World Bank Document
Total Page:16
File Type:pdf, Size:1020Kb
The World Bank Report No: ISR4433 Implementation Status & Results Bolivia Lake Titicaca Local Sustainable Development (P101426) Operation Name: Lake Titicaca Local Sustainable Development (P101426) Project Stage: Implementation Seq.No: 9 Status: ARCHIVED Archive Date: Country: Bolivia Approval FY: 2008 Public Disclosure Authorized Product Line:IBRD/IDA Region: LATIN AMERICA AND CARIBBEAN Lending Instrument: Specific Investment Loan Implementing Agency(ies): Fondo de Inversion Productiva y Social (FPS), Vice Ministry of Tourism Key Dates Board Approval Date 20-Dec-2007 Original Closing Date 30-Jun-2013 Planned Mid Term Review Date 09-Jul-2012 Last Archived ISR Date 23-Feb-2011 Public Disclosure Copy Effectiveness Date 01-Dec-2008 Revised Closing Date 30-Jun-2013 Actual Mid Term Review Date Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective of the Project is to contribute to local sustainable development in the Recipient's side of the Lake Titicaca watershed. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Public Disclosure Authorized Component(s) Component Name Component Cost Basic Services 9.00 Tourism Support 7.00 Technical Assistance 4.00 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Unsatisfactory Moderately Unsatisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Unsatisfactory Overall Risk Rating Public Disclosure Authorized Implementation Status Overview For technical reasons and those related to disbursement and contract management it was decided to implement the project in two phases: (a) Phase 1 would include (i) the execution by the Vice ministry of Tourism of consultancies that have been contracted up to the date of the supervision mission, the activities of institutional strengthening associated with international markets; and (ii) have the remaining of the components of infrastructure be executed by FPS. The work of the executing unit Public Disclosure Copy of the Vice Ministry of Tourism would be completed by December 31, 2011. This phase will also include the execution by FPS of the 52 subprojects already initiated which would be completed before May 2013. (b) Phase 2 would include (i) the execution by FPS of the consultancy for the design of the water supply, sewerage and wastewater treatment plant of Achacachi and Tiwanaku; Page 1 of 6 Public Disclosure Authorized The World Bank Report No: ISR4433 and (ii) the finalization of the works associated with these studies. Similarly the works outlined in the design studies for water supply, sewerage and wastewater treatment plant of Copacabana, San Pedro, San Pablo de Tiquina and Viacha would be executed by FPS. Locations Country First Administrative Division Location Planned Actual Bolivia Departamento de La Paz Viacha Bolivia Departamento de La Paz Tito Yupamqui Bolivia Departamento de La Paz Tiahuanaco Bolivia Departamento de La Paz Taraco Public Disclosure Copy Bolivia Departamento de La Paz Tacanoca Bolivia Departamento de La Paz Isla del Sol Bolivia Departamento de La Paz San Pedro Bolivia Departamento de La Paz Puerto Perez Bolivia Departamento de La Paz Puerto Acosta Bolivia Departamento de La Paz Pucarani Bolivia Departamento de La Paz Isla Pariti Bolivia Departamento de La Paz Nina Chiri Bolivia Departamento de La Paz Masaya Bolivia Departamento de La Paz Isla de la Luna Bolivia Departamento de La Paz Lacaya Bolivia Departamento de La Paz Kallutaca Bolivia Departamento de La Paz Huarina Bolivia Departamento de La Paz Guaqui Bolivia Departamento de La Paz Desaguadero Bolivia Departamento de La Paz Copacabana Bolivia Departamento de La Paz Catavi Public Disclosure Copy Bolivia Departamento de La Paz Carabuco Page 2 of 6 The World Bank Report No: ISR4433 Country First Administrative Division Location Planned Actual Bolivia Departamento de La Paz Batallas Bolivia Departamento de La Paz Aygachi Bolivia Departamento de La Paz Avicaya Bolivia Departamento de La Paz Ancoraimes Bolivia Departamento de La Paz Achacachi Results Public Disclosure Copy Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Geo-tourism survey ratings for key areas Text Value Copacabana # 53 Not yet measured; will be 65 Islas del Sol y Luna # 49 measured by MTR. 65 Sampaya # 46 60 TSY # 45 60 CKT # 46 60 TKCHAH # 52 65 Pto Perez # 40 55 Tiwanaku # 50 65 TCC - 40 55 Date 20-Nov-2007 10-Jun-2011 30-Jun-2013 Comments Urban Environmental Sustainability Index for Text Value Copacabana # 4 Not yet measured; will be 2 key communities Achacachi # 3 measured by MTR. 2 Tiquina # 4 2 Tiwanaku # 4 2 Viacha - 4 2 Date 20-Nov-2007 10-Jun-2011 30-Jun-2013 Comments Public Disclosure Copy Page 3 of 6 The World Bank Report No: ISR4433 Indicator Name Core Unit of Measure Baseline Current End Target Quality of the State of the Lake Reports Text Value Poor # limited in scope, partial Not yet measured; will be High - Covers all key data, little analysis, and measured by MTR. environmental and social limited policy impact issues, in-depth scientific and policy analysis; serves as the key management document for guiding the management of Lake Titicaca in Bolivia. Date 20-Nov-2007 10-Jun-2011 30-Jun-2013 Comments Public Disclosure Copy Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Number of Tourism Improvement Projects Text Value 0 100 Date 20-Nov-2007 10-Jun-2011 30-Jun-2013 Comments Number of Cultural Heritage Sites Protected Text Value 0 20 Date 20-Nov-2007 10-Jun-2011 30-Jun-2013 Comments Number of Small Business Supported Text Value 0 20 Date 20-Nov-2007 10-Jun-2011 30-Jun-2013 Comments Number of rural towns provided woth improved Text Value 0 20 water and sanitation services Date 20-Nov-2007 10-Jun-2011 30-Jun-2013 Comments 16 in process in the city of Laja Number of Tourism Studies - COMPLETED Text Value 0 4 Date 20-Nov-2007 10-Jun-2011 30-Jun-2013 Comments One additional in progress Number of municipal land-use management Text Value 0 12 Public Disclosure Copy plans Date 20-Nov-2007 17-Jun-2010 30-Jun-2013 Page 4 of 6 The World Bank Report No: ISR4433 Indicator Name Core Unit of Measure Baseline Current End Target Comments 6 in process of being contracted Improved community water points constructed Number Value 0.00 0.00 or rehabilitated under the project Date 20-Nov-2007 10-Jun-2011 30-Jun-2013 Comments New piped household water connections that Number Value 0.00 0.00 are resulting from the project intervention Date 20-Nov-2007 10-Jun-2011 30-Jun-2013 Comments Public Disclosure Copy Number of other water service providers that Number Value 0.00 0.00 the project is supporting Date 20-Nov-2007 10-Jun-2011 30-Jun-2013 Comments Number of people in rural areas provided with Number Value 0.00 0.00 access to Improved Water Sources under the project Date 20-Nov-2007 10-Jun-2011 30-Jun-2013 Comments Number of people in urban areas provided with Number Value 0.00 0.00 access to Improved Sanitation under the project Date 20-Nov-2007 10-Jun-2011 30-Jun-2013 Comments Number of people in urban areas provided with Number Value 0.00 0.00 access to regular solid waste collection under the project Date 20-Nov-2007 10-Jun-2011 30-Jun-2013 Comments Number of cities with adequate solid waste Text Value 0 3 services Date 20-Nov-2007 10-Jun-2011 30-Jun-2013 Comments Designs are being finalized Number of urban communities provided with Text Value 0 0 3-5 adequate wastewater services Date 20-Nov-2007 10-Jun-2011 30-Jun-2013 Comments 3 cities in design Public Disclosure Copy Data on Financial Performance (as of 01-Sep-2011) Financial Agreement(s) Key Dates Page 5 of 6 The World Bank Report No: ISR4433 Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P101426 IDA-43790 Effective 20-Dec-2007 11-Feb-2008 01-Dec-2008 30-Jun-2013 Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P101426 IDA-43790 Effective XDR 12.80 12.80 0.00 1.47 11.33 12.00 Disbursement Graph Public Disclosure Copy Key Decisions Regarding Implementation The Project will be restructured to be implemented in two phases. Restructuring History Level two Approved on 16-Sep-2010 Related Projects There are no related projects. Public Disclosure Copy Page 6 of 6.