Space Shuttle Missions Summary

Space Shuttle Missions Summary

Revision S, PCN-1 February 2007 SPACE SHUTTLE MISSIONS SUMMARY Page 81 - STS-67 LANDING SITE/ SSME-TL CREW LAUNCH SITE, RUNWAY, NOM-ABORT SRB ORBIT PAYLOAD MISSION HIGHLIGHTS (7) FLT ORBITER LIFTOFF TIME, CROSSRANGE EMERG RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, NO. LANDING SITES, LANDING TIMES THROTTLE AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, TITLE, NAMES ABORT TIMES FLT DURATION, PROFILE ET EXPERIMENTS FIRSTS, SIGNIFICANT ANOMALIES, ETC.) & EVA'S WINDS ENG. S.N. STS-67 OV-105 CDR: KSC 39A EDW 22, CONC 104/104/ BI-071 28.45° DIRECT OI-23 CARGO: KSC W / D : OPF 81, VAB 5, PAD 19 = 105 days total. (Flight 8) Stephen S. Oswald 61:06:38:12.95Z (EDW 44, CONC 25) 109% (37) INSERTION (5) 28528 LBS SEQ Endeavour (Flt 3 - STS-42, STS-56) 01:37:00 AM EST (P) 77:21:47:14Z RSRM LAUNCH POSTPONEMENTS : FLT #68 P378/R139/V91/M124 01:38:13 AM EST (A) 1:47:14 PM PST PREDICTED: 43 POST OMS -2 : PAYLOAD - Launch date baselined as 11/3/94 on 6/24/93 Spacelab Thursday 18 Saturday 13 100/104/104/ 190.4 X CHARGEABLE: - Postponed launch to 12/1/94 on 11/5/93 KSC-68 Pallet PLT: 3/2/95 (5) 3/18/95 (5) 70/104 ET-69 187.3 NM 20067 LBS - Postponed launch to 1/12/95 on 3/25/94 William G. Gregory - Postponed launch to 2/23/95 on 9/26/94 PAD 16th P379/R190/M166 LAUNCH WINDOW : DEORBIT BURN : ACTUAL: LWT 62 DEPLOYED: - Postponed launch to 3/2/95 on 11/30/94 39A-41 Spacelab 2H30M CTOB 77:20:39:13Z 100/104/104/ 0 LBS Flight M / S 1: XRANGE: 268 NM 67/104 LAUNCH SCRUBS : None MLP-1 John M. Grunsfeld EOM PLS : KSC ET NON - DEPLOYED : EDO 5 P380/R191/M167 TAL: BEN ORBIT DIR : AL17 SSME S / N : RPT 18303 LBS LAUNCH DELAYS : TAL WX : MRN 1 = 2012 (16) 271K - Delayed coming out of T-9 min hold awaiting confirmation that OMS PODS : M / S 2 : AIM PT : NOMINAL 2 = 2033 (7) MIDDECK: FES feedline B heater 1 was operating after switching from SELECTED: LPO4-15 Wendy B. Lawrence MLGTD: 1672 FT 3 = 2031 (12) ET 1764 LBS heater 2 at T-18 mins. Launch delay of 1M13S. RPO1-21 P381/R192/F25 RTLS: KSC 33/CI/N BR / UP TAL: BEN 36/CI/N 77:21:47:01Z FRC5-8 VEL: 201 KGS 214K SHUTTLE TAL WX : M / S 3 ( PAYLOAD CDR ): AOA: EDW 22/CI/N 209 KEAS ACCUMULATED - Ben Guerir (prime & selected) and Moron were forecast and Tamara E. Jernigan PLS: EDW 22/CI/N HDOT: -1.4 FPS ET WEIGHTS: observed GO. Banjul was not available because of local (Flt 3 - STS-40, STS-52) IMPACT DEPLOYED: instability. P382/R130/V83/F14 TDEL: TD NORM 195 : 1:22:37 766624 LBS 0.48 0.202/0.24 2980 FT MET NON - DEPLOYED : DOLILU / NOMINAL I - LOADS : P / S 1: MAX Q NAV : NLGTD: 6240 FT LAT: 948654 LBS - Both DOLILU and nominal were NO GO for ET load indicator Samuel T. Durrance 728 PSF 739 PSF 77:21:47:14Z 15.5°S CARGO TOTAL : ES-73 using L-1 data base. Using M data base, both were GO, (Flt 2 - STS-35) VEL: 151 KGS LONG : 2036386 LBS DOLILU was selected because we had a better data base at P383/R120/V116/M108 SRB STG : HDOT: -6.3 FPS 159.45°W MACH 1.4. An LSEAT waiver was written. 2:06.9 2:05 PERFORMANCE P / S 2 : DRAG CHUTE MARGINS ( LBS ) : NIGHT LAUNCH : Space Shuttle night launch #11. DEPLOY: 147 KEAS Ronald A. Parise PERF: NOMINAL 77:21:47:16Z FPR: 3775 (Flt 2 - STS-35) FUEL BIAS: 1136 FLIGHT DURATION CHANGES / LANDING SITE CHANGE : P384/R119/V117/M107 2 ENG TAL : BRK INIT : 142 KGS FINAL TDDP: 4099 - Waved off landing at KSC on orbits 246, 247, and 248 2:38 2:35 RECON: 6754 because of forecast ceiling violations and thunderstorms within DRAG CHUTE 30 nm. Extended flight 1 day. NEG RETURN : JETTISON: 54 KGS PAYLOADS: - Waved off landing at KSC on orbits 262 and 263. Forecast of 3:59 4:01 77:21:47:43Z PLB: low ceiling and 0.2 cloud cover under 12K. Decision made to AVE BRK DECEL : ASTRO-2 change landing site to EDW. PTA ( U / S 297) : 5.5 FPS/S GAS-2 - Total flight duration extension 1 day plus 1 orbit. 4:22 4:15 WHEELS STOP : LANDING SITE CHANGE : KSC to EDW PTM ( U / S 427) : 77:21:48Z MIDDECK: 5:30 5:17 11647 FT M 3 EOM : CMIX, EVENTS: PGS-TCS - Most persons in orbit at one time, total eleven (11). Mir 18 SE T / M ( BYD ): ROLLOUT: 9935 FT WEIGHT: PGS-STES was launched at 9:11 a.m. Moscow time (12:11 a.m. CST) on 5:49 5:49 47 SEC 217646 LBS SAREX-2, MACE March 14 from Baikonur cosmodrome with Norm Thagard, Vladimir Dezhurov and Gennady Strekalov on board (planned SE PTM ( U / S -897): WINDS: X CG: 5 + 4 EDO CRYO return on Atlantis on STS-71). Three Russians went on Mir MCC FCR-1 (47) 6:33 6:33 H14, R5 KTS 1083.5 TK SETS plus 7 Americans on Endeavor). OFFICIAL: 2515P22 MECO CMD : H14, R4 KTS DEORBIT: EDO FLIGHT DIRECTORS : 8:27.65 8:27.3 193 X 182 NM PALLET A/E - R. E. Jackson DENS ALT : 3481 FT LANDING: Continued. O 1 - B. P. Austin MECO VI : VELOCITY: RMS 41 O 2 - A. L. Pennington 25922 25914 FLT DURATION : WEIGHT: 25852 FPS (S.N. 303) O 3 - J. P. Shannon 16:15:08:48 217437 LBS L/O 4 - C. W. Shaw OMS -2 : S / T : 516:22:32:16 ENTRY RMS NOT USED MOD - A. L. Briscoe 40:19.8 40:19.8 X CG: RANGE: MOD - J. W. Bantle 279 FPS 279 FPS Continued. 1085.0 4216 NM Revision S, PCN-1 February 2007 SPACE SHUTTLE MISSIONS SUMMARY Page 82 - STS-71 LANDING SITE/ SSME-TL CREW LAUNCH SITE, RUNWAY, NOM-ABORT SRB ORBIT PAYLOAD MISSION HIGHLIGHTS (7) FLT ORBITER LIFTOFF TIME, CROSSRANGE EMERG RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, NO. LANDING SITES, LANDING TIMES THROTTLE AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, TITLE, NAMES ABORT TIMES FLT DURATION, PROFILE ET EXPERIMENTS FIRSTS, SIGNIFICANT ANOMALIES, ETC.) & EVA'S WINDS ENG. S.N. STS-67 Continued. Continued . Continued OV -105 : SIGNIFICANT ANOMALIES : 82:17:54:11 - Spacelab SCOS cache addressing error. - FES primary A failed to come out of standby. DISTANCE: - Noisy supply water tank D quantity transducer. 6,892,836 sm - High N2 flow on PCS system 2, 14.7 cabin regulator. - Middeck audio terminal unit failure (main bus current spike). - CCPI failure to power portable light or camcorder. - Handheld mike was inoperative on both middeck and airlock ATU’s. Possible short. - TEAC 8 mm VCR anomaly (degraded picture quality). - Unexplained external IPS disturbances. Pointing performance degraded. - Water spray boiler 2 excessive water usage (most of water was accidentally off-loaded prelaunch.) - L5D oxidizer injector temperature erratic (GMEM uplinked). - R4R jet fail leak, jet stopped leaking at 21:53 MET..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us