Space Shuttle Missions Summary
Total Page:16
File Type:pdf, Size:1020Kb
Revision S, PCN-1 February 2007 SPACE SHUTTLE MISSIONS SUMMARY Page 81 - STS-67 LANDING SITE/ SSME-TL CREW LAUNCH SITE, RUNWAY, NOM-ABORT SRB ORBIT PAYLOAD MISSION HIGHLIGHTS (7) FLT ORBITER LIFTOFF TIME, CROSSRANGE EMERG RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, NO. LANDING SITES, LANDING TIMES THROTTLE AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, TITLE, NAMES ABORT TIMES FLT DURATION, PROFILE ET EXPERIMENTS FIRSTS, SIGNIFICANT ANOMALIES, ETC.) & EVA'S WINDS ENG. S.N. STS-67 OV-105 CDR: KSC 39A EDW 22, CONC 104/104/ BI-071 28.45° DIRECT OI-23 CARGO: KSC W / D : OPF 81, VAB 5, PAD 19 = 105 days total. (Flight 8) Stephen S. Oswald 61:06:38:12.95Z (EDW 44, CONC 25) 109% (37) INSERTION (5) 28528 LBS SEQ Endeavour (Flt 3 - STS-42, STS-56) 01:37:00 AM EST (P) 77:21:47:14Z RSRM LAUNCH POSTPONEMENTS : FLT #68 P378/R139/V91/M124 01:38:13 AM EST (A) 1:47:14 PM PST PREDICTED: 43 POST OMS -2 : PAYLOAD - Launch date baselined as 11/3/94 on 6/24/93 Spacelab Thursday 18 Saturday 13 100/104/104/ 190.4 X CHARGEABLE: - Postponed launch to 12/1/94 on 11/5/93 KSC-68 Pallet PLT: 3/2/95 (5) 3/18/95 (5) 70/104 ET-69 187.3 NM 20067 LBS - Postponed launch to 1/12/95 on 3/25/94 William G. Gregory - Postponed launch to 2/23/95 on 9/26/94 PAD 16th P379/R190/M166 LAUNCH WINDOW : DEORBIT BURN : ACTUAL: LWT 62 DEPLOYED: - Postponed launch to 3/2/95 on 11/30/94 39A-41 Spacelab 2H30M CTOB 77:20:39:13Z 100/104/104/ 0 LBS Flight M / S 1: XRANGE: 268 NM 67/104 LAUNCH SCRUBS : None MLP-1 John M. Grunsfeld EOM PLS : KSC ET NON - DEPLOYED : EDO 5 P380/R191/M167 TAL: BEN ORBIT DIR : AL17 SSME S / N : RPT 18303 LBS LAUNCH DELAYS : TAL WX : MRN 1 = 2012 (16) 271K - Delayed coming out of T-9 min hold awaiting confirmation that OMS PODS : M / S 2 : AIM PT : NOMINAL 2 = 2033 (7) MIDDECK: FES feedline B heater 1 was operating after switching from SELECTED: LPO4-15 Wendy B. Lawrence MLGTD: 1672 FT 3 = 2031 (12) ET 1764 LBS heater 2 at T-18 mins. Launch delay of 1M13S. RPO1-21 P381/R192/F25 RTLS: KSC 33/CI/N BR / UP TAL: BEN 36/CI/N 77:21:47:01Z FRC5-8 VEL: 201 KGS 214K SHUTTLE TAL WX : M / S 3 ( PAYLOAD CDR ): AOA: EDW 22/CI/N 209 KEAS ACCUMULATED - Ben Guerir (prime & selected) and Moron were forecast and Tamara E. Jernigan PLS: EDW 22/CI/N HDOT: -1.4 FPS ET WEIGHTS: observed GO. Banjul was not available because of local (Flt 3 - STS-40, STS-52) IMPACT DEPLOYED: instability. P382/R130/V83/F14 TDEL: TD NORM 195 : 1:22:37 766624 LBS 0.48 0.202/0.24 2980 FT MET NON - DEPLOYED : DOLILU / NOMINAL I - LOADS : P / S 1: MAX Q NAV : NLGTD: 6240 FT LAT: 948654 LBS - Both DOLILU and nominal were NO GO for ET load indicator Samuel T. Durrance 728 PSF 739 PSF 77:21:47:14Z 15.5°S CARGO TOTAL : ES-73 using L-1 data base. Using M data base, both were GO, (Flt 2 - STS-35) VEL: 151 KGS LONG : 2036386 LBS DOLILU was selected because we had a better data base at P383/R120/V116/M108 SRB STG : HDOT: -6.3 FPS 159.45°W MACH 1.4. An LSEAT waiver was written. 2:06.9 2:05 PERFORMANCE P / S 2 : DRAG CHUTE MARGINS ( LBS ) : NIGHT LAUNCH : Space Shuttle night launch #11. DEPLOY: 147 KEAS Ronald A. Parise PERF: NOMINAL 77:21:47:16Z FPR: 3775 (Flt 2 - STS-35) FUEL BIAS: 1136 FLIGHT DURATION CHANGES / LANDING SITE CHANGE : P384/R119/V117/M107 2 ENG TAL : BRK INIT : 142 KGS FINAL TDDP: 4099 - Waved off landing at KSC on orbits 246, 247, and 248 2:38 2:35 RECON: 6754 because of forecast ceiling violations and thunderstorms within DRAG CHUTE 30 nm. Extended flight 1 day. NEG RETURN : JETTISON: 54 KGS PAYLOADS: - Waved off landing at KSC on orbits 262 and 263. Forecast of 3:59 4:01 77:21:47:43Z PLB: low ceiling and 0.2 cloud cover under 12K. Decision made to AVE BRK DECEL : ASTRO-2 change landing site to EDW. PTA ( U / S 297) : 5.5 FPS/S GAS-2 - Total flight duration extension 1 day plus 1 orbit. 4:22 4:15 WHEELS STOP : LANDING SITE CHANGE : KSC to EDW PTM ( U / S 427) : 77:21:48Z MIDDECK: 5:30 5:17 11647 FT M 3 EOM : CMIX, EVENTS: PGS-TCS - Most persons in orbit at one time, total eleven (11). Mir 18 SE T / M ( BYD ): ROLLOUT: 9935 FT WEIGHT: PGS-STES was launched at 9:11 a.m. Moscow time (12:11 a.m. CST) on 5:49 5:49 47 SEC 217646 LBS SAREX-2, MACE March 14 from Baikonur cosmodrome with Norm Thagard, Vladimir Dezhurov and Gennady Strekalov on board (planned SE PTM ( U / S -897): WINDS: X CG: 5 + 4 EDO CRYO return on Atlantis on STS-71). Three Russians went on Mir MCC FCR-1 (47) 6:33 6:33 H14, R5 KTS 1083.5 TK SETS plus 7 Americans on Endeavor). OFFICIAL: 2515P22 MECO CMD : H14, R4 KTS DEORBIT: EDO FLIGHT DIRECTORS : 8:27.65 8:27.3 193 X 182 NM PALLET A/E - R. E. Jackson DENS ALT : 3481 FT LANDING: Continued. O 1 - B. P. Austin MECO VI : VELOCITY: RMS 41 O 2 - A. L. Pennington 25922 25914 FLT DURATION : WEIGHT: 25852 FPS (S.N. 303) O 3 - J. P. Shannon 16:15:08:48 217437 LBS L/O 4 - C. W. Shaw OMS -2 : S / T : 516:22:32:16 ENTRY RMS NOT USED MOD - A. L. Briscoe 40:19.8 40:19.8 X CG: RANGE: MOD - J. W. Bantle 279 FPS 279 FPS Continued. 1085.0 4216 NM Revision S, PCN-1 February 2007 SPACE SHUTTLE MISSIONS SUMMARY Page 82 - STS-71 LANDING SITE/ SSME-TL CREW LAUNCH SITE, RUNWAY, NOM-ABORT SRB ORBIT PAYLOAD MISSION HIGHLIGHTS (7) FLT ORBITER LIFTOFF TIME, CROSSRANGE EMERG RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, NO. LANDING SITES, LANDING TIMES THROTTLE AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, TITLE, NAMES ABORT TIMES FLT DURATION, PROFILE ET EXPERIMENTS FIRSTS, SIGNIFICANT ANOMALIES, ETC.) & EVA'S WINDS ENG. S.N. STS-67 Continued. Continued . Continued OV -105 : SIGNIFICANT ANOMALIES : 82:17:54:11 - Spacelab SCOS cache addressing error. - FES primary A failed to come out of standby. DISTANCE: - Noisy supply water tank D quantity transducer. 6,892,836 sm - High N2 flow on PCS system 2, 14.7 cabin regulator. - Middeck audio terminal unit failure (main bus current spike). - CCPI failure to power portable light or camcorder. - Handheld mike was inoperative on both middeck and airlock ATU’s. Possible short. - TEAC 8 mm VCR anomaly (degraded picture quality). - Unexplained external IPS disturbances. Pointing performance degraded. - Water spray boiler 2 excessive water usage (most of water was accidentally off-loaded prelaunch.) - L5D oxidizer injector temperature erratic (GMEM uplinked). - R4R jet fail leak, jet stopped leaking at 21:53 MET..