References for Investment Projects
Total Page:16
File Type:pdf, Size:1020Kb
REFERENCES FOR INVESTMENT PROJECTS Project title: Modernization of the heating system in a building Loka 16c Client: Municipality Starše Period: September 2014 Position in project: External expert Value of project: 26.000 EUR Description: Investment presents replacement of the existing heating system with the most economical and environmentally-friendly model. With the installation of new heat pumps (area-water) and hopper municipality will reduce expenditure on heating and generate savings in the current state. We prepared feasibility study with CBA. Municipality applied on public tender for energy efficiency 2014. Project title: Modernization of the heating system in a building Loka 16c Client: Municipality Starše Period: September 2014 Position in project: External expert Value of project: 26.000 EUR Description: Investment presents replacement of the existing heating system with the most economical and environmentally-friendly model. With the installation of new heat pumps (area-water), hopper, equipment and materials for functioning of the system and installation of the system municipality will reduce expenditure on heating and generate savings in the current state. We prepared feasibility study with CBA. Municipality applied on public tender for energy efficiency 2014. Project title: Construction of health centre in Rače Client: Municipality Rače-Fram Period: August 2014 Position in project: External expert Value of project: 1.045.000 EUR Page 1 from 24 Description: Municipality will invest in the construction of a new health station. This will represent the acquisition of additional premises for the implementation of health care services from two clinics in five rooms (two family medicine clinic, one reference clinic, laboratory and other related facilities and dental clinic). The total surface area of new health station will be 523,19 m2. We prepare the feasibility study with CBA. Municipality has applied to state co-financing. Project title: Renovation of student’s dorm in Celje. I phase Client: Ministry of Education, Science and Sport Period: June 2014 Position in project: External expert Value of project: 713.226 EUR Description: Renovation of student’s dorm will cover area of 6.768,59 m2. It will contain arrangements of 180 beds which are at disposal for pupils and students. They will be rebuilt to 20 single rooms and 80 double rooms. Renovation will also cover reconstruction of the boiler and replacement of energy source to increase energy savings. We prepare the feasibility study with CBA. Utility regulation of settlements Godešič, Reteče and Gorenja vas Project title: - Reteče Client: Municipality Škofja Loka Period: January 2014 Position in project: External consultant Value of project: 6.339.000 EUR Description: The main purpose is supply of healthy, sanitary, safe drinking water (restoration of older and deteriorated water supply - 7.928 m), and the relevant regulation of discharges wastewater system (6.884 m) to the renovation of existing public lighting (length of 4.150 m with 116 lights). There will be connected 290 households with 864 inhabitants. We prepared the feasibility study and CBA. Municipality has applied to ERDF public tender to get EU financing. Page 2 from 24 Project title: Business education center PRIZMA 50+ Client: City municipality Maribor and Municipality Slovenska Bistrica Period: December 2013 Position in project: External expert Value of project: 498.614 EUR Description: Municipality Maribor and Municipality Slovenska Bistrica will establish equipped and functioning intergenerational, development, business and educational center PRIZMA 50 + (adequate space and technical support for older people and companies in the field of active aging and management of age-diverse workforce). We prepare the feasibility study with CBA. Municipalities have applied to ERDF public tender to get EU financing. Project title: Regulation of water system Jelovec - Srednje Client: City municipality Maribor Period: December 2013 Position in project: External expert Value of project: 611.590 EUR Description: The investment will include construction of 1.600 m of water pipelines, pumping stations »PP Jelovec" and water tank "VH Srednje". Municipality will improve public drinking water supply on the suburban area on the west part of city Maribor. We prepare the feasibility study with CBA. Municipalities have applied to ERDF public tender to get EU financing. Project title: Town center – a comprehensive renovation (Orožnova street 7) Client: City municipality Maribor Period: December 2013 Position in project: External expert Value of project: 1.270.000 EUR Description: The investment of a building Orožnova 7 includes major maintenance work at the facility. Adaptation works are planned - carrying out maintenance work, construction, and installation and finishing works. Improvements following the progress of technology and will not Page 3 from 24 interfere the design of the facility and does not change its capacity, size, intended use and appearance, fixtures and fittings. We prepare the feasibility study with CBA. Utility infrastructure of settlements Stara Loka, Trnje in Vešter – Project title: zone A and zone B Client: Municipality Škofja Loka Period: December 2013 Position in project: External consultant Value of project: 1.031.000 EUR Description: Preparation of feasibility study and CBA. Municipality renovated 2.630 m of drinking water system for 492 inhabitants. They plan to construct 2.785 m of storm sewer, 2.163 m sewage system and connect 492 inhabitants to WWTP Suha. With these investments municipality solved the problems of drinking water supply and of drainage and water treatment in the area. Municipality has applied to ERDF public tender to get EU financing. Construction of secondary sewage system in municipality Starše, Project title: II phase, I stage Client: Municipality Starše Period: December 2013 Position in project: External expert Value of project: 1.091.000 EUR Description: The investment included construction of 2,637 m of sewerage system and three pumping stations. Investment can connect approximately 74 households, representing 220 PE and so finally solved fecal discharges of wastewater. New channels are connected to already construct WWTP Ptuj. We prepare the feasibility study with CBA. Municipality has applied to ERDF public tender to get EU financing. Project title: Reconstruction of the building of the Institute for Ethnic Studies Client: Institute for Ethnic Studies Period: October 2013 Position in project: External consultant Page 4 from 24 Value of project: 1.182.000 EUR Description: Preparation of feasibility study and CBA. Investment represents a complete renovation of the building under the cultural protection conditions. Renovation will include arrangement of mansard and basement area, arrangement of new driveway to the building. The building is old and it needs also energy renovation as far as possible. Project title: Utility infrastructure of settlement Puštal – zone A and zone B Client: Municipality Škofja Loka Period: October 2013 Position in project: External consultant Value of project: 6.172.000 EUR Description: Municipality planed the construction of 3.088 m of storm sewer, 2.984 m of sewage system and connects 459 inhabitants to WWTP Suha. They also plan to renovate 1.650 m of drinking water system for 277 inhabitants. With these investments municipality will solve the problems of drinking water supply and of drainage and water treatment in the area. We prepared the feasibility study and CBA. Municipality has applied to ERDF public tender to get EU financing. Project title: Information and demonstration center Vrbanski plato I. phase Client: City Municipality Maribor Period: September 2013 Position in project: External expert Value of project: 556.000 EUR Description: Municipality Maribor wants to build information and demonstration center on the water coverage Vrbanski plato. One part of investment plans the construction of the center and other part the establishment of different education programs concerning drinking water. We prepared feasibility study. Project title: The establishment of fiber connectivity for institutions in the field Page 5 from 24 of research and education, “IR-OPTIKA” Client: Ministry of Education, Science and Sport Period: July to August 2013 Position in project: External Consultant Value of project: 14.700.000 EUR Description: Ministry for Education, Science and Sport want to establish the fibre connectivity for institutions in the field of research and education to one or more of the total common connection points with the link in the Slovenian academic and educational network - ARNES. Thus, in place of the optical connection will enable ultra-fast links organizations in total closed network ARNES, which means powerful, long-term stable and sustainable communication solutions. We prepared the Feasibility study, CBA and Application form for ERDF funding. Project title: Reconstruction of local road 362041 Cesta na Kumen (2nd part) Client: Municipality Lovrenc na Pohorju Period: May 2013 Position in project: External expert Value of project: 779.000 EUR Description: The reconstruction of local roads represents the rehabilitation of damaged bearing layers of asphalt or swabs of the existing roadway, resurfacing the roadway, arranging drainage, traffic signals and traffic safety equipment, the expansion of the bridge and the regulation of public lighting on sections where it does not exist yet. The length of road reconstruction is 2700 m.