Priority Project 1: Railway Axis Berlin-Verona/Milano-Bologna-Napoli-Messina-Palermo

Total Page:16

File Type:pdf, Size:1020Kb

Priority Project 1: Railway Axis Berlin-Verona/Milano-Bologna-Napoli-Messina-Palermo Annual Report of the Coordinator Pat Cox Brussels October 2013 Transport TEN-T Trans-European Transport Networks Annual Activity Report 2012-2013 for PriorityProject 1 Railway axis Berlin-Verona/Milano-Bologna-Napoli Messina-Palermo Brussels October 2013 Pat Cox European Coordinator This report only represents the opinion of the European Coordinator and does not prejudice the official position of the European Commission. 2 Priority Project 1: Railway axis Berlin-Verona/Milano-Bologna-Napoli-Messina-Palermo TABLE OF CONTENTS Summary 3 1. Introduction 4 2. State of the project 5 2.1. The Brenner Corridor (Munich - Verona) 5 2.1.1. Brenner Base Tunnel 5 2.1.2. Northern access route 11 2.1.3. Southern access route 12 2.2. Other sections 13 2.2.1. Germany 13 2.2.2. Italy 13 2.3. European Rail Traffic Management System (ERTMS) 14 2.4. Project financing 14 2.4.1. National commitments 14 2.4.2. Cross-financing mechanisms 15 2.4.3. EU commitments 16 2.5. Cooperation frameworks 17 2.5.1. Austria-Italy Intergovernmental Commission (CIG) 17 2.5.2. Brenner Corridor Platform 17 2.5.3. Aktionsgemeinschaft-Brennerbahn - Comunita d'azione ferrovia del Brennero 18 2.5.4. Alpine Convention 19 2.6. Activities of the Coordinator 19 3. Coordinator's mandate 2010-2013 21 4. Outlook 24 Annex 26 European Commission 3 Priority Project 1: Railway axis Berlin-Verona/Milano-Bologna-Napoli-Messina-Palermo SUMMARY With a TEN-T budget allocation of almost €1 billion in the financial perspective 2007-2013, Priority Project 1 Berlin-Palermo is one of the most significant infrastructure projects of the Trans-European Transport Network. PP1 will connect the main economic centres of activity in Northern Europe with those in Southern Europe. The centrepiece of this project 1 is the Brenner Corridor. This section, located between Munich and Verona, crosses the ecologically sensitive Alpine regions which are under constant pressure from the volume of road traffic. Since June 2010, when Pat Cox undertook his role of Coordinator for this project, important progress has been made: • A crucial step for the realisation of the Brenner Base Tunnel was made by the agreement of 18 April 2011 on the total cost for the project of €7460 million (2010 prices). Following this agreement the main construction works on the base tunnel could start. • By June 2013, 27 km of tunnels including 1.4 km of the main tubes, had been excavated, representing more than 10 % of the whole tunnel system. • Despite severe austerity programmes, Austria and Italy committed significant additional funding for the Brenner Base Tunnel to ensure the continuation of this major infrastructure project. • The Lower Inn Valley line, which is part of the northern access route in Austria, went into operation on 9 December 2012. • On the southern access route the planning phase of the mission critical lot Fortezza- Ponte Gardena is about to be completed. • On 15 June 2012, Austria and Germany signed an inter-ministerial agreement for the upgrading of the section between Munich and Kiefersfelden. This agreement allowed the start of the planning process of the important cross-border section. Despite the important progress which has been made on this high capacity rail axis, there are still important issues that need to be tackled. In particular on the northern access route (Munich-Kiefersfelden) and on the southern access route concrete decisions and financial commitments to the planning and the construction still have to be made to secure the necessary progress and EU co-funding. The Coordinator will continue to emphasise the need to make the most of the EU funds, which are available under the current funding decisions and will become available in the future under the new TEN-T policy. Furthermore, the Coordinator will continue to stress the importance of flanking measures, supporting the construction and operation of the infrastructure, and a clear communication strategy, securing the engagement of all stakeholders directly and indirectly involved in this project. As of 2014, PP1 will become an integral part of the Scandinavian-Mediterranean corridor. The more complex temporal, geographical and multi-modal scope of this new corridor will require a different coordination strategy. The major challenges will be to bring together all stakeholders, lead them to concrete results and secure adequate EU co-funding to accommodate progress. European Commission 4 Priority Project 1: Railway axis Berlin-Verona/Milano-Bologna-Napoli-Messina-Palermo 1. INTRODUCTION The 2200 km long high capacity north-south rail axis between Berlin and Palermo is one of the most significant projects of the trans-European transport network (TEN-T). The centrepiece of this Priority Project 1 is the cross-border rail section between Munich and Verona, the so- called Brenner Corridor, including the Brenner Base Tunnel, the northern access route and the southern access route. The Berlin-Palermo rail axis will make an important contribution to a sustainable European transport policy. By constructing a high capacity rail axis the scope of both freight and passenger transport between northern and southern Europe will significantly increase. Also it will deliver an important contribution to reaching the EU's policy goal of achieving modal shift from road to rail. Furthermore, Priority Project 1 will help address some of the key environmental challenges that communities along the line are facing, especially in the ecologically sensitive Alpine regions encompassed by the Brenner Corridor, where the quality of life and environment is under constant pressure from the volume of road traffic. Financially, the strategic significance of Priority Project 1 to the EU's transport infrastructure policy is confirmed by the allocation of almost €1 billion of the TEN-T budget in the financial perspective 2007-2013. Priority Project 1 offers a double added value, especially in this period of economic crisis and budgetary rigour: firstly, it offers a capacity to stimulate and leverage further investment, creates employment and supports the infrastructural industry in the countries and regions along the corridor; secondly, it contributes to the long-term mobility and sustainability objectives of Member States, regions and of the European Union. When undertaking the role of European Coordinator for Priority Project 1 in June 2010, Coordinator Cox declared that he wanted to ensure progress by establishing, first of all, concrete financial capacity in particular for the Brenner Corridor. In this regard, good progress has been made on the Brenner Base Tunnel and the southern access route. During this reporting period Austria and Italy committed significant additional funding for the coming years, despite the fact that both states are undergoing austerity programmes. Moreover, on the Austrian side of the northern access route the new Lower Inn Valley rail between Kundl and Baumkirchen became operational on 9 December 2012. On the German side the preliminary planning process has started. However, no concrete financial commitments have yet been made for the final planning and construction of this part of the line. The next reporting period will be dedicated to the transition from Priority Project 1 Berlin- Palermo to the Scandinavian-Mediterranean Core Network Corridor and to preparing and optimising EU funding for the period 2014-2020 under the multiannual financial framework. In addition to the financing imperative for the various projects, the Coordinator will continue to focus on the progressive identification and development of a comprehensive framework of accompanying policy measures aimed at improving efficiency and sustainable mobility. An important step in this direction was made on 10 June 2013, when the European Union ratified the Transport Protocol of the Alpine Convention. Apart from describing project developments during the reporting period 2012-2013, this report also provides a summary of the Coordinator's first mandate, which started in June 2010 and ended on 22 July 2013. European Commission 5 Priority Project 1: Railway axis Berlin-Verona/Milano-Bologna-Napoli-Messina-Palermo 2. STATE OF THE PROJECT 2.1. The Brenner Corridor (Munich – Verona) The success of Priority Project 1 clearly depends on the realisation of its centrepiece, the Brenner Corridor, which includes the cross-border Brenner Base Tunnel between Innsbruck and Fortezza, the cross-border access route between Munich and Innsbruck, and the southern access route between Fortezza and Verona. The Brenner Corridor is of fundamental importance in terms of transport, economics and ecology. It is needed in order to transfer a significant part of freight traffic from road to rail. The resulting reduction in air and noise pollution will greatly improve the ecological situation and quality of life in the area. Once the new railway line is operational, journey times crossing this part of the Alps will be shorter, freight capacity will be enhanced and thus a bottleneck which is crucial for the entire project will be eliminated. The Brenner Corridor will interconnect the national railway networks that nowadays operate with different systems. The command and control system installed will be ERTMS-II (European Rail Traffic Management System, Level II), compatible at a European level. Realising the Brenner Corridor goes beyond Priority Project 1. Together with the Gotthard- Monte Ceneri axis in Switzerland and the Lyon-Turin rail connection, the Brenner Corridor will link high-capacity rail networks between northern and southern Europe, thus delivering a major contribution to the establishment of the trans-European transport network and to achieving the environmental objectives which are so important for the ecologically sensitive Alpine region. It is clear that the new base tunnel can only add value to the trans-European transport network if access routes north and south of the tunnel can process the same traffic flows. The Coordinator therefore considers the timely completion of the access routes, in parallel with the base tunnel, as one of his main priorities.
Recommended publications
  • Faunistics of Oribatid Mites (Acari, Oribatida) in Dry Grassland Sites in the Eisack Valley (South Tyrol, Prov
    90 (2) · August 2018 pp. 57–70 Faunistics of oribatid mites (Acari, Oribatida) in dry grassland sites in the Eisack Valley (South Tyrol, Prov. Bolzano, Italy) Heinrich Schatz c/o Institute of Zoology, University of Innsbruck, Technikerstr. 25, 6020 Innsbruck, Austria E-mail: [email protected] Received 15 July 2018 | Accepted 21 July 2018 Published online at www.soil-organisms.de 1 August 2018 | Printed version 15 August 2018 DOI 10.25674/8vad-hw64 Abstract Oribatid mites were investigated in five dry grassland sites in the basin around Klausen / Chiusa (South Tyrol). Soil and litter samples were taken from characteristic microhabitats (dry grassland, dry bushland, rocky steppe). A total of 150 oribatid species belonging to 47 families were encountered, most of them closely associated with dry habitats. Gymnodamaeus irregularis Bayar- togtokh & Schatz, 2009 and Liochthonius perelegans Moritz, 1976 are new records for Italy, additional six species are new records for South Tyrol. Two species (Licneremaeus sp., Pseudoppia sp.) could not be identified at species level, possibly they are unde- scribed species. Remarkable species are presented, and their general distribution and habitat requirements pointed out. The possible origin of the oribatid mite species in dry grasslands is discussed, as inferred from the high proportion of ‘mediterranean species’ with distribution centre in South or Southeast Europe. The species assemblages of the different sites and habitats are compared. Keywords Alps | species assemblages | distribution | ecology 1. Introduction The Eisack valley / Valle Isarco around Klausen / Chiusa is favoured by a warm climate and some well- Dry grasslands are unfertilized plant communities in preserved dry grasslands still exist in this area.
    [Show full text]
  • 01 17 a EDITORIALE P 3 a a a a O EDITORIAL R P P P P O O O O MÜNCHEN R R R R E U
    01 17 01 17 2 F F F F O O O O R R R R F TEZZA TEZZA TEZZA TEZZA O AAccAcceecscssesoos s SSouu Sddud BBrreeBnnr ennnee nrrooero R AAccAcceecscssesoos s NNooo Nrrddord EEuuErrooupproaapa TEZZA Accesso Sud Bren nero Accesso Nord Europa / / / / SSüüSddüzzuudllzaauuulaff uf BBrreeBnnrennneenrr er F F F F NNooNrrddozzruudllzaauuulaff uf RA RA RA RA / F Südzulauf Brenner N N N N Nordzulauf RA ZE ZE ZE ZE MÜ MÜ MÜ MÜ N NSF NSF NSF NSF ZE N N N N MÜ NSF E E E E CHE CHE CHE CHE S S S S T T T T N I I I I E E E E NN NN NN NN E CHE BO BO BO BO VERO VERO VERO VERO N N N N S T I SBRUC SBRUC SBRUC SBRUC E L L L L NN TRE TRE TRE TRE BO VERO N ZA ZA ZA ZA N N N N SBRUC N N N N L A A A A N N N N TRE ZA O O O O T T T T N K K K K O O O O / / / / N A N BO BO BO BO O T K O / Z Z Z Z BO E E E E N N N N Z E N 14 4 3 9 7 6 BRENNER-NORDZULAUF: INFOBÜRO INROSENHEIM INFOBÜRO BRENNER-NORDZULAUF: INFOPOINTDIROSENHEIM AL BRENNERO: NORD ACCESSO TALLINN CONFERENCEIN CONNECTING EUROPE TALLINN A CONFERENCE CONNECTING EUROPE EDITORIAL EDITORIALE FRANZENSFESTE–WAIDBRUCK VOR VOR DEM FRANZENSFESTE–WAIDBRUCK ABSCHLUSS ZURZULAUFSTRECKE PLANUNGS- UNDGENEHMIGUNGSPHASE COMPLETATA GARDENAQUASI FORTEZZA–PONTE ACCESSO DI TRATTA DELLA APPROVAZIONE EDI DIPROGETTAZIONE FASE HALBZEIT BEIMBRENNERBASISTUNNEL DELBRENNERO TEMPO PERLAGALLERIA DIBASE DELSECONDO L’INIZIO DERBRENNERBAHN 150-JAHR-JUBILÄUMSFEIER DELBRENNERO ANNI DELLAFERROVIA PERI150 FESTEGGIAMENTO Editoriale Editorial Una visione di Corridoio Eine Korridorbetrachtung ➜ Il programma consolidato di costruzione ➜ Das konsolidierte Bauprogramm für den della Galleria di Base del Brennero e della sua entrata Brenner Basistunnel und seine geplante Inbetriebnahme in servizio nel 2027 costituisce oggi un punto di rife- im Jahr 2027 sind heute der Bezugspunkt für die Planung rimento per la corretta pianificazione degli interventi der Infrastrukturmaßnahmen im SCANMED-Korridor, infrastrutturali lungo il corridoio SCANMED, in parti- insbesondere im Abschnitt zwischen Verona und München.
    [Show full text]
  • Download the History Book In
    GHELLA Five Generations of Explorers and Dreamers Eugenio Occorsio in collaboration with Salvatore Giuffrida 1 2 Ghella, Five Generations of Explorers and Dreamers chapter one 1837 DOMENICO GHELLA The forefather Milan, June 1837. At that time around 500,000 people live in At the head of the city there is a new mayor, Milan, including the suburbs in the peripheral belt. Gabrio Casati. One of these is Noviglio, a rural hamlet in the south of the city. He was appointed on 2 January, the same day that Alessandro Manzoni married his second wife Teresa Borri, following the death of Enrichetta Blondel. The cholera epidemic of one year ago, which caused It is here, that on June 26 1837 Domenico Ghella more than 1,500 deaths, is over and the city is getting is born. Far away from the centre, from political life back onto its feet. In February, Emperor Ferdinand and the salon culture of the aristocracy, Noviglio is I of Austria gives the go-ahead to build a railway known for farmsteads, rice weeders, and storks which linking Milan with Venice, while in the city everyone come to nest on the church steeples from May to is busy talking about the arrival of Honoré de Balzac. July. A rural snapshot of a few hundred souls, living He is moving into the Milanese capital following an on the margins of a great city. Here Dominico spends inheritance and apparently, to also escape debts his childhood years, then at the age of 13 he goes to accumulated in Paris. France, to Marseille, where he will spend ten long years working as a miner.
    [Show full text]
  • COMMISSION of the EUROPEAN COMMUNITIES Brussels, 7.8.2003
    COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 7.8.2003 SEC(2003) 849 COMMISSION STAFF WORKING PAPER ANNEXES TO the TEN Annual Report for the Year 2001 {COM(2003) 442 final} COMMISSION STAFF WORKING PAPER ANNEXES TO the TEN Annual Report for the Year 2001 Data and Factsheets The present Commission Staff Working Paper is intended to complementing the Trans- European Networks (TEN) Annual Report for the Year 2001 (COM(2002)344 final. It consists of ten annexes, each covering a particular information area, and providing extensive information and data reference on the implementation and financing of the TEN for Energy, Transport and Telecommunications. 2 INDEX Pages Annex I : List of abbreviations .....................................................................................................4 Annex II : Information on TEN-T Priority Projects ......................................................................6 Annex III : Community financial support for Trans-European Network Projects in the energy sector during the period from 1995 to 2001 (from the TEN-energy budget line) ......24 Annex IV Progress achieved on specific TEN-ISDN / Telecom projects from 1997 to 2001....36 Annex V: Community financial support in 2001 for the co-financing of actions related to Trans-European Network Projects in the energy sector .............................................58 Annex VI : TEN-Telecom projects financed in 2001 following the 2001 call for proposals .......61 Annex VII : TEN-T Projects/Studies financed in 2001 under Regulation 2236/95
    [Show full text]
  • Baustoffe Erd- Und Tiefbau 2021 PREISLISTE
    2021 Baustoffe Erd- und Tiefbau PREISLISTE Mehr als Beton. Erd- & Tiefbau Baustoffrecycling & Abfallwirtschaft Abbruch- & Rückbauarbeiten Zement & Derivate Mineralische Baustoffe Fertigbeton 2021 Inhalt Sand / Kies / Schotter / Erde / Steine + Transport 3 Beton 5 Spezialbetone 6 PREISLISTE PREISLISTE Leicht- / Isolierbetone 7 Transport und Service für Beton 7 Beton nach Zusammensetzung 8 Zement / Trockenmörtel / Trockenspritzgemisch 8 Zusatzmittel / Betontechnologische Leistungen 9 Baustoffrecycling 10 Regiearbeiten / Abbruch- und Aushubarbeiten 11 Kontaktdaten / Standorte 12 SAND. KIES. SCHOTTER. ERDE. STEINE NATURMATERIAL GEWASCHEN nach UNI EN 12620 und UNI EN 13242 (System 2+) NG Sand 0-4 € 16,00 / t Sand 0-5 (trocken gebrochen) € 16,50 / t Putzsand 0-3 (auf Bestellung) € 16,00 / t Estrichsand 0-5 € 17,00 / t Kies 4-8 / 8-16 / 16-32 € 16,00 / t Kies 2-5 / 5-8 / 8-12 (auf Bestellung) € 17,00 / t Kies 12-16 / 16-22 / 22-32 (auf Bestellung) € 17,00 / t Kies 32-63 (auf Bestellung) € 17,00 / t Schottergemisch (Frostkoffer) 0-8 / 0-16 / 0-32 / 0-63 (Sieblinie A/B) € 17,00 / t Winterstreusplitt 4-8 (trocken gebrochen, auf Bestellung) € 17,50 / t Spezielle Sand- / Kiesgemische auf Anfrage. WEITERES NATURMATERIAL NA Spielsand, Feinsand € 38,50 / t Rundkies gewaschen 16-32 € 42,00 / t Schotter-Grobkies gebrochen 32-63 / 32-200 € 12,50 / t Schotter-Grobkies nicht gebrochen 32-63 € 10,25 / t Kalkschotter 4-8 / 8-16 / 16-32 € 20,00 / t Porphyrschotter 4-8 / 8-16 / 16-32 € 19,00 / t Bindematerial gebrochen 0-32 € 11,25 / t Bindematerial gebrochen 0-80 € 11,75 / t Bindematerial (Kalk) 0-32 € 21,00 / t Felsbruchmaterial € 7,25 / t Auffüllmaterial € 4,75 / t Marmorsplitt / Marmorrundkies braun / schwarz / weiß auf Anfrage Spezielle Schottergemische auf Anfrage.
    [Show full text]
  • Entdecke Mit Mir Das Eisacktal Scopri Con Me La Valle Isarco Let’S Explore the Eisacktal Valley 2 Pfeifer Huisele
    Entdecke mit mir das Eisacktal Scopri con me la Valle Isarco Let’s explore the Eisacktal Valley 2 Pfeifer Huisele Sobald Pfeifer Huisele auftaucht, herrscht Aufregung. Die in Ratschings beheimatete Sagengestalt konnte sich als Zauberer in jedes Wesen verwandeln, egal ob Fliege oder Elefant. Er wurde gefürchtet und als Hexen- meister bezeichnet. Als solcher verursachte er Unwetter und andere Katastrophen, bis der Teufel dem Treiben ein Ende setzte. Heute führt er dich durch das Eisacktal. Action, Spaß und Spannung sind angesagt. Der positive Nebeneffekt: Du lernst ganz nebenbei, was das Eisack- tal an Geschichtlichem, Kulturellem und Kulinarischem zu bieten hat! Non appena arriva Pfeifer Huisele, l’eccitazione è garan- tita. Come mago si poteva trasformare in tutto ciò che voleva, non importa se mosca o elefante. Tutti tenevano paura di lui e veniva chiamato stregone. Come tale cau- sava temporali e altre catastrofi, finché il diavolo non ha posto fine a tutto questo. In tempi passati infestava suo luogo, ma oggi ti accompagna attraverso tutta la Valle Isarco. Azione, divertimento e curiosità sono garantiti. Impara cosa offre la Valle Isarco per quanto riguarda storia, cultura e cucina! 3 Talking about the Pfeifer Huisele causes excitement. As a wizard this fi gure was able to turn into any imaginable character, no matter if elephant or fl y. He was feared by people and was called warlock. He was responsible for storms and other disasters until the devil put an end to it. In the past the Pfeiff er Huisele was making trouble but nowadays he is the one to lead you through the Eisack- tal valley.
    [Show full text]
  • A Hydrographic Approach to the Alps
    • • 330 A HYDROGRAPHIC APPROACH TO THE ALPS A HYDROGRAPHIC APPROACH TO THE ALPS • • • PART III BY E. CODDINGTON SUB-SYSTEMS OF (ADRIATIC .W. NORTH SEA] BASIC SYSTEM ' • HIS is the only Basic System whose watershed does not penetrate beyond the Alps, so it is immaterial whether it be traced·from W. to E. as [Adriatic .w. North Sea], or from E. toW. as [North Sea . w. Adriatic]. The Basic Watershed, which also answers to the title [Po ~ w. Rhine], is short arid for purposes of practical convenience scarcely requires subdivision, but the distinction between the Aar basin (actually Reuss, and Limmat) and that of the Rhine itself, is of too great significance to be overlooked, to say nothing of the magnitude and importance of the Major Branch System involved. This gives two Basic Sections of very unequal dimensions, but the ., Alps being of natural origin cannot be expected to fall into more or less equal com­ partments. Two rather less unbalanced sections could be obtained by differentiating Ticino.- and Adda-drainage on the Po-side, but this would exhibit both hydrographic and Alpine inferiority. (1) BASIC SECTION SYSTEM (Po .W. AAR]. This System happens to be synonymous with (Po .w. Reuss] and with [Ticino .w. Reuss]. · The Watershed From .Wyttenwasserstock (E) the Basic Watershed runs generally E.N.E. to the Hiihnerstock, Passo Cavanna, Pizzo Luceridro, St. Gotthard Pass, and Pizzo Centrale; thence S.E. to the Giubing and Unteralp Pass, and finally E.N.E., to end in the otherwise not very notable Piz Alv .1 Offshoot in the Po ( Ticino) basin A spur runs W.S.W.
    [Show full text]
  • Beschaffung Neue Züge Für Brennerverkehr
    Purchase of new rolling stock for Brenner axis Passenger within the transport chain Conference Vendryne, October, 13 2016 ÖBB-Personenverkehr/Fernverkehr Beschaffung Tag- und Nachtverkehr & Ausweitung Nachtverkehr Lines with need for new rolling stock in 2021 Verbindungen − Munich - Verona − Munich - Venice München − Munich - Bologna Innsbruck Verona Venedig Bologna ÖBB-Personenverkehr/Fernverkehr 2 Beschaffung Tag- und Nachtverkehr & Ausweitung Nachtverkehr ÖBB and DB together established a successfull open access line between Munich and northern Italy • DB/ÖBB EC-trains connect the important agglomerations in Bavaria and Northern Italy • Connections to the nationala high-speed networks in Germany and Italy in Munich and Bologna • All big citys in Germany and Italy are accessible with max. one change of trains Stadt mit DB/ÖBB-EC-Halt 2014 Stadt ohne DB/ÖBB-EC-Halt 2014 (mit 1 x Umsteigen erreichbar) ÖBB-Personenverkehr/Fernverkehr 3 Beschaffung Tag- und Nachtverkehr & Ausweitung Nachtverkehr Which type of train can satisfy the needs of the passengers? (and of the railway untertakings)? Stadt ohne DB/ÖBB-EC-Halt 2014 (mit 1 x Umsteigen erreichbar) ÖBB-Personenverkehr/Fernverkehr 4 Beschaffung Tag- und Nachtverkehr & Ausweitung Nachtverkehr Different traintypes as options available trainset e.g. ÖBB-CityJet Push-pull operation Capacity fixed Homologtion as trainset permanently coupled coaches + driving trailer Push-pull operation Capacity fixed e.g. railjet Not permantly couple coaches + driving trailer Push-pull operation Capacity variable e. g. DB-EC/IC Homologation as single coaches Loco pulled coaches e.g. ÖBB-EC No Push-pull operation Kapazitätsanpassung möglich ÖBB-Personenverkehr/Fernverkehr 5 Beschaffung Tag- und Nachtverkehr & Ausweitung Nachtverkehr Advantages and disadvantages of highfloor and lowfloor Pro Contra Low floor Low floot − Better accessibility (esp.
    [Show full text]
  • View Its System of Classification of European Rail Gauges in the Light of Such Developments
    ReportReport onon thethe CurrentCurrent StateState ofof CombinedCombined TransportTransport inin EuropeEurope EUROPEAN CONFERENCE OF MINISTERS TRANSPORT EUROPEAN CONFERENCE OF MINISTERS OF TRANSPORT REPORT ON THE CURRENT STATE OF COMBINED TRANSPORT IN EUROPE EUROPEAN CONFERENCE OF MINISTERS OF TRANSPORT (ECMT) The European Conference of Ministers of Transport (ECMT) is an inter-governmental organisation established by a Protocol signed in Brussels on 17 October 1953. It is a forum in which Ministers responsible for transport, and more speci®cally the inland transport sector, can co-operate on policy. Within this forum, Ministers can openly discuss current problems and agree upon joint approaches aimed at improving the utilisation and at ensuring the rational development of European transport systems of international importance. At present, the ECMT's role primarily consists of: ± helping to create an integrated transport system throughout the enlarged Europe that is economically and technically ef®cient, meets the highest possible safety and environmental standards and takes full account of the social dimension; ± helping also to build a bridge between the European Union and the rest of the continent at a political level. The Council of the Conference comprises the Ministers of Transport of 39 full Member countries: Albania, Austria, Azerbaijan, Belarus, Belgium, Bosnia-Herzegovina, Bulgaria, Croatia, the Czech Republic, Denmark, Estonia, Finland, France, the Former Yugoslav Republic of Macedonia (F.Y.R.O.M.), Georgia, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Moldova, Netherlands, Norway, Poland, Portugal, Romania, the Russian Federation, the Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Turkey, Ukraine and the United Kingdom. There are ®ve Associate member countries (Australia, Canada, Japan, New Zealand and the United States) and three Observer countries (Armenia, Liechtenstein and Morocco).
    [Show full text]
  • Congress Centrum Alpbach Sustainability Report EN Pdf 2 MB
    Sowing the seeds of sustainability... Congress Centre Alpbach sustainability report Congress Centre Alpbach Alpbach Tourismus GmbH A-6236 Alpbach/Tirol - Austria Tel. +43/5336/600-100, Fax +43/5336/600-200 [email protected] congressalpbach.com/en/ Printed according to the guidelines of the Austrian environmental labelling standards for “printed materials”. 2001 Contents Foreword Alpbachtal Seenland Thanks to its uniform architectural style and fantas- A voyage of discovery / Architecture / tic flower displays throughout the summer, the village Accommodation / Premium partners 4 – 5 of Alpbach has earned itself a global reputation and a whole host of awards such as “Europe’s Most Beautiful Village life / History / Flower Village” and “Austria’s Most Beautiful Village”. Sustainability in the region 6 – 7 The Congress Centre Alpbach is a masterpiece of con- struction and a Green Building that preserves the village’s Population / Overnight stays / unique image while also ensuring maximum energy ef- 2017 Forum participants 8 – 9 ficiency. Having pursued a comprehensive sustainabil- ity strategy since 2010, the Congress Centre Alpbach now serves as a shining example of best practice when it comes to hosting Green Meetings. Read on to learn Efficient more about the framework conditions, fields of activity The CCA 10 – 13 and real-world results of the measures that have been implemented to date as part of the Alpbach Green Meet- ing project. This forward-looking concept has already European Forum Alpbach reached over 140,000 participants at the Congress Cen- The world in a village / tre Alpbach alone, and these crowds in turn serve as vital Scholarship programme / multipliers.
    [Show full text]
  • Tunnels and Underground Cities
    Tunnels and Underground Cities: Engineering and Innovation meet Archaeology, Architecture and Art – Peila, Viggiani & Celestino (Eds) © 2019 Taylor & Francis Group, London, ISBN 978-1-138-38865-9 Brenner base tunnel & Isarco River underpass section: Several technical and operational solutions P. Lunardi Lunardi Geo-Engineering, Milan, Italy G. Cassani, M. Gatti & L. Bellardo Rocksoil S.p.A., Milan, Italy ABSTRACT: The Brenner Base Tunnel is part of the TEN-T SCAN-MED corridor and allows the overcoming as a natural barrier of the Alpine ranges. The Isarco River Underpass represents the southernmost construction lot and links the Brenner Base Tunnel with the existing Brenner line and the railway station in Fortezza. The section will include civil works for the two main tunnels for a total length of roughly 4.3 km, as well as two interconnecting tunnels for a total length of 2.3 km that connect with the existing railway line. Construction will be extremely complex from a technical point of view: both the main tunnels and the interconnecting tunnels will pass under the Isarco River, the A22 motorway, the SS12 motorway and the Verona-Bren- ner railway line with a minimal leeway. The work is scheduled to be completed in 2023. The paper summarizes the design choices made for the construction of the underground works, with specific reference to the construction of the Isarco river underpass tunnels. The excavation will be performed with a very shallow cover, ranging between 5–8 m, very close to the river bed. It will start from shafts on the riverbanks, after ground improvement and soil freezing.
    [Show full text]
  • Das Magazin Der Marktgemeinde Kundl • Oktober 2020
    KUNDLDas Magazin der Marktgemeinde Kundl • Oktober 2020 life Foto: marcomedia An einen Haushalt • Amtliche Mitteilung • P.b.b. Vorwort des Bürgermeisters staltungen genützt werden soll - die den. Der alte Turnsaal wurde bereits dafür benötigte Infrastruktur wurde „entkernt“ und die Bautätigkeiten bereits bautechnisch berücksichtigt. für die Schulküche laufen auf Hoch- touren. Ich freue mich, dass den Erweiterung Haus der Musik / Musik- Schülerinnen und Schülern künftig schule eine moderne, leicht zugängliche Der akute Platzmangel im Haus der Lehrküche zur Verfügung steht. Musik ist schon seit längerem be- kannt. Durch den Abriss der alten Neubau Kletter- und Boulderhalle Volksschule, in der schon seit vielen Für den westlichen Teil des alten Jahren zwei Klassen der Musikschule Mittelschul-Turnsaals sowie den da- untergebracht waren, musste auch ran anschließenden Gebäudetrakt, hier Ersatz geschaffen werden. Das in dem seinerzeit der Schulwart Foto: fotostudio.west.Wörgl Haus der Musik wird nunmehr um wohnte, gibt es ebenfalls eine neue die dringend benötigten Musik- Verwendung: es wird eine Kletter- Liebe Kundlerinnen, liebe Kundler schulräume erweitert und zudem und Boulderhalle errichtet, die zu- wird ein neues Fluchtstiegenhaus künftig vom Alpenverein betrieben Rege Bautätigkeiten prägen derzeit errichtet, um die Sicherheit im werden wird. Die Boulderhalle wird das Ortsbild der Marktgemeinde Brandfall zu gewährleisten. im ehemaligen Turnsaal unterge- Kundl. Der für alle offensichtlichste bracht und bildet eine Einheit mit Neubau ist
    [Show full text]