Together, Writing Stories of Success Engineering Solutions

You’ve heard a lot of stories over the years — some are epic tales of heroism, others are short stories with simple resolutions. The best stories — the type of stories we’d like to write with you — have common elements we can all relate to.

Many stories start the same way — with listening. By listening, we work to strengthen the trust you have placed in our people and technologies over the years. By listening and working together, we achieve the ultimate goal — safe and competitive generation worldwide.

Often the cast of characters is familiar — in this case, it’s our engineering experts. Our combination of Nuclear Steam Supply System (NSSS) engineering and Specialty engineering expertise allows to deliver a total-plant perspective. Plus, we maintain analysis-of-record for approximately one-third of the North American operating plants. So our engineers bring a wide experience base to use in performing analysis for utilities, regardless of the OEM.

There's a common theme to the stories too — great teamwork. Our engineering teams are integrated across all of Framatome’s service offerings. From major projects to component replacements, our engineers deliver project excellence from beginning to end. And our experts have experience collaborating with site teams to meet your plant’s specifi c needs and deliver with operational excellence. We’re listening and writing new stories of success, together.

Our Objective

To provide the best engineering to deliver safe, world-class project performance, total cost certainty, and a partner committed to excellence. We strive for operational excellence by focusing on safety, quality, performance and delivery of innovative products and reliable solutions.

1 Our Engineering Story

The heritage of Framatome engineering traces back to many mergers and acquisitions that strengthened the engineering capabilities of the Framatome brand. Today, the knowledge and skills from the company growth is apparent in the diverse offerings of our engineering organization. Our organization is divided into two areas to support ongoing plant operations, NSSS Engineering and Specialty Engineering. Whether you require engineering support for a design change package or complex nuclear analysis for a fuel transition, Framatome has the experience and staff to understand your issue and translate it into an engineering analysis that provides value to your plant operation.

You probably already have experience with the Framatome engineering workforce. Our engineers not only support other Framatome services such as outages, component repair & replacement, inspection and testing, and fuels, but also perform turnkey engineering in support of our I&C and product businesses. Framatome engineers also support the SGT business activities and provide engineering for the recently acquired ’s Nuclear I&C business. Our engineers are embedded into the value of the Framatome brand.

In the following pages, we present a snapshot of our engineering capabilities while highlighting solutions provided to our customers. We look forward to working with you.

1950s 1989 1996 2001 Babcock Framatome SA BWNT Framatome 2003 & Wilcox acquires B&W changes to ANP/ Acquisition of NPD, forming Framatome merge Eaton Cutler- BWNT Technologies Hammer

2018 NP 1950s 1987 1994 1996/97 2002 becomes Duke Duke SGT DE&S acquires Framatome 2006 Framatome Power Engineering created VECTRA & ANP acquires Framatome & Services Yankee Atomic DE&S and ANP becomes Stearns Roger AREVA NP

1975 Pacific VECTRA NUTECH Nuclear created acquires with NUTECH Impell

2 New NP became Framatome in North America Framatome in January is known as Framatome Inc. was previously New NP 2018 following its sale to: a subsidiary of Our largest Pickering, Ontario AREVA NP % locations are: 75.5 Richland, Wash. EDF Group 19.5% Lynchburg, Va. Charlotte, N.C. Our customers recognize % Mitsubishi our team for safe and 5 Heavy Industries + several other excellent performance. Assystem locations across the continent.

Framatome We employ business 239 4 units: 2,300 have 30+years of Engineering experienced, service In 2017, our employees and Design Authority knowledgeable have contributed approximately and passionate Fuel 945+ people. years of 2,000 hours service Installed of community service directly benefiting nearly Base have 250+ 410 Instrumentation years of organizations and Control service and thousands of individuals.

Since Over time, Framatome and 2010 its predecessor organizations Best of have serviced every nuclear 5 energy facility in the the Best United States. We earned In 2017, we more than supported Nuclear Energy Institute Top Innovative Practice 265 Award winners used Patents 44 Framatome technology. credited to more than Framatome outages at nuclear 400 Inventors energy facilities. in the United States.

3 NSSS Engineering

The story First-of-a-kind solution

Utility Challenge A utility needed baffl e bolt replacements. Due to component aging, the baffl e plates had shifted and a new bolt-by-bolt inspection would cause the plant to miss a license renewal deadline.

Framatome Solution Framatome was stumped on this one. No existing approach would solve the issue. So the team came up with a fi rst-of-a- kind solution — a simplifi ed structural model, paired with a sophisticated statistical analysis that could reliably predict the entire bolt population’s future behavior. In the span of two weeks, Framatome’s team met the challenge and went beyond, working 24-hour Framatome is a full-service provider shifts to develop the solutions, including of NSSS engineering services in the the redesign of a probe, fabricating pressurized water reactor (PWR) and new transducers, upgrading the UT (BWR) markets, instruments, qualifying and deploying the including: new technique and doing inspections in tandem with engineering analysis. • Reload fuel analysis • Safety analysis The Result • Evaluations and analysis of NSSS The team was able to run millions of components and ancillary systems simulations to quickly develop a high level of confi dence to demonstrate the • Design change packages for NSSS structural integrity of the plant’s internals modifi cations and meet the deadline. • Evaluations of plant design bases and accident analysis The Benefi t Best in class at solving emergent issues

4 Risk Informed Engineering

10 CFR 50.69 The story Risk Informed Engineering Programs A new way Safety- Non-safety- related related of thinking

RISC-1 RISC-2 Utility Challenge A plant was spending large amounts of time and money maintaining safety- An estimated 1% of components could be related equipment. 10 CFR 50.69 allows for High Safety categorized as RISC-2 Significance reduced regulatory burden on equipment Low Safety % that is of low safety signifi cance. Significance Up to 75 of components could be categorized Framatome Solution as RISC-3 The plant brought in Framatome to RISC-3 RISC-4 implement a pilot program for 50.69. Using PRA and plant experience, equipment can be re-categorized as low or high safety signifi cance. This As the nuclear industry faces escalating provides greater focus on what truly economic challenges, there are increasing maintains plant safety. Low safety drivers to reduce operating costs while signifi cant equipment can be removed maintaining exceptional nuclear safety. from regulatory programs, and plant- Our clients are looking for cutting-edge controlled treatments can be developed. technology solutions that are safer and more competitive than ever. The Result The process was so successful the Currently, the industry is rethinking plant abandoned the pilot program and operating practices to improve effi ciency launched a full implementation. They and achieve their objectives. In response, are now on the path to increase safety Framatome has teamed with C.R. focus while reducing expensive regulatory Grantom P.E. & Associates, LLC (CRG LLC) oversight. Plus, the Framatome team will to provide services implementing Risk develop alternative treatments for them. Informed Engineering Programs Understanding regulatory rules and staying (10 CFR 50.69) to the nuclear industry. This ahead of the curve is something you can agreement combines Rick Grantom and count on, every day. his team’s extensive industry experience implementing all aspects of 10 CFR 50.69, The Benefi t with the engineering expertise and diverse Improved safety focus and reduced capabilities of Framatome to provide a full-scope solution for our customers. O&M costs for the life of the plant

5 License Renewal/ Subsequent License Renewal

The story Fast delivery

Utility Challenge A utility is extending their operating license from 60 to 80 years. The scope included a very complex update to some reactor vessel materials aging evaluations, as well as Framatome-supplied replacement components. The schedule for the license amendment required a signifi cant amount of work in a very short period of time, including incorporating input from multiple vendors.

Framatome has performed regulatory- Framatome Solution approved design basis and current Framatome assembled its experts, licensing basis validation and many of whom worked on the original reconstitution projects for more than license renewal efforts, to complete one third of U.S. nuclear power plants. Environmentally Assisted Fatigue (EAF) This solid foundation adds insight and evaluations. They also had to update expertise, which have proven invaluable to a complex, multi-variable, regression license renewal (LR)/subsequent license analysis with new data from recent renewal (SLR) clients. surveillance capsule materials testing.

Framatome has been involved in LR The Result activities since the early 1990s and helped Framatome mobilized quickly to formulate the industry’s approach and meet the deadline. The team worked methodology for license renewal. with the utility and the PWR Owner’s Group to complete close to a year’s worth Framatome is dedicated to plant Long of work in only four months, meeting the Term Operation (LTO) with a global customer’s submittal deadline. Completing presence and is familiar with the current a ton of quality work in a hurry? That’s a NRC expectations and industry standards. common story of how we deliver. Framatome has been involved since the initial efforts of the industry to establish The Benefi t a working process for LR, including Past experience applied to your development of the initial and revised future needs Part 54 Rule, NEI 95-10, and the successful Industry Pilot Program at two nuclear sites. 6 Design Change Package Modifi cations

The story The right fi t

Utility Challenge New revisions to a plant’s room heat-up calculations showed that the Auxiliary Feedwater Room Coolers needed to be upgraded. The coolers had been downgraded to non-safety, the new analysis showed that the coolers would now need to be categorized as safety- related. On top of that, the cooler was in a very congested area of the plant.

Framatome Solution Under an EOC agreement, Framatome specifi ed and delivered the upgraded Framatome’s Plant Modifications team is safety-related coolers and designed the dedicated to providing the highest quality plant modifi cation. The design provided for Framatome’s modification packages. the capacity, redundancy and train Our team delivers more than 40 years of separation to meet the requirements plant design and modification experience and restore the plant design basis. The with a spectrum of different nuclear team worked around the clock as the plant designs. In addition, some of our equipment supplier, the architect engineer project experience includes mechanical and the plant’s responsible engineer. and structural analyses, electrical and I&C analyses, BOP modifications, and risk and The Result safety assessments. Working closely with the installation contractor resulted in a smooth Using Framatome’s unique experience replacement, despite tight tolerances in all phases of design and nuclear and overcoming emergent challenges. operation, our Plant Modifications team The plant goals for safety, schedule and can ensure the most cost-effective and budget were met, and a long-standing workable solutions to any operational design basis vulnerability was resolved. issues. The combination of engineering, Being prepared results from listening product and field services capabilities and understanding. allows Framatome to deliver total plant solutions to you. The Benefi t High Quality DCPs across all engineering disciplines

7 Equipment Qualifi cation

The story Integrated for success

Utility Challenge When faced with a potential steam line break, a plant determined that the components in their switchgear room were not rated for the resulting indefi nite 100% humidity environment. This would likely lead to a white fi nding with the NRC. They were pessimistic about their chances of avoiding the fi nding.

Framatome Solution Framatome provides complete solutions The plant had already fi led a License for your seismic, radiological, and/or Event Report with the NRC, so the environmental equipment qualifi cation clock was ticking. The Framatome team issues to ensure continued safe operation performed stress analysis on the steam of your nuclear asset. lines and refi ned the customer’s GOTHIC model. This resulted in a signifi cant Often, costly equipment replacement can reduction in the calculated environmental be avoided through harvesting margins conditions. Then the team procured and between analyzed and actual conditions. tested switchgear equipment to validate it Framatome understands where existing would perform its required function for at margins may exist and has the tools and least 30 minutes at 100% humidity. creativity needed to use these margins to achieve low cost solutions. The Result The team coupled analysis, procurement, As a full service provider, we use the and testing to achieve a solution quickly. subject matter experts and skillsets The solution demonstrated reduced event from electrical, structural, radiological severity. In the end, this avoided a white and thermal hydraulic engineering as fi nding with the NRC. well as former operators and system engineers to provide holistic answers to The Benefi t your questions. As your single point of accountability, Framatome offers turnkey Integrated approach achieved an services from procurement to engineering on-time solution to a challenging and installation. problem

8 Cyber Security

The story Finishing the job

Utility Challenge A utility acquired and installed hardware and software for cyber security. Before the system could be fully confi gured, their expert left the company.

Framatome Solution The utility turned to their Engineer of Choice relationship with Framatome to fi nish the job. Framatome partnered with McAfee and other specialty contractors outside the nuclear industry. We reconfi gured and “hardened” the system Protecting our nation’s energy by applying security updates and the infrastructure is vital to our national correct patches to prevent vulnerabilities security. Framatome provides the and produce a more robust confi guration. most effi cient and effective means to safeguard energy facilities and achieve The Result regulatory compliance. Not only is the utility’s cyber security solution up and running, it’s stronger. And, Framatome delivers a holistic perspective the process for hardening the system was (engineering, regulatory/compliance, standardized for future implementations, cyber/physical), and a pragmatic which created signifi cant time savings. approach through fully leveraging existing Framatome didn’t stop there; we continue protections, a comprehensive suite of to stay involved with the project, solutions and additional technology via implementing updates and providing strategic relationships. Our programs are support. We stand by our work. designed to fully leverage and integrate into existing plant programs, processes The Benefi t and procedures. This will ensure Providing cutt ing-edge solutions adequate protection, meet the regulatory while reducing operational costs requirements most effi ciently and provide opportunities to reduce the on-going operational program costs.

9 Specialty Engineering

The story From start to fi nish

Utility Challenge When a plant decided to replace their feedwater heater, they faced differences between new and old equipment, along with many installation challenges.

Framatome has a dedicated team Framatome Solution supplying engineering services to the Framatome teams provided a full- operating nuclear fl eet in all areas of scope of seamlessly integrated plant systems and components. services. This included the engineering analysis for the changes accounting Our Plant Engineering team has more than for the tight clearances identifi ed by 40 years of plant design and modifi cation metrology, as well as the complicated experience with a spectrum of different rigging requirements. Utilizing previous nuclear plant designs. Along with major experience with large component plant modifi cations, some of our project replacements, the team adapted experience includes mechanical and to emergent challenges to deliver a structural analyses, electrical and I&C comprehensive solution. analyses, fi re protection, and risk and safety assessments. The Result Utilizing seamless integration of a full Using Framatome’s unique experience scope of services, Framatome completed and expertise in all phases of design the feedwater heater replacement. As the and nuclear operation, the Specialty project evolved, a number of challenges Engineering team can ensure the most had to be overcome. In every case, the cost-effective and workable solutions to team quickly and successfully addressed any operational issues. emergent issues. In the end, critical path time was minimized, and the project was To meet dynamic needs throughout a success. At Framatome, we are with the energy industry, the team has you from beginning to end. also been successful in providing engineering integrated with procurement The Benefi t and installation. The combination of engineering, product, installation Diverse expertise in products, support and fi eld services capabilities engineering and fi eld services allows Framatome to deliver total plant engineering solutions to you.

10 I&C Engineering

The story Upgraded reliability

Utility Challenge A utility decided to upgrade their analog I&C system to an entirely digital, safety- related system to address obsolescence reliability issues and reduce costs.

Framatome Solution Framatome was brought in to install the TELEPERM® XS digital control system. From the beginning of the project, Framatome was involved with hardware and software design and development of multiple design change packages. The Framatome team was also the customer licensing agent to support the NRC 50.59 Framatome is committed to offering our rule and conducted the independent customers cost-effective Instrumentation verifi cation and validation (V&V) with the & Controls (I&C) solutions with high software. Lastly, Framatome supported quality and predictability. Our customers the outage for total installation. expect every job to be done right — the fi rst time, on budget and on schedule — The Result and Framatome listens and delivers. In the end, the utility’s new digital system Our customers see the benefi ts of our response times were much quicker and intense engineering training program, more reliable and ongoing operation and as well as project management training maintenance costs were signifi cantly and certifi cation program which reduced. This was the fi rst fully digital assures quality and effi cient execution safety-related system installed in the U.S. of the projects. with a skill set that can be applied to the same or smaller projects. To date, there Recently, Framatome acquired Schneider have been no operational or complaint- Electric’s Nuclear I&C business, related issues with this system. positioning us as a market leader in nuclear automation worldwide. This The Benefi t provides access to I&C platforms like Vertically integrated, turnkey Tricon™, Foxboro DCS, and Spec 200. I&C solutions

11 Data Analytics

The story Predicting the future

Utility Challenge A system analytics modeling challenge was issued by a U.S. nuclear utility. The goal was to reduce operator burden and maintenance costs and improve plant reliability.

Framatome Solution Framatome used N-Vision™ data analytics to automate asset data collection and reporting. The fi rst step of the challenge Framatome has teamed with IBM Watson was to integrate the data from various data IoT to deliver powerful data analytics to sources throughout the plant. Framatome the nuclear industry. N-Vision™ is a fi rst- executed the rare event detection function of-a-kind data analytics service utilizing on six pre-identifi ed events. Using industry-leading business analytics automatic fi ltering, the team developed software. The platform brings together a event detection models. To test the model, core set of dynamic capabilities as well Framatome used data for the event and as analytics applications for energy in one updated any tags as necessary to ensure solution. N-Vision™ enables important accurate detection. operational excellence improvements. Our team stands ready to provide data- The Result driven insight and the best data analytics N-Vision™ was able to process a terabyte of solution for the nuclear industry. information to detect a similar event based on the data. The team received data on a Through its partnership with IBM, potential plant failure one hour earlier than Framatome is helping the nuclear alarm indications. The data was also able to industry take advantage of these explain reasons for alarms and downstream advancements and the data readily consequences of the event. Do we have the available to their organization to establish ability to see into the future? Nope, just a predictive maintenance culture that is another innovative solution. data-driven. We offer the technologies, services and expertise needed to guide The Benefi t your team to more informed solutions. A data-driven predictive maintenance culture

12 Power Uprates

The story The power of relationships

Utility Challenge A utility wanted to increase power generation from a plant. They decided to perform a Measurement Uncertainty Recapture (MUR) and an Extended Power Uprate (EPU).

Framatome Solution Framatome performed both uprates. The MUR installed Leading Edge Flow Meters (LEFM) allowing increased power output. The EPU was more complex — it involved going through the entire plant, system There are many factors that need to be by system, and tackling everything from considered for power uprates, such as licensing to plant modifi cations and fuel burnup, secondary side equipment safety analysis. The best way to get it limitations and the remaining licensed done was working in lock-step with the plant life. Many plants have elected to utility’s uprate team, and Framatome did make major equipment upgrades along just that, dedicating on-site personnel with any of the three uprate types to and thousands of manhours. provide additional output. Improvements in turbines and MSRs can increase a The Result plant’s output by up to 20 MWe. The MUR was completed in just nine months, an industry record, and resulted Framatome has extensive expertise in in an immediate uprate. The EPU resulted all areas of power uprates, which allows in several innovations such as LPI us to focus the engineering where it crosstie and increased power output. counts, while providing broad coverage The real success? The utility and to ensure that overall risks are evaluated Framatome developed relationships that and managed. We offer customers the had everyone working toward a common essential skill sets in electrical, civil, goal, every day. mechanical, and I&C, as well as the experience in nuclear steam supply The Benefi t systems and fuel design, to provide Working together on diffi cult turnkey power uprate services. challenges to fi nd solutions

13 Fire Protection

The story Overcoming our differences

Utility Challenge A utility wanted to move from deterministic fi re protection to a risk- Framatome’s committed and highly informed plan. The scope included experienced Fire Protection group has coordination and management of provided engineering services to the the project as well as information nuclear power industry for more than management across the entire fl eet. 25 years, bringing experience and global capabilities to the majority of the U.S. Framatome Solution fl eet. Finding the right partner. In this case Framatome teamed up with a competitor Framatome’s Fire Protection group has to bring the utility the solution they the expertise to support the nuclear needed. How did competitors work fl eet in resolving issues associated with together? We understood each other’s all aspects of their license-based Fire scope and worked in parallel. Then we Protection Program, whether they retain used peer review to validate the work — the prescriptive 10 CFR 50 Appendix R, or we check their work, and they check ours. transitioned to the 10 CFR 50.48.c NFPA 805 performance-based programs. The Result The utility benefi ts from leveraging the Framatome has extensive experience experience and skill of two vendors. And, in developing classical fi re protection they get a seamless transition of data system analysis/design/implementation as a result. Additionally, a process was as well as on-site support services. developed that can be used going forward With the advent of EPU, NFPA 805 to bring best-in-class Fire PRA solutions risk reduction and license renewal to the entire industry. Now utilities get requirements, Framatome’s Fire higher-quality Fire PRA assessments from Protection group has supported plants in committed partners. We overcame our developing/implementing modifi cations differences and worked together for to protect new transformer installations, mutual benefi t. plant fi re alarm system replacement and incipient detection designs to address The Benefi t the program commitments in a cost- Resourceful cooperation allows us effective manner. to deliver top-notch solutions

14 Seismic Evaluations

The story Focusing on what matt ers most

Utility Challenge A utility was required to re-evaluate seismic at their operating plants following the Fukushima Daiichi accident. The scope included seismic equipment list, seismic walk downs, structure and component fragility analysis, seismic PRA, alternative actions and an industry peer review. The objective was to limit unnecessary plant modifi cations and realistically represent Framatome’s experience includes plant safety. knowledge of the regulatory framework and ASME/ANS Probabilistic Risk Framatome Solution Assessment (PRA) standard, development The best solution would require a diverse of seismic fragilities, integration of the group of industry subject matter experts seismic PRA model into the existing — so that’s what was provided. Bringing internal events PRA model, and active together leaders in seismic hazards, participation in seismic risk evaluation fragility analysis, plant operations and industry meetings. probabilistic risk, the team implemented an approach that iteratively improved Framatome has developed a cost- results and pinpointed concerning effective, integrated and iterative systems, structures and components. approach for seismic risk evaluations They focused on what mattered most, to identify any additional analyses or ensuring costs were providing value. modifi cations early and minimize the duration of the analysis. The Framatome The Result seismic evaluation methodology meets The team provided an assessment that the requirements of Regulatory Guide validated safe operations, met regulatory 1.200, ASME/ANS PRA Standard, and the requirements, achieved a successful peer Seismic Evaluation Guidance (SPID). review and minimized expense on plant modifi cations.

The Benefi t Listening to the customer and achieving their objectives

15 Framatome Nuclear Parts Center

The story Dependable on-time delivery

Utility Challenge Plants need a dependable resource for spare parts. In one instance, an operator needed Velan Gate Valves delivered three months ahead of typical production time.

Framatome Solution Framatome’s Nuclear Parts Center (NPC) jumped into action and traveled to the supplier site to ensure the needed inventory was supplied to meet the outage window — just one example in a 40-year history of providing on-time delivery of high-quality parts to the nuclear industry.

Framatome’s Nuclear Products division The Result is focused on the products and services The NPC stocks approximately 22,000 offered today and new products and parts a year at the Level B storage facility, services to be developed for the future which is ISO 9001 and 18001 certifi ed. in order to deliver innovative and reliable The NPC provides ASME N, NPT, and solutions with the highest quality and NR Certifi cates of Authorization. Their best value in the industry. The Nuclear portfolio has expanded to offer innovative Parts Center (NPC) features a Customer solutions to help utilities with all reactor Inquiry System (www.framatome.com/ types to lower their inventory costs npc) where utilities can connect with while maintaining access to high-quality Framatome 24/7/365 for access to inventory, every day. its extensive spare parts inventory, guaranteed stocking programs, supply The Benefi t chain management and technical 24/7/365 access to an extensive support. The electrical, I&C and mechanical resources in products also inventory of spare parts have expertise in commercial grade dedication, equipment qualifi cation, reverse engineering and strategic product development.

16 The Full Spectrum of Engineering Solutions

Balance of Plant Services Thermal Hydraulics/Performance • Balance of Plant (BOP) Projects • Flow Modeling & Hydraulic Analysis • BOP Engineering, Design, Analysis, Procurement, • Fluid Transient — Hydrodynamic Pipe Loads and Construction • System Water Hammer Evaluation • Complete Procurement Services • Thermal-Hydraulic Analysis including CFD • Decommissioning Modeling • Design Change Packages Electrical/I&C Engineering • Electrical and I&C Services and Products • AC/DC System Design & Analysis — Digital Upgrades • Calculation Conversions • Engineering Field Support • Control Room Design • Field Engineering • Cyber Security and Security Safeguards • General Construction Management Projects • Design Studies • Major Plant Component Replacements • Diesel Generator Engineering • Plant Upgrades • Digital I&C System Analyses: Setpoint, FMEA, • Power Uprates Reliability, Response Time Uncertainty • Radiological, Valve and Condenser Services • Digital Upgrades • Specialized Machining, Welding and Precision • Electrical Calculations & System Analysis (ETAP) Measurements • Evaluation of Changes to Plant Operations • Task Management and Craft Labor • Electrical Load Management • Testing and Turnover • Environmental Qualification • Work Planning & Packages • Human Factors Engineering Civil/Structural • I&C Calculations • Concrete & Steel Design (STRUDL) • I&C System Design • Containment Analysis & Design (ANSYS) • Interface Management • Dynamic Loading (LSDYNA) • Licensing Support • Load Path and Haul Route Evaluations • Modification Package Development • Rigging Evaluations • Plant Process Computer Replacements • Seismic Analysis (SASSI) • Power Systems Modeling (ETAP, etc.) • Seismic PRA — HCLPF Analyses • Qualifi cation of Replacement Parts • Soil Mechanics & Foundations • Repairs to Existing Hardware • SQUG Qualifications • Requirements Specification Development Component & Services Engineering • Security Replacements & Upgrades • Single Point Vulnerability • 3D Modeling and Design Services • Software Quality Assurance (SQA) Plans • 180-Day and Fast Track Reports and Procedures • ASME III and XI Expertise and Consultation • Software Verification and Validation (V&V) • Code Reconciliations • Specifications • Condition Monitoring & Operational Assessments • Temporary Power Design and Evaluation • Degradation Assessments • Voltage Regulation • Design and Equipment Specifications • Heavy Rigging Independent Review and Safety Analysis Consultation • Accident Analysis • Loose Part Analysis • Containment Analysis • Manway/Closure Analysis • Equipment Out of Service (EOOS) Evaluations • NSSS Equipment Repair and Replacement Planning • Justification for Continued Operation (JCOs) • Skip Inspection Determinations • Licensing Support • Stabilization Criteria Documents • Lost Parts Analysis • Steam Generator Consultation • Probabilistic Risk Analysis (PRA) — Including Fire, • Steam Generator Hardware Qualification Seismic • Tube Integrity Engineering • Radiation Shielding Contingency Planning Services • Radiological and Environmental Analysis • Security Modifications • Contingency Plan Drill & Exercises • Site Dose Models • Emergency Preparedness Planning • Transient Analysis • Radiology Drill & Exercise Planning

17 License Renewal & Regulatory Projects Nuclear Analysis • Assessment of Plant CLB, DB, Programs & • Alternative Source Term Technical Support Doc. SSC Scoping, Screens, • Containment & High Energy Line Break Analysis Aging Management • Control Room Habitability • Design Basis Documentation (DBD) • Criticality Analysis • Initial Plant Life Extension Analyses • Dose Assessment • LR Site Implementation Plan Improved Tech Spec • Fluid Transient — Hydrodynamic Pipe Loads • NRC Inspection Review Support • GOTHIC Analysis • Plant Condition Assessments • MCNP, DORT, SCALE, Heating Analysis • Plant Financial Modeling/Analyses • Meteorological & Atmospheric Dispersion Analysis • Risk Informed Engineering Programs • PSA Support Services (10 CFR 50.69) • Radiation Accident & Safety Analysis • Time-Limited License Aging Analysis & License • Radiation Effl uents & Waste Management • Renewal Application Support • Radiation Environmental Monitoring Program • Reliability Improvement Support • Corrective Action Program • Radiation Shielding & Equipment Qualification • Equipment Reliability Studies • Risk-Based Technical Specification Optimization • ISI/IST • Risk-Informed In-Service Inspection • Human Performance Trending • Risk-Informed Procurement • Life Cycle Management • Spent Fuel Characterization • MOV/AOV Programs • Spent Fuel Pool Thermal-Hydraulic Analysis • MOV/Equipment Testing • Transient/LOCA Safety Analysis • Operating Experience Program Structural & Engineering Mechanics • Plant Maintenance Living Program (PMLP) • ASME Equipment & Component Qualification • Plant Maintenance Optimization (PMO) • Attachment Point Response Spectra • Plant Restart Support • AUX Equipment Qualification • Predictive & Preventative Program Assessments • Cavity Pressurization • Reliability Engineering • Crane Assessments • Root Cause Analysis/Support • Drop/Impact Analyses • Single-Point Vulnerability Evaluations • Environmentally-Assisted Fatigue (for all class 1 Mechanical Engineering component) • 10CFR50.71(e) USAR Updating USAR Program • FIV Analysis • ALWR Design • Flaw Handbooks for RCS Components • ASME & B31.1 Piping/Support Design and Analysis • Fluid Transient Load Evaluations • Design Basis Upgrades • Fracture Mechanics, Elastic and Inelastic • Development/Evaluation/Enhancement • High Energy Line Break (HELB) Loading Reduction • Engineering Studies/Cost-Benefit Analysis • Justifications for Continuing Operation of • Insulation Replacement & Modifi cation Equipment • Mechanical Component Engineering • Leak Before Break • Mechanical Systems Engineering • Materials, Environmental Degradation, RV Integrity, • Plant Modifications and Plant Design Modification Specification Development, Material Selection, Packages Failure Analysis • Safety Related Room Coolers • MRP-227 Implementation, Inspection Planning, and • Suction Strainer/Containment Engineering Evaluation • Sump Hydraulic Analysis • Piping Stress Analyses • System Assessments — SSFIs, SSEIs • RCS and NSSS Structural Analysis & Design • System Monitoring/EPRI • Seismic/Dynamic Loading Development & Analysis Fire Protection Engineering • Seismic Qualification of Equipment • Snubber Reduction • Detection/Suppression/Water Supply • Stress Analysis/Finite Element Analysis System Design • Support Analyses (ASME NF) • Fire Barrier Testing and Qualification • Suspended Systems • Fire Safe Shutdown Analysis • Vibration Analysis • NFPA 805 Post Transition Support • Plant Fire Protection Program Support

18 Framatome, previously known as New NP (former subsidiary of AREVA NP), is a major international player in the nuclear energy market focused on designing, building, maintaining and advancing the global nuclear fl eet. In North America, Framatome Inc. combines U.S. and Canadian leadership to deliver innovative solutions and value-added technologies to support the operation of the commercial nuclear fl eet and prepare for the next generation of nuclear power plants. Leveraging the expertise of its 2,300 North American employees, Framatome Inc. is helping its customers improve the safety and performance of their nuclear plants and achieve their economic and societal goals.

Join the energy conversation with Framatome Inc. on Twitter: @FramatomeUS and Facebook: @FramatomeUS.

Framatome is owned by the EDF Group (75.5%), Mitsubishi Heavy Industries (MHI – 19.5%) and Assystem (5%).

Framatome Inc. 3315 Old Forest Road Lynchburg, VA 24501

For more information, contact: Installed Base North America Sales Tel: 704.805.2022 [email protected]

Jeremy Picard Director, Business Development Engineering Tel: 704.805.2613 [email protected] www.framatome.com/us

N-Vision is a trademark of Framatome Inc. TELEPERM is a registered trademark of Framatome Inc. Tricon, Foxboro and Spec-200 are registered tradenames of Schneider Electric. Framatome Inc. Proprietary. The data contained herein are solely for your information and are not to be construed as a warranty or other contractual obligation. ©2018 Framatome Inc. All rights reserved. B_US_715_ENG_07-18