Space Cen- and contractor operated. ter Industrial Area, the other another nine-mile branch going east toward the Atlantic Ocean for 1963 – 1983: service to the NASA launch pads and the inter- facts In 1963, the Florida East Coast Railway built a change with the Air Force track. 7.5- mile connection to the Kennedy Space Center In the late 1970s, NASA acquired three from its mainline just north of Titusville, Fla. The World War II-era ex-U.S Army Alco S2 locomo- line required a drawbridge to be built over the In- tives for local switching in the area of the Vehicle dian River, part of the Intercoastal Waterway. The Assembly Building and the KSC Industrial Area. steel bridge and its approaches are approximately The Florida East Coast provided track mainte- a half-mile long, built on concrete pilings. The nance, crews and locomotive power for the arriving draw span stays open continuously until a train ap- and departing traffic. proaches, and the crew activates a switch to lower it. 1983 - Present: The Florida East Coast connection joined 28 NASA purchased the Florida East Coast NASA miles of NASA-constructed track at a junction portion of the railroad line in June 1983.
    [Show full text]
  • Spaceport News John F
    Feb. 11, 2011 Vol. 51, No. 3 Spaceport News John F. Kennedy Space Center - America’s gateway to the universe www.nasa.gov/centers/kennedy/news/snews/spnews_toc.html Tank fixed, Discovery rolls out for STS-133 launch By Frank Ochoa-Gonzales Spaceport News s New York Yankee great Yogi Berra once said: “It’s Adéjà vu all over again.” On the final night of January 2011, in front of Kennedy work- ers, their friends and family, space shuttle Discovery trekked its way from the Vehicle Assembly Building to Launch Pad 39A. It was the second time Dis- covery rolled out for its STS-133 mission to the International Space Station, which now is targeted to launch Feb. 24 at 4:50 p.m. EST “Anytime we have a long flow of challenges, which we’ve had for STS-133, that makes the final out- come even sweeter,” said Stephanie Stilson, Discovery’s NASA flow director for the past 11 missions. So when we finally get to the launch we really appreciate the work that NASA/Kim Shiflett has happened and all the long hours Xenon lights illuminate space shuttle Discovery as it makes its nighttime trek, known as “rollout,” from the Vehicle Assembly Building to Launch Pad 39A at our team has put in.” Kennedy Space Center on Jan. 31. The first rollout came last year For Discovery’s flow team, the in late September when Discovery xenon lights not only highlighted Follow along on launch day was supposed to make its last flight the STS-133 stack, but the many NASA’s Launch Blog is set to begin about five hours prior to liftoff, and will highlight to the space station in November.
    [Show full text]
  • N AS a Facts
    National Aeronautics and Space Administration The NASA Railroad he NASA Railroad is a 38-mile industrial short line on the 1983 to Present: TKennedy Space Center in Central Florida. It connects to additional Air Force trackage on Cape Canaveral Air Force NASA purchased the Florida East Coast portion of the Station. The railroad system is government owned and railroad line in June 1983. Because of the hazardous contractor operated. commodities hauled over the railroad, particularly the solid rocket boosters for the space shuttle, NASA decided to 1963 to 1983: completely rebuild and upgrade the line. In 1963, the Florida East Coast Railway built a The original track was 100- or 112-pound jointed rail on 7.5- mile connection to the Kennedy Space Center from wood cross ties and limestone ballast. It was replaced with its mainline just north of Titusville, Fla. The line required 132-pound continuous-welded rail and concrete cross ties. a drawbridge to be built over the Indian River, part of the The work was done by the track maintenance subsidiary of Intercoastal Waterway. The steel bridge and its approaches the Florida East Coast. The track was constructed to 60 mph standards, which are approximately a half-mile long, built on concrete facts pilings. The draw span stays open continuously until a train is Florida East Coast mainline speed; however, normal approaches, and the crew activates a switch to lower it. operating speed is 25 mph to reduce maintenance and The Florida East Coast connection joined 28 miles of increase the life span of the track.
    [Show full text]
  • Chronology of KSC and KSC Related Events for 1991
    q_ KHR-16 March 1992 Chronology of KSC and KSC Related Events for 1991 (',;AgA-T_-[O7.,_02) CNROI_OLOOY _]F KSC AND KSC N_2-25250 KrLAT_J EVi7 NTS F_ ]Vol Annudl R_oort t ]_qi (r_J_rton) L;_,L _) CSCL 050 Uncles G3/_9 007774_ National Aeronautics and Space Administration John R Kennedy Space Center KK _ONii li*li (IIV. I/?i| v kv- CHRONOLOGY OF KSC AND KSC RELATED EVENTS FOR 1991 BY KEN NAIL, JR. KSC UBRARY ARCHIVIST v V FOREWORD This 1991 Chronology is published to fulfill the requirements of KMI 2700.1 (as revised) to describe and document KSC's role in NASA progress. Maledais for this Chronology were selected from a number of published sources. The document records KSC events of inlerest to hislodans and other researchers. Arrangement is by date of occurrence, though the source cited may be dated one or more days after the event. Materials were researched and prepared for publication by Historian-Archivist Ken Nail, Jr., of EG&G FLORIDA, Inc. The 1991 Chronology includes two appendices: (A) Shuttle Era Rrsts (p. 261) and (B) Shuttle Landings at KSC (p. 263). A General Index (p. 264) and a Company Index (p. 274) have been included for added convenience to resemchem, and each _ has been headlined. Comment on the Chronology should be directed to the John F. Kennedy Space Center, UBRARY-E, Kennedy Space Center, Flodda, 32899. Walter L Covin_ Center Services . J TABLE OF CONTENTS JANUARY ................................................. 1 FEBRUARY ............................................... 14 MARCH ................................................. 24 APRIL .................................................. 43 MAY .................................................... 60 JUNE ................................................... 89 JULY ................................................... 108 AUGUST ...............................................
    [Show full text]
  • Meeting of the Technical Advisory Committee
    Commissioner Lesley “Les” Miller, Jr. Meeting of the Technical Advisory Committee Hillsborough County MPO Chairman Monday, June 17, 2019, 1:30 PM County Center, 18th Floor – Plan Hillsborough Committee Room Commissioner Pat Kemp Hillsborough County MPO Vice Chair Paul Anderson I. Call to Order Port Tampa Bay II. Public Comment - 3 minutes per speaker, please Councilman Harry Cohen City of Tampa III. Approval of Minutes – May 20, 2019 Trent Green Planning Commission IV. Action Items Commissioner Ken Hagan Hillsborough County A. It’s TIME Hillsborough Survey (Lisa Silva, MPO Staff) Mayor Mel Jurado B. Temple Terrace Electric Vehicle Study (Wade Reynolds, MPO Staff) City of Temple Terrace Joe Lopano V. Status Reports Hillsborough County Aviation Authority A. East Fowler Avenue Land Use Study (Pedro Parra, TPC) Mayor Rick A. Lott City of Plant City B. THEA – Sketch Level Planning (Bob Frey, THEA) Councilman Guido Maniscalco C. Smart Cities Update (Vik Bhide, City of Tampa) City of Tampa VI. Old Business & New Business David Mechanik HART A. TAC Workshop July 29 Commissioner Kimberly Overman B. MPO TAC liaison – Sarah McKinley Hillsborough County Commissioner VII. Adjournment Mariella Smith Hillsborough County VIII. Addendum Cindy Stuart Hillsborough County A. MPO Meeting Summary & Committee Reports School Board Councilman Luis Viera B. Correspondence from FDOT on SIS Network City of Tampa C. Publication of Notice of Funding ATCMTD Joseph Waggoner Expressway Authority D. FTA to hold June 18 Webinar – Integrating Mobility Innovation Program Beth Alden, AICP Executive Director The full agenda packet is available on the MPO’s website, www.planhillsborough.org, or by calling (813) 272-5940.
    [Show full text]
  • Trains 2018 Index
    INDEX TO VOLUME 78 Reproduction of any part of this volume for commercial pur poses is not allowed without the specific permission of the publishers. All contents © 2017 and 2018 by Kalmbach Media Co., Wau kesha, Wis. JANUARY 2018 THROUGH DECEMBER 2018 – 908 PAGES HOW TO USE THIS INDEX: Feature material has been indexed three or more times—once by the title under which it was published, again under the author’s last name, and finally under one or more of the subject categories or railroads. Photographs standing alone are indexed (usually by railroad), but photo graphs within a feature article are not separately indexed. Brief news items are indexed under the appropriate railroad and/or category; news stories are indexed under the appro- priate railroad and/or category and under the author’s last name. Most references to people are indexed under the company with which they are easily identified; if there is no easy identification, they may be indexed under the person’s last name (for deaths, see “Obi t uaries”). Maps, museums, radio frequencies, railroad historical societies, rosters of locomotives and equipment, product reviews, and stations are indexed under these categories. Items from countries other than the U.S. and Canada are indexed under the appropriate country. A Amtrak engineer to face criminal trial in Pa., Apr 8 Abilene & Smoky Valley Railroad: Amtrak likely to pay for crashes — even the ones that are A big engine in a small town, May 34-37 not its fault, May 14 Agony on the Michigan Northern, Dec 56-57 Amtrak regional at
    [Show full text]
  • The Florida Rail System Plan: Investment Element
    Draft Final Report The Florida Rail System Plan: Investment Element prepared for the Florida Department of Transportation prepared by Cambridge Systematics, Inc. With support from Planning Innovations, Inc Quandel Consultants September 2010 Letter from the Secretary Citizens of Florida: I am pleased to submit to you the Investment Element of the 2010 Florida Rail System Plan. Unlike in past years, where the Florida Rail System Plan was more descriptive of the separate freight and passenger rail systems, this plan is more visionary, strategic, and policy-driven. The plan was guided by a broad base of stakeholders, including the Rail Stakeholder Advisory Committee, members of the public and private sectors, modes of transportation, economic development and environmental interests, and citizen representatives. The Committee and others worked throughout the summer and fall of 2009 to develop an inventory of Florida’s rail system needs and recommend priority investments that support the strategic goals, objectives, and policies of the Florida Rail System Plan. The Florida Rail System Plan is comprised of a Policy Element and this document, the Investment Element. The Policy Element provides a broad policy framework for the investment of limited state resources in Florida’s rail system. The Investment Element builds upon the framework of the Policy Element by identifying the needs of Florida’s rail system, establishing priorities for the investment of state funds, and setting forth future action steps necessary to implement the plan. Florida in the year 2030 will be shaped by the actions, decisions, and policy choices made today. The challenges of continuing population growth, a rapidly diversifying economy, improving our infrastructure, and preserving our exceptional natural environment, will require a creative and visionary approach to address the mobility needs of Florida’s citi- zens, businesses, and visitors while fostering smarter and more sustainable patterns of growth for our future.
    [Show full text]
  • 536 Part 117—Drawbridge Operation Regulations
    Pt. 117 33 CFR Ch. I (7–1–12 Edition) (c) Any Order of Apportionment 117.47 Clearance gages. made or issued under section 6 of the 117.49 Process of violations. Truman-Hobbs Act, 33 U.S.C. 516, may be reviewed by the Court of Appeals for Subpart B—Specific Requirements any judicial circuit in which the bridge 117.51 General in question is wholly or partly located, 117.55 Posting of requirements. if a petition for review is filed within 90 117.59 Special requirements due to hazards. days after the date of issuance of the ALABAMA order. The review is described in sec- tion 10 of the Truman-Hobbs Act, 33 117.101 Alabama River. U.S.C. 520. The review proceedings do 117.103 Bayou La Batre. 117.105 Bayou Sara. not operate as a stay of any order 117.107 Chattahoochee River. issued under the Truman-Hobbs Act, 117.109 Coosa River. other than an order of apportionment, 117.113 Tensaw River. nor relieve any bridge owner of any li- 117.115 Three Mile Creek. ability or penalty under other provi- sions of that act. ARKANSAS 117.121 Arkansas River. [CGD 91–063, 60 FR 20902, Apr. 28, 1995, as 117.123 Arkansas Waterway-Automated amended by CGD 96–026, 61 FR 33663, June 28, Railroad Bridges. 1996; CGD 97–023, 62 FR 33363, June 19, 1997; 117.125 Black River. USCG–2008–0179, 73 FR 35013, June 19, 2008; 117.127 Current River. USCG–2010–0351, 75 FR 36283, June 25, 2010] 117.129 Little Red River.
    [Show full text]