Matjhabeng WWTW Masterplan Rev0 (19July2016).Pdf

Total Page:16

File Type:pdf, Size:1020Kb

Matjhabeng WWTW Masterplan Rev0 (19July2016).Pdf DRAFT CLIENT: Department of Water and Sanitation – Construction West By- e-mail MASTERPLAN FOR THE CONSOLIDATION OF THE MATJABENG WASTE WATER TREATMENT PLANTS: REV 0 JULY 2016 COMPILED BY: WaterGroup (Pty) Ltd Tel: 011 950 0242 CSVwater Consulting Engineers (Pty) Ltd Tel: 012 667 6260 Master Plan for the Consolidation of the Matjabeng WWTW’s – Revision 0 DRAFT Compiled by : WaterGroup (Pty) Ltd Tel: 011 950 0242 CSVwater Consulting Engineers (Pty) Ltd Tel: 012 667 6260 Project Manager : Charl van der Walt [email protected] // 082 374 1581 Date : July 2016 TABLE OF REVISIONS Rev No. Date Nature of Revision 0 July 2016 First DRAFT Submission Compiled by Watergroup and CSVwater Consulting Engineers Page | i Master Plan for the Consolidation of the Matjabeng WWTW’s – Revision 0 DRAFT EXECUTIVE SUMMARY The Watergroup/CSV consortium presented the DWS Construction Unit North West with a report on 14 January 2016 in which the short term interventions for the Theronia and Witpan waste water treatment works (WWTW’s) were set out. These interventions have in the meantime been implemented. The objective of this second report is to provide the Matjabeng LM with a view on the eventual layout of its water treatment facilities, in particular the three large facilities of Thabong (currently 18 Mℓ/d), Witpan (currently being upgraded to 12 Mℓ/d) and Theronia (25 Mℓ/d). For the masterplan determination, a time horizon of 20 years has been used. Information regarding growth forecasts, existing sewer infrastructure as well as the status of the sewage pump stations has been obtained from the municipality. This information has been used to build a model in SWMM (a This report is the second of two reports where the first report described the current status and recommends immediate interventions required. For the sake of completion, these recommended interventions proposed were to: (a) Fast Track the implementation of the changes currently being done at the Witpan WWTW – no more than 6 months should be allowed for these changes to be implemented. (b) Start immediately with restoring the unit processes at the Theronia WWTW – as an interim measurement, flow must be diverted after the inlet works to the existing maturation ponds. (c) Investigate the feasibility of implementing a regional waste water work at a suitable point where land is available and the typography encourages feed by gravity. Use of existing infrastructure should be utilised as far as possible (Report 2 to expand more on this). (d) Investigate the viability of the sewage pump stations in maintaining their functionality regarding delivery of raw sewage to the two plants (Report 2 to expand on this) (e) Resume with monitoring as soon as processes are restored (staff has monitoring equipment Green Drop kits for onsite analysis). Weekly reports to DWS must be done in the meantime. Progress on points a) and b) above is that the completion of the Witpan construction changes are scheduled for completion in May 2016. As far as Theronia WWTW is concerned, the sewage flow after the inlet works has been intercepted and diverted to the maturation ponds. No feedback on the restoration of the existing plant has been made. Report 2 (this report) concluded with the following: (i) Repair all defunct mechanical and electrical equipment at Theronia WWTW; (ii) Limited refurbishment at Thabong WWTW. Provide for an additional 15 Mℓ/d new activated sludge treatment plant at Thabong WWTW immediately, with another 15 Mℓ/d module by the time the Witpan WWTW is decommissioned; (iii) Finalise the current work at the Witpan WWTW to prevent further pollution of the Witpan lake; (iv) Existing pump stations should be brought back to optimal operation. This includes upgrading security, maintaining equipment and ensuring the safety measures are taken and in place. Compiled by Watergroup and CSVwater Consulting Engineers Page | 2 Master Plan for the Consolidation of the Matjabeng WWTW’s – Revision 0 DRAFT (v) Construction of new transfer pump station at Witpan WWTW. This will collect current flows to Witpan WWTW and transfer to Thabong WWTW. The current structures could be utilized to provide emergency storage. New Bronville pump station to transport waste water to Thabong WWTW (Option to upgrade and divert current Bronville pump stations will also be considered) (vi) New rising mains to be installed at two new pump stations as stated above. (vii) Repair and lining of current Mostert canal, as well as the installation of a new canal at Theronia WWTW. (viii) A funding option entailing the implementation of a Public Private Partnership (PPP) option to exploit water reclamation has been provided for consideration. Compiled by Watergroup and CSVwater Consulting Engineers Page | 3 Master Plan for the Consolidation of the Matjabeng WWTW’s – Revision 0 DRAFT TABLE OF CONTENTS DESCRIPTION PAGE NO. EXECUTIVE SUMMARY ..................................................................................................................................... i 1. INTRODUCTION ...................................................................................................................................... 7 1.1 Background ............................................................................................................................................ 7 1.2 Purpose and Context of this Report ..................................................................................................... 9 2. NEEDS ANALYSES .............................................................................................................................. 10 2.1 Population ............................................................................................................................................. 10 2.1.1 RSA Census 2011 .................................................................................................................. 10 2.1.2 Aerial Counting ....................................................................................................................... 11 2.2 Existing Network .................................................................................................................................. 13 2.3 Status of the Sewage Pumping Station ............................................................................................. 17 2.4 Status of the Current Sewage Treatment Plants ............................................................................... 23 2.5 Required Effluent Standards ............................................................................................................... 25 2.5.1 Background: ............................................................................................................................ 25 2.5.2 Current WULA status: ............................................................................................................. 27 2.5.3 Future Effluent Quality Expectations ...................................................................................... 27 2.5.4 Other Stakeholders ................................................................................................................. 28 2.5.5 Conclusion and Recommendation .......................................................................................... 28 2.5.6 Thabong WWTW .................................................................................................................... 29 2.5.7 Witpan WWTW ....................................................................................................................... 34 2.5.8 Theronia WWTW .................................................................................................................... 37 2.6 Summary of the Needs Analyses ....................................................................................................... 41 3. OPTION ANALYSES ............................................................................................................................. 42 3.1 Identifications of Options .................................................................................................................... 43 3.1.1 Option 1A: Upgrade both Thabong and Theronia .................................................................. 44 3.1.2 Option 1B: Extension of the Thabong WWTW ....................................................................... 44 3.1.3 Option 2: Extension of the Theronia WWTW and Decommissioning of the Thabong WWTW and Witpan WWTW ................................................................................................................ 45 3.1.4 Option 3: New Regional Works at Extension of the Theronia WWTW and Decommissioning of the Thabong WWTW and Witpan WWTW ......................................................................... 46 3.2 Pricing of Options ................................................................................................................................ 47 4. SEWAGE NETWORK BULK INFRASTRUCTURE - DESIGN BASIS ................................................. 50 4.1 General Design Considerations .......................................................................................................... 50 4.2 Sewage Reticulation ............................................................................................................................ 50 4.3 Sewage Pumping Station .................................................................................................................... 52 4.3.1 Structural Design
Recommended publications
  • South Africa
    PUBLIC VERSION DOC Investigation No. A-791-825 ITC Investigation Nos. 701-TA-___-___ and 731-TA- ___-___ Total No. of Pages: 370 AD/CVD Operations Petitioners’ Business Proprietary Information for Which Proprietary Treatment Has Been Requested Deleted at Exhibits AD-ZA-1 (Atts. 1, 2, 5, 7,), AD-ZA- 2, AD-ZA-4, and AD-ZA-5 PUBLIC VERSION BEFORE THE INTERNATIONAL TRADE ADMINISTRATION OF THE U.S. DEPARTMENT OF COMMERCE AND THE U.S. INTERNATIONAL TRADE COMMISSION ANTIDUMPING DUTY PETITION VOLUME XVI SOUTH AFRICA COMMON ALLOY ALUMINUM SHEET FROM BAHRAIN, BRAZIL, CROATIA, EGYPT, GERMANY, GREECE, INDIA, INDONESIA, ITALY, KOREA, OMAN, ROMANIA, SERBIA, SLOVENIA, SOUTH AFRICA, SPAIN, TAIWAN, AND TURKEY PETITIONERS: THE ALUMINUM ASSOCIATION COMMON ALLOY ALUMINUM SHEET TRADE ENFORCEMENT WORKING GROUP AND ITS INDIVIDUAL MEMBERS W. BRAD HUDGENS JOHN M. HERRMANN DAVID C. SMITH WILLIAM H. CROW II PAUL C. ROSENTHAL GRACE W. KIM EMILY R. MALOOF KATHLEEN W. CANNON MELISSA M. BREWER NEREUS JOUBERT R. ALAN LUBERDA JOSHUA R. MOREY VLADIMIR VARBANOV BROOKE M. RINGEL MATTHEW G. PEREIRA GEORGETOWN ECONOMIC KELLEY DRYE & WARREN LLP SERVICES, LLC 3050 K Street, N.W., Suite 400 3050 K Street, N.W. Washington, DC 20007 Washington, D.C. 20007 (202) 342-8400 (202) 945-6660 Counsel to Petitioners March 9, 2020 PUBLIC VERSION Table of Contents Page I COMMON ALLOY ALUMINUM SHEET FROM SOUTH AFRICA IS BEING SOLD OR OFFERED FOR SALE AT LESS THAN FAIR VALUE .......,.1 A. Introduction............... 1 B. Producers in South Africa."..'. ,2 C. Export Price or Constructed Export Price' .4 D. Normal Value........ 5 E.
    [Show full text]
  • Postal: PO Box 116, Ficksburg, 9730 Physical: 27 Voortrekker Street, Ficksburg Tel: 051 933 9300 Fax: 051 933 9309 Web: TABLE of CONTENTS
    Postal: PO Box 116, Ficksburg, 9730 Physical: 27 Voortrekker Street, Ficksburg Tel: 051 933 9300 Fax: 051 933 9309 Web: http://www2.setsoto.info/ TABLE OF CONTENTS List of Figures .........................................................................................................................................................................................................................................................................3 List of Maps ............................................................................................................................................................................................................................................................................4 List of Tables ..........................................................................................................................................................................................................................................................................5 List of Acronyms ....................................................................................................................................................................................................................................................................7 Definitions ..............................................................................................................................................................................................................................................................................8
    [Show full text]
  • Matjhabeng Municipality Local
    MATJHABENG MUNICIPALITY LOCAL PUBLIC NOTICE MATJHABENG LOCAL MUNICIPALITY BUDGET & IDP 2014/2015 PUBLIC PARTICIPATION SCHEDULE DATES PARTICIPATING COMMUNITIES / TIMES VENUES WARDS Allanridge (Ward 19 & 36) 16H30 Nyakallong Community Hall Riebeeckstad (Wards 10, 25 & 35) 16H30 Swimming Pool Welkom (Ward 32) 16H30 Ferdie Meyer Hall Monday 12 May 2014 Odendaalsrus (Ward 18) 16h30 Kutlwanong Community Hall Odendaalsrus (Ward 20) 16h30 Kutlwanong Community Hall DATES PARTICIPATING COMMUNITIES / TIMES VENUES WARDS Welkom (Ward 27) 16H30 Dagbreek Primary School Bronville (Ward 12) 16H30 Hani Park Clinic Odendaalsrus (Ward 22) 16H30 Kutlwanong Community Hall Tuesday 13 May 2014 Odendaalsrus (Ward 10) 16H30 JC Motumi High School Odendaalsrus (Ward 36) 16h30 Town Hall DATES PARTICIPATING COMMUNITIES / TIMES VENUES WARDS Odendaalsrus (Ward 21) 16H30 Malebaleba School Wednesday 14 Welkom (Ward 33) 16H30 Ferdie Meyer Hall May 2014 Odendaalsrus (Ward 35) 16H30 Town Hall Bronville (Ward 11) 16H30 Bronville Community Hall Welkom (Ward 24) 16H30 Reahola Housing Units DATES PARTICIPATING COMMUNITIES / TIMES VENUES WARDS Bronville (Ward 23) 16H30 Hani Park Church Thabong (Ward 12) 16H30 Tsakani School Thursday 15 May Thabong (Ward 30) 16H30 Thabong Primary School 2014 Thabong (Ward 31) 16H30 Thabong Community Centre Thabong (Ward 28) 16H30 Thembekile School DATES PARTICIPATING COMMUNITIES / TIMES VENUES WARDS Thabong (Ward 26) 16H30 Bofihla School Thabong (Ward 29) 16H30 Lebogang School Monday 19 May 2014 Thabong Far East (Ward 25) 16H30 Matshebo School
    [Show full text]
  • Spatial Transformation: Are Intermediate Cities Different? South African Cities Network: Johannesburg
    CENTRE FOR DEVELOPMENT SUPPORT SENTRUM VIR ONTWIKKELINGSTEUN ACKNOWLEDGEMENTS Lead authors: Lochner Marais (University of the Free State) Danie Du Plessis (Stellenbosch University) Case study authors: Drakenstein: Ronnie Donaldson (Stellenbosch University) King Sabata Dalindyebo: Esethu Ndzamela (Nelson Mandela University) and Anton De Wit (Nelson Mandela University Lephalale: Kgosi Mocwagae (University of the Free State) Matjhabeng: Stuart Denoon-Stevens (University of the Free State) Mahikeng: Verna Nel (University of the Free State) and James Drummond (North West University) Mbombela: Maléne Campbell (University of the Free State) Msunduzi: Thuli Mphambukeli (University of the Free State) Polokwane: Gemey Abrahams (independent consultant) Rustenburg: John Ntema (University of South Africa) Sol Plaatje: Thomas Stewart (University of the Free State) Stellenbosch: Danie Du Plessis (Stellenbosch University) Manager: Geci Karuri-Sebina Editing by Write to the Point Design by Ink Design Photo Credits: Page 2: JDA/SACN Page 16: Edna Peres/SACN Pages 18, 45, 47, 57, 58: Steve Karallis/JDA/SACN Page 44: JDA/SACN Page 48: Tanya Zack/SACN Page 64: JDA/SACN Suggested citation: SACN. 2017. Spatial Transformation: Are Intermediate Cities Different? South African Cities Network: Johannesburg. Available online at www.sacities.net ISBN: 978-0-6399131-0-0 © 2017 by South African Cities Network. Spatial Transformation: Are Intermediate Cities Different? is made available under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License. To view a copy of this license, visit http://creativecommons.org/licenses/by-nc-sa/4.0/. 2 SPATIAL TRANSFORMATION: ARE INTERMEDIATE CITIES DIFFERENT? Foreword As a network whose primary stakeholders are the largest cities, the South African Cities Network (SACN) typically focuses its activities on the “big” end of the urban spectrum (essentially, mainly the metropolitan municipalities).
    [Show full text]
  • Mean Streets: Migration, Xenophobia and Informality in South Africa
    Mean Streets Migration, Xenophobia and Informality in South Africa Published by the Southern African Migration Programme (SAMP), the African Centre for Cities (ACC) and the International Development Research Centre (IDRC) Southern African Migration Programme, International Migration Research Centre Balsillie School of International Affairs, 67 Erb Street West, Waterloo, Ontario N2L 6C2, Canada African Centre for Cities, University of Cape Town, Environmental & Geographical Science Building, Upper Campus, Rondebosch, 7701, South Africa International Development Research Centre, 160 Kent St, Ottawa, Canada K1P 0B2 and Eaton Place, 3rd floor, United Nations Crescent, Gigiri, Nairobi, Kenya ISBN 978-1-920596-11-8 © SAMP 2015 First published 2015 Production, including editing, design and layout, by Bronwen Dachs Muller Cover by Michiel Botha Cover photograph by Alon Skuy/The Times. The photograph shows Soweto residents looting a migrant-owned shop in a January 2015 spate of attacks in South Africa Index by Ethné Clarke Printed by MegaDigital, Cape Town All rights reserved. No part of this publication may be reproduced or transmitted, in any form or by any means, without prior permission from the publishers. Mean Streets Migration, Xenophobia and Informality in South Africa Edited by Jonathan Crush Abel Chikanda Caroline Skinner Acknowledgements The editors would like to acknowledge the financial and programming support of the Inter- national Development Research Centre (IDRC), which funded the research of the Growing Informal Cities Project and the Workshop on Urban Informality and Migrant Entrepre- neurship in Southern African Cities hosted by SAMP and the African Centre for Cities in Cape Town in February 2014. Many of the chapters in this volume were first presented at this workshop.
    [Show full text]
  • "6$ ."*@CL9@CJ#L "6&$CG@%LC$ A=-L@68L&@@*>C
    1 PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT THE LEBONE SOLAR FARM, ONVERWAG RE/728 AND VAALKRANZ 2/220, WELKOM, FREE STATE, SOUTH AFRICA DATE: 2013-10-17 REPORT TO: ADEL GROENEWALD (Enviroworks) Tel: 086 198 8895; Fax: 086 719 7191; Postal Address: Suite 116, Private Bag X01, Brandhof, 9301; E-mail: [email protected] ANDREW SALOMON (South African Heritage Resources Agency - SAHRA) Tel: 021 462 4505; Fax: 021 462 4509; Postal Address: P.O. Box 4637, Cape Town, 8000; E-mail: [email protected] PREPARED BY: KAREN VAN RYNEVELD (ArchaeoMaps) Tel: 084 871 1064; Fax: 086 515 6848; Postal Address: Postnet Suite 239, Private Bag X3, Beacon Bay, 5205; E-mail: [email protected] THE LEBONE SOLAR FARM, ONVERWAG RE/728 AND VAALKRANZ 2/220, WELKOM, FS ENVIROWORKS 2 SPECIALIST DECLARATION OF INTEREST I, Karen van Ryneveld (Company – ArchaeoMaps; Qualification – MSc Archaeology), declare that: o I am suitably qualified and accredited to act as independent specialist in this application; o I do not have any financial or personal interest in the application, ’ proponent or any subsidiaries, aside from fair remuneration for specialist services rendered; and o That work conducted has been done in an objective manner – and that any circumstances that may have compromised objectivity have been reported on transparently. SIGNATURE – DATE – 2013-10-17 THE LEBONE SOLAR FARM, ONVERWAG RE/728 AND VAALKRANZ 2/220, WELKOM, FS ENVIROWORKS 3 PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT THE LEBONE SOLAR FARM, ONVERWAG RE/728 AND VAALKRANZ 2/220, WELKOM, FREE STATE, SOUTH AFRICA EXECUTIVE SUMMARY TERMS OF REFERENCE - Enviroworks has been appointed by the project proponent, Lebone Solar Farm (Pty) Ltd, to prepare and submit the EIA and EMPr for the proposed 75MW photovoltaic (PV) solar facility on the properties Remaining Extent of Farm Onverwag 728 and Portion 2 of Farm Vaalkranz 220 near Welkom in the Free State, South Africa.
    [Show full text]
  • Finding Voice: a Visual Arts Approach to Engaging Social Change, Kim S
    Revised Pages Finding Voice Revised Pages THE NEW PUBLIC SCHOLARSHIP series editors Lonnie Bunch, Director, National Museum of African-American History and Culture Julie Ellison, Professor of American Culture, University of Michigan Robert Weisbuch, President, Drew University The New Public Scholarship encourages alliances between scholars and commu- nities by publishing writing that emerges from publicly engaged and intellectually consequential cultural work. The series is designed to attract serious readers who are invested in both creating and thinking about public culture and public life. Under the rubric of “public scholar,” we embrace campus-based artists, humanists, cultural crit- ics, and engaged artists working in the public, nonprofit, or private sector. The editors seek useful work growing out of engaged practices in cultural and educational arenas. We are also interested in books that offer new paradigms for doing and theorizing public scholarship itself. Indeed, validating public scholarship through an evolving set of concepts and arguments is central to The New Public Scholarship. The universe of potential contributors and readers is growing rapidly. We are teaching a generation of students for whom civic education and community service learning are quite normative. The civic turn in art and design has affected educational and cultural institutions of many kinds. In light of these developments, we feel that The New Public Scholarship offers a timely innovation in serious publishing. Civic Engagement in the Wake of Katrina, edited by Amy Koritz and George J. Sanchez Is William Martinez Not Our Brother? Twenty Years of the Prison Creative Arts Project, Buzz Alexander The Word on the Street: Linking the Academy and the Common Reader, Harvey Teres For the Civic Good: The Liberal Case for Teaching Religion in the Public Schools, Walter Feinberg and Richard A.
    [Show full text]
  • Electrification Infrastructure Projects
    Electrification Infrastructure Projects “Do more together with less” Roshan Pillay 24 February 2016 ESKOM Overview Transmission substation Electricity generation Transmission lines Customer Services (765/400/275 kV) Embedded generation Distribution lines 132/88/66kV Industry, mining & large metros Distribution substation Reticulation HV line (11 & 22kV) Reticulation Residential LV line (380/220V) Commercial/small industry/ farming/small munics 2 What are the technical opportunities? Type of service: Minor Distribution Line Construction (11-33kV) Major Distribution Line Construction (11-33kV) Pole Replacement - Dead Conditions Pole Replacement - Live Conditions Electrification Infills Live Work Maintenance 11-33kV - FSOU Live Work Maintenance 44-132kV - FSOU Live Work Maintenance Substations - FSOU 3 What are the technical opportunities? Type of service: SPU Meter Dis connections & Re-connections - FSOU MV and LV Cable repairs and maintenance Emergency Distribution Line Repairs and Maintenance Electrical and Civil Work - FSOU Substations 4 What are the non technical opportunities? Type of service: PPU meter Audits FSOU SPU meter Audits FSOU SPU Meter Readings - FSOU 5 Free State Operating Unit Project Budget • +- R1b for the next 3 years (2016 – 2018) • Categories: • Direct Customers • Strengthening • Refurbishment • Asset Purchases • Electrification Infrastructure Projects: Thabo Mofutsanyana Vrede Memel Petrus Steyn Reitz Warden Bethlehem Harrismith Marquard Clarens Phuthaditjhaba Ficksburg Clocolan Excelsior Ladybrand Tweespruit SIP
    [Show full text]
  • Ventersburgg Bulk Water Supply (4).Pdf
    PROPOSED DEVELOPMENT OF THE 42KM VENTERSBURG BULK WATER SUPPLY FROM KOPPIE ALLEEN TO VENTERSBURG, FREE STATE PROVINCE. Draft Basic Assessment Report November 2016 Prepared for: Prepared by: Anton Francois Ackermann BASIC ASSESSMENT REPORT (For official use only) File Reference Number: Application Number: Date Received: Basic assessment report in terms of the Environmental Impact Assessment Regulations, 2014, promulgated in terms of the National Environmental Management Act, 1998 (Act No. 107 of 1998), as amended. Kindly note that: 1. This basic assessment report is a standard report that may be required by a competent authority in terms of the EIA Regulations, 2014 and is meant to streamline applications. Please make sure that it is the report used by the particular competent authority for the activity that is being applied for. 2. This report format is current as of 08 December 2014. It is the responsibility of the applicant to ascertain whether subsequent versions of the form have been published or produced by the competent authority 3. The report must be typed within the spaces provided in the form. The size of the spaces provided is not necessarily indicative of the amount of information to be provided. The report is in the form of a table that can extend itself as each space is filled with typing. 4. Where applicable tick the boxes that are applicable in the report. 5. An incomplete report may be returned to the applicant for revision. 6. The use of “not applicable” in the report must be done with circumspection because if it is used in respect of material information that is required by the competent authority for assessing the application, it may result in the rejection of the application as provided for in the regulations.
    [Show full text]
  • FREE STATE DEPARTMENT of EDUCATION Address List: ABET Centres District: XHARIEP
    FREE STATE DEPARTMENT OF EDUCATION Address List: ABET Centres District: XHARIEP Name of centre EMIS Category Hosting School Postal address Physical address Telephone Telephone number code number BA-AGI FS035000 PALC IKANYEGENG PO BOX 40 JACOBSDAL 8710 123 SEDITI STRE RATANANG JACOBSDAL 8710 053 5910112 GOLDEN FOUNTAIN FS018001 PALC ORANGE KRAG PRIMARY PO BOX 29 XHARIEP DAM 9922 ORANJEKRAG HYDROPARK LOCAT XHARIEP 9922 051-754 DAM IPOPENG FS029000 PALC BOARAMELO PO BOX 31 JAGERSFONTEIN 9974 965 ITUMELENG L JAGERSFORNTEIN 9974 051 7240304 KGOTHALLETSO FS026000 PALC ZASTRON PUBLIC PO BOX 115 ZASTRON 9950 447 MATLAKENG S MATLAKENG ZASTRPM 9950 051 6731394 LESEDI LA SETJABA FS020000 PALC EDENBURG PO BOX 54 EDENBURG 9908 1044 VELEKO STR HARASEBEI 9908 051 7431394 LETSHA LA FS112000 PALC TSHWARAGANANG PO BOX 56 FAURESMITH 9978 142 IPOPENG FAURESMITH 9978 051 7230197 TSHWARAGANANG MADIKGETLA FS023000 PALC MADIKGETLA PO BOX 85 TROMPSBURG 9913 392 BOYSEN STRE MADIKGETLA TROMPSBU 9913 051 7130300 RG MASIFUNDE FS128000 PALC P/BAG X1007 MASIFUNDE 9750 GOEDEMOED CORRE ALIWAL NORTH 9750 0 MATOPORONG FS024000 PALC ITEMELENG PO BOX 93 REDDERSBURG 9904 821 LESEDI STRE MATOPORONG 9904 051 5530726 MOFULATSHEPE FS021000 PALC MOFULATSHEPE PO BOX 237 SMITHFIELD 9966 474 JOHNS STREE MOFULATHEPE 9966 051 6831140 MPUMALANGA FS018000 PALC PHILIPPOLIS PO BOX 87 PHILIPPOLIS 9970 184 SCHOOL STRE PODING TSE ROLO PHILIPPOLIS 9970 051 7730220 REPHOLOHILE FS019000 PALC WONGALETHU PO BOX 211 BETHULIE 9992 JIM FOUCHE STR LEPHOI BETHULIE 9992 051 7630685 RETSWELELENG FS033000 PALC INOSENG PO BOX 216 PETRUSBURG 9932 NO 2 BOIKETLO BOIKETLO PETRUSBUR 9932 053 5740334 G THUTONG FS115000 PALC LUCKHOFF PO BOX 141 LUCKHOFF 9982 PHIL SAUNDERS A TEISVILLE LUCKHOFF 9982 053 2060115 TSIBOGANG FS030000 PALC LERETLHABETSE PO BOX 13 KOFFIEFONTEIN 9986 831 LEFAFA STRE DITLHAKE 9986 053 2050173 UBUNTU FS035001 PALS SAUNDERSHOOGTE P.O.
    [Show full text]
  • Provincial Gazette for Free State No 76 of 14-November-2014
    Provincial Provinsiale Gazette Koerant Free State Province Provinsie Vrystaat Published by Authority Uitgegee op Gesag NO. 76 FRIDAY 14 NOVEMBER 2014 NO. 76 VRYDAG, 14 NOVEMBER 2014 PROCLAMATION PROKLAMASIE 35 Declaration of Township: Thabong: Extension 19 …………….. 2 35 Dorpsverklaring: Thabong: Uitbreiding 19 ……………...……….. 2 MISCELLANEOUS Applications For Public Road Carrier Permits: Advert 170 …....…….. 5 Advert 172 …………. 44 NOTICE KENNISGEWINGS The Conversion of Certain Rights into Leasehold …………..……….. 99 Wet op die Omskepping van Sekere Regte tot Huurpag ……………. 99 PLEASE TAKE NOTE: THE LAST PUBLICATION OF THE PROVINCIAL GAZETTE FOR THE YEAR 2014 WILL BE ON 12 DECEMBER 2014. THE NEXT PUBLICATION WILL BE ON 16 JANUARY 2015 ...…. 103 PROVINCIAL GAZETTE / PROVINSIALE KOERANT, 14 NOVEMBER 2014 / 14 NOVEMBER 2014 2 PROCLAMATIONS PROKLAMASIES ________ ________ [NO. 35 OF 2014] [NO. 35 VAN 2014] DECLARATION OF TOWNSHIP: THABONG: EXTENSION 19 DORPSVERKLARING: THABONG: UITBREIDING 19 By virtue of the powers vested in me by section 14(1) of the Townships Kragtens die bevoegdheid my verleen by artikel 14(1) van die Ordinance, 1969 (Ordinance No. 9 of 1969), I, S M Mlamleli, Member Ordonnansie op Dorpe, 1969 (Ordonnansie No. 9 van 1969), verklaar of the Executive Council of the Province responsible for Cooperative ek, S M Mlamleli, Lid van die Uitvoerende Raad van die Provinsie Governance, Traditional Affairs and Human Settlements, hereby verantwoordelik vir Samewerkende Regering, Tradisionele Sake en declare the area represented by General Plan S.G. No. 1037/2005 as Menslike Nedersettings, hierby die gebied voorgestel deur Algemene approved by the Surveyor General on 14 November 2005 to be an Plan L.G. No.
    [Show full text]
  • Matjhabeng Nketoana Lejweleputswa District Municipality N1
    Working for integration Dr Kenneth Kaunda District Free State Municipality Maquassi Ngwathe Hills Fezile Dabi Nala District Municipality Moqhaka Matjhabeng Nketoana Lejweleputswa District Municipality N1 Tswelopele Dihlabeng Thabo Mofutsanyane Setsoto District Municipality Tokologo xxxx xxxxMasilonyana Sources: Esri, USGS, NOAA Matjhabeng – Free State Housing Market Overview Human Settlements Mining Town Intervention 2008 – 2013 The Housing Development Agency (HDA) Block A, Riviera Office Park, 6 – 10 Riviera Road, Killarney, Johannesburg PO Box 3209, Houghton, South Africa 2041 Tel: +27 11 544 1000 Fax: +27 11 544 1006/7 Acknowledgements The Centre for Affordable Housing Finance (CAHF) in Africa, www.housingfinanceafrica.org Coordinated by Karishma Busgeeth & Johan Minnie for the HDA Disclaimer Reasonable care has been taken in the preparation of this report. The information contained herein has been derived from sources believed to be accurate and reliable. The Housing Development Agency does not assume responsibility for any error, omission or opinion contained herein, including but not limited to any decisions made based on the content of this report. © The Housing Development Agency 2015 Contents 1. Frequently Used Acronyms 1 2. Introduction 2 3. Context 5 4. Context: Mining Sector Overview 6 5. Context: Housing 7 6. Context: Market Reports 8 7. Key Findings: Housing Market Overview 9 8. Housing Performance Profile 10 9. Market Size 16 10. Market Activity 22 11. Lending Activity 32 12. Leverage 37 13. Affordability Profile 40 14.
    [Show full text]