Southern Expressway Duplication

Total Page:16

File Type:pdf, Size:1020Kb

Southern Expressway Duplication DELIVERING OUR TRANSPORT FUTURE NOW north-south corridor southern expressway duplication Graphic for illustration purposes only All enquiries: 1300 626 097 Visit: www.infrastructure.sa.gov.au Email: [email protected] southern expressway duplication SOUTH ROAD PANALATINGA ROAD MARION ROAD SEACOMBE ROAD MAJORS ROAD LANDER ROAD YOUNG STREET MOORE ROAD Black Existing access Blue Compulsory access provided by duplication Green New access provided by duplication Black Existing roundabout Red Existing traffic signal Black Existing bridge October 2010 February 2011 March 2011 start issue Expression of release Project Impact project planning study Interest for D&C contact Report and concept design milestones > Approximately 18.5km of > Duplication of existing > Construction will start in roadway to be constructed interchanges, road and late 2011 and is scheduled pedestrian bridges for completion by mid 2014 PANALATINGA ROAD SHERRIFFS ROAD BEACH ROAD MAIN SOUTH ROAD MOORE ROAD BEACH ROAD O’SULLIVANS FLAXMILL ROAD ELIZABETH ROAD HONEYPOT ROAD SHERRIFFS ROAD March 2011 May 2011 Late 2011 Mid 2014 release Project Impact issue design and construct start construction Report and concept design tender documents construction completed A two-way A chance to have your say run from Gawler to Old Noarlunga The local community will receive with a series of strategic non-stop Southern Expressway information about the project and road links to connect the rapidly have an opportunity to provide input expanding industrial and residential The Southern Expressway and feedback. The department will growth areas in the north and south, Duplication project will provide work with residents, businesses, providing new opportunities for a two-way 18.5 km road from industry groups and local government economic development. The 78 Darlington to Old Noarlunga to determine a concept design that kilometre corridor will comprise four operational 24 hours a day, considers factors such as: road links: seven days a week. > safety > Northern Expressway from > community needs Gawler to Port Wakefield Road > local heritage > Northern Connector from Port The project will: > visual amenity Wakefield Road to the Port River > Construct a new roadway > environmental impacts Expressway alongside the existing Southern > cost > South Road from Port River Expressway, creating a two-way > construction. Expressway to the Southern road Environmental investigations Expressway > Southern Expressway from > extend existing road and The potential environmental, social and Darlington to Old Noarlunga. pedestrian bridges economic effects of the duplicated > duplicate existing interchanges. expressway are being investigated Nearly $2 billion has been by the project team. Findings will be committed for major projects along The benefits of a two-way summarised in a Project Impact Report the north-south corridor, including Southern Expressway are: that will be available for public comment the recently completed Northern > reduced travel times to and in March 2011. Expressway ($564 million), Gallipoli from the southern suburbs and Underpass ($114 million), Glenelg What’s happened? Fleurieu Peninsula. There will be Tram Overpass $32 million) as an estimated travel time saving > Planning study contract awarded well as the current South Road of 13 minutes on the Southern > Jobs taskforce established. Superway – Wingfield to Regency Park ($812 million). Expressway, when compared What’s next? to Main South Road with 16 > Start extensive community Darlington Transport Study signalised intersections engagement process The Darlington Transport Study is > greater access for people living in > Develop concept design a separate project to the Southern the southern area to employment, > Environmental impact investigations. Expressway duplication that education, shopping and is developing a plan for future North-south transport corridor community facilities in the south upgrades of South Road in the and wider metropolitan area Together with the release of South Darlington area. Australia’s Strategic Infrastructure It includes South Road/Sturt Road > greater commercial traffic access Plan in 2005, the State Government intersection and the South Road/ to industry related facilities in the announced its intention to create a Flinders Drive intersection, including wider metropolitan area non-stop north-south corridor between adjacent intersections such as > tourist locations on the Fleurieu the Port River Expressway and the Ayliffes Road and the Southern Peninsula will be easier to access Southern Expressway. Expressway as well as potential > opportunities for economic To deliver the outcomes of the 30 changes to local land use and development in the southern year Plan for Greater Adelaide, the public transport connections. The regions government has broadened the scope study is scheduled for completion in > improved road safety. of Adelaide’s north-south corridor to early 2011. All enquiries: 1300 626 097 Visit: www.infrastructure.sa.gov.au Email: [email protected].
Recommended publications
  • Traffic Impact Assessment
    APPENDIX Q9 Traffic impact assessment See attached Traffic Impact Assessment Report prepared by Arup. Olympic Dam Expansion Draft Environmental Impact Statement 2009 Appendix Q 165 BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment October 2008 Arup This report takes into account the Arup Pty Ltd ABN 18 000 966 165 particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no Arup responsibility is undertaken to any third Level 17 1 Nicholson Street, party Melbourne VIC 3000 Tel +61 3 9668 5500 Fax +61 3 9663 1546 www.arup.com Job number 085200/01 BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment Contents Page Executive Summary i 1 Introduction 1 2 Existing Conditions 5 2.1 Road Network 5 2.2 Road Classification, Responsibilities and Policies 5 2.3 Road Environment 7 2.4 Traffic Data 13 2.5 Baseline Traffic Flows 19 2.6 Future Road Network Improvements 21 2.7 Rail Network 23 2.8 Rail Operations 25 2.9 Crash Analysis 26 3 Proposed Olympic Dam Expansion 32 3.1 Overview 32 3.2 Olympic Dam Site Expansion Heavy Vehicles AADT 33 3.3 Ancillary Traffic AADT 39 3.4 Total AADT 43 3.5 Traffic Movements Between Townships and Olympic Dam 54 3.6 Road Link Level of Service - Impact 60 3.7 Key Intersections, Peak Hour Traffic and Impacts 64 3.8 Over-Dimensional Load Movements and Impacts 66 3.9 Road Safety 81
    [Show full text]
  • South of the City
    South of the city. 7daysinmarion.com.au Introduction Coastal Marion Sturt Central Marion Tonsley Oaklands Park Morphettville Edwardstown Enjoy 7 Days in Marion Getting Around Public transport is available Welcome to the City of Marion. The ‘7 Days in Marion’ throughout the City of Marion. Guide will help you to enjoy the experiences and people The Glenelg tram line services of our city. the northern parts of the City of Marion, while the Seaford train line and Tonsley train Covering an area of about 55 square kms and featuring line service the central and 7kms of coastline. Only 20 minutes drive south west southern areas. of Adelaide, the City of Marion offers a mix of cultural, Bus services run throughout sporting, leisure and shopping experiences. All against the City of Marion. a backdrop of hills, open space and the coast. All of these services run to and from the City at regular This guide will help you find out where you can walk intervals. along a spectacular coastline, stroll through an art For more information about gallery, hit the cycle paths, cool off at a pool and get public transport please visit close to nature. adelaidemetro.com.au There are options for those who want to hone their skateboarding skills or soak up local Indigenous culture. With plenty of places to eat, play, shop and stay, we have established seven daily itineraries to assist your visit. Take this guide, or use the website, get together with family and friends, say hello to the locals and discover the City of Marion.
    [Show full text]
  • Northern Connector FACT SHEET July 2008
    northern connector FACT SHEET July 2008 Involved at this early stage are a wide range The planning study will include an economic Have your of government agencies, local businesses and analysis and identify relevant environmental community bodies that need to understand issues and outline an approach for design and and comment on the proposal and to raise construction. It will also provide the framework say about a any issues about it. for an environmental impact assessment to be developed throughout this year. Since the announcement in March 2008 a major project range of activities have occurred, including: The project route is expected to be confirmed > feedback on design based on traffic needs by the end of 2009. Five months ago the Minister for Transport, and engineering Patrick Conlon announced a study into a > desktop research on similar projects Where is the project? new road and rail transport corridor in the > drop-in forums held at Globe Derby Park The planning study area will investigate area west of Port Wakefield Road – the and St Kilda a 17 km corridor from north of the Brown Northern Connector. > shopping centre displays at Hollywood Road/Port Wakefield Road intersection through to the connection of the Port River This fact sheet sets out additional Plaza and Virginia Expressway and South Road. information about the project and identifies > meeting and planning with emergency the opportunities for the community to services experts This includes a section of approximately be involved in the planning process that > field surveys that look at geography, 1 km width on the western side of is underway.
    [Show full text]
  • Justification and Benefits of the Northern Expressway and Port Wakefield Road Upgrade
    northernexpressway environmental report B Part B. Need for the Proposal and Consideration of Alternatives 4. Justifi cation and benefi ts of the Northern Expressway and Port Wakefi eld Road Upgrade 4-1 5. Alternative routes considered and the selected route 5-1 6. Economic and fi nancial assessment 6-1 Northern Expressway Environmental Report 4 Justification and benefits of the Northern Expressway and Port Wakefield Road Upgrade 4.1 Introduction The proposed Northern Expressway and Port Wakefield Road Upgrade will provide significant State and regional benefits, in particular by improving access to Adelaide for freight transport via the Sturt Highway, including freight for export from key areas such as the Barossa Valley wine producing area and the Riverland wine and citrus producing area. Together with the Port River Expressway, it will provide a high standard link between the Sturt Highway at Gawler and the Port of Adelaide, South Australia’s main shipping port. It will remove much heavy freight traffic from Main North Road, Angle Vale Road and Heaslip Road, lessening congestion and improving safety for urban traffic in the northern suburbs. 4.1.1 Background Part A outlined the various studies undertaken that justify the need for the Northern Expressway. For example, the Strategic Planning Study by SKM in 1998 concluded that there was a need to provide additional capacity for traffic movement from the outer northern suburbs, and that it is significantly more cost effective to develop a new route on the fringe of the northern urban area than to upgrade the existing Main North Road through northern metropolitan Adelaide.
    [Show full text]
  • Consolidated Table of Limited Access Locations for SA
    Information Bulletin August 2020 Heavy Vehicles Limited Access Locations in SA Areas or routes of Operation Outlined below is a list of Limited Access Locations within South Australia. Despite the dimension limits specified, access may be permitted for some vehicle combinations that operate under a Class 1 notice published by the National Heavy Vehicle Regulator (NHVR) that provides access for combinations to travel on all routes and areas in South Australia or a route specific permit issued by the NHVR. Note: Regions are defined as per Primary Industries and Regions SA (PIRSA), published at http://www.pir.sa.gov.au/regions. Adelaide Metropolitan Area Dimension Limit Condition of access for (metres) vehicles which exceed a Location / Road dimension limit which Width Height Length applies to a limited access location Adelaide CBD, bounded by West Terrace, South 2.5 4.3 19 Specific permit Terrace, East Terrace and North Terrace Specific permit for width or Pedestrian bridge over South Terrace, Adelaide 2.5 4.5 19 length Park Terrace, Salisbury, between the intersections of Commercial Road/Park Terrace and Salisbury 2.5 4.3 19 Access not permitted Hwy/Waterloo Corner Road/Park Terrace Pedestrian bridge over Main North Road and Malinya Drive when turning from Main North Road 3.5 4.5 19 onto Malinya Drive, Salisbury Park Railway bridge over Rosetta St, West Croydon 2.5 3.0 19 Access under notice for Railway bridge over Chief St, Brompton 2.5 3.2 19 vehicles that exceed the length Road bridge over St Andrews Terrace, Willunga 3.5 4.5 19 dimension
    [Show full text]
  • Ridesprogramme ISSUE 64
    Bicycle SA SEPTEMBER-NOVEMBER 2017 RidesPROGRAMME ISSUE 64 FREE RIDES EVERY WEEK FOR EVERYONE! www.bikesa.asn.au RidesPROGRAMME September-November 2017 Information Ride Group Coordinators The rides are free of charge (unless indicated otherwise) and available 30/30 Beach Streak Mishmash to the general public. For a punctual start, please arrive 15 minutes prior Daniel 0433 391 674 Michele 0438 010 220 to the scheduled starting time. Riders are encouraged to join Bicycle All Women’s Bike Rides Night Espresso SA after three rides. Only Bicycle SA members are eligible to lead and Lanie 0406 452 117 Rob 8299 0230 coordinate rides. The ride leaders can be contacted for additional rides Better Harts Northside Cycling Group information. Each ride has been coded for your convenience and it is Sharon 8723 0805 Gary 8255 1979 [email protected] suggested that you choose the ride to suit your ability. Children under 16 Pedalling Parents Border BUG Warwick 8344 8996 shall be accompanied by a responsible adult. The Rides Programme is Marcus 0407 978 763 subject to change without notice. Peninsula Pedallers Cobwebs Raelene 8682 3196 [email protected] On Road Ride Codes Poseurs d’Adelaide ‘Cycle Salisbury’ Peter 0407 182 376 1 Up to 15km/h A Flat Nigel 0431 838 735 2 15 to 18km/h B A few hills Ride with Keith GAD-BUG Rebecca 8232 7277 3 18 to 20km/h C Hilly and steep (Goolwa and District Bicycle User Group) Riverland Riders 4 20 to 23km/h D Challenging Gavin 0468 909 397 Ruth 0427 752 815 5 23 to 26km/h Peter 0418 820 921 Anne 0431 829 973 Saturday Express 6 26+km/h Patsy 8379 6477 Gallery Glides Saturday Sojourn Mountain Bike Ride Codes Warwick 8344 8996 Chris 0414 802 919 Class 1 (MTB Beginner) Limited off road experience.
    [Show full text]
  • North-South Corridor Darlington Upgrade Project
    north-south corridor Darlington Upgrade Project Concept of lowered motorway, South Road/Sturt Road intersection background The North-South Corridor is one of Adelaide’s most Northern Expressway important transport corridors. It is the major route for north and south bound traffic including freight vehicles running between Gawler and Gawler Old Noarlunga, a distance of 78 kilometres. Proposed Northern Connector Outer Harbor PORT WAKEFIELD RD The Australian Government has committed to upgrade the North-South Corridor over VICTORIA RD the next decade and together with the South Australian Government has committed $620 MAIN NORTH RD million to construct the Darlington Upgrade South Road Superway Project. The Australian Government will PORT ADELAIDE provide $496 million, with the remaining MILITARY RD GRAND JUNCTION RD $124 million being contributed by the South Australian Government. TORRENS RD PORT RD This stretch of road provides a series of PROSPECT strategic free-flowing road links to connect FINDON Torrens Road to River Torrens upgrade the rapidly expanding industrial and Grange GRANGE RD NORTH RIVER TORRENS ADELAIDE residential growth areas in the north and ADELAIDE the south providing new opportunities for TAPLEYS HILL RD MILE END SOUTH TCE economic development. GREENHILL RD Gallipoli Underpass FULLARTON RD The current roadway isn’t capable of handling SOUTH RD GOODWOOD RD Glenelg Tram projected growth and the number of vehicles CROSS RD MARION RD ANZAC HWY Overpass that need to use the road or the size of freight Glenelg MORPHETT RD carriers travelling along it. In response, the BRIGHTON RD DAWS RD Australian and South Australian Governments are expanding the route by creating a MARION dedicated non-stop North-South Corridor STURT RD with a program to eliminate the worst Darlington Upgrade Project bottlenecks already underway.
    [Show full text]
  • Westlink MCA Detail Report
    i © InfraPlan (Aust) Pty Ltd. 2016 The information contained in this document produced by InfraPlan (Aust) Pty Ltd is solely for the use of the Client for the purposes for which it has been prepared and InfraPlan (Aust) Pty Ltd undertakes no duty or accepts any responsibility to any third party who may rely on this document. All rights reserved. No sections or elements of this document may be removed from this document, reproduced, electronically stored or transmitted in any form without the written permission of InfraPlan (Aust) Pty Ltd. i Contents Report Structure .......................................................................................................................... 2 Introduction ................................................................................................................................ 3 1 Theme 1: Place-making and a vibrant city ......................................................................... 5 1.1 Corridor ability to support the 30 Year Plan vision for infill and corridor development ............ 6 1.1.1 Number of properties within the 600m corridor that have a ‘Capital Value: Site Value’ ratio of less than 1.3 ........................................................................................................ 6 1.1.2 Cubic metres of transit supportive zones and policy areas (urban corridor, regeneration and so on) that support increased development potential within 600m of the corridor .....................................................................................................................
    [Show full text]
  • Thursday, 22 January 2015
    No. 6 331 THE SOUTH AUSTRALIAN GOVERNMENT GAZETTE www.governmentgazette.sa.gov.au PUBLISHED BY AUTHORITY ALL PUBLIC ACTS appearing in this GAZETTE are to be considered official, and obeyed as such ADELAIDE, THURSDAY, 22 JANUARY 2015 CONTENTS Page Appointments, Resignations, Etc. .............................................. 332 Corporations and District Councils—Notices............................ 362 Development Act 1993—Erratum ............................................ 334 Employment Agents Registration Act 1993—Notice ................ 334 Gaming Machines Act 1992—Notices ...................................... 335 Land Acquisition Act 1969—Notice ......................................... 338 Mining Act 1971—Notice ......................................................... 338 National Parks and Wildlife (National Parks) Regulations 2001—Notices ....................................................................... 338 Petroleum and Geothermal Energy Act 2000—Notice .............. 339 Partnership Act 1891—Notice ................................................... 364 Proclamations ............................................................................ 342 Public Trustee Office—Administration of Estates .................... 363 REGULATIONS Police Superannuation Act 1990 (No. 5 of 2015) .................. 345 Road Traffic Act 1961 (No. 6 of 2015) .................................. 348 Private Parking Areas Act 1986 (No. 7 of 2015) ................... 350 National Parks and Wildlife Act 1972 (No. 8 of 2015) .......... 352 Public
    [Show full text]
  • Environmental Report
    northernexpressway environmental report A Part A. Introduction and Background 1. What is the Northern Expressway Project? 1-1 2. The environmental assessment process 2-1 3. Community and stakeholder engagement 3-1 Northern Expressway Environmental Report 1 What is the Northern Expressway Project? 1.1 Overview The proposed Northern Expressway Project consists of two components: the Northern Expressway (between Gawler and Port Wakefield Road) and the Port Wakefield Road Upgrade. The project will provide an improved highway and freight connection through metropolitan Adelaide between the Sturt Highway at Gawler and the Port River Expressway. This project will improve freight access from the northern areas of the State and from the main highways, and link key centres in the north, east and west of Australia with the Port of Adelaide, South Australia’s main shipping port. The location plan in Figure 1.1 places this road infrastructure in context. The Northern Expressway component – 23 km of new four-lane expressway with restricted access and a speed limit of 110 km/h – will link to Port Wakefield Road with a new intersection to the north of Taylors Road, approximately 3 km north of the Waterloo Corner intersection. Port Wakefield Road will be upgraded at key locations between the new intersection and the existing intersection with the Salisbury Highway; some local roads will be diverted to service road access for improved safety. The Expressway will replace the section of Main North Road between Gawler and Gepps Cross as the designated AusLink National Network road link. The proposed Northern Expressway and Port Wakefield Road Upgrade is South Australia’s largest and highest priority project under the current AusLink Investment Program and, as such, has the commitment of the South Australian Government.
    [Show full text]
  • Master Plan Chapter 11
    11 Services Infrastructure ADELAIDE AIRPORT / MASTER PLAN 2019 189 11.1. Introduction 11.2. Overview Services infrastructure is a key component of Adelaide Airport’s operations both now and into • Services infrastructure at Adelaide the future. It comprises the power, water, sewer, Airport will continue to expand to telecommunications and stormwater networks that service aviation and non-aviation related meet increases in demand across developments across the Airport Business District. the airport, arising from increased The reliability, efficiency and sustainability of these passenger movements and new networks and supply arrangements are the key developments. objectives for Adelaide Airport when planning for services infrastructure. AAL works closely with • Augmentation of the existing utility external utilities providers to ensure these essential networks will likely include: services are available to support the operation and – growth of the airport. Potential relocation of the 750 millimetre water main which transects the airport site – Expansion of networks to supply new areas of development – New services infrastructure to the Airport East Precinct Figure 11-1: Installed Solar Photovoltaics on Multi-Storey Car Park Roof 190 ADELAIDE AIRPORT / MASTER PLAN 2019 11.3. Recent Developments Improvements to the services infrastructure that have • Connection to the underground aquifers located been implemented since Master Plan 2014 include: along the southern boundary of the airport for use by the Terminal 1 cooling towers • Installation
    [Show full text]
  • Planning and Delivery of Major Infrastructure Projects in SA
    Planning and Delivery of Major Infrastructure Projects in SA Mark Elford Executive Director, Economic Development Department of Planning, Transport and Infrastructure 8th Annual SA Major Project Conference 12-13 August 2015 Knet #9665529 Presentation Outline • Integrated Transport and Land Use Plan (ITLUP) • Regional Mining and Infrastructure Plan (RMIP) / Resources Infrastructure Taskforce (RIT) • North – South Corridor 30/09/2015 Strategic Context Integrated Transport and Land Use Plan Revised version released on 6 July 2015 The Process GOALS 1. Healthy, safe, affordable and connected communities 2. A strong, diverse and growing economy 3. Thriving natural and built environments 1. Growing the role of public transport 2. Efficient connections to export/import gateways CHALLENGES 3. Prioritising transport to encourage mixed-use development 4. Encouraging active travel modes 5. Fine-tuning maintaining and better utilising asset 6. Planning system to integrate transport and land use PRIORITIES 17 priorities to address challenges Public transport for Greater Adelaide Solutions for all of South Australia: Road Network for Greater Adelaide Managing and maintaining the asset SOLUTIONS Cycling and walking for Greater Adelaide Safety Regional South Australia Reducing environmental impacts Freight and ports Reducing car dependency Public Transport Complete the improvements to the north- south backbone train network (ie electrification) Ade LINK tram network Redesign and modernise the bus network Potential underground train loop in the
    [Show full text]